DE452210C - Chamber lock with groups of spar basins offset from one another in terms of height - Google Patents

Chamber lock with groups of spar basins offset from one another in terms of height

Info

Publication number
DE452210C
DE452210C DEP50903D DEP0050903D DE452210C DE 452210 C DE452210 C DE 452210C DE P50903 D DEP50903 D DE P50903D DE P0050903 D DEP0050903 D DE P0050903D DE 452210 C DE452210 C DE 452210C
Authority
DE
Germany
Prior art keywords
basin
chamber
basins
filling
saving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP50903D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HERMANN PROETEL
Original Assignee
HERMANN PROETEL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HERMANN PROETEL filed Critical HERMANN PROETEL
Priority to DEP50903D priority Critical patent/DE452210C/en
Application granted granted Critical
Publication of DE452210C publication Critical patent/DE452210C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • E02C1/02Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass with auxiliary basins
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Description

Kammerschleuse mit in der Höhenlage gegeneinander versetzt angeordneten Gruppen von Sparbecken. Die Kammerschleuse nach der vorliegenden Erfindung bezweckt, die Wasserersparnis, die bei den üblichen Schleusen mit Sparbecken praktisch bis zu etwa 7$ Prozent betragen kann, noch weiter zu steigern. Dazu dienen folgende Vorrichtungen: i. die an sich bekannte Anordnung mehrerer in ihrer Höhenlage gegeneinander versetzt angeordneter Gruppen von Sparbecken, wobei nur zwischen den tiefer liegenden Gruppen von Sparbecken und der Kammerschleuse Abschlußvorrichtungen vorgesehen sind, und die Füllung und Entleerung der Sparbecken durch Öffnen und Abschließen des Zutrittes der äußeren Luft; 2. die Ausnutzung der beim Ausfluß des Wassers aus der Schleusenkammer in die Sparbecken und umgekehrt geleisteten Arbeit zur Erzeugung von Luftverdünnung und Luftverdichtung, wodurch die Füllhöhe in den Sparbecken vergrößert und damit auch die Wasserersparnis vergrößert wird.Chamber lock with offset from one another in the altitude Groups of saving pools. The purpose of the chamber lock according to the present invention the water saving, which is practically up to with the usual locks with saving basins can be up to about $ 7 percent to increase even further. The following are used for this Devices: i. the per se known arrangement of several against each other in their altitude staggered groups of savings basins, with only between the deeper ones Groups of savings basins and the chamber lock closure devices are provided, and the filling and emptying of the savings basin by opening and closing the access the outside air; 2. The utilization of the water outflow from the lock chamber work done in the saving basins and vice versa to generate air dilution and air compression, which increases the fill level in the savings basin and thus the water saving is also increased.

Wenn mit den bekannten übereinanderliegenden Sparbecken einerseits oder bei der bekannten Anordnung der Speichersparbecken in zwei Gruppen mit gegeneinander versetzter Höhenlage andererseits eine gesteigerte Wasserersparnis erzielt werden soll, muß die Anzahl der Sparbecken groß gewählt werden: nach der bisher bekannten Ausführungsweise werden dazu auch eine grolle Anzahl von Absch lußvorriclittu1geii (Schützen oder Ventilen) und Füllschächten erforderlich, die nicht nur große Kosten erfordern, sondern auch \-eranlassung zu Undichtirkeiten und Wasserverlust geben.If with the well-known superimposed savings basins on the one hand or with the known arrangement of the storage tanks in two groups with one another offset altitude, on the other hand, increased water savings can be achieved should, the number of savings basins must be chosen large: after the previously known Execution method There are also a large number of closing devices for this purpose (Guards or valves) and filling shafts required, which are not only great costs require, but also give rise to leaks and water loss.

Dies wird dadurch vermieden, claß nur die Becken der tiefer liegenden Gruppe zwecks Fülluni und Entleerung in üblicher Weise durch Verschlußvorrichtungen, Füllschacht und Umlauf finit der Schletisenkanimer verbunden sind, während die Becken der höher liegenden Gruppe durch offene Füllschlitze finit Gien ersteren in \-erbincitui- stehen und (lau jedes Becken durch Rollre mit der Außenluft zu verbinden oder von ihr abschließbar ist. Ferner sind zur '\-ei-gr?ißerulig der Wirkung als weitere Ausführungsform über den Sparbecken zwei zur Erzeugung von verdichteter und verdünnter Luft bestimmte Hilfskammern vorgesehen, von deren meckere Rohre ausgehen, die mittels eines Rohres mit den Sparbecken und mittels eines Ruhres niit der Außenluft zu verbinden sind.This is avoided by only using the pelvis of the lower lying ones Group for the purpose of filling and emptying in the usual way through locking devices, Filling shaft and circulation are finitely connected to the Schletisenkanimer, while the basin of the higher lying group through open filling slits finitely Gien the former in \ -erbincitui- stand and (lukewarm to connect each pool with the outside air by rollre or from it is lockable. Furthermore, to the '\ -ei-gr? Ißerulig the effect than further Embodiment over the savings basin two for the production of compressed and diluted Air certain auxiliary chambers are provided, from whose crappy pipes go out, which means a pipe with the saving basin and by means of a stirrer with the outside air are.

In der Zeichnung ist die Erfindunf- in zwei Ausführungsbeispielen dargestellt. Abb_ i zeigt einen Querschnitt einer Kam; nierschIense in der einfacheren Anlage ohne Hilfskaminerli.In the drawing, the invention is in two exemplary embodiments shown. Fig_ i shows a cross section of a chimney; nierschIense in the simpler one System without auxiliary chimney.

Abb. 2 und 3 sind Querschnitte finit Hilfskammern.Fig. 2 and 3 are cross-sections of finite auxiliary chambers.

In Abb. i sind nur die Becken b, und b.. mit Abschlußvorrichtungen z, versehen, die, wie üblich, in den Verbindungsschacht w eingebaut sind, der' zu dem Umlauf ic führt. Der Umlauf fit ist finit vier Schleusenkammer durch Stichkanäle t in offener Verbindung. Dagegen wird das Becken b, aus dem Bekken b, und .das Becken b3 aus dem Becken b., gefüllt und geleert. Zu diesem Zwecke stehen die Becken durch stets offene gekrümmte Schlitze s miteinander in Verbindung. Die Füllung und Entleerung geschieht durch üitnen und Absperren der Verbindung mit der Außenluft. Es führt nämlich von der Decke des Beckens 6l das Rohr r zur Decke des Beckens b,; in dieses Rohr ist der Dreiwegelialin z eingebaut, durch den die Verbindung beider Becken mit der Außenluft leergestellt und abgeschlossen werden kann.In Fig. I, only the basins b, and b .. with closing devices z, which, as usual, are built into the connection shaft w, the 'to the circulation ic leads. The circulation fit is finite four lock chambers through branch channels t in open connection. In contrast, basin b, basin b, and .the basin b3 from basin b., filled and emptied. For this purpose, the pools stand through always open curved slots s in connection with each other. The filling and emptying is done by opening and shutting off the connection with the outside air. It leads namely from the ceiling of the basin 6l the pipe r to the ceiling of the basin b; in this The three-way line is built into the pipe, which connects the two basins can be emptied and closed with the outside air.

Soll nun bei der Entleerung der Schleusenkaninier zuerst das Becken b1 gefüllt werden, so wird zunächst mittels des Dreiwegeliahns s das Becken b1 gelüftet, b, aber von der Außenluft abgeschlossen, dann wird das Ventil v geöffnet. Da aus dein Becken b, die Luft nicht entweichen kann, kann Wasser nicht eintreten, clagegen strömt es durch den Schlitz s in das Becken b1. Wenn b1 gefüllt ist, braucht der Hahn w nur so gestellt zu werden, claß nunmehr b, abgeschlossen und b_ gelüftet wird, dann füllt sich b,, während aus b, wegen nianl;elnder Lüftung nichts ausfließen kann. `ach Beendigung der Fiilltilih von b., wird auch dieses Becken von clei- Luft abl;eschlossen, dann wird das Ventil v geschlossen, unc1 hierauf kann clie Füllhin- von b3 und b4 in derselben Weise vorgenommen werden.Should now the basin first when emptying the lock channels b1 are filled, the basin b1 is first ventilated by means of the three-way elevator, b, but closed off from the outside air, then valve v is opened. From there your basin b, the air cannot escape, water cannot enter, on the other hand it flows through the slot s into the basin b1. If b1 is filled, it needs Hahn w to be placed only in such a way, now b, locked and b_ vented then b, fills up, while from b, nothing flows out due to poor ventilation can. After completion of the filling of b., this basin also becomes of clei air closed, then the valve v is closed, unc1 then the filling can of b3 and b4 can be done in the same way.

Bei Entleerung der Sparhecken und Fül-Iting der Schleusenkaininer ist der Vorgang entsprechend umgekehrt. Auf diese Weise lassen sich alle Sparbecken in richtiger Reilienfolge füllen und entleeren, obwohl nur die eine Gruppe mit VerschIußvorrichtungrn V ausgerüstet ist; es ist dabei lediglich die Lüftung mittels des verhältnismäßig dünnen Rohres ä- und des Hahnes z in der beschriebenen Weise zu regeln. Dieses Rohr finit Dreilv egehalin ist in Abb. i der Deutlichkeit wegen mir für die Becken b1 und b, gezeichnet.When emptying the hedges and filling the Schleusenkaininer the process is reversed accordingly. In this way, all savings basins Fill and empty in the correct sequence, although only one group has a locking device V is equipped; it is only the ventilation by means of the proportionate thin tube ä- and the cock z to regulate in the manner described. This pipe finite Dreilv egehalin is in Fig. i for the sake of clarity for the basin b1 and b, drawn.

Die vorliegende Erfindung bezweckt aber noch eine weitere Steigerung der Wasserersparnis dadurch, daß die beim Überströmen des Wassers, aus der Schleusenkammer in die Sparbecken oder unigekehrt geleistete Arbeit teilweise zur Vergrößerung der Füllhöhe iii den Sparbecken ausgenutzt wird.The present invention aims at a further improvement the water saving due to the fact that when the water flows over from the lock chamber in the savings basin or the work done in reverse, partly to increase the Filling level iii the saving basin is used.

Die zu diesem Zwecke getroffene Einrichtung wird durch Abb.2 erläutert. Zum leichteren Verständnis sind dort zunächst nur einfache Sparbecken B1 und B., gezeichnet. über dem obersten Sparbecken Bi sind noch zwei geschlossene Kammern 0 und L- angeordnet, die durch das von dein Boden von 0 ausgehende und bis nahe an den Boden von U reichende Rohr f verbunden sind. Ztiniichst ist U mit Wasser gefüllt, 0 leer. Von der Decke der Kammer U ist das Luftrohr rt, geführt, von der Decke der Kammer 0 das Luftrohr r" und von der Decke des Sparbeckens B, das Rohr r6 ; diese drei Rohre sind mit einem vierten Rohrstück rl, das zur Außenluft führt, zu dem V ierwegehahn zusammengeführt.The setup made for this purpose is illustrated by Fig.2. To make it easier to understand, only simple savings basins B1 and B. are shown there. Above the uppermost savings basin Bi, two closed chambers 0 and L- are arranged, which are connected by the pipe f starting from the bottom of 0 and reaching close to the bottom of U. At first U is filled with water, 0 empty. From the ceiling of chamber U is the air pipe rt, led from the ceiling of chamber 0 the air pipe r "and from the ceiling of the spar basin B, the pipe r6 ; these three pipes are connected to a fourth pipe section rl, which leads to the outside air, merged into the four-way valve.

Es soll nun das NVasser des Teiles A1 der Schleusenkammer in das Sparbecken Bi übergeführt werden. Anfangs beträgt, wenn das Becken Bi leer und der Kammerteil A1 ganz gefüllt ist, der Überdruck h. Wird nun (las Sparbecken Bi, das von der Außenluft abgeschlossen ist, mittels der Rohre r6 und rfl mit dein Becken LT verbunden, so tritt beim Füllen des Sparbeckens BL die Luft aus diesein in die Kammer U über und drückt das darin enthaltene Wasser mittels des Rohres f in die darüber liegende Kammer 0. Dieses Überdrücken dauert so lange, bis der Wasserstandsunterschied e zwischen der abgesenkten Schleusenkammer und dem teilweise -efüllten Sparbecken gleich dem Wasserstandsunterschied ; zwischen der geleerten Kammer t% und der gefüllten hannner 0 ist. Alsdann wird das Rohr r" abgeschlossen, das Rohr rb dagegen iiiit der Außenluft verbunden. Dann strömt das Wasser aus der Schleusenkammer weiter in das Sparbekken B1 über, bis sich der M-asserstand in bei-den in der Linie i-i ausgespiegelt hat. jetzt wird der noch mit Luft gefüllte Teil des Beckens B1 mittels der Rohre rb und r" mit dein oberen Teil der Kammer 0 verbunden, und außerdem wird das Rohr r" mit der Außenluft in Verbindung gebracht. Dadurch fließt das U'asser der Kammer 0 in die kamnier Z' zurück, und es entsteht in 0 eine Luftverdünnung. so daß durch die Rohre ro und rb die Luft aus dem Becken B1 abgesaugt wird, wodurch weiteres Wasser aus der Schleusenkammer in das Becken Dl übertritt. Es steigt zur Linie c-c, während es in (ier Schleusenkammer bis zur Linie d-d absinkt, so daß zuletzt der Wasserstand in dem Becken B1 um das Maß k höher steht als in_ der Schleusenkammer.The N water of part A1 of the lock chamber is now to be transferred into the savings basin Bi. At the beginning, when the basin Bi is empty and the chamber part A1 is completely filled, the excess pressure is h. If (read the spar basin Bi, which is closed off from the outside air, is connected to your basin LT by means of the pipes r6 and rfl, then when the spar basin BL is filled, the air from it passes into the chamber U and presses the water it contains by means of the Tube f into chamber 0 above it. This overpressure lasts until the water level difference e between the lowered lock chamber and the partially filled saving basin equals the water level difference; between the emptied chamber t% and the filled hannner 0. Then the tube r "closed, the pipe rb, on the other hand, is connected to the outside air. Then the water flows from the lock chamber further into the Sparbekken B1 until the water level in both is reflected in line ii. Now it is still with air The filled part of the pool B1 is connected to the upper part of the chamber 0 by means of the pipes rb and r ", and the pipe r" is also used in connection with the outside air eight. As a result, the water in chamber 0 flows back into chamber Z ', and air is diluted in 0. so that the air is sucked out of the basin B1 through the pipes ro and rb, whereby more water passes from the lock chamber into the basin Dl. It rises to line cc, while in (ier lock chamber it sinks to line dd, so that finally the water level in basin B1 is higher by the amount k than in the lock chamber.

Im unigekehrten Falle, beim Entleeren der Sparhecken und Füllen der Schleusenkaniiner, wird (las =@nfangsgefälle zwischen Sparbecken und Schleusenkammer benutzt, um Wasser aus der Kammer U in die Kammer 0 zu saugen. Dann wird nach erfolgter Ausspiegelung zwischen Sparbecken und Schleusenkammer das Wasser aus der Kamnier 0 nach der Kammer U zurückgeleitet und die dabei in U erzeugte Druckluft benutzt, uni (las Wasser aus dem Sparbeckcn hinauszudrücken, so daß der Wasserstand in der Schleusenkammer über denjenigen im Sparbecken hinaussteigt. Durch die beschriebene l@inrichtung kann ein größerer Teil des \N' assers der Schleusenkammer in die Sparbecken übergeleitet und bei Füllung der Schleusenkammer wieder zurückgeleitet werden, als es mit gewöhnlichen offenen S S parbecken mögich 1 ist. Die beiden Kammern 0 und V können nacheinander für die Füllung und Entleerung aller Sparbecken B benutzt werden, sind also nur einmal erforderlich. Zur Verbindung der Lufträume sind die vier Rohrstränge rb, r",-r" und rl, die in dem Vierwegehalin z zusammengeführt sind, für jedes Sparbecken erforderlich. Sie sind in Xbb. 2 jedoch der Deutlichkeit wegen nur für das Becken B, gezeichnet.In the unreversed case, when emptying the savings hedges and filling the lock canals, the initial slope between the savings basin and the lock chamber is used to suck water from chamber U into chamber 0 the chamber 0 is fed back to the chamber U and the compressed air generated in U is used to push the water out of the spar basin so that the water level in the lock chamber rises above that in the spar basin \ N 'ater of the sluice chamber into the saving basins transferred and are fed back again when filling the lock chamber than it parbecken with ordinary open SS is mögich. 1 the two chambers 0 and V can be successively B are used for the filling and emptying of all saving basins, are therefore only required once. To connect the air spaces, the four pipe strings r b, r ", - r" and rl, which are merged in the four-way halo z, are required for each saving basin. You are in Xbb. 2, however, only for basin B, drawn for the sake of clarity.

Der Vorgang beim Entleeren der Schleusenkaininer und Füllen eines Sparbeckens ist also folgender: Zuerst wird rb mit r" verbunden; nach Gberdrücken des Wassers aus U nach 0 wird abgeschlossen und rb mit r1 verbunden; nach Ausspiegelung zwischen der Schleusenkainnier und den Sparbecken wird r" mit rb verbunden und endlich r" mit rb. Sobald dann das Sparbecken B1 ganz gefüllt ist, wird rb abgeschlossen. Alsdann stehen die Kammern 0 und U zur Füllung des nächsten Sparbeckens bereit. Beim Entleeren des Sparbeckens und Füllen der Schleusenkammer sind die Vorgänge entsprechend umgekehrt.The process when emptying the Schleusenkaininer and filling a saving basin is as follows: First rb is connected with r " ; after pushing the water from U to 0 it is terminated and rb is connected with r1; after mirroring between the Schleusenkainnier and the saving basin, r" becomes with rb connected and finally r " with rb. As soon as the saving basin B1 is completely filled, rb is closed. Then chambers 0 and U are ready to fill the next saving basin. When emptying the saving basin and filling the lock chamber, the processes are reversed accordingly.

In Abb. 3 ist ein Querschnitt der Gesamtanordnung einer Schleuse mit allen beschriebenen Spareinrichtungen dargestellt. Die Sparbecken sind in bekannter Weise in zwei Gruppen angeordnet; über dem obersten Sparbecken sind die Kammern 0 und U untergebracht. Von jedem Teilbecken führt ein Rohrstrang rb zu dem Hahn z, mittels dem eine Verbindung entweder- durch den Rohrstrang r" mit der Kammer U -oder durch den Rohrstrang r. mit der Kammer 0 oder durch den Rohrstrang r, mit der Außenluft eingeschaltet werden kann. Der Deutlichkeit halber sind auch in der Abb. 3 nur die Rohrleitungen der Kammer b1 dargestellt. 'Mit diesen Einrichtungen kann eine @Vasserersparnis von mehr als 9o Prozent der Schleusenfüllung erzielt werden.In Fig. 3 is a cross section of the overall arrangement of a lock with all described savings facilities shown. The saving pools are well known Way arranged in two groups; The chambers are located above the uppermost savings basin 0 and U housed. A pipe string rb leads from each sub-basin to the tap z, by means of which a connection either through the pipe string r "with the chamber U -or through the pipe string r. with the chamber 0 or through the pipe string r, with the outside air can be switched on. For the sake of clarity are also in the Fig. 3 only shows the pipelines of chamber b1. 'With these facilities can achieve a @water saving of more than 90 percent of the lock filling will.

Claims (2)

PATENT ANSPRÜCIIL' i. Kammerschleuse mit in der Höhenlage gegeneinander versetzt angeordneter. Gruppen von Sparbecken, dadurch gekennzeichnet, daß die Becken der tiefer liegenden Gruppe (b_, b,) zwecks Füllung und Entleerung durch Verschlußvorrichtungen (v), Füllschacht (w) und Umlauf (u) mit der Schleusenkammer verbunden sind, während die Becken der höher liegenden Gruppe (bi, b3) durch offene Füllschlitze (s) mit der ersteren in Verbindung stehen und daß jedes Bekken durch Rohre (r) mit der -Außenluft zu verbinden oder von ihr abschließbar ist. PATENT CLAIM i. Chamber lock with offset from one another in the altitude. Groups of saving basins, characterized in that the basins of the lower group (b_, b,) are connected to the lock chamber for the purpose of filling and emptying by closing devices (v), filling shaft (w) and circulation (u), while the basins of the higher lying group (bi, b3) are connected to the former through open filling slits (s) and that each pool can be connected to the outside air by pipes (r) or can be locked from it. 2. Kammerschleuse nach dem Anspruche i, gekennzeichnet durch zwei zur Erzeugung von verdichteter und verdünnter Luft bestimmte Hilfskammern (0) und (U), von deren Decken Rohre (r,) und (r") ausgehen,. die mittels eines Rohres (rb) mit dem Sparbecken (b1) und mittels eines Rohres (r1) mit der Außenhift zu verbinden sind.2. Chamber lock according to the claim i, characterized by two for the generation of compressed and diluted air certain auxiliary chambers (0) and (U), from whose ceilings pipes (r,) and (r ") extend. which by means of a pipe (rb) with the saving basin (b1) and by means of a pipe (r1) are to be connected to the outer shift.
DEP50903D 1925-07-10 1925-07-10 Chamber lock with groups of spar basins offset from one another in terms of height Expired DE452210C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP50903D DE452210C (en) 1925-07-10 1925-07-10 Chamber lock with groups of spar basins offset from one another in terms of height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP50903D DE452210C (en) 1925-07-10 1925-07-10 Chamber lock with groups of spar basins offset from one another in terms of height

Publications (1)

Publication Number Publication Date
DE452210C true DE452210C (en) 1927-11-07

Family

ID=7384718

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP50903D Expired DE452210C (en) 1925-07-10 1925-07-10 Chamber lock with groups of spar basins offset from one another in terms of height

Country Status (1)

Country Link
DE (1) DE452210C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1244667B (en) * 1957-09-16 1967-07-13 Hochtief Ag Hoch Tiefbauten Savings lock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1244667B (en) * 1957-09-16 1967-07-13 Hochtief Ag Hoch Tiefbauten Savings lock

Similar Documents

Publication Publication Date Title
DE2410107C3 (en) Washer with condenser
DE452210C (en) Chamber lock with groups of spar basins offset from one another in terms of height
DE1800204A1 (en) Drainage pot for fuel gas lines
DE673751C (en) Device for taking oil samples from power machines
DE803255C (en) Pipe connection between waste pipe and socket piece of the sewer system
AT235757B (en) Device for rapid lock at double locks
DE347679C (en) Economy sluice with siphon operation
AT43122B (en) Flap weir to protect against flood damage and to utilize the fertilizing effect of floods.
DE550533C (en) Device for producing soap foam
DE3345582A1 (en) Water reservoir, in particular for a softener device in dish-washing machines
DE534985C (en) Feed water purifier
DE904758C (en) Underwater tank made of concrete to hold oil, gasoline and other fuels
DE909920C (en) Tidal power station with constant inflow to the turbines
AT158698B (en) Cinema device with circulating oil.
DE952413C (en) Tanker with pipeline network for loading and unloading
DE441293C (en) Method and apparatus for mixing pulp and bleaching liquid in tower bleachers
DE642788C (en) Device for reducing the groundwater upwelling that occurs when emptying shipping and works canals
DE616156C (en) Process for the production of pulp from pulp-containing fiber material
DE638746C (en) Device for securing distillery equipment against unauthorized removal of brandy
DE556125C (en) Condensate steam jet pump
DE50791C (en) Innovation in water level indicators with valves that close automatically when the glass breaks
DE509220C (en) Borehole pump with double acting piston
DE364525C (en) Water tube boiler
DE640944C (en) Portable high pressure acetylene generator based on the displacement principle
DE747184C (en) Process for the recovery of the SO gases contained in the waste liquors from sulphite pulp cookers