DE4310468B4 - Hardware for scaffolding planks of scaffolding - Google Patents
Hardware for scaffolding planks of scaffolding Download PDFInfo
- Publication number
- DE4310468B4 DE4310468B4 DE19934310468 DE4310468A DE4310468B4 DE 4310468 B4 DE4310468 B4 DE 4310468B4 DE 19934310468 DE19934310468 DE 19934310468 DE 4310468 A DE4310468 A DE 4310468A DE 4310468 B4 DE4310468 B4 DE 4310468B4
- Authority
- DE
- Germany
- Prior art keywords
- scaffolding
- sheet metal
- metal housing
- planks
- fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/151—Platforms made of wood, with or without reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/158—Platforms supported by spigots which engage through holes in the platform
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Tents Or Canopies (AREA)
- Finishing Walls (AREA)
Abstract
Beschlag für Gerüstbohlen von Baugerüsten, bestehend aus einem kastenförmigen Blechgehäuse, welches die Endabschnitte der Gerüstbohlen allseitig umschließt und an diesen befestigt ist, dadurch gekennzeichnet, daß das Blechgehäuse (1) als Tiefziehteil ausgebildet ist.fitting for scaffolding planks scaffolding, consisting of a box-shaped Metal housing, which surrounds the end sections of the scaffold planks on all sides and on this is fixed, characterized in that the sheet metal housing (1) is designed as a deep-drawn part.
Description
Die Erfindung betrifft einen Beschlag für Gerüstbohlen von Baugerüsten, bestehend aus einem kastenförmigen Blechgehäuse, welches die Endabschnitte der Gerüstbohlen allseitig umschließt und an diesen befestigt ist.The The invention relates to a fitting for scaffolding planks of scaffolding, consisting from a box-shaped Metal housing, which surrounds the end sections of the scaffold planks on all sides and on this is attached.
Die nach dem Stande der Technik üblichen Gerüstsysteme verwenden als Gerüstbelag meistens Gerüstbohlen aus Holz. Diese Gerüstbohlen aus Holz werden in bestimmten Breiten und Längen hergestellt und als tragende Elemente sowie als Halteelemente zwischen mit Abstand zueinander angeordneten Vertikalrahmen fixiert. In Verbindung mit Verstrebungen und anderen Bauteilen müssen die Gerüstbohlen große Schub- und Zugkräfte sowie vertikale Kräfte aufnehmen, die in dem fachwerkähnlich erstellten Baugerüst wirken. Zur Aufnahme und Einleitung dieser Kräfte in die Gerüstbohlen und zum Kantenschutz sind an den Stirnseiten der Gerüstbohlen die Beschläge der eingangs genannten Art befestigt. Ein solcher Beschlag ist beispielsweise in dem DE-Zulassungsbescheid des Instituts für Bautechnik, Berlin, 30. April 1982, Anlage 25, für Firma Layher offenbart.The conventional scaffolding systems according to the state of the art use as scaffolding mostly scaffolding planks wooden. These scaffolding planks made of wood are produced in certain widths and lengths and as bearing Elements as well as holding elements between at a distance fixed vertical frame fixed. In conjunction with struts and other components the scaffolding planks size Push and pull forces as well as vertical forces record in the truss-like created Scaffolding Act. For receiving and introducing these forces into the scaffolding planks and for edge protection are on the front sides of the scaffold planks the fittings attached the type mentioned. Such a fitting is for example in the DE-certificate of approval of the Institut für Bautechnik, Berlin, April 30th 1982, Appendix 25, for Company Layher discloses.
Handelsübliche Beschläge bestehen gewöhnlich aus einem Stahlblechzuschnitt, der kastenförmig entsprechend der Breite und Dicke der Gerüstbohle gebogen ist und dessen einander überlappende Seitenteile miteinander verschweißt sind.Commercially available fittings exist usually from a sheet steel blank, the box-shaped according to the width and thickness of the scaffold board is bent and its overlapping one another Side parts are welded together.
Diese Beschläge haben sich in der Praxis zwar gut bewährt, erfordern aber einen verhältnismäßig großen Aufwand für die Herstellung und Anbringung. Darüber hinaus ergeben sich bisweilen Festigkeitsprobleme im Bereich der punktgeschweißten Überlappungen der Blechgehäuse, die den häufig auftretenden starken mechanischen Belastungen der Gerüstbohle nicht immer standhalten. Schließlich sind in den Bereichen der sich überlappenden Seitenteile die Wandungen des Blechgehäuses zwangsläufig verhältnismäßig dick, so daß sie die Außenkontur der Holzbohle überragen. Letzteres läßt sich nur dadurch vermeiden, daß die Holzbohle im Anbringungsbereich des Endbeschlages vor dessen Anbringung entsprechend abgearbeitet wird. Auch hierdurch entsteht ein beträchtlicher Arbeitsaufwand bei der Anbringung.These Forged Although have proven themselves in practice, but require a relatively large effort for the Production and installation. About that In addition, there are sometimes strength problems in the area of spot welded overlaps the sheet metal housing, the most common strong mechanical loads of the scaffold board can not always withstand. Finally are in the areas of overlapping Side parts the walls of the sheet metal housing necessarily relatively thick, so that you the outer contour tower over the wooden plank. The latter can be only by avoiding that Wooden screed in the attachment area of the end fitting before its attachment is processed accordingly. This also creates a considerable Workload during installation.
Es ist Aufgabe der Erfindung, den Endbeschlag für Gerüstbohlen der eingangs genannten Art dahingehend weiterzubilden, daß der Herstellungs- und Anbringungsaufwand deutlich verringert wird. Zugleich soll die Haltbarkeit des Beschlages und der damit ausgerüsteten Gerüstbohlen verbessert werden.It Object of the invention, the end fitting for scaffold planks of the aforementioned Further develop type to the effect that the manufacturing and installation costs is significantly reduced. At the same time, the durability of the fitting and the one equipped with it scaffolding planks be improved.
Zur Lösung dieser Aufgabe schlägt die Erfindung ausgehend von dem Beschlag der eingangs genannten Art vor, daß das Blechgehäuse als Tiefziehteil ausgebildet ist.to solution this task strikes the invention starting from the fitting of the aforementioned Kind of that the metal housing is designed as a deep-drawn part.
Die erfindungsgemäß hergestellten Beschläge für Gerüstbohlen sind außerordentlich kostengünstig herzustellen, weil sie in einem einzigen Arbeitsgang aus einem Halbzeug entsprechender Größe kalt gezogen werden können. Bei der Herstellung der Halbzeuge entsteht erheblich geringerer Verschnitt. Die fertigen tiefgezogenen Beschläge haben gegenüber geschweißten Beschlägen eine wesentlich höhere mechanische Festigkeit, da sich das Material durch die Kaltverformung verfestigt. Die sehr hohe Festigkeit ist insofern von Bedeutung, als über den Beschlag der Gerüstbohle die gesamten Auflagerkräfte und ein großer Teil der Schub- und Zugkräfte des Baugerüstfachwerkes in die Gerüstbohle eingeleitet werden. Die höhere Festigkeit hat außerdem zur Folge, daß die tiefgezogenen Beschläge gemäß der Erfindung gegen Schlag und Stoß weniger empfindlich sind, als die nach dem Stande der Technik bekannte Schweißkonstruktion. Aus diesem Grunde sind die mit den Beschlägen gemäß der Erfindung versehenen Gerüstbohlen weniger empfindlich gegen Aufschlagen der Stirnseiten bei Verlade-, Transport- oder Montagearbeiten.The produced according to the invention Forged for scaffolding planks are extraordinary economical because they are made of a semi-finished product in a single operation appropriate size cold can be pulled. In the production of semi-finished products is significantly lower Waste. The finished deep-drawn fittings have a welded opposite fittings much higher mechanical strength, because the material is due to the cold deformation solidified. The very high strength is important in this respect, than about the Fitting the scaffold board the entire support forces and a big one Part of the pushing and pulling forces of the scaffolding framework into the scaffolding board be initiated. The higher one Strength also has to Consequence, that the deep-drawn fittings according to the invention less shock and impact are sensitive, as known in the prior art welded construction. For this reason, those provided with the fittings according to the invention scaffolding planks Less susceptible to bumping the front ends when loading, Transport or installation work.
Durch Wegfall der bisherigen seitlichen Blechüberlappungen und die dadurch geringere Wandstärke des Gehäuses in diesen Bereichen trägt der Beschlag bei seiner Anbringung auf dem Holz der Gerüstbohle nur wenig auf, so daß es nicht oder zumindest in wesentlich geringerem Maße notwendig ist, das Holz vor der Anbringung des Beschlages abzuarbeiten.By Elimination of the previous lateral sheet metal overlaps and thereby lower wall thickness of the housing in these areas he wears the Fitting when mounted on the wood of the scaffold board only a little, so that it is not necessary, or at least to a much lesser extent, the wood work off before fitting the fitting.
Eine besonders bevorzugte Ausführungsform der Erfindung sieht vor, das Blechgehäuse aus verzinktem oder sendzimirverzinktem Halbzeug oder Blech tiefzuziehen, statt das fertige, sperrige Blechgehäuse nachträglich mit einem Korrosionsschutz zu versehen.A particularly preferred embodiment the invention provides, the sheet metal housing of galvanized or sendzimir galvanized Deep-drawn semi-finished or sheet metal, instead of the finished, bulky sheet metal housing with later to provide corrosion protection.
Zweckmäßig weist der Boden des Blechgehäuses eine Reihe von Belüftungsöffnungen auf. Diese Belüftungsöffnungen dienen der Belüftung der Stirnseiten der Holzbohlen, um zu verhindern, daß durch ein Anfaulen des Holzes im Stirnbereich die Lebensdauer der Gerüstbohle beeinträchtigt wird.Appropriately points the bottom of the sheet metal housing a series of vents on. These vents serve the ventilation the faces of the wooden planks to prevent it from passing through a plucking of the wood in the forehead area the life span of the scaffold plank impaired becomes.
Schließlich ist das Blechgehäuse an seinen Seitenteilen mit fluchtenden Lochungen für die Aufnahme von Befestigungshohlnieten und Anschlußhohlnieten versehen. Die Befestigungshohlnieten haben einen verhältnismäßig kleinen Durchmesser und befinden sich an dem der Mitte der Holzbohle zugewandten Rand des Gehäuses. Sie dienen der sicheren Verbindung zwischen dem Blechgehäuse und der Holzbohle. Die Anschlußhohlnieten haben demgegenüber einen wesentlich größeren Durchmesser und befinden sich in der Nähe der Stirnseite der Holzbohle. Ihr Durchmesser ist so groß bemessen, daß die an den Vertikalrahmen des Baugerüstes befindlichen Haltebolzen zwecks Verbindung zwischen Vertikalrahmen und Gerüstbohle in sie eingreifen können.Finally, the sheet-metal housing is provided on its side parts with aligned holes for receiving mounting rivets and connecting rivets. The mounting hollow rivets have a relatively small diameter and are located on the edge of the housing facing the middle of the wood plank. They serve to secure connection between the sheet metal housing and the wood plank. By contrast, the connecting hollow rivets have a substantially larger diameter and are located near the end face of the wooden screed. Their diameter is so large that the retaining bolts located on the vertical frame of the scaffolding can engage in them for the purpose of connection between the vertical frame and the scaffold board.
Ein Ausführungsbeispiel der Erfindung wird im folgenden anhand der Zeichnung näher erläutert. Es zeigen:One embodiment The invention will be explained in more detail below with reference to the drawing. It demonstrate:
Der
in der Zeichnung dargestellte Beschlag gemäß der Erfindung besteht aus
einem Blechgehäuse,
welches in seiner Gesamtheit mit dem Bezugszeichen
Das
Blechgehäuse
Die
Wie
insbesondere aus den
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19934310468 DE4310468B4 (en) | 1993-03-31 | 1993-03-31 | Hardware for scaffolding planks of scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19934310468 DE4310468B4 (en) | 1993-03-31 | 1993-03-31 | Hardware for scaffolding planks of scaffolding |
Publications (2)
Publication Number | Publication Date |
---|---|
DE4310468A1 DE4310468A1 (en) | 1994-10-06 |
DE4310468B4 true DE4310468B4 (en) | 2006-09-28 |
Family
ID=6484326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19934310468 Expired - Lifetime DE4310468B4 (en) | 1993-03-31 | 1993-03-31 | Hardware for scaffolding planks of scaffolding |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE4310468B4 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102013108336B4 (en) | 2013-08-02 | 2023-06-07 | Quick Bauprodukte Gmbh | Device for connecting two planks at the ends |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1918885U (en) * | 1965-04-17 | 1965-07-01 | Deventer K G | DEVICE FOR PROTECTING THE FRONT OF WOODEN BOARDS. |
DE3808100A1 (en) * | 1988-03-11 | 1989-09-21 | Langer Ruth Geb Layher | SCAFFOLDING FLOOR |
-
1993
- 1993-03-31 DE DE19934310468 patent/DE4310468B4/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1918885U (en) * | 1965-04-17 | 1965-07-01 | Deventer K G | DEVICE FOR PROTECTING THE FRONT OF WOODEN BOARDS. |
DE3808100A1 (en) * | 1988-03-11 | 1989-09-21 | Langer Ruth Geb Layher | SCAFFOLDING FLOOR |
Non-Patent Citations (2)
Title |
---|
DE-Zulassungsbescheid des Instituts für Bautechnik Berlin, 30. April 1982 Anlage 25,für Fa. Layher. |
DE-Zulassungsbescheid des Instituts für BautechnikBerlin, 30. April 1982 Anlage 25,für Fa. Layher. * |
Also Published As
Publication number | Publication date |
---|---|
DE4310468A1 (en) | 1994-10-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE60309809T2 (en) | Connecting element for wooden beams | |
DE2166879A1 (en) | PROFILE SUPPORT FOR A COMPONENT SKELETON CONSTRUCTION | |
DE19882454B4 (en) | Support column for a vehicle body | |
DE102017218472A1 (en) | Horizontal bars | |
DE4310468B4 (en) | Hardware for scaffolding planks of scaffolding | |
DE2724932A1 (en) | LATCH FOR METAL PIPE SCAFFOLDING | |
EP0023373B1 (en) | Rolled section for use as a flange or a post in truss girders and similar constructional elements | |
DD210186A1 (en) | GRINDEL AS A VERY INDEPENDENT SPRAY FRAME IN THE PLANT PROTECTION DEVICE | |
EP0596207A1 (en) | Sheet metal, preferably cold rolled section for the construction of supporting frameworks, platforms or the like | |
DE10051793A1 (en) | Wood connector between beams has shaped sheet steel part with fixing flange and two bearing flanges and inclined fastening means extending from top of secondary support inclined through up into main support | |
DE19809733B4 (en) | Substructure of a tent with ballast protection | |
DE2853623A1 (en) | GRATING | |
DE822899C (en) | Steel frame construction | |
DE1963243A1 (en) | Combined sheet pile wall | |
DE3705809A1 (en) | Railing handrail and posts | |
CH672102A5 (en) | ||
DE2535815A1 (en) | H-girder and upright steel frame skeleton connecting bracket - comprising L-shaped outer member with bolt-holed side plates for upright and girder | |
DE19602075B4 (en) | Prefabricated steel garage, which has statically and stability stressed components made of sheet steel | |
CH645153A5 (en) | Metal mast provided with through-passages | |
EP1110621A1 (en) | Wall segment for booth wall | |
EP0813278B1 (en) | Head plate made of sheet metal | |
DE3738765C2 (en) | Mailbox system | |
DE7030311U (en) | RUN GRATE. | |
CH645427A5 (en) | Double garage | |
DE4336077A1 (en) | Dry-construction partition wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8181 | Inventor (new situation) |
Free format text: NEUBAUER, MICHAEL, 5970 PLETTENBERG, DE PADUR, MARTIN, 5970 PLETTENBERG, DE BUTTGEREIT, KLAUS, 5970PLETTENBERG, DE |
|
8110 | Request for examination paragraph 44 | ||
8127 | New person/name/address of the applicant |
Owner name: ALTRAD PLETTAC ASSCO GMBH, 58840 PLETTENBERG, DE |
|
8364 | No opposition during term of opposition | ||
R071 | Expiry of right | ||
R071 | Expiry of right |