DE3641412A1 - Process for lining a tunnel, shaft or the like with tubbing - Google Patents
Process for lining a tunnel, shaft or the like with tubbingInfo
- Publication number
- DE3641412A1 DE3641412A1 DE19863641412 DE3641412A DE3641412A1 DE 3641412 A1 DE3641412 A1 DE 3641412A1 DE 19863641412 DE19863641412 DE 19863641412 DE 3641412 A DE3641412 A DE 3641412A DE 3641412 A1 DE3641412 A1 DE 3641412A1
- Authority
- DE
- Germany
- Prior art keywords
- tubbing
- hollow body
- tunnel
- ring
- mountains
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 239000000463 material Substances 0.000 claims abstract description 9
- 238000003825 pressing Methods 0.000 claims abstract description 4
- 238000004519 manufacturing process Methods 0.000 claims abstract description 3
- 239000002985 plastic film Substances 0.000 claims description 4
- 229920006255 plastic film Polymers 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 2
- 229910052751 metal Inorganic materials 0.000 claims description 2
- 230000000750 progressive effect Effects 0.000 claims description 2
- 239000011435 rock Substances 0.000 abstract 3
- 239000011440 grout Substances 0.000 description 3
- 238000004026 adhesive bonding Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 229920002457 flexible plastic Polymers 0.000 description 1
- 230000002706 hydrostatic effect Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000037303 wrinkles Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/157—Laggings making use of fluid cushions, e.g. the fluid containing a hardenable material
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Auskleiden eines Tunnels Schachtes oder dergl. mit Tübbingen in Ringform oder anderen Formen, die stufenweise mit fortschreitender Her stellung des Tunnels oder Schachtes aneinandergefügt werden, wo bei nach dem Anbringen eines Tübbingringes der zwischen den Tüb bingen und dem anstehenden Gebirge befindliche Zwischenraum verfüllt wird.The invention relates to a method for lining a tunnel shaft or the like with ring segments or other forms that gradually with progressive Her position of the tunnel or shaft, where if after attaching a segment ring between the segments bingen and the space between the mountains is backfilled.
Tübbinge sind einzelne Segmente aus Gußeisen, Walzstahl oder Beton, mit denen geschlossene Ringe zusammengesetzt werden, die zum statischen Ausbau von langen Schächten, z. B. von Tunnel röhren verwendet werden. Dabei werden mit einem geeigneten Gerät nacheinander Tunnelabschnitte hergestellt, wobei jeweils nach Herstellung eines Tunnel-Abschnitts ein Tübbingring eingebaut wird. Nach Einbau jedes Tübbingringes muß dieser zum besseren An schluß an das Gebirge mit Beton oder Verpreßmörtel hinterfüllt werden. Zu diesem Zweck können z. B. in den Tübbingen Löcher angebracht sein, durch die das Verpreßmaterial in den Ringraum zwischen Tübbingring und Gebirge eingebracht werden kann. Dabei wird in dem Ringraum näherungsweise ein hydrostatischer Druck erzeugt.Tubbings are individual segments made of cast iron, rolled steel or concrete used to assemble closed rings, for the static expansion of long shafts, e.g. B. of tunnels tubes are used. Do this with a suitable device successively made tunnel sections, each after Production of a tunnel section installed a segment ring becomes. After installing each tubbing ring, this must be done for better after the mountains backfilled with concrete or grout will. For this purpose, e.g. B. holes in the tubbings be attached, through which the grouting material in the annular space can be introduced between the tubbing ring and the mountains. Here is approximately a hydrostatic pressure in the annulus generated.
Bei durchlässigem Gebirge führt dies dazu, daß dieser Druck nicht unmittelbar auf dessen Matrix übertragen werden kann. Vielmehr baut sich der Druck an den Stellen ab, wo er wenig Widerstand findet, wobei solche Stellen verminderten Widerstandes durch das Gefüge bedingt oder durch Auflockerung beim vorausge gangenen Vortrieb entstanden sein können. Die Folge ist eine teilweise Stabilisierung des Gebirges durch Vermörtelung. Ein getretene Auflockerungen des Gebirges können nur ungenügend oder nicht rückgängig gemacht werden, so daß Setzungen, die zu hohen Schäden führen können unvermeidbar sind. Solche Setzungen müssen beispielsweise bei U-Bahn-Bauten, die in der Regel unter bebauten Bereichen durchgeführt werden, unter allen Umständen vermieden werden.With permeable mountains, this leads to the fact that this Pressure cannot be transferred directly to its matrix. Rather, the pressure is reduced where it is little Finding resistance, such places of reduced resistance due to the structure or by loosening up in advance may have arisen. The consequence is one partial stabilization of the mountains through mortaring. A Loosening up of the mountains can only be insufficient or cannot be undone, so that settlements that are too high Damage can be inevitable. Such settlements must for example, in the case of subway buildings, which are usually built on Areas to be performed are avoided under all circumstances will.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren der eingangs genannten Art zu schaffen, bei dem Setzungen vermie den oder zumindest weitestgehend vermindert werden.The invention has for its object a method to create of the type mentioned, in which settlements are missing the or at least be largely reduced.
Die gestellte Aufgabe wird gemäß der Erfindung dadurch gelöst, daß in dem Zwischenraum zwischen jeweils einem Tübbing ring und dem Gebirge ein oder mehrere aufblähbare Hohlkörper angeordnet werden, die mit einem erstarrenden Material unter sol chem Druck gefüllt werden, daß sie aus ihrem zunächst flachen Ausgangszustand aufgebläht werden und flächig an den Tübbingen einerseits und dem Gebirge andererseits mit dem für eine Verpres sung notwendigen Druck zur Anlage kommen.The object is achieved according to the invention solved that in the space between each segment ring and the mountains one or more inflatable hollow bodies be arranged with a solidifying material under sol chem pressure are filled so that they are initially flat Initial state to be inflated and flat on the segments on the one hand and the mountains on the other hand with that for a pressing necessary pressure come to the system.
Durch die Erfindung wird erreicht, daß eine flächige, radiale Lasteinleitung in das Gebirge erfolgt. Damit kann eine dem Erddruck und der Überdeckung angepaßte Lastwirkung erzeugt werden. Es ist sogar möglich, eine Vorspannung zu erzeugen, um dadurch eine Verdichtung vortriebsbedingter Auflockerungen im Ge birge zu bewirken.The invention ensures that a flat, radial load introduction into the mountains takes place. With that a generated load effect adapted to the earth pressure and the cover will. It is even possible to create a bias to thereby a compression of loosening in the ge due to propulsion to effect mountains.
Es kann ein einziger Hohlkörper verwendet werden, der den Tübbingring auf seinem Umfang umgibt, jedoch ist es zweck mäßiger, pro Tübbing einen Hohlkörper zu verwenden.A single hollow body can be used, the surrounds the segment ring on its circumference, but it is useful more moderate to use one hollow body per segment.
Der Hohlkörper wird vorzugsweise an der Außenseite des Tübbings vor dessen Einbau angebracht. Die Befestigung kann dabei durch Kleben oder durch Anker erfolgen.The hollow body is preferably on the outside of the Tubbings attached before its installation. The attachment can by gluing or by anchors.
Vorzugsweise wird der Hohlkörper in einer Vertiefung des Tübbings befestigt, die mit Ausnahme eines schmalen Randes die gesamte Außenseite des Tübbings einnimmt. Dies hat den Vor teil, daß der Hohlkörper beim Transport und beim Einbau des Tüb bings geschützt ist.The hollow body is preferably in a recess of the tubbing attached, with the exception of a narrow edge occupies the entire outside of the tubbing. This has the intent part that the hollow body during transport and when installing the tub bings is protected.
Es ist von Vorteil, wenn zumindest die Ränder der Hohl körper, die einander zwischen benachbarten Tübbingringen zuge kehrt sind, mit einer so weit einwärts verlaufenden Falte verse hen werden, daß diese sich beim Aufblähen der Hohlkörper nach außen in den Ringraum zwischen den benachbarten Tübbingringen hineinwölbt. Hierdurch kann auch der Ringraum zwischen benachbar ten Tübbingringen stabilisiert werden.It is beneficial if at least the edges of the hollow bodies drawn towards each other between neighboring tubbing rings are reversed with a fold so far inward hen be that after the inflation of the hollow body after outside in the annular space between the neighboring tubbing rings bulges in. As a result, the annular space can also be adjacent th segment rings are stabilized.
Es können Hohlkörper aus einer Kunststoff-Folie verwen det werden, die natürlich ausreichend stabil bemessen sein muß, um dem Druck des eingeführten Verpreßmaterials standhalten zu können. Eine solche Folie aus nachgiebigem Kunststoff paßt sich den Unebenheiten des Gebirges an. Statt dessen können aber auch Hohlkörper aus Blech verwendet werden.Hollow bodies made of a plastic film can be used det, which of course must be dimensioned sufficiently stable, to withstand the pressure of the inserted grouting material can. Such a flexible plastic film fits the bumps of the mountains. Instead, you can also Hollow body made of sheet metal can be used.
Um die Hohlkörper verfüllen zu können, werden diese mit wenigstens einem Einfüllröhrchen versehen, das beim Anbringen an einem Tübbing durch einen Durchlaß im Tübbing hindurchgesteckt wird, so daß es nach innen ragt und von dort mit dem Verpreßmate rial versorgt werden kann.In order to be able to fill the hollow bodies, they are also used Provide at least one filler tube that is attached when attached a tubbing through a passage in the tubbing so that it protrudes inwards and from there with the grout rial can be supplied.
Die Erfindung wird nachfolgend anhand der Zeichnung nä her erläutert. In der Zeichnung stellen dar:The invention is based on the drawing explained here. In the drawing:
Fig. 1 eine Stirnansicht auf einen Ausschnitt eines Tübbingringes mit den Hohlkörpern in noch nicht aufgeblähtem Zustand, wobei in den Fig. 1a, b und c der Bereich zweier benachbarter Tübbingringe im Querschnitt mit verschiedenen Ausbildungen und Anordnungen der Hohlkörper dargestellt ist und Fig. 1 is an end view of a section of a tubbing ring with the hollow bodies in the not yet inflated state, the area of two adjacent tubbing rings in cross-section with different designs and arrangements of the hollow body is shown in Figs. 1a, b and
Fig. 2 eine Darstellung wie in Fig. 1, jedoch mit aufgeblähten Hohlkörpern. Fig. 2 is an illustration as in Fig. 1, but with inflated hollow bodies.
Fig. 1 zeigt einen Ausschnitt aus einem Tübbingring in Stirnansicht der aus Tübbingen 1 besteht, die zu einem Ring zu sammengefügt sind. Der Tübbingring befindet sich in einem zuvor hergestellten Tunnelabschnitt, und zwischen ihm und dem Gebirge 2 befindet sich ein Zwischenraum 3. Auf der Rückseite der Tübbinge sind Hohlkörper 4 befestigt, die zunächst die dargestellte flache Form aufweisen und in ihrer Flächenausdehnung etwa der Flächen ausdehnung der Rückseite der Tübbinge entsprechen. Die Befesti gung an den Tübbingen kann durch Klebung oder durch Anker erfol gen. An den Hohlkörpern 4 sind Röhrchen 5 angebracht, die beim Anbringen der Hohlkörper durch Löcher in den Tübbingen so weit hindurchgesteckt werden, daß sie nach innen ragen und an ihren Enden an eine Vorrichtung zum Einbringen von Verpreßmaterial an geschlossen werden können. Die zunächst flachen Hohlkörper 4 kön nen aus zwei Kunststoff-Folien oder zwei Blechen bestehen, die an ihren Rändern miteinander verbunden sind. Dies kann gemäß Fig. 1a durch eine flächige Verbindung erfolgen, jedoch kann auch gemäß Fig. 1b zumindest an den Rändern der Hohlkörper, die einander zwischen benachbarten Tübbingringen zugekehrt sind, eine einwärts verlaufende Falte 6 vorgesehen werden. Bei einer nicht darge stellten Ausführung ist ein Blech oder eine Folie mit den Rändern des Tübbings verbunden, so daß der Hohlkörper aus der Folie oder dem Blech und der Rückenfläche des Tübbings gebildet wird. Fig. 1 shows a section of a tubbing ring in front view which consists of tubbing 1 , which are joined together to form a ring. The tubbing ring is located in a previously created tunnel section, and there is an intermediate space 3 between it and the mountain 2 . On the back of the segments, hollow bodies 4 are fastened, which initially have the flat shape shown and in their area dimension correspond approximately to the area dimension of the back of the segments. The fastening supply to the segments can be achieved by gluing or by anchors. Tubes 5 are attached to the hollow bodies 4, which are inserted through holes in the segments as far as possible so that they protrude inwards and at their ends to one Device for introducing grouting material can be closed. The initially flat hollow body 4 NEN can consist of two plastic films or two sheets, which are connected at their edges. According to FIG. 1a, this can be done by a flat connection, but also according to FIG. 1b, an inward running fold 6 can be provided at least at the edges of the hollow bodies which face each other between adjacent tubbing rings. In a not Darge presented embodiment, a sheet or a film is connected to the edges of the tubbing, so that the hollow body is formed from the film or sheet and the back surface of the tubbing.
Besonders zweckmäßig ist es, gemäß Fig. 1c in den Tüb bingen eine Vertiefung 7 vorzusehen, in die die Hohlkörper ein gelegt werden können, so daß sie nicht vorstehen und beim Trans port und Einbau geschützt sind.It is particularly useful to bring a recess 7 into the tub as shown in FIG. 1c, into which the hollow bodies can be placed so that they do not protrude and are protected during transport and installation.
Fig 2 zeigt eine gleiche Darstellung wie in Fig. 1, jedoch mit aufgeblähten Hohlkörpern. Es ist ersichtlich, daß die Hohlkörper 4 den Zwischenraum zwischen den Tübbingen und dem Gebirge nunmehr ausfüllen, nachdem ein erstarrendes Material, z. B. Beton oder Vergußmörtel, in sie eingebracht worden ist. Dabei kann durch zusätzliche Kanäle 8 der Zwischenraum zwischen benach barten Tübbingen noch mit Verpreßmaterial ausgefüllt werden.Fig. 2 shows the same representation as in Fig. 1, but with inflated hollow bodies. It can be seen that the hollow body 4 now fill the space between the tubbings and the mountains after a solidifying material, for . B. concrete or grout, has been introduced into it. It can be filled with grouting material by additional channels 8, the space between neighboring disclosed segments.
Wenn gemäß Fig. 1b eine Falte 5 an den Rändern der Hohlkörper vorgesehen ist, kann sich diese Falte gemäß Fig. 2b beim Einbringen des Verpreßmaterials nach außen wölben, so daß der Zwischenraum zwischen benachbarten Tübbingringen ausgefüllt wird. Es können auch an allen vier Seiten der Hohlkörper Falten vorgesehen werden.If a fold 5 is provided at the edges of the hollow body according to FIG. 1b, this fold can bulge outwards according to FIG. 2b when the pressing material is introduced, so that the space between adjacent tubbing rings is filled. Wrinkles can also be provided on all four sides of the hollow body.
Es braucht nicht jeder einzelne Tübbing mit einem Hohl körper versehen zu werden. Statt dessen können separate Hohlkör per gesondert in den Raum 3 zwischen Gebirge und Rückenfläche des Tübbingringes eingebaut werden.Not every single tubbing needs to be provided with a hollow body. Instead, separate hollow bodies can be installed separately in the room 3 between the mountains and the back surface of the segment ring.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863641412 DE3641412A1 (en) | 1986-12-04 | 1986-12-04 | Process for lining a tunnel, shaft or the like with tubbing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863641412 DE3641412A1 (en) | 1986-12-04 | 1986-12-04 | Process for lining a tunnel, shaft or the like with tubbing |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3641412A1 true DE3641412A1 (en) | 1988-06-09 |
Family
ID=6315442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19863641412 Ceased DE3641412A1 (en) | 1986-12-04 | 1986-12-04 | Process for lining a tunnel, shaft or the like with tubbing |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3641412A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4438352A1 (en) * | 1994-10-27 | 1996-05-02 | Bilfinger Berger Bau | Additional sealing for unsealed tubbing lining |
CN104727829A (en) * | 2015-03-09 | 2015-06-24 | 三峡大学 | Tunnel lining structure with detachable lining tire and construction installation method thereof |
DE102014117581A1 (en) * | 2014-12-01 | 2016-06-02 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Tunnel extension made of tubbing rings with outside compliance element |
CN111236971A (en) * | 2020-01-19 | 2020-06-05 | 天津大学 | Air bag type duct piece for urban shield tunnel and operation method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1534623A1 (en) * | 1966-07-12 | 1969-08-21 | Gruen & Bilfinger Ag | Procedure for avoiding subsidence during tunnel construction by means of shield driving |
DE1534626B2 (en) * | 1966-10-27 | 1975-02-13 | Gruen & Bilfinger Ag, 6800 Mannheim | Segment lining for carrying out a method to avoid subsidence during tunnel construction by means of shield driving |
-
1986
- 1986-12-04 DE DE19863641412 patent/DE3641412A1/en not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1534623A1 (en) * | 1966-07-12 | 1969-08-21 | Gruen & Bilfinger Ag | Procedure for avoiding subsidence during tunnel construction by means of shield driving |
DE1534626B2 (en) * | 1966-10-27 | 1975-02-13 | Gruen & Bilfinger Ag, 6800 Mannheim | Segment lining for carrying out a method to avoid subsidence during tunnel construction by means of shield driving |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4438352A1 (en) * | 1994-10-27 | 1996-05-02 | Bilfinger Berger Bau | Additional sealing for unsealed tubbing lining |
DE102014117581A1 (en) * | 2014-12-01 | 2016-06-02 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Tunnel extension made of tubbing rings with outside compliance element |
CN104727829A (en) * | 2015-03-09 | 2015-06-24 | 三峡大学 | Tunnel lining structure with detachable lining tire and construction installation method thereof |
CN111236971A (en) * | 2020-01-19 | 2020-06-05 | 天津大学 | Air bag type duct piece for urban shield tunnel and operation method thereof |
CN111236971B (en) * | 2020-01-19 | 2021-08-24 | 天津大学 | Air bag type duct piece for urban shield tunnel and operation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2835237C2 (en) | Tunnel lining made of curved lining segments | |
DE3806126C2 (en) | ||
DE2103760A1 (en) | Tunnel construction process | |
DE2041526B2 (en) | TENSION FOR A COMPRESSION ANCHOR | |
DE2120178B2 (en) | LINING SEGMENT AND METHOD OF LINING A TUNNEL | |
DE102007015259A1 (en) | Friction tube anchor with cartridge adhesive | |
DE2527743C3 (en) | Tunnel construction made of reinforced concrete segments | |
DE4417076C2 (en) | Device for sealing duct walls in the area of the connection of a secondary duct to a main duct | |
DE3641412A1 (en) | Process for lining a tunnel, shaft or the like with tubbing | |
DE2427638C3 (en) | Procedure for upgrading the route in tunneling | |
DE2646334C2 (en) | Wire warping mat for routes in mining and tunnel construction to create a connection between the extension and the surrounding mountains made of hardening backfill material | |
DE2033142B2 (en) | PROCEDURE FOR LINING A TUNNEL AND SIGN FOR CARRYING OUT THE PROCEDURE | |
DE2250635C3 (en) | Method of making a tunnel | |
DE8632480U1 (en) | Tubbing for a ring-shaped lining of a tunnel, shaft or the like. | |
DE3601587C2 (en) | ||
DE4014437C2 (en) | ||
DE9407896U1 (en) | Device for sealing duct walls in the area of the connection of a secondary duct to a main duct | |
DE3844417C2 (en) | Process for producing a re-tensionable compression anchor with permanent corrosion protection, and compression anchor manufactured thereby | |
DE2118034B2 (en) | Mine prefabricated concrete supports - has round hole with bows protruding in to take interposed locking bush with wedges | |
DE3326430A1 (en) | Reusable formwork for the composite supports and back-filling method | |
DE3336153C2 (en) | Hollow body that can be filled with building material | |
EP0752503B1 (en) | Sealing ring for gaps between multi-element constructions, in particular for underground works | |
DE4329333C2 (en) | Procedure for the preliminary expansion of a vault-like tunnel or gallery | |
DE4106839A1 (en) | Post injection valve for forming pressure anchor in rock - comprises metal or polyethylene tube with valve orifices in wall covered by several windings of self-adhesive bandage | |
DE4125083C2 (en) | Process for lining tunnels or the like driven by shield tunneling machines with tubbing segments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
8131 | Rejection |