DE3607245C2 - Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the process - Google Patents
Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the processInfo
- Publication number
- DE3607245C2 DE3607245C2 DE19863607245 DE3607245A DE3607245C2 DE 3607245 C2 DE3607245 C2 DE 3607245C2 DE 19863607245 DE19863607245 DE 19863607245 DE 3607245 A DE3607245 A DE 3607245A DE 3607245 C2 DE3607245 C2 DE 3607245C2
- Authority
- DE
- Germany
- Prior art keywords
- ballast
- paver
- smoothing
- screed
- belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/02—Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/12—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for distributing granular or liquid materials
- E01C19/15—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for distributing granular or liquid materials for laying-down uncoated stone or similar materials, or for striking-off or spreading same without compacting, e.g. for crushed rock base courses, sand cushions for paving
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/01—Devices for working the railway-superstructure with track
- E01B2203/017—Devices for working the railway-superstructure with track removed or not present yet
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/06—Placing ballast
- E01B2203/062—New ballast
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/08—Levelling ballast or ground beneath
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/14—Way of locomotion or support
- E01B2203/145—Way of locomotion or support on the ballast
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/14—Way of locomotion or support
- E01B2203/146—Way of locomotion or support using other means than driven wheels as propulsion means
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Description
Die Erfindung betrifft ein Verfahren zum Herstellen eines Schotterbettes, insbesondere für Eisenbahngleise auf einem Planum, wobei ein entlang des herzustellenden Schotterbet tes bewegter Schotterbandfertiger mit Schotter beschickt wird, der Schotter mittels des Fertigers auf dem Planum verteilt wird und anschließend der verteilte Schotter ver dichtet und geglättet wird.The invention relates to a method for producing a Ballast bed, especially for railroad tracks on one Flat surface, one along the ballast bed to be produced Moved ballast paver loaded with ballast the ballast by means of the paver on the level is distributed and then the distributed ballast ver seals and smoothes.
Die Erfindung betrifft ferner einen Schotter-Band-Fertiger zur Durchführung des Verfahrens nach Anspruch 1 mit einem Raupenfahrwerk, einer Aufnahmeeinrichtung für Schotter, einer Transporteinrichtung zum Transport des Schotters von der Aufnahmeeinrichtung zu einer an einem Ende des Ferti gers im Abstand vom Raupenfahrwerk angeordneten Einrichtung zum Verteilen des Schotters auf dem Planum, sowie mit die ser zugeordneten Einrichtungen zum Verdichten und Glätten des verteilten Schotters.The invention further relates to a ballast belt paver to carry out the method according to claim 1 with a Crawler track, a receiving device for ballast, a transport device for transporting the ballast from the receiving device to one at one end of the ferti gers arranged at a distance from the crawler track to distribute the ballast on the level, as well as with the this associated devices for compacting and smoothing of the distributed ballast.
Für Neubau- und Umbaustrecken im Eisenbahnbau ist es immer wieder erforderlich, Schotter auf ein vorbereitetes Planum aufzubringen. Bei diesem Arbeitsvorgang soll das Planum möglichst wenig beschädigt werden, damit das Oberflächen wasser aufgrund der Planumsneigung ohne Beeinträchtigung abfließen kann.It is always for new construction and conversion lines in railway construction again required, gravel on a prepared subgrade to apply. In this process, the formation should be damaged as little as possible so that the surfaces water without impairment due to the incline of the formation can drain off.
Aus der DE 35 06 776 A1 ist ein Schotter-Band-Fertiger der oben genannten Gattung bekannt. Dieser Fertiger fährt auf dem Planum und baut in Arbeitsrichtung hinter sich das Schotterbett auf. Aufgrund des sehr hohen Gewichtes des Fertigers (ca. 25 t einschließlich Schotter) sind hierbei Raupenspuren auf dem Planum nicht zu vermeiden. Diese längsverlaufenden Raupenspuren verhindern jedoch, daß das Oberflächenwasser in der gewünschten Weise abfließen kann.DE 35 06 776 A1 is a ballast belt paver known genus. This paver starts up the formation and builds it behind in the direction of work Ballast bed on. Due to the very high weight of the Manufacturers (approx. 25 t including ballast) are here Unavoidable caterpillar tracks on the formation. These longitudinal caterpillar tracks, however, prevent that Surface water can drain off in the desired manner.
Der vorliegenden Erfindung liegt daher die Aufgabe zugrun de, ein Verfahren und einen Fertiger zur Durchführung die ses Verfahrens anzugeben, bei welchem das vorbereitete Pla num beim Einbau des Schotterbettes möglichst wenig beschä digt wird.The present invention is therefore based on the object de, a process and a paver to carry out the of this procedure, in which the prepared pla num as little as possible when installing the ballast bed is damaged.
Diese Aufgabe wird durch die Merkmale in den kennzeichnen den Teilen des Anspruchs 1 bzw. des Anspruchs 2 gelöst.This task is characterized by the features in the the parts of claim 1 and claim 2 solved.
Da der Fertiger erfindungsgemäß auf dem eigenen, neu einge bauten und verdichteten Schotterbett bewegt wird, verur sacht dieser keinerlei Beschädigungen des Planums, insbe sondere keine die Querentwässerung des Planums störende Längsspuren. Der erfindungsgemäße Fertiger weist den weite ren Vorteil auf, daß die Beschickung des Fertigers mit Schotter ebenfalls ohne Verletzung des Planums möglich ist. Ferner kann beim erfindungsgemäßen Verfahren praktisch jede beliebige Schotterhöhe unter dem Fertiger eingebaut werden, was bei den bekannten Fertigern, die sich auf dem Planum bewegen, nur bedingt möglich ist.Since the paver according to the invention on its own, newly built and compacted ballast bed is moved if this does not damage the formation, in particular in particular, none that interferes with the transverse drainage of the formation Longitudinal traces. The paver according to the invention is wide ren advantage that the paver is fed with Gravel is also possible without violating the formation. Furthermore, practically any of the methods according to the invention any ballast height can be installed under the paver, what about the well-known pavers who are on the formation move, is only possible to a limited extent.
Gemäß einer vorteilhaften Ausgestaltung der Erfindung ist vorgesehen, daß die Einrichtungen zum Verdichten und Glät ten des Schotters relativ zum Fertiger höhenverstellbar sind. Da aufgrund des sehr hohen Gewichts des Fertigers auch bei noch so guter Verdichtung Einsenkungen im Bereich der Raupenfahrwerke nicht auszuschließen sind, und um zu vermeiden, daß die auf dem Planum abzulegenden Schwellen später unsachgemäß abgelegt werden müssen, läßt sich die Ebene dieser Einrichtungen höhenmäßig verändern, so daß durch die Raupenfahrwerke verursachte Einsenkungen unschäd lich bleiben.According to an advantageous embodiment of the invention provided that the devices for compacting and smoothing The height of the ballast is adjustable relative to the paver are. Because of the very high weight of the paver even with the best compaction, depressions in the area the crawler tracks cannot be ruled out, and to avoid the thresholds to be deposited on the formation must be stored improperly later, the Change level of these facilities in height, so that depressions caused by the crawler tracks are harmless stay the same.
Gemäß einer weiteren vorteilhaften Ausgestaltung der Erfin dung ist vorgesehen, daß die Transportbänder über die Ein richtung zum Verdichten und Glätten hinweg verlängert sind. Die verlängerten Förderbänder transportieren somit den Schotter über die Verdicht- und Glätteinrichtung hinweg in Arbeitsrichtung des Fertigers vor den Fertiger und die Ein richtung zum Verteilen des Schotters verteilt den Schotter vor dem Fertiger.According to a further advantageous embodiment of the Erfin manure is provided that the conveyor belts on the one direction for compacting and smoothing are extended. The extended conveyor belts thus transport the Ballast over the compaction and smoothing device in Direction of work of the paver in front of the paver and the one Direction for distributing the ballast distributes the ballast in front of the paver.
Um ein einfaches Beladen der Aufnahmeeinrichtung mit Schot ter zu gewährleisten, ist weiterhin zweckmäßigerweise vor gesehen, daß die Seitenwände und/oder die Stirnwand der Aufnahmeeinrichtung für Schotter zumindest in ihrem oberen Bereich jeweils als verschwenkbare Klappen ausgebildet sind.To easily load the receiving device with sheet To ensure ter is still appropriate before seen that the side walls and / or the end wall of the Receiving device for ballast at least in its upper one Area each designed as pivotable flaps are.
Nachdem aufgrund der Tatsache, daß sich der Fertiger auf dem gefertigten Schotterbett bewegt, das Niveau des Ferti gers und somit auch der Aufnahmeeinrichtung für Schotter um die Einbauhöhe des Schotters gegenüber den anderen Ebenen erhöht, wird bei einer Seitenbeschickung oder stirnseitigen Beschickung der Aufnahmeeinrichtung der Schüttwinkel ungün stiger, d. h. geringer. Gemäß einer Weiterbildung der Erfin dung ist daher vorgesehen, daß die innen liegenden Flächen der Seitenwände bzw. der Stirnwand mit Gleitrollen versehen sind, um so ein besseres Gleiten des Schotters und somit geringere Schüttwinkel zu ermöglichen.After due to the fact that the paver is on the level of the ferti moved gers and thus also the receiving device for crushed stone the installation height of the ballast compared to the other levels is increased, with a side loading or front Feeding the receiving device of the angle of repose unun stiger, d. H. less. According to a further training of the Erfin manure is therefore provided that the inner surfaces the side walls or the front wall with castors are so the ballast slides better and thus to allow lower angles of repose.
Gemäß einer weiteren vorteilhaften Ausgestaltung der Erfin dung kann die verschwenkbare Klappe als Bandförderanlage ausgebildet sein. Dadurch wird die Beschickung der Schot ter-Aufnahmeeinrichtung mit Schotter unabhängig von den ge gebenen Höhendifferenzen möglich.According to a further advantageous embodiment of the Erfin the swiveling flap can be used as a belt conveyor system be trained. This will load the sheet ter receiving device with ballast regardless of ge given height differences possible.
Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den übrigen Unteransprüchen gekennzeichnet.Further advantageous embodiments of the invention are in marked the other subclaims.
Bevorzugte Ausführungsbeispiele der Erfindung werden anhand der Zeichnung näher erläutert. In der Zeichnung zeigt:Preferred embodiments of the invention are based on the drawing explained in more detail. The drawing shows:
Fig. 1 eine Seitenansicht eines erfindungsgemäßen Ferti gers, Fig. 1 is a side view of a Ferti invention gers,
Fig. 2 eine vergrößerte Darstellung der Arbeitsaggregate des Fertigers gemäß Fig. 1, Fig. 2 is an enlarged view of the working units of the finisher shown in FIG. 1,
Fig. 3 eine Schnittansicht des Fertigers gemäß Fig. 1 von hinten, Fig. 3 is a sectional view of the finisher shown in FIG. 1 from the rear,
Fig. 4 einen Querschnitt durch den Fertiger im Bereich des Kübels, und Fig. 4 shows a cross section through the paver in the area of the bucket, and
Fig. 5 einen Querschnitt durch den Fertiger im Bereich des Kübels gemäß einer alternativen Ausführungsform. Fig. 5 shows a cross section through the paver in the area of the bucket according to an alternative embodiment.
Der in Fig. 1 und den übrigen Figuren dargestellte erfin dungsgemäße Fertiger arbeitet in einer Arbeitsrichtung A, welche derjenigen gemäß dem Stand der Technik entgegenge setzt ist. Es sind zwei Raupenfahrwerke 2 vorgesehen, über denen sich das Antriebsaggregat 10 befindet. In Arbeits richtung des Fertigers gesehen hinter dem Antriebsaggregat 10 befindet sich die als Kübel ausgebildete Aufnahmevor richtung 12 für Schotter. Diese kann durch seitliche Be schickung 24 oder durch rückwärtige Beschickung 26 gefüllt werden. Über eine Transporteinrichtung 20, die aus zwei Förderbändern besteht, wird das Schottermaterial 6 durch einen Schotterkanal 28 hindurch zur in Arbeitsrichtung A des Fertigers vorne liegenden Seite des Fertigers beför dert. Die beiden parallel verlaufenden Förderbänder sind jeweils getrennt steuerbar und fördern den Schotter in den Schneckenkanal 30, wobei der Schotter von dort über eine als Förderschnecke ausgebildete Einrichtung 14 seitlich auf die vorgesehene Einbaubreite verteilt wird. The paver according to the invention shown in FIG. 1 and the other figures works in a working direction A which is opposite to that according to the state of the art. Two crawler tracks 2 are provided, above which the drive unit 10 is located. Seen in the working direction of the paver behind the drive unit 10 is the receptacle 12 , designed as a bucket, for ballast. This can be filled by side loading 24 or by rear loading 26 . Via a transport device 20 , which consists of two conveyor belts, the ballast material 6 is conveyed through a ballast channel 28 to the side of the paver lying forward in the direction of work A of the paver. The two parallel conveyor belts can each be controlled separately and convey the ballast into the screw channel 30 , the ballast from there being laterally distributed over the intended installation width via a device 14 designed as a screw conveyor.
Wie in den Fig. 1 und insbesondere 2 dargestellt, ist der Schneckenkanal 30 bzw. die Förderschnecke am in Arbeits richtung des Fertigers vordersten Ende des Fertigers an geordnet. An die Förderschnecke schließt sich entgegen der Arbeitsrichtung des Fertigers die als Schlagbohle ausgebil dete Einrichtung 16 und hieran die als Glättbohle ausgebil dete Einrichtung 18 an.As shown in FIGS. 1 and in particular 2, the screw channel 30 or the screw conveyor is arranged at the front end of the paver in the direction of work of the paver. Contrary to the direction of work of the paver, the conveyor is followed by the device 16 designed as a screed and then the device 18 configured as a screed.
Die Arbeitsweise des erfindungsgemäßen Fertigers ist dem nach so, daß, wie aus Fig. 1 deutlich wird, sich der Ferti ger auf dem eingebrachten und verdichteten Schotterbett 8 bewegt. Der neu einzubringende, lose Schotter wird an der Vorderseite des Fertigers über die Förderschnecke seitlich verteilt, anschließend durch die Schlagbohle verdichtet und schließlich durch die Glättbohle geglättet.The operation of the paver according to the invention is so that, as is clear from Fig. 1, the Ferti ger moves on the inserted and compacted ballast bed 8 . The new loose ballast to be introduced is spread out laterally at the front of the paver via the screw conveyor, then compacted by the screed and finally smoothed by the screed.
Wie aus den Fig. 1 und 2 erkennbar, sind die Schlagbohle und die Glättbohle an einer verschwenkbaren Bohle 32 schwimmend gelagert, welche die Einbauhöhe und die jeweils erforderliche Neigung elektronisch gesteuert festlegt. Über die um den Punkt 34 verschwenkbar gelagerte Bohle 32 können die Schlag- und die Glättbohle bei Bedarf angehoben oder abgesenkt werden.As can be seen from FIGS. 1 and 2, the impact screed and the screed are floatingly supported on a pivotable screed 32 , which determines the installation height and the required inclination in an electronically controlled manner. The screed and the smoothing screed can be raised or lowered as required via the screed 32 which is pivotably mounted about the point 34 .
Aus den Fig. 1 und 2 ist ferner ersichtlich, daß der Ferti ger mit wahlweise absenkbaren bzw. einziehbaren Gleisachsen 36, 38 versehen ist, welche am Rahmen des Fahrzeugs einer seits am hinteren Ende und andererseits im vorderen Bereich zwischen Raupenfahrwerk 2 und Glättbohle befestigt sind. In der in Fig. 2 skizzierten Hubhöhe (ausgefahrene, gestri chelte Position) der Gleisachsen 36, 38 ist der Fertiger gleisfahrbar mindestens aus dem Fahrzeugbegrenzungsprofil der Deutschen Bundesbahn herausgehoben.From Figs. 1 and 2 it can also be seen that the Ferti ger is provided with optional lowerable or retractable track axles 36 , 38 which are attached to the frame of the vehicle on the one hand at the rear end and on the other hand in the front area between the crawler track 2 and screed . In the lifting height outlined in FIG. 2 (extended, dashed position) of the track axles 36 , 38 , the paver is lifted at least out of the vehicle limitation profile of the Deutsche Bundesbahn.
Wie Fig. 3 zeigt, weist der Kübel an seinen Seitenbereichen feststehende Seitenwände 58 sowie wahlweise bewegliche Klappen 60 auf, die um in Fertigerlängsrichtung verlaufende Achsen 62 verschwenkbar sind. In Fig. 3 befindet sich die linke Klappe 60 in ihrer vertikalen Grundposition, während die rechte Klappe 60 nach außen ausgeschwenkt ist, sich al so in Beladeposition befindet. Über eine geeignete Abstüt zung 64 werden die Seitenteile in der jeweiligen Position abgestützt.As shown in FIG. 3, the bucket has fixed side walls 58 on its side areas and optionally movable flaps 60 , which can be pivoted about axes 62 running in the longitudinal direction of the paver. In Fig. 3, the left flap 60 is in its vertical basic position, while the right flap 60 is pivoted outward, so is al in the loading position. The side parts are supported in the respective position via a suitable support 64 .
Wie aus Fig. 4 erkennbar, können sowohl die feststehenden Seitenwände 58 als auch die beweglichen Klappen 60 an ihren innenliegenden Seiten mit Gleitrollen 66 versehen sein, um das Gleiten des in den Kübel einzufüllenden Schotters zu verbessern.As can be seen from FIG. 4, both the fixed side walls 58 and the movable flaps 60 can be provided on their inner sides with slide rollers 66 in order to improve the sliding of the ballast to be filled into the bucket.
Eine weitere mögliche Ausbildung der Seitenwände des Kübels ist in Fig. 5 dargestellt. Hierbei werden die beweglichen Klappen von verschwenkbaren Bandanlagen 68 gebildet, die in ihrer Grundstellung etwa vertikal ausgerichtet sind, wie dies auf der linken Seite dargestellt ist, und welche im Bedarfsfalle um eine etwa mittig angeordnete, in Längsrich tung des Fertigers verlaufende Achse 70 verschwenkbar sind, wie dies auf der rechten Seite gezeigt ist. Diese Bandanla gen 68 ermöglichen, daß auch bei tiefliegenden Kippkanten (z. B. Lkw-Schüttung) der Schotter in den Kübel transpor tiert werden kann.Another possible design of the side walls of the bucket is shown in FIG. 5. Here, the movable flaps are formed by pivotable belt systems 68 , which are oriented approximately vertically in their basic position, as shown on the left-hand side, and which, if necessary, can be pivoted about an approximately centrally arranged axis 70 running in the longitudinal direction of the paver, as shown on the right. This Bandanla conditions 68 enable that the ballast can be transported into the bucket even with deep-lying tipping edges (e.g. truck bed).
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863607245 DE3607245C2 (en) | 1986-03-05 | 1986-03-05 | Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863607245 DE3607245C2 (en) | 1986-03-05 | 1986-03-05 | Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the process |
Publications (2)
Publication Number | Publication Date |
---|---|
DE3607245A1 DE3607245A1 (en) | 1987-09-10 |
DE3607245C2 true DE3607245C2 (en) | 1993-12-23 |
Family
ID=6295573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19863607245 Expired - Fee Related DE3607245C2 (en) | 1986-03-05 | 1986-03-05 | Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the process |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3607245C2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3834313C2 (en) * | 1988-10-08 | 1996-12-05 | Hermann Kirchner Gmbh & Co Kg | Process and plant for the production of a ballast bed for a railway track |
DE4208801C2 (en) * | 1992-03-19 | 2001-09-13 | Hermann Kirchner Gmbh & Co Kg | Ballast paver for making a ballast bed, e.g. for railway tracks or the like |
FR2765900A1 (en) * | 1997-07-10 | 1999-01-15 | Desquenne & Giral | Leveller for ballast laid under railway track carried on sleepers |
PL3636834T3 (en) | 2018-10-08 | 2021-12-20 | Zürcher Holding GmbH | Method for creating a new building line layout for a stretch of track |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3506776C2 (en) * | 1985-02-26 | 1993-12-09 | Unbehaun Olaf Dipl Kaufm Dipl | Paver for making a ballast bed for railroad tracks |
-
1986
- 1986-03-05 DE DE19863607245 patent/DE3607245C2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
DE3607245A1 (en) | 1987-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0426004B1 (en) | Machine for collecting and redistributing ballast | |
EP0255564B1 (en) | Machine for replacing or renewing the rails and sleepers of an existing track | |
DE2331914C2 (en) | Method and device for stabilizing the sub-structure of track beds | |
DE102007010101B4 (en) | Method for producing a supply line duct and train consisting of vehicles for carrying out the method | |
DE2818514C2 (en) | ||
EP0771909B1 (en) | Machine for dismantling old and installing new railway tracks | |
CH616472A5 (en) | ||
EP1582629B1 (en) | Paver and method for simultaneously applying multiple layers of material | |
DE3834313C2 (en) | Process and plant for the production of a ballast bed for a railway track | |
DE3607245C2 (en) | Process for producing a ballast bed, in particular for railway tracks on a level, and ballast belt pavers for carrying out the process | |
EP0056497A1 (en) | Frame wagon in a train for the subsoil stabilization of railway tracks | |
DE3151030A1 (en) | MOBILE PLANT FOR PRODUCING A BETWEEN PLANUM AND BULLET BED OF A PROTECTIVE LAYER | |
DE2714050C2 (en) | ||
DD154226A5 (en) | METHOD AND DEVICE FOR UNDERGROUND ARMING OF RAILWAY RAILS | |
DE20216202U1 (en) | Plant for the rehabilitation of a formation | |
EP0551835B1 (en) | Machine for placing sand or ballast between rails and railway understructure, and method for replacing the railway superstructure | |
DE871767C (en) | Machine for lifting and processing the bedding material under railroad tracks | |
EP3636834B1 (en) | Method for creating a new building line layout for a stretch of track | |
DE102020120833B4 (en) | Attachment device for a truck for applying a covering layer of pourable building material to a road and/or path substructure | |
DE202005001467U1 (en) | Construction device for producing a loose path adjacent to a rail or roadway on supporting ballast substructure by deposition of loose substrate material | |
DE2714055A1 (en) | Self propelled track laying machine - cleans and relays ballast with plough, conveyor chain, sieve and accumulator | |
DE9315878U1 (en) | Paver | |
DE3717996A1 (en) | Marginal strip finisher | |
EP1644584A1 (en) | Device for producing ballast layers | |
DD209006A5 (en) | RAILWAY TRAIN FOR THE RENEWAL OF RAILWAY RAILS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |