DE3532655A1 - Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method - Google Patents

Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method

Info

Publication number
DE3532655A1
DE3532655A1 DE19853532655 DE3532655A DE3532655A1 DE 3532655 A1 DE3532655 A1 DE 3532655A1 DE 19853532655 DE19853532655 DE 19853532655 DE 3532655 A DE3532655 A DE 3532655A DE 3532655 A1 DE3532655 A1 DE 3532655A1
Authority
DE
Germany
Prior art keywords
tunnel
prefabricated
sealing elements
parts
joints
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19853532655
Other languages
German (de)
Inventor
Hans Richter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE19853519124 external-priority patent/DE3519124A1/en
Priority claimed from DE19853528864 external-priority patent/DE3528864A1/en
Application filed by Individual filed Critical Individual
Priority to DE19853532655 priority Critical patent/DE3532655A1/en
Priority to DE19863604940 priority patent/DE3604940A1/en
Priority to PCT/EP1986/000321 priority patent/WO1986007107A1/en
Priority to EP86903354A priority patent/EP0224524A1/en
Priority to DE19863617956 priority patent/DE3617956A1/en
Publication of DE3532655A1 publication Critical patent/DE3532655A1/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B1/00Dumping solid waste
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/006Sealing of existing landfills, e.g. using mining techniques
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

To reconstruct waste tips by introducing a liquid-tight, accessible prefabricated construction, a sealing element is proposed which is stretched under the cover. A method and an apparatus are described which enable accessible prefabricated constructions to be introduced subsequently. A laterally open tunnel-like apparatus moves through under the waste tip by the material being excavated in front of it and being conveyed away laterally and by prefabricated units being introduced sideways and situated behind it, on which prefabricated units the apparatus can be supported for further advance.

Description

Die Erfindung betrifft eine begeh-, kontrollier-, und reparierbare flüssigkeitsundurchlässige Schicht in einer Deponiehalde; sowie ein Verfahren zur nachträglichen Einbringung in bestehende Deponien und eine Vorrichtung zur Durchführung des Verfahrens.The invention relates to a walkable, controllable, and repairable liquid impermeable layer in a dump; such as a procedure for the subsequent introduction into existing landfills and an apparatus for performing the method.

Zum Abdichten von neu angelegten Deponien ist es bekannt, aus Beton­ fertigteilen bestehende begehbare Konstruktionen auf der Sohle zu situieren. Die Betonteile sind von oben wasserdicht ausgeführt und können unten befahren und begangen werden durch gewölbeartige Aus­ bildungen. It is known to seal new landfills from concrete finish existing walk-on structures on the sole situate. The concrete parts are watertight from above can be accessed and walked on below by vaulted exit educations.  

Nachteilig ist dabei, daß die wasserdichtende Schicht oberhalb der Betonfertigteile liegt und damit nicht reparierbar ist; lediglich kontrollierbar von unten. Außerdem ist es nicht möglich, bestehende Deponien nachträglich nach dieser Methode zu sanieren.The disadvantage here is that the waterproof layer above Precast concrete is lying and is therefore not repairable; only controllable from below. It is also not possible to create existing ones Refurbish landfills subsequently using this method.

Es besteht die Aufgabe, die Abdichtung der Betonfertigteile derart auszubilden, daß eine leichte Kontrollier- und Reparierbarkeit ge­ geben ist; ein Verfahren zum nachträglichen Einbau von Betonfertig­ teilen in eine bestehende Deponie und eine Vorrichtung zum Durch­ führen des Verfahrens zu schaffen.The task is to seal the precast concrete parts in this way train that ge easy to control and repair give is; a method for retrofitting concrete divide into an existing landfill and a device for through lead the process to create.

Gelöst wird die Aufgabe durch den kennzeichnenden Teil des Anspruchs 1, 5, 6. Vorteilhafte Ausgestaltungen sind den Unteransprüchen entnehmbar.The task is solved by the characterizing part of the claim 1, 5, 6. Advantageous refinements are the subclaims removable.

Zweckmäßigerweise werden gewölbeartige Betonfertigteile verwendet, die auf Säulen und diese auf einer Bodenplatte ruhen, derart, daß eine für Personen erforderliche Durchgangshöhe entsteht.Concrete prefabricated concrete parts are expediently used, which rest on pillars and these on a base plate such that A passage height required for people is created.

Zur kontrollierbaren und reparierbaren Abdichtung gegen Flüssig­ keiten wird nun erfindungsgemäß vorgeschlagen von unten an der Decke bzw. im Gewölbe der Betonfertigteile eine formsteife Folie bzw. Platte selbsttragend einzuspannen und zwar versetzt zu den Stößen der Betonfertigteile und anderen Säulen mündend in eine Rin­ ne und untereinander gegen Tropfwasser dichtend durch überlappten Stehpfalz. Die formsteifen Folienteile werden von unten in die Betongewölbe unter Wahrung eines Abstands eingebracht. Die Abstüt­ zung erfolgt in rinnenartigen Ausbildungen an den "Kapitelen" der Säulen. For controllable and repairable sealing against liquids speed is now proposed according to the invention from below on the A dimensionally stable film on the ceiling or in the vault of the precast concrete elements or to clamp the plate self-supporting and offset to the Joints of the precast concrete elements and other pillars ending in a channel ne and sealed against each other against dripping water by overlapping Standing Palatinate. The rigid film parts are from below in the Concrete vault inserted while maintaining a distance. The support Tongue-like training takes place on the "chapters" of the Columns.  

Als Verfahren zum Einbringen der Betonfertigteile in bestehende Deponien wird erfindungsgemäß vorgeschlagen ein quer zu seiner Längsachse sich vorwärtsbewegender in Segmente unterteilter Tun­ nel, bei dem auf der Vorderseite Material abgebaut und längs im Tunnel abtransportiert wird. Ebenfalls längs in Tunnel werden die Betonfertigteile antransportiert und abgesetzt, so daß sich der querwandernde Tunnel auf diesen abstützen kann zur Erzeugung seiner Vorschubkraft.As a process for introducing the precast concrete parts into existing ones According to the invention, landfills are proposed one across from it Longitudinal axis of forward moving tunes divided into segments nel where material is removed on the front and lengthways in the Tunnel is removed. Also in the tunnel are the Precast concrete parts transported and deposited, so that the transverse tunnels can be used to generate its Feed force.

Als Vorrichtung zur Einbringung der Betonfertigteile wird vor­ geschlagen eine Vorrichtung ähnlich P 35 19 124.4 und P 35 28 864.7 Fig. 1 nur daß das Stützschild 9 weggelassen wird und die Vorschubzylinder 10 sich auf den Betonfertig­ teilen abstützen statt auf dem Stützschild 9.A device similar to P 35 19 124.4 and P 35 28 864.7 Fig. 1 is suggested as a device for introducing the precast concrete parts, except that the support plate 9 is omitted and the feed cylinders 10 are supported on the precast concrete parts instead of on the support plate 9 .

Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand der Zeichnung näher erläutert. Sie stellt einen Querschnitt durch die tunnelartige Vorrichtung 1 gemäß P 35 28 864.7 Fig. 1 dar. Die Vorschubzylinder 2 sind an der Vorrichtung 1 befestigt und pressen gegen die Betonfertigteile 3 und 4. Die Betonfertigteile bestehen aus 2 Teilen. Das Betonfertigteil 3 stellt das obere Gewölbe dar. Das Betonfertigteil 4 das Funda­ ment mit Säulen 8. Die formsteife Folie bzw. Platte 5 liegt in einer rinnenartigen Ausbildung 6 an dem Kapitel der Säule 8 auf und stützt sich im Scheitel der Gewölbe in einem überlappten Stehpfalz 7 gegen sein Nachbarelement ab.An embodiment of the invention is explained below with reference to the drawing. It represents a cross section through the tunnel-like device 1 according to P 35 28 864.7 FIG. 1. The feed cylinders 2 are fastened to the device 1 and press against the precast concrete parts 3 and 4 . The precast concrete parts consist of 2 parts. The precast concrete part 3 represents the upper vault. The precast concrete part 4 the foundation with columns 8 . The dimensionally stable film or plate 5 lies in a channel-like formation 6 on the chapter of the column 8 and is supported in the apex of the vault in an overlapping standing seam 7 against its neighboring element.

Vor der Vorrichtung 1 wird das Material abgetragen und per För­ derband 31 seitlich aus dem Tunnel transportiert, so daß die Vor­ richtung 1 in Pfeilrichtung durch Presse der Zylinder 2 auf die Betonfertigteile 3 und 4 sich vorwärtsbewegen kann. Die Beton­ teile 3 und 4 werden längs des "Tunnels" (rechtwinklig zur Zeichenebene) in dem durch den Hub der Vorschubzylinder 2 unter dem rückwärtigen überstehenden Ende der Decke 5 entstehenden Freiraum eingebracht.Before the device 1, the material is removed and transported via För derband 31 out of the tunnel side, so that the front of device 1 in the arrow direction by the press of the cylinders 2 on the precast concrete parts 3 and 4 can move forward. The concrete parts 3 and 4 are introduced along the "tunnel" (perpendicular to the plane of the drawing) in the space created by the stroke of the feed cylinder 2 under the rear projecting end of the ceiling 5 .

Die Decke 5 ist erfindungsgemäß von seiner Schneide aus nach hin­ ten geneigt, um während des Vorschubhubes entlastet zu werden. Zusätzlich kann durch schnelles kurzes Einfahren des Abstützzy­ linder 4 die Vorschubreibung vermindert werden. Mit Rohr 11 und 12 wird die Rinne 6 entwässert.The blanket 5 is inclined according to the invention from its cutting edge towards th to be relieved during the feed stroke. In addition, the feed friction can be reduced by quickly briefly retracting the support cylinder 4 . The gutter 6 is dewatered with pipes 11 and 12 .

Claims (6)

1. Plattendichtelemente 5 aus Kunststoff etc. zur Feuchtigkeits­ abdichtung in begehbaren Fertigteil-Konstruktionen unter einer Deponie, dadurch gekennzeichnet, daß es formsteif und selbsttragend ausgebildet und in etwa der Form der Decke im begehbaren Raum angepaßt ist.1. Panel sealing elements 5 made of plastic etc. for moisture sealing in walk-in prefabricated structures under a landfill, characterized in that it is dimensionally stable and self-supporting and is roughly adapted to the shape of the ceiling in the walk-in room. 2. Plattendichtelemente 5 nach Anspruch 1, dadurch gekennzeichnet, daß die Stöße 7 des Elements versetzt zu den Stößen 10 des Fertig­ teilelementes angeordnet sind.2. Panel sealing elements 5 according to claim 1, characterized in that the joints 7 of the element are arranged offset to the joints 10 of the prefabricated element. 3. Plattendichtelemente 5 nach Anspruch 1, dadurch gekennzeichnet, daß die Stöße 7 überlappte Stehpfalze sind.3. Panel sealing elements 5 according to claim 1, characterized in that the joints 7 are overlapping standing seams. 4. Plattendichtelemente nach Anspruch 1, dadurch gekennzeichnet, daß es im Bereich der Kapitele der Säulen 8 in Rinnen 6 ein­ mündet und sich auch dort abstützt.4. Panel sealing elements according to claim 1, characterized in that it opens in the region of the chapters of the columns 8 in channels 6 and is also supported there. 5. Verfahren zum nachträglichen Einbringen von Fertigteilen zum Abdichten einer bestehenden Deponie, dadurch gekennzeichnet, daß eine tunnelartige Vorrichtung sich seitwärts unter der Deponie hindurchbewegt in dem diese seitlich offen ist und das Material aufnimmt und entlang des Tunnels nach außen transportiert, so daß die tunnelartige Vorrichtung sich durch rückwärtiges Ab­ stützen auf bereits eingebrachte Fertigteile in den entstandenen Hohlraum pressen kann und hinter ihr Platz für weitere Fertigteile entsteht, die entlang des Tunnels transportiert und abgesetzt werden.5. Process for the subsequent introduction of finished parts to Sealing an existing landfill, characterized, that a tunnel-like device is located sideways under the Moving the landfill in which it is open on the side and that Picks up material and transports it out along the tunnel, so that the tunnel-like device by rearward Ab are based on prefabricated parts that have already been introduced into the resulting parts  Can press cavity and behind it space for more Finished parts are created that are transported along the tunnel and be discontinued. 6. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 5, dadurch gekennzeichnet, daß die Vorrichtung nach P 35 28 864.7 Fig. 1 anstelle des Stützschildes 9 Vorschubzylinder 2 besitzt, die am Seitenteil 2 und am Boden 1 befestigt sind und sich am Betonfertigteil 3 abstützen.6. Device for performing the method according to claim 5, characterized in that the device according to P 35 28 864.7 Fig. 1 instead of the support plate 9 has feed cylinders 2 , which are attached to the side part 2 and bottom 1 and are supported on the precast concrete part 3 .
DE19853532655 1985-05-28 1985-09-13 Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method Ceased DE3532655A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE19853532655 DE3532655A1 (en) 1985-05-28 1985-09-13 Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method
DE19863604940 DE3604940A1 (en) 1985-05-28 1986-02-17 Method and apparatus for placing an impervious layer under a landfill site
PCT/EP1986/000321 WO1986007107A1 (en) 1985-05-28 1986-05-28 Method and device for post-setting a liquid impervious layer in extended dumping grounds and contaminated areas in order to protect ground waters
EP86903354A EP0224524A1 (en) 1985-05-28 1986-05-28 Method and device for post-setting a liquid impervious layer in extended dumping grounds and contaminated areas in order to protect ground waters
DE19863617956 DE3617956A1 (en) 1985-05-28 1986-05-28 METHOD AND DEVICE FOR THE INNOVATIVE PUTTING IN OF A LIQUID-IMPERPERABLE LAYER IN EXPANDED LANDFILLS AND CONTAMINATED LOCATIONS FOR PROTECTING THE GROUNDWATER

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE19853519124 DE3519124A1 (en) 1985-05-28 1985-05-28 Device and process for subsequently laying a film under landfilled wastes
DE19853528864 DE3528864A1 (en) 1985-05-28 1985-08-12 Apparatus for introducing a layer impermeable to water into a waste tip
DE19853532655 DE3532655A1 (en) 1985-05-28 1985-09-13 Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method

Publications (1)

Publication Number Publication Date
DE3532655A1 true DE3532655A1 (en) 1987-03-26

Family

ID=27193171

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19853532655 Ceased DE3532655A1 (en) 1985-05-28 1985-09-13 Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method

Country Status (1)

Country Link
DE (1) DE3532655A1 (en)

Similar Documents

Publication Publication Date Title
DE1170329B (en) Method for the layer-by-layer installation of core seals, especially bituminous, for dams in the course of the layer-by-layer embankment and device for carrying out the method
DE3532655A1 (en) Liquid-tight construction under a waste tip, a method of subsequently introducing it and an apparatus for carrying out the method
DE3607499C2 (en)
EP0250606B1 (en) Method and apparatus for the posterior mounting of construction elements on an extended floor in the soil at drift mining operations
DE2801616C3 (en) method for driving routes or tunnels in water-bearing floating floors using a compressed air propulsion shield
DE3604940A1 (en) Method and apparatus for placing an impervious layer under a landfill site
DE3910176A1 (en) Protection and sealing of steep slopes, in particular of waste heaps and the like
DE2443276C3 (en) Expansion for tunnels of curved cross-section driven with stepped or sloped face
DE3545207A1 (en) METHOD AND DEVICE FOR PUTING A WATERPROOF LAYER INTO THE GROUND
DE2710429A1 (en) Concrete structure incorporating drainage system - has leaktight inner surface covered by flexible drainage strips supported on webs
EP0230667B1 (en) Method for the stripe-wise removal of subsoil layers, especially non-rigid ones
DE2810911A1 (en) Composting material depository - straddled by bridges carrying conveyors for spreading, loosening and aerating
DE2138741A1 (en) ROLLER SHUTTER FOR JOINTS IN BRIDGES OR SIMILAR STRUCTURES
EP0835984B1 (en) Method to substitute the supporting liquid by compressed air in an hydro-shield
DE2826580C2 (en) Device for erecting a tubular structure or the like in an open trench sheeting
DE3528864A1 (en) Apparatus for introducing a layer impermeable to water into a waste tip
DE3511548A1 (en) Method of subsequently producing a sealing base under existing landfill sites
EP0329825B1 (en) Repairable isolation of waste dump
EP0360145B1 (en) Method for sealing off existing waste sites or polluted areas
DE1784259A1 (en) Sealing lining of tunnels, galleries and other structures
DE3821822A1 (en) Movable roofing for refuse landfills
DE2111034A1 (en) Core seal inside dams and method and device for manufacturing the same
DE2510912C3 (en) Method for building the lining of a bunker, in particular in underground mining and device for carrying out the method
DE4013806C1 (en) Open tunnel construction - comprises longitudinal corrugated profiled sections with sheet walling and roofing sections
DE2312098A1 (en) PROCESS FOR THE PRODUCTION OF A METALLIC LINING IN CONCRETE POOLS AND LINING, IN PARTICULAR FOR FUEL ELEMENT STORAGE POOLS, STORAGE POOLS OR REACTOR POOLS IN NUCLEAR POWER PLANTS

Legal Events

Date Code Title Description
AF Is addition to no.

Ref country code: DE

Ref document number: 3519124

Format of ref document f/p: P

8131 Rejection