DE3210375A1 - Floating power station - Google Patents

Floating power station

Info

Publication number
DE3210375A1
DE3210375A1 DE19823210375 DE3210375A DE3210375A1 DE 3210375 A1 DE3210375 A1 DE 3210375A1 DE 19823210375 DE19823210375 DE 19823210375 DE 3210375 A DE3210375 A DE 3210375A DE 3210375 A1 DE3210375 A1 DE 3210375A1
Authority
DE
Germany
Prior art keywords
power plant
floating power
hulls
water
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19823210375
Other languages
German (de)
Other versions
DE3210375C2 (en
Inventor
Heinrich 6250 Limburg Zey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZEY GEB ROTH ROSWITHA MARIA 6250 LIMBURG DE
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19823210375 priority Critical patent/DE3210375A1/en
Publication of DE3210375A1 publication Critical patent/DE3210375A1/en
Application granted granted Critical
Publication of DE3210375C2 publication Critical patent/DE3210375C2/de
Granted legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B17/00Other machines or engines
    • F03B17/06Other machines or engines using liquid flow with predominantly kinetic energy conversion, e.g. of swinging-flap type, "run-of-river", "ultra-low head"
    • F03B17/062Other machines or engines using liquid flow with predominantly kinetic energy conversion, e.g. of swinging-flap type, "run-of-river", "ultra-low head" with rotation axis substantially at right angle to flow direction
    • F03B17/063Other machines or engines using liquid flow with predominantly kinetic energy conversion, e.g. of swinging-flap type, "run-of-river", "ultra-low head" with rotation axis substantially at right angle to flow direction the flow engaging parts having no movement relative to the rotor during its rotation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The invention relates to a floating power station with two hulls firmly connected to one another. In the space between them, two or more water wheels are mounted one behind the other in such a way that they are driven in an undershot manner by the flowing water. One continuous sheet-metal bulkhead each is lowered at the opposite edges of the two hulls in order to limit the path of the flowing water. Located behind the first (and further) water wheel is an inlet of a box-shaped channel which passes through the respective hull. The outlets of the two channels, the inlets of which are located behind the same water wheel, are offset from one another to avoid counter- banking. Several stabilising supports are distributed dimensionally and by weight over the hulls and are held on the bottom by means of hydraulic motors independently carrying out control movements relative to one another. <IMAGE>

Description

Schwimmendes Kraftwerk Floating power plant

E N E R G I E V E R S O R G U N G 1. In der heutigen Zeit, die im Zeichen einer weltweiten Energiekrise steht, stellt man die verschiedensten Überlegungen an, wie aus dieser Misere herauszukommen ist. E N E R G I E V E R S O R G U N G 1. In this day and age, the im If there is a sign of a global energy crisis, a wide variety of considerations are made how to get out of this misery.

Sämtliche Energieträger haben ihr Für und Wider, sei es bei der Atomkraft - Umweltgefährdung, hohe Kosten, bei 01- und Kohlekraftwerkens Umweltverschmutzung oder sei es die Solar- und Windenergie, die beide noch in den Kinderschuhen stecken. Außerdem gibt es noch die Wasserkraftwerke. Sie sind am umweltfreundlichsten, aber prozentua) am wenigsten genutzten aller im Moment gängigen Arten. Hier möchte ich anknüpfen, denn ich glaube auf dieser Basis einen preiswerten und vielversprechenden Weg gefunden zu haben. All energy sources have their pros and cons, be it with nuclear power - Environmental hazard, high costs, pollution from oil and coal-fired power plants or be it solar and wind energy, both of which are still in their infancy. There are also the hydropower plants. They are the most environmentally friendly, however percentua) the least used of all currently common types. Here I want to because I believe an inexpensive and promising one on this basis To have found the way.

2. Als Grundlage dienen zwei gleichlange und hohe Schleppschiffe: Trag-SähigReit je 1700-1800 tons.. Beide Schiffe müßten mit einer Stahlkonstruktion starr miteinander verbunden werden, mit einem Innenabstand (Bordwand zu Bordwand) von 7300 mm. Dann müßte im ersten wie auch im letzten Viertel je ein Wasserrad angebracht werden mit den Maßen: 7000 x 6000 mm mit zehn Wasseraufschlagleisten 7000 x 1300 x 12 mm, dieses in Leichtbauweise ausgeführt (AL Cu @g 2). Montiert würden beide Räder auf einem Lagerbett, das beide 3chiffe überspannt. Auf jeder Seite des jeweiligen Rades wäre ein leistungsgerechter Generator zu montieren (eventuell über ein Getriebe). Die Räder müssen so zu 2. montiert sein, daß der untere Totpunkt der Schlagleisten 500 mm über dem Kiel liegt, da 200 mm unter dem Totpunkt eine Schürze angebracht wird, von der Mittelachse Radwelle 2500 mm gegen den Strom und 2000 mm mit dem Strom 7030 mm breit.2. Two towers of equal length and height serve as the basis: Trag-SähigReit 1700-1800 tons each .. Both ships should have a steel structure be rigidly connected to each other, with an interior clearance (side wall to side wall) from 7300 mm. Then a water wheel would have to be installed in both the first and the last quarter are with the dimensions: 7000 x 6000 mm with ten water impact strips 7000 x 1300 x 12 mm, this made of lightweight construction (AL Cu @g 2). Both would be assembled Wheels on a camp bed that spans both aisles. On each side of the respective Rades would have to be fitted with a performance-based generator (possibly via a gearbox). The wheels must be like this to 2. be mounted that the bottom dead center of the blow bars is 500 mm above the keel, as 200 mm below the dead center a Apron is attached, from the central axis wheel shaft 2500 mm against the current and 2000 mm with the stream 7030 mm wide.

Auf der langen Seite, die gegen den Strom gerichtet ist, wird eine Klappe angebracht, ait Blechen 7200 x 2000 x 12 mm Leichtbauweise Al Cu Mg 2. Als Auf Lage dient eine Trägerkonstruktion aus dem gleichen Material, dasselbe gilt auch für die Schürze. Die Klappe ist. On the long side that goes against the current, there will be one Flap attached, ait sheet metal 7200 x 2000 x 12 mm lightweight construction Al Cu Mg 2. As A support structure made of the same material is used on the layer, the same applies also for the apron. The flap is.

450 nach unten verstellbar und am Ende leicht angebogen, so daß sie bei Niedrigwasser über den Boden mit aufgleiten kann. Alle Bleche sind versenkt aufgeschraubt. Die Klappe ist an der Vorderkante aufgehängt, je einmal außen und einmal in der Mitte. Über den Strönnings. 450 adjustable downwards and slightly bent at the end so that they can slide over the ground at low tide. All sheets are countersunk unscrewed. The flap is hung on the front edge, one each on the outside and one once in the middle. Over the Strönnings.

kanal legt sich ein IPBv400, welcher auf beiden Seiten durch eine A-Stützenkonstruktion gehalten wird und auf Rollen läuft. Hier eingebaut ist eine Welle mit 3 Seilscheiben. Die Welle ist elektrisch über ein Getriebe beidseitig synchron angetrieben. Die Rollen der A Stützen laufen auf Schienen oder in U-Profil. Die Portalkonstruktion läuft dann seloständig bei Belastung dem senkrechten Zug nach. channel is an IPBv400, which is connected on both sides by a A-pillar construction is held and runs on rollers. There is one built in here Shaft with 3 pulleys. The shaft is electric on both sides via a gear synchronously driven. The roles of the A supports run on rails or in a U-profile. The portal construction then runs independently under the load of the vertical train after.

Dieser Unterzug mit Klappe soll den Wasserdruck auf die Schlgleisten verstärken aber auca gleichzeitig bei Niedrigwasser ein Ausspülen unter dem Rad verhiadern, was einen Energieverlust zur Folge hätte. This girder with a flap is supposed to keep the water pressure on the beater bars but also intensify rinsing under the wheel at low tide go wrong, which would result in a loss of energy.

Das Wasserrad ist auf beiden Seiten geschlossen. Die Schürze mit Klappe ist zum Boden hin 300 mm verstellbar, unabhängig von dem Montagebett des Wasserrades aufgehängt und in einer Rollenführung laufend, die gegen den Strom abgestützt ist und deren Gleitschienen an den Bordwänden befestigt werden. Das gesamte Lagerbett für Wasserrad und Generatoren ist durch acht hydraulische Pressen 1300 mm hebbar (synchron). Dieses ist nötig für den Transport sowie Reparaturer an stehender Anlage. Die Führung bzw. Halterung des Bettes wird durc inefnanderlaufende Vierkantrohre mit innerem Rohr,AußenmaB 250 x 25( zu 2. x 20 mm, 2000 mm lang und äußerem Rohr Innenmaß von 255 x 255 x 20 mm gewährleistet. Es sind acht Stück pro Bett, die sich Je zu vier auf beide Schiffskörper verteilen und lotrecht in dieselben hineinlaufen. The water wheel is closed on both sides. The apron with The flap can be adjusted 300 mm towards the floor, regardless of the mounting bed of the The waterwheel is suspended and running in a roller guide that is supported against the current and whose slide rails are attached to the drop sides. The entire camp bed for water wheel and generators can be lifted 1300 mm by eight hydraulic presses (synchronous). This is necessary for the transport and repairs to the standing system. The bed is guided or held by running square tubes with inner tube, external dimensions 250 x 25 ( 2. x 20 mm, 2000 mm long and the outer tube ensures inner dimensions of 255 x 255 x 20 mm. There are eight of them per bed, four of which are distributed on both hulls and perpendicular in the same run in.

Das Bett liegt bei Betrieb auf einer untergezogenen Trägerkonstruktion auf. Das gesamte Maschinenteil ist in Leichtbauweise gegen Witterungseinflüsse halbrundförmig zu tberbauen, beide Generatorenräume können gegen den des Wasserrades in der Höhe abgestuft werden. Generatorenräume sind zum Wasserrad hin verschottet. Durch Türen ist der Raum des Wasserrades aber zugänglich. Die Uberdachung nuß innerhalb des Strömungskanals bis 250 mm über den Wasserspiegel reichen. Hier wArde ein Streifen Linatex Gummi angebracht, 7000 x 300 x 10 und mit Flacheisen, zwischen welchem der Gummi liegt, an die Uberdachung angeschraubt. So ist das Wasserrad gegen äußere Einflüsse, vor allem Kälte, geschützt. Eine Eisbildung ist ausgeschlossen, da der Linatex Gummi mit dem Wasserspiegel abschließt. Der Raum des Wasserrades müßte beheizbar sein, so daß die Temperatur im Winter immer über dem Gefrierpunkt liegt. During operation, the bed rests on a support structure that is underneath on. The entire machine part is semi-circular in a lightweight construction to protect against the effects of the weather to be built over, both generator rooms can be raised against that of the waterwheel be graded. Generator rooms are sealed off towards the waterwheel. Through doors however, the space of the water wheel is accessible. The roofing must be within the The flow channel extends up to 250 mm above the water level. Here would be a stripe Linatex rubber attached, 7000 x 300 x 10 and with flat iron, between which the Rubber is screwed to the canopy. So is the water wheel towards the outside Influences, especially cold, protected. Ice formation is impossible because the Linatex rubber is flush with the water level. The space of the water wheel should be heatable so that the temperature in winter is always above freezing point.

3. Verschottung des Wasserdurchlaufes zwischen den Schiffen (Stro.mungs kanal) Durchgehende Aufhängung von Blechen zwischen den Wasserrädern und vor dem ersten bis zur Bugspitze Bockkonstruktion von Ende Schürze letztes Wasserrad bis Bugspitze 120 IPB Pfostenhöhe 1580 mm mit aufgelegten Längsträger 1700 mm Gesamthöhe, Pfostenabstand Steg zu Steg 3010 mm. Die Längsträger liegen auf den Pfosten voll auf.3. Bulkheading of the water flow between the ships (currents canal) Continuous suspension of metal sheets between the water wheels and in front of the first up to the bow top trestle construction from the end of the apron up to the last waterwheel Front tip 120 IPB post height 1580 mm with attached longitudinal beam 1700 mm total height, Post spacing web to web 3010 mm. The side members are full on the posts on.

An den Bordwänden werden im gleichen Abstand, wie die Pfosten, lotrecht Träger angebracht, Steg zu Steg 3010 Iwm5 es sind IPB 100 2000 zu 3. mm lang und enden 200 mm oberhalb des Kiels. Die Bleche sind 3000 x 1800 x 12 und gleichseitig 80 mm abgekantet, das heißt, oben und unten (die Bleche sowie U Profile und Träger alles in Leichtbauweise Al Cu Mg 2). Zu jedem Blech gehören noch zwei profilierte U 60 nun 2500 lang, sowie zwei 80 mm IPB 2500 lang (U mit runden Ecken). On the side walls are at the same distance as the posts, perpendicular Carrier attached, web to web 3010 Iwm5 there are IPB 100 2000 to 3. mm long and ends 200 mm above the keel. The sheets are 3000 x 1800 x 12 and bevelled 80 mm on the same side, that is, above and below (the sheets as well as U Profiles and beams all in lightweight construction Al Cu Mg 2). Still belong to every sheet two profiled U 60 now 2500 long, as well as two 80 mm IPB 2500 long (U with round Corners).

Die U laufen innerhalb des Flansches des IPB 100. Die Bleche sind von auflen versenkt iufgeschraubt auf das U. Die Bleche sind an der oberen Abkantung 15 mm auf halbe Flanschbreite auszuklinken. Die 80 ULm IPB werden jeweils 500 mm aus der Mitte rechtwinklig zur Breite des Bleches gleich iem U von Rückwand versenkt aufgeschraubt. Auf die 80 mm Abkantungen werden 80 äun U aufgeschraubt, 3000 lang und in den Abkantwinkel Knotenbleche als Steifung eingesetzt. Die IPB 80, sowie profilier.es U 60 mm sind unten mit Flachmaterial verschweißt und mit Blech und dem untergezogenen U zusammen gebohrt und verschraubt, de3gleichen am oberen U, hier aber nur Blech mit U 80 mm und U 80 mm mit U 60 mm prof. im Winkel von außen versenkt. The U run inside the flange of the IPB 100. The metal sheets are Countersunk from the outside and screwed onto the U. The sheets are on the upper edge Notch 15 mm to half the flange width. The 80 ULm IPB are each 500 mm countersunk from the center at right angles to the width of the sheet equal to iem U from the rear wall unscrewed. 80 mm U are screwed onto the 80 mm bevels, 3000 long and gusset plates are used as reinforcement in the bevel angle. The IPB 80, as well profilier.es U 60 mm are welded at the bottom with flat material and with sheet metal and Drilled and screwed together with the drawn U, the same on the upper U, but here only sheet metal with U 80 mm and U 80 mm with U 60 mm prof. at an angle from the outside sunk.

Das 80 mm U ist an den 80 mm IPB soweit auszuklinken, so daß die Rollenführung, die Qn dessen Flansch verläuft, nicht gestört wird. The 80 mm U is to be disengaged on the 80 mm IPB so that the Roller guide that runs Qn whose flange is not disturbed.

Darum wird auf das 3lech von außen ein Verstärkungsblech aufgeschraubt, welches d@e ausgeklinkten U 80 mm mit Blech wieder steift. Therefore, a reinforcement plate is screwed onto the sheet metal from the outside, which stiffens the notched U 80 mm with sheet metal.

Dieses Blech wird in die Aufhängung der Konstruktion mit einbezogen. This sheet metal is included in the suspension of the construction.

Am unteren U ist genau in Achse mitte Blech und Aufhängung desselben ein Fuß anzubringen, in Höhe von 150 mm mit einer Bodenplatte 400 x 400 x 30. Auf diesem Fuß gleicht sich die Verkantung der Konstruktion bzw. Verklemmung in der Führung der IPB aus. In der Höhe Ende IPB 100, die ja lotrecht zum Schiffskörper an demselben angebracht sind, ist jeweils zwischen den Festpunkten IPB 100 und den sich verschiebenden IPB 80 eine Laufrolle anzubringen 400x100 mm aus Rohr. Die Rolle ist gummiert und an den Lagern wasserdicht geschlossen, so auch eine Rolle zwischen den IPB 80. Sie laufen also an der Blechrückwand zu 3. und sitzen auf Lagerblöcken, welche am Schiffskörper befestigt sind und stabilisieren das Blech zusätzlich in sich. Das wären also pro Blech drei Rollen. Die IPB 80 sind oben mit einer @tahlkappe verschlossen und von innen nach außen versenkt verschraubt. In den Flanschen der beiden IPB laufen jeweils zwei Rollenpaare, welche dicht am Steg der Träger gefuhrt worden un@ an den Bordwänden befestigt sind. Die Rollenp@@re liegen @000 mm auseinander. Die Tiefststellung der Bleche liegt 100 mm über den Rollen 400 x 100 mm und wird oben justiert über die gesamte Länge der Verschottung, gleichmäßig in der Auflage der Winkel, die an de Bordwand angebracht sind, worauf sich die Kappen der beiden IP. auflegen. At the lower U is exactly the same in the middle of the axis sheet metal and suspension to attach a foot, at a height of 150 mm with a base plate 400 x 400 x 30. On The tilting of the construction or jamming in the resembles this foot Management of the IPB. At the end of the IPB 100, which is perpendicular to the hull are attached to the same is between the fixed points IPB 100 and the If the IPB 80 is shifting, attach a roller 400x100 mm made of pipe. The role is rubberized and sealed watertight on the bearings, including a roller between the IPB 80. So you run on the sheet metal rear wall to 3rd and sit on bearing blocks which are attached to the hull and stabilize the sheet metal additionally in itself. So that would be three rolls per sheet. The IPB 80 are on top with closed with a steel cap and screwed countersunk from the inside to the outside. In the flanges of the two IPB each run two pairs of rollers, which are close to the web the girder has been guided and fastened to the ship's sides. The roles p @@ re are @ 000 mm apart. The lowest position of the sheets is 100 mm above the Rolls 400 x 100 mm and is adjusted at the top over the entire length of the bulkhead, evenly in the support of the angles that are attached to the side wall, whereupon the caps of the two IP. hang up.

Die Aufhängung der Bleche erfolgt mittig @@ en (die Abkantung des Bleches 80 mm ist durch Knotenbleche und 8@ mm U versteift) in Form eines zweischerigen Klobens, welcher fest @it dem Blech verbunden ist und an einer einzelnen Rolle, die an die Bock- und Hebekonstruktion lotrecht montiert wird. Auf dem oberen Flansch des 120 mm IPB sitzt ein Lagerbock mit zwei Umlenkrollen. Das sell 18 mm wird wie folgt eingeschert. Festpunkt mit Kausche an angeschweißter Aufhängung an der Hebevorrichtung untere i"£ansch durch Bolzen befestigt, Seilführung durch innere @olle (Kloben) über Rolle an Hebebock, durch zweite Rolle über beide Umlenkr@llen zu einen im Gewicht noch zu bestimmenden Kontergewicht, welches in den Schiffskörper hinein verläuft. So ist der Zug immer rechtwinklig zum bloch. So ergibt sich folgendes Bild: Die Strömung ist in der Verschottung konstant gehalten, wenn alle Bleche herunter gelassen sind, arretiert nach unten, wie schon beschrieben an den beiden @@B 80. Bei Bodenberuhrung regelt sich dann die Verschottung selbständig auch bei unregelmäßigem Untergrund. The sheets are suspended in the middle (the fold of the Plate 80 mm is stiffened by gusset plates and 8 @ mm U) in the form of a double scissor Block, which is firmly connected to the sheet metal and on a single roller, which is mounted vertically on the trestle and lifting structure. On the top flange The 120 mm IPB has a bearing block with two pulleys. That sell 18mm will be like follows reeved. Fixed point with thimble on welded suspension on the lifting device lower part fastened by bolts, cable guide through inner roller (block) Via roller on lifting jack, through the second roller over both deflection pulleys to one in weight still to be determined counterweight, which runs into the hull. So the train is always at right angles to the bloch. So the following picture emerges: The The flow in the bulkhead is kept constant when all metal sheets are lowered are locked down, as already described on the two @@ B 80. When touching the ground the bulkhead then regulates itself automatically even with irregular subsoil.

zu 3 , Die von der Bugspitze aus trichterförmig gefaßte Strömung wird von der Klappe, dle bie 45@ verstellbar ist, auf den Unterzug und somit voll auf die 1000 mm hohen Aufschlagleisten gebracht.to 3, The flow, which is funnel-shaped from the bow tip, becomes from the flap, which is adjustable by 45 @, to the beam and thus fully open brought the 1000 mm high impact strips.

4. Verlauf der zusätzlichen Strömungskanäle für zweites Wasserrad.4. Course of the additional flow channels for the second water wheel.

@enn ich die Außenb@rdwand mit 180° anlege, müßte der Winkel des Strömungskanals in den Maßen 1000 x 1500 mm (Unterseite = Schiffs-@oienhöhe) 2000 mm @inter dem ersten dasserrad beginnend das jeweilige Schiff zum Hec@ hin durchlaufend bei 160° liegen. Wenn 2000 mm @inter dem ersten wasserrad bei dem äußeren Schiff als Maß an@enommen sind (äußeres Schiff = Strommitte zustehendes), so sind bei dem Inneren die Maße des Einlaufes um mindestens 1500 mm zu versetzen, so daß im @uslauf (Strömungskanal zwischen innerer Verschottung) kein Gegenstau ents@eht. Der Einlauf ist durch eine Luke verschließar. Sie ist an einem durchgehenden Scharnier gehalten und kann auf 70° ausgestellt werlen, tn der Unterkante zieht sich ein Blech mit aus. Bei der Innenverschottung m@ßte dementsprechend ein Blech maß gerecht umfunktioniert werden, um einen einwandfreien Auslauf zu gewährleisten. Der Kanal ist also iil Kastenform gehalten und wasserdicht zu verschweißen. If I lay out the outer wall at 180 °, the angle of the Flow channel with the dimensions 1000 x 1500 mm (underside = ship height) 2000 mm @ between the first wheel and running through the respective ship to the Hec @ be at 160 °. If 2000 mm @ behind the first waterwheel at the outer ship are taken as a measure of @ en (outer ship = due to the middle of the river), so are Inside, the dimensions of the inlet should be offset by at least 1500 mm so that in the outlet (Flow channel between the inner bulkhead) no back pressure arises. The enema can be locked by a hatch. It is held on a continuous hinge and can be extended to 70 °, a sheet pulls itself along the lower edge the end. In the case of the internal bulkheading, a sheet metal would have to be converted accordingly to ensure proper drainage. So the channel is iil Box shape and welded watertight.

5. Stabilisierung des Konze@ts bei jeglichem Wasserstand Zur@ckgreifend auf die starre Verbindung beider Schiffe zueinander, @@@te die Stabilisierung bzw. Abstützung wie folgt beschaffen sein: 10 IPB 600 müßten über die gesamten Schiftslängen (rechtwinklig zur Länge über beide Schiffe) maß- und gewichtsmäßig verteilt jeweils zwei übereinander in einem Abstand von 1500 mm (lichtesMaB) montiert werden. Das heißt 1500 mm vom Schiffsieck zum Wasserspiegel hin, so zu 5. daß der untere Träger alle vier Bordwände durchbricht, der Obere aber auf Deck aufliegt. Die Träger müssen an beiden Köpfen 200 mm über die Bordwand (außen) hinausragen und am Oberdeck in einer Tr§-gerkonstruktion eingebaut sein. Zwischen den Trägern ist eine Verbindungskonstruktion eingebaut, die in den Schiffen bis auf den Boden reicht und mit demselben und den Bordwänden verbunden ist. An den jeweiligen Trägerköpfen ist eine Führung 410x310x30 2700 lang.5. Stabilization of the concentration at any water level, falling back on the rigid connection of the two ships to each other, @@@ te the stabilization or The support should be designed as follows: 10 IPB 600 should be over the entire length of the shaft (at right angles to the length over both ships) in proportion to size and weight two can be mounted on top of each other at a distance of 1500 mm (clear dimension). That means 1500 mm from the ship's corner to the water level, so to 5. that the lower girder breaks through all four side walls, but the upper one rests on the deck. The beams must protrude 200 mm over the drop side (outside) on both heads and built into a girder construction on the upper deck. Between the straps a connecting structure is built in, which extends down to the ground in the ships is enough and is connected to the same and the side walls. On the respective carrier heads is a guide 410x310x30 2700 long.

rechtwinklig zu den IPB 600 angeschweißt und mit Knotenblechen gesteift. Hierdurch verläuft die Abstützung, Träger 'B 400. Die Flanschen sind mit Blechen zu verschweißen, so daß eine Rechteckform entsteht 400x300 mm, Bleche 350x14 mm. Die Länge der Träger wäre noch Sestzulegen, da der nöchste Hochwasserstand einbezogen werden muß. Die Fü@e der Stützen sind Bleche 800x800x40 mm mit Führungen passend auf die Stützen 400 hoch, in welche sich dieselben einsetzen. Welded at right angles to the IPB 600 and stiffened with gusset plates. The support 'Beam' B 400 runs through this. The flanges are made of metal sheets to be welded, so that a rectangular shape is created 400x300 mm, sheets 350x14 mm. The length of the girders would have to be set as the next high water level is included must become. The feet of the supports are sheet metal 800x800x40 mm with guides up on the supports 400, in which they are inserted.

Die werden rundum verschraubt. Unter der Platte ist mittig ein Dorn. They are screwed all around. There is a thorn in the middle under the plate.

Oben an den Stutzen befinden sich Galgen rechtwinklig und zum Schiff hinweisend. Material, gleiche Form wie Stützen, voll aufliegend 400x 300 mm 900mm lang. In den Galgen, sowie der IPB 600 auf Oberdeck sind Scheerrollen einzubauen. Im Galgen vi@r, im IPB 600 fünf. At the top of the nozzles there are gallows at right angles to the ship indicative. Material, same shape as supports, fully supported 400x 300 mm 900mm long. Shear rollers must be installed in the gallows and the IPB 600 on the upper deck. In the gallows vi @ r, in the IPB 600 five.

Das Ende des 25mm Stahlseils hat eine Kausche. Dieselbe wird am Galgen an einer Aufhängung mit einem Bolzen befestigt. Die Aufhängung befindet sich am Galgen links, von dort wird nach rechts weitergescheert, aber die fünfte Xtolle unten verlä@ft das Weil auf eine Winde, auf welches es sich auftrommelt. Die zehn Winden werden jeweils von einem Hydraulikmotor betrieben. Die zein Hydraulikmotore steuern sich eigenständig gegeneinander aus. Das heißt, sie sind gleichgeschaltet durch eine einzige Pumpe augetrie@en, über gleichmäßig justierte Ventile in sich selbst durch Druck steuerbar. Das heißt, die zu Boden gebrachten Stützen regulieren sich gegeneinander aus, werden aber mit dem gleichen Druck dort gehalt en und gleichen den Druck zu 5. bei fallendem und s@eigendem izasser automatisch aus, so daß das Konze@t immer einen ei@wandfreien Stand @@t. Auch müßten auf beiden Schiffen Sensoren e@ngebaut sein, welche bei Bodenberührung Magnetbremsen an sämtlich@n Trommeln zu gleicher Zeit auslösen, die sich bei Aufschwimmen ab@r auch wieder gleichzeitig lösen. Hinzu kommt eine Abstützung inn@rhalb des Strömung@kanals aber nur bei Niedrigstwasser, gosteuert durch den Sens@r, st@tzt es sich bei Bodenberührunr im Winkel Vers@hottung IPB 600 das Konzept noch einmal ab (IPB 300 mit verschweißt@n Flanschen und Fußplatte). Diese 6 Stützen werden durch hydraulis@he Pressen gefahren, welche bei Aufschwimmen die Stützen wieder @oll aus den Wasser nehmen. Die Abstützung soll einer Verwerfung der beiden Schiffe bei Aufsetzen entgegenwirken und sie in Längs- und @uerrichtung in der Waage halten. The end of the 25mm steel cable has a thimble. The same will be on the gallows attached to a suspension with a bolt. The suspension is on Gallows on the left, from there on to the right, but the fifth Xtolle below, the Weil runs on a winch on which it drums itself. The ten Each winch is operated by a hydraulic motor. The zein hydraulic motors steer themselves against each other independently. That means they are synchronized by a single pump, via evenly adjusted valves in itself controllable even by pressure. That is, regulate the supports brought to the ground compete against each other, but are held and equalized there with the same pressure the pressure to 5. with falling and s @ own izasser automatically so that the concept always has a wall-free stand. Also should be on both Ship sensors must be built in, which apply magnetic brakes to all of the ships when they come into contact with the ground Drums trigger at the same time, which when floating up @ r also at the same time again to solve. In addition, there is support inside the flow channel but only at very low tide, Controlled by the sensor, it is supported at an angle when it comes into contact with the ground IPB 600 from the concept again (IPB 300 with welded flanges and base plate). These 6 supports are driven by hydraulic presses, which float upwards Take the supports out of the water again @oll. The support is said to be a fault counteract the two ships when touching down and move them lengthways and forward keep in balance.

Dieses hier beschriebene Konzept könnte auf allen großen Strömen der Welt i@ jeder Zahl eingesetzt werden (auch eventuell mit drei @asserrädern und sechs Generatoren, dann müßten aber die Läufe der zusätzlichen Strömungskanäle geändert werden und zwar auf 45° zu den Gener@@@ren), außerhalb der Fahrrinne aufgehängt an ein im Dreieck gerammten Trägerverbund, dessen Spitze gegen den Strom gerichtet ist und in dessen offenen Schenkel ein IPBv5OO zusätzlich gerammt ist. An dem stromab-wärts weisenden Flansch des IP3v500 hängt sich das gesamte @onzept und zwar an einen Rollenschlitten, der in dem flansch verlauft, so daß bei fallendem und steigendem asser der Schlitten immer nachläuft. Der 500 IPBv hat eine Kopfrtlatte, so daß der Rollenschlitten oben nicht herausspringen kann. The concept described here could apply to all major streams of the world i @ every number can be used (also possibly with three @ asteric wheels and six generators, but then the courses of the additional flow channels would have to be changed are hung at 45 ° to the gener @@@ ren) outside the fairway to a girder assembly rammed into a triangle, the tip of which is directed against the current and an IPBv5OO is also rammed into the open leg. On the downstream facing flange of the IP3v500, the entire concept is attached to a roller carriage, which runs in the flange, so that the slide moves with falling and rising water always runs after. The 500 IPBv has a head plate so that the roller carriage is on top can't jump out.

Die gerammten Träger sind im Berliner Verband miteinander verbunden. The rammed girders are connected to one another in the Berlin Association.

Mit gehalten von den zehn Abstützungen wird sich der Stand des Konzepts nicht verändern, da alle Haltepunkte zueinander -wariabel sind und sich mit dem fallenden und steigenden Wasser kontinuierzu 5. lich mit verändern. Auch hinter Staustufenkraftwerken ist das Konzept einzusetzen. Auf zwei übereinander angebrachten querträgern am Staustufenkraftwerk wäre ein elektrisch angetriebener Schlitten in dem jeweiligen Trägerflanschen rollengelagert, seitlich verfahrbar, so daß jeder Turbinenauslauf gewählt werden kann. Mitte Schlitten wieder ein IPBv 500 lotrecht für Mohen- und TieSenverstellung, wie schon beschrieben. Hier kann die erzeugte Energie sogar direkt mit eingespeist werden. So wäre das Konzept jedem Wasserstand gerecht und würde fast wartungsfrei seinen Dienst versehen. Von Bug zu Bug wäre ein blechen anzubringen mit parallel zum Konzept lauSenden Flacheisen, in welche ein Säuberungsgerät in Form eines Elevators eingebaut ist, hier aber mit 500mm langen aber starken Zinken, welche den Rechen säubern und soinit eine Störung der Wasserräder weitgehend ausschalten. Ein unter dem Auswurf @ontiertes Förderband 1000 mm breit, würde den anfallenden tinrat seitlich nach Strommitte zu, wieder dem Wasser übergeben oder aber in einer beigelegten Schute deponieren. The status of the concept is maintained by the ten supports do not change, since all breakpoints are variable to one another and correspond to the falling and rising water continuously 5. Lich with change. The concept can also be used behind barrage power plants. On two on top of each other Any cross members attached to the barrage power plant would be electrically powered Slide is roller-mounted in the respective girder flange, can be moved sideways, so that any turbine outlet can be selected. Another IPBv in the middle of the slide 500 vertical for Mohen and TieSen adjustment, as already described. Here can the energy generated can even be fed in directly. So the concept would be for everyone Water level and would do its job almost maintenance-free. From bug a sheet metal would have to be attached to the bow with flat iron running parallel to the concept, in which a cleaning device in the form of an elevator is built, but here with 500mm long but strong tines, which clean the rake and soinit a malfunction the water wheels largely off. A conveyor belt mounted under the discharge 1000 mm wide, the resulting tinrat would laterally towards the middle of the stream, again give it to the water or deposit it in an enclosed barge.

Diese Konzepte können auch wesentlich kleirer und einfacher konstruiert auf kleinen Flüssen, ja sogar großen Bächen, installiert werden. Vor dein Einschwimmen des jeweiligen Kcnzepts wäre es angebracht den Arbeitsort zu schleifen, so daß eventuelle größere Unebenheiten beseitigt werden. Das konnte mit eine Schlepper geschehen, der winklig zu sich selbst einen schweren IPBv träger über den Grund zieht. These concepts can also be constructed in a much smaller and simpler way be installed on small rivers, even large streams. Before you swim in of the respective concept, it would be appropriate to grind the place of work so that possible larger bumps can be removed. That could be done with a tug who at an angle to himself pulls a heavy IPBv girder over the bottom.

So wäre relativ sehr billig viel Energie zu erzeugen. It would be relatively cheap to generate a lot of energy in this way.

P.S.: In der Verschottung können @n den einzelnen Aufhängungen und Blechen alle Träger und U-Profile also 2U bzw. 40 mm verstärkt werden. P.S .: In the bulkheading, @n the individual suspensions and Sheet metal, all beams and U-profiles are reinforced by 2U or 40 mm.

Z u s a t z z u Nr. 5 Stabilis@erung des Konzepts bei jeglichem Wasserstand Die Stabilisierungsstützen können auch über Zahnstangen gefahren werden, die beidseitig auf den Trägerflansch befestigt sind. Dann müßten die Führungen beidseitig eine Nute mit eingeschweißt haben, wodurch die Zahnstangen verlaufen. So würden die Seilzüge wegfallen und die Spannung zwischen Oberdeck und Stütze,oberes Ende wäre nicht mehr vorhanden. An der hydraulischen Justierung würde sich nichts ändern, nur das auf beiden Seiten des IPB 400 ein Antriebsritzel und somit 2 Antriebe vorhanden sind. Addition to No. 5 Stabilization of the concept at any water level The stabilizing supports can also be driven over racks on both sides are attached to the carrier flange. Then the guides would have to be one on both sides Have also welded grooves, which cause the racks to run. So would the cables disappear and the tension between upper deck and support, upper end would no longer be available. Nothing would change in the hydraulic adjustment, just that Both sides of the IPB 400 have a drive pinion and therefore 2 drives.

t)azu wäre noch zu sagen, daß die Leistungsstärke der Generatoren minimal bei 2000 KW liegt (pro Generator).t) one more thing to be said is the power of the generators is at least 2000 KW (per generator).

Wenn man heute nur für die Bauerwartung eines Atomkraftwerkes eine halbe Million DM pro Tag in Rechnung stellt, nur für Aushub und Fundamentierung der herkömmlichen Atom-, Kohle- oder Wasserkraftwerke wieder mit Millionenausgaben belastet wird, so ist dieses von mir vorgestellte Projekt weitaus am billigsten und unabhängig von Atom und Kohle bzw. Pumpkraftwerken, ja sogar auch weitgehend vom dem Tras serstand der benutzten Flüsse (der Wasserstand der Flüsse bestimmt ja weitgehend die Leistung dieser fest etablierten Kraftwerke) am rentabelsten. Es mag in diesen Zusammenhang schon viel über diese Möglichkeit nachgedacht worden sein, aber die variable Abstutzung, Verankerung, Strömungskanäle, Unterzüge und Verschottung sind absoneu. .Yucb die Wirtschaftlichkeit sowie Urnweltfreundlichkeit steht zweifellos außer Frage. So ist das Kraftwerk auch für starkfließende Bäche geeignet, obw@hl es @@@r fest an einem Punkt etabliert dem Wasserstand @@em@ber @b@r variabel ist.If today you only have one for the construction expectation of a nuclear power plant half a million DM billed per day, only for excavation and foundation the conventional nuclear, coal or hydroelectric power plants again with expenditures in the millions is charged, this project that I have presented is by far the cheapest and independent of nuclear and coal or pump power stations, yes even to a large extent from the water level of the rivers used (determines the water level of the rivers yes largely the performance of these firmly established power plants) most profitable. Much thought may have been given to this possibility in this context be, but the variable bracing, anchoring, flow channels, beams and Isolation are absurd. .Yucb the economy and environmental friendliness stands undoubtedly out of the question. So the power plant is also suitable for fast flowing brooks, obw @ hl es @@@ r firmly established at one point the water level @@ em @ ber @ b @ r variable is.

So könnte man für den P@@ eines der h@@kömmlichen Kohle- oder @asserkraftwerkes, ganz abgesehen von At@mkraftwerken, mehrere meiner hier vorgestellten Konzepte fertigen und sie auf unseren gro@en Strömen wie @hein, Weser @lbe u. Donau ihren Dienst versehen lassen und diese str@men ganz sicher noch in causend Jahren.So you could for the P @@ one of the h @@ conventional coal or @asserkraftwerkes, Quite apart from atmospheric power plants, produce several of my concepts presented here and they do their job on our big rivers like @hein, Weser @lbe and Danube let it flow for sure in causend years.

Auch Angeb@t und Nachfra@e in Industri@ballungs@@ntren wäre durch das Hinschl@ppen v@@ Konz@pten die S@itze genommen.Also offer and demand in Industri @ ballungs @@ ntren would be through the add @ @ @ concept taken the seats.

Claims (8)

PATNTANSPRÜCHE 0 Schwimmendes Kraftwerk mit zwei oder mehreren in Reihe angeordneten Wasserrädern, die von der Strömung in einem zwischen zwei mit Abstand fest verbundenen Schiffskörpern ausgebildeten Kanal unterschlächtig angetrieben werden, d a d u r c h g e k e n n -z e i c h n e t, daß von einem (in Strömungsrichtung) hinter dem ersten (oder weiteren) Wasserrad angeordneten Einlauf aus ein kastenförmiger Kanal durch den jeweiligen Schiffskörper hindurchgeführt ist, und daß zur Vermeidung eines Gegenstaues an dem Auslauf die beiden dem(jeweiligen)Wasserrad zugeordneten Kanäle in den Schiffskörpern zueinander versetzt angeordnet sind. PATENT CLAIMS 0 Floating power plant with two or more in Series of arranged waterwheels, which are carried by the flow in one between two with Distance firmly connected hulls formed channel undershot driven be, d u r c h e k e n n -z e i c h n e t, that from one (in the direction of flow) behind the first (or further) waterwheel arranged inlet from a box-shaped Channel is passed through the respective hull, and that to avoid of a backwater at the outlet, the two associated with the (respective) water wheel Channels in the hulls are arranged offset from one another. 2) Kraftwerk nach dem Anspruch 1, d a d u r c h g e k e n n -z e i c h n e t, daß der Einlauf von einer schwenkbaren und auf 700 ausstellbaren Luke verschließbar ist. 2) Power plant according to claim 1, d a d u r c h e k e n n -z e i c h n e t that the inlet is from a hinged hatch that can be opened to 700 is lockable. 3) Kraftwerk nach dem Anspruch 2, d a u r c h g e k e n n -z e i c h n e t, daß gemeinsam mit der Luke ein an ihrer Unterkante vorgesehenes Blech bewegbar ist. 3) power plant according to claim 2, d a u r c h e k e n n -z e i c h n e t that together with the hatch a sheet metal provided on its lower edge is movable. P A T E N T A N S 1' R t C H E 4) Schwimmendes Kraftwerk mit zwei oder mehreren in Reihe angeordneten Wasserrädern, die von der Strömung in einem zwischen zwei mit Abstand fest verbundenen Schiffskörpern ausgebildeten Kanal unterschlächtig angetrieben werden, d a d u r c h g e k e n n -æ e i c h n e t, daß an dem jeweiligen Schiffskörper eine Verschottung aus Blechen von der Bugspitze zum ersten Wasserrad und zwischen den Wasserrädern mit Hilfe einer Bockkonstruktion durchgehend aufgehängt ist. P A T E N T A N S 1 'R t C H E 4) Floating power plant with two or several waterwheels arranged in series, which are driven by the current in one Undershot canal formed between two hulls firmly connected at a distance be driven, d u r c h e k e n n -æ e i c h n e t that at the respective Hull a bulkhead made of sheet metal from the bow tip to the first waterwheel and suspended between the water wheels with the help of a trestle construction is. 5) Schwimmendes Kraftwerk nach dem Anspruch 4, d a d u r c h g e k e n n z e i c h n e t, daß die Bleche an einem Seil bis zu einer Berührung mit dem Untergrund herunterlaßbar sind.5) floating power plant according to claim 4, d a d u r c h g e k It is noted that the metal sheets on a rope up to a contact with the Underground can be lowered. 6) Schwimmendes Kraftwerk nach dem Anspruch 5, d a d u r c h g e k e n n z e i c h n e t, daß das Seil über Rollen geführt und mit einem in den Schiffskörper hinein verlauf enden Konterge.cht belastet ist.6) floating power plant according to claim 5, d a d u r c h g e k It is noted that the rope is passed over pulleys and with one in the hull running into it is counterbalanced. 7) Schwimmendes Kraftwerk nach dem Anspruch 1 oder 4, d a -d u r c h g e k e n n æ e i c h n e t, daß zur Verstärkung des Wasserdruckes auf die Schlagleisten des tYasserrades ein Unterzug mit einer nach unten hin verstellbaren Klapl!e versehen ist.7) floating power plant according to claim 1 or 4, d a -d u r c h g e k e n n æ e i c h n e t that to increase the water pressure on the blow bars of the water wheel, provide a girder with a flap that can be adjusted downwards is. 8) Schwimmendes Kraftwerk mit zwei oer mehreren in Reihe angeordneten Wasserrädern, die von der Strömung in einem zwischen zwei mit Abstand fest verbundenen Schiffskörpern ausgebildeten Kanal unterschlächtis angetrieben werden, d a d u r c h g e k e n n -z e i c h n e t, daß mehrere Stabilisierungsstützen, maß- und gewichtsmäßig über die gesamten Schiffskörper verteilt, mit Hilfe von sich eingenständig gegeneinander aussteuernden Hydraulikmotoren an dem Untergrund gehalten sind, so daß das Kraftwerk ständig einen einwandfreien Stand hat.8) Floating power plant with two or more in series Water wheels that flow from the flow in between two firmly connected at a distance Hull formed channel undershot driven it will be noted that several stabilizing supports, Distributed in terms of size and weight over the entire hull, with the help of yourself Hydraulic motors that independently steer against each other are held on the ground so that the power plant is always in perfect condition.
DE19823210375 1982-03-20 1982-03-20 Floating power station Granted DE3210375A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19823210375 DE3210375A1 (en) 1982-03-20 1982-03-20 Floating power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19823210375 DE3210375A1 (en) 1982-03-20 1982-03-20 Floating power station

Publications (2)

Publication Number Publication Date
DE3210375A1 true DE3210375A1 (en) 1983-11-10
DE3210375C2 DE3210375C2 (en) 1987-08-13

Family

ID=6158906

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19823210375 Granted DE3210375A1 (en) 1982-03-20 1982-03-20 Floating power station

Country Status (1)

Country Link
DE (1) DE3210375A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE360520C (en) * 1922-10-04 Anders Peter Andersen Device for the installation of a hydropower plant in Fluessen
DE2626984A1 (en) * 1976-06-16 1977-12-29 Johann Stafflinger Water driven power generator mounted on moored raft - has rotor shafts above water level coupled to common generator
DE2927776A1 (en) * 1979-07-10 1981-01-29 Rudolf Dr Wieser Pump for agricultural irrigation - has centrifugal pump coupled to water wheel to give high lift with small wheel
DE3034862A1 (en) * 1980-09-16 1982-03-25 Bernhard 6800 Mannheim Jöst USE OF FLOWING WATER FOR ENERGY

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE360520C (en) * 1922-10-04 Anders Peter Andersen Device for the installation of a hydropower plant in Fluessen
DE2626984A1 (en) * 1976-06-16 1977-12-29 Johann Stafflinger Water driven power generator mounted on moored raft - has rotor shafts above water level coupled to common generator
DE2927776A1 (en) * 1979-07-10 1981-01-29 Rudolf Dr Wieser Pump for agricultural irrigation - has centrifugal pump coupled to water wheel to give high lift with small wheel
DE3034862A1 (en) * 1980-09-16 1982-03-25 Bernhard 6800 Mannheim Jöst USE OF FLOWING WATER FOR ENERGY

Also Published As

Publication number Publication date
DE3210375C2 (en) 1987-08-13

Similar Documents

Publication Publication Date Title
DE60126984T2 (en) METHOD AND DEVICE FOR ARRANGING AT LEAST ONE WIND TURBINE ON OPEN WATER
EP3019740A1 (en) Floating wind turbine with a floating foundation, and method for installation of such a wind turbine
EP0034605A1 (en) Plant for producing electrical power from a watercourse and turbine assembly for such a plant
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN105603881A (en) Integral erecting system for large sea-crossing arch bridge and construction method thereof
WO2011103988A1 (en) Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation
DE102017115817A1 (en) Foundation for an offshore wind energy plant
DE202008013954U1 (en) Hydropower plant with water wheels, floats, automatic height regulation, small wind turbines and photovoltaic
DE102012011491A1 (en) Underwater-compressed air-energy storage for storage of energy and for its regenerative recovery in power supply networks, has closed pressure receptacle for accommodating and storage of compressed air or such gaseous medium
DE2602355A1 (en) FAST TRANSPORT SYSTEM
DE3210375A1 (en) Floating power station
DE2746079A1 (en) DRY DOCK WITH A LIFTING PLATFORM
AT513995B1 (en) Floating river power station
WO2021191766A1 (en) Device and method for erecting a wind turbine with a tower and two booms extending from the tower
EP2047096A2 (en) Hydroelectric device for a water power installation
DE10302203A1 (en) Mobile flowing water power unit has flow channel through the belly of a ship to drive a water wheel
AT525731B1 (en) water roller power plant
DE10113409A1 (en) Wind and wave power system, stands on 3 or more pillars floating in sea bed, and has flotation tubes encased in base parts consisting of at least 3 independent units with 3 flushing line connections
EP2321214A2 (en) Production plant for offshore wind power stations, and method for the production of at least one subassembly thereof
DE2723147A1 (en) POWER PLANT TO USE THE ENERGY FROM SEA CURRENTS, IN PARTICULAR TIDAL CURRENTS
DE3221098A1 (en) Fluid-flow machine, in particular as a prime mover
CN114855725A (en) Bidirectional water flow self-traction hydraulic lifting sewage interception coarse grating
DE1481840A1 (en) Container loading crane
WO2024056907A1 (en) Modular system and hydroelectric power plant
DE880119C (en) Locking device for locks, harbors, docks or waterways

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
OR8 Request for search as to paragraph 43 lit. 1 sentence 1 patent law
8105 Search report available
8127 New person/name/address of the applicant

Owner name: ZEY, GEB. ROTH, ROSWITHA MARIA, 6250 LIMBURG, DE

8181 Inventor (new situation)

Free format text: ZEY, HEINRICH, 6250 LIMBURG, (VERSTORBEN), DE

8172 Supplementary division/partition in:

Ref country code: DE

Ref document number: 3249891

Format of ref document f/p: P

Q171 Divided out to:

Ref country code: DE

Ref document number: 3249891

AH Division in

Ref country code: DE

Ref document number: 3249891

Format of ref document f/p: P

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee