DE1481840A1 - Container loading crane - Google Patents

Container loading crane

Info

Publication number
DE1481840A1
DE1481840A1 DE19671481840 DE1481840A DE1481840A1 DE 1481840 A1 DE1481840 A1 DE 1481840A1 DE 19671481840 DE19671481840 DE 19671481840 DE 1481840 A DE1481840 A DE 1481840A DE 1481840 A1 DE1481840 A1 DE 1481840A1
Authority
DE
Germany
Prior art keywords
bridge
scaffolding
loading crane
quay wall
container loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19671481840
Other languages
German (de)
Inventor
Hans Tax
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE1481840A1 publication Critical patent/DE1481840A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes

Description

DιPL-IνG. F.Weickmann, Dr. Ing. A/Weickmann, Dipl-Ing-RWeickmann D1PL.-PHYS. Dr. K. Fincke Patentanwälte 1 A ft 1 P / ΠDιPL-IνG. F.Weickmann, Dr. Ing.A / Weickmann, Dipl-Ing-RWeickmann D1PL.-PHYS. Dr. K. Fincke Patentanwälte 1 A ft 1 P / Π

8 MÖNCHEN 27, mohlstrasse 22, rufnummer 483921/228 MÖNCHEN 27, Mohlstrasse 22, phone number 483921/22

Hans laxHans lax

München 23, Potsdamer Strasse 3Munich 23, Potsdamer Strasse 3

Oonta iner-VerladekranOonta iner loading crane

Die Erfindung betrifft einen Container-Verladekran, umfassend ein nahe einer Kaimauer an Land stehendes Krangerüst mit einer kaimauerseitigen und einer landseitigen Gerüstscheibe, auf diesem Krangerüst eine sich quer zur Kaimauer erstreckende Brücke mit einem über Wasser auskragenden, hochschwenkbaren Brückenausleger, auf dieser Brücke verfahrbar eine zumindest die kaimauerseitige Gerüstscheibe durchlaufende Laufkatze, auf dieser Laufkatze ein Hebezeug, auf dem Kran stationär angeordnet ein Lasthubantriebswerk für dieses Hebezeug und eine Seilverbindung zwischen dem Antriebswerk und dem Hebezeug.The invention relates to a container loading crane, comprising a crane frame standing on land near a quay wall with a on the quay wall side and a landside scaffolding disc this crane frame is a bridge extending transversely to the quay wall with a swiveling bridge that protrudes over the water Bridge boom, a trolley traversing at least the scaffolding disc on the quay wall side can be moved on this bridge, a hoist on this trolley, a load lifting drive mechanism for this hoist and arranged in a stationary manner on the crane a cable connection between the drive mechanism and the hoist.

Bei bekannten Container-Verladekränen dieser Bauart ist das Lasthubantriebswerk nächst dem landseitigen Ende der landseitig über die landseitige Gerüstsoheibe hinaus frei aus-In known container loading cranes of this type, the load lifting drive mechanism is next to the landside end of the landside beyond the land-side scaffold plate freely

909812/077 2909812/077 2

kragenden Brücke angeordnet. Das Gewicht des Lasthubantriebswerks erzeugt somit ein Gegendrehmoment für einen Betriebszustand, in dem der Brückenausleger in seine horizontale Betriebsstellung abgesenkt ist und die belastete Laufkatze nächst dem seeseitigen Ende des Brückenträgers steht. Nicht ausreichend berücksichtigt ist bei dieser Art der Anordnung des Lasthubantriebswerks ein Betriebszustand, bei dem der Ausleger hochgeschwenkt ist, die Laufkatze im Bereich des landseitigen Brückenabschnitts in Extremfällen sogar im Bereich des landseitig auskragenden Brückenabschnitts - steht und von der Seeseite kommender Wind den hochgeschwenkten Brückenausleger belastet. In diesem Betriebszustand ist für Stabilitätsbetrachtungen als Kippkante die BasIb der landseitigenGerüstscheibe zu nehmen. Sas um diese Kippkante erzeugte Moment des Eigengewichts des Lasthubantriebswerks, das um die gleiche Kippkante erzeugte Moment der resultierenden Windkraft auf den hochgeschwenkten Brückenausleger, das Eigengewichtsmoment des landseitig auskragenden Brückenabschnitts und ggfs. das Gewichts- und Lastmoment des landseitig auskragenden Brückenabschnitts um diese Kippkante wirken sämtliche in gleicher Richtung und können den Kran zum Land hin umwerfen.cantilevered bridge arranged. The weight of the load lift drive mechanism thus generates a counter torque for an operating state in which the bridge boom is in its horizontal operating position is lowered and the loaded trolley next to the sea-side end of the bridge girder stands. In this type of arrangement of the load lifting drive mechanism, an operating state is not sufficiently taken into account, in which the boom is swiveled up, the trolley in the area of the landside bridge section in In extreme cases, even in the area of the land-side cantilevered bridge section - there is wind coming from the sea side loaded the swiveled bridge boom. In this operating state it is used as a tilting edge for stability considerations to take the base of the landside scaffolding disc. Sas around this tilting edge generated the moment of the dead weight of the load lift drive mechanism, which generated around the same tilting edge Moment of the resulting wind power on the swiveled bridge boom, the dead weight of the cantilevered land side Bridge section and, if applicable, the weight and load moment of the land-side cantilevered bridge section around it Tilting edges all work in the same direction and can overturn the crane towards the land.

Erfindungsgemäß wird hier dadurch Abhilfe geschaffen, daß das Lasthubantriebswerk auf der landseitigen Gerüstscheibe ange-According to the invention, a remedy is provided here that the Load hoist drive unit attached to the landside scaffolding disc

-3--3-

909812/0772909812/0772

ordnet ist.is arranged.

In an sich bekannter Weise können die Lastseile von dem Antriebswerk ausgehend der Brücke entlang verlaufen, auf ihrem Weg längs der Brücke über Umlenkrollen der Laufkatze geführt und in Tragrollen eines Containeraufnahmerahmens eingeschert sein und am wasserseitigen Ende der Brücke fest verankert sein; bei landseitiger Ausladung der Brücke über die landseitige Gerüstscheibe hinaus können die Lasteeile von dem Triebwerk über Umlenkrollen nächst dem landseitigen Ende der Brücke geführt sein.In a manner known per se, the load ropes can run along the bridge starting from the drive mechanism guided their way along the bridge over pulleys of the trolley and in support rollers of a container mounting frame be reeved and firmly anchored at the waterside end of the bridge; if the bridge is unloaded from the land side the shore-side scaffolding disk can also move the load parts from the engine via pulleys next to the shore-side one Be led at the end of the bridge.

Die Erfindung will weiter ermöglichen, daß die Laufkatze auch bei hochgeschwenktem Brückenabsohnitt auf den landseitigen Brückenabschnitt noch fahren kann. Im Hinblick auf dieses Ziel wird erfindungsgemäß weiter vorgeschlagen, daß nächst der kaimauerparallelen Knotenachse zwischen Brücke und kaimauerseitiger GerUstscheibe Lastseilführungsrollen angeordnet sind, welche bei niedergelassenem Brückenausleger aus der Laufbahn der Laufkatze ausgerückt sind und bei hochgeschwenktem Brückenausleger die Führung der Lasthubseile übernehmen, derart, daß die Laufkatze auf dem landseitigen Brückenabschnitt verfahrbar ist.The invention further aims to make it possible for the trolley to still travel onto the landside bridge section even when the bridge section is swiveled up. With regard This aim is further proposed according to the invention that next to the junction axis parallel to the quay wall between the bridge and the scaffolding disc on the quay wall side, load rope guide rollers are arranged, which when the bridge boom is down the track of the trolley are disengaged and take over the guidance of the load hoisting ropes when the bridge boom is swiveled up, in such a way that the trolley can be moved on the landside bridge section.

Die Ausrückbarkeit der Lastseilführungsrollen kann dadurchThe disengagement of the rope guide rollers can thereby

-4-9098127O772-4-9098127O772

herbeigeführt werden, daß diese an Schwenkarmen angebracht werden. Die Stellbewegung der Sohwenkarme kann mit der Au·- legervereohwenkung swangsläufig gekoppelt werden.be brought about that this is attached to swivel arms will. The adjusting movement of the swing arm can be adjusted with the Legervereohwenken to be coupled inevitably.

In der Regel wird man den erfindungsgemäBen Oontalner-Ver— ladekran fahrbar ausführen wollen und eu diesem Zweck dlt Qerüstsohelben auf Fahrwerk:· stellen, welche längs kaimauerparalleler Kranfahrsohlenen fahrbar sind.As a rule, the Oontalner method according to the invention will be used want to make the loading crane mobile and dlt for this purpose Scaffolding the same on the running gear: · Place which can be moved along the crane running sole parallel to the quay wall.

Die Erfindung will welter errelohen, dafi cu be- und tntladende Oontalner-Sohlffe bei hoohgesohwenktem BrUokenausleger bis unmittelbar an die Kaikante heranfahren können, ohne dafi Kollisionen swlschen dem Oont*lner-Verladekran und dsm Schiff su befürchten sind. Im Hinblick auf diese Zielsetzung wird erflndungagemäB welter Torgesohlagen, dafl die kaimauer··Itige Oerüflteoheib· ron unten nach oben landeinwärts gensigt ist und dafl der Brüokenaueleger näohst der Knotenaohse swleohen Brttoke und kaimauerseitiger (torüstsohelbe angelenkt 1st·The invention wants to redeem that loading and unloading Oontalner-Sohlffe with high-swiveled bridge boom up to be able to drive directly to the edge of the quay without dafi Collisions between the Oont * lner loading crane and the ship are to be feared. With a view to this objective, according to the invention, the bottom of the gate is used, so that the quay wall ·· Itige Oerüflteoheib · ron is approved from below to above inland and so that the broker is closer to the knot axis and on the quay wall side (hinged to the gate structure 1st

Der BrUokenausleger 1st beim Hoohklappen unbelastetsauf den unbelasteten Brüokenaualeger sind die sum Hoohsiehen dienenden Seil· all·in ausgelegt, für den BetrlebsKustand, In dem der BrUokenausleger unbelastet 1st, sind susammenfaltbare Zugstütien Torgeaehtn, welche den BrUokenaualeger in der nieder-The BrUoken boom is unloaded on the hoisting unencumbered broths are those who serve the sum Hoohsiehen Rope · all · in designed, for the operational state in which the BrUoken booms are unloaded 1st, are collapsible pull rods Torgeaehtn, which the BrUokenaualeger in the lower-

—5——5—

909812/0772909812/0772

gelassenen Stellung tragen; diese gehen von über der BrUoke gelegenen Stellen der kaimauerseitlgen Gerttstsoheibe aus. Diese Zugstützen können an dem Brüokenausleger und an der kaimauerseitigen Gerüstsoheibe angelenkt und mit Kniokgelenken ausgeführt sein.bear serene position; these go from across the BrUoke parts of the quay wall-side Gerttstsoheibe. These tensile supports can be articulated on the bridge boom and on the scaffolding plate on the quay wall side and can be designed with knee joints.

Ein zum Verstellen des Brüokenauslegers dienendes AuslegerverStellantriebewerk wird man aus den eingangs gestellten Kippmomentüberlegungen heraus räumlich möglichst mit dem Lasthubantriebswerk zusammenfassen; dementsprechend wird man Auslegerverstellseile von dem Auslegerverstellantriebswerk zu Plasohenzügen laufen lassen, welche zwischen Unterflaschen am Brückenausleger und über der Brücke gelegenen Oberflaschen an der kaimauerseitigen Gerüstscheibe verlaufen.A boom adjustment drive mechanism which is used to adjust the boom boom is one of those provided at the beginning Combine tilting moment considerations spatially with the load lift drive mechanism as far as possible; accordingly becomes jib adjustment ropes are run from the jib adjustment drive to plasma trains, which are located between lower blocks on the bridge jib and above the bridge Upper flaps run on the scaffolding disc on the quay wall side.

Es empfiehlt sioh, den Brüokenausleger in seiner hochgeklappten Stellung verriegelbar zu machen. Zu diesem Zweck kann man an der kaimauerseitigen Gerüstscheibe ein pendelartiges Yerrlegelungsglled über der Brücke aufhängen, welches in seiner Außerbetriebsstellung bei kaimauerparalleler Betrachtunger iohtung in Deckung mit der kaimauerseitigen GerÜBtscheibe ist.It is recommended that the broth boom be locked in its folded-up position. To this end you can hang a pendulum-like Yerrlegelungsglled over the bridge on the scaffolding disc on the quay wall side, which in its inoperative position, when viewed parallel to the quay wall, it is in line with the scaffolding panel on the quay wall side.

Um das aus den beiden Gerüstsoheiben und der Brücke gebildeteAbout that formed from the two scaffold blocks and the bridge

-6-909812/0772-6-909812 / 0772

Gelenkviereok verwindungssteif zu machen, kann man die die Brlicke überragende kalmauerseltlge Gerüstscheibe mit der Brücke durch Versteifungsstreben verbinden, welche von oberhalb und unterhalb der Brücke gelegenen Stellen der kalmauereeitlgen Gerüstscheibe ausgehen und wenigstens annähernd in der kaimauerparallelen Knotenachse zwischen der Brücke und der landeeitigen Gerüstscheibe enden; diese Versteifungsstreben können an ihren beiden Enden gelenkig mit den jeweiligen Anschlußteilen verbunden sein.To make four-sided joints torsion-resistant, one can do the the bridge towering over the Kalmauerelge scaffolding disc Connect to the bridge with stiffening struts, which are located from above and below the bridge run out of the scaffolding disc on the side of the Kalmau and at least approximately in the node axis parallel to the quay wall between the bridge and the landing-side scaffolding disc ends; these stiffening struts can be articulated at both ends be connected to the respective connection parts.

Die Erfindung will schließlich eine Möglichkeit schaffen, um ein- und denselben Container-Verladekran je nach Anwendungszweck und Anwendungsort mit verschiedenen Spurweiten betreiben zu können. Demgemäß wird weiter vorgeschlagen, daß die Spurweite des Krangerüsts veränderbar sein soll. Zur Veränderung der Spurweiten kann man in der Weise vorgehen, daß man den Abstand der Gerüstscheiben in Brückenlängsrichtung veränderbar macht. Für die Abstandsveränderung der Gerüstscheiben stehen wieder zwei Möglichkeiten zur Verfügung: nach einer ersten Möglichkeit wird die landseitige Gerüstscheibe unter Veränderung der Länge der Versteifungsstreben an verschiedenen Stellen der Brücke angesetzt; eine andere Möglichkeit besteht darin, daß der zwischen den Gerüstscheiben liegende Brückenabschnitt und die Versteifungsstreben verlängerbar sind. Diese letztere Möglichkeit verdient beiFinally, the invention aims to create a possibility to operate the same container loading crane with different gauges depending on the purpose and place of use to be able to. Accordingly, it is further proposed that the track width of the crane frame should be variable. To the Changing the gauges can be done in such a way that the distance between the scaffolding disks in the longitudinal direction of the bridge makes changeable. For changing the distance between the scaffolding panels there are again two options available: the first option is the landside scaffolding section by changing the length of the stiffening struts attached to different points of the bridge; another The possibility is that the bridge section lying between the scaffolding disks and the stiffening struts can be lengthened are. This latter option deserves at

-7--7-

909812/0772909812/0772

H818A0H818A0

bestimmten Bauarten deshalb den Vorzug vor der erstgenannten, well die Ansohlußteile an der Brücke für den Anschluß der landseltlgen Oerüstsoheibe und der Versteifungsstreben dann unabhängig von der jeweiligen Spurweite stets veränderbar sind.Therefore, certain types of construction take precedence over the former, well the connection parts on the bridge for connecting the landseltlgen Oerüstsoheibe and the stiffening struts can then always be changed regardless of the respective track width.

Die beillegenden Figuren erläutern die Erfindung. Es stellen dartThe accompanying figures explain the invention. Put it dart

Flg. 1 einen erflndungegemäeen Oontainer-Verladekran bei kaimauerparalleler Betraohtungsrlohtung mit dem Brüokenausleger in Arbeitsstellung} Flg. 1 an invented Oontainer loading crane with a quay wall parallel debarking with the briquette boom in working position}

Flg. 2 das Verseilungssohema der Lasthubselle; Flg. 2 the stranding theme of the load lifting shaft; Flg. 3 den Kran naoh Figur 1 mit hoohgeschwenktem Ausleger; Flg. 3 shows the crane according to FIG. 1 with the boom pivoted high;

Flg. 4 das VerseIlungssohema der Lasthubseile bei hoohgesohwenktem Ausleger; Flg. 4 shows the theme of the load lifting ropes with the boom pivoted high;

Flg. 5 das Versellungssohema des Auslegerverstellseile; Fig. 6 einen Schnitt naoh Linie VI-VI der Figur 1; Flg. 7 einen Schnitt naoh Linie VII-VII der Figur 1; Flg. 5 the topic of the boom adjustment cable; 6 shows a section along line VI-VI of FIG. 1; Flg. 7 shows a section along line VII-VII in FIG. 1;

Flg. 8 eine Ansieht entsprechend der Figur 1 bei veränderter Spurweite. Flg. 8 shows a view corresponding to FIG. 1 with a changed track width.

In Figur 1 ist mit 10 der Kai beeelohnet, mit 12 die Kaimauer und mit H ein an der Kaimauer anliegendes Schiff.In FIG. 1, the quay is rewarded with 10, the quay wall with 12 and a ship lying against the quay wall with H.

-8-909812/0772 -8- 909812/0772

Auf dem Kai sind Schienen 16,18 verlegt, welche länge der Kaimauer 12 verlaufen und auf denen Fahrwerke 20,22 verlaufen. Auf dem Krangerüst 24 ruht eine Brücke 30. Das Krangerüst 24 setzt sich zusammen aus einer landseitigen Gerüstscheibe 26 und einer Eaimauerseitigen Gerüetsoheibe 28. Rails 16, 18 are laid on the quay, which run the length of the quay wall 12 and on which running gears 20, 22 run. A bridge 30 rests on the crane scaffold 24. The crane scaffold 24 is composed of a land-side scaffolding disc 26 and a scaffolding base 28 on the Eai wall-side.

Die Brüoke 30 setzt sich zusammen aus einem landseitigen BrUokenabsohnitt 32, aus einem hochschwenkbaren Ausleger 34 und einem landseitigen Kragarm 36. Die Brüoke 30 umfasst, wie die Figuren 6 und 7 zeigen, zwei parallele Brückenträger 38,40, auf denen eine laufkatze 42 fährt.The Brüoke 30 is composed of a landside BrUokenabsohnitt 32, from a swing-up boom 34 and a land-side cantilever arm 36. The bridge 30 comprises, as FIGS. 6 and 7 show, two parallel ones Bridge girders 38, 40 on which a trolley 42 travels.

Das Verfahren der Laufkatze besorgt ein nicht eingezeichneter Fahrwerksmotor, der über Schleifkontakte und Stromschienen gespeist wird.The movement of the trolley is done by a chassis motor (not shown) that operates via sliding contacts and busbars is fed.

An der Laufkatze 42 ist ein Hebezeug 44 aufgehängt, das einen Container 46 trägt.A hoist 44, which carries a container 46, is suspended from the trolley 42.

Die Ausbildung des Hebezeugs ist im einzelnen aus Figur 4 zu entnehmen: man erkennt dort die Laufkatze 42, die mit Laufrädern 48 auf dem Brückenträger 38,40 fährt. Auf der Laufkatze 42 sind Umlenkrollen 50 angeordnet; ein Hubseil 51 verläuft von einem Lasthubantriebswerk 52, das am oberenThe design of the hoist is shown in detail in FIG to be seen: one recognizes there the trolley 42, which travels with running wheels 48 on the bridge girder 38,40. On the Trolley 42, pulleys 50 are arranged; a hoisting rope 51 runs from a load hoisting drive mechanism 52, which is at the top

-9-909812/0772-9-909812 / 0772

-*- H81840- * - H81840

Ende der landeeitigen Gerüstscheibe 24 angeordnet ist, über eine Umlenkrolle 54 am Kragarm 36 und über die Umlenkrollen 50 zu einem Festpunkt 56 am wasserseitigen Ende der Brücke. Das Seil 51 ist zwischen den Umlenkrollen 50 der Laufkatze 42 in Tragrollen 58 eines Containeraufnahmerahmens 60 eingeschert. Durch mehr oder weniger starkes Einziehen des Lasthubseils 51 kann der Containeraufnahmerahmen 60 angehoben bzw. gesenkt werden.The end of the landing-side scaffold disk 24 is arranged, Via a deflection roller 54 on the cantilever arm 36 and via the deflection rollers 50 to a fixed point 56 at the water-side end the bridge. The rope 51 is between the pulleys 50 the trolley 42 reeved into support rollers 58 of a container receiving frame 60. By more or less strong When the load lifting rope 51 is drawn in, the container receiving frame 60 can be raised or lowered.

Die vorstehenden Ausführungen beziehen sich auf ein einziges Lasthubseil. Entsprechend dem rechteckigen Grundriß von Containern werden in der Regel vier solohe Lasthubseile vorhanden sein, je eines für jede Ecke des Containergrundrisses. Der Seilverlauf ist für sämtliche Lasthubseile in der Regel identisch.The above explanations relate to a single load hoisting rope. Corresponding to the rectangular outline of containers, there will usually be four single load lifting ropes, one for each corner of the container outline. The course of the rope is usually identical for all load lifting ropes.

Der Brückenausleger 30 ist, wie bereits angedeutet, hochschwenkbar; er ist zu diesem Zweck bei 62 gelenkig gelagert. Zum Hochschwenken ist ein Auslegerverstellseil 64 vorgesehen, wie in Figur 5 angedeutet. Das Auslegerverstellseil 64 geht von einem Auslegerverstellantriebswerk 66 aus, das mit dem Lasthubantriebswerk 52 baulich zusammengefasst ist. Dieses Auslegerverstellseil 64 läuft über eine Umlenkrolle 68 an der Spitze der Gerüstsoheibe 28 in einen Flaschenzug 70 ein, dessen Oberflasche 72 ebenfalls an der Spitze der Gerüst-As already indicated, the bridge boom 30 can be swiveled up; it is articulated at 62 for this purpose. A boom adjustment cable 64 is provided for swiveling up, as indicated in FIG. The boom adjustment cable 64 goes from a boom adjustment drive mechanism 66, which is connected to the Load lift drive mechanism 52 is structurally summarized. This Boom adjustment cable 64 runs over a pulley 68 the tip of the scaffold plate 28 in a pulley 70, its upper block 72 also at the top of the scaffolding

-10--10-

909812/0772909812/0772

"10" U818A0" 10 " U818A0

scheibe 28 angeordnet ist und dessen Unterflasohe 74 am Brückenausleger 34 sitzt.Disk 28 is arranged and its Unterflasohe 74 on Bridge boom 34 is seated.

In der niedergeklappten Stellung ist der Brückenausleger 34 durch Zugstützen 76,73 getragen» die einerseits an der kaimauerseitigen Gerüstscheibe 28 und andererseits an dem Brückenausleger 34 angelenkt sind. Jede der Zugstützen 76, 78 weist ein Knickgelenk 80 bzw. 82 auf (Figur 3).In the folded-down position, the bridge boom 34 is supported by tension supports 76, 73 on the one hand on the scaffolding disc 28 on the quay wall side and on the other hand on the Bridge boom 34 are articulated. Each of the tension supports 76, 78 has an articulated joint 80 or 82 (FIG. 3).

In der hochgeklappten Stellung ist der Brückenausleger 34 durch einen Sicherungshaken 84 gesichert, der im Betriebszustand der Figur 1 in Deckung mit der kaimauerseitigen Gerüst scheibe 28 steht.In the folded up position, the bridge arm 34 is secured by a securing hook 84, which in the operating state of Figure 1 in congruence with the quay wall-side scaffolding disk 28 is.

Bas aus den Gerüstscheiben 26,28 und dem Brückenträger 30 gebildete Gelenkviereck ist ausgesteift durch Versteifungsstreben 86,88, die einerseits gelenkig an der KaimauerseItigen Gerüstscheibe 28 und andererseits gelenkig an der Brücke angeschlossen sind.Bas from the scaffolding disks 26, 28 and the bridge girder 30 The quadrangle formed is stiffened by stiffening struts 86, 88, which are on the one hand articulated on the quay wall Scaffolding disk 28 and on the other hand are articulated to the bridge.

Wie aus Figur 1 ersichtlich,ist die kaimauerseitige Gerüstscheibe 28 gegen die Vertikale geneigt; die Folge hiervon ist, daß das Gelenk 62 zur Landseite hin verlegt werden kann und der gesamte Brückenausleger 34 in seiner hochgeschwenkten Stellung vom Schiff Abstand gewinnt.As can be seen from Figure 1, the quay wall-side scaffolding disc 28 inclined to the vertical; the consequence of this is that the joint 62 can be relocated to the land side and the entire bridge boom 34 gains distance from the ship in its swiveled up position.

-11--11-

9 0 9 8 12/07729 0 9 8 12/0772

Die laufkatze 42 Boll bei hoohgesohwenktem Brllokenaueleger 34 in den Absohnitten 32 und 36 der Brüoke verfahrbar bleiben. Zu diesem Zweck 1st, wie aus den Figuren 2 und 4 ereiohtlich, eine Umlenkrolle 90 vorgesehen, die mittels eines Sohwenka:The trolley 42 Boll at the hoohgesohwenktem Brllokenaueleger 34 remain movable in the subsections 32 and 36 of the Brüoke. For this purpose, as shown in Figures 2 and 4, a pulley 90 is provided, which by means of a Sohwenka: 92 nächst dem Anlenkpunkt 62 des BrUokenauslegers 34 gelagert ist. Bei horizontalem Brückenausleger 34 ist die Umlenkrolle 90, wie aus Figur 2 ersichtlich, hoohgeschwenkt, so daß sie die Fahrt der Laufkatze 42 nicht behindert. Bei hoohgeeohwenktem Brüokenausleger 34 hingegen ist die Umlenkrolle niedergesohwenkt, so daß sie das Lasthubseil 51 führt und zwar in einer Höhe, die gegenüber dem Betriebszustand mit horizontalem Ausleger 34 unverändert ist. Sie Laufkatze 42 kann deshalb bei hochgeschwenktem Ausleger 34 weiterhin über die BrUokenabschnitte 32 und 36 fahren.92 is mounted next to the articulation point 62 of the BrUoken boom 34. When the bridge boom 34 is horizontal, the pulley is 90, as can be seen from Figure 2, swiveled up so that they does not hinder the travel of the trolley 42. In contrast, when the briquette boom 34 is swiveled high, the pulley is swiveled down so that it leads the load lifting cable 51 and that at a height that is unchanged compared to the operating state with a horizontal boom 34. You trolley 42 can therefore continue with the boom 34 pivoted up Drive BrUoken Sections 32 and 36.

Der Schwenkarm 92 weist einen Antrieb auf, der nicht eingezeichnet ist. Dieser Antrieb ist mit der Bewegung des Brückenauslegers 34 zwangsläufig gekoppelt, so daß in der horizontalen Stellung des Auslegers 34 die Umlenkrolle 90, wie aus Figur 2 ersiohtlioh, hoohgerückt ist, während bei hoohgeklapptem Ausleger, wie Figur 4 zeigt, die Umlenkrolle 90 ihre FUhrungeeteilung zum Seil 51 einnimmt.The pivot arm 92 has a drive which is not shown. This drive is inevitably coupled with the movement of the bridge boom 34, so that in the horizontal position of the boom 34, the deflection roller 90, as from FIG. 2 is raised, while with the boom folded up, as FIG. 4 shows, the deflection roller 90 their leadership division for rope 51 assumes.

Mit der Laufkatze 42 let, wie aus den Figuren 1 und 3 ersichtlich, eine Führergondel 94 vereinigt.As can be seen from FIGS. 1 and 3, a guide gondola 94 is combined with the trolley 42 let.

-12--12-

909812/0772909812/0772

Zwischen den Gerüstscheiben 26 und 26 ist, wie aus den Figuren 1 und 3 ersichtlich, eine Fahrebene für Container« Transportmittel gebildet; auf dieser Fahrebene können beispielsweise Geleise für Eisenbahngüterzüge verlegt sein.Between the frame disks 26 and 26 is, as shown in the Figures 1 and 3 can be seen, a driving level for containers " Means of transport formed; Tracks for rail freight trains, for example, can be laid on this driving level.

Wie duroh Vergleich der Figuren 1 und 8 zu ersehen ist, ist der Abstand der Gerüstscheiben 26 und 28 veränderbar und damit die Spurweite der Fahrschienen 16 und 18. Zum Vergrößern der Spurweite auf das Maß gemäß Figur 8 werden in den Brüokenabsohnitt 32 und in die Versteifungsetreben 86,88 Verlängerungsstücke 96 bzw. 98 eingesetzt.As can be seen by comparing Figures 1 and 8, the distance between the scaffolding disks 26 and 28 can be changed and thus the track width of the running rails 16 and 18 Enlarging the track width to the dimension according to Figure 8 are in the Brüokenabsohnitt 32 and in the stiffening struts 86.88 extension pieces 96 or 98 inserted.

In Figur 3 ist einer der kritischen Setriebszustände des Container-Verladekrane gezeichnet. Der hochgeklappte Brückenaueleger 34 sei einem hohen Winddruck ausgesetzt. Dieser erzeugt ein Kippmoment um die Fahrschiene 16. Dieses Kippmoment bleibt deshalb in erträglichen Grenzen, weil die Gewichte der Antriebswerke 52,66 auf der landseitigen Gerüstscheibe 26 konzentriert sind und selbst kein im gleichen Sinne wirkendes Drehmoment erzeugen, im Gegensatz zu älteren Ausführungeformen, bei denen die Antriebswerke landeinwärts von der Gerüstscheibe 36 angeordnet waren.In Figure 3 is one of the critical operating states of the Container loading cranes drawn. The folded-up bridge arm 34 is said to be exposed to high wind pressure. This generates a tilting moment around the running rail 16. This tilting moment remains within tolerable limits because the Weights of the drive units 52, 66 are concentrated on the shore-side scaffolding disk 26 and are not themselves in the same Generate effective torque, in contrast to older designs, in which the drive mechanisms inland from the frame plate 36 were arranged.

-12a--12a-

909812/0772909812/0772

AlAl

Wie aus den Figuren 1, 5» 6 und 8 erkennbar, Bind die Antriebswerke 52,66 in einem Gehäuse 100 untergebracht, welches daneben weitere nicht eingezeichnete Antriebe, Schaltgeräte, Regelgeräte und Steuergeräte aufnehmen kann. Es kann somit die Elektroinstallation des Krane,weitgehend in einer Einheit zusammengefasst, im Herstellerwerk montiert werden, so daß sie am Orte der Kranaufstellung nur noch mit den übrigen Teilen des Krangerüsts zusammengefasst zu werden braucht. Dies ist vor allem bei Großkrananlagen ein entscheidender Vorteil, wenn man bedenkt, daß bisher oft woohen- oder sogar monatelange Hontagearbeiten für den Einbau der Antriebe, Schaltgeräte, Steuergeräte und Regelgeräte erforderlich waren.As can be seen from Figures 1, 5, 6 and 8, bind the Drive mechanisms 52,66 housed in a housing 100, which also has other drives, not shown, Switchgear, control devices and control devices can accommodate. The electrical installation of the crane, largely combined in one unit, can thus be assembled in the manufacturing plant so that they are only combined with the remaining parts of the crane structure at the location of the crane installation needs to become. This is a decisive advantage, especially in large crane systems, if you consider that up to now often woohen or even months of honing work for the Installation of the drives, switching devices, control devices and regulating devices were required.

909812/0772909812/0772

Claims (1)

PatentansprücheClaims 1. Container-Verladekran, umfassend ein nahe einer Kaimauer an Land stehendes Krangerüst mit einer kaimauerse it igen und einer landseitigen Gerüstscheibe, auf diesem Krangerüst eine sich quer zur Kaimauer erstreckende Brücke mit einem über Wasser auskragenden, hochschwenkbaren Brückenausleger, auf dieser Brücke verfahrbar eine zumindest die kaimauerseitige Gerüstscheibe durchlaufende Laufkatze, auf dieser Laufkatze ein Hebezeug, auf dem Kran stationär angeordnet ein Lasthubantriebswerk für dieses Hebezeug und eine Seilverbindung zwischen dem Antriebswerk und dem Hebezeug, dadurch ^kennzeichnet, daß das Lasthubantriebswerk (52) auf der landseitigen Gerüstscheibe (26) angeordnet ist.1. Container loading crane, comprising a crane frame standing on land near a quay wall with a quay wall it igen and a shore-side scaffolding disc, on this crane scaffolding one that extends across the quay wall Bridge with a swiveling bridge boom that protrudes over water and can be moved on this bridge a trolley running through at least the scaffolding disc on the quay wall side, on this trolley a hoist, A load lifting drive mechanism for this hoist and a cable connection are arranged stationary on the crane between the drive mechanism and the hoist, characterized ^ indicates that the load lift drive mechanism (52) on the Land-side scaffolding disc (26) is arranged. 2. Container-Verladekran nach Anspruch 1 , dadurch gekennzeichnet, daß - in an sich bekannter Weise - Lasthubseile (51) von dem Lasthubantriebswerk (52) ausgehend, der Brücke (30) entlang verlaufen, auf ihrem Weg längs der Brücke (30) über Umlenkrollen (50) der Laufkatze (42) geführt und in Tragrollen (58) eines Containerauf-2. Container loading crane according to claim 1, characterized in that that - in a manner known per se - load hoisting ropes (51) starting from the load hoisting drive mechanism (52), run along the bridge (30), on their way along the bridge (30) over pulleys (50) of the trolley (42) out and in support rollers (58) of a container -H-9098 12/0772-H-9098 12/0772 ASAS nahmerahmens (60) eingeschert sind und am wasserseitigen Ende der Brüoke fest verankert sind. frame (60) are reeved and are firmly anchored at the water-side end of the bridge. 3. Oontalner-Verladekran nach Anspruch 2, dadurch gekennzeichnet, daß bei landseltiger Ausladung (36) der Brücke (30) über die landseitige Gerüstsoheibe (24) hinaus die Lasthubselle (51) von dem Lasthubantriebswerk (52) über Umlenkrollen (50) nächst dem landseItIgen Ende der Brücke (30) geführt sind.3. Oontalner loading crane according to claim 2, characterized in that that when the bridge (30) is landed overhang (36) over the land-side scaffold plate (24) also the load lifting shaft (51) from the load lifting drive mechanism (52) over pulleys (50) next to the land side End of the bridge (30) are performed. 4. Container-Verladekran, insbesondere nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß näohst der kaimauerparallelen Knotenachse zwischen Brücke (30) und kaimauerseitiger ßerüstscheibe (28) Lastseilführungsrollen (90) angeordnet sind, welche bei niedergelassenem Brückenausleger (34) aus der Laufbahn der Laufkatze (42) ausgerückt sind und bei hochgeschwenktem Brückenausleger (34) die Führung der Lasthubseile (51) übernehmen, derart, daß die Laufkatze (42) auf dem landseitigen Brückenabschnitt (32,36) verfahrbar ist.4. Container loading crane, especially after one of the Claims 1 to 3, characterized in that next the junction axis parallel to the quay wall between the bridge (30) and the quay wall-side scaffolding disc (28) load rope guide rollers (90) are arranged, which when the bridge jib (34) is down from the track of the trolley (42) are disengaged and when the bridge boom (34) is swiveled up, take over the guidance of the load hoisting ropes (51) in such a way that that the trolley (42) can be moved on the landside bridge section (32,36). 5. Container-Verladekran nach Anspruch 4» daduroh gekennzeichnet, daß die Führungsrollen (90) an Schwenkarmen (92) angebracht sind.5. Container loading crane according to claim 4 »daduroh characterized in that the guide rollers (90) on swivel arms (92) are attached. -15--15- 909812/0772909812/0772 -4*- H818A0-4 * - H818A0 6. Container-Verladekran nach Anspruch 5» dadurch gekennzeichnet, daß die Stellbewegung der Sohwenkarme (92) mit der Auslegerversohwenkung zwangsläufig gekoppelt ist.6. Container loading crane according to claim 5 »characterized in that the adjusting movement of the Sohwenkarme (92) is inevitably coupled with the boom swiveling. 7. Container-Verladekran nach einem der Ansprüche 1 bis7. Container loading crane according to one of claims 1 to 6, dadurch gekennzeichnet, daß die Laufkatze (4-2) durch einen auf ihr angebrachten Fahrwerkemotor angetrieben ist» welcher beispielsweise über Schleifkontakte und länge des Brückenträgers verlaufende Stromabnahmesohienen mit Energie versorgt ist.6, characterized in that the trolley (4-2) is driven by a landing gear motor attached to it »which, for example, has sliding contacts and the length of the bridge girder running power take-off rails is supplied with energy. 8. Oontainer-Verladekran naoh einem der Ansprüche 1 bis8. Oontainer loading crane naoh one of claims 1 to 7, daduroh gekennzeichnet, daß die Laufkatze (42) mit einem unterhalb des Brückenträgers liegenden Führerhaus (94) ausgerüstet ist.7, characterized by the fact that the trolley (42) with a driver's cab (94) located below the bridge girder. 9· Oontainer-Verladekran naoh einem der Anepcüahe 1 bis9 · Oontainer loading crane according to one of the paragraphs 1 to 8, daduroh gekennzeichnet, daß die Gterüstscheiben (26,28) auf Fahrwerken (20,22) stehen, welche länge kaimauerparalleler Kranfahrschienen (16,18) fahrbar sind.8, characterized by the fact that the frame disks (26,28) stand on trolleys (20, 22) which length of crane rails (16, 18) parallel to the quay wall can be moved. 10. Oontainer-Verladekran naoh einem der Ansprüche 1 bis10. Oontainer loading crane naoh one of claims 1 to 9, daduroh gekennzeichnet, daß zwischen den GerUstscheiben9, characterized by the fact that between the framework disks -16--16- 909812/0772909812/0772 H81840H81840 (26,28) eine Fahrebene für Container-Transportmittel gebildet ist.(26,28) a driving level for container transport is formed. 11. Container-Verladekran nach Anspruch 10, dadurch gekennzeichnet, daß in der Fahrebene Eisenbahngeleise verlegt sind.11. Container loading crane according to claim 10, characterized in that rail tracks in the driving plane are relocated. 12. Container-Verladekran, insbesondere nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, daß die kaimauerseitige Gerüstsoheibe (28) von unten nach oben landeinwärts geneigt ist und daß der Brückenausleger (34) nächst der Knotenachse zwischen Brücke (30) und kaimauerseitiger Gerüstscheibe (28) (bei 62) angelenkt ist.12. Container loading crane, in particular according to one of claims 1 to 11, characterized in that the Scaffolding plate (28) on the quay wall side from bottom to top is inclined inland and that the bridge boom (34) next to the node axis between the bridge (30) and Scaffolding disc (28) on the quay wall side (at 62) is articulated is. 13> Container-Verladekran nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, daß der Brückenausleger (34) in der niedergelassenen Stellung durch gestreckte zusammenfaltbare Zugstützen (76,78) getragen ist, welche von über der Brücke (30) gelegenen Stellen der kaimauerseitigen Gerüstscheibe (28) ausgehen.13> Container loading crane according to one of claims 1 to 12, characterized in that the bridge boom (34) is supported in the lowered position by extended, collapsible tension supports (76,78), which start from points of the scaffolding disc (28) on the quay wall side above the bridge (30). 14· Container-Verladekran nach Anspruch 13, dadurch gekennzeichnet, daß die Zugstützen (76,78) an dem Brückenausleger (34) und an der ka i.mauer se it igen Gerüstscheibe (28)14 · Container loading crane according to claim 13, characterized in that the tension supports (76, 78) on the bridge jib (34) and on the scaffolding disc (28) on the wall side -17-909812/0772-17-909812 / 0772 angelenkt und mit Knickgelenken (80,82) ausgebildet sind.are articulated and formed with articulated joints (80, 82). 15. Container-Verladekran nach einem der Ansprüche 1 bis Η» dadurch gekennzeichnet, daß ein Auslegerverstellantriebswerk (66) räumlich mit dem Lasthubantriebswerk (52) zusammengefasst ist und daß Auslegerverstellseile (64) von dem AuslegerverStellantriebswerk (66) zu Piaschenzügen (70) verlaufen, welche zwischen Unterflaschen (74) am Brückenausleger (34) und über der Brücke (30) gelegenen Oberflaschen (72) an der kaimauerseitigen Gerüstscheibe (28) verlaufen.15. Container loading crane according to one of claims 1 to Η »characterized in that a boom adjustment drive mechanism (66) is spatially combined with the load lift drive mechanism (52) and that boom adjustment ropes (64) from the boom adjustment drive mechanism (66) to Piaschenzügen (70) which run between lower blocks (74) on the bridge boom (34) and above the bridge (30) located upper flaps (72) on the quay wall side Scaffolding disc (28) run. 16. Container-Verladekran, insbesondere nach einem der Ansprüche 1 bis 15» dadurch gekennzeichnet, daß der Brückenausleger (34) in seiner hochgeklappten Stellung verriegelbar ist.16. Container loading crane, in particular according to one of claims 1 to 15 »characterized in that the Bridge arm (34) can be locked in its folded-up position. 17. Container-Verladekran nach Anspruch 16, dadurch gekennzeichnet, daß zur Verriegelung des Brückenauslegers (34) an der kaimauerseitigen Gerüstscbeibe (28) ein pendelartiges Verriegelungsglied (84) über der Brücke (30) aufgehängt ist, welches in seiner Außerbetriebsstellung bei kaimauerparalleler Betrachtungsriohtung in Deckung mit der kaimauerseitigen Gerüstscheibe (28) ist.17. Container loading crane according to claim 16, characterized in that that for locking the bridge boom (34) on the scaffolding disc (28) on the quay wall side pendulum-like locking member (84) is suspended over the bridge (30), which in its inoperative position If the view is parallel to the quay wall, it is in line with the scaffolding disc on the quay wall side (28) is. 90981 2/077290981 2/0772 18. Container-Verladekran, insbesondere nach einem der Ansprüche 1 bis 17, dadurch gekennzeichnet, daß die die Brücke (30) überragende kaimauerseitige öerüstsoheibe (28) mit der Brücke (30) verwindungssteif durch Vereteifungsstreben (86,88) verbunden ist, welche von oberhalb und unterhalb der Brüoke (30) gelegenen Stellen der kaimauerseitigen OerÜatscheibe (28) ausgehen und wenigstens annähernd in der kaimauerparallelen Knotenachse zwischen der Brücke (30) und der landseitigen Gerüstsoheibe (26) enden.18. Container loading crane, in particular according to one of claims 1 to 17, characterized in that the the bridge (30) protruding from the quay wall side öerüstsoheibe (28) with the bridge (30) torsion-resistant is connected by stiffening struts (86,88), which are located above and below the bridge (30) on the quay wall-side OerÜatscheibe (28) and at least approximately in the junction axis parallel to the quay wall between the bridge (30) and end of the landside scaffolding bracket (26). 19. Container-Verladekran nach Anspruch 18, dadurch gekennzeichnet, daß die Vereteifungsstreben (86,88) an ihren beiden Enden gelenkig gelagert sind.19. Container loading crane according to claim 18, characterized in that the reinforcement struts (86,88) are articulated at both ends. 20. Container-Verladekran, insbesondere nach einem der Ansprüche 9 bis 19, dadurch gekennzeichnet, daß die Spurweite des Krangerüsts (24) veränderbar ist.20. Container loading crane, especially after one of the Claims 9 to 19, characterized in that the track width of the crane frame (24) can be changed. 21. Container-Verladekranmch Anspruch 20, dadurch gekennzeichnet, daß der Abstand der Gerüstecheiben (26,28) in Brückenlängsrichtung gemessen veränderbar ist.21. Container-Verladekranmch claim 20, characterized in that the distance between the scaffold discs (26,28) measured in the longitudinal direction of the bridge can be changed. 22. Container-Verladekran nach Anspruch 21, dadurch ge-22. Container loading crane according to claim 21, characterized in that 909812/Ü772909812 / Ü772 -■»·- H81840- ■ »· - H81840 aoao kennzeichnet, daß die landseitige Gerüstscheibe (26) unter Veränderung der Länge der Versteifungs-Btreten (86,88) an verschiedenen Stelen der Brücke (30) ansetzbar ist.indicates that the shore-side scaffolding disc (26) by changing the length of the stiffening steps (86, 88) on various pillars of the bridge (30) can be applied. 23. Oontainer-Verladekran nach Anspruch 21, dadurch gekennzeichnet, daß der zwischen den Gerüstsoheibsn (26,28) liegende BrUokenabsohnitt (32) und die Versteifungsstreben (86,88) verlängerbar sind.23. Oontainer loading crane according to claim 21, characterized in that the between the Gerüstsoheibsn (26,28) lying BrUokenabsohnitt (32) and the stiffening struts (86,88) are extendable. 24. Container-Verladekran nach einem der Ansprüche 1 bis 23, dadurch gekennzeichnet, daß ein Gehäuse des Last« hubantriebswerks (52) als obere Querstrebe der landseitigen Gerüstscheibe (26) ausgeführt ist.24. Container loading crane according to one of claims 1 to 23, characterized in that a housing of the load « Hubantriebswerk (52) is designed as an upper cross strut of the landside scaffold disc (26). 25* Oontainer-Verladekran naoh Anspruch 24t dadurch gekennzeichnet, daß in dem Gehäuse weitere Antriebe, Sohaltgeräte, Regelgeräte, und Steuergeräte zu einer Einheit zusammengefasst sind, welche als Ganzes am Orte der Kranauf β teilung anlieferbar und mit den übrigen Teilen des Krangerüst· «usammenfügbar 1st.25 * Oontainer loading crane according to claim 24t, characterized in that further drives, holding devices, regulating devices and control devices to form a unit in the housing are summarized, which can be delivered as a whole at the location of the crane division and with the other parts of the Crane scaffolding · «can be joined together. 909812/0772909812/0772
DE19671481840 1967-02-03 1967-02-03 Container loading crane Pending DE1481840A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DET0033146 1967-02-03

Publications (1)

Publication Number Publication Date
DE1481840A1 true DE1481840A1 (en) 1969-03-20

Family

ID=7557538

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19671481840 Pending DE1481840A1 (en) 1967-02-03 1967-02-03 Container loading crane

Country Status (4)

Country Link
US (1) US3532227A (en)
BE (1) BE709494A (en)
DE (1) DE1481840A1 (en)
NL (1) NL6801520A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0318264A1 (en) * 1987-11-24 1989-05-31 Daniel A. Hanafin Travelling container crane

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4142777C2 (en) * 1991-12-23 1997-02-06 Man Takraf Foerdertechnik Gmbh Cable guide for the trolley of portal cranes
US5456560A (en) * 1993-01-26 1995-10-10 Virginia International Terminals, Inc. Method and apparatus for moving containers between a ship and a dock
DE102006015430A1 (en) * 2006-03-31 2007-10-04 Noell Crane Systems Gmbh Crane with boom and track for the cable trolley

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US731231A (en) * 1901-03-15 1903-06-16 Wellman Seaver Engineering Company Wharf-crane.
US754187A (en) * 1903-09-03 1904-03-08 C W Hunt Company Hoisting mechanism.
US1019867A (en) * 1911-03-02 1912-03-12 Thos S Watson Company Elevating, transporting, and discharging apparatus.
GB621818A (en) * 1946-10-30 1949-04-20 Charles Edward Dougherty Improvements relating to the loading and unloading of ships
FR1079553A (en) * 1953-04-09 1954-12-01 Ceretti & Tanfani Improvements made to gantry cranes with two trolleys and their control device
FR1412752A (en) * 1964-10-27 1965-10-01 Wellman Smith Owen Eng Co Ltd Improvements to cranes
GB1132967A (en) * 1964-12-08 1968-11-06 Davy And United Instr Ltd Control systems for preventing swinging of suspended loads
FR1437599A (en) * 1965-03-19 1966-05-06 adjustable monorail gantry elevator-lowerer for all building work
US3414143A (en) * 1966-11-10 1968-12-03 Gordon L. Scott Marine terminal facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0318264A1 (en) * 1987-11-24 1989-05-31 Daniel A. Hanafin Travelling container crane

Also Published As

Publication number Publication date
BE709494A (en) 1968-05-30
NL6801520A (en) 1968-08-05
US3532227A (en) 1970-10-06

Similar Documents

Publication Publication Date Title
DE2556882A1 (en) SYSTEM (ARRANGEMENT) AND PROCEDURE FOR THE INDEPENDENT UNLOADING AND STOWING OF A CRANE JIB
DE2062626A1 (en) Double articulated crane
DE202021102638U1 (en) Lifting device for steel rails
DE2407073A1 (en) PALLET TRUCK FOR HEAVY LOADS
EP0384112B1 (en) Tower crane, preferably a crane rotating at the top of the tower
DE1481840A1 (en) Container loading crane
DE2449755A1 (en) PALLET TRUCK FOR HEAVY LOADS
EP0433283B1 (en) Ship's loader or unloader
DE2133111A1 (en) Free standing crane
DE849605C (en) Tower crane
DE2114402C3 (en) Collapsible crane
DE1756635C3 (en) Device for reloading bulk material from a dump
DE897530C (en) Conveyor system, especially for buildings
DE854422C (en) Crane with boom that can be folded onto the mast
DE2029016A1 (en) Tower crane
DE803791C (en) Construction elevator arrangement
DE620024C (en) Suspension for foldable boom on loading bridges or the like.
DE2724761A1 (en) TROLLEY FOR CARRYING LARGE CONTAINERS
DE1261771B (en) Loading device for the transport of large loads in the cargo hold on ships
AT228973B (en) Bridge crane
AT339939B (en) PALLET TRUCK FOR HEAVY LOADS AND ITS APPLICATION
DE2821102A1 (en) Lorry for transporting prefabricated concrete sections - has adjustable frame to lock to section and winch operated support frame
DE4432773A1 (en) Loading and unloading device for ships and similar large-capacity transport vehicles
DE2015087C (en) Mobile crane
DE1217304B (en) Swing-out derrick