DE3022029A1 - Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope - Google Patents

Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope

Info

Publication number
DE3022029A1
DE3022029A1 DE3022029A DE3022029A DE3022029A1 DE 3022029 A1 DE3022029 A1 DE 3022029A1 DE 3022029 A DE3022029 A DE 3022029A DE 3022029 A DE3022029 A DE 3022029A DE 3022029 A1 DE3022029 A1 DE 3022029A1
Authority
DE
Germany
Prior art keywords
supports
retaining wall
slope
mountain slope
mountain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE3022029A
Other languages
German (de)
Inventor
Des Erfinders Auf Nennu Verzicht
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DIETERLE KG GEB
Original Assignee
DIETERLE KG GEB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DIETERLE KG GEB filed Critical DIETERLE KG GEB
Priority to DE3022029A priority Critical patent/DE3022029A1/en
Publication of DE3022029A1 publication Critical patent/DE3022029A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

Main supports, made of concrete, are set up close together. Prefabricated components are hung in position to bridge the gap between them. The retaining wall is for hillside slopes or embankments, esp. at the verge of traffic routes. The supports (2) are erected away from the slope and the space (5) between their rear sides (7) and the slope (4) is lined. The whole space may be filled by a support disc slab (8) using e.g. a backfilling of concrete. The supports may be erected first and then backfilled, or the whole operation can be carried out in a single process.

Description

Verfahren zur Bildung einer Stützwand od. dgl.Method for forming a retaining wall or the like.

Die Erfindung betrifft ein Verfahren zur Bildung einer Stützwand od. dgl. für Berghänge, Böschungen od. dgl. insbesondere am Rande von Verkehrswegen od. dgl., wobei insbesondere aus Beton bestehende Hauptstützen nebeneinander erstellt und dann deren Zwischenraum mit einhängbaren Fertigteilen od. dgl. überbrückt wird.The invention relates to a method for forming a retaining wall or the like for mountain slopes, embankments or the like. In particular Od at the edge of traffic routes created and then the gap between them with hook-in prefabricated parts or the like is bridged.

Es sind bereits zahlreiche Konstruktionen und Verfahren zur Erstellung von Stützmauern und -wänden bekannt. Aus der DE-PS 24 A"! 216 ist dabei ein Verfahren der eingangs erwähnten Art bekannt, bei welchem aber zunächst der Berghang oder die Böschung abgetragen werden muß, bis seine Oberfläche der Rückseite der zu erstellenden Stützwand entspricht.Numerous constructions and methods for creating retaining walls and walls are already known. From the DE-PS 24 A "! 216 is a method of the aforementioned Type known, but in which the mountain slope or embankment must first be removed until its surface corresponds to the back of the retaining wall to be created.

Der Erfindung liegt demgegenüber die Aufgabe zugrunde, ein Verfahren zur Bildung einer Stützwand od. dgl. der eingangs erwähnten Art und auch eine entsprechende Stützwand selbst zu schaffen, mit der praktisch beliebige, bestehende Böschungen, Felshänge, Einschnitte an Verkehrswegen auch mit anstehendem Lockergestein u. dgl. gesichert werden können, ohne daß zuvor die gesamte Oberfläche des Berghanges geglättet oder bearbeitet werden muß.In contrast, the invention is based on the object of providing a method for forming a support wall or the like mentioned type and also to create a corresponding retaining wall yourself, with which practically any existing embankments, Rock slopes, cuts on traffic routes can also be secured with loose rock and the like, without the entire surface of the mountain slope having to be smoothed or processed beforehand.

Die Lösung dieser Aufgabe besteht im wesentlichen darin, daß die Hauptstützen zumindest bereichsweise mit Abstand zum Berghang erstellt und der Zwischenraum zwischen ihrer dem Berghang zugewandten Rückseite und dem Berghang druckfestThe solution to this problem is essentially that the main supports, at least in some areas, at a distance from the Mountain slope created and the space between its back facing the mountain slope and the mountain slope pressure-resistant

Mr/HMr / H

13® 4351U(O) 30 813® 4351U (O) 30 8

h t. C If*« h t. C If * «

ausgebaut wird. Bevorzugt wird dabei der Zwischenraum als sieh nach oben öffnender Winkelraum ausgebildet. Die Hauptstützen können also unabhängig von einer Vorbearbeitung des Berghanges erstellt, insbesondere betoniert werden, wonach dann ihre Verbindung mit dem Berghang durch den erwähnten ! druckfesten Ausbau hergestellt wird.is expanded. In this case, the intermediate space is preferably designed as an angular space that opens upward. The main pillars can therefore be created, in particular concreted, independently of any pre-processing of the mountain slope, after which then their connection with the mountainside through the one mentioned! pressure-resistant expansion is produced.

I Besonders vorteilhaft ist es, wenn der gesamte ZwischenraumI It is particularly advantageous if the entire space

5 zwischen der Rückseite der Hauptstützen und dem Berghang 5 between the back of the main supports and the mountainside

f durch eine Stützscheibe od. dgl. ausgefüllt, insbesonderef by a support disc or the like. Filled, in particular

hjnterbetoniert wird. Es ergibt sich dann praktisch eineis concreted under. There is then practically one

< <J Hauptstütze mit einer gegen den Berghang verlaufenden Be- << J Main support with a loading

; tonwand, wodurch Druckkräfte sehr gut aufgenommen und über-; clay wall, whereby compressive forces are absorbed very well and

I tragen werden können, insbesondere, wenn die HauptstützeI can wear it, especially when the main support

J auch leicht in der Richtung geneigt ist, in der der BerghangJ is also slightly inclined in the direction in which the mountainside is

; etwas stärker geneigt ist.; is slightly more inclined.

f Zuerst kann die Hauptstütze erstellt und dann hinterbetoniertf First the main column can be created and then back-concreted

\. werden. Dies ergibt eine sichere und dennoch einfache Arbeits- \. will. This results in a safe and yet simple working

i weise. Es ist aber auch möglich, daß das Betonieren der Haupt- i wise. But it is also possible that the concreting of the main

i stützen und deren Hinterbetonieren in einem Arbeitsgang gleich- i and their back-concreting in one work step at the same time.

ί zeitig durchgeführt wird,
i
ί is carried out in good time,
i

In vorteilhafter Weise können bei dem erfindungsgemäßen Verfahren die Stützpfeiler ein Haupttragwerk bilden, welchesAdvantageously, in the method according to the invention the supporting pillars form a main structure, which

; durch den an dem Hang anstehenden Hinterbeton kraftschlüssig; due to the back concrete on the slope

\ mit dem Berghang verbunden wird. \ is connected to the mountainside.

\ Besonders zweckmäßig ist es, wenn in den Hauptstützen und/oder \ It is particularly useful if in the main supports and / or

I deren Hinterbetonierung Durchbrüche, Aussparungen, KanäleI their back-concreting breakthroughs, recesses, channels

I od. dgl. freigelassen werden, durch die Permanentanker od.dgl.I or the like. Be released through the permanent anchor or the like.

I in den Untergrund geführt und verankert werden können. DadurchI can be guided and anchored underground. Through this

kann je nach Tiefe der Verankerung auch in einer quer zum Mauerverlauf liegenden Richtung die kraftschlüssige Verbindung verbessert werden, so daß insbesondere Lockergestein oder rutschgefährdete Hänge od. dgl. sicher abgefangen werden.Depending on the depth of the anchoring, the non-positive connection can also be made in a direction perpendicular to the course of the wall be improved, so that in particular loose rock or slopes at risk of slipping od. The like. Are safely intercepted.

« *
te
rr
«*
te
rr

Aufwendige Fundamentvorsprünge und große Erdbewegungen mit entsprechenden Konstruktionstiefen können dadurch vermieden werden.Elaborate foundation projections and large earth movements with Corresponding construction depths can thereby be avoided.

Zur Erfindung gehört auch eine Stützmauer zur Befestigung von insbesondere stellen Berghängen, Böschungen od. dgl. mit Stützpfeilern und zwischen diesen Pfeilern eingehängten Fertigelementen, welche Stützmauer vor allem nach dem vorbeschriebenen Verfahren hergestellt sein kann. Diese Stützmauer Ist f dadurch gekennzeichnet, daß die Stützpfeiler mit. dem abzu- i stützenden 3erghang od. dsl. einen sich nach oben öffnenden f Winkel einschließen und der Winkelraum zwischen der Stütze und | dem Berghang od. dgl. durch eine druckfeste Einfügung, vor- I zugsweise eine Betonscheibe od. dgl. ausgefüllt ist.The invention also includes a retaining wall for fastening in particular, mountain slopes, embankments or the like Support pillars and prefabricated elements suspended between these pillars, which retaining wall especially according to the above Process can be produced. This retaining wall is f characterized in that the support pillars with. to the- i supporting 3erghang or dsl. an upward opening f Include angle and the angular space between the column and | the mountain slope od. The like. By a pressure-resistant insert, in front of I preferably a concrete slab or the like. Is filled.

Weitere Ausgestaltungen der Erfindung sind Gegenstand weite- -Further embodiments of the invention are the subject of wide-

Nachstehend ist die Erfindung mit ihren ihr als wesentlich zugehörenden Einzelheiten anhand der Zeichnung noch näher beschrieben. Es zeigt:The invention with its essential details is described in more detail with reference to the drawing. It shows:

Flg. 1 in schaubildlicher Darstellung einen Ausschnitt einer erfindungsgemäß hergestellten Stützmauer undFlg. 1 in a diagrammatic representation a section of a retaining wall produced according to the invention and

FIg. 2 einen Querschnitt des mit Hilfe der erfindungsgemäßen Stützmauer abgefangenen Berghanges, wobei zusätzliche Anker etwa rechtwinklig zur Oberfläche der Stützmauer angeordnet und in den Berghang eingeführt sind.FIg. 2 shows a cross section of the mountain slope intercepted with the aid of the retaining wall according to the invention, with additional Anchors are arranged approximately at right angles to the surface of the retaining wall and inserted into the mountainside.

Eine im ganzen mit 1 bezeichnete Stützmauer hat im Abstand nebeneinanderstehende Hauptstützen bzw. Stützpfeiler 2, im folgenden auch kurz Stützen 2 genannt, die gemäß Fig. 2 auf einem relativ schmalen Fundament 3 aufgesetzt sein können. In Fig. 2 erkennt man, daß diese Stützen 2 und somit auch die gesamte Stützmauer 1 mit dem abzustützenden Berghang 4 einenA retaining wall, designated as a whole by 1, has main supports or pillars 2, in the distance that are adjacent to one another hereinafter also referred to as supports 2 for short, which according to FIG. 2 can be placed on a relatively narrow foundation 3. In Fig. 2 it can be seen that these supports 2 and thus also the entire retaining wall 1 with the mountain slope 4 to be supported

/©308/ © 308

sich nach oben öffnenden winkelartigen Zwischenraum 5 einschließt, der nach Fertigstellung" der Stützmauer 1 mit Erdreich 6 ausgefüllt werden kann.upwardly opening angular space 5 includes, which after completion “of the retaining wall 1 can be filled with soil 6.

Der Winkelraum 5 ist im Bereich der Stützen 2 bei der fertiggestellten Stützmauer 1 hinterbetoniert, d, h. an der dem Berghang 4 zugewandten Rückseite 7 der Stützen 2 schließt sich eine druckfeste Einfügung in Form einer mauerartigQ,n Scheibe 8 an, die den Kontakt zwischen dem eigentlichen, abzustützenden Berghang 4 und den Hauptstützen 2 herstellt. Diese Scheibe 8 kann dadurch gebildet werden, daß nach dem Erstellen der Stützen 2 der winkelförmige Zwischenraum 5 zwischen den Rückseiten 7 und dem Berghang 4 hinterbetoniert wird. Wenn dabei die Stützen 2 bereits fertiggestellt sind, genügt eine aus zwei sich gegenüberstehenden Wänden gebildete Schalung, Es ist aber auch möglich, die Stützen 2 und die Hinterbetonierung 8 dreihäuptig in einem Guß an die Böschung zu betonieren. Im Ausführungsbeispiel gemäß Fig. 1 erkennt man, daß die Scheibe 8 in ihrer Dicke der Breite der im Querschnitt rechtwinkligen Stützen 2 entspricht, so daß die Seitenflächen 9 der Stützen 2 bündig mit den seitlichen Oberflächen dieser hinterbetonierten Scheibe 8 verlaufen.The angular space 5 is concreted in the area of the supports 2 in the completed retaining wall 1, d, h. the rear side 7 of the supports 2 facing the mountainside 4 is followed by a pressure-resistant insert in the form of a wall-like Q , n disk 8, which establishes the contact between the actual mountainside 4 to be supported and the main supports 2. This disc 8 can be formed in that, after the supports 2 have been created, the angular space 5 between the rear sides 7 and the mountain slope 4 is concreted behind. If the supports 2 have already been completed, a formwork formed from two opposing walls is sufficient. In the embodiment according to FIG. 1 it can be seen that the thickness of the disc 8 corresponds to the width of the supports 2, which are rectangular in cross-section, so that the side surfaces 9 of the supports 2 run flush with the side surfaces of this disc 8 that is concreted in the back.

Bei der Erstellung der Stützwand 1 können in den Hauptstützen 2 und deren Hinterbetonierung 8 Durchbrüche 10, Aussparungen, Kanäle od. dgl. freigelassen werden, durch die Permanentanker 11 od. dgl. in den Untergrund 12 des Berghanges 4 geführt und dort verankert werden können. Die Zahl dieser Anker 11 richtet sich dabei nach der Höhe der Stützwand 1 und auch der Eigenstabilität des abzufangenden Berghanges 4. In Fig. 1 ist beispielsweise an jeder Stütze 2 ein Anicer 11 vorgesehen, während in Fig. 2 angedeutet ist, wie z. B. zwei solche Anker an jeder Stütze 2 angebracht werden können.When creating the supporting wall 1, openings 10, recesses, Channels or the like are left free, guided through the permanent anchors 11 or the like in the subsoil 12 of the mountain slope 4 and can be anchored there. The number of these anchors 11 depends on the height of the supporting wall 1 and also the inherent stability of the mountain slope to be intercepted 4. In Fig. 1, for example, an anicer 11 is provided on each support 2, while is indicated in Fig. 2, such as. B. two such anchors can be attached to each support 2.

Bei einem Betonieren zuerst der Hauptstütze und einem nach deren zumindest teilweisen Ausschalen erfolgenden Hinter-When concreting first the main column and one after the at least partial stripping of the backing

1/703081/70308

30220233022023

betonieren können die Hauptstützen 2 an allen - im Ausführungsbeispiel bei mit einem parallel zur Hangorientierung verlaufenden rechteckigen Querschnitt - vier Seiten geschalt und dann wenigstens die Rückseite 7 ausgeschalt werden, wonach mit Hilfe .zweier einander gegenüberliegender, rechtwinklig zum Berghang angeordneter Schalungen die hinter dem Stützpfeiler 2 jeweils anzubringende Betonscheibe 8 betoniert werden kann.can concret the main supports 2 at all - in the exemplary embodiment with a rectangular cross-section running parallel to the slope orientation - four sides are formed and then at least the back 7 are switched off, after which with the help of two opposing, right angles Formwork arranged on the mountain slope concreted the concrete slab 8 to be attached behind the supporting pillar 2 can be.

An den Seitenflächen 9 der Stützen 2 können bei deren Herstellung gegen den Berghang 4 hin schräg von vorne oben nach hinten unten verlaufende Nuten 13 zum Einhängen von Betonfertigteilen 14 ausgespart werden. Man erkennt dies besonders deutlich anhand der Fig. 1. Später können die in diesen schrägen Nuten 13 eingehängten Betonfertigteile 14 mit Erdreich 6 hinterfüllt und der Zwischenraum 15 zwischen den übereinanderbefindlichen Betonfertigteilen 14 gegebenenfalls wiederum mit Erde und/oder Pflanzen ausgefüllt werden. Dadurch ergibt sich insgesamt eine Stützwand 1, die bepflanzt werden kann und sich somit gut in eine Landschaft einfügen läßt. Trotz ihrer guten Tragfähigkeit und Stützfähigkeit wirkt eine solche Stützwand 1 leicht und locker.On the side surfaces 9 of the supports 2 can during their production against the mountain slope 4 obliquely from the front top to the rear Grooves 13 running at the bottom for hanging in precast concrete parts 14 are left out. You can see this particularly clearly on the basis of FIG. 1. The precast concrete parts 14 suspended in these inclined grooves 13 with soil 6 can later be used backfilled and the space 15 between the precast concrete parts 14, which are one above the other, again if necessary Soil and / or plants to be filled in. Overall, this results in a supporting wall 1 that can be planted and is thus can be integrated well into a landscape. In spite of its good load-bearing capacity and support capacity, such a supporting wall 1 is effective easy and loose.

Die Länge der Zwischenelemente 14 entspricht dabei dem lichten Abstand der Nutenböden 13 a der benachbarten Stützen 2, so daß diese Zwischenelemente 14 gut an den etwa rechtwinklig zur Oberfläche des Berghanges 4 orientierten Seitenwänden 9 der Stützen 2 eingefügt und eingeschoben werden können. The length of the intermediate elements 14 corresponds to the clearance between the groove bottoms 13 a of the adjacent supports 2, so that these intermediate elements 14 can be inserted and pushed in well on the side walls 9 of the supports 2 oriented approximately at right angles to the surface of the mountain slope 4 .

Im Ausführungsbeispiel weisen die Nuten 13 an ihrem hinteren Ende 13 b jeweils eine Erweiterung 15anach unten auf, die zur Aufnahme einer an den Fertigelementen 14 befindlichen Einhängeleiste 16 dient. Die Breite der Nuten 13 vor dieser Erweiterung 15 entspricht dabei der Gesamtdicke der Fertigelemente 14 im Bereich dieser Halteleiste 16. Auf diese Weise können die Fertigelemente mit der leistenartigen Verdickung 16 in die NutenIn the exemplary embodiment, the grooves 13 at their rear end 13 b each have an enlargement 15a downward, which for A suspension strip 16 located on the prefabricated elements 14 is used. The width of the grooves 13 before this expansion 15 corresponds to the total thickness of the prefabricated elements 14 in the area of this retaining strip 16. In this way, the prefabricated elements with the strip-like thickening 16 in the grooves

/35308/ 35308

* w I" * CS <-C »" ·* w I "* CS <-C» "·

• τ «■ ι· α β · * · «• τ «■ ι · α β · * ·«

ι · ι ι ι ι > }i si r» c ·ι · ι ι ι ι> } i si r »c ·

13 eingeschoben und dann mit der Leiste 16 in die Erweiterung 15aeingerastet werden. Sie liegen dort aufgrund ihres Schwergewichtes genügend fest. Gegebenenfalls könnte aber der dann an der Oberfläche der Fertigelemente 14 zusätzlich in die Nuten 13 noch eine Verteilung eingeschoben werden.13 and then snapped into the extension 15 with the strip 16. They are there because of their heavy weight sufficiently firm. If necessary, however, the could then also be inserted into the grooves on the surface of the prefabricated elements 14 13 a distribution can be inserted.

In Fig. 1 erkennt -.^.n noch, daß der Anker 11, welcher einen entsprechenden '<L·; al in den Stützen 2 und der Hinterbetonierung 8 durcb~sr.zt und eine Verspannung gegenüber Gern Untergrund erlaßt, die Vorderseite 17 der Stütze 2 &it einer Halteplatte 18 übergreift. Dies kann sowohl dann uer Fall sein, wenn Stützpfeiler 2 und Hinterbeton 8 aus einem Guß bestehen oder nacheinander erstellt wurden.In Fig. 1 -. ^. N recognizes that the armature 11, which has a corresponding '<L ·; al and a stress opposite subsoil Gern shall adopt in the supports 2 and the Hinterbetonierung sr.zt 8 durcb ~, the front side 17 of the support 2 engages over it a retaining plate eighteenth This can be the case when support pillars 2 and back concrete 8 consist of one casting or were created one after the other.

Vor allem bei Kombination einzelner oder mehrerer der vorbeschriebenen Maßnahmen ergibt sich eine Stützwand 1 mit einer filigranartigen Hangsicherung, die es erlaubt, den gesamten abgesicherten Einschnitt des Geländes mittels Bepflanzung umweltfreundlich zu gestalten und die der Landschaft eventuell durch diesen Einschnitt zugefügten Wunden wieder zu schließen. Dabei ist außerdem in vorteilhafter Weise der Flächenbedarf selbst bei hohen Hängen erheblich geringer als bei herkömmlichen Winkel-, Rucksack- oder auch Schwergewichtsstützmauern, die große Erdbewegungen wegen der zum Hang hin großen Fundamentvorsprünge und Konstruktionstiefen erfordern. Darüber hinaus sind die Kosten der erfindungsgemäßen Stützwandkonstruktion geringer, weil eine aufwendige Vorbearbeitung des Berghanges nicht notwendig ist.Especially when combining one or more of the above Measures results in a support wall 1 with a filigree slope protection that allows the entire to make the secured incision of the site environmentally friendly by means of planting and that of the landscape to close any wounds caused by this incision. It is also in an advantageous manner Space requirement, even on high slopes, is significantly lower than with conventional angled, backpack or heavyweight retaining walls, which require large earth movements because of the large foundation protrusions and construction depths towards the slope. In addition, the costs of the retaining wall construction according to the invention are lower because of the complex pre-processing of the mountainside is not necessary.

Es sei noch erwähnt, daß der Kanal für die Anker 11 statt durch Aussparungen aucn nacntragiicn durch eine Bohrung gebildet werden kann.It should also be mentioned that the channel for the armature 11 takes place formed by recesses also nacntragiicn through a hole can be.

Die im Ausführungsbeispiel vorgesehene leichte rückwärtige Neigung der Stützwand nat den Vorteil, daß die an ihr vorgesehenen Pflanzen gut beregnet werden kennen. Außerdem ergibtThe slight rearward inclination of the supporting wall provided in the exemplary embodiment naturally has the advantage that the provided on it Know plants are well watered. Also results

/7/ 7

sich dadurch eine günstigere Einleitung der aufzunehmenden Stützkräfte.This results in a more favorable introduction of the supporting forces to be absorbed.

Alle in der Beschreibung, den Ansprüchen und der Zeichnung dargestellten Merkmale und Konstruktionsdetails können sowohl einzeln als auch in beliebiger Korabination miteinander wesentliche Bedeutung haben.All features and construction details shown in the description, the claims and the drawing can be used as well individually as well as in any coordination with one another are of essential importance.

130D51/030,8130D51 / 030.8

Claims (1)

2.2. 3.3. 4.4th Verfahren zur Bildung einer Stützwand od. dgl.Method for forming a retaining wall or the like. AnsprücheExpectations Verfahren zur Bildung einer Stützwand od. dgl. für Berghänge, Böschungen od. dgl. insbesondere am Rande von Verkehrswegen od. dgl., wobei insbesondere aus Beton bestehende Hauptstützen nebeneinander erstellt und dann deren Zwischenraum mit einhängbaren Fertigteilen od. dgl. überbrückt wird, dadurch geMethod for forming a retaining wall or the like for mountain slopes, embankments or the like, in particular at the edge od of traffic routes and then the gap between them with hook-in prefabricated parts od. The like. Is bridged, thereby ge kennzeichnetindicates daß die Hauptstützen (2)that the main supports (2) zumindest bereichsweise mit Abstand zum Berghang erstellt und der Zwischenraum zwischen ihrer dem Berghang zugewandten Rückseite und dem Berghang druckfest ausgebaut wird.at least in some areas created at a distance from the mountainside and the space between them and the mountainside facing back and the mountainside is expanded pressure-resistant. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der gesamte Zwischenraum (5) zwischen der Rückseite (7) der Stützen (2) und dem Berghang (4) durch eine Stützscheibe (8) od. dgl. ausgefüllt, insbesondere hinterbetoniert wird.Method according to claim 1, characterized in that the entire space (5) between the rear (7) of the supports (2) and the mountain slope (4) by a support disc (8) or the like. Filled, in particular is concreted back. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß zuerst die Hauptstützen (2) erstellt und dann hinterbetoniert werden.Method according to claim 1 or 2, characterized in that first the main supports (2) are created and then be concreted back. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das Betonieren der Hauptstützen (2) und deren Hinterbetonieren in einem Arbeitsgang durchgeführt wird.Method according to claim 1 or 2, characterized in that the concreting of the main supports (2) and their Back-concreting is carried out in one operation. 13DDS1/IQ30813DDS1 / IQ308 I · · tillI till .1 3 S.1 3 p Verfahren n'ach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß in den Hauptstützen (2) und/oder deren Hinterbetonierung (8) Durchbrüche (TO)1 Aussparungen, Kanäle od. dgl. freigelassen oder gebohrt werden, durch die Permanentanker (11) od. dgl. in den Untergrund (12) geführt und verankert werden.Method according to one of Claims 1 to 4, characterized in that openings (TO) 1 recesses, channels or the like are left free or drilled in the main supports (2) and / or their backing (8) through the permanent anchors ( 11) or the like. In the subsurface (12) and anchored. Verfahrer nacV einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß bei einem Betonieren zuerst der Stützen (2) ur, 1 einem nach deren zumindest teilweisen Ausschalen erfolgenden Hinterbetonieren die Stützen (2) :,a allen z. B. bei insbesondere mit einem parallel zur Kangorientierung verlaufenden rechteckigen Querschnitt vier Seiten geschalt und dann wenigstens die Rückseite(7)ausgeschalt wird, wonach mit Hilfe zweier einander gegenüberliegender, rechtwinklig zum Berghang angeordneter Schalungen die hinter der- Stütze (2) anzubringende Betonscheibe (8) od. dgl. betoniert wird.Processor according to one of claims 1 to 5, characterized in that when concreting first of all the supports (2) ur, 1, after concreting the supports (2) after at least partial stripping thereof, the supports (2):, a all z. B. in particular with a rectangular cross-section running parallel to the edge orientation, four sides are formed and then at least the rear side (7) is formed, after which the concrete slab (8) to be attached behind the support (2) with the help of two opposing formworks arranged at right angles to the mountain slope ) or the like is concreted. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß die Stützen in einem sich nach oben öffnenden Winkel mit der Oberfläche des Berghanges (4) erstellt werden.Method according to one of Claims 1 to 6, characterized in that that the supports are at an angle that opens upwards with the surface of the mountain slope (4) to be created. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß an den Seitenflächen (9) der Stützen (2) gegen den Berghang (4) hin schräg von vorne oben nach hinten unten verlaufende Nuten (13) zum Einhängen der Betonfertigteile (14) ausgespart werden.Method according to one of Claims 1 to 7, characterized in that that on the side surfaces (9) of the supports (2) against the mountain slope (4) obliquely from the front and top Grooves (13) running at the bottom at the rear for hanging the precast concrete parts (14) are left out. χι gekennzeichnet, daß die in die schrägen Nuten (13) eingehängten Betonfertigteile C!4) od. dgl. mit Erdreich (6) hinterfüllt und ihr Zwischenraum (15) gegebenenfalls mit Erde und/oder Pflanzen ausgefüllt wird.χι marked, that the precast concrete parts C! 4) or the like suspended in the inclined grooves (13) with soil (6) backfilled and their space (15) is optionally filled with soil and / or plants. /3/ 3 130^51/0306130 ^ 51/0306 10. Stützmauer zur Befestigung von insbesondere steilen Berghängen, Böschungen od. dgl. rait Stützpfeilern od. dgl. und zwischen diesen Stützen eingehängten Fertigelementen, insbesondere hergestellt nach dem Verfahren gemäß einem oder mehreren der vorstehenden Ansprüche, dadurch gekennzeichnet, daß die Stützen (2) mit dem abzustützenden Berghang (A) od. dgl. einen Zwischenraum (6), insbesondere einen sich nach oben öffnenden Winkel einschließen und der Zwischenoder Winkelraum (6) zwischen der Stütze (2) und dem Berghang (4) od. dgl. durch eine druckfeste Einfügung, vor-10. Retaining wall for fastening particularly steep ones Mountain slopes, embankments or the like rait support pillars or the like and prefabricated elements suspended between these supports, in particular produced by the method according to one or more of the preceding claims, characterized in that the supports (2) od with the mountain slope to be supported (A). The like. Include an intermediate space (6), in particular an upwardly opening angle, and the intermediate or Angular space (6) between the support (2) and the mountain slope (4) or the like by means of a pressure-resistant insert, U zugsweise eine Betonscheibe (8) od. dgl. ausgefüllt ist.U preferably a concrete disc (8) or the like. Is filled. 11. Stützmauer nach Anspruch 10, dadurch gekennzeichnet, daß die Stützen (2) od. dgl. an ihren etwa rechtwinklig zur Oberfläche des Berghanges (4) orientierten Ssitenwänden (9) Nuten (13) zum Einfügen und Einschieben der Zwischenelemente (14) aufweisen, deren Länge dem lichten Abstand der Nutenböden (13 a) der benachbarten Stützen (2) entspricht. 11. Retaining wall according to claim 10, characterized in that the supports (2) or the like. At their approximately perpendicular to the surface of the mountain slope (4) oriented Ssitenwwall (9) grooves (13) for inserting and pushing in the intermediate elements (14) , the length of which corresponds to the clear distance between the groove bases (13 a) of the adjacent supports (2). 12. Stützmauer nach Anspruch 10 oder 11, dadurch gekennzeichnet, daß die Muten (13) an ihrem hinteren Ende (13 b)12. Retaining wall according to claim 10 or 11, characterized in that the grooves (13) at their rear end (13 b) / eine Erweiterung (ISr nach unten zur Aufnahme einer an/ an extension (ISr down to accommodate an an den Fertigelementen (14) befindlichen Einhängeleiste (16) od. dgl. Vorsprung aufweisen und daß die Breite der Nuten (13) vor der Erweiterung (150 vorzugsweise der Dicke der Fertigelemente (14) im Bereich der Halteleiste (16) od. dgl. entspricht.the prefabricated elements (14) located hanging bar (16) or the like. Have projection and that the width of the grooves (13) before the extension (150 preferably the thickness of the Prefabricated elements (14) or the like in the area of the retaining strip (16). 13. Stützmauer nach einem der Ansprüche 10 bis 12, dadurch gekennzeichnet, daß sie insbesondere im Bereich ihrer Stützen (2) und der dahinter befindlichen Einfügung (8) jeweils wenigstens einen ausgesparten und/oder gebohrten Kanal (10) od. dgl. für in dem Berghang-Untergrund (12} festlegbare und verspannöare Anker (11) aufweist.13. Retaining wall according to one of claims 10 to 12, characterized characterized in that they are in particular in the area of their supports (2) and the insertion (8) behind them in each case at least one recessed and / or drilled channel (10) or the like for in the mountain slope subsoil (12} Has fixable and Verspannöare anchor (11). 151/0308 /4 151/0308 / 4 14. Stützmauer nach einem der Ansprüche 10 bis 13, dadurch gekennzeichnet, daß Stützpfeiler (2) und Hinterbeton
(3) aus einem Guß bestehen.
14. Retaining wall according to one of claims 10 to 13, characterized in that the support pillars (2) and back concrete
(3) consist of one casting.
15. Stützmauer nach einem der Ansprüche 10 bis 14, dadurch gekennzeichnet, daß sie - vorzugsweise weniger als der Berghang (4), jedoch in der gleichen Richtung - geneigt ist.15. Retaining wall according to one of claims 10 to 14, characterized in that it - preferably less than that Mountain slope (4), but in the same direction - is inclined. 16. Stützmauer nach einem der Ansprüche 10 bis 15, dadurch gekennzeichnet, daß die Seitenflächen (9) der Stützen
(2) und die Stützscheiben (8) jeweils miteinander
16. Retaining wall according to one of claims 10 to 15, characterized in that the side surfaces (9) of the supports
(2) and the support disks (8) each with one another
fluchten.cursing. - Beschreibung -- Description - 13 OtD 51/(030813 OtD 51 / (0308 20482048
DE3022029A 1980-06-12 1980-06-12 Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope Withdrawn DE3022029A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE3022029A DE3022029A1 (en) 1980-06-12 1980-06-12 Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE3022029A DE3022029A1 (en) 1980-06-12 1980-06-12 Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope

Publications (1)

Publication Number Publication Date
DE3022029A1 true DE3022029A1 (en) 1981-12-17

Family

ID=6104440

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3022029A Withdrawn DE3022029A1 (en) 1980-06-12 1980-06-12 Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope

Country Status (1)

Country Link
DE (1) DE3022029A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0345077A2 (en) * 1988-06-03 1989-12-06 Societe Civile Des Brevets Henri Vidal Facing system
US4899502A (en) * 1985-07-05 1990-02-13 Golovnoi Nauchno-Issledovatelsky i Proektny Institut "KrymNIIproekt" Simf eropolsky Filtal Dnepropetrovskogo Inzhenernostroitelnogo Instituta Building or structure erected on a slope
EP0503110A1 (en) * 1991-03-13 1992-09-16 Peter Lüft Facing element for selfsupporting structures

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4899502A (en) * 1985-07-05 1990-02-13 Golovnoi Nauchno-Issledovatelsky i Proektny Institut "KrymNIIproekt" Simf eropolsky Filtal Dnepropetrovskogo Inzhenernostroitelnogo Instituta Building or structure erected on a slope
EP0345077A2 (en) * 1988-06-03 1989-12-06 Societe Civile Des Brevets Henri Vidal Facing system
EP0345077A3 (en) * 1988-06-03 1990-02-07 Henri Vidal Facing system
US5004376A (en) * 1988-06-03 1991-04-02 Henri Vidal Facing system
EP0503110A1 (en) * 1991-03-13 1992-09-16 Peter Lüft Facing element for selfsupporting structures

Similar Documents

Publication Publication Date Title
DE2944385A1 (en) METHOD FOR PRODUCING SLOT WALLS
DE3401629A1 (en) Block, and wall formed from blocks of this type
EP3441527A1 (en) Shut-off device for preventing the passage of land vehicles
CH707671B1 (en) Supporting masonry element and retaining wall made of supporting masonry elements.
DE4226067A1 (en) Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall
DE1947249C3 (en) Method for producing a diaphragm wall in the ground and prefabricated part for carrying out the method
AT397415B (en) METHOD FOR PRODUCING UNDERGROUND CONSTRUCTIONS BY LID CONSTRUCTION
DE102007003085B4 (en) Process for producing a sealing wall with optimized precast concrete elements
DE3022029A1 (en) Embankment or hillside road or trackside retaining wall - has pressure resistant filling behind main supports spaced out from slope
WO2019158459A1 (en) Shoring equipment
EP0272473B1 (en) Process for supporting retaining walls
CH666502A5 (en) METHOD FOR PRODUCING A SLOT CONSTRUCTION CONCRETE WALL, ARRANGEMENT FOR CARRYING OUT THE METHOD AND CONCRETE WALL PRODUCED BY THE METHOD.
DE2917994C2 (en) Process for the production of a construction pit sheeting or retaining wall made of reinforced concrete for terrain cuts
DE69006144T2 (en) Process for the production of structures, in particular railway underpasses.
DE2747774C3 (en) Holding device for support cheeks to support slope material on an embankment
DE804088C (en) Anchoring of bank walls, especially sheet pile walls
DE4302986C2 (en) Process for the production of a structure in the form of a cover with precast reinforced concrete piles
DE3201601A1 (en) Method of placing sheet pile walls or the like in the earth by flushing and also a construction element for carrying out the method
DE3837850C2 (en) Blackboard and formwork block
DE206878C (en)
EP0981673B2 (en) Device for stabilising an unstable shoulder in railway and road construction and method for producing the same
AT390290B (en) Method of producing a slope protective structure, and slope protective structure produced according to this method
DE3685881T2 (en) SUPPORT CONSTRUCTION AND METHOD FOR REALIZING THIS SUPPORT CONSTRUCTION.
DE2710456A1 (en) Masonry wall inclined pile and underpinning - is made of reinforced concrete with common reinforcing core to base of wall
EP0970281B1 (en) Method for stabilizing embankments

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law