DE29711544U1 - Reinforcement basket for construction purposes - Google Patents

Reinforcement basket for construction purposes

Info

Publication number
DE29711544U1
DE29711544U1 DE29711544U DE29711544U DE29711544U1 DE 29711544 U1 DE29711544 U1 DE 29711544U1 DE 29711544 U DE29711544 U DE 29711544U DE 29711544 U DE29711544 U DE 29711544U DE 29711544 U1 DE29711544 U1 DE 29711544U1
Authority
DE
Germany
Prior art keywords
wire rope
piece
cage according
reinforcing cage
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29711544U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PFEIFER SEIL HEBETECH
Original Assignee
PFEIFER SEIL HEBETECH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PFEIFER SEIL HEBETECH filed Critical PFEIFER SEIL HEBETECH
Priority to DE29711544U priority Critical patent/DE29711544U1/en
Priority to EP98940129A priority patent/EP1021630B1/en
Priority to DK98940129T priority patent/DK1021630T3/en
Priority to HU0002654A priority patent/HU223050B1/en
Priority to PL98338048A priority patent/PL338048A1/en
Priority to PCT/EP1998/004123 priority patent/WO1999001630A1/en
Priority to AU88554/98A priority patent/AU8855498A/en
Priority to AT98940129T priority patent/ATE209286T1/en
Priority to ES98940129T priority patent/ES2166183T3/en
Priority to US09/446,903 priority patent/US6308478B1/en
Priority to DE59802763T priority patent/DE59802763D1/en
Priority to CZ0479699A priority patent/CZ296916B6/en
Publication of DE29711544U1 publication Critical patent/DE29711544U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • E04B1/0038Anchoring devices specially adapted therefor with means for preventing cold bridging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/125Reinforcement continuity box
    • E04G21/126Reinforcement continuity box for cable loops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Moulding By Coating Moulds (AREA)

Description

PFISTER & PFISTER PATENTANWÄLTE Dipl.-Ing. Helmut PfisterPFISTER & PFISTER PATENT ATTORNEYS Dipl.-Ing. Helmut Pfister

European Patent AttorneyEuropean Patent Attorney

Dipl.-Phys. Stefan PfisterDipl.-Phys. Stefan Pfister

D-87700 Memmingen/Bayern Bürol: Herrenstraße 11D-87700 Memmingen/Bavaria Office: Herrenstraße 11

21/1 Telefon 0 83 31 / 241221/1 Telephone 0 83 31 / 2412

Telefax 0 83 31/24 07 Büro 2: Buxacher Straße 9Fax 0 83 31/24 07 Office 2: Buxacher Straße 9

Telefon 0 83 31 / 6 51 83 Telefax 0 8331/65185 Postgiroamt München 1343 39-805 (BLZ 700100 80) Bayer. Vereinsbank Memmingen 2 303 396 (BLZ 731 200 75) USt-Id. Nr. · Vat Reg. No. ■ N° CEE DE 129 066 032Telephone 0 83 31 / 6 51 83 Fax 0 8331/65185 Postgiroamt München 1343 39-805 (bank code 700100 80) Bayer. Vereinsbank Memmingen 2 303 396 (bank code 731 200 75) VAT ID No. · VAT Reg. No. ■ N° CEE DE 129 066 032

0 2. JUL! 19970 2. JUL! 1997

Pfeifer Seil- und Hebetechnik GmbH & Co. Dr.-Karl-Lenz-Straße 66 87700 MemmingenPfeifer Rope and Lifting Technology GmbH & Co. Dr.-Karl-Lenz-Straße 66 87700 Memmingen

"Armierungskorb für Bauzwecke""Reinforcement cage for construction purposes"

Die Erfindung betrifft einen Armierungskorb für Bauzwecke mit einem Obergurt, einem Untergurt, einem sich zwischen dem Obergurt und dem Untergurt erstreckenden gekröpften Querkraftstab sowie eine Isolationsschicht im Bereich Kröpfung.The invention relates to a reinforcement cage for construction purposes with an upper chord, a lower chord, a cranked shear bar extending between the upper chord and the lower chord, and an insulation layer in the cranking area.

Es sind Armierungskörbe bekannt, die beispielsweise dazu dienen, eine Balkonplatte, meist aus Stahlbeton oder ein ähnliches Bauelement mit dem Bauwerk zu verbinden. Dabei geht es im wesentlichen darum, die auftretenden Druck- und Zugkräfte aus Biegung und die Querkräfte aufzunehmen. Eine Isolationsschicht sorgt dafür, daß der Wärmeübergang von der Balkonplatte oder dergleichen in das Bauwerk optimal gedämmt wird,Reinforcement cages are known which are used, for example, to connect a balcony slab, usually made of reinforced concrete or a similar structural element, to the building. The main purpose here is to absorb the compressive and tensile forces arising from bending and the transverse forces. An insulation layer ensures that the heat transfer from the balcony slab or similar into the building is optimally insulated.

um die sich sonst ergebenden Schaden und Wärmeverluste zu vermeiden. Die Armierungsstäbe, die den bekannten Korb bilden, sind in der Regel aus nichtrostendem Stahl gefertigt, da insbesondere im Bereich der Isolationsschicht bei normalem Stahl mit Rost zu rechnen ist und Edelstahl auch eine geringere Wärmeleitfähigkeit besitzt.to avoid the damage and heat loss that would otherwise occur. The reinforcing bars that form the well-known basket are usually made of stainless steel, since rust is to be expected, especially in the area of the insulation layer, with normal steel and stainless steel also has a lower thermal conductivity.

Der Erfindung liegt die Aufgabe zugrunde, den bekannten Armierungskorb zu verbessern, insbesondere im Hinblick auf die Verringerung der Wärmeverluste aber auch in Richtung auf die Verbesserung bei der Anpassung an die örtlichen Verhältnisse.The invention is based on the object of improving the known reinforcement cage, in particular with regard to the reduction of heat losses but also in the direction of improving adaptation to local conditions.

Zur Lösung dieser Aufgabe wird vorgeschlagen, daß mindestens ein Gurt als ein Drahtseilstück gebildet ist, das die auftretenden Zugkräfte aufnimmt.To solve this problem, it is proposed that at least one belt is formed as a piece of wire rope that absorbs the tensile forces that occur.

Hierdurch erreicht die Erfindung, daß beim Einbau in Fertigteile keine starren Stahlteile überstehen. Das Seil ist beim Transport des Betonteils wegbiegbar. Der wesentliche Vorteil der Verwendung von Drahtseilstücken besteht aber darin, daß die Querschnittsabmessungen eines Drahtseilstückes wesentlich kleiner gehalten werden können, als die entsprechenden Querschnittsabmessungen von Armierungsstäben. Ein Drahtseilstück ist wesentlich höher belastbar und demgemäß kann mit kleineren Querschnitten ausgekommen werden. Kleinere Querschnitte wiederum ergeben eine wesentlich verringerte Wärmeleitung.The invention thus ensures that no rigid steel parts protrude when installed in prefabricated parts. The cable can be bent away when the concrete part is being transported. The main advantage of using wire cable pieces is that the cross-sectional dimensions of a wire cable piece can be kept much smaller than the corresponding cross-sectional dimensions of reinforcing bars. A wire cable piece can bear much higher loads and smaller cross-sections can therefore be used. Smaller cross-sections in turn result in significantly reduced heat conduction.

In der Regel wird in einer Ausgestaltung der Erfindung der Obergurt von einem Drahtseilstück gebildet sein, da insbesondere bei auskragenden Balkonplatten oder ähnlichen Bauteilen der Obergurt die Zugspannungen überträgt. Bei anderen Anwendungsbeispielen der Erfindung kann dagegen das Drahtseilstück auch den Untergurt bilden. Auch der Querkraftstab kann von einem Drahtseilstück gebildet sein.As a rule, in one embodiment of the invention, the upper chord will be formed by a piece of wire rope, since the upper chord transfers the tensile stresses, particularly in the case of cantilevered balcony slabs or similar components. In other application examples of the invention, however, the piece of wire rope can also form the lower chord. The shear force rod can also be formed by a piece of wire rope.

3 -3 -

Die Verbindung des Drahtseilstückes des erfindungsgemäßen Armierungskorbes mit den Armierungsstäben der anschließenden Armierungen, kann beispielsweise dadurch erfolgen, daß das Drahtseilstück parallel zu den Armierungsstäben verläuft. Die Einbettung des Drahtseilstückes im Beton erübrigt besondere Maßnahmen zur Verankerung und zur Verbindung mit den benachbarten Armierungsstäben.The connection of the wire rope section of the reinforcement cage according to the invention with the reinforcement bars of the adjoining reinforcements can be achieved, for example, by running the wire rope section parallel to the reinforcement bars. The embedding of the wire rope section in the concrete eliminates the need for special measures for anchoring and connecting it to the adjacent reinforcement bars.

In besonderen Fällen kann jedoch auch vorgesehen sein, daß ein Ende des Drahtseilstückes ein Verankerungselement, zum Beispiel eine aufgepresste Hülse trägt. Auch eine am Ende des Drahtseilstücks ausgebildete Schlaufe kann der Verankerung dienen.In special cases, however, it can also be provided that one end of the wire rope section carries an anchoring element, for example a pressed-on sleeve. A loop formed at the end of the wire rope section can also serve as an anchor.

In einer abgewandelten Ausbildungsform der Erfindung, ist das Drahtseilstück durch Preßhülsen mit den anschließenden Armierungsstäben verbunden.In a modified embodiment of the invention, the wire rope piece is connected to the adjoining reinforcing rods by means of compression sleeves.

Bei einer anderen Variante der Erfindung ist im Bereich der Isolationsschicht ein Armierungsstab angeordnet, der mindestens mit seinem einen Ende mittels einer Preßhülse mit einem Drahtseilstück verbunden ist.In another variant of the invention, a reinforcing rod is arranged in the area of the insulation layer, which is connected at least at one end to a piece of wire rope by means of a press sleeve.

Die Armierungen benachbarter Bauteile können auch teilweise aus Drahtseilen bestehen, und das Drahtseilstück im Bereich der Isolationsschicht ist dann mindestens mit seinem einen Ende mit diesen Drahtseilen oder Drahtseilstücken verbunden, beispielsweise durch Preßhülsen.The reinforcements of adjacent components can also partially consist of wire ropes, and the piece of wire rope in the area of the insulation layer is then connected at least at one end to these wire ropes or pieces of wire rope, for example by means of compression sleeves.

In der Zeichnung sind einige Ausführungsbeispiele der Erfindung schematisch dargestellt.Some embodiments of the invention are shown schematically in the drawing.

Es zeigen:Show it:

Fig. 1 einen senkrechten Schnitt durchFig. 1 a vertical section through

zwei aneinander anschließende Be-two adjacent

tonteile, mit einem erfindungsgemäßen Armierungskorbclay parts, with a reinforcement cage according to the invention

Fig. 2 und 3 abgewandelte AusführungsbeispieleFig. 2 and 3 modified embodiments

der Erfindungthe invention

Beim Ausführungsbeispiel der Fig. 1 ist ein verzinktes Drahtseil 3 mittels einer Preßhülse 12 mit dem Armierungsstab 10 verbunden. Dieser Armierungsstab besteht aus nichtrostendem Stahl und besitzt eine gerippte Außenfläche. Durch eine weitere Preßhülse 13, ist der Stab 10 mit einem Betonstahl bzw. Armierungsstab 9 üblicher Ausbildung verbunden.In the embodiment of Fig. 1, a galvanized wire rope 3 is connected to the reinforcing rod 10 by means of a press sleeve 12. This reinforcing rod is made of stainless steel and has a ribbed outer surface. The rod 10 is connected to a reinforcing steel or reinforcing rod 9 of conventional design by means of a further press sleeve 13.

Das Drahtseilstück 3 mit dem Armierungsstab 10 und dem Armierungsstab 9 bilden den Obergurt 1, der üblicherweise auf Zug beansprucht wird. Der Untergurt 2 wird von einem Armierungsstab 14 gebildet, der an seinen Enden Scheiben 15 trägt, um die Druckkräfte zwischen den beiden Bauteilen 17 und 18 übertragen zu können. Der Stab 14 besteht ebenfalls cius nichtrostendem Stahl.The wire rope section 3 with the reinforcing rod 10 and the reinforcing rod 9 form the upper chord 1, which is usually subjected to tensile stress. The lower chord 2 is formed by a reinforcing rod 14, which has disks 15 at its ends, in order to be able to transfer the compressive forces between the two components 17 and 18. The rod 14 is also made of stainless steel.

Zwischen dem Obergurt 1 und dem Untergurt 2 erstreckt sich der mit einer Abkröpfung versehene Querkraftstab 19, der gegebenenfalls auch von einem Drahtseil gebildet sein kann. Die Isolationsschicht zwischen den Bauteilen 17 und 18 ist mit 11 bezeichnet.The shear force rod 19, which is provided with a bend and can optionally also be formed by a wire rope, extends between the upper chord 1 and the lower chord 2. The insulation layer between the components 17 and 18 is designated 11.

Der Armierungsstab 10, der Querkraftstab 19 und der Stab 14 des Untergurtes 2 können durch nicht näher dargestellte Mittel untereinander verbunden sein, so daß ein einbaubereiter Armierungskorb erhalten wird. Dieser Korb umfaßt auch die Isolationsschicht 11.The reinforcement bar 10, the shear bar 19 and the bar 14 of the lower flange 2 can be connected to one another by means not shown in detail, so that a reinforcement cage ready for installation is obtained. This cage also includes the insulation layer 11.

Beim Ausführungsbeispiel nach der Fig. 2 ist das Drahtseilstück 4 derart angeordnet, daß es die Isolationsschicht 11In the embodiment according to Fig. 2, the wire rope piece 4 is arranged in such a way that it covers the insulation layer 11

durchdringt. Das Drahtseilstück 4 ist durch die Preßhülsen 8 jeweils mit den Armierungsstäben 9 der Bauteile 16 und 17 verbunden. penetrates. The wire rope section 4 is connected to the reinforcement bars 9 of the components 16 and 17 by the press sleeves 8.

Beim Ausführungsbeispiel der Fig. 3 ist das Drahtseilstück 5 parallel zu den Armierungsstäben 6 verlegt, so daß die Kraftübertragung des Obergurtes 1 über den Beton erfolgt, der die Stäbe 6 und das Drahtseilstück 5 umgibt. Preßhülsen 7 verbessern die Verankerung.In the embodiment of Fig. 3, the wire rope section 5 is laid parallel to the reinforcing bars 6, so that the force transmission of the upper chord 1 takes place via the concrete that surrounds the bars 6 and the wire rope section 5. Press sleeves 7 improve the anchoring.

Die jetzt mit der Anmeldung und später eingereichten Ansprüche sind Versuche zur Formulierung ohne Präjudiz für die Erzielung weitergehenden Schutzes.The claims filed now with the application and subsequently are attempts to formulate without prejudice to obtain more extensive protection.

Die in den abhängigen Ansprüchen angeführten Rückbeziehungen weisen auf die weitere Ausbildung des Gegenstandes des Hauptanspruches durch die Merkmale des jeweiligen Unteranspruches hin. Jedoch sind diese nicht als ein Verzicht auf die Erzielung eines selbständigen, gegenständlichen Schutzes für die Merkmale der rückbezogenen Unteransprüche zu verstehen.The references cited in the dependent claims indicate the further development of the subject matter of the main claim through the features of the respective subclaim. However, these are not to be understood as a waiver of achieving independent, objective protection for the features of the referenced subclaims.

Merkmale, die bislang nur in der Beschreibung offenbart wurden, können im Laufe des Verfahrens als von erfindungswesentlicher Bedeutung, zum Beispiel zur Abgrenzung vom Stand der Technik beansprucht werden.Features that were previously only disclosed in the description can be claimed in the course of the procedure as being of essential importance to the invention, for example to distinguish it from the prior art.

Claims (5)

PFISTER & PFISTER PATENTANWÄLTE Dipl.-Ing. Helmut PfisterPFISTER & PFISTER PATENT ATTORNEYS Dipl.-Ing. Helmut Pfister European Patent Attorney
Dipl.-Phys. Stefan Pfister
European Patent Attorney
Dipl.-Phys. Stefan Pfister
D-87700 Memmingen/Bayern
Büro 1: Herrenstraße 11
D-87700 Memmingen/Bavaria
Office 1: Herrenstrasse 11
21/1 Telefon 0 83 31 / 241221/1 Telephone 0 83 31 / 2412 Telefax 0 83 31/24 07
Büro 2: Buxacher Straße 9
Fax 0 83 31/24 07
Office 2: Buxacher Straße 9
Telefon 0 83 31 / 6 51 83
Telefax 0 8331/65185
Postgiroamt München
1343 39-805 (BLZ 70010080)
Bayer. Vereinsbank Memmingen
2 303 396 (BLZ 731 200 75)
USt-Id. Nr. ■ Vat Reg. No. · N° CEE
DE 129 066 032
Telephone 0 83 31 / 6 51 83
Fax 0 8331/65185
Postgiroamt Munich
1343 39-805 (bank code 70010080)
Bayer. Vereinsbank Memmingen
2 303 396 (bank code 731 200 75)
VAT ID No. ■ Vat Reg. No. · N° CEE
DE 129 066 032
0 2. JULI 19970 2 JULY 1997 SchutzansprücheProtection claims ;; 1. Armierungskorb für Bauzwecke mit einem Obergurt, einem Untergurt, einen sich zwischen dem Obergurt und dem Untergurt erstreckenden gekröpften Querkraftstab sowie eine Isolationsschicht im Bereich der Kröpfung, dadurch gekennzeichnet, daß mindestens ein Drahtseilstück (3,4,5) vorgesehen ist, das die auftretenden Zugkräfte aufnimmt.1. Reinforcing cage for construction purposes with an upper chord, a lower chord, a cranked shear force rod extending between the upper chord and the lower chord and an insulation layer in the region of the crank, characterized in that at least one piece of wire rope (3, 4, 5) is provided which absorbs the tensile forces that occur.
2. Armierungskorb nach Anspruch 1, dadurch gekennzeichnet, daß das Drahtseilstück (3, 4, 5) aus nichtrostendem Stahl besteht.2. Reinforcing cage according to claim 1, characterized in that the wire rope piece (3, 4, 5) consists of stainless steel. 3. Armierungskorb nach einem oder beiden der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Obergurt (1) von einem Drahtseilstück (3, 4, 5) gebildet ist.3. Reinforcing cage according to one or both of the preceding claims, characterized in that the upper chord (1) is formed by a piece of wire rope (3, 4, 5). 4. Armierungskorb nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das Drahtseilstück (5) parallel zu den Armierungsstäben (6) der anschließenden Armierungen verläuft.4. Reinforcing cage according to one or more of the preceding claims, characterized in that the wire rope piece (5) runs parallel to the reinforcing bars (6) of the adjoining reinforcements. 5. Armierungskorb nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das5. Reinforcing cage according to one or more of the preceding claims, characterized in that the Drahtseilstiick (5) mindestens an einem Ende ein Verankerungselement, zum Beispiel eine aufgepresste Hülse (7) trägt.Wire rope piece (5) carries an anchoring element, for example a pressed-on sleeve (7), at least at one end. Armierungskorb nach einem oder mehreren derReinforcement cage according to one or more of the vorhergehenden Ansprüche, dadurch gekennzeichnet, daß preceding claims, characterized in that das Drahtseilstück (4) durch Presshülsen (8) mit den anschließenden Armierungsstäben (9) verbunden ist.the wire rope piece (4) is connected to the adjoining reinforcing bars (9) by means of press sleeves (8). Armierungskorb nach einem oder mehreren der vorhergehenden Ansprüche, gekennzeichnet durch einen Armierungsstab (10) im Bereich der Isolationsschicht (11), der mindestens mit seinem einen Ende mittels einer Presshülse (12) mit dem Drahtseilstück (3) verbunden ist.Reinforcing cage according to one or more of the preceding claims, characterized by a reinforcing rod (10) in the region of the insulation layer (11), which is connected at least at one end to the wire rope piece (3) by means of a press sleeve (12). Armierungskorb nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das Drahtseilstück (4) mindestens mit seinem einen Ende mit einem Drahtseil bzw. Drahtseilstück verbunden ist, das die benachbarte Armierung bildet.Reinforcing cage according to one or more of the preceding claims, characterized in that the wire rope piece (4) is connected at least at one end to a wire rope or wire rope piece which forms the adjacent reinforcement. Armierungskorb nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Querkraftstab (19) von einem Drahtseilstück gebildet ist.Reinforcing cage according to one or more of the preceding claims, characterized in that the transverse force rod (19) is formed by a piece of wire rope.
DE29711544U 1997-07-03 1997-07-03 Reinforcement basket for construction purposes Expired - Lifetime DE29711544U1 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
DE29711544U DE29711544U1 (en) 1997-07-03 1997-07-03 Reinforcement basket for construction purposes
EP98940129A EP1021630B1 (en) 1997-07-03 1998-07-03 Device for linking reinforced concrete elements
DK98940129T DK1021630T3 (en) 1997-07-03 1998-07-03 Device for connecting reinforced concrete elements
HU0002654A HU223050B1 (en) 1997-07-03 1998-07-03 Device for linking reinforced concrete elements
PL98338048A PL338048A1 (en) 1997-07-03 1998-07-03 Apparatus for jointing together precast reinforced concrete building units
PCT/EP1998/004123 WO1999001630A1 (en) 1997-07-03 1998-07-03 Device for linking reinforced concrete elements
AU88554/98A AU8855498A (en) 1997-07-03 1998-07-03 Device for linking reinforced concrete elements
AT98940129T ATE209286T1 (en) 1997-07-03 1998-07-03 DEVICE FOR CONNECTING REINFORCED CONCRETE PARTS
ES98940129T ES2166183T3 (en) 1997-07-03 1998-07-03 DEVICE FOR JOINING ARMED CONCRETE PARTS.
US09/446,903 US6308478B1 (en) 1997-07-03 1998-07-03 Device for connecting reinforced concrete sections
DE59802763T DE59802763D1 (en) 1997-07-03 1998-07-03 DEVICE FOR CONNECTING ARMED CONCRETE PARTS
CZ0479699A CZ296916B6 (en) 1997-07-03 1998-07-03 Device for linking reinforced concrete elements and method of making a joint of such reinforced concrete elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29711544U DE29711544U1 (en) 1997-07-03 1997-07-03 Reinforcement basket for construction purposes

Publications (1)

Publication Number Publication Date
DE29711544U1 true DE29711544U1 (en) 1998-10-29

Family

ID=8042470

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29711544U Expired - Lifetime DE29711544U1 (en) 1997-07-03 1997-07-03 Reinforcement basket for construction purposes

Country Status (1)

Country Link
DE (1) DE29711544U1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1355013A1 (en) * 2002-04-19 2003-10-22 Bouygues Batiment Connection between a floor slab and a wall and insulated building comprising such a connection
EP1600569A2 (en) * 2004-04-06 2005-11-30 Schöck Bauteile GmbH Heat insulating building element
EP3569780A1 (en) * 2018-05-18 2019-11-20 Schöck Bauteile GmbH Connection element to be mounted between a building connection component and a building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1355013A1 (en) * 2002-04-19 2003-10-22 Bouygues Batiment Connection between a floor slab and a wall and insulated building comprising such a connection
FR2838759A1 (en) * 2002-04-19 2003-10-24 Bouygues Batiment ASSEMBLY OF A WALL AND A FLOOR SLAB AND APPLICATION TO THE CONSTRUCTION OF BUILDING WITH IMPROVED THERMAL INSULATION
EP1600569A2 (en) * 2004-04-06 2005-11-30 Schöck Bauteile GmbH Heat insulating building element
EP1600569A3 (en) * 2004-04-06 2006-03-22 Schöck Bauteile GmbH Heat insulating building element
EP3569780A1 (en) * 2018-05-18 2019-11-20 Schöck Bauteile GmbH Connection element to be mounted between a building connection component and a building

Similar Documents

Publication Publication Date Title
DE60111008T2 (en) Cladding tube for tendon with longitudinally arranged channels
CH676615A5 (en)
EP2054553A1 (en) Tilt-lift method for erecting a bridge
DE3138807A1 (en) FREE LINK, IN PARTICULAR CABLE ROPE FOR A CABLE ROPE BRIDGE
EP1021630A1 (en) Device for linking reinforced concrete elements
DE3312458A1 (en) TRANSPORT ANCHORS FOR PRECAST CONCRETE PARTS
DE29711544U1 (en) Reinforcement basket for construction purposes
EP1471192A1 (en) Connecting device for concrete components
DE4102332A1 (en) Balcony mounting - has fibre-reinforced plastic absorbing tension load and passing through insulating body
EP3690187B1 (en) Pre-loadable ground anchor
DE3806759C2 (en) Method for renovating a hollow cylindrical building body and kit system therefor
DE3446006A1 (en) Corrosion-protected reinforcing bar for bridging planned structural joints
CN216949735U (en) Self-adaptive anti-seismic combined column
CN210946497U (en) Cable-stayed bridge segmented cable system with prestressed cable saddle structure
DE102017102903A1 (en) Rebar of flat steel
DE4437104C1 (en) Anchorage for clamp with supplementary bellied wire strands
EP1908880A1 (en) Rigid coupling of sleepers
DE4441772C2 (en) Prestressed tension member made of tension wires and method for erecting such a tension member
CH674752A5 (en)
EP2241699A2 (en) Anchor casing for anchoring pre-tensioned reinforcement elements
DE29805137U1 (en) Component for thermal insulation
CN212613394U (en) Twisted steel diagonal fastening cable buckle
CN113266191A (en) Self-adaptive anti-seismic combined column and construction method thereof
EP1754840B1 (en) Building element for heat insulation
DE3417398A1 (en) REINFORCED CONCRETE COMPONENT

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19981210

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20001218

R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20031028

R152 Utility model maintained after payment of third maintenance fee after eight years

Effective date: 20051005

R071 Expiry of right