DE29513990U1 - Arrangement for fastening a pipeline to a wall - Google Patents

Arrangement for fastening a pipeline to a wall

Info

Publication number
DE29513990U1
DE29513990U1 DE29513990U DE29513990U DE29513990U1 DE 29513990 U1 DE29513990 U1 DE 29513990U1 DE 29513990 U DE29513990 U DE 29513990U DE 29513990 U DE29513990 U DE 29513990U DE 29513990 U1 DE29513990 U1 DE 29513990U1
Authority
DE
Germany
Prior art keywords
support
wall
nut
slot
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29513990U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
J van Walraven BV
Original Assignee
J van Walraven BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by J van Walraven BV filed Critical J van Walraven BV
Publication of DE29513990U1 publication Critical patent/DE29513990U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B37/00Nuts or like thread-engaging members
    • F16B37/04Devices for fastening nuts to surfaces, e.g. sheets, plates
    • F16B37/045Devices for fastening nuts to surfaces, e.g. sheets, plates specially adapted for fastening in channels, e.g. sliding bolts, channel nuts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/12Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/24Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with a special member for attachment to profiled girders
    • F16L3/243Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with a special member for attachment to profiled girders the special member being inserted in the profiled girder
    • F16L3/2431Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with a special member for attachment to profiled girders the special member being inserted in the profiled girder the special member being inserted and subsequently rotated to a limited extent
    • F16B9/026

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

PATENTANWÄLTE ·· ··· #* " " "'PATENT ATTORNEYS ·· ··· # * """'

DiPLiNG. HEINER LICHTI DiPLiNG. HEINER LICHTI

DlPL-PHYS. dr. RER. NAT. JOST LEMPERT D-76207 KARLSRUHE (DURLACH)DlPL-PHYS. dr. RER. NAT. JOST LEMPERT D-76207 KARLSRUHE (DURLACH)

POSTFACH 410760 DIPL.-ING. HARTMUT LASCH TELEFON: (0721)9432815 TELEFAX: (0721) 9432840PO BOX 410760 DIPL.-ING. HARTMUT LASCH TELEPHONE: (0721)9432815 FAX: (0721) 9432840

J. van Walraven B.V. 13411.2/94 Lj/bfJ. van Walraven B.V. 13411.2/94 Lj/bf

Industrieweg 5Industrieweg 5

641 RK MIJDRECHT 30. August 19 95641 RK MIJDRECHT 30 August 19 95

NiederlandeNetherlands

Anordnung zur Befestigung einer RohrleitungArrangement for fastening a pipeline

an einer Wandon a wall

Die Neuerung bezieht sich auf eine Anordnung zur Befestigung einer Rohrleitung an einer Wand, bestehend aus einer an der Wand zu befestigenden, im Querschnitt C-förmigen Tragschiene, einem mit einem Hammerkopf und mit Gewinde versehenen Tragbolzen und einer Rohrschelle, wobei der durch den Schlitz der Tragschiene nach aussen ragende Tragbolzen mit seinem Hammerkopf hinter den Rändern des Längsschlitzes der Tragschiene greift und mittels einer aussen an der den Schlitz aufweisenden Wand der Tragschiene anliegenden Mutter festsetzbar ist und die Rohrschelle am freien Gewindeende des Tragbolzens 0 aufschraubbar ist.The innovation relates to an arrangement for fastening a pipeline to a wall, consisting of a support rail with a C-shaped cross-section to be fastened to the wall, a support bolt with a hammer head and thread, and a pipe clamp, whereby the support bolt protruding outwards through the slot in the support rail has its hammer head gripping behind the edges of the longitudinal slot in the support rail and can be secured by means of a nut resting on the outside of the wall of the support rail with the slot, and the pipe clamp can be screwed onto the free threaded end of the support bolt 0.

Eine derartige Anordnung zur Befestigung bezw. Aufhängung von Rohrleitungen an horizontalen oder senkrechten Wänden ist allgemein bekannt.Such an arrangement for fastening or hanging pipes on horizontal or vertical walls is generally known.

Zunächst wird die Tragschiene an der tragenden Wand befestigt, worauf der Tragbolzen mit den Hammerkopf durch den Schlitz der Tragschiene hindurchgesteckt, alsdann einen Viertelschlag gedreht und daraufhin mit der Mutter festgesetzt wird. Meistens wird dabei zwischen der den Schlitz aufweisenden Tragschienenwand und der Mutter eine Unterlegscheibe vorgesehen. Auf den frei auskragenden Tragbolzen wird sodann die die Rohrleitung umfassende Rohrschelle aufgeschraubt.First, the support rail is attached to the supporting wall, whereupon the support bolt with the hammer head is inserted through the slot in the support rail, then turned a quarter turn and then secured with the nut. A washer is usually placed between the support rail wall with the slot and the nut. The pipe clamp that surrounds the pipeline is then screwed onto the freely projecting support bolt.

Im allgemeinen handelt es sich um eine grosse Anzahl von Befestigungspunkten, deren Stellen öfters - durch Verschieben an der betreffenden Tragschiene - nachgestellt werden müssen ehe die endgültige Befestigung der Rohrleitungen) stattfinden kann. Die dazu erforderlichen Arbeiten, u.a. zunächst das lose Anziehen der Mutter zum Vorpositionieren, das Losdrehen der Mutter und danach das Festziehen der Mutter, machen die Montagearbeit schwierig und zeitraubend, und zwar insbesondere bei senkrecht angeordneten Tragschienen, da die Tragbolzen dabei an ihren vorläufigen Stellen bereits ziemlich kräftig angezogen werden müssen um unerwünschte Verschiebungen zu vermeiden.In general, there are a large number of fastening points, the positions of which must be readjusted frequently - by moving the relevant support rail - before the final fastening of the pipes can take place. The work required for this, including first loosely tightening the nut for pre-positioning, loosening the nut and then tightening the nut, makes the assembly work difficult and time-consuming, especially with vertically arranged support rails, since the support bolts must already be tightened quite strongly in their temporary positions in order to avoid undesirable displacement.

Die Neuerung beabsichtigt, den obengenannten Nachteilen entgegenzuwirken.The innovation aims to counteract the disadvantages mentioned above.

Neuerungsgemäss wird dieser Zweck dadurch erreicht, dass 0 zwischen der den Schlitz enthaltenden Wand der Tragschiene und der Mutter ein in Richtung gegen den Kopf vorgespanntes Federelement vorgesehen ist.According to the innovation, this purpose is achieved by providing a spring element pre-tensioned towards the head between the wall of the support rail containing the slot and the nut.

Durch die neuerungsgemässe Massnahme kann der TragbolzenThe new measure allows the support bolt

- in einem Ausgangszustand, in dem das Federelement den zum Hineinstecken des Kopfes benötigten Abstand zwischen Kopf und Mutter unter Vorspannung überbrückt - einfach an ihrer Stelle vorpositioniert werden unter weiterem Zusammendrücken des Federelementes. Nachdem der Hammerkopf dabei in der richtigen Drehlage durch den Schlitz hindurchgesteckt worden ist und der Bolzen um einen Viertelschlag gedreht worden ist, wird der Tragbolzen durch das zurückweichende Federelement an seiner vorläufigen Stelle gehalten, während es möglich bleibt, die Tragstange im Schlitz zu verstellen. Im Prinzip wird die Mutter erst wirksam, wenn sie endgültig angezogen wird.- in an initial state in which the spring element bridges the gap between the head and the nut required to insert the head under pre-tension - simply pre-position it in place by further compressing the spring element. After the hammer head has been pushed through the slot in the correct rotational position and the bolt has been turned a quarter turn, the support bolt is held in its temporary position by the receding spring element, while it remains possible to adjust the support rod in the slot. In principle, the nut only becomes effective when it is finally tightened.

Zu bemerken ist, dass aus der US 4.830.532 eine Anordnung zur gegenseitigen Verbindung von zwei im Querschnitt C-förmigen Schienen bekannt ist, wobei eine Verbindungsplatte - an der Schlitzseite jeder der beiden Schienen anliegend - mittels je eines mit einem in der betreffenden Schiene greifenden Hammerkopf versehenen Schraubenbolzens und einer Mutter an den zu verbindenden Schienen befestigt ist. Dabei ist zwischen der Verbindungsplatte und jeder Mutter eine Feder vorgesehen, die beim Anziehen der Mutter in einer Aussparung an der Unterseite des Mutterkörpers aufgenommen wird. Von einem 5 auskragenden Gewindebolzen, auf dessen freiem Ende ein weiteres Befestigungsorgan, wie eine Rohrschelle, zu befestigen ist, ist dabei nicht die Rede.It should be noted that US 4,830,532 discloses an arrangement for connecting two rails with a C-shaped cross-section, whereby a connecting plate - adjacent to the slotted side of each of the two rails - is fastened to the rails to be connected by means of a screw bolt provided with a hammer head that engages the relevant rail and a nut. A spring is provided between the connecting plate and each nut, which is received in a recess on the underside of the nut body when the nut is tightened. There is no mention of a 5 projecting threaded bolt, on the free end of which another fastening element, such as a pipe clamp, is to be fastened.

Ferner ist aus der FR 2.150.077 eine aus im Querschnitt 0 C-förmigen Profilen zusammengesetzte Auflage mit von dieser nach oben auskragenden Tragstangen bekannt, wobei die Tragstangen am unteren Ende mit je einer Schiebemutter in die Schienenprofile eingreifen und mit je einer ausserhalb der Schienen an einer Unterlegscheibe an-Furthermore, FR 2.150.077 discloses a support made up of profiles with a 0 C-shaped cross-section and with support rods projecting upwards from this, whereby the support rods engage in the rail profiles at the lower end with a sliding nut each and are attached to a washer outside the rails.

liegenden Gegenmutter fixiert werden können. Dabei sind zwecks einer vorläufigen Fixierung der Schienen Federelemente zwischen Schienenboden und jeder Schiebemutter vorgesehen.can be fixed using the counter nut. Spring elements are provided between the rail base and each sliding nut to temporarily fix the rails.

Eine bevorzugte Ausbildungsform der Neuerung ist dadurch gekennzeichnet, dass das Federelement eine auf dem Schaft des Tragbolzen sitzende Schraubenfeder ist, welche über eine Erweiterung der Gewindebohrung der über die Traglänge hinaus verlängerten Mutter vorragt, wobei die axiale Länge der Erweiterung mindestens der Länge der Schraubenfeder im zusammengedrückten Zustand entspricht.A preferred embodiment of the innovation is characterized in that the spring element is a helical spring seated on the shaft of the support bolt, which protrudes beyond an extension of the threaded bore of the nut extended beyond the support length, the axial length of the extension corresponding at least to the length of the helical spring in the compressed state.

Die Neuerung wird nachstehend an Hand der Zeichnung eines Ausführungsbeispiels näher erläutert. Hierbei zeigen:The innovation is explained in more detail below using the drawing of an example. Shown here:

Fig. 1 einen Querschnitt des Ausführungsbeispiels der Anordnung im montierten Zustand;Fig. 1 is a cross-section of the embodiment of the arrangement in the assembled state;

Fig. 2 einen Schnitt II-II gemäß Fig. 1 undFig. 2 a section II-II according to Fig. 1 and

Fig. 3 einen Querschnitt wie in Fig. 1 vor der Montage.Fig. 3 a cross section as in Fig. 1 before assembly.

Die in der Zeichnung dargestellte Anordnung besteht aus einer Tragschiene 1, einem Tragbolzen 2 und einer Rohrschelle 10.The arrangement shown in the drawing consists of a support rail 1, a support bolt 2 and a pipe clamp 10.

Die Tragschiene 1 wird von einem Kastenprofil mit C-förmigem Querschnitt gebildet und wird mit der Wand la an einer z.B. senkrechten Tragwand befestigt (z.B. mit Schrauben).The support rail 1 is formed by a box profile with a C-shaped cross-section and is fastened with the wall la to a vertical support wall (e.g. with screws).

In der gegenüberliegenden Wand Ib ist ein Längsschlitz vorgesehen.A longitudinal slot is provided in the opposite wall Ib.

Der Tragbolzen 2 besitzt einen hammerkopfartig ausgebildeten Kopf 4 bekannter Art.The support bolt 2 has a hammerhead-like head 4 of known type.

Auf dem mit Gewinde versehenen Tragbolzen 2 sitzen eine Unterlegscheibe 5 und eine Mutter 6. Die Bohrung der über ihre Traglänge hinaus verlängerten Mutter 6 ist bei 7 erweitert unter Bildung einer ringförmigen Aufnahme für eine den Bolzen umgebende Schraubenfeder 8, deren oberes Ende an der Unterlegscheibe 5 anliegt.A washer 5 and a nut 6 are seated on the threaded support bolt 2. The bore of the nut 6, which is extended beyond its support length, is widened at 7 to form an annular receptacle for a helical spring 8 surrounding the bolt, the upper end of which rests against the washer 5.

Fig. 1 zeigt die Befestigungsanordnung in dem Zustand, in der der Tragbolzen 2 an der Tragschiene 1 vorläufigFig. 1 shows the fastening arrangement in the state in which the support bolt 2 is temporarily attached to the support rail 1.

festgesetzt ist. Der Tragbolzen 2 greift dabei mit den beiden in Querrichtung auskragenden Flügeln des Hammerkopfes 4 hinter die den Schlitz 2 begrenzenden Wandteile Ib.
20
The support bolt 2 engages with the two wings of the hammer head 4 projecting in the transverse direction behind the wall parts 1b delimiting the slot 2.
20

Fig. 2 zeigt den Tragbolzen mit dem Hammerkopf in einer Position, in der er gegen eine (weitere) Drehbewegung nach links gesichert liegt.Fig. 2 shows the support bolt with the hammer head in a position in which it is secured against (further) rotation to the left.

In dem Zustand nach Fig. 1 sitzt die Tragschiene mit ihren Wandteilen Ib federnd zwischen dem Hammerkopf 4 einerseits und der federnd angedrückten Unterlegscheibe anderseits eingeklemmt. In diesem Zustand hält die vorgespannte Feder 8 den Tragbolzen 2 einerseits mit einem 0 genügenden Halt in einer vorläufigen Lage mit Bezug auf die Tragschiene 1, während der Bolzen anderseits leicht von Hand in eine endgültige Lage verstellbar ist.In the state according to Fig. 1, the support rail with its wall parts 1b is clamped spring-loaded between the hammer head 4 on the one hand and the spring-loaded washer on the other. In this state, the pre-tensioned spring 8 holds the support bolt 2 on the one hand with sufficient hold in a provisional position with respect to the support rail 1, while the bolt on the other hand can easily be adjusted by hand into a final position.

Im Zustand nach Fig. 1 wird schließlich - nachdem derIn the state shown in Fig. 1, finally - after the

— 6 — · ' · «9·· 99 &bgr;— 6 — · ' · «9·· 99 &bgr;

Bolzen 2 in seine endgültige Lage geschoben worden ist die Mutter 6 angezogen, wodurch sie unmittelbar an der Unterlegscheibe geklemmt wird und die dabei weiter zusammengedrückt Feder 8 vollständig in dem ringförmigen Raum 7 der Mutter 6 aufgenommen wird.Once bolt 2 has been pushed into its final position, nut 6 is tightened, whereby it is clamped directly to the washer and the spring 8, which is further compressed, is completely accommodated in the annular space 7 of nut 6.

In Fig. 3 ist angegeben, wie die noch voneinander getrennten Tragschiene 1 und Tragbolzen 2 miteinander verbunden werden können.Fig. 3 shows how the still separate support rail 1 and support bolt 2 can be connected to each other.

Aus der in Fig. 3 gezeigten gegenseitigen Lage, wobei der Hammerkopf mit seiner grössten Abmessung in der Längsrichtung des Schlitzes 3 ausgerichtet liegt, die Mutter 6 die gleiche Lage auf dem Bolzen wie in Fig. 1 einnimmt und die vorgespannte Feder 8 die Unterlegscheibe 5 gegen die Unterseite des Kopfes 4 presst, wird der Tragbolzen 5 einfach in Richtung des Pfeiles P die (festsitzenden) Tragschiene gepresst. Der ausgerichtet liegende Kopf 4 bewegt sich dabei durch den Schlitz 3 hindurch nach innen, während die Unterlegscheibe an der Aussenseite der Schiene anliegt und die Feder 8 weiter zusammengedrückt wird. Sobald der Hammerkopf in den Schlitz eintritt, wird auf den Bolzen 2 ein Drehmoment ausgeübt, wodurch der sich durch den Schlitz hindurch bewegende Hammerkopf einen Viertelschlag macht, welcher den Hammerkopf in die in Fig. 2 gezeigte Sicherungslage bringt.From the mutual position shown in Fig. 3, with the hammer head aligned with its largest dimension in the longitudinal direction of the slot 3, the nut 6 assuming the same position on the bolt as in Fig. 1 and the pre-tensioned spring 8 pressing the washer 5 against the underside of the head 4, the support bolt 5 is simply pressed against the (fixed) support rail in the direction of arrow P. The aligned head 4 moves inwards through the slot 3, while the washer rests against the outside of the rail and the spring 8 is further compressed. As soon as the hammer head enters the slot, a torque is exerted on the bolt 2, whereby the hammer head moving through the slot makes a quarter blow, which brings the hammer head into the securing position shown in Fig. 2.

Die kleinste Querabmessung des Hammerkopfes 4 kann auch ein wenig grosser als die Breite des Schlitzes 3 sein. In diesem Fall wird der Tragbolzen 4 in einem mit Fig. 3 vergleichbaren Ausgangszustand ein wenig schräg eingesteckt, sodass der Hammerkopf zunächst mit dem einen Längsrand und darauf mit dem anderen Längsrand hinter die betreffenden Wandteile Ib greifen kann.The smallest transverse dimension of the hammer head 4 can also be a little larger than the width of the slot 3. In this case, the support bolt 4 is inserted slightly obliquely in an initial state comparable to Fig. 3, so that the hammer head can first grip with one longitudinal edge and then with the other longitudinal edge behind the relevant wall parts Ib.

9« t* «ftf · ·«·# »»9« t* «ftf · ·«·# »»

Schliesslich ist in Fig. 1 dargestellt, wie auf das freie Geweindeende des Tragbolzens eine an sich bekannte Rohrschelle aufgeschraubt ist.Finally, Fig. 1 shows how a known pipe clamp is screwed onto the free threaded end of the support bolt.

Claims (1)

SCHUTZANSPRÜCHEPROTECTION CLAIMS 1010 Anordnung zur Befestigung einer Rohrleitung an einer Wand, bestehend aus einer an der Wand zu befestigenden, im Querschnitt C-förmigen Tragschiene, einem mit einem Hammerkopf und mit Gewinde versehenen Tragbolzen und einer Rohrschelle, wobei der durch den Schlitz der Tragschiene nach aussen ragende Tragbolzen mit seinem Hammerkopf hinter die Ränder des Längsschlitzes der Tragschiene greift und mittels einer aussen an der den Schlitz enthaltenden Wand der Trageschiene anliegenden Mutter festsetzbar ist und die Rohrschelle am freien Gewindeende des Tragbolzen aufschraubbar ist, dadurch gekennzeichnet, dass zwischen der den Schlitz (3) aufweisenden Wand der Tragschiene (1) und der Mutter (6) ein in Richtung gegen den Kopf (4) vorgespanntes Federelement (8) vorgesehen ist.Arrangement for fastening a pipeline to a wall, consisting of a support rail to be fastened to the wall, C-shaped in cross section, a support bolt with a hammer head and a thread and a pipe clamp, whereby the support bolt protruding outwards through the slot in the support rail reaches with its hammer head behind the edges of the longitudinal slot in the support rail and can be secured by means of a nut resting on the outside of the wall of the support rail containing the slot and the pipe clamp can be screwed onto the free threaded end of the support bolt, characterized in that a spring element (8) prestressed in the direction towards the head (4) is provided between the wall of the support rail (1) having the slot (3) and the nut (6). Anordnung nach Anspruch 1, dadurch gekennzeichnet, dass das Federelement (8) eine auf dem Schaft des Tragbolzens sitzende Schraubenfeder ist, welche aus einer ringförmigen Erweiterung (7) der Gewindebohrung der über ihre Traglänge verlängerten Mutter (6) hinausragt, wobei die axiale Länge der Erweiterung mindestens der Länge der Schraubenfeder im zusammengedrückten Zustand entspricht.Arrangement according to claim 1, characterized in that the spring element (8) is a helical spring seated on the shaft of the supporting bolt, which protrudes from an annular extension (7) of the threaded bore of the nut (6) extended beyond its supporting length, the axial length of the extension corresponding at least to the length of the helical spring in the compressed state.
DE29513990U 1994-08-30 1995-08-30 Arrangement for fastening a pipeline to a wall Expired - Lifetime DE29513990U1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL9401397A NL9401397A (en) 1994-08-30 1994-08-30 Device for attaching an object, more particularly a pipe, to a wall.

Publications (1)

Publication Number Publication Date
DE29513990U1 true DE29513990U1 (en) 1995-10-26

Family

ID=19864579

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29513990U Expired - Lifetime DE29513990U1 (en) 1994-08-30 1995-08-30 Arrangement for fastening a pipeline to a wall

Country Status (2)

Country Link
DE (1) DE29513990U1 (en)
NL (1) NL9401397A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1001709C2 (en) * 1995-11-21 1997-05-23 Walraven J Van Bv Device for attaching an object, more particularly of a pipe, to a wall.
DE29805705U1 (en) 1998-03-28 1998-08-13 Hägele, Wolfgang, 73113 Ottenbach Hammer head screw
NL1005551C2 (en) * 1997-03-17 1998-09-18 Walraven J Van Bv Pre-assembled bracket for lightweight frame structure
EP0866231A3 (en) * 1997-03-17 1999-01-20 J. van Walraven B.V. Prefabricated fastening device
EP1081326A2 (en) * 1999-09-02 2001-03-07 Dieter Prosch Fastening system for a building element like winding roll or Roman shade rod to a support rail for window decorations
DE19945306C1 (en) * 1999-09-22 2001-03-22 Frank Gmbh R Fastening system
EP1188939A1 (en) * 2000-09-19 2002-03-20 fischerwerke Artur Fischer GmbH & Co. KG Hammer-head element to be fixed in a sloted mounting bar
EP1338805A3 (en) * 2002-02-21 2004-01-21 Schwarz Verbindungs-Systeme GmbH Releasable fixing insert for a retaining groove
EP0860617B2 (en) 1997-02-20 2006-12-27 fischerwerke Artur Fischer GmbH & Co. KG Hammer head screw for fastening to the ceiling
EP2246577A1 (en) 2009-04-30 2010-11-03 Wagner & Co. Solartechnik GmbH Fastening element
WO2012051998A1 (en) * 2010-10-22 2012-04-26 Energiebau Solarstromsysteme Gmbh Antitwist protection for securing the position of a screw head or the like and arrangement of the antitwist protection, component and screw or the like with a nut
GB2533682A (en) * 2014-10-22 2016-06-29 Gripple Ltd Improvements in or relating to connecting devices
CN106224644A (en) * 2016-07-25 2016-12-14 华北水利水电大学 A kind of pipe-hanger support coupling arrangement of fast assembling-disassembling
EP3494314A4 (en) * 2016-08-02 2020-04-15 Flexistrut Building Services Pty Ltd Fixing device
CN115092602A (en) * 2022-07-05 2022-09-23 德马科技集团股份有限公司 Adjustable positioning supporting mechanism of chain machine and chain machine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1167853A (en) * 1956-07-12 1958-12-02 Aeroquip Corp Fixing device connected to a rail, usable for fixing objects on floors, ceilings or partitions
CH541768A (en) * 1971-08-16 1973-09-15 Meyer Otto tripod
US4830531A (en) * 1985-10-04 1989-05-16 Unistrut International Corp. Unitary connection assembly for metal channels and method for assembly

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0775838A1 (en) * 1995-11-21 1997-05-28 J. van Walraven B.V. A device for fastening an object, more particularly a pipe, to a wall
NL1001709C2 (en) * 1995-11-21 1997-05-23 Walraven J Van Bv Device for attaching an object, more particularly of a pipe, to a wall.
EP0860617B2 (en) 1997-02-20 2006-12-27 fischerwerke Artur Fischer GmbH & Co. KG Hammer head screw for fastening to the ceiling
NL1005551C2 (en) * 1997-03-17 1998-09-18 Walraven J Van Bv Pre-assembled bracket for lightweight frame structure
EP0866231A3 (en) * 1997-03-17 1999-01-20 J. van Walraven B.V. Prefabricated fastening device
DE29805705U1 (en) 1998-03-28 1998-08-13 Hägele, Wolfgang, 73113 Ottenbach Hammer head screw
EP1081326A2 (en) * 1999-09-02 2001-03-07 Dieter Prosch Fastening system for a building element like winding roll or Roman shade rod to a support rail for window decorations
EP1081326A3 (en) * 1999-09-02 2003-06-25 Dieter Prosch Fastening system for a building element like winding roll or Roman shade rod to a support rail for window decorations
DE19945306C1 (en) * 1999-09-22 2001-03-22 Frank Gmbh R Fastening system
EP1188939A1 (en) * 2000-09-19 2002-03-20 fischerwerke Artur Fischer GmbH & Co. KG Hammer-head element to be fixed in a sloted mounting bar
EP1338805A3 (en) * 2002-02-21 2004-01-21 Schwarz Verbindungs-Systeme GmbH Releasable fixing insert for a retaining groove
EP2246577A1 (en) 2009-04-30 2010-11-03 Wagner & Co. Solartechnik GmbH Fastening element
DE102009019345A1 (en) 2009-04-30 2010-11-11 Wagner & Co. Solartechnik Gmbh fastener
WO2012051998A1 (en) * 2010-10-22 2012-04-26 Energiebau Solarstromsysteme Gmbh Antitwist protection for securing the position of a screw head or the like and arrangement of the antitwist protection, component and screw or the like with a nut
GB2533682A (en) * 2014-10-22 2016-06-29 Gripple Ltd Improvements in or relating to connecting devices
CN106224644A (en) * 2016-07-25 2016-12-14 华北水利水电大学 A kind of pipe-hanger support coupling arrangement of fast assembling-disassembling
EP3494314A4 (en) * 2016-08-02 2020-04-15 Flexistrut Building Services Pty Ltd Fixing device
US10883525B2 (en) 2016-08-02 2021-01-05 Flexistrut Building Services Pty Ltd Fixing device
CN115092602A (en) * 2022-07-05 2022-09-23 德马科技集团股份有限公司 Adjustable positioning supporting mechanism of chain machine and chain machine
CN115092602B (en) * 2022-07-05 2024-07-09 德马科技集团股份有限公司 Adjustable positioning supporting mechanism of chain machine and chain machine

Also Published As

Publication number Publication date
NL9401397A (en) 1996-04-01

Similar Documents

Publication Publication Date Title
DE29513990U1 (en) Arrangement for fastening a pipeline to a wall
EP1224416A1 (en) Conduit system
DE4447456C2 (en) Mounting rail
AT512283B1 (en) SOLAR MOUNTING SYSTEM
DE19946578A1 (en) Quick connection system for threaded rods
EP0333772A1 (en) Modular building system.
DE3521783C1 (en) Spacer bush for fastening a fitting part to a hollow profile provided with a front profile part
DE8514233U1 (en) Device for aligning formwork elements arranged side by side
EP0882898A1 (en) Anchor device
DE19618138A1 (en) Room divider system for building undergoing restoration
DE20019594U1 (en) Adjustment device of a frame
DE9417856U1 (en) Device for releasably fastening two components together
EP1247999A2 (en) Mounting system
DE9212546U1 (en) Tubular frame
DE4218413C2 (en) Device for fastening plate-shaped facade elements
EP0846814B1 (en) Support rail
DE3517306A1 (en) Device for aligning shuttering elements arranged next to one another
DE8700986U1 (en) Rod light with spring relief
EP0581945A1 (en) Connecting unit
DE3519948A1 (en) Device for securing elongate articles on building parts
EP0866231B1 (en) Prefabricated fastening device
DE19700952C2 (en) Device for anchoring scaffolding
DE4318615A1 (en) Device and method for connecting the end of a profiled structural element, in particular a tube, to another element
DE29721303U1 (en) Device for fastening a grid field comprising vertical and horizontal struts to a fence post
DE3405631C2 (en)

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19951207

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 19981123

R157 Lapse of ip right after 6 years

Effective date: 20020501