DE2942093A1 - Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length links - Google Patents
Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length linksInfo
- Publication number
- DE2942093A1 DE2942093A1 DE19792942093 DE2942093A DE2942093A1 DE 2942093 A1 DE2942093 A1 DE 2942093A1 DE 19792942093 DE19792942093 DE 19792942093 DE 2942093 A DE2942093 A DE 2942093A DE 2942093 A1 DE2942093 A1 DE 2942093A1
- Authority
- DE
- Germany
- Prior art keywords
- cap
- piston
- pledging
- roof
- thrust piston
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005065 mining Methods 0.000 description 3
- 230000002349 favourable effect Effects 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/06—Special mine caps or special tops of pit-props for permitting step-by-step movement
- E21D23/066—Pivoted cantilever extensions therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Transmission Devices (AREA)
Abstract
Description
Titel: Schwenkeinrichtung für eine VorpfändkappeTitle: Swivel device for a pre-pledging cap
Zusatz zu Patent ... (Patentanmeldung P 29 18 411.0) Die Erfindung b@@@ifft eine Schwenkeinrichtung für eine an einer Hangendkapne agenkte Vorpfändkappe, bestehend aus mindestens einem Schubkolbengetriebe, welches sich an der Hangendkappe gelenkig abstützt und an einem an der Hangendkappe angelenkten Lenker gelenkig angreift, der seinerseits über ein gelenkig eingeschaltetes Zwischenglied mit der Vorpfändkappe verbunden ist. Addendum to patent ... (patent application P 29 18 411.0) The invention b @@@ ifft a swivel device for a pre-pledged cap attached to a hanging cap, Consists of at least one thrust piston gear, which is located on the hanging cap articulated and engages articulated on a handlebar articulated on the hanging end cap, which in turn has an articulated intermediate link with the pre-pledging cap connected is.
Eine solche Schwenkeinrichtung fUr die Vorpfändkappe eines hydraulischen Schreitausbaus für Bergbau-Untertagebetriebe ist Gegenstand des Hauptpatents0 Mit dieser Schwenkeinrichtung ist es möglich, die Vorpfändkappe von ihrer Vorpfändposition, in der sie das Hangende vor der stempelunterstützten Hauptkappe des Schreitausbaus abfängt, in eine Ruheposition zu schwenken, in der sie flach unter der Hauptkappe liegt. Zugleich kann die Vorpfändkappe bei Bedarf auch in eine Zwischenposition geschwenkt werden, in der sie zur Stützung des Abbaustoßes wirksam ist. Insgesamt läßt sich die Vorefändkapse über einen Schwenkbereich von 180° oder mehr verschwenken.Such a pivoting device for the pre-pledging cap of a hydraulic Striding support for underground mining operations is the subject of the main patent0 Mit this pivoting device, it is possible to move the pre-pledging cap from its pre-pledging position, in which she is the hanging wall in front of the stamp-supported main cap of the walkway support begins to pivot to a resting position in which it lies flat under the main canopy lies. At the same time, the pre-pledging cap can also be in an intermediate position if necessary panned in which they are effective to support the mining impact is. Overall, the Vorefändkapse can be swiveled over a swivel range of 180 ° or pivot more.
Durch geeignete Bemessung der Hebelarmlängen läßt sich außerdem eine günstige Übersetzung der vom Schubkolbengetriebe ausgeübten Kraft erreichen, so daß es möglich ist, das Hangende oder auch den bbaustoß mit hohen Stützkräften abzufangen.By suitable dimensioning of the lever arm lengths, a Achieve favorable translation of the force exerted by the piston mechanism, so that it is possible to intercept the hanging wall or the structural joint with high supporting forces.
Die Erfindung bezweckt eine Verbesserung und weitere Ausgestaltung der Kapnen-Schwenaeinrichtung nach dem Hauptpatent während nach dem Hautttatent das die Verbindung zwischen Lenker und Vorefändkanpe herstellende Zwischenglied aus einer starren Lasche od.dgl. besteht, wird erfindungsgemäß vorgeschlagen, für dieses Zwischenglied mindestens ein weiteres Schubkolbengetriebe vorzusehen.The invention aims to improve and further develop it the Kapnen-Schwenaeinrichtung according to the main patent while after the skin patent the link that establishes the connection between the handlebars and the Vorefändkanpe from a rigid tab or the like. exists, is proposed according to the invention for this intermediate member to provide at least one further thrust piston gear.
Bei dieser Ausgestaltung der Schwenkeinrichtung wird der erforderliche Zylinderhub zum Verschwenken der Vornfändkappe über einen Schwenkbereich, der vorzugsweise größer als 1800 ist, auf zwei hydrculische Schubkolbengetriebe aufgeteilt. Infolgedessen ist es möglich, Schubkolbengetriebe kürzerer Baulängen zu verwenden und insgesamt die Baulänge der gesamten Schwenkeinrichtung beträchtlich herabzusetzen. Außerdem läßt sich die Stützkraft an der Spitze der Vorpfändkaooe aufgrund einer günstigeren Kinematik, d.h. größeren Hebelarmabmessungen, erhöhen. In dieser Hinsicht vorteilhaft ist es, wenn das Anschlußgelenk des das Zwischenglied bildenden Schubkolbengetriebes in Nähe des vorderen landes der Vortfändkappe angeordnet wird.With this configuration of the pivoting device, the required Cylinder stroke for pivoting the Vornfändkappe over a pivoting range, which is preferably is greater than 1800, divided between two hydraulic push-piston gears. Consequently it is possible to use thrust piston gears of shorter overall lengths and overall reduce the overall length of the entire swivel device considerably. aside from that can the supporting force at the top of the Vorpfändkaooe due to a more favorable Increase kinematics, i.e. larger lever arm dimensions. Beneficial in this regard it is when the connecting joint of the sliding piston mechanism forming the intermediate link is arranged in the vicinity of the front land of the Vorfändkappe.
Die an dem Lenker angreifenden Schubkolbengetriebe werden zweckmäßig in einem gemeinsamen Gelenk bzw. in Gelenken mit dem Lenker verbunden, deren Gelenkachsen zusamnenfallen. Ferner empfiehlt es sich, die am Lenker angreifenden Schubkolbengetriebe gegeneinander seitlich versetzt so anzuordnen, daß sie bei unter die Hangendkaspe geschwenkter Vornfändkasse seitlich nebeneinanderliegen.The thrust piston gear acting on the handlebars will be expedient connected in a common joint or in joints with the handlebar, their joint axes to collapse. It is also advisable to use the thrust piston gear acting on the handlebar to be arranged laterally offset from one another so that they are under the hanging cap swiveled forward cash register side by side.
Außerdem besteht die Möglichkeit, mehrere parallele Lenker vorzusehen und außerdem für die einzelnen Schubkolbengetriebe eine Gruppe paralleler Schubkolbengetriebe zu verwenden o In der Zeichnung ist ein usfhrungsbeispiel der Erfindung dargestellt0 Es zeigen: Fig. 1 eine erfindungsgemäße Schwenkeinrichtung in Seitenansicht und bei in die Vorpfändnosition geschwenkter Vorpfändkapse; Fig. 2 die Schwenkeinrichtung nach Fig. 1, wobei die Vorpfändkappe in eine stsi+zposition geschwenkt ist, in der sie den Abbaustoß abfangen kann; Fig. 3 die Einrichtung nach den Fig. 1 und 2 ebenfalls in Seitenansicht, wobei die Vorpfändkappe in eine Ruhenosition unter die Hangendkapte geschwenkt ist.It is also possible to provide several parallel links and also a group of parallel push-piston gears for the individual push-piston gears to use o The drawing shows an exemplary embodiment of the invention 1 shows a pivoting device according to the invention in side view and FIG with the pre-pledging cap pivoted into the pre-pledging position; 2 shows the pivoting device according to Fig. 1, wherein the Vorpfändkappe is pivoted into a stsi + zposition in which it can intercept the mining blow; 3 shows the device according to FIGS. 1 and 2 as well in side view, with the pre-pledging cap in a resting position under the hanging cap is pivoted.
In der Zeichnung ist mit 1 eine Hangendkappe bezeichnet, welche im allgemeinen die stemtelunterstützte Kappe eines schreitenden Ausbaugestells, z.B. eines Ausbauschildes, eines Ausbaubockes od.dgl. ist. Am vorderen Ende dieser Hangendkappe 1 ist in einem Bolzengelenk 4 mit horizontaler Gelenkachse eine Vorpfändkappe 3 schwenkbar angeschlossen, die mit Hilfe einer Schwenkeinrichtung gegenüber der Hangendkappe 1 in der bankrechten Ebene verschwenkbar ist.In the drawing, 1 denotes a hanging end cap, which in the generally the stem-assisted cap of a striding support frame, e.g. an expansion shield, a trestle or the like. is. At the front end of this hanging cap 1 is a pre-pledging cap 3 in a pin joint 4 with a horizontal joint axis pivotally connected, with the help of a pivoting device opposite the hanging end cap 1 can be pivoted in the right bank plane is.
Die Schwenkeinrichtung weist mindestens ein donneltwirkendes hydraulisches Schuhkolbengetriebe 5 auf, dessen Zylinder sich in einem Gelenk 2 an der Unterseite der Hangendkappe 1 abstützt Das Gelenk 2 ist gegenüber dem Anschlußgelenk 4 der Vorpfändkatpe 3 zum Versatz hin ver-6 setzt. Die Kolbenstange /des Schubkolbengetriebes 5 ist in einem Gelenk 7 mit mindestens einem Lenker 8 verbunden, der an seinem anderen Ende über ein Gelenk 11 an der Unterseite der Hangendkapne 1 angeschlossen ist. Das Gelenk 11 liegt in Nähe dzs Anschlußgelenks 4 der Vornfändkappe 3, gegenüber diesem geringfügig zum Versatz hin versetzt.The pivoting device has at least one thundering hydraulic Shoe piston gear 5, the cylinder of which is in a joint 2 on the underside the hanging end cap 1 is supported The joint 2 is opposite to the connecting joint 4 of the Vorpfändkatpe 3 relocated towards the offset. The piston rod / piston gear 5 is connected in a joint 7 with at least one link 8 on its other The end is connected to the underside of the hanging cap 1 via a hinge 11. The joint 11 is located in the vicinity of the connecting joint 4 of the Vornfänd cap 3, opposite this slightly offset towards the offset.
Zwischen dem freien Ende des Lenkers 8 und der Vorpfändkappe 3 ist als Zwischenglied ein weiteres doppeltwirkendes hydraulisches Schubkolbengetriebe 9 gelenkig eingeschaltet. Das Pnschlußgelenk 12 dieses Schubkolbengetriebes 9 an der Vornfändkappe 3 liegt in Nähe des abbaustoßseitigen Endes der Vorpfändkappe. Die Kolbenstange 10 des Schubkolbengetriebes 9 ist im Gelenk 7 oder in einem Gelenk, dessen Gelenkachse mit der Gelenkachse des Gelenks 7 zusammenfällt, mit dem Lenker 8 verbunden.Between the free end of the handlebar 8 and the pre-pledging cap 3 is Another double-acting hydraulic thrust piston gear as an intermediate element 9 articulated switched on. The connection joint 12 of this thrust piston gear 9 on the Vornfändkappe 3 is in the vicinity of the working face-side end of the Vorpfändkappe. The piston rod 10 of the piston mechanism 9 is in the joint 7 or in a joint, whose joint axis coincides with the joint axis of the joint 7, with the handlebar 8 connected.
Mit Hilfe der beiden hydraulischen Schubkolbengetriebe 5 und 9 läßt sich die Vorpfändkappe 3 gegenüber der Hangendkappe 1 in der bankrechten Ebene über einen Winkel von über 1800 verschwenken. Fig. 1 zeigt die Vorpfändkappe 3 in ihrer Vorpfändposition, in der sie durch Ausschub der Schubkolbengetriebe 5 und 9 bis etwa in die Höhenlage der Hangendkappe 1 hochgeschwenkt ist, in der sie das Hangende vor der Kappe 1 unterfängt.With the help of the two hydraulic piston gears 5 and 9 can the Vorpfändkappe 3 opposite the Hangendkappe 1 in the bank level over Pivot an angle of over 1800. Fig. 1 shows the Vorpfändkappe 3 in their Pre-pledging position, in which they are pushed out by pushing piston gears 5 and 9 to is pivoted up about the height of the hanging end cap 1, in which it is the hanging wall underpins in front of the cap 1.
Durch Einschub der Schubkolbengetriebe 5 und 9 läßt sich die Vorpfändkappe 3 in die Ruheposition gemäß Fig. 3 bringen, in der sie in geringem Abstand flach unter der Hangendkappe 1 liegt. Die Schubkolbengetriebe 5 und 9 sind mit ihren Achsen seitlich gegeneinander versetzt so angeordnet, daß sie ifl der Einschubnosition gemäß Fig. 3 etwa parallel nebeneinander liegen.By inserting the thrust piston gear 5 and 9, the pre-pledging cap 3 bring into the rest position according to FIG. 3, in which they in little Distance is flat under the hanging end cap 1. The piston gears 5 and 9 are arranged with their axes laterally offset from one another so that they ifl the Slide-in position according to FIG. 3 lie approximately parallel next to one another.
Durch Druckbeaufschlagung der Schubkolbengetriebe 5, 9 in Ausschubrichtung läßt sich die Vorpfändkate 3 außerdem in jede Zwischentosition, z.B. in die Zwischentosition gemäß Fig. 2 bringen, ihrer sie geeignet ist, den Abbaustoß mit hohen Stützkräften abzufangen.By applying pressure to the piston gears 5, 9 in the direction of extension The pre-pledging card 3 can also be placed in any intermediate position, e.g. in the intermediate position Bring according to Fig. 2, it is suitable, the working face with high supporting forces intercept.
5 Da die Schubkolbengetriebe /und 9 beim Hochschwenken der Vorpfändkace 3 von der Ruhetosition gemäß Fig. 3 in die Vorpfändposition gemäß Fig. 1 nur Ausschubbewegungen und entstrechend beim Abschwenken von der Position gemäß Fig. 5 Since the thrust piston gear / and 9 when swiveling up the Vorpfändkace 3 from the rest position according to FIG. 3 to the pre-pledging position according to FIG. 1 only push-out movements and correspondingly when swiveling away from the position according to FIG.
1 in diejenige nach Fig. 3 nur Einschubbewegungen ausführen, ist auch eine einfache Steuerung der Schubkolbengetriebe gegeben L e e r s e i t e1 only perform insertion movements in the one according to FIG. 3, is also given a simple control of the piston transmission L e r page
Claims (4)
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19792942093 DE2942093A1 (en) | 1979-10-18 | 1979-10-18 | Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length links |
GB8014660A GB2048355A (en) | 1979-05-08 | 1980-05-02 | Mine roof supports |
PL1980224052A PL123706B1 (en) | 1979-05-08 | 1980-05-06 | Outrigger device for a leading roof beam being pivotally mounted on a main roof beam of roof support unit |
FR8010060A FR2456210A1 (en) | 1979-05-08 | 1980-05-06 | ELONGATE FORMING DEVICE COMPRISING A VISOR CAPABLE OF PIVOTING WITH RESPECT TO THE ROOF |
AU58154/80A AU535255B2 (en) | 1979-05-08 | 1980-05-07 | Mine roof support |
ES491245A ES491245A0 (en) | 1979-05-08 | 1980-05-07 | IMPROVEMENTS IN CANTILEVER FLOORING DEVICES WITH A CANTILEVER COVER READY IN A TURNABLE WAY, ON THE ROOF COVER OF A FITTING FRAME |
CS803247A CS253555B2 (en) | 1979-05-08 | 1980-05-08 | Forward reinforcing equipment for forward reinforcing ceiling joist |
US06/147,896 US4347021A (en) | 1979-05-08 | 1980-05-08 | Mine roof supports |
YU1228/80A YU43472B (en) | 1979-05-08 | 1980-05-08 | Longish ceiling plate for supporting roof system in mines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19792942093 DE2942093A1 (en) | 1979-10-18 | 1979-10-18 | Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length links |
Publications (2)
Publication Number | Publication Date |
---|---|
DE2942093A1 true DE2942093A1 (en) | 1981-05-07 |
DE2942093C2 DE2942093C2 (en) | 1987-01-29 |
Family
ID=6083738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19792942093 Granted DE2942093A1 (en) | 1979-05-08 | 1979-10-18 | Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length links |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2942093A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3514046C1 (en) * | 1985-04-18 | 1985-11-21 | Bochumer Eisenhütte Heintzmann GmbH & Co KG, 4630 Bochum | Pivot joint for a front cantilever |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2124244B2 (en) * | 1971-05-15 | 1974-10-24 | Kloeckner-Werke Ag, 4100 Duisburg | Cap train for moving longwall mining |
DE2709225B1 (en) * | 1977-03-03 | 1978-08-17 | Hemscheidt Maschf Hermann | Vorpfaendeinrichtung for hydraulic step extension |
DE2918411A1 (en) * | 1979-05-08 | 1980-11-13 | Gewerk Eisenhuette Westfalia | Coal mining machine frame - has hinged front shield lockable by power cylinder and linked in any desired position |
-
1979
- 1979-10-18 DE DE19792942093 patent/DE2942093A1/en active Granted
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2124244B2 (en) * | 1971-05-15 | 1974-10-24 | Kloeckner-Werke Ag, 4100 Duisburg | Cap train for moving longwall mining |
DE2709225B1 (en) * | 1977-03-03 | 1978-08-17 | Hemscheidt Maschf Hermann | Vorpfaendeinrichtung for hydraulic step extension |
DE2918411A1 (en) * | 1979-05-08 | 1980-11-13 | Gewerk Eisenhuette Westfalia | Coal mining machine frame - has hinged front shield lockable by power cylinder and linked in any desired position |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3514046C1 (en) * | 1985-04-18 | 1985-11-21 | Bochumer Eisenhütte Heintzmann GmbH & Co KG, 4630 Bochum | Pivot joint for a front cantilever |
Also Published As
Publication number | Publication date |
---|---|
DE2942093C2 (en) | 1987-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2801863B2 (en) | Lifting device with at least one scissor cross | |
DE2904544A1 (en) | RETURN DEVICE FOR HYDRAULIC SHIELD REMOVAL RACKS | |
DE2448367C3 (en) | Longwall frame | |
DE2557255A1 (en) | Self advancing roof support unit for thick seams - has figure eight steering system for angular stability of hydraulic props | |
DE2942093A1 (en) | Roof contacting structure for mine roof support - is extendable bar pivoted to piston and unit and extension bar via fixed or adjustable length links | |
DE3107209C2 (en) | ||
DE3015664A1 (en) | EXTENSION BLOCK | |
DE2841028C3 (en) | Lemniscate guide for a hydraulic support frame | |
DE2217830C3 (en) | Shield support frame | |
DE2507263A1 (en) | Shield support for mines - has equipment for elastically stabilising cap to floor base | |
DE2547853C2 (en) | Shield support unit | |
DE2745429C2 (en) | Migrating auxiliary support for the transitional area of the longwall section | |
DE2309670B1 (en) | EXTENSION FRAME PROVIDED WITH AN OFFSET SHIELD FOR STRUCTURAL STRUCTURE IN SUBSTITUTE PIT OPERATIONS | |
DE2601001C2 (en) | ||
DE2617141B2 (en) | Cap and break shield construction for a shield support frame | |
DE2363487A1 (en) | Advancing tunnel supporting structure - has hydraulic vertically adjustable columns curved outwards towards the tunnel wall face | |
DE2655076A1 (en) | EXTENSION CLAMP | |
DE2935162C2 (en) | Returning and adjusting device for a face conveyor. | |
DE3311581C1 (en) | Shield-type support assembly | |
DE1947378C3 (en) | Cap construction for longwall mining | |
DE3031397C2 (en) | Returning and adjusting device for a face conveyor | |
DE3448126C2 (en) | Shield-type support assembly for underground mining | |
DE2910569C3 (en) | Alignment device for the stamps of a walking frame | |
DE1902490C3 (en) | Pre-pledging device for a pit lining element | |
DE2026902C3 (en) | Pre-pledging cap for support frames |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8162 | Independent application | ||
8110 | Request for examination paragraph 44 | ||
8127 | New person/name/address of the applicant |
Owner name: GEWERKSCHAFT EISENHUETTE WESTFALIA GMBH, 4670 LUEN |
|
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8327 | Change in the person/name/address of the patent owner |
Owner name: WESTFALIA BECORIT INDUSTRIETECHNIK GMBH, 4670 LUEN |
|
8339 | Ceased/non-payment of the annual fee |