DE2802737A1 - Mine support arch erecting machine - has endless tracked carriage for advancing arch shaped structure with winch operated hoist - Google Patents

Mine support arch erecting machine - has endless tracked carriage for advancing arch shaped structure with winch operated hoist

Info

Publication number
DE2802737A1
DE2802737A1 DE19782802737 DE2802737A DE2802737A1 DE 2802737 A1 DE2802737 A1 DE 2802737A1 DE 19782802737 DE19782802737 DE 19782802737 DE 2802737 A DE2802737 A DE 2802737A DE 2802737 A1 DE2802737 A1 DE 2802737A1
Authority
DE
Germany
Prior art keywords
elements
expansion
conveyor
trolley
mounting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19782802737
Other languages
German (de)
Other versions
DE2802737B2 (en
DE2802737C3 (en
Inventor
Roland Guenther
Karl-Heinz Dr Ing Schwarting
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gutehoffnungshutte Sterkrade AG
Original Assignee
Gutehoffnungshutte Sterkrade AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gutehoffnungshutte Sterkrade AG filed Critical Gutehoffnungshutte Sterkrade AG
Priority to DE19782802737 priority Critical patent/DE2802737C3/en
Publication of DE2802737A1 publication Critical patent/DE2802737A1/en
Publication of DE2802737B2 publication Critical patent/DE2802737B2/en
Application granted granted Critical
Publication of DE2802737C3 publication Critical patent/DE2802737C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The machine for erecting supporting arches made of curved channel sections (7), has a similarly arched erecting frame (6) at the front. This is supported on a short pedestal at one end, and a long floor member (6c) at the other end of the arch. This floor member runs parallel to the side of the gallery, and the frame is advanced by a drive track (5b, 5d) mounted on it, with an endless chain (5b). Above this are supported the arch sections (7a) which are moved towards the erecting frame (6). The latter houses a trolley (8) which is raised and travels around the fram by means of winches (10) at each side. Guide rollers (9) around the frame assist in positioning the arch sections as they are lifted.

Description

Verfahren und Vorrichtung zur Durchführung desMethod and device for carrying out the

Verfahrens für den Tunnel- und Streckenvortrieb, insbesondere für Strecken im Untertagebetrieb mit Streckenquerschnitten unter 20 m2 Die Erfindung bezieht sich auf ein Verfahren und eine Vorrichtung zur Durchführung des Verfahrens für den Tunnel- und Strecken-Vortrieb, insbesondere für Strecken im Untertagebetrieb mit Streckenquerschnitten unter 20 m2.Procedure for tunneling and driving, especially for Underground routes with cross-sections of less than 20 m2 The invention relates to a method and an apparatus for performing the method for tunnel and section driving, especially for sections in underground operation with cross-sections of less than 20 m2.

Dabei wird davon ausgegangen, daß die vom Streckenvortrieb freigelegten Ausbruchflächen unverzüglich und endgültig, d. h. ohne Zuhilfenahme einer vorläufigen Unterstützung in Nähe der Ortsbrust unterstützt werden.It is assumed that those exposed by the drifting Excavated areas immediately and definitively, d. H. without the aid of a preliminary Support in the vicinity of the working face.

Es wird ferner davon ausgegangen, daß die Ausbauarbeiten weitestgehend von der-Art des Vortriebs, z. B.It is also assumed that the expansion work will be largely of the type of propulsion, e.g. B.

von einer Streckenvortriebsmaschine unabhängig sind.are independent of a tunneling machine.

Es wird auch die Bedingung vorausgesetzt, daß die Vorrichtung zur Durchführung des Verfahrens den Streckenquerschnitt für die Unterbringung der Strekkenvortriebsmaschine und deren Hilfsaggregate nicht behindert und daß insbesondere der Raum an der Firste nicht durch Manipulatoren, Laufkatzen, Hubeinrichtungen, Montagebühnen u. dgl. für den Strekkenvortrieb selbst freigehalten wird.It is also assumed that the device for Carrying out the procedure, the cross-section of the route to accommodate the tunneling machine and their auxiliary units are not hindered and that in particular the space on the roof not by manipulators, trolleys, lifting devices, assembly platforms and the like for the drive itself is kept free.

Ferner darf das Verfahren keine Schwellbeanspruchungen in das Deckgebirge einleiten.Furthermore, the method must not have any swelling stresses in the overburden initiate.

Die genannten Anforderungen, die an das neue Verfahren und an die dazugehörige Vorrichtung zu stellen sind, entspringen der Erfahrung der Praxis, daß die bisher bekannten Verfahren und Vorrichtungen zur unmittelbaren Unterstützung der Ausbruchflächen ohne Vorschaltung eines vorläufigen Ausbaus die an sie gestellten Erwartungen nicht erfüllt haben.The requirements mentioned, which are to be met by the new procedure and the associated devices are to be provided, arise from practical experience, that the previously known methods and devices for immediate support of the excavated areas without preliminary expansion Failed to meet expectations.

Das Verfahren nach der DT-AS 11 95 702 arbeitet mit einer verfahrbaren Arbeitsbühne und beansprucht den gesamten Streckenquerschnitt für die Unterbringung einer hängenden Arbeitsbühne und ist daher nur für Streckenvortriebe mit großem Streckenquerschnitt geeignet. Für Abbaustrecken mit beschränktém Strekkenprofil ist das Verfahren nach der genannten DT-AS nicht brauchbar.The procedure according to DT-AS 11 95 702 works with a movable one Working platform and takes up the entire cross-section of the route for accommodation a hanging work platform and is therefore only suitable for drifting with large Track cross-section suitable. For mining sections with a restricted section profile the procedure according to the DT-AS mentioned cannot be used.

Das Verfahren nach der DT-AS 22 53 670 arbeitet ebenfalls mit einer Hebe- und Ladebühne zum Transport der darauf gestapelten Ausbauteile und mit » einer zusätzlichen Einbaubühne, Das Verfahren beansprucht den Firstraum und schränkt das Profil und damit den Arbeitsraum des Vortriebs in unerwünschter Weise ein.The method according to DT-AS 22 53 670 also works with one Lifting and loading platform for transport of the expansion parts stacked on it and with »an additional built-in platform. The process takes up the roof space and restricts the profile and thus the working space of the advance in undesirable Wise one.

Die Verfahren und Vorrichtungen nach den DT-AS 25 01 320, DT-OS 26 02 423 und DT-AS 22 16 643 arbeiten mit zusammensteckbaren vormontierten Ausbaubögen, die mit Hilfe einer in der Firste untergebrachten Laufkatze über die Vortriebsmaschine hinweg zur Ortsbrust vorgefahren und dort gesetzt werden müssen. Diese Verfahren eignen sich wohl für den Ausbau von Strecken mit großem Streckenquerschnitt, sind jedoch für Strecken mit geringerem Querschnitt unbrauchbar, weil sie den Firstraum in unerträglicher Weise beanspruchen.The methods and devices according to DT-AS 25 01 320, DT-OS 26 02 423 and DT-AS 22 16 643 work with pre-assembled extension sheets that can be plugged together, with the help of a trolley housed in the roof over the tunneling machine must be driven up to the face and set there. These procedures are probably suitable for the expansion of routes with a large cross-section but useless for routes with a smaller cross-section, because they have the ridge space stress in an unbearable manner.

Auch die Streckenvortriebsmaschine mit eingebauter Vorrichtung zum Setzen der Ausbau-Elemente nach der DT-OS 20 10 622 beansprucht einen großen Strekkenquerschnitt und ist außerdem sehr aufwendig.Also the tunneling machine with built-in device for Setting the expansion elements according to DT-OS 20 10 622 requires a large route cross-section and is also very complex.

Sie besitzt auch den Nachteil, daß Vortriebsarbeiten und Ausbauarbeiten nicht unabhängig voneinander durchführbar sind. Dies führt zu gegenseitigen Behinderungen, die sich besonders für Abbaustrecken im Untertagebetrieb bei Streckenquerschnitten unter 20 m2 ungünstig auswirken.It also has the disadvantage that excavation work and expansion work cannot be carried out independently of one another. This leads to mutual disabilities, which are particularly suitable for mining routes in underground operation with route cross-sections less than 20 m2 have an unfavorable effect.

Es ist daher die Aufgabe der Erfindung, für Strecken mit einem Streckenquerschnitt unter 20 m2 ein einfaches Verfahren und eine wenig aufwendige Vorrichtung zu schaffen, womit erreicht ist, daß der Transport der Ausbau-Elemente und deren endgültige Montage in unmittelbarer Nähe der Ortsbrust ohne Zuhilfenahme eines vorläufigen Ausbaus und ohne Inanspruchnahme des Arbeitsraumes des Streckenvortriebs ausführbar sind, daß das Gebirge an Firste und Sohle möglichst wenig aufgelockert wird und Schwellbeanspruchungen nicht in das Gebirge eingeleitet werden, daß ferner die Stillstandszeiten für die Vortriebsmaschine auf eine Restzeit zum Verschrauben bzw. Verkeilen der Ausbau-Elemente eingeschränkt werden und die Ausbauarbeiten in kürzerer Zeit und mit geringerem Personalaufwand als bei den bekannten Verfahren ausführbar sind.It is therefore the object of the invention for routes with a route cross-section to create a simple process and an inexpensive device under 20 m2, what is achieved that the transport of the expansion elements and their final assembly in the immediate vicinity of the face without the aid of a provisional support and can be carried out without using the working space of the drifting, that the mountains at the roof and bottom are loosened as little as possible and swell loads not be introduced into the mountains, that also the downtimes for the Driving machine for a remaining time to screw or wedge the extension elements and the expansion work in less time and with less Personnel costs can be carried out as in the known methods.

Diese Vorteile dürfen nicht durch einen hohen Aufwand für zusätzliche und den Vortrieb behindernden Einrichtungen erkauft werden.These benefits may not be due to a high outlay for additional and facilities that hinder the advance are bought.

Demgemäß besteht die Erfindung bei einem Verfahren und einer Vorrichtung zur Durchführung des Verfahrens für den Tunnel- und Streckenvortrieb insbesondere für Strecken im Untertagebetrieb mit Streckenquerschnitten unter 20 m2 darin, daß a) die vo Streckenvortrieb freigelegten Ausbruchflächen dem Vortrieb stetig folgend in der Nähe der Ortsbrust endgültig durch Ausbau-Elemente unterstützt werden, b) daß die lösbar miteinander verbundenen Segmente eines Ausbau-Elementes an einer Seite des Stoßes außerhalb des von den Vortriebs-Einrichtungen beanspruchten Profils maschinell mit Hilfe einer Förder-Einrichtung einem bogenförmigen Montage-Gestell zugeführt werden, c) daß die lösbar zusammengebundenen Segmente eines Ausbau-Elementes mit Hilfe eines maschinell angetriebenen Führungs-Elementes im Montagegestell geführt und auf dessen Tragrollen zum anschließenden Zusammenbau bereitgestellt werden, d) daß die auf Tragrollen des Montagegestells bereitgehaltenen Ausbau-Elemente mit Hilfe eines im Montage-Gestell angeordneten Verstell-Elementes bis zur erforderlichen Höhe angehoben und anschließend mittels Schraub- und Keilverbindungen in üblicher Weise in die Endstellung gebracht und gesichert werden, e) daß das Verzugsmaterial auf dieselbe Weise transportiert und in den Raum zwischen den Ausbruchflächen und den Ausbau-Elementen eingebracht wird, f) daß die Verschalungstafeln zum Hinterfüllen des Raumes zwischen Ausbruchfläche und Ausbau-Elementen auf dieselbe Art eingebracht werden, g) daß durch Anwendung dieses Verfahrens die Stillstandszeiten der Vortriebsmaschine von z. Z.Accordingly, the invention resides in a method and apparatus to carry out the procedure for tunneling and driving, in particular for underground routes with cross-sections of less than 20 m2 in that a) the excavated areas exposed by the drift continuously follow the drift in the vicinity of the face are finally supported by support elements, b) that the releasably interconnected segments of an expansion element on one Side of the joint outside the profile used by the jacking equipment mechanically with the help of a conveyor device an arched assembly frame are supplied, c) that the releasably tied together segments of an expansion element guided in the assembly frame with the help of a machine-driven guide element and are provided on its support rollers for subsequent assembly, d) that the expansion elements kept ready on the support rollers of the mounting frame With the help of an adjustment element arranged in the mounting frame up to the required Height raised and then by means of screw and wedge connections in the usual way Way are brought into the end position and secured, e) that the warping material the same way transported and into the space between the excavated areas and the expansion elements are introduced, f) that the shuttering panels for backfilling of the space between the excavated area and finishing elements are introduced in the same way be, g) that by using this method the downtimes of the tunneling machine from Z. Z.

70 % der Gesamtzeit bis auf eine für das Verkeilen der Ausbau-Elemente benötigte Restzeit herabgesetzt werden, h) daß der Raum an der Firste von den sperrigen Manipulatoren bekannter Verfahren nicht beansprucht wird, i) daß der Anwendungsbereich des Verfahrens für Strecken mit niedriger Firsthöhe nicht eingeengt ist, k) daß das Verfahren keinerlei Relativbewegung zwischen Gebirge und den Ausbau-Elementen verursacht und keine schwellenden Belastungen in das Gebirge eingeleitet werden, 1) daß die Ausbau-Arbeiten in kürzerer Zeit als beim bekannten Verfahren durchgeführt werden können, m) daß das Ausbau-Personal von der beschwerlichen und gefährdeten Transportarbeit beim Einbringen des endgültigen Ausbaus entlastet wird, n) daß die Ausbau-Arbeiten von einer Restbelegschaft von 2 Mann durchgeführt werden können. 70% of the total time except for one for wedging the extension elements The remaining time required can be reduced, h) that the space at the roof of the bulky Manipulators of known methods is not claimed i) that the scope of the procedure for routes with a low ridge height is not restricted, k) that the process does not have any relative movement between the rock and the finishing elements caused and no swelling loads are introduced into the mountains, 1) that the expansion work in less time than with known Procedures can be carried out m) that the expansion staff from the arduous and endangered transport work when introducing the final expansion is, n) that the expansion work is carried out by a remaining workforce of 2 men can be.

Zur Durchführung des Verfahrens ist eine Vorrichtung erforderlich, die folgende Merkmale besitzt: a) eine auf Kufen in Richtung Ortsbrust vorschiebbare Fördereinrichtung mit einer umlaufenden endlosen Mitnehmerkette zum Transport der einzelnen oder der lösbar miteinander verbundenen Segmente der Streckenbögen sowie des übrigen Ausbaumaterials, b) ein bogenförmiges, als Kastenprofil ausgebildetes Montage-Gestell mit mehreren daran befestigten horizontal angeordneten Tragrollen, c) eine im Montage-Gestell geführte, darin reversierbar laufende, von einer rinde angetriebene Laufkatze mit Greifer zum Umfassen, Transportieren und Ablegen der Streckenbögen auf den Tragrollen.A device is required to carry out the process has the following features: a) one that can be pushed forward on runners in the direction of the face Conveyor with a revolving endless driver chain for transporting the individual segments or the detachably interconnected segments of the route arcs as well of the rest of the construction material, b) an arcuate, designed as a box profile Mounting frame with several horizontally arranged support rollers attached to it, c) one guided in the assembly frame, reversible in it, from a bark powered trolley with gripper for gripping, transporting and depositing the Track bends on the support rollers.

Die zum Transport der Streckenbögen und des übrigen Ausbaumaterials erforderliche Transport-Einrichtung besteht nach der Erfindung aus einem nach oben offenen schmalen Fördertrog, einer darin umlaufenden Mitnehmerkette mit Antriebsrolle und Umkehrrolle sowie einem Antrieb.The one for transporting the arches and the rest of the construction material required transport facility exists according to the invention from a narrow conveyor trough open at the top, a carrier chain circulating in it with drive roller and reversing roller as well as a drive.

Die Streckenbögen und das übrige Material werden durch die Transport-Einrichtung dem mit ihr verbundenen Montagegestell zugeführt, das nach der Erfindung an den beiden stoßseitigen Enden in Führungshülsen geführt und mit Hilfe von hydraulischen Verstell-Elementen heb- und senkbar ist, wobei die Verstell-Elemente auf Stütz- und Vorschubkufen abgestützt sind und die der Fördereinrichtung benachbarte Führungshülse durch ein Anschluß stück und die Stütz- und Vorschubkufe unmittelbar mit der Fördereinrichtung verbunden ist.The route sheets and the rest of the material are transported by the transport device supplied to the assembly frame associated with it, which according to the invention to the both butt ends guided in guide sleeves and with the help of hydraulic Adjusting elements can be raised and lowered, the adjustment elements on support and feed skids are supported and the guide sleeve adjacent to the conveyor device by a connection piece and the support and feed skid directly to the conveyor connected is.

Auf diese Weise sind die Förder-Einrichtung und das Montage-Gestell eine geschlossene Verschiebe-Einheit.In this way, the conveyor device and the assembly frame a closed sliding unit.

Der Weitertransport der Streckenbögen erfolgt mit Hilfe der im Montage-Gestell untergebrachten und darin reversierbar laufenden Laufkatze und dem mit ihr verbundenen Greifer.The route bends are transported on with the help of the in the assembly frame housed and reversible running trolley and the trolley connected to it Grapple.

Dies ist erfindungsgemäß dadurch ermöglicht, daß die Laufkatze mit Greifer in einem Gehäuse untergebracht ist, worin sich die drei Führungsrollen zur Führung der Laufkatze im Kastenprofil des Montage- Gestells befinden und aus welchem die gleichfalls darin angeordnete Schwenkachse des Greifers herausragt, wobei der Greifer aus dem Zapfenhalter, dem Schwenkzapfen mit Aufnahmeauge, dem Verbindungsbolzen und den Klemmbacken besteht, mittels derer die Segmente der Streckenbögen umgreifbar, durch das am Anschluß stück angreifende Zug-Element der zur Zugeinrichtung gehörenden Winde über die Tragrollen ziehbar und auf diesen ablegbar sind.This is made possible according to the invention in that the trolley with Gripper is housed in a housing, in which the three guide rollers for Guiding of the trolley in the box profile of the assembly The frame and from which the swivel axis of the gripper, which is also arranged in it, protrudes, wherein the gripper from the pin holder, the pivot pin with receiving eye, the There is connecting bolt and the clamping jaws, by means of which the segments of the stretch arcs can be grasped by the pulling element acting on the connection piece of the pulling device belonging winch can be pulled over the support rollers and placed on them.

Dabei besteht die Zugeinrichtung nach der Erfindung aus der reversierbar ausgebildeten Winde, den Ablenkrollen und den Zug-Elementen (beispielsweise Seilen).The pulling device according to the invention consists of the reversible trained winch, the deflection pulleys and the pulling elements (e.g. ropes).

In der Zeichnung ist der Gegenstand der Erfindung dargestellt, und zwar zeigen Fig. 1 Seitenansicht auf die Vorrichtung Fig. 2 rückwärtige Ansicht Fig. 3 Draufsicht Fig. 4 Seitenansicht der Förder-Einrichtung Fig. 5 dasselbe im Schnitt Fig. 6 dasselbe in Draufsicht Fig. 7 Seitenansicht auf die Laufkatze mit Greifer Fig. 8 dasselbe im Schnitt Fig. 9 Einzelheit (Greifer) nach Pfeil IX in Fig. 8 im Schnitt Fig. 10 - 12 Perspektivische Darstellung des Transportablaufs von Streckenbögen Die Vorrichtung zur sofortigen endgültigen Unterstützung der Ausbruchflächen ist in der Strecke entsprechend den Fig. 1 und 2 zwischen dem Hangenden 1 und dem Liegenden 3 angeordnet und folgt stetig dem Vortriebs-Fortschritt an der Ortsbrust 4.In the drawing, the object of the invention is shown, and Although FIG. 1 shows a side view of the device, FIG. 2 shows a rear view Fig. 3 top view Fig. 4 side view of the conveyor device Fig. 5 the same in Section Fig. 6 the same in plan view Fig. 7 side view the trolley with gripper Fig. 8 the same in section. Fig. 9 Detail (gripper) according to arrow IX in Fig. 8 in section Fig. 10-12 perspective view of the Transport sequence of route bends The device for immediate final support the breakout areas is in the route according to FIGS. 1 and 2 between the Arranged hanging walls 1 and the lying 3 and constantly follows the progress of the advance on the face 4.

Die in den Fig. 1 und 3 gezeigten Streckenbögen 7 werden als Einzelsegmente 7 a oder durch Klammern lösbar miteinander'verbunden,mit Hilfe der Förder-Einrichtung 5 (Fig. 4, 5, 6) in dem Fördertrog 5 a und deren im Boden des Troges umlaufenden Mitnehmerkette 5 b zum Montage-Gestell 6 befördert.The route arcs 7 shown in FIGS. 1 and 3 are used as individual segments 7 a or releasably connected to one another by brackets, with the aid of the conveyor device 5 (Fig. 4, 5, 6) in the conveyor trough 5 a and their revolving in the bottom of the trough Carrying chain 5 b transported to the assembly frame 6.

Die Mitnehmerkette 5 b wird von einem Antrieb 5 e über die Antriebsrolle 5 c angetrieben und über die Umlenkrolle 5 d umgelenkt.The driver chain 5 b is driven by a drive 5 e via the drive roller 5 c driven and deflected over the pulley 5 d.

Das Montagegestell 6 ist entsprechend den Fig. 1 und 2 bogenförmig gestaltet und als Kastenträger ausgebildet. Beide Enden des Montagegestells 6 sind entsprechend Fig. 1 in einer Führungshülse 6 a geführt. Das Montage-Gestell 6 kann mittels der beiden in den Führungshülsen 6 a angeordneten und auf den Stütz- und Vorschubkufen 6 c abgestützten und daran befestigten hydraulischen Verstell-Elementen 6 b in Richtung auf die Firste angehoben und in der Gegenrichtung abgesenkt werden.The mounting frame 6 is according to FIG. 1 and 2 designed arched and designed as a box girder. Both ends of the mounting frame 6 are guided according to FIG. 1 in a guide sleeve 6 a. The assembly frame 6 can be arranged by means of the two in the guide sleeves 6 a and on the support and feed skids 6 c supported and attached to hydraulic adjustment elements 6 b raised in the direction of the roof and lowered in the opposite direction.

Die in Nähe der Fördereinrichtung 5 angeordnete Führungshülse 6 a (Fig. 1) ist durch das Anschlußstück 6 d mit der Fördereinrichtung 5 verbunden, an welche auch die Stütz- und Vorschubkufe 6 c angeschlossen ist. Auf diese Weise bilden Fördereinrichtung 5 und Montagegestell 6 entsprechend Fig. 2 eine auf Kufen in Richtung Ortsbrust bewegbare Verschiebe-Einheit.The arranged in the vicinity of the conveyor 5 guide sleeve 6 a (Fig. 1) is connected to the conveyor 5 by the connector 6 d, to which the support and feed skid 6 c is also connected. In this way Conveyor 5 and assembly frame 6 according to FIG. 2 form one on runners Sliding unit that can be moved in the direction of the face.

In dem Kastenträger des Montage-Gestells 6 ist eine darin reversierbar verfahrbare mit einem Greifer ausgerüstete Laufkatze 8 (Fig. 7, 8, 9) angeordnet.In the box girder of the assembly frame 6 one is reversible therein movable trolley 8 (FIGS. 7, 8, 9) equipped with a gripper is arranged.

Diese dient dazu, die einzelnen Bogensegmente 7 a der Streckenbögen 7 oder die durch Klammern lösbar miteinander verbundenen Segmente 7 a mit Hilfe der Klemmbacken 8 g zu umfassen, über die Tragrollen 9 zu führen und auf diesen für die Endmontage bereitzuhalten.This serves to separate the individual arc segments 7 a of the route arcs 7 or the segments 7 a releasably connected to one another by brackets with the aid to include the jaws 8 g, to guide them over the support rollers 9 and onto them to be kept ready for final assembly.

Zu diesem Zweck besitzt die Laufkatze 8, wie Fig. 8 zeigt, ein Gehäuse 8 a, worin die Führungsrollen 8 b zur Führung der Katze 8 im Montage-Gestell 6 untergebracht sind.For this purpose, the trolley 8, as shown in FIG. 8, has a housing 8 a, in which the guide rollers 8 b for guiding the trolley 8 are housed in the mounting frame 6 are.

In dem Gehäuse 8 a ist außerdem eine Schwenkachse 8 c-vorhanden, die aus dem Gehäuse hervorragt und woran der Greifer gelenkig angeschlossen ist. Dieser besteht entsprechend Fig. 9 aus einem Zapfenhalter 8 d, einem Schwenkzapfen 8 e mit Aufnahme-Auge, einem Verbindungsbolzen 8 f und den Klemmbacken 8 g, mittels derer die Segmente 7 a der Streckenbögen 7 umgriffen werden.In the housing 8 a, a pivot axis 8 c-is also present, which protrudes from the housing and to which the gripper is articulated. This consists according to FIG. 9 of a pin holder 8 d, a pivot pin 8 e with receiving eye, a connecting bolt 8 f and the clamping jaws 8 g, by means of of which the segments 7 a of the arches 7 are encompassed.

Beiderseits der in den Fig. 7 und 8 gezeigten Laufkatze 8 sind Anschlußstücke 8 g angebracht, an denen die Zug-Elemente 10 c (Seile) angreifen und die Katze 8 reversierbar im Kastenträger des Montage-Gestells 6 bewegen.On both sides of the trolley 8 shown in FIGS. 7 and 8 are connecting pieces 8 g attached, on which the pulling elements 10 c (ropes) attack and the trolley 8 move reversibly in the box girder of the assembly frame 6.

Die zum Verfahren der Laufkatze 8 aus Fig. 3 erkennbare Zug-Einrichtung 10 besteht aus einer reversierbaren Winde 10 a, den Ablenkrollen 10 b und den Zug-Elementen 10 c, die bei dem beschriebenen Ausführungsbeispiel Seile sind.The traction device for moving the trolley 8 from FIG. 3 can be seen 10 consists of a reversible winch 10 a, the deflection rollers 10 b and the pulling elements 10 c, which are ropes in the embodiment described.

In den Fig. 10 bis 12 ist der Ablauf des Transportes von Streckenbögen dargestellt.In FIGS. 10 to 12, the sequence of transporting route sheets is shown shown.

Außer den Streckenbögen 7 kann mit der beschriebenen Vorrichtung auch das übrige zum Ausbau benötigte Material, wie z. B. das Verzugsmaterial und Verschalungstafeln, transportiert werden.In addition to the route arcs 7 can also be used with the device described the rest of the material required for expansion, such as B. the warping material and formwork panels, be transported.

LeerseiteBlank page

Claims (6)

1. Verfahren und Vorrichtung zur Durchführung des Verfahrens für den Tunnel- und Streckenvortrieb, insbesondere für Strecken im Untertagebetrieb mit Streckenquerschnitten unter 20 m2 dadurch gekennzeichnet, daß a) die vom Streckenvortrieb freigelegten Ausbruchflächen dem Vortrieb stetig folgend in der Nähe der Ortsbrust endgültig durch Ausbau-Elemente unterstützt werden, b) daß die lösbar miteinander verbundenen Segmente eines Ausbau-Elements an einer Seite des Stoßes außerhalb des von den Vortriebs-Einrichtungen beanspruchten Profils maschinell mit Hilfe einer Förder-Einrichtung einem bogenförmigen Montage-Gestell zugeführt werden, c) daß die lösbar zusammengebundenen Segmente eines Ausbau-Elements mit Hilfe eines maschinell angetriebenen Führungs-Elementes im Montagegestell geführt und auf dessen Tragrollen zum anschließenden Zusammenbau bereitgestellt werden, d) daß die auf Tragrollen des Montagegestells bereitgehaltenen Ausbau-Elemente mit Hilfe eines im Montage-Gestell angeordneten Verstell-Elementes bis zur erforderlichen Höhe angehoben und anschließend mittels Schraub-und Keilverbindungen in üblicher Weise in die Endstellung gebracht und gesichert werden, e) daß das Verzugsmaterial auf dieselbe Weise transportiert und in den Raum zwischen den Ausbruchflächen und den Ausbau-Elementen eingebracht wird, f) daß die Verschalungstafeln zum Hinterfüllen des Raumes zwischen Ausbruchfläche und Ausbau-Elementen auf dieselbe Art eingebracht werden, g) daß durch Anwendung dieses Verfahrens die Stillstandszeiten der Vortriebsmaschine von z. Z. 70 % der Gesamtzeit bis auf eine für das Verschrauben bzw. Verkeilen der Ausbau-Elemente benötigte Restzeit herabgesetzt werden, h) daß der Raum an der Firste von den sperrigen Manipulatoren bekannter Verfahren nicht beansprucht wird, i) daß der Anwendungsbereich des Verfahrens für Strecken mit niedriger Firsthöhe nicht eingeengt ist, k) daß das Verfahren keinerlei Relativbewegung zwischen Gebirge und den Ausbau-Elementen verursacht und keine schwellenden Belastungen in das Gebirge eingeleitet werden, 1) daß die Ausbau-Arbeiten in kürzerer Zeit als beim bekannten Verfahren durchgeführt werden können.1. Method and apparatus for performing the method for the Tunnel and route driving, especially for routes in underground operation with Route cross-sections of less than 20 m2 characterized in that a) from the tunneling exposed excavation areas continuously following the advance near the face are finally supported by expansion elements, b) that the detachable with each other connected segments of an expansion element on one side of the joint outside the by the tunneling equipment stressed profile mechanically with the help of a Conveying device are fed to an arched assembly frame, c) that the releasably tied together segments of an expansion element with the help of a machine driven guide element guided in the mounting frame and on its support rollers to the subsequent assembly are provided, d) that the rollers on the Mounting frame held ready expansion elements with the help of a mounting frame arranged adjustment element is raised to the required height and then brought into the end position in the usual way by means of screw and wedge connections and secured, e) that the drafting material is transported in the same way and introduced into the space between the excavated areas and the finishing elements will, f) that the shuttering panels for backfilling the space between the breakout area and extension elements are introduced in the same way, g) that by application this method, the downtime of the tunneling machine of z. Currently 70% of the Total time except for one for screwing or wedging the expansion elements the remaining time required can be reduced, h) that the room at the roof the bulky manipulators of known methods do not claim i) that the scope of the procedure for routes with low ridge height does not is narrowed, k) that the method does not have any relative movement between mountains and caused by the expansion elements and no swelling loads in the mountains be initiated, 1) that the expansion work in less time than the known Procedures can be carried out. 2. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1, gekennzeichnet durch, a) eine auf Kufen (6 c) in Richtung Ortsbrust (4) vorschiebbare Fördereinrichtung (5) mit einer umlaufenden endlosen Mitnehmerkette (5 b) zum Transport der einzelnen oder der lösbar miteinander verbundenen Segmente (7 a) der Strekkenbögen (7) sowie des übrigen Ausbaumaterials.2. Device for performing the method according to claim 1, characterized through, a) a conveyor device that can be advanced on runners (6c) in the direction of the face (4) (5) with a revolving endless driver chain (5 b) for transporting the individual or the releasably interconnected segments (7 a) of the stretch arcs (7) as well the rest of the finishing material. b) ein bogenförmig, als Kastenprofil ausgebildetes Montage-Gestell (6) mit mehreren, daran befestigten horizontal angeordneten Tragrollen (9), c) eine im Montage-Gestell (6) geführte, darin reversierbar laufende von einer Winde (10) angetriebene Laufkatze mit Greifer (8) zum Umfassen, Transportieren und Ablegen der Strekkenbögen (7) auf den Tragrollen (9). b) an arched assembly frame designed as a box profile (6) with several horizontally arranged support rollers (9) attached thereto, c) one guided in the mounting frame (6) and reversibly running in it by a winch (10) driven trolley with gripper (8) for gripping, transporting and depositing the stretching arches (7) on the support rollers (9). 3. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß die Fördereinrichtung (5) aus einem nach oben offenen schmalen Fördertrog (5 a), einer darin umlaufenden Mitnehmerkette (5 b) mit Antriebsrolle (5 c) und Umkehrrolle (5 d) sowie einem Antrieb (5 e) besteht.3. Apparatus according to claim 2, characterized in that the conveyor (5) from a narrow conveyor trough open at the top (5 a), one encircling it Driver chain (5 b) with drive roller (5 c) and reversing roller (5 d) as well as a drive (5 e) exists. 4. Vorrichtung nach den Ansprüchen 2 und 3, dadurch gekennzeichnet, daß das Montage-Gestell (6) an den beiden stoßseitigen Enden in Führungshülsen (6 a) geführt und mit Hilfe von hydraulischen Verstell-Elementen (6 b) heb- und senkbar ist, daß die Verstell-Elemente (6 b) auf Stütz- und Vorschubkufen (6 c) abgestützt sind und daß die der Fördereinrichtung (5) benachbarte Führungshülse (6 a) durch ein Anschluß stück (6 d) und die Stütz- und Vorschubkufe (6 c) unmittelbar mit der Fördereinrichtung (5) verbunden ist.4. Device according to claims 2 and 3, characterized in that that the assembly frame (6) is in guide sleeves (6 a) guided and can be raised and lowered with the aid of hydraulic adjustment elements (6 b) is that the adjusting elements (6 b) are supported on support and feed skids (6 c) are and that the conveyor (5) adjacent guide sleeve (6 a) through a connection piece (6 d) and the support and feed skid (6 c) is directly connected to the conveyor (5). 5. Vorrichtung nach den Ansprüchen 2 bis 4, d a d u r c h g e k e -n n z e i c h n e t daß die Laufkatze mi Greifer ;3) in einem Gehäuse (8 a) untergebracht ist, worin sich die drei Führungsrollen (8 b) zur Führung der Laufkatze im Kastenprofil des Montage-Gestells (6) befinden und aus welchem die gleichfalls darin angeordnete Schwenkachse (8 c) des Greifers herausragt, wobei der Greifer aus dem Zapfenhalter (8 d), dem Schwenkzapfen (8 e) mit Aufnahmeauge, dem Verbindungsbolzen (8 f) und den Klemmbacken (8 g) besteht, mittels derer die Segmente (7 a) der Streckenbögen (7) umgreifbar, durch das am Anschlußstück (8 h) angreifende Zug-Element (10 c) der zur Zugeinrichtung (10) gehörenden Winde (10 a) über die Tragrollen (9) ziehbar und auf diesen ablegbar sind.5. Device according to claims 2 to 4, d a d u r c h g e k e -n n z e i c h n e t that the trolley with gripper; 3) housed in a housing (8 a) is where the three guide rollers (8 b) for guiding the trolley in the box section of the mounting frame (6) are located and from which the also arranged therein Pivot axis (8 c) of the gripper protrudes, the gripper from the pin holder (8 d), the pivot pin (8 e) with receiving eye, the connecting bolt (8 f) and the clamping jaws (8 g), by means of which the segments (7 a) of the stretch arcs (7) can be grasped by the tension element (10 c) acting on the connection piece (8 h) the winch (10 a) belonging to the pulling device (10) can be pulled over the support rollers (9) and can be placed on this. 6. Vorrichtung nach den Ansprüchen 2 bis 5, dadurch gekennzeichnet, daß die Zugeinrichtung (10) aus der reversierbar ausgebildeten Winde (10 a), den Ablenkrollen (10 b) und dem Zug-Element (10 c) besteht.6. Device according to claims 2 to 5, characterized in that that the pulling device (10) from the reversible winch (10 a), the Deflection rollers (10 b) and the pulling element (10 c) consists.
DE19782802737 1978-01-23 1978-01-23 Device for introducing a final route extension consisting of extension frames Expired DE2802737C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19782802737 DE2802737C3 (en) 1978-01-23 1978-01-23 Device for introducing a final route extension consisting of extension frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19782802737 DE2802737C3 (en) 1978-01-23 1978-01-23 Device for introducing a final route extension consisting of extension frames

Publications (3)

Publication Number Publication Date
DE2802737A1 true DE2802737A1 (en) 1979-07-26
DE2802737B2 DE2802737B2 (en) 1979-11-22
DE2802737C3 DE2802737C3 (en) 1981-04-02

Family

ID=6030135

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19782802737 Expired DE2802737C3 (en) 1978-01-23 1978-01-23 Device for introducing a final route extension consisting of extension frames

Country Status (1)

Country Link
DE (1) DE2802737C3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0025307A1 (en) * 1979-08-29 1981-03-18 Allan Richard Hilton Apparatus for and a method of erecting an underground roadway support
CN116927831A (en) * 2023-09-14 2023-10-24 湖南省通盛工程有限公司 Tunnel arch protection integral dismounting equipment and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3502199C1 (en) * 1985-01-24 1986-02-27 Bochumer Eisenhütte Heintzmann GmbH & Co KG, 4630 Bochum Process for erecting a heading powered support assembly

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2010622A1 (en) * 1970-03-06 1971-09-23
DE7321234U (en) * 1973-06-06 1976-07-01 Bade & Co Gmbh, 3160 Lehrte DEVICE FOR STACKING AND INSTALLATION OF TUEBBING ELEMENTS IN TUNNEL DRIVING
DE2216643B2 (en) * 1972-04-07 1977-06-23 Bergbaustahl Gmbh & Co, 5800 Hagen Setting roof support in mechanically driven underground roadways - with sides of support unit suspended on roof segment and transported to roadway face where they are assembled

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2010622A1 (en) * 1970-03-06 1971-09-23
DE2216643B2 (en) * 1972-04-07 1977-06-23 Bergbaustahl Gmbh & Co, 5800 Hagen Setting roof support in mechanically driven underground roadways - with sides of support unit suspended on roof segment and transported to roadway face where they are assembled
DE7321234U (en) * 1973-06-06 1976-07-01 Bade & Co Gmbh, 3160 Lehrte DEVICE FOR STACKING AND INSTALLATION OF TUEBBING ELEMENTS IN TUNNEL DRIVING

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Glückauf, 112, 1976, Nr. 2, S. 60-69 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0025307A1 (en) * 1979-08-29 1981-03-18 Allan Richard Hilton Apparatus for and a method of erecting an underground roadway support
CN116927831A (en) * 2023-09-14 2023-10-24 湖南省通盛工程有限公司 Tunnel arch protection integral dismounting equipment and construction method
CN116927831B (en) * 2023-09-14 2023-12-19 湖南省通盛工程有限公司 Tunnel arch protection integral dismounting equipment and construction method

Also Published As

Publication number Publication date
DE2802737B2 (en) 1979-11-22
DE2802737C3 (en) 1981-04-02

Similar Documents

Publication Publication Date Title
AT507495B1 (en) POWER OR MACHINE
DE2621674B2 (en) Process and device for driving and upgrading an underground route as well as upgrading the route to carry out the process
DE2815898A1 (en) DEVICE FOR POSITIONING CEILING SUPPORT IN A TUNNEL
DE2802737A1 (en) Mine support arch erecting machine - has endless tracked carriage for advancing arch shaped structure with winch operated hoist
DE2415802C3 (en) Movable deflection and tensioning station for a hydraulic conveying hose line
DE2216643C3 (en) Method and device for assembling roadworks, in particular for machine heading with roadheaders in mining
DE2908452A1 (en) Mine gallery prefabricated support setting machine - is ring mounted on travelling bench on gantry on section cutting machine
DE1019984B (en) Extraction and conveying equipment consisting of a coal plow and face conveyor
DE2747975C3 (en) Device for building routes, especially in mining
DE2801181C2 (en) Device for the pre-assembly of multi-part support frames when mechanically driving underground routes, tunnels, tunnels and the like by means of a roadheading machine
DE2646496B2 (en) Facility for the continuous expansion of a line with a door frame expansion
DE2611181C3 (en) Device for the mechanical installation of track expansion frames
DE2934625C2 (en) Device for the partial mechanization of the expansion work in a partial section drive and method for introducing a preassembled road support using this device
DE3303059A1 (en) CONNECTION FEEDER
DE1080948B (en) Device for mechanical expansion of a route with route arches
DE3545025C1 (en) Apparatus for transporting and facilitating the assembly of support material
DE3626948C2 (en)
DE3824395C1 (en) Device for shifting support sections, designed as I-shaped box sections and free of external straps, in mine and tunnel support free of bracing and props
DE2119201C3 (en) Erector trolley for inserting a segment lining in tunnels
DE2532685C3 (en) Reversing station for overhead monorails, especially in underground operations
DE3145270C2 (en) Device used as an expansion aid for tunneling in mining and tunneling
DE2651474C3 (en) Use of a partial section tunneling machine for building through (re-tearing) deformed routes in underground mining
DE2215978B2 (en) Device for inserting expansion parts in underground routes
DE1139455B (en) Portal-like extension scaffolding for the introduction of route extension elements
DE2253670C3 (en) Method and device for the mechanical installation of support frames, in particular arch support frames when driving up routes in underground operations

Legal Events

Date Code Title Description
OAP Request for examination filed
OD Request for examination
BGA New person/name/address of the applicant
C3 Grant after two publication steps (3rd publication)
8339 Ceased/non-payment of the annual fee