DE2727870A1 - Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks - Google Patents

Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks

Info

Publication number
DE2727870A1
DE2727870A1 DE19772727870 DE2727870A DE2727870A1 DE 2727870 A1 DE2727870 A1 DE 2727870A1 DE 19772727870 DE19772727870 DE 19772727870 DE 2727870 A DE2727870 A DE 2727870A DE 2727870 A1 DE2727870 A1 DE 2727870A1
Authority
DE
Germany
Prior art keywords
section
sliding surfaces
side bearing
bridge
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19772727870
Other languages
German (de)
Inventor
Edmund Hertle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alfred Kunz and Co
Original Assignee
Alfred Kunz and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alfred Kunz and Co filed Critical Alfred Kunz and Co
Priority to DE19772727870 priority Critical patent/DE2727870A1/en
Publication of DE2727870A1 publication Critical patent/DE2727870A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • E01D21/065Incremental launching
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The structure is made by concreting on a section in a form onto a previously completed section, and rythmycally forwarding it into position while another section is made. Where structures have a cross-section varying along their length and extending below the forwarding plane, full-length side bearing brackets are concreted on in this plane, with straight bottom strip-shaped sliding tracks. During construction these are supported by the brackets on the sliding surfaces. The brackets may be provided by the laterally cantilevered roadway slab.

Description

Verfahren zum Herstellen von langen Bauwerken mit; über Method for producing long structures with; above

deren Länge veränderlichen Querschnitten. their length variable cross-sections.

Die Erfindung betrifft ein Verfahren zum Herstellen von langen Bauwerken aus Stahlbeton oder Spannbeton, insbesondere Brückenüberbauten, bei dem das Bauwerk durch Anbetonieren eines Abschnitts in einer Schalung an den zuvor fertiggestellten hergestellt und im Takt der Herstellung eines Abschnitts bis in seine Einbaustellung vorgeschoben wird.The invention relates to a method for producing long structures made of reinforced concrete or prestressed concrete, in particular bridge superstructures, in which the structure by concreting a section in formwork to the previously completed manufactured and in time with the manufacture of a section up to its installation position is advanced.

Nach diesem aus der DT-PS 12 37 603 bekannten Taktschiebeverfahren lassen sich in wirtschaftlicher Weise lange Bauwerke herstellen, deren in der Vorschub ebene liegende untere Flächen ebene oder kreisbogenförmige Gleitflächen bilden, die sich unter Zwischenlage von Gleitbelägen auf im Abstand voneinander angeordneten tragenden Gleitflächen abstützen.According to this incremental shifting process known from DT-PS 12 37 603 can be produced in an economical way, long structures, their in the feed flat lower surfaces form flat or circular arc-shaped sliding surfaces, which are arranged at a distance from one another with the interposition of sliding linings support the bearing sliding surfaces.

Das bekannte Taktschiebeverfahren läßt sich in wirtschaftlicher Weise jedoch dann nicht anwenden, wenn das zu erstellende Bauwerk in der Vorschubebene keine ebene untere Fläche aufweist, auf der das Bauwerk im Takt seiner abschnittweisen Herstellung vorgeschoben werden kann. Sollen beispielsweise gevoutete Brückenüberbauten, also solche, deren Höhe im Bereich der tragenden Pfeiler vergrößert ist, nach dem Taktschiebeverfahren hergestellt werden, müssen die gevouteten Unterseiten mit einem stützenden Material zur Schaffung einer in der Vorschubebene liegenden ebenen Gleitbahn ausgefüllt werde, wodurch die Wirtschaftlichkeit des Taktschiebeverfahrens gegenüber üblichen 3aufweisen, bei denen der Brückenüberbau in seiner Einbauendstellunq hergestellt wird, weitgehend verlorenoeht.The known incremental launch method can be used in an economical manner however, do not apply if the structure to be created is in the feed plane does not have a flat lower surface on which the structure in the cycle of its sections Manufacturing can be advanced. Should, for example, haunched bridge superstructures, So those whose height is increased in the area of the supporting pillars, after Incremental launching process produced must be haunted Undersides with a supporting material to create one in the feed plane lying flat slideway will be filled, whereby the profitability of the Incremental launching method compared to the usual 3, in which the bridge superstructure is produced in its installation end position, largely lost.

Aufgabe der vorliegenden Erfindung ist es, das bekannte 'laktschiebeverfahren so auszugestalten, daß es sich auch zur blerstellung von langen Bauwerken mit über deren Länge veränderlichen und sich bis unter die Vorschubebene erstrekkenden Querschnitten anwenden leßt.The object of the present invention is to use the known 'lactating method to be designed in such a way that it can also be used to create long structures with over the length of which can be changed and cross-sections extending below the feed plane let us apply.

erfindungsgemäß wird diese Aufgabe bei einem Verfahren der eingangs angegebenen Art dadurch gelöst, daß an Bauwerke mit über deren Länge veränderlichen und sich bis unter die Vorschubebene erstreckenden Querschnitten in der Vorschubebene seitliche, über deren gesamte Länge verlaufende Auflagerkonsolen mit geradlinigen unteren streifenförmigen Gleitbahnen anbetoniert und diese während ihrer Herstellung über die Auflagerkonsolen auf Gleitflächen abgestützt werden.According to the invention, this object is achieved in a method of the above specified type solved in that on structures with variable over their length and cross-sections in the feed plane extending below the feed plane lateral support brackets running over their entire length with straight Concreted lower strip-shaped slideways and these during their manufacture be supported on sliding surfaces via the support brackets.

Das erfindungsgemäße Verfahren läßt sich zur Herstellung langer Bauwerke auch dann mit allen Vorteilen des Taktschiebeverfahrens anwenden, wenn diese keine ebenen unteren Flächen zun Vorschieben in der Vorschubebene aufweisen. Die seitlichen Auflagerkonsolen mit den in der Vorschubebene liegenden Gleitbahnen lassen sich mit relativ geringem Aufwand herstellen, so daß auf besondere und aufwendige Maßnahmen zur Schaffung von ebenen in der Vorschubebene liegenden unteren Flächen der Bauwerke verzichtet werden kann.The inventive method can be used for the production of long structures even then use the incremental launching method with all the advantages, if these are none have flat lower surfaces to advance in the advance plane. The side Support brackets with the slideways in the feed plane can be Manufacture with relatively little effort, so that on special and complex measures to create flat lower surfaces of the structures in the feed plane can be dispensed with.

Bei Brückenüberbauten können die seitlichen Auf lagerkonsolen in vorteilhafter Weise durch die seitlich auskragende Fahrbahnplatte gebildet werden, die sodann im Bereich der stützenden Gleitflächen verstärkt werden sollte.In the case of bridge superstructures, the side support brackets can be more advantageous Way are formed by the laterally projecting deck slab, which then should be reinforced in the area of the supporting sliding surfaces.

Die Gleitflächen werden bei Brückenüberbauten zweckmäßigerweise durch die Stirnflächen von seitlich an den Pfeilern und Widerlagern angeordneten Auflagefingern gebildet. Zur Reibungsverminderung und zum Schutz der Gleitflächen und Bauwerke werden zweckmäßigerweise zwischen die Gleitflächen und Gleitbahnen reibungsvermindernde Beläge eingelegt.The sliding surfaces are expediently used in bridge superstructures by the end faces of support fingers arranged laterally on the pillars and abutments educated. To reduce friction and to protect sliding surfaces and structures are expediently friction-reducing between the sliding surfaces and slideways Coverings inserted.

Ein Ausführungsbeispiel des erfindungsgemäßen Verfahrens wird nachstehend anhand der Zeichnung näher erläutert. In dieser zeigt Fig.1 eine Seitenansicht eines Ausschnitts einer Einschubbrücke während ihrer Herstellung in schematischer Darstellung, Fig.2 einen Querschnitt durch den Brückenüberbau mit geringstem Querschnitt, Fig.3 einen Querschnitt durch den Sückenüberbau mit maximalem Querschnitt und Fig.4 einen Querschnitt durch einen Brückenüberbau mit an der isahrbahnplatte vorgesehenen Gleitbahnen.An embodiment of the method according to the invention is shown below explained in more detail with reference to the drawing. In this Fig.1 shows a side view of a A section of an insertion bridge during its production in a schematic representation, FIG. 2 shows a cross-section through the bridge superstructure with the smallest cross-section, FIG. 3 a cross-section through the saddle superstructure with maximum cross-section and FIG Cross-section through a bridge superstructure with slideways provided on the roadway slab.

Der in einer ortsfesten Schalung abschnittweise hergestellte und im Takt der Herstellung jeweils eines Abschnitts in Richtung des Pfeils A in seine Einbaustellung vorgeschobene Brückenüberbau 1 stützt sich auf der Ausgangsseite auf das Widerlager 2 sowie die Pfeiler 3 und 4 ab. Die weiteren Stützpfeiler sowie das Brückenlager auf der Empfangsseite des taktweise vorgeschobenen Brückenüberbaus 1 sind nicht dargestellt. Der Brückenüberbau 1 weist eine gevoutete Unterkante 6 auf, so daß diese keine ebene Einschubgleitbahn bildet. Beidseits des Brückenüberbaus sind über die Länge des Bauwerks verlaufende auskragende Konsolen 5 angeordnet, die auf ihrer Unterseite mit einer ebenen, in der Vorschubebene liegenden Gleitbahn 6 versehen sind. Über die Gleitbahnen 6 stützen sich die Auflagerkonsolen 5 auf Finger 7 ab, die beidseits an den oberen Enden der Widerlager 2 und Pfeiler 3,4 angeordnet sind. Die Finger 7 fassen die gevoutete Unterkante 6 des Brückenüberbaus 1 gabelförmig ein, so daß sich das Brückenüberbauwerk 1 trotz seines über die Höhe veränderlichen Querschnitts vorschieben läßt, ohne daß ein Heben oder Senken des überbau auftritt.The section produced in a fixed formwork and in the Clock of the production of a section in the direction of arrow A in his In the installation position of the advanced bridge superstructure 1 is supported on the exit side on the abutment 2 and the pillars 3 and 4. The other pillars as well the bridge bearing on the receiving side of the intermittently advanced bridge superstructure 1 are not shown. The bridge superstructure 1 has a haunched lower edge 6 so that it does not form a flat slide-in slide. On both sides of the bridge superstructure cantilevered brackets 5 are arranged over the length of the structure, those on their underside with a flat sliding track lying in the feed plane 6 are provided. The support brackets 5 are supported via the slideways 6 Finger 7 on both sides at the upper ends of the abutments 2 and pier 3.4 are arranged. The fingers 7 grasp the haunched lower edge 6 of the bridge superstructure 1 fork-shaped, so that the bridge superstructure 1 despite its over the height variable cross-section can be advanced without raising or lowering the superstructure occurs.

Bei der in Fig.4dargestellten Ausführungsform ist die beidseits auskragende Fahrbahnplatte 8 mit einer Verstärkung 9 versehen, die die Auflagerkonsole bildet. Da die Auf lagerkonsolen 9 ein Teil der Fahrbahnplatte 8 selbst bilden, treten diese bei der fertigen Brücke optisch kaum in Erscheinung.In the embodiment shown in Figure 4 is the projecting on both sides Slab 8 is provided with a reinforcement 9 which forms the support bracket. Since the support brackets on 9 form part of the deck 8 itself, they occur hardly visible in the finished bridge.

L e e r s e i t eL e r s e i t e

Claims (4)

Patentansprüche 1.) Verfahren zum Herstellen von langen Bauwerken aus Stahlbeton, insbesondere Brückenüberbauten, bei dem das Bauwerk durch Anbetonieren eines Abschnitts in einer Schalung an den zuvor fertiggestellten hergestellt und im Takt der Herstellung eines Abschnitts auf stützenden Gleitflächen bis in seine Einbaustellung vorgeschoben wird, d a d u r c h g e -k e n n z e i c h n e t, daß an Bauwerke (1)mit über deren Länge veränderlichen und sich bis unter die Vorschubebene erstreckenden Querschnitten in der Vorschubebene seitliche, über deren gesamte Länge verlaufende Auf lagerkonsolen (5) mit geradlinigen unteren streifenförmigen Gleitbahnen (6) anbetoniert und diese während ihrer Herstellung über die Auf lagerkonsolen (5) auf den Gleitflächen abgestützt werden. Claims 1.) Method for producing long structures made of reinforced concrete, in particular bridge superstructures, in which the structure is cast in concrete of a section in a formwork to the previously completed and manufactured in time with the production of a section on supporting sliding surfaces up to its Installation position is advanced, d u r c h e -k e n n n z e i c h n e t that on structures (1) with variable length over their length and extending to below the feed level lateral extending cross-sections in the feed plane, over their entire length running on storage consoles (5) with straight lower strip-shaped slideways (6) concreted and this during their production over the support brackets (5) be supported on the sliding surfaces. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die seitlichen Auf lagerkonsolen bei Brückenüberbauten durch die seitlich auskragende Fahrbahnplatte (8,9) gebildet werden.2. The method according to claim 1, characterized in that the lateral Support brackets on bridge superstructures through the laterally projecting deck slab (8,9) can be formed. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Gleitflächen bei Brückenüberbauten (1) durch die Stirnflächen von seitlich an den Pfeilern (3,4) und widerlagern (2) angeordnete Auflagefinger (7) gebildet werden.3. The method according to claim 1 or 2, characterized in that the Sliding surfaces on bridge superstructures (1) through the front surfaces from the side of the Support fingers (7) arranged on pillars (3, 4) and abutments (2) are formed. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß zwischen die Gleitflächen und Gleitbahnen reibungsvermindernde Beläge eingelegt werden.4. The method according to any one of claims 1 to 3, characterized in that that friction-reducing linings are inserted between the sliding surfaces and slideways will.
DE19772727870 1977-06-21 1977-06-21 Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks Ceased DE2727870A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19772727870 DE2727870A1 (en) 1977-06-21 1977-06-21 Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19772727870 DE2727870A1 (en) 1977-06-21 1977-06-21 Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks

Publications (1)

Publication Number Publication Date
DE2727870A1 true DE2727870A1 (en) 1979-01-18

Family

ID=6011973

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19772727870 Ceased DE2727870A1 (en) 1977-06-21 1977-06-21 Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks

Country Status (1)

Country Link
DE (1) DE2727870A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0514256A1 (en) * 1991-05-14 1992-11-19 Sarl P.X. CONSULTANTS Process for making structures like bridges and structures so obtained

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0514256A1 (en) * 1991-05-14 1992-11-19 Sarl P.X. CONSULTANTS Process for making structures like bridges and structures so obtained
FR2676478A1 (en) * 1991-05-14 1992-11-20 Px Consultants METHOD FOR THE CONSTRUCTION OF WORKS SUCH AS BRIDGES AND ARTICLES THUS OBTAINED

Similar Documents

Publication Publication Date Title
DE2639812B2 (en) Prefabricated building element for the production of ceilings and / or walls as well as method and device for the production thereof
DE2523237A1 (en) STEEL BEAM
DE68904208T2 (en) INCLINED CABLE BRIDGE AND METHOD FOR THEIR CONSTRUCTION.
DE2248472C3 (en) Process for the production of T-beams from prestressed concrete
DE2514063C2 (en)
DE2727870A1 (en) Erecting long bridge from varying cross=section concrete sections - using side bearing brackets in forwarding plane with bottom slide tracks
DE2443770C2 (en) Railway bridge with continuously welded tracks
AT396276B (en) SPACERS FOR LAYING A LAYER OF ARMORING IRON AGAINST A SHUTTER FOR THE PRODUCTION OF A CONCRETE CONSTRUCTION
DE1043372B (en) Method for the construction of reinforced concrete bridges in sections using cantilever
DE2147748C3 (en) Method for creating a structure from a number of prefabricated elements
DE3516477C2 (en)
DE2754213B1 (en) Method for manufacturing a Zuggurtbruecke made of reinforced or prestressed concrete
DE19522478C2 (en) Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process
DE2723770A1 (en) Varying gradient bridge superstructure stepped advancing system - uses packing members under guide track to vary height of advancing sections
DE2432547C3 (en)
DE3806279C2 (en) Prefabricated, transportable wall and process for its manufacture
DE3435112A1 (en) Method and device for manufacturing bridges
DE3221960C2 (en) Method for producing a slot channel for surface drainage of traffic areas
DE2811200A1 (en) Sliding bearing for bridge advanced in steps - has sliding plates directly returnable to start position as bridge moves on
DE1683943C3 (en)
DE2054356A1 (en) Finished part and process for the manufacture of the finished part
DE3000716A1 (en) COMPOSITE PANEL PROFILE
DE2735379C2 (en) Process for the production of prestressed concrete bridges
DE2251475A1 (en) PROCESS AND BASE FOR THE PRODUCTION OF A STRUCTURAL STRUCTURE, IN PARTICULAR A BRIDGE MADE OF STRENGTHENED CONCRETE
DE1257818B (en) Process for the segmental production of bridge structures or the like elongated structures made of in-situ concrete and precast concrete component for carrying out the process