DE2621055A1 - Reinforced concrete rooms with one side left open - are made from contractable inner casing mould fixed to cantilever and assigned to L-shaped supports with outer casing elements - Google Patents

Reinforced concrete rooms with one side left open - are made from contractable inner casing mould fixed to cantilever and assigned to L-shaped supports with outer casing elements

Info

Publication number
DE2621055A1
DE2621055A1 DE19762621055 DE2621055A DE2621055A1 DE 2621055 A1 DE2621055 A1 DE 2621055A1 DE 19762621055 DE19762621055 DE 19762621055 DE 2621055 A DE2621055 A DE 2621055A DE 2621055 A1 DE2621055 A1 DE 2621055A1
Authority
DE
Germany
Prior art keywords
formwork
rear wall
assigned
inner shell
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19762621055
Other languages
German (de)
Other versions
DE2621055C2 (en
Inventor
Hugo Schmidt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19762621055 priority Critical patent/DE2621055C2/en
Publication of DE2621055A1 publication Critical patent/DE2621055A1/en
Application granted granted Critical
Publication of DE2621055C2 publication Critical patent/DE2621055C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The casing installation is for the prodn. of rooms having one side open and made from reinforced concrete. There is an inner casing for the walls and ceiling and removable outer wall casing elements for the side and end walls. A contractable inner casing mould is fixed to a cantilever. The mould is assigned to L-shaped supports fitted with outer casing elements for the side walls and one end wall. The support base is on rollers or friction bearings. The base can be firmly bolted into position. The supports are removable. The rear wall outer casing element can be moved along rails from the inner mould by slightly more than its length.

Description

Vorrichtung zur serienmäßigen Herstellung von einseitig offenenDevice for the serial production of one-sided open

Raumzellen aus Stahlbeton Bei bekannten Vorrichtungen zur serienmäßigen Fertigung von einseitig offenen Raumzellen bereitet die Ein- und Ausschalung vielseitige Schwierigkeiten und nicht unbedeutenden Arbeitsaufwand.Room cells made of reinforced concrete In known devices for series production The production of space cells open on one side makes shuttering and dismantling versatile Difficulties and not insignificant workload.

Diese Vorrichtungen bestehen u.a. aus verfahrbaren Innen- und Aussenschalaggregaten mit Formbodenwagen (DDR-PS 32 875) oder aus stationär angeordneter Innen- und Außenschalvorrichtung mit zugehörigen Paletten (D-OS-17 59 214), die mit vorgefertigtem Betonboden zur weiteren Fertigung unter die an einem Kragarm befestigte Innenschalung gefahren werden. Bei der ersten ist für die Bewegungen der Schalaggregate ein umfangreiches Gleis- und Antriebssystem notwendig und zudem ein erheblicher Arbeitsaufwand für Justierungen erforderlich. Diese Nachteile sind in den stationär angeordneten Vorrichtungen, die die D-OS-17 59 214 aufzeigt, weitgehend vermieden. Jedoch ist auch dort der Nachteil gegeben, daß eine grössere Anzahl von Paletten vorhanden sein muß, um eine wirtschaftliche Fließfertigung zu ermöglichen. Außerdem ist die Investition für eine größere Anzahl sehr teurer Paletten mit erforderlichen Beheizungsaggregaten und Antriebsmotoren nicht sehr sinnvoll, wenn in einem Betonwerk ein Kran und beheizbare Fertigungstische sowieso vorhanden sind, wobei der Kran die entsprechenden Transporte zusdtzlich ohne wesentliche Kosten vornehmen könnte und die Fertigungstische besser genutzt würden. Voraussetzung hierfUr ist eine entsprechende Anordnung der Fertigungsplitze und insbesonders die Gestaltung der Schalvorrichtung.These devices consist, among other things, of movable internal and external formwork units with a molded floor trolley (DDR-PS 32 875) or from a stationary inner and outer shuttering device with associated pallets (D-OS-17 59 214), which are used with a prefabricated concrete floor further production under the inner formwork attached to a cantilever arm will. The first is an extensive one for the movements of the formwork units Track and drive system necessary and also a considerable amount of work for Adjustments required. These disadvantages are in the stationary arranged devices, which the D-OS-17 59 214 shows, largely avoided. However, there is that too The disadvantage given that a larger number of pallets must be available to one to enable economical flow production. Besides, the investment is for a large number of very expensive pallets with the necessary heating units and drive motors not very useful if a crane and heatable in a concrete plant Manufacturing tables are available anyway, with the crane doing the appropriate transports in addition, without significant costs and could make the production tables better would be used. The prerequisite for this is a corresponding arrangement of the production lines and especially the design of the shuttering device.

Die Aufgabenstellung der Erfindung besteht darin, eine Schalvorrichtung fur die serienmäßige Herstellung von einseitig offenen Raumzellen aus Stahlbeton so zu gestalten, daß die Paletten entfallen können und die Beschickung der Schalvorrichtung mit einem auf vorhandenem Fertigungstisch vorgefertigten Beton boden mit angeflochtenem Bewehrungskorb und der Abtransport der Raumzelle aus der Schalvorrichtung mit dem sowieso in einem Betonwerk vorhandenen Kran ermöglicht wird.The object of the invention is to provide a shuttering device for the serial production of single-sided open room cells made of reinforced concrete to be designed so that the pallets can be omitted and the loading of the formwork device with a prefabricated concrete floor with braided on the existing production table Reinforcement cage and the removal of the space cell from the formwork device with the anyway in a concrete plant existing crane is made possible.

Die gestellte Aufgabe wird dadurch gelöst, daß einer, an einem Kragarm befestigten, zusammenziehbaren Innenschalform, L-förmige, am Fuß auf Rollen oder in Gleitlagern gelagerte und verriegelbare, nach außen wegfahrbare Stützen mit daran befestigten Außenschalelementen und einem Stirnwandaußenschalelement zugeordnet werden, daß das Außenruckwandschalelement der Raumzelle etwas mehr als deren Länge auf Schienen von der Innenschalform, wegfahrbar angeordnet wird und fUr das Auflegen des vorgefertigten Beton bodens mit angeflochtenem Bewehrungskorb unter der an einem Kragarm befestigten Innenschalvorrichtung Auflagervorrichtungen angeordnet werden.The problem posed is achieved in that one, on a cantilever arm attached, contractible inner shell shape, L-shaped, on the foot on rollers or In plain bearings and lockable, outwardly movable supports with on them attached outer formwork elements and assigned to a front wall outer formwork element that the outer back wall cladding element of the room cell is slightly more than its length on rails from the inner shell form, is arranged so that it can be moved away and for laying on of the prefabricated concrete floor with braided reinforcement cage under the one Cantilever-attached inner formwork support devices are arranged.

Der an sich vorteilhaften stationären Anordnung einer Schalvorrichtung, wobei eine zusammenziehbare Innenschalung an einem frei austragenden Kragarm mit zugeordneten portalartigen Stützen, als Träger der Außenschalelemente, vorgesehen ist (D-OS-17 59 214), haften einige Mängel an, die verbesserungsfdhig sind. In fast allen Betonwerken, in denen Raumzellen hergestellt werden, sind fUr den Transport von Bauteilen Krone entsprechender Größenordnung vorhanden, die bei der vorgeschlagenen Lösung mit eingesetzt und damit besser genutzt werden sollen. Hierbei werden die erforderlichen Paletten eingespart und die Transportweee der Paletten fUr Produktionszwecke frei. Bei der Schalvorrichtung der D-OS-17 59 214 ist das nicht möglich, weil die Portale, an denen die Außenwandschal elemente verfahrbar gelagert sind, die Verwendung eines Kranes zum Abheben und Ausfahren der Raumzelle wegen der Querbalken nicht zulassen. Erfindungsgemöß sollen daher die der, an einem Kragarm befestigten, zusammenziehbaren Innenschalung zugeordneten StUtzen L-förmig ausgebildet und am L-förmigen Ende verschieb- und Verriegelbar sein. Das bedeutet eine erhebliche Kosteneinsparung bei der Umrüstung von Schalung nach der e-OS-l 683 860, die nur fUr Betonkästen ohne Boden geeignet ist. Betonkdsten ohne Boden verlieren jedoch immer mehr an Bedeutung, so daß die vorhandenen Uberzähligen Schalformen, insbesonders was die Außenschalelemente betrifft, kostengünstig umgebaut werden können. Außerdem bedarf die torartige Anordnung der Ruckwandaußenschalung großen konstruktiven Aufwands, um die Lasten in der Seitenwandschalung ohne Verwindungs gefahr aufzunehmen. Um den bereits erhdrteten Betonboden mit oder auch ohne Bewehrung der Wände und Decken in die Schalform einbringen zu können, wird daher das Außenschalelement der Rückwand der Raumzelle auf Schienen verfahrbar vorgesehen und zwar derart, daß zwischen der Endstellung des Ruckwandaußenschalelements und der Innenschalform so viel Zwischenraum entsteht, daß der vorgefertigte Beton boden mit angeflochtener Wand- und Decken bewehrung ungehindert eingebracht und auf die unter der frei auskragenden Innenschalform anzuardnenten Auflagervorrichtungen abgesetzt werden kann. Als weitere Alternative soll das Außenschalelement anstatt an dem Seitenaußenschalelement wie in der D-OS117 59 214 an einem gesondert anzuordnenten Stützpfeiler vorgesehen werden, was ebenso die Gefahr des Verwindens für das Seitenaußenschalelement vermeiden, jedoch günstige Möglichkeiten zur mechanischen Bedienung anbietet.The stationary arrangement of a formwork device, which is advantageous in itself, with a contractible inner formwork on a freely projecting cantilever arm associated portal-like supports, provided as a carrier of the outer shell elements (D-OS-17 59 214), there are some defects that could be improved. In almost all concrete works in which room cells are produced are for transport of components crown of the corresponding order of magnitude available in the case of the proposed Solution should also be used and thus better used. Here are the required pallets saved and the transport week of the pallets for production purposes free. With the shuttering device of D-OS-17 59 214 this is not possible because the portals, on which the outer wall shell elements are movably mounted, the use of a Do not allow the crane to lift and extend the cubicle because of the crossbeams. According to the invention, therefore, should be that of the, attached to a cantilever arm, contractible Supports assigned to the inner formwork are L-shaped and can be displaced at the L-shaped end. and be lockable. This means considerable cost savings when retrofitting of formwork according to e-OS-l 683 860, which is only suitable for concrete boxes without a bottom is. Concrete buildings without a bottom are becoming less and less important, so that the Existing surplus formwork forms, especially with regard to the outer formwork elements, can be rebuilt inexpensively. In addition, the gate-like arrangement requires the Rear wall outer formwork great structural effort to handle the loads in the side wall formwork without risk of twisting. To the already hardened concrete floor with or to be able to insert into the formwork form without reinforcing the walls and ceilings, Therefore, the outer formwork element of the rear wall of the room cell can be moved on rails provided in such a way that between the end position of the rear wall outer formwork element and the inner shell form so much space is created that the prefabricated concrete Floor with braided wall and ceiling reinforcement can be brought in unhindered and on the support devices to be attached under the freely cantilevered inner shell form can be discontinued. As a further alternative, the outer formwork element should be used instead on the side outer shell element as in D-OS117 59 214 on a separately to be arranged Support pillars are provided, which also the risk of twisting for the side outer formwork element avoid, but offer favorable possibilities for mechanical operation.

Anhand eines Ausfuhrungsbeispiels wird die Erfindung im Rahmen eines Fertigungsvorgangs nachstehend näher beschrieben. Es zeigen: Abb. 1: Einen Längsschnitt durch eine Schalvorrichtung mit einem einfahrenden vorgefertigten Beton boden und angeflochtenem Bewehrungskorb für Wände und Decke, Außenschalung weggefahren, Innenschalung zusammengezogen.The invention is based on an exemplary embodiment in the context of a Manufacturing process described in more detail below. Show it: Fig. 1: A longitudinal section through a formwork device with an incoming prefabricated one Concrete floor and braided reinforcement cage for walls and ceilings, external formwork moved away, inner formwork pulled together.

Abb. 2: Einen Querschnitt durch eine Schalvorrichtung mit weggefahrener Außenschalung und zusammengezogener Innenschalung, links ein einfahrender vorgefertigter Beton boden mit angeflochtenem Bewehrungskorb für Wände und Decken, rechts eine fertig betonierte erhärtete Raumzelle, bereit zum Abheben und Ausfahren.Fig. 2: A cross-section through a shuttering device with the moved away External formwork and contracted internal formwork, on the left an incoming prefabricated one Concrete floor with braided reinforcement cage for walls and ceilings, one on the right fully concreted, hardened room cell, ready to be lifted off and extended.

Abb. 3: Eine Draufsicht auf eine Schalvorrichtung mit der alternativen Anordnung einer torartigen RUckwandaußenschalung an einem Stützpfeiler angeordnet.Fig. 3: A top view of a shuttering device with the alternative Arrangement of a gate-like rear wall outer formwork arranged on a support pillar.

Der Beton boden 6 der Raumzelle 8 wird vorweg auf einem Fertigung tisch, der auch für andere plattenförmige Bauteile verwendet werden kann, hergestellt. Nach dem Erhärten des eingebrachten Betons für den Beton boden 6 wird mit Hilfe eines fahrbaren Flechtgerüsts die Bewehrung für Wände und Decken geflochten. Die Betonböden 6 mit angeflochtenem Bewehrungskorb 7 können auf Vorrat zum Ausgleich von Ausfällen an Arbeitskrdften ohne Aufwand an Paletten gehalten werden. Sobald die Schalvorrichtung vom vorhergehenden Arbeitsvorgang frei und für den neuen Arbeitstakt vorbereitet ist, nimmt der Kran 10 den Bewehrungskorb 7 mit dem angeflochtenen, erhärteten Betonboden 6 auf, dreht ihn in Längsrichtung zur Längsachse der Schalvorrichtung und transportiert ihn zwischen das weggefahrene RUckwandaußenschalungselement 4 und die Innenschalform 1. Dort wird der Bewehrungskorb 7 soweit abgesenkt, daß er mit der öffnung der Torseite beim Einfahren die zusammengezogene Innenschalform 1, die an einem Kragarm 2 befestigt ist, umfassen kann. Nun wird der Bewehrungskorb 7 in Richtung seiner Langsachse um die zusammengezogene Innenschalform 1 transportiert und der Betonboden 6 auf auf die Aulagervorrichtungen 9 abgesetzt, wobei hierfUr angeordnete Führungen den Beton boden 6 mit angeflochtenem Bewehrungskorb 7 in seine vorgesehene Lage yleiten lassen. Die Innenschalform 1 wird dann auf eine, die inneren Abmessungen der Raumzelle 8, nachbildenden, Form gebracht und arretiert. Im weiteren Arbeitsfortgang werden die äußeren Außenseitenschalelemente 3, das Stirnwandaußenschalelement 5 und das Rückwandaußenschalelement 4 herangeführt, die L-förmigen Stützen 11 am Fuß und in sonst bekannter Wiese verriegelt, so daß eine starre Gußform entsteht.The concrete floor 6 of the cell 8 is in advance of a manufacturing table, which can also be used for other plate-shaped components. After hardening of the introduced concrete for the concrete floor 6 is with the help The reinforcement for the walls and ceilings is woven using a mobile wickerwork structure. the Concrete floors 6 with braided reinforcement cage 7 can be kept in reserve for compensation can be held on pallets without any effort from failures of workers. As soon the shuttering device from the previous work process free and for the new work cycle is prepared, the crane 10 takes the reinforcement cage 7 with the braided, hardened concrete floor 6, turns it in the longitudinal direction to the longitudinal axis of the formwork device and transports it between the withdrawn rear wall outer formwork element 4 and the inner shell form 1. There the reinforcement cage 7 is lowered so far that it with the opening of the door side when retracting the contracted inner shell form 1, which is attached to a cantilever arm 2, may include. Now the reinforcement cage 7 transported around the contracted inner shell mold 1 in the direction of its longitudinal axis and the concrete floor 6 deposited on the storage devices 9, guides arranged for this purpose the concrete floor 6 with a braided reinforcement cage 7 let it slide into its intended position. The inner shell form 1 is then placed on a the inner dimensions of the space cell 8, reproducing, brought shape and locked. In the further work progress, the outer outer side formwork elements 3, the end wall outer formwork element 5 and the rear wall outer shell element 4 brought up, the L-shaped supports 11 on Foot and locked in an otherwise known meadow, so that a rigid mold is created.

Ist der Beton der Raumzelle nach dem Einbringen erhärtet, werden die Verriegelungen der Außenschalelemente 3, 4, 5 und Innenschalform 1 gelöst und diese weggefahren, bzw. zusammengezogen. Weil die Schalvorrichtung stationär ist, können alle diese Bewegungsvorgänge und Verriegelungen auch leicht durch entsprechende Stellmotore ausgefUhrt werden.If the concrete of the room cell has hardened after it has been poured in, the Locks of the outer shell elements 3, 4, 5 and inner shell mold 1 released and this moved away or contracted. Because the shuttering device is stationary, you can all of these movements and interlocks are also easily carried out by appropriate Servomotors are executed.

Wenn der Ausschalvorgang abgeschlossen ist, hebt der Kran 10 den fertigen Rohkörper der Raumzelle 8 soweit an, daß die verbliebene, an einer Stirnseite befindliche, Öffnung von der Innenschalform 1 frei wird. Der Kran 10 fährt dann den Rohkörper der Raumzelle 8 in Richtung seiner Längsachse bis kurz vor das ganz weggefahrene Rückwandaußenschalelement 4, wobei die zusammengezogene Innenschalform 1, die an dem Kragarm 2 befestigt ist, stehenbleibt. Die Raumzelle 8 kann dann seitlich oder nach Anheben in jeder beliebigen Richtung weggefahren und zur weiteren Ausstattung oder Vorratshaltung abgesetzt werden. Ein neuer Arbeitsvorgang kann beginnen.When the stripping process is complete, the crane 10 lifts the finished one Raw body of the room cell 8 so far that the remaining, located on one end face, Opening of the inner shell form 1 is free. The crane 10 then moves the raw body the room cell 8 in the direction of its longitudinal axis until just before the completely driven away Rear wall outer shell element 4, wherein the contracted inner shell shape 1, the the cantilever arm 2 is attached, remains. The room cell 8 can then laterally or after lifting, moved away in any direction and for further equipment or stockpiling. A new work process can begin.

Claims (2)

Patentans prüche Schalvorrichtung zur Herstellung von einseitig offenen Raumzellen aus Stahlbeton mit einer Innenschalung fUr die Wände und Decken der Raumzelle, mit wegfahrbaren Außenwandschalelementen für die Seitenwände, die Stirnwand und die RUckwand der Raumzelle, dadurch gekennzeichnet, daß einer an einem kragarm (2) befestigten zusammenziehbaren Innenschalform (1) L-förmige, am Fuß auf Rollen oder in Gleitlagern gelagerte und am Fuß starr verriegelbare, nach außen wegfahrbare Stützen (11) mit daran befestigten Außenseitenschalelementen (3) und einem Stirnwandaußenschalelement (5) zugeordnet sind, daß das Rückwandoußenschalelement (4) der Raumzelle (8) um etwas mehr als deren Länge auf Schienen von der Innenschalform (1) wegfahrbar ist und für das Auflegen des vorgefertigten Beton bodens (6) mit angeflochtenem Bewehrungskorb (7) unter der an einem Kragarm (2) befestigten Innenschalform (1) Auflagervorrichtungen (9) angeordnet sind.Patent claims formwork device for the production of one-sided open Room cells made of reinforced concrete with internal formwork for the walls and ceilings of the room cell, with removable outer wall formwork elements for the side walls, the front wall and the rear wall of the room cell, characterized in that one on a cantilever arm (2) attached contractible inner shell shape (1) L-shaped, on the foot on rollers or Mounted in plain bearings and rigidly lockable at the base, they can be moved outwards Supports (11) with external formwork elements (3) attached to them and an end wall external formwork element (5) are assigned that the rear wall outer shell element (4) of the room cell (8) around slightly more than the length of which can be moved away from the inner shell mold (1) on rails and for placing the prefabricated concrete floor (6) with braided reinforcement cage (7) under the inner shell form (1) attached to a cantilever arm (2) support devices (9) are arranged. 2) Schalvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Rückwandschalelement (4) torartig an einem freistehenden Stützpfeiler (12) angeordnet und wie ein Tor von der Rückwand der Raumzelle (8) wegdrehbar ist. 2) shuttering device according to claim 1, characterized in that the rear wall formwork element (4) is arranged like a gate on a free-standing support pillar (12) and how a gate can be rotated away from the rear wall of the room cell (8).
DE19762621055 1976-05-12 1976-05-12 Device for the production of room cells made of reinforced concrete, open on one side Expired DE2621055C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19762621055 DE2621055C2 (en) 1976-05-12 1976-05-12 Device for the production of room cells made of reinforced concrete, open on one side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19762621055 DE2621055C2 (en) 1976-05-12 1976-05-12 Device for the production of room cells made of reinforced concrete, open on one side

Publications (2)

Publication Number Publication Date
DE2621055A1 true DE2621055A1 (en) 1977-12-01
DE2621055C2 DE2621055C2 (en) 1985-04-04

Family

ID=5977780

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19762621055 Expired DE2621055C2 (en) 1976-05-12 1976-05-12 Device for the production of room cells made of reinforced concrete, open on one side

Country Status (1)

Country Link
DE (1) DE2621055C2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD32875A3 (en) * 1961-10-26 1964-10-26
DE1683860A1 (en) * 1967-04-05 1971-03-11 Kaletka Ing Josef Formwork for the serial production of large-format concrete structures
DE1759214A1 (en) * 1968-04-10 1971-06-03 Hugo Schmidt Formwork device for the production of self-contained prefabricated space parts made of reinforced concrete in one pour

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD32875A3 (en) * 1961-10-26 1964-10-26
DE1683860A1 (en) * 1967-04-05 1971-03-11 Kaletka Ing Josef Formwork for the serial production of large-format concrete structures
DE1759214A1 (en) * 1968-04-10 1971-06-03 Hugo Schmidt Formwork device for the production of self-contained prefabricated space parts made of reinforced concrete in one pour

Also Published As

Publication number Publication date
DE2621055C2 (en) 1985-04-04

Similar Documents

Publication Publication Date Title
DE2803629A1 (en) PREFABRICATED COMPONENTS WITH REINFORCEMENT OR REINFORCEMENT ELEMENTS AS A BOX OR CAISSON, EQUIPMENT FOR MANUFACTURING SUCH COMPONENTS AND PROCESSES FOR MANUFACTURING AND ASSEMBLING ON CONSTRUCTION
DE1759214C3 (en) Device for the serial production of single-sided open space cells made of reinforced concrete
DE2845106C2 (en) Method and device for the production of monolithic reinforced concrete room cells, e.g. prefabricated garages
DE1808989C3 (en) Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor
DE2257768A1 (en) PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS
DE3931201C1 (en) Concrete railway sleepers mfr. - uses moving frame mechanism which releases each sleeper immediately
DE2621055A1 (en) Reinforced concrete rooms with one side left open - are made from contractable inner casing mould fixed to cantilever and assigned to L-shaped supports with outer casing elements
EP0085366B1 (en) Method of and device for manufacturing three-dimensional cells from solidifying building material
DE2657310B2 (en) Method for installing horizontal tendons in a concrete structure made with sliding formwork and an annular wall as well as sliding formwork for carrying out the process
DE1434748A1 (en) Prefabricated building
CH566853A5 (en) Prefabrication plant for large reinforced concrete slabs - has vertical shuttering plates and support bridge for unloading completed slabs
DE2820039A1 (en) Plant for making prestressed concrete beam sections - fills moulds and removes as strings on pallet supports before dividing into required lengths
DE1584315A1 (en) Plant for the production of especially wall-sized precast concrete parts
DE2213349A1 (en) MACHINE FOR THE MACHINE MANUFACTURING OF BUILDING BLOCK WALLS FROM LAYERS AND STAGGERED BUILDING BLOCKS
DE1584637B2 (en) Device for producing a large-format building board and use of the device
DE2161301A1 (en) PROCESS AND SYSTEM FOR THE PRODUCTION OF REINFORCED CONCRETE ROOM CELLS
DE3344034A1 (en) Installation for assembly-line production of precast concrete parts, in particular of large panels
DE1010437B (en) Process and plant for the production of elongated concrete products or rows of such products with reinforcement
DE2902287C2 (en) Heat treatment furnace for hardening concrete masses poured into molds and plant for the production of precast concrete parts
DE2756996A1 (en) Concrete panel prodn. equipment - has frame with shuttering plates on rails between stationary tipping platforms
DE2204785C3 (en) Process and plant for the production of large panels from reinforced concrete
DE3435081C2 (en)
DE2417805A1 (en) Removable formwork for concrete room unit - has formwork split to enable moulded shell to be removed on pallet
AT334809B (en) PROCESS FOR PRODUCING A ROOM FROM REINFORCED CONCRETE AND DEVICE FOR CARRYING OUT THE PROCESS
DE861662C (en) Device for the factory production of prefabricated concrete parts

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition