DE2529506A1 - Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks - Google Patents

Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks

Info

Publication number
DE2529506A1
DE2529506A1 DE19752529506 DE2529506A DE2529506A1 DE 2529506 A1 DE2529506 A1 DE 2529506A1 DE 19752529506 DE19752529506 DE 19752529506 DE 2529506 A DE2529506 A DE 2529506A DE 2529506 A1 DE2529506 A1 DE 2529506A1
Authority
DE
Germany
Prior art keywords
wall
reinforced concrete
reinforcement
height
legs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19752529506
Other languages
German (de)
Inventor
Alfred Ing Grad Bohlander
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19752529506 priority Critical patent/DE2529506A1/en
Publication of DE2529506A1 publication Critical patent/DE2529506A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials
    • E04H7/28Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials composed of special building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The prefabricated reinforced-concrete system is for the construction of single or multi-row cellular silos which are square or otherwise rectangular in cell plan. A horizontally divided wall component has a centre part of prismatic shape and rectangular cross-section, adjoining horizontally extending reinforced concrete shanks, which leave open trapezoid space between them. There are square bearing blocks at the shank ends, set symmetrically to, and equidistant from, the two wall axes. The reinforcing portions for the centre part of the mesh are comprised in a mesh of the height (H) of a wall section. The square-centred open space for concrete casting is completely sealed outside by the income reinforced-concrete shanks.

Description

Stahlbetonfertlgteilsystem zur Herstellung von ======================================= ein-und mehrreihigen Zellensilos.Precast reinforced concrete system for the production of ====================================================================== single and multi-row cell silos.

Die Erfindung betrifft die Konstruktion und die Herstellung von ein-und mehrreihigen Zellensilos,mit rechteckigem oder quadratischem Grundriss,deren Wände und Stützen aus vorgefertigten Stahlbetonfertigteilen zusammengesetzt und gebildet werden. Zweck der Erfindung ist, ein Herstellungssystem zu entwickeln, das sich gegenüber den bis jetzt bekannten und praktizierten Konstruktions-und Herstellungsverfahren durch grössere Wirtschaftlichkeit und bessere Gebrauchstüchtigkeit auszeichnet. The invention relates to the design and manufacture of one and multi-row cell silos, with a rectangular or square floor plan, their walls and columns assembled and formed from prefabricated reinforced concrete elements will. The purpose of the invention is to develop a manufacturing system that compared to the construction and manufacturing processes known and practiced up to now characterized by greater economy and better usability.

Die derzeit üblichen Konstruktions-bezw.Herstellungssysteme zur Erstellung der raumumschliessenden Elemente von Stahlbetonsilos lassen sich in wenige Hauptgruppen unterscheiden: a) Wand-und Stützenherstellung in Ortbeton zwischen vorher zu erstellender beidseitiger Schalung erlaubt es, Wand-und Stützenquerschnitte,sowie auch die eingelegten Bewehrungen genau den statischen Erfordernissen anzupassen. Eine exakte statische Berechnung unter Berücksichtigung der Durchlaufwirkung in Verbindung mit der hieraus sich ergebenden Dimensionierung der Betonquerschnitte und ihrer Bewehrung erbringt hierbei ganz beträchtliche Einsparungen an Werkstoffen. Die Oberflächenbeschaffenheit der so erstellten Stahlbetonteile ist ausreichend glatt,dicht und frostunempfliidlich. Das Aufbringen von «chützer.den und glättenden Schichten ist zumeist nicht erforderlich. Die Nachteile dieses 2.rstems siria extrem hohe Lohnkosten,ein grosser Bedarf an FaQ'harbitern,ein hoher Verbruach ar. Schal-und Rüstmaterial, sowie ausserdem recht lange Bauzeiten. Dieses Verfahren ist das im allgemeinen Stahlbetonbau übliche und wird als monolitische Bauweise bezeichnet.The currently usual construction or manufacturing systems for creation the space-enclosing elements of reinforced concrete silos can be divided into a few main groups differentiate between: a) Wall and column production in in-situ concrete between those to be created beforehand Formwork on both sides allows wall and column cross-sections, as well as the inlaid ones Adapt the reinforcement exactly to the static requirements. An exact static one Calculation taking into account the flow effect in connection with this resulting dimensioning of the concrete cross-sections and their reinforcement here very considerable savings in materials. The surface finish The reinforced concrete parts created in this way are sufficiently smooth, tight and not susceptible to frost. The application of protective and smoothing layers is usually not necessary. The disadvantages of this 2.rstems siria extremely high labor costs, a great need for FaQ'harbiters, a high crime ar. Scarf and armor material, as well as more Law long construction times. This method is the usual one in general reinforced concrete construction is called monolithic construction.

b) Wand-und Stützenherstellung in Ortbeton zwischen vorher zu erstellender beidseitiger Kletterschalung, Es ist im Prinzip das System wie unter a)beschrieben, nur wird hier die schalung aufgeteilt in zwei horizontale nchalringe, die über den gesamten Siloabschnitt reichen. Diese ochalringe sind als steife Kästen ausgebildet, die abwechselnd übereinander gesetzt und verschraubt werden. Es kann 50 praktisch mit zwei Schalringen der gesamte aufgehende Silo eingeschalt und betoniert werden. Das Verfahren hat praktisch die gleichen Vor - und Nachteile,wie das unter a) beschriebene System. Die Gerätevorhaltekosten werden dadurch gesenkt, dass typisierte Kletterschalungen einschliesslich allem Zubehör für Gerüste und BedieWingsplattformen zur Miete angeboten werden. Eine echte Kostensenkung ist nur erreichbar, wenn ausreichend Fachpersonal zur Verfügung steht, das mit der Handhabung des Geräts vertraut ist und bereits einschlägige Erfahrung besitzt.b) Wall and column production in in-situ concrete between the Climbing formwork on both sides, In principle, the system is as described under a), only here the formwork is divided into two horizontal nchal rings, which extend over the entire silo section. These ochal rings are designed as rigid boxes, which are alternately placed on top of each other and screwed. It can be 50 practical The entire rising silo can be shuttered and concreted with two shuttering rings. The process has practically the same advantages and disadvantages as that described under a) System. The equipment storage costs are reduced by using standardized climbing formwork including all accessories for scaffolding and operating platforms for rent will. A real cost reduction can only be achieved if there is sufficient specialist staff is available who is familiar with the handling of the device and already has relevant experience.

c) Wand- und Stützenherstellung in Ortbeton unter Verwendung von Gleitschalung. Es sind dies speziell für diesen Zweck entwickelte Schalungssysteme, die entsprechend dem Baufortschritt empor gezogen werden. Dieses Anneben erfolgt vermittels Hebezeuge, die in der Silowand verankert sind und höhenmässig mit der Gleitschalung mitwandern.c) Construction of walls and columns in in-situ concrete using sliding formwork. These are formwork systems specially developed for this purpose, which are accordingly be drawn up to the construction progress. This lifting is done by means of lifting equipment, which are anchored in the silo wall and move along with the sliding formwork in terms of height.

Die Vorteile dieses Systems sind verhältnismässig geringe Kosten für das Vorhalten von Gerät und behalung, sowie kurze Bauzeit zu allermindest für den aufgehenden Zellenteil des Silos. Der Vorteil der kurzen Bauzeit wird allerdings mit dadurch erzielt, dass kontinuierlich ohne Unterbrechung rund um die Uhr gearbeitet werden muss und nur erfahrenes Fachpersonal Verwendung finden kann. Denn gerade bei diesem System sind Erfolg oder Mißerfolg ausserordentlich von der Sorgfalt und der Erfahrung des Baustellenpersonals abhängig. Auch bei sorgflltigster Ausführung lässt sich eine ausreichend glatte und geschlossene Wandoberfläche nicht erzielen. Das Gleiten der schalung an dem noch nicht erhärtetem Beton verursacht infolge der nicht zu verhindernden Wandreibung eine Auflockerung und die Bildung von horizontalen Haarrissen in den Aussenschichten der Wandquerschnitte. Auch das Anheben der Schalung im Pilgerschrittverfahren kann diesen Mangel nur mindern, aber nicht vollkommen abstellen. Die mit diesem Verfahren erstellten Silos bedürfen praktisch fast immer einer zusätzlichen Glättschicht auf den Wandflächen, um die Gefahr einer Brückenbildung zu vermeiden, sofern das Lagergut hierzu neigt. Zwingend ist stets eine isolierende Schutzschicht auf den der Atmosphäre zugewandten Seiten der Zellenwände zum Schutze gegen Durchfeuchtungen.The advantages of this system are relatively low costs for the provision of equipment and retention, as well as a short construction time at least for the rising cell part of the silo. The advantage of the short construction time is, however achieved by working continuously around the clock without interruption and only experienced specialists can be used. Because right now in this system success or failure is extremely dependent on care and attention depending on the experience of the construction site personnel. Even with the most careful execution a sufficiently smooth and closed wall surface cannot be achieved. The sliding of the formwork on the not yet hardened concrete as a result of the wall friction that cannot be prevented, loosening and formation of horizontal hairline cracks in the outer layers of the wall cross-sections. That too Raising the formwork in the pilgrim step method can only reduce this deficiency, but do not turn off completely. The silos created with this method require practical almost always an additional smoothing layer on the wall surfaces to avoid the risk of a Avoid bridging if the stored goods tend to do so. It is always imperative an insulating protective layer on the sides of the cell walls facing the atmosphere to protect against moisture penetration.

Besonders gefährdet sind solche Silos im Bereich von Seehäfen oder im Küstenbereich wegen der besonderen Aggressivität der Meeresluft. Bei Verzicht auf solche Schutzschichten können ansonsten sehr hohe Unterhaltungskosten entstehen.Such silos in the area of seaports or are particularly at risk in the coastal area because of the particular aggressiveness of the sea air. With waiver Otherwise, such protective layers can result in very high maintenance costs.

d) Wand-und Stützenherstellung durch Zusammenfügen von vorgefertigten Stahlbetonfertigteilen. Die Anwendung von vorgefertigten Stahlbetonbauteilen beschränkt sich fast ausschliesslich auf die Verwendung vorgefertigter Wandtafeln. Nur selten werden in den Kreuzungspunkten der Wände vorgefertigte Stützen angeordnet. Die Verbindung der einzelnen Wandteile mit den Stützen erfolgt scharnier-oder gelenkartig am Bau durch Einschalen der Stoßstellen und anschliessendem Verguss mit Ortbeton. Der Vorteil dieser Bauweise liegt darin, dass die Herstellung der Einzelteile in starren Formen auf dem Rütteltisch erfolgt,wodurch grosse Maßgenauigkeit bei glatter, dichter und korrossions beständiger Oberflächenbeschaffenheit gewährleistet wird. Der Nachteil dieser Bauweise liegt in den am Bau erforderlich werdenden zusätzlichen fichalarbeiten. Sie sind sehr lohnintensiv und strecken die Bauzeit. Hinzu kommt weiterhin, dass die schlanken Wandplatten nicht von selbst stehen und zusätzliche Abstützungsarbeiten erforderlich machen, was neben zusätzlichen Kosten auch eine beträchtliche Erhöhung des Unfallrioikos mit sich bringt.d) Wall and column production by joining together prefabricated Precast reinforced concrete parts. The use of prefabricated reinforced concrete components is limited almost exclusively on the use of prefabricated blackboards. Rarely prefabricated supports are placed at the crossing points of the walls. The connection the individual wall parts with the supports takes place in the manner of a hinge or joint on the building by shuttering the joints and subsequent grouting with in-situ concrete. The advantage This design is based on the fact that the production of the individual parts in rigid forms takes place on the vibrating table, whereby great dimensional accuracy with smooth, dense and Corrosion-resistant surface quality is guaranteed. The disadvantage This construction method is based on the additional fichal work that is required on the construction site. They are very wage-intensive and stretch the construction time. In addition, there is also the fact that the slim wall panels do not stand up by themselves and additional support work required, which, in addition to additional costs, also represents a considerable increase the risk of accidents.

Ein weiterer erheblicher Nachteil liegt in dem relativ grossen Bedarf an Bewehrungsstahl. Diese Ausführung vermittels Fertigteilen, die nur zug - und druckfest miteinander verbunden sind, bedeutat praktisch eine Auflösung des Gesamtsilos in einzelne ,voneinander unabhängige Einzeltragwerke. Deswegen müssen die Einzelwandbauteile als frei aufliegende Träger auf zwei Stützen berechnet und bemessen werden. Der materialsparende Einfluss der Durchlaufwirkung geht hierbei verloren. Die Folge ist1 der oben erwähnte hohe Bedarf an Bewehrungsstahl. Auch der uebergang zur Verwendung von vorgespannten Stahlbetonwandplatten bringt nur gewichtsmässig eine Einsparung von Bewehrungsstahl, eine Kostensenkung lässt sich jedoch praktisch nicht erzielen, da eine Vorfertigung im langen Spannbett nicht möglich ist. sollen befriedigende Ergebnisse erzielt werden, so muss jeder einzelne Wandteil im Standverfahren und für sich hergestellt werden.Another significant disadvantage is the relative huge Reinforcement steel requirement. This execution by means of prefabricated parts, which only train - and are connected to each other in a pressure-resistant manner, practically means a dissolution of the Complete silos in individual, independent individual structures. Therefore have to the individual wall components are calculated as free-lying beams on two supports and be measured. The material-saving influence of the flow effect goes here lost. The consequence is1 the high demand for reinforcing steel mentioned above. Even the transition to the use of prestressed reinforced concrete wall panels only brings In terms of weight, a saving in reinforcing steel, a cost reduction can be achieved but practically impossible to achieve, since prefabrication in the long bed is not possible is possible. if satisfactory results are to be achieved, each individual must Wall part can be produced in the stand process and for itself.

Zusammenfassend kann festgestellt werden, dass die z.Zt. üblichen und praktizierten Herstellungsverfahren von Stahlbetonzellensilos noch nicht die günstigst mögliche Lösung darstellen. Verbesserungen sind sowohl auf der Kostenseite, wie auch in Bezug auf Erhöhung der Qualität noch möglich. In summary it can be stated that the currently usual and did not yet practice manufacturing processes for reinforced concrete cell silos represent the cheapest possible solution. Improvements are both on the cost side, as is still possible with regard to increasing the quality.

Der Erfindung liegt die Aufgabe zu Grunde, ein Konstruktions-und Herstellungsverfahren für ein - oder mehrreihige Stahlbetonsilos zu entwickeln, das die statischen Vorteile der monolithischen Bauweise verbindet mit den herstellungstechnischen Vorteilen der Fertigteilbauweise. The invention is based on the object of a construction and To develop manufacturing processes for single or multi-row reinforced concrete silos, that combines the static advantages of the monolithic construction with the manufacturing technology Advantages of precast construction.

Diese Aufgabe wird erfindungsgemäss wie folgt gelöst: Die Zellenwände werden in horizontal liegende,parallel begrenzte Teilabschnitte zerlegt, die als Stahlbetonwandbauteile ( im folgenden nur noch als " Wandbauteile" bezeichnet ) vorgefertigt werden. Diese Wandbauteile haben eine bestimmte Höhe "H" . Das Mittelstück dieser Wandbauteile hat rechteckigen Querschnitt und ist von prismatischer Form. According to the invention, this object is achieved as follows: The cell walls are divided into horizontally lying, parallel delimited subsections, which are called Reinforced concrete wall components (hereinafter referred to as "wall components") be prefabricated. These wall components have a certain height "H". The middle piece this wall component has a rectangular cross-section and is prismatic in shape.

An'den beiden Enden des Mittelstücks sind beidseitig Stahlbetonscheiben, im nachfolgenden Schenkel genannt, angebracht.At the two ends of the middle piece are reinforced concrete discs on both sides, called in the following leg, attached.

Die Schenkel sind voutenförmig nach aussen gestellt,ihre Wandstärke ist so gewählt, dass zwischen den beiden Schenkeln ein freier, trapezförmiger Zwischenraum entsteht.The legs are tapered to the outside, their wall thickness is chosen so that between the two legs a free one trapezoidal space is created.

Die Höhe dieser Schenkel ist genau so groß wie die Höhe H der Wandbauteile selbst. An den Enden der Schenkel sind sog.Auflagersteine von der Höhe H/2 angeordnet,und zwar so, dass die Schenkel oben und unten gegenüber dem Auflagerstein einen überstand von H/4 haben. Die Auflagersteine haben quadratischen Grundriss mit der Seitenlänge ate", ihre Hauptachsen laufen parallel zu den Wandachsen und haben von diesen beiden Wandachsen einen Abstand "d".The height of these legs is exactly the same as the height H of the wall components itself. At the ends of the legs, so-called support stones with a height of H / 2 are arranged, and in such a way that the legs above and below protruded from the support stone of H / 4 have. The support stones have a square floor plan with the length of the side ate ", their main axes run parallel to the wall axes and have two of them Wall axes a distance "d".

Die btahlbetonwandbauteile sämtlicher Zellenwände haben bei quadratischem Zellengrundriss gleiche Betonabmessungen.The reinforced concrete wall components of all cell walls have a square Cell floor plan with the same concrete dimensions.

Bei rechteckigem Grundriß unterscheiden sich die Wandbauteile der verschiedenen Wandrichtungen lediglich in der Länge des prismatischen Mittelteils. Voraussetzung in beiden Fällen ist, dass Längs-und Querachse der wände sich unter einem winkel von 90 Grad schneiden. Beim Zusammenbau der Wandbauteile von Längs-und Querwänden in einem Banaschnittpunkt werden die Wandbauteile so angeordnet, dass die Auflagersteine von Längs-und Querwänden zahnstangenartig abwechselnd übereinander zu liegen kommen.In the case of a rectangular floor plan, the wall components of the different wall directions only in the length of the prismatic middle part. The prerequisite in both cases is that the longitudinal and transverse axes of the walls are below cut at an angle of 90 degrees. When assembling the wall components of longitudinal and For transverse walls at a Bana intersection, the wall components are arranged in such a way that the supporting stones of the longitudinal and transverse walls alternating in a rack-like manner one on top of the other come to rest.

Alle Auflagersteine sämtlicher Wandbauteile die im Knotenpunkt zusammenlaufen, haben jetzt von beiden Wandachsen den gleichen Abstand "d". Sie bilden jetzt gemeinsam vertikal verlaufende Betonleisten mit quadratischem Querschnitt von der Kantenlänge "e". In diese Betonleisten münden die Schenkel der Wandbauteile ein. Auf diese Weise entsteht im Knotenpunkt eine nach aussen vollkommen umschlossene,sternförmige Aussparung mit,im Zentrum quadratischen Querschnitt, an welchen sich in den Wandrichtungen die trapezförmigen Aussparungen zwischen den Schenkeln anschliessen. In diesem freien Raum sind die Überdeckungsstöße der Wandbewehrungen untergebracht,sowie die Bewehrung des als Stütze ausgebildeten quadratischen Zentrums der Aussparung. Die für die Stützenbewehrung erforderlichen Bügel können von der Seite eingebracht werden.All support stones of all wall components that converge at the junction, now have the same distance "d" from both wall axes. They are now forming together vertical concrete strips with a square cross-section of the length of the edge "e". The legs of the wall components open into these concrete strips. In this way A star-shaped recess that is completely enclosed on the outside is created at the junction with, in the center a square cross-section, on which in the wall directions connect the trapezoidal recesses between the legs. In this free The overlap joints of the wall reinforcement and the reinforcement are housed in the room of the square center of the recess designed as a support. The for the Stirrups required for column reinforcement can be introduced from the side.

Analog wie bei den Innenknotenpunkten erfolgt das Ver -setzen der Wandbauteile bei den Knotenpunkten einer Ausdenwand bezw. bei der wekknotenpu>2+-en.The shifting of the takes place in the same way as with the inner nodes Wall components at the nodes of a Ausdenwand respectively. at the wekknotenpu> 2 + -en.

Der überstand der Bewehrung in der wandfreien Seite wird hinter der Stützenbewehrung rahmenartig in Richtung der durchlaufenden Wand abgebogen, wodurch eine für die ttbertragung von Längskräfte und Biegemomente ausreichende Verankerung der Eiseneinlagen erfolgt. Die bei diesen Enotenpunkten noch zur Schliessung der Ausenfläche erforderlichen Passtücke werden erst versetzt, wenn im zugehörigen Höhenbereich die Bewehrung abgebogen und geordnet ist.The overhang of the reinforcement in the wall-free side is behind the Column reinforcement bent like a frame in the direction of the continuous wall, whereby Anchoring that is sufficient for the transmission of longitudinal forces and bending moments the iron deposits takes place. The at these points of note still to the closing of the The fitting pieces required for the outside area are only moved if they are in the associated height range the reinforcement is bent and ordered.

Bei einem Knotenpunkt der Aussenwand mit drei einlaufenden Wänden wird ein nur ebenes, einflächiges Paßstück erforderlich. Dieses ist so geformt, dass es nach dem Versetzen der höhenmäßig entsprechenden Wandbauteile von oben eingebracht und in seine Sollstellung abgesetzt werden kann.At a junction of the outer wall with three incoming walls only a flat, single-surface adapter is required. This is shaped like this that it is introduced from above after moving the wall components with the corresponding height and can be deposited in its target position.

Die Halterung erfolgt durch eingegossene Justiermarken,die in verschiedenen Höhen angebracht sind,sodass das ansonsten nur schmale Paßstück nicht kippen kann. Bei den Knotenpunkten der Siloecken wird mit der Bewehrung analog wie bei den Knotenpunkten der Aussenwand verfahren. Hier werden die Bewehrungsüberstände sinngemäss in Richtung der beiden Aussenwände abgebogen, was eine ausreichende Verankerung der Eiseneinlagen ergibt. Bei den Siloecken wird Murc Schließung der von den Schenkeln der Wandbauteile nicht abgedeckten Aussenflächen ein winkelförmiges PaB-stück erforderlich. Auch dieses Paßstück wird von oben eingebracht und versetzt, seine Fixierung erfolgt ebenfalls durch Justiermarken. Ein Kippen ist wegen der Winkelform hier ohnehin nicht möglich. Die Justiermarken werden für sämtliche Stahlbetonteile, das sind die Wandbauteile,sowie die ebenen und winkelförmigen Paßstücke, gleich ausgeführt. Eine Justiermarke besteht aus einer oberen und einer unteren Zapfenführung, die in die Ober - bezw.Unterseite des Wandbauteils eingegossen sind. In die untere Zapfenführung wird bei der Montage des oben liegenden Wandbauteils der Führungszapfen eingeführt, dessen Oberteil in das obere Wandbauteil eingreifen soll. Der Führungszapfen hat einen Ringansatz mit dem die Fugenstärke eingestellt werden kann. Ungleichheiten in der Höhenlage lassen sich durch Einfügen von, in aer Dicke variablen Beilagescheiben ausgleichen und beheben. Bei grösseren,aus der Herstellung resultierenden Ungenauigkeiten, d.h.dort, wo die obere Zapfenführung nicht über der unteren Zapfenführung steht, werden Führtingszapfen ohne Oberteil verwendet, sodass die Justiermarke hier nur zur Höheneinstellung dient. Grundsätzlich dienen die justiermarken lediglich zur Vereinfachung der Montage und es wäre auch ausreichend, wenn beispielsweise nur eine Justiermarke im Eingriff steht und die restlichen Justiermarken lediglich der Höhenfixierung dienen.It is held by cast-in alignment marks, which are in different Heights are attached so that the otherwise narrow fitting cannot tip over. The reinforcement at the nodes of the silo corners is the same as for the nodes move the outer wall. Here the reinforcement overhangs are analogously in the direction of the two outer walls bent, which provides sufficient anchoring of the iron inlays results. In the case of the silo corners, Murc will close the legs of the wall components Uncovered outer surfaces require an angular fitting. Even this fitting piece is introduced and displaced from above; it is fixed in place also through alignment marks. Tilting is due to the angular shape here anyway not possible. The alignment marks are for all reinforced concrete parts that are the wall components, as well as the flat and angular fitting pieces, executed the same. An alignment mark consists of an upper and a lower pin guide, the are cast in the top or bottom of the wall component. In the lower pivot guide the guide pin is inserted when assembling the wall component on top, whose upper part is to engage in the upper wall component. The guide pin has a ring attachment with which the joint thickness can be adjusted. Inequalities the height can be varied by inserting, in the thickness Washers balance and fix. In the case of larger inaccuracies resulting from the production, i.e. where the upper tenon guide does not stand over the lower tenon guide, guide pins are used without an upper part, so that the alignment mark is only here serves to adjust the height. Basically, the adjustment marks are only used for Simplification of assembly and it would also be sufficient if, for example, only an alignment mark is in engagement and the remaining alignment marks only the Serve height fixation.

Die Wandbewehrungen eines Wandbauteils werden auf Grund statischer Berechnung für die Wandhöhe H" ermittelt und in einem Bewehrungskorb von der Höhe "H/2" zusammengefasst.The wall reinforcement of a wall component becomes more static due to it Calculation for the wall height H "determined and in a reinforcement cage from the height "H / 2" combined.

Dieser Bewehrungskorb ist in seiner Länge beidseitig um das Maß "m" grösser als das ZellenachsmaB. Dieses Maß "m" ist seinerseits wiederum geringfügig kleiner als der Abstand der Wandachse vom Grund der Aussparung zwischen den Schenkeln = Maß "n". Bei der Montage wird nun der Bewehrungs -überstand des zu versetzenden Wandbauteils in den Bewehrungsüberstand des bereits versetzten Wandbauteils eingefädelt und der zu versetzende Wandbauteil in seine Soll -stellung abgelassen und fixiert. Damit wird ein, den otahlbetonbestimmgen entsprechender Bewehrungsstoß erzielt, der für Weiterleitung von Normal - und Querkräften, sowie von Biegemomenten geeignet ist. Das erforderliche Maß "m" ergibt sich aus den Stahlbetonbestimmungen für die Vorschrift betr. der Länge des Uberdeckungsstoßes. Die höhenmässige Anordnung der Bewehrungskörbe und ihre Überstände entspricht genau der Anordnung der Auflagersteine in einem Wandbauteil.This reinforcement cage is in its length on both sides by the dimension "m" larger than the cell axis dimension. This dimension "m" is again insignificant smaller than the distance between the wall axis and the base of the recess between the legs = Dimension "n". During assembly, the reinforcement overhang of the The wall component is threaded into the reinforcement overhang of the wall component that has already been moved and the wall component to be moved is lowered into its target position and fixed. In this way, a reinforcement joint corresponding to the reinforced concrete requirements is achieved, which is suitable for transferring normal and shear forces as well as bending moments is. The required dimension "m" results from the reinforced concrete regulations for the Regulation regarding the length of the overlap joint. The vertical arrangement of the Reinforcement cages and their overhangs correspond exactly to the arrangement of the support blocks in a wall component.

Die Durchdringung der Bewehrungen der Längs-und Querwände wird also dadurch erzielt, das0 die bewehrungen für die Wandhöhe "H" Jeweils in Körbe mit der Höhe "H/2" zusammengefasst werden und diese Körbe sich abwechselns im Wandschnittpunkt überkreuzen. Das Einfädeln des Bewehrungsüberstandes des zu versetzenden Wandbauteils in den Bewehrungsüberstand des bereits versetzten ttandbauteils bezw.in die btützenbewehrung bereitet keine behwierigkeiten,wenn die beiden Bewehrungslagen des ¢berstands auf der einen Seite zusanmengerödelt werden, sodass hier ein geschlossenes Bewehrungapaket von geringer Dicke entsteht, das ohne Schwierigkeit in die Lücken der Wand bezw. Stützenbewehrung eingefädelt werden kann.The penetration of the reinforcements of the longitudinal and transverse walls is thus This is achieved by the fact that the reinforcements for the wall height "H" are each in baskets the height "H / 2" and these baskets alternate in the wall intersection cross over. The threading of the reinforcement overhang of the wall component to be moved in the reinforcement overhang of the already displaced base component or in the column reinforcement Doesn't cause any problems if the two reinforcement layers of the overhang one side be knödelt together, so that here a closed Reinforcement package of small thickness is created, which can be easily inserted into the gaps the wall or Column reinforcement can be threaded.

In die Wandbauteile sind Abstandshalter eingegossen, die zur Stabilisiereung der Schalung auf dem Rütteltisch erforderlich sind. Sie werden beidseitig mit Innengewinde ausgeführt, in Abstandhaltermitte ist eine Scheibe zur Verankerung angebracht. Hierdurch können die Abstandshalter als Halterungen für Gerüste oder als Halterungen für zusätzliche Wandverkleidungen genützt werden. Im Falle, dass sie nicht benötigt werden, werden die Gewindebohrungen durch eingesetzte Kunststoffstopfen verschlossen.Spacers are cast into the wall components for stabilization the formwork on the vibrating table are required. They are threaded on both sides executed, in the middle of the spacer there is a washer for anchoring. Through this The spacers can be used as brackets for scaffolding or as brackets for additional Wall cladding can be used. In the event that they are not needed the threaded holes are closed by inserted plastic plugs.

Die mit der Erfindung erzielbaren Vorteilsgewinne gegenüber anderen Herstellungsverfahren liegen gleichermaßen auf wirtschaftlichem wie auf technischem Gebiet. Infolge der Möglichkeit, die Konstruktion in allen Belangen den Ergebnissen der statischen Berechnung genau anzupassen, können die Werkstoffe bis an ihre zulässige Grenze genützt werden, dies bedeutet geringe Betonabmessungen und sparsamster Stahlverbrauch und damit niedrige Werkstoffkosten. Von kostensenkendem Einfluss ist weiterhin die ausserordentlich schnelle und einfache Montage, da jegliche Schal-und Abstützungsarbeiten am Bau entfallen. Die Wandbauteile sind infolge der Gabelform an den Enden absolut standsicher, sie werden mit Hilfe des Hebezeugs von oben abgelassen und versetzt, was eine wesentliche Abminderung des Unfallrisikos bedeutet. Der Ortbetonverguss benötigt nur geringe Betonmengen, sodass er ohne behwierigkeit mit Hebezeug und Betonkübel ausgeführt werden kann. Die Anzahl der benötigten Wandbauteile ist z.B.The advantages that can be achieved with the invention over others Manufacturing processes are both economical and technical Area. As a result of the possibility of the construction in all respects the results to adapt exactly to the static calculation, the materials can be up to their permissible Limit can be used, this means small concrete dimensions and the most economical steel consumption and thus low material costs. The cost-reducing influence is still Extremely quick and easy assembly, as all formwork and support work omitted in construction. The wall components are absolute due to the fork shape at the ends stable, they are lowered and moved from above with the help of the hoist, which means a significant reduction in the risk of accidents. The cast-in-place concrete Requires only small amounts of concrete, so that it can be lifted and lifted without difficulty Concrete bucket can be run. The number of wall components required is e.g.

bei einem mehrreihigen Zellensilo ausserordentlich groß.extremely large in a multi-row cell silo.

Sämtliche Wandbauteile können, gleichgültig ob es sich um einen quadratischen oder rechteckigen Zellengrundriss handelt,praktisch mit einer Form hergestellt werden. Diese kann ohne große Umstände durch Zwischenbauteile den Achsabständen des Silos angepasst werden. Damit sind die Voraussetzungen für eine maschinelle Herstellung der Betonteile und der Bewehrungskörbe gegeben. Bei Konzentration auf einige wenige Zellengrundrisstypen und Entwicklung in Richtung auf maschinelle Herstellung der Einzelbauteile lassen sich die Lohnkosten bei der Herstellung in einem Ausmaß senken, wie dies bei einem anderen System nicht möglich ist.All wall components can, regardless of whether they are square or rectangular cell floor plan, can be made practically with a mold. This can easily adjust the center distances of the silo by using intermediate components be adjusted. These are the prerequisites for machine production the concrete parts and the reinforcement cages. When concentrating on a few few Cell layout types and development in the direction of machine production of the Individual components can reduce the labor costs in the production to an extent that as is not possible with any other system.

Im technischen Bereich sind die Vorteile im wesentlichen durch die Fertigteilbauweise selbst bedingt. Die Wandbauteile werden in Stahlblechschalungen und auf dem Rüttel -tisch hergestellt. Dies ergibt eine ausserordentlich glatte und dichte Oberflächenbeschaffenheit. Die Stahlbetonteile sind mit Sicherheit absolut korrosionsbeständig,jegliche Unterhaltungsarbeiten entfallen. Die Korrosionsbeständig -keit hat besondere Bedeutung für Silos in aggressiver Atmosphäre. Sämtliche Aussenflächen sind, da keine Ortbetonschalungen erforderlich werden, von gleichmässiger Beschaffenheit und ergeben eine gute architektonische Wirkung. Auf der Zelleninnenseite ist eine glatte Wandoberfläche erforderlich und insofern von Bedeutung, als sie den Wandreib -ungswinkel herabsetzt und damit die Wanddrücke beim Entleerungsvorgang, der für die Bemessung maßgebend ist,deutlich mindert. Die Verringerung des Wandreibungswinkels hat besonaere Bedeutung bei der Lagerung von pulverförmigen Lage rst offen, weil die ansonsten leicht zur Brückenbildung neigen. Von wesentlicher Bedeutung ist ausserdem die große Oberflächenhärte, die durch das Rütteln erzielt wird. Die Zellenwände haben dadurch sehr große Abriebsfestigkeiten, eine Eigenschaft, die bei Silos für Lagergüter der Nährmittelindustrie sehr oft Voraussetzung ist. Was die hier beschriebene,werkstoffmäßige Güte der Stahlbetonkonstruktionsteile anbelangt, so gibt es kein Herstellungsverfahren,das in dieser Beziehung mit der Fertigteilbauweise in Wettbewerb treten kann.In the technical field, the advantages are essentially due to the Prefabricated construction itself dependent. The wall components are in sheet steel formwork and made on the vibrating table. This gives an extraordinarily smooth one and dense surface finish. The reinforced concrete parts are absolute for sure corrosion-resistant, no maintenance work is required. The corrosion resistant -equality is of particular importance for silos in an aggressive atmosphere. All outside areas are of uniform quality, since no in-situ concrete formwork is required and result in a good architectural effect. There's one on the inside of the cell smooth wall surface required and insofar as it is important to the wall friction -Duction angle and thus the wall pressures during the emptying process, which is for the dimensioning is decisive, significantly reduces. The reduction of the wall friction angle is of particular importance in the storage of powdery layer rst open because which otherwise tend to form bridges. It is also essential the great surface hardness that is achieved by shaking. The cell walls therefore have very high abrasion resistance, a property that silos for Storage goods in the food industry are very often a prerequisite. As for the material-related As far as the quality of the reinforced concrete structural parts is concerned, there is no manufacturing process that can compete with the prefabricated construction method in this regard.

Die charakteristischen Merkmale und die Wirkungsweise der Erfindung wird nachfolgend an einem Ausführiingsbeispiel zeichnerisch dargestellt und näher beschrieben. In der zeichnerischen Darstellung und im Text werden folgende Bezeichnungen und Bezugszeichen eingeführt: Nr. 1 = Wandbauteil allgemein 2 2 = Mittelstück von Wanabauzeil Nr. 3 = Schenkel beim Wandbauteil 4 = Aufiagerstein beim Schenkel 5 5 = Paßstück eben für Knoten in Aussenwand n 6 = Paß stück in Winkelform für Eckknotenpunkt 7 7 = Bewehrungskorb im Mittelteil des Wandbauteils " 8 = Überstände des Bewehrungskorbs beidseitig " 9 = Justiermarken allgemein n 10 = Abstandshalter allgemein " 11 = untere Zapfenführung der Justiermarke " 12 = obere " " " " 13 = zweiseitiger Führungszapfen der Justiermarke " 14 = einseitiger II " " §' 15 = Ringansatz am " 16 = Beilagescheibe zum " lt 17 = Mörtelfuge " 18 = Distanzrohr für Abstandshalter " 19 = Ankerscheibe, in Mitte Distanzrohr " 20 = Gewindelöcher beidseitig im Distanzrohr " 21 = Verschlußstopfen für Abstandshalter. The characteristic features and mode of operation of the invention is shown graphically and in more detail below using an exemplary embodiment described. The following designations are used in the graphic representation and in the text and reference symbols introduced: No. 1 = wall component in general 2 2 = middle section of Wanabauzeil No. 3 = leg of wall component 4 = support stone for leg 5 5 = fitting piece just for nodes in the outer wall n 6 = fitting piece in angular form for corner node 7 7 = reinforcement cage in the middle part of the wall component "8 = overhangs of the reinforcement cage on both sides "9 = adjustment marks in general n 10 = spacers in general "11 = lower spigot guide of the adjustment mark" 12 = upper "" "" "13 = two-sided guide pin of the adjustment mark "14 = one-sided II" "§ '15 = ring attachment on "16 = washer to" lt 17 = mortar joint "18 = spacer tube for spacer "19 = armature disk, in the middle of the spacer tube" 20 = threaded holes on both sides in the spacer tube "21 = sealing plug for spacer.

Im einzelnen zeigen die zeichnerischen Darstellungen: Fig. 1 : Horizontalschnitt durch einen erfindungsgemäss erstellten mehrreihigen Zellensilo,bezw.nur einen Teilausschnitt hiervon.Es sind die inneren Querachsen mit A-A,die inneren Längsachsen mit B-B,die äusseren Querachsen mit Ao-Ao,die äusseren Längsachsen mit Bo-Bo bezeichnet.Grundsätzlich gesehen, sind die Achsbezeichnungen austauschbar,sie dienen lediglich zur zeichnerischn. The drawings show in detail: FIG. 1: Horizontal section by a multi-row cell silo created according to the invention, or only a partial section There are the inner transverse axes with A-A, the inner longitudinal axes with B-B, the outer transverse axes with Ao-Ao, the outer longitudinal axes with Bo-Bo. Basically seen, the axis designations are interchangeable, they are only used for drawing.

Unterscheidung.Des Bild zeigt,wie die einzelnen Wandbauteile in den einzelnen Knotenpunkten zusammengefügt werden.In den inneren Knoterpunkten treffen je 4 Wandbauteile zusammen, hier sind keine Paßstücke erforderlich.Bei Knotenpunkten einer Aussenwand,d.h.der Achse Ao-Ao oder Bo-Bo, treffen nur 3 Wandbauteile zusammen, die nicht abgedeckte RestflÅche wird mit dem Paßstück(5) abgedeckt Bei Eckknotenpunkten,d.s.die Schnitt punkte der Aussenachsen Ao - Ao und Bo - Bo wird ein winkelförmiges Paßstück ( 6 ) zur Abdeckung der Restflachen erforderlich. Zur besseren tbersicht ist auf die Darstellung der Bewehrung verzichtet, es sind nur die Umrisse der Stahlbetonteile mit den Aussparungen für den Ortbetonverguß dargestellt. Differentiation. The picture shows how the individual wall components in the individual nodes can be joined together; meet in the inner node points 4 wall components each together, no adapters are required here an outer wall, i.e. the axis Ao-Ao or Bo-Bo, only 3 wall components come together, the uncovered remaining area is covered with the fitting piece (5) cut points of the outer axes Ao - Ao and Bo - Bo becomes an angular Adapter (6) required to cover the remaining areas. For a better overview the reinforcement is not shown, only the outlines of the reinforced concrete parts shown with the recesses for the cast-in-place concrete.

Fig.2: Mittelschnitt vertikal durch Wandbauteil mit schematischer Darstellung der Bewehrung.Fig. 2: Center section vertical through wall component with schematic Representation of the reinforcement.

1? 3: Zu Figur 2) gehöriger Mittelschnitt horizontal durch Wandbauteil. 1? 3: Center section corresponding to FIG. 2), horizontally through wall component.

vt 4: Seitenansicht auf andbauteil ohne Darstellung der Bewehrung. vt 4: Side view of the add-on part without showing the reinforcement.

5: Zu Figur 4) gehörige Draufsicht auf Wandbauteil. 5: Top view of the wall component belonging to FIG. 4).

Die Bilder Fig. 1+5 zeigen die Einzelbauteile, aus denen sich ein Wandbauteil (1) insgesamt zusammensetzt,nämlich das Mittelstück (2),an den beiden Enden die Stahlbetonschenkel(3) mit den Auflagersteinen (4),die Justiermarken (9) und die Abstandshalter (lO),sowie ausserdem die Porm des Bewehrungskorbes,unterteilt in Korb im Mittelteil (7),der über die gesamte Höhe des Mittelstücks (2) mit Schenkeln (3) reicht,mit beidseitigen Bewehrungsüberständen (8). Die Tiefe der Vergussaussparung,Maß n,ist geringfüfig grösser als das Uberstandsmaß "m", da bei der Montage der Bewehrungsüberstand (8) des neu zu versetzenden Wandbauteils in die Aussparung "n" eingreifen soll. The pictures Fig. 1 + 5 show the individual components that make up a Wall component (1) composed as a whole, namely the middle piece (2), on the two End the reinforced concrete legs (3) with the support stones (4), the alignment marks (9) and the spacers (10), and also the Porm of the reinforcement cage, divided in the basket in the middle part (7), which extends over the entire height of the middle piece (2) with legs (3) is sufficient, with reinforcement protrusions on both sides (8). The depth of the grouting recess, degree n, is slightly larger than the protrusion dimension "m", since the reinforcement protrusion during assembly (8) of the new wall component to be relocated is intended to engage in the recess "n".

Bei rechteckigem Zellengrundriß haben die Achsabstände a unterschiedliche Größe,ihre Differenz wird ausgeglichen durch verschieden große Längen "s" des Mittelstücks (2). Die Stahlbetonschen -kel (3) an beiden Enden und an beiden Seiten sind voutenförmig nach aussen gestellt, an ihren Enden befinden sich die Auflagerstaine (4),sie sind nur hals so hoch wie Schenkel und Mittelstück und sind betreffend der Höhe mittig zu diesen angebracht. In the case of a rectangular cell layout, the center distances a have different Size, the difference between them is compensated for by the length "s" of the middle section of different sizes (2). The reinforced concrete legs (3) at both ends and on both sides are tapered placed on the outside, at their ends are the Auflagerstaine (4), they are only neck as high as the thigh and middle section and are centered in terms of height attached to these.

In den Auflagersteinen (4) sind planmäßig 3ustiermarken eingegossen. Die Anordnung der Justiermarken (9) im Mittelstück ist von der Gesamt -größe der Wandbauteile (1) abhängig und erfolgt nach praktischen Überlegungen, die zeichnerische Darstellung ist nur beispielsweise gedacht. Im Mittelstück (2) des Wandbauteils sind ausserdem die Abstandshalter (10) angebracht. Sie sind an für sich für die Stabilisierung der Wandschalungen auf dem Rütteltisch erforderlich. Für die Anordnung der Abstandshalter sind deshalb vorwiegend Erfordernisse des Herstellungsvorgangs maßgebend. In the support stones (4) are planned 3ustiermarken poured. The arrangement of the alignment marks (9) in the center piece depends on the overall size of the Wall components (1) dependent and takes place after practical considerations, the graphic Representation is only intended as an example. In the middle section (2) of the wall component the spacers (10) are also attached. You are in for yourself for that The wall formwork must be stabilized on the vibrating table. For the arrangement the spacers are therefore primarily requirements of the manufacturing process authoritative.

Die Anordnung kann auch dadurch bestimmt werden, dass die Abstandshalter späterhinaus am Silo selbst als Verankerungen von Arbeits-und Schutzbühnen ect. The arrangement can also be determined in that the spacers later on the silo itself as anchoring of work and protective platforms etc.

dienen sollen. Die Darstellung der Anordnung der Abstandshalter auf Fig.3 ist ebenfalls nur beispielsweise gedacht. should serve. The illustration of the arrangement of the spacers on 3 is also only intended as an example.

Fig. 6: Draufsicht auf die Anordnung von Schenkeln (3)mit Auflagersteinen (4) beim Mittelstück (2) eines Wandbauteils (1).Fig. 6: Top view of the arrangement of legs (3) with support stones (4) in the middle piece (2) of a wall component (1).

Fig. 7: Die zu Fig.6 gehörige Seitenansicht.Fig. 7: The side view belonging to Fig. 6.

Fig. 6 mit Fig.7 zeigen die Maßordnung, der Schenkelenden und Ausbildung der Auflagersteine (4) genügen müssen, damit die gewünschte,allseitig geschlossene Knotenpunktausbildung mit der inneren sternförmigen Aussparung für den Ortbetonverguß entsteht. Die Auflagersteine haben quadratischen Grundriss mit der Kantenlänge $'e" ; die Achsen der Auflagersteine sind parallel zu den Wandachsen der Zelle, d.h. zu den Achsen A-A bezw.B-B und haben auch von diesen den gleichen Abstand "d". Hierdurch kommen bei der Montage die Auflagersteine der verschiedenen Wandbau-teile genau übereinanderzu liegen, die genaue Fixierung erfolgt durch die in die Auflagersteine (4) oben und unten eingegossenen Justiermarken (9). Fig. 6 with Fig.7 show the dimensional order, the leg ends and training the support stones (4) must suffice so that the desired, closed on all sides Node formation with the inner star-shaped recess for the cast-in-place concrete arises. The support stones have a square floor plan with the edge length $ 'e " ; the axes of the bearing blocks are parallel to the wall axes of the cell, i.e. to the axes A-A or B-B and have the same distance "d" from them. Through this the support stones of the various wall components come exactly during assembly to lie on top of each other, the exact fixation takes place through the in the support stones (4) adjustment marks cast in at the top and bottom (9).

Pig. 8:Räumliche Darstellung der Ilandbauteile von vier in einem inneren Knotenpunkt einlaufendenWände. Die Wandbauteile von Längs-und Querachsen sind infolge Überlagerung in den Auflagersteinen höhenmässig um H/2 versetzt. Zur besseren Darstellung sind die Wandbauteile etwas aus dem Knotenpunkt zurückgezogen gezeichnet. Pig. 8: Spatial representation of the Iland components of four in one inner junction of incoming walls. the Wall components of longitudinal and Transverse axes are offset in height by H / 2 due to overlapping in the support stones. For a better representation, the wall components have been withdrawn a little from the junction drawn.

Fig. 3 : Räumliche barstellung der Wandbauteile von vier in einem inneren Knotenpunkt einlaufende Wände in ihrer wirklichen Stellung nach der Montage.Fig. 3: Spatial position of the wall components of four in one inner junction incoming walls in their real position after assembly.

Dargestellt ist ein Teilausschnitt mit einem Höhenbereich von 3 Wandbauteilen. Die Horizontalfugen der Wandbauteile sind in beiden Achsen ATA und B-B Jeweils um die halbe Höhe der Wandbauteile H/2 versetzt. A partial section with a height range of 3 wall components is shown. The horizontal joints of the wall components are around in both axes ATA and B-B half the height of the wall components H / 2 offset.

Fig.10 : Zeigt einen Horizontalschnitt durch den in Fig.9 dargestellten Knotenpunkt und zwar in Höhe der in Fig.9 eingetragenen Ebene El. Der Schnitt verläuft in der Horizontalfuge der Wandbauteile (1) der Achse A-A; in dieser Richtung ist in diesem Bereich keine Bewehrung vorhanden, weil im Bereich der inneren Aussparung die Bewehrungskörbe auf die halbe Höhe zusammengezogen sind, wodurch jeweils eine Lücke von H/2 entsteht. In diese Lücke greifen die Bewehrungsüberstände der Bewehrungen der Achse B-B ein und kreuzen hierbei die darunter liegende Bewehrungen der Achse A-A.Fig.10: Shows a horizontal section through the one shown in Fig.9 Node, specifically at the level of the plane E shown in FIG. The cut goes in the horizontal joint of the wall components (1) along the axis A-A; is in that direction There is no reinforcement in this area because in the area of the inner recess the reinforcement cages are pulled together to half the height, whereby each one There is a gap of H / 2. The reinforcement overhangs reach into this gap the axis B-B and cross the underlying reinforcements of the axis A-A.

Pig.ll: Zeigt den Horizontalschnitt des in Fig.9 dargestellten Knotenpunkts, hier jedoch in Höhe der in Fig. 9 eingetragenen Ebene E2. Das Schnitt -bild ist geometrisch genau das gleiche wie in Fig.lO, es unterscheidet sich nur durch die Drehung des Achsenkreuzes um 90 Grad. Pig.ll: shows the horizontal section of the node shown in Fig. 9, here, however, at the level E2 entered in FIG. 9. The sectional view is geometrically exactly the same as in Fig.lO, it differs only by the Rotation of the axbox by 90 degrees.

Fig.l2: Vertikalschnitt längs der Achse A-A des in Fig.9 dargestellten Teilbereichs eines inneren Knotens. Fig.l2: Vertical section along the axis A-A of the shown in Fig.9 Part of an inner node.

Das Bild zeigt, wie die Bewehrungagruppen der beiden Achsen im Schnittpunkt sich abwechseln und kreuzen. In die Lücken der Bewehrungsüberstände der Achse A-A greifen die Bewehrungsüberstände der Achse B-B ein und kreuzen so die Bewehrungen der Achse A-A. The picture shows how the reinforcement groups of the two axes at the intersection alternate and cross. In the gaps in the reinforcement overhangs on axis A-A the reinforcement overhangs on axis B-B intervene and thus cross the reinforcements the Axis A-A.

Fig.13: Zeigt den Vertikalschnitt des gleichen Teilbereichs wie Fig.9 und 10; hier wird jedoch längs der Achse B-B geschnitten. Das Schnittbild is-t genau das gleiche wie in Fig.12,lediglich höhenmässig um H/2 versetzt, Fig. 8 bis einschl. 13 zeigen im Zusammenhang, wie die konstruktive Aufgabe gelöst wird,innerhalb der sternförmigen Aussparung für den Ortbetonverguss die Bewehrungen zweier senkrecht zu einander stela enden Wände statisch einwandfrei zu stoßen und das sowohl für die Längs-wie für die Querachse, und zusätzlich gleichzeitig eine gegenseitige Durchdringung der Bewehrungsgruppen beider Richtungen, d.h. von Längs-und Querachse, unter 90 Grad ermöglicht und dies in einer leicht zu handhabenden, praktikablen Art. Erst die Erfüllung dieser beiden Bedingungen erbringt eine biegesteife Ausbildung des Wandknotenpunkts.Fig. 13: Shows the vertical section of the same sub-area as Fig. 9 and 10; here, however, the cut is made along the axis B-B. The cut is accurate the same as in Fig. 12, only offset in height by H / 2, Fig. 8 up to and including 13 show in connection how the constructive task is solved within the star-shaped recess for the cast-in-place concrete, the reinforcements of two perpendicular to each other stela end walls to butt statically flawless and that for both the longitudinal as for the transverse axis, and in addition at the same time a mutual penetration the reinforcement groups in both directions, i.e. from the longitudinal and transverse axis, less than 90 Degree and this in an easy-to-use, practicable way. First the fulfillment of these two conditions results in a rigid design of the Wall node.

Fig.14:Räumliche Darstellung eines äusseren Knotenpunkts, d.h. eines Schnittpunktes der Aussenachse z.B. Fig. 14: Spatial representation of an outer node, i.e. a Intersection of the outer axis e.g.

Ao-Bo mit der Innenachse z.B.3»B. Hier laufen nur 3 Wände im Knotenpunkt zusammen, die Wandbauteile sämtlicher Wände sind identisch. In Richtung der fehlenden 4.Wand verbleiben Öffnungen, die durch einflächige, ebene Paßstücke (5) verschlossen werden. Diese Paßstücke (5) haben die Form von zwei aufeinanderstehenden Rechtecken, von denen das eine eine Breite "2d + e", das andere eine Breite von "2d - elt hat. Das obere Rechteck ist das breitere, das Paßstück hat die Stärke e. Betreffend der Definition der Maße "d" und "e" vergl.Fig.6. Ao-Bo with the inner axis e.g. 3 »B. Here only 3 walls run in the intersection together, the wall components of all walls are identical. Towards the missing 4.Wall openings remain, which are closed by single-surface, flat fitting pieces (5) will. These adapters (5) have the shape of two rectangles standing on top of one another, one of which has a width of "2d + e", the other a width of "2d - elt. The upper rectangle is the wider one, the fitting piece has the thickness e. Regarding the For definition of dimensions "d" and "e", see Fig. 6.

Beim Paßstück (5) sind auf der Breitseite oben 4, auf der Schmalseite unten 2, und auf den Überständen in Paßstück Mitte 2 Justiermarken (9) eingegossen. Die äusseren Justiermarken auf der Oberseite und die Justiermarken auf den PaBstücküberstanden haben von der entsprechenden Achse den Abstand "d" und sind für den Eingriff in die Justiermarken der Auflagersteine (4) vorgesehen. The adapter (5) has 4 on the broad side and 4 on the narrow side 2 below, and 2 adjustment marks (9) cast into the middle of the fitting piece on the protrusions. The outer adjustment marks on the top and the adjustment marks on the pieces of the piece protruded have the from the corresponding axis Distance "d" and are for the engagement in the alignment marks of the support stones (4) is provided.

Die innerenJustiermarkenauf der Oberseite und die beiden dustiermarken auf der Schmalseite unten, sind für den gegenseitigen Eingriff von Paßstück in Paßstück vorgesehen. Die Formgebung des Paßstücks(4) ist für das Versetzen von oben vorgesehen; die Anordnung der justiermarken fixiert das Paßstück in seiner Lage und verhindert infolge der Anordnung in verschiedenen Höhen ein Kippen des Paß stücks. Damit befindet sich das Paß stück in stabilem Gleichgewicht und bedarf für das Vergiessen mit Ortbeton keiner besonderen Abstützung. The inner adjustment marks on the top and the two adjustment marks on the narrow side below, are for the mutual engagement of fitting piece in fitting piece intended. The shape of the fitting piece (4) is intended for displacement from above; the arrangement of the adjustment marks fixes the fitting piece in its position and prevents it due to the arrangement at different heights tilting of the passport piece. So is the fitting piece is in a stable equilibrium and is required for casting with in-situ concrete no special support.

Fig. 15: Porizontalschnitt durch den in Fig.14 dargestellten äusseren Knotenpunkt in der Höhe einer Vergußfuge zwischen den Wandbauteilen der Achse Ao-Ao. Die Bewehrungsüberstände dieser Achsrichtung sind ebenfalls auf H/2 zusammengezogen, sodass jeweils eine Lücke von H/2 entsteht. Im vorliegenden Fall führt der Schnitt durch eine solche Lücke der Richtung Ao-Ao. In diese Lücke greifen senkrecht hierzu die Bewehrungsüberstände der Achsrichtung B-3 ein, sie werden hinter der Stützenbewehrung rahmenartig in Richtung der durchlaufenden Wand Ao-Ao abgebogen. Die Ver -hältnisse sind hier was die Durchdringung anbelangt, analog wie bei einem inneren Knotenpunkt.Fig. 15: Horizontal section through the outer one shown in Fig. 14 Node at the level of a grouting joint between the wall components of the axis Ao-Ao. The reinforcement overhangs in this axial direction are also drawn together to H / 2, so that there is a gap of H / 2 in each case. In the present case, the cut leads through such a gap in the direction of Ao-Ao. Into this gap reach perpendicular to this the reinforcement overhangs in axial direction B-3, they are behind the column reinforcement bent like a frame in the direction of the continuous wall Ao-Ao. The ratios are here in terms of penetration, analogous to an inner node.

Fig. 16: Seitenansicht des in Fig.14 dargestellten Enotenpunktausschnitts; sie zeigt das Zusammenwirken von Wandbauteilen der Achsrichtung Ao-Ao mit den in gleicher Richtung eingebauten Pabstücken (5).FIG. 16: side view of the end node section shown in FIG. 14; FIG. it shows the interaction of wall components in the axial direction Ao-Ao with the in Pab pieces installed in the same direction (5).

Fig. 17: Ansicht des Paßstücks (5) mit den sich aus den Konstruktionsgrößen der Wandbauteile ergebenden Abmessungen. Betreffend der Definition der Grössen " d " und " e " vergl. Fig. 6.Fig. 17: View of the adapter (5) with the construction sizes the dimensions resulting from the wall components. Concerning the definition of the quantities " d "and" e "see FIG. 6.

Fig. 18: Räumliche Darstellung eines Sckknotenpunkts, d.h. Schnittpunkt der Achsen Ao-Ao und Bo-Bo.Fig. 18: Spatial representation of a sunk node, i.e. point of intersection of the axes Ao-Ao and Bo-Bo.

In diesem Schnittpunkt laufen nur zwei Wände ein, die zuamen eilen rechten Winkel bilden. Durch das Fehlen der entsprechenden Wandbauteile entstehen in beiden Wandebenen Öffnungen, die durch ein winkelförmiges Paß stück (6) verschlossen werden. Das Paßstück (5) ist so geformt, dass es von oben eingeführt und versetzt werden kann. Jede Winkelseite des Paß stücks besteht aus zwei aufeinanderstehenden Rechtecken verschiedener Breite, die an der Siloecke bündig stehen.Diese Rechtecke haben je die Höhe H/Z, die Gesamthöhe des Paßstücks ist "H" . Die Breite der grösseren Rechtecke ist " 2d + e ", die Breite der kleineren Rechtecke jedoch nur n 2d - e n. Diese beiden Rechtecke sind Je auf beider Winkelseite so angeordnet, dass einem breiten Rechteck auf der einen Seite ein schmales Rechteck auf der anderen Seite gegenübersteht und umgekehrt. Hierdurch fügt sich das Paßstück (6) lückenlos in die einlaufenden Wandbauteile beider Richtungen ein, wodurch der Innenraum für den Ortbetonverguss nach aussen volllkommen umschlossen wird. Oben und unten sind Justiermarken (9) eingegossen, die mit den Justiermarken der einlaufenden Wandbauteile beider Wandrichtungen im Eingriff stehen, wodurch das Paßstück in seiner Pollstellung unverschieblich fixiert ist. Ein Kippen ist infolge der Winkelform des Paßstücks (6) ohnehin nicht möglich. Zur besseren Verdeutlichung ist ein Paßstück aus seiner Stellung etwas herausgezogen dargestellt. At this point of intersection, only two walls come together, rushing towards each other Form right angles. Due to the lack of the corresponding wall components arise openings in both wall planes, which are closed by an angled fitting piece (6) will. The adapter (5) is shaped to insert and offset from above can be. Each angled side of the passport consists of two superimposed Rectangles of different widths that are flush with the silo corner each have the height H / Z, the total height of the fitting is "H". The width of the bigger one Rectangles is "2d + e", but the width of the smaller rectangles is only n 2d - e n. These two rectangles are each arranged on both sides of the angle so that one wide rectangle on one side a narrow rectangle on the other opposite and vice versa. As a result, the fitting piece (6) fits seamlessly into the incoming wall components in both directions, creating the interior space for the In-situ concrete grouting is completely enclosed to the outside. There are alignment marks above and below (9) poured in with the alignment marks of the incoming wall components of both Wall directions are in engagement, whereby the fitting piece immovable in its pole position is fixed. Tilting is not due to the angular shape of the fitting piece (6) anyway possible. For the sake of clarity, a fitting piece is something out of its position shown pulled out.

Fig.19: Horizontalschnitt durch den in Fig.18 räumlich darT gestellten Eckknotenpunkt. Die Innenraumaussparung für den Ortbetonverguß hat die trapezförmigen Verlängerungen hier nur in den Richtungen der beiden einlaufenden Wände. Der quadratförmige Eckbereich der Aussparung ist als Stütze mit entsprechender Bewehrung ausgebildet. Die Bewehrungsüberstände beider Wandrichturlben lauerl durch i Stützenbewehrung hindurch und werder hinter dieser rahmenartig in die entsprechenden Wandrichtungen abgebogen, wodurch ein einwandfreier Überdeckungsstoß der Wandbewehrungen erzielt wird. Die Stützenbügel könen seitlich eingefügt werden.Fig. 19: Horizontal section through the spatially shown in Fig. 18 Corner node. The interior recess for the cast-in-place concrete has the trapezoidal shape Extensions here only in the directions of the two incoming walls. The square one The corner area of the recess is designed as a support with appropriate reinforcement. The reinforcement overhangs both wall directives lauerl through i Column reinforcement through and are behind this frame-like in the corresponding Wall directions bent, resulting in a perfect overlap of the wall reinforcement is achieved. The support brackets can be inserted from the side.

Fig.20: Zeigt die Seitenansicht auf Wandfläche Bo-Bo des in Fig.ld dargestellten Teilausschnitts eines Eckknotenpunkt 5.Fig. 20: Shows the side view of wall surface Bo-Bo of the in Fig.ld The illustrated partial section of a corner node 5.

Fig.21: Zeigt die Seitenansicht auf Wandfläche Ao-Ao des in Fig. 18 dargestellten Teilausschnitts eines Eckknotenpunkts.Fig. 21: Shows the side view on wall surface Ao-Ao of the in Fig. 18 shown partial section of a corner node.

Fig.22: Zeigt die beiden'Seitenansichten, sowie die Draufsicht auf das Paßstück (5) eines Eckknotenpunktes, wie es bei Fig. 18 beschrieben wird. Die Differenz beider Rechtecklängen je einer wandseite beträgt "e", d.h.diese Überstände haben die gleichen Maße sowohl im Querschnitt als auch in der Höhe, wie die Auflagersteine (4) der Wandbauteile. Sie übernehmen im Eckknotenpunkt die Funktion der Auflagersteine. Die Reihenfolge der Montage von Wandbauteil (1) und Pabstücken (6) ergibt sich zwangsläufig von selbst.Fig. 22: Shows the two side views as well as the top view the fitting (5) of a corner node as described in FIG. the The difference between the two lengths of the rectangle on each side of the wall is "e", i.e. these overhangs have the same dimensions, both in cross section and in height, as the support stones (4) the wall components. They take over the function of the support stones in the corner node. The order in which the wall component (1) and Pabstücks (6) are assembled is inevitable by itself.

Fig.23: Schnitt durch eine Justiermarke (9), bei welcher oberer und unterer Wandbauteil genau übereinander stehen. Hier besteht die Justiermarke (9) aus: obere Zapfenführung (12),untere Zapfenführung (11) zweiseitiger Führungszapfen ( 13) mit Ringansatz (15) und in der Höhe veränderlicher Beilagescheibe (16) zur Einstellung der Stärke der Mörtelfuge (17) Hier dient die Justiermarke (9) zur Fixierung der Wandbauteile sowohl in horizontaler als auch in vertikaler Richtung.Fig. 23: Section through an alignment mark (9), in which upper and lower wall component are exactly one above the other. Here is the alignment mark (9) consisting of: upper pin guide (12), lower pin guide (11), two-sided guide pin (13) with ring attachment (15) and a height-adjustable washer (16) for Adjustment of the thickness of the mortar joint (17) Here the adjustment mark (9) is used for fixing of the wall components both in the horizontal and in the vertical direction.

Fig.24: Schnitt durch eine Justiermarke (9), bei welcher oberer und unterer Wandbauteil infolge MaBungenauigkeit, herrührend aus der Fertigung, nicht exakt übereinander stehen. Durch Wegnahme des Oberteils entsteht aus dem ehemals zweiseitigen Führungszapfen (17) jetzt ein nur einseitiger Führungszapfen (14), der hier ausschliesslich nur zur Höheneinstellung dient.Fig. 24: Section through an alignment mark (9), in which upper and lower wall component due to dimensional inaccuracy resulting from production are exactly on top of each other. By removing the upper part, the formerly two-sided guide pin (17) now only one-sided guide pin (14), which here only for Height adjustment is used.

Fig.25: zeigt die beispielsweise Ausfahrung eines Abstandshalters (lO),bestehend aus dem Distanzrohr (18) mit mittig angebrachter Ankerscheibe (19) und beidseitigem Innengewinde (20).Die Gewindebohrungen werden, sofern sie nicht benutzt sind, durch Gewindestopfen (21) verschlossen.Fig. 25: shows the extension of a spacer, for example (lO), consisting of the spacer tube (18) with a centrally mounted armature disk (19) and internal thread (20) on both sides. The threaded holes are, if they are not are used, closed by threaded plugs (21).

Claims (8)

P a t e n t a n s p r u c h:P a t e n t a n s p r u c h: 1. Stahlbetonfertigteilsystem für ein-oder mehrreihige Zellensilos mit rechteckigem oder quadratischem Zellengrundriss, derart ges-taltet, dassian sSmtlichensd.h. inneren, äusseren und Eck -~Wandschnittpunkten sogenannte Wandknotenpuiikte entstehen, die eine druck-und zugfeste und insbesonders biegesteife Verbindung der maximal 4 einlaufenden Wandflächen untereinander ermöglichen, ohne dass an der Baustelle auszuführende Schalarbeiten erforderlich werden/ dadurch gekennzeichnet wie folgt: Die Zellenwände werden in horizontal liegende,parallel begrenzte Teilabschnitte, sogenannte Wandbauteile (1) zerlegt. Diese haben die Höhe H. Ein Wandbauteil, als Gesamtstück mit (1) bezeichnet,hat einen JMittelteil (2) von prismatischer Form und rechteckigem Querschnitt. An dieses Mittelstück (2) schliessen sich an beiden Enden und beidseitig die sich horizontal erweiternden Stahlbetonschenkel (3) an.1. Precast reinforced concrete system for single or multi-row cell silos with a rectangular or square cell layout, designed in such a way that one all of them inner, outer and corner wall intersections, so-called wall node points arise that create a pressure and tensile strength and, in particular, rigid connection of the allow a maximum of 4 incoming wall surfaces one below the other without having to be on the construction site Formwork work to be carried out becomes necessary / characterized as follows: The cell walls are divided into horizontally lying, parallel delimited sections, so-called wall components (1) dismantled. These have the height H. A wall component, as Entire piece designated by (1) has a central part (2) of prismatic shape and rectangular cross-section. Both of them connect to this middle piece (2) Ends and on both sides of the horizontally widening reinforced concrete legs (3). a Die Wndstärke dieser Stahlbetonschenkel (3) ist so bemessen, dass zwischen ihnen ein trapezförmiger, freier Raum entsteht. An den Enden sämtlicher 4 Schenkel sind mittig zur Höhe H quadratische Auflagersteine (4) von der Höhe H/2 angeordnet. Der verbleibende Abstand zwischen Oberfläche Stahlbetonschenkel (3) und Oberfläche Auflagerstein (4) be -trägt somit oben und unten je 11/4. Die Auflager -steine ( 4) haben eine Kantenlänge von "e" und sind symetrisch und mit gleichem Abstand "d zu den beiden Wandachsen angeordnet. In der statischen Berechnung werden für den entsprechenden Höhenanteil von H die erforderlichen Bewehrungsquerschnitte für den Bewehrungskorb-Mittelteil (7) und auch für die Bewehrungsüberstände (8) ermittelt. Die Bewehrungsanteile für den Korbmittelteil (7) werden in einem Korb von der Höhe H zusammengefasst, die Bewehrungsanteile der Überstände (8) jedoch in einem Korb von der minderen Höhe H/2. Die höhenmässige Lage der Körbe der Bewehrungsüberstände (8) entspricht genau der Höhenlage der Auflagersteine (4)des dazu gehörigen Wandbauteils. Die Bewehrungsüberstände (8) ragen beidseitig um das Maß "m" über dieangrenzenden Wandachsen hinaus. Dieses Maß "m" ist geringfügig kleiner als das Maß "n", welches den Abstand der Wandachsen von der Stirefläche des durch die Schenkel (3) gebildeten trapezförmigen freien Raum bezeichnet. Insgesamt werden bei einem inneren Knotenpunkt, in welchem 4 Wandbauteile einlaufen, durch die insgesamt 8 Stahlbetonschenkel (4) ein freier Raum gebildet, dessen Mittelteil quadratische Form hat und an dessen 4 Seiten sternförmig sich die trapezförmigen Raumvergrösserungen anschließen. Diese gesamte, für den Ortbetonverguß, sowie für die Ausbildung der Überdeckungsstöße der Bewehrung vorgesehene Aussparung wird durch die einlaufenden Stahlbetonschenkel (4) vollkommen nach außen abgeschlossen. a The wall thickness of these reinforced concrete legs (3) is dimensioned so that A trapezoidal, free space is created between them. At the ends of all 4 legs are centered at height H, square support stones (4) of height H / 2 arranged. The remaining distance between the surface of the reinforced concrete legs (3) and the surface of the support stone (4) is 11/4 at the top and bottom. The supports -Stones (4) have an edge length of "e" and are symmetrical and with the same Distance "d to the two Wall axes arranged. In the static The necessary reinforcement cross-sections are calculated for the corresponding height portion of H. for the reinforcement cage middle part (7) and also for the reinforcement overhangs (8) determined. The reinforcement parts for the cage middle part (7) are in a cage summarized by the height H, but the reinforcement parts of the protrusions (8) in a basket of the lower height H / 2. The height of the baskets of the reinforcement overhang (8) corresponds exactly to the height of the support blocks (4) of the associated wall component. The reinforcement overhangs (8) protrude on both sides by the dimension "m" over the adjacent ones Wall axes. This dimension "m" is slightly smaller than the dimension "n", which the distance of the wall axes from the front surface of the formed by the legs (3) called trapezoidal free space. In total, at an inner node, in which 4 wall components run through the total of 8 reinforced concrete legs (4) a free space is formed, the central part of which has a square shape and at which The trapezoidal room enlargements are connected in a star shape on 4 sides. These entire, for the cast-in-place concrete, as well as for the formation of the overlap joints The recess provided for the reinforcement is created by the incoming reinforced concrete legs (4) completely closed off from the outside. 2. Stahlbetonfertigteilsystem nach Anspruch 1, dadurch gekennzeichnet, dass die Auflagersteine oben und unten in ihren Schwerpunkten,und auch das Mittelstück (2) des Wandbauteils eingegossenen Justiermarken, als Sammelbegriff mit (9) bezeichnet,besitzen.2. Precast reinforced concrete system according to claim 1, characterized in that that the support stones above and below in their centers of gravity, and also the center piece (2) of the wall component cast adjustment marks, referred to as a collective term with (9). Diese bestehen im einzelnen aus unterer Zapfenführung (ll),oberer Zapfenführung (12), den beidseitigen Führungszapfen (13) mit Ringansatz (15) und eine in ihrer Dicke variablen Beilagescheibe ( 16) zur Einstellung der genauen Stärke der Mörtelfuge (17). These consist in detail of the lower pin guide (ll), the upper one Spigot guide (12), the two-sided guide pins (13) with ring attachment (15) and a washer (16) of variable thickness for setting the exact thickness the mortar joint (17). 3. Stahlbetonfertigteilsystem nach Anspruch 1 und 2, dadurch gekennzeichnet, dass, falls die justiermarken (9) nach Anspruch 2 nicht genau übereinander zu stehen kommen, der zweiseitige Führungszapfen (13) ersetzt wird durch einen, um sein Oberteil'verkürzten einseitigen Führungszapfen (14).3. Precast reinforced concrete system according to claim 1 and 2, characterized in that that, if the adjustment marks (9) according to claim 2 do not stand exactly one above the other come, the two-sided guide pin (13) is replaced by one shortened by its upper part one-sided guide pin (14). 4. Stahlbetonfertigteilsystem nach Anspruch 1, dadurch gekennzeichnet, dass im Mittelstück (2) des Wandbauteils (1) sogenannte Abstandshalter, als Sammelbegriff mit (10) bezeichnet, versetzt werden, die beim Rüttelvorgang für die Stabilisierung der Wandschalungen sorgen und auch für die Aufhängung von Schutz-oder Arbeitsbühnen oder Verkleidungen ect.genutzt werden können. Die konstruktive Gestaltung dieser Abstandshalter (10) ist nicht Gegenstand eines Patentanspruchs.4. Precast reinforced concrete system according to claim 1, characterized in that that in the middle piece (2) of the wall component (1) so-called spacers, as a collective term designated by (10), added to the stabilization during the shaking process the wall formwork and also for the suspension of protective or working platforms or panels etc. can be used. The constructive design of this Spacer (10) is not the subject of a patent claim. 5. Stahlbetonfertigteilsystem nach Anspruch l,dadurch gekennzeichnet, dass die bei einem Aussenknotenpunkt mit nur 3 einlaufenden Wänden die durch die Betonschenkel (4) nicht abgedeckten Aussenflächen verschlossen werden, durch ein vorgefertigtes Paßstück (5), das in seiner Form genau der verbliebenen Wandlücke &ngepasst ist, und nach dem Versetzen der beiden einlaufenden Wandbauteile von oben eingesetzt wird. Das Paßstück (5) wird durch Justiermarken (9) in seiner Sollstellung unverschieblich, und durch die Anordnung der Justiermarken in verschiedenen Höhen, kippsicher gehalten. Die Justiermarken (9) hier entsprechen den Justiermarken nach Anspruch 2 und 3. Die hier verbleibende Aussparung für den Ortbetonverguß hat nur 3 trapezförmige Raumvergrösserungen. Die Bewehrung der nur einseitig einlaufenden Wand wird durch die Stützenbewehrung hindurch geführt und hinter ihr rahmenartig in Richtung der durchlaufenden Wände abgebogen, was zur Ausbildung als biegesteifer Knoten erforderlich ist.5. Precast reinforced concrete system according to claim l, characterized in that that at an external junction with only 3 incoming walls, the through the Concrete legs (4) uncovered outer surfaces are closed by a prefabricated fitting piece (5), the shape of which corresponds exactly to the remaining gap in the wall & n is fitted, and after relocating the two incoming wall components of is used above. The fitting piece (5) is in its target position by adjustment marks (9) immovable, and due to the arrangement of the adjustment marks at different heights, held tipping over. The adjustment marks (9) here correspond to the adjustment marks Claim 2 and 3. The remaining recess for the cast-in-place concrete has only 3 trapezoidal room enlargements. The reinforcement of the only one-sided incoming The wall is led through the column reinforcement and behind it like a frame bent in the direction of the continuous walls, resulting in training as more rigid Knot is required. 6. ' Stahlbetonfertigteilsystem nach Anspruch 1,dadurch gekennzeichnet, dass die bei einem Eckknotenpunkt mit nur 2 einlaufenden Wänden die durch die Betonschenkel hier nicht abgedeckten Aussenflächen verschlossen werden, durch ein vorgefertigteslwinkelartiges Paßstück (6), das in seiner Form genau der verbleibenden Wandlücke angepasst ist und nach dem Versetzen der beiden einlaufenden Wandbauteile von oben eingesetzt werden kann. Das Paßstück (6) wird durch eingegossene Justiermarken in seiner Stellung fixiert. Die Justiermarken (9) hier entsprechen den Justiermarken nach Anspruch 2 und S.6. 'Precast reinforced concrete system according to claim 1, characterized in that that the at a corner node with only 2 incoming walls the outer surfaces not covered by the concrete legs are closed, by a prefabricated lwinkelartiges fitting piece (6), which in its shape exactly the remaining wall gap is adapted and after relocating the two incoming Wall components can be used from above. The fitting piece (6) is cast by Adjustment marks fixed in its position. The alignment marks (9) correspond here the alignment marks according to claim 2 and p. Die Bewehrungsüberstände der beiden einlaufenden Wandbauteile werden durch die Stützenbewehrung hindurch geführt und hinter ihr rahmenartig abgebogen, wodurch die Biegesteife Ausbildung des Knotens gewährleistet ist. The reinforcement overhangs of the two incoming wall components are passed through the column reinforcement and bent in a frame-like manner behind it, whereby the rigid formation of the node is guaranteed. 7. Stahlbetonfertigteilsystem nach Anspruch 1, dadurch gekennzeichnet, dass die Wandbauteile (1) als vorgespannte Wandbauteile ausgeführt werden.7. Precast reinforced concrete system according to claim 1, characterized in that that the wall components (1) are designed as prestressed wall components. 8. Stahlbetonfertigteilsystem nach Anspruch 1, dadurch gekennzeichnet, dass Kombinationen mit den Ansprüchen 2 bis einschl. 7 ausgeführt werden.8. Precast reinforced concrete system according to claim 1, characterized in that that combinations with claims 2 to 7 inclusive are carried out. In Betracht gezogene Druckschriften: Patentschriften keine Literatur : Handbuch " Silos ts von M.u.A.Reimbert im Bauverlag Wiesbaden-Berlin von 1961, Kap .11.5. Stahlbetonsilos.Publications considered: patents not literature : Handbook "Silos ts by M.u.A. Reimbert in Bauverlag Wiesbaden-Berlin from 1961, Chapter 11.5. Reinforced concrete silos. .Handbuch der Fertigteilbauweise von Dr.Ing.T.Koncz,Zürich vom April 1962, Ksp. 8,6s Silos. .Manual for precast construction by Dr.Ing.T.Koncz, Zurich from April 1962, Ksp. 8.6s silos. L e e r s e i t eL e r s e i t e
DE19752529506 1975-07-02 1975-07-02 Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks Pending DE2529506A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19752529506 DE2529506A1 (en) 1975-07-02 1975-07-02 Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19752529506 DE2529506A1 (en) 1975-07-02 1975-07-02 Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks

Publications (1)

Publication Number Publication Date
DE2529506A1 true DE2529506A1 (en) 1977-01-13

Family

ID=5950496

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19752529506 Pending DE2529506A1 (en) 1975-07-02 1975-07-02 Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks

Country Status (1)

Country Link
DE (1) DE2529506A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4281490A (en) * 1978-06-09 1981-08-04 Patrick Foody Silo
DE3147651A1 (en) * 1981-12-02 1983-06-16 Rischmüller, Wilhelm, 3000 Hannover Silo consisting of precast concrete parts
ITTR20130004A1 (en) * 2013-06-20 2014-12-21 Edilgori S P A PANEL SYSTEM - PREFABRICATED WALL IN REINFORCED CONCRETE FOR BIOCELLES WITH STABLE INSTALLATION.
CN109322520A (en) * 2018-11-16 2019-02-12 刘全义 Rectangular Concrete silo and its assembly method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4281490A (en) * 1978-06-09 1981-08-04 Patrick Foody Silo
DE3147651A1 (en) * 1981-12-02 1983-06-16 Rischmüller, Wilhelm, 3000 Hannover Silo consisting of precast concrete parts
ITTR20130004A1 (en) * 2013-06-20 2014-12-21 Edilgori S P A PANEL SYSTEM - PREFABRICATED WALL IN REINFORCED CONCRETE FOR BIOCELLES WITH STABLE INSTALLATION.
CN109322520A (en) * 2018-11-16 2019-02-12 刘全义 Rectangular Concrete silo and its assembly method

Similar Documents

Publication Publication Date Title
DE3739967A1 (en) STEEL BEAM FOR A CONCRETE PLATE
EP0385923B1 (en) Structural member for the construction of buildings, parts of buildings or the like
DE3517601A1 (en) VOLUME ELEMENT FOR THE PRE-CONSTRUCTION OF COMPONENTS AND FORM UNIT FOR THEIR PRODUCTION
EP0752033B1 (en) Structure consisting of prefabricated components
DE3432940A1 (en) Prefabricated masonry structure
DE2529506A1 (en) Cellular silo formed of prefabricated reinforced concrete - with horizontally sectioned wall open trapezoid spaces and square bearing blocks
DE19941603C2 (en) Reinforced concrete part for the production of foundations for buildings
DE1299838B (en) Prefabricated assembly skeleton construction made of prestressed concrete
EP0644302A2 (en) Building block system
DE2020381C3 (en) Cooling tower with a spatial supporting structure comprising several floors
DE3101340A1 (en) "PRECAST STEEL CONCRETE PART, ESPECIALLY FOR CEILING PANELS, AND CARRIER PROFILE HERE"
DE2000679C3 (en) In its basic form, at least triangular shaped stone and a column built from such shaped stones
DE3418313A1 (en) Prefabricated element for a wall
DE2921113A1 (en) FORMWORK STONE
DE1684213B2 (en) Buildings with frames made from individual parts
DE2456988A1 (en) Prefabricated-component demountable tunnel-type structure - with cutouts in base accommodating bottom lugs of wall components
DE931066C (en) Spherical hollow bodies, in particular drinking water containers
DE804474C (en) Procedure and masonry for erecting structures
DE2328893C3 (en) Arch-shaped component
DE568904C (en) Half-timbered construction with frame parts made of cast iron
DE1954712A1 (en) Lost formwork for a standing wall
DE824255C (en) Process for erecting buildings with incomplete skeleton construction
DE2403364A1 (en) PRECAST CEILING
AT346048B (en) CASED CONCRETE - PREFABRICATED ELEMENT
DE3000151A1 (en) Locator for vehicle reinforcing bars - comprises two steel wires joined by traverse wires having locator pins and rings to hold reinforcing bars