DE2456886A1 - Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground - Google Patents

Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground

Info

Publication number
DE2456886A1
DE2456886A1 DE19742456886 DE2456886A DE2456886A1 DE 2456886 A1 DE2456886 A1 DE 2456886A1 DE 19742456886 DE19742456886 DE 19742456886 DE 2456886 A DE2456886 A DE 2456886A DE 2456886 A1 DE2456886 A1 DE 2456886A1
Authority
DE
Germany
Prior art keywords
cavity
ram
hollow
hollow pile
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19742456886
Other languages
German (de)
Inventor
Josef Dipl Ing Schleich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19742456886 priority Critical patent/DE2456886A1/en
Publication of DE2456886A1 publication Critical patent/DE2456886A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/06Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/32Prefabricated piles with arrangements for setting or assisting in setting in position by fluid jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The underground narrow wall system, has elongated steel hollow battens open in the opposite direction to the working direction. These battens are pile driven, jar rammed or jet rammed into the underground area to be sealed off. They have plastic strips with self coupling ends protected against the insertion procedure inserted into the hollow space between the batten walls to help create the tightly sealed steel lamellar sealing apron. The hollow battens are twisted or drawn to allow in-filling of the steel sheet or plastic strip apron.

Description

@ e s c h r e i b u n g Das hier zu beschreibende Verfahren dient dazu, daß zum Abschluß eines mehr oder weniger wasserdurchlässigen Unt£rgrundes eine Schmalwand in den Boden in geeigneter bzw. geforderter Tiefe kostensparend im einfachen Baubetrieb, übliche Baugeräte verwendend eingebracht wird. @ e s c h r e i b u n g The procedure to be described here is used in addition that at the end of a more or less water-permeable subsoil a narrow wall in the ground at a suitable or required depth saves costs is introduced using common construction equipment in simple construction operations.

Die Schmalwand besteht dabei ausdem jeweils am geeignetsten material wie Stahl, Kunststoff, Zementgemisch, Tongemisch.The narrow wall consists of the most suitable material in each case such as steel, plastic, cement mix, clay mix.

Schmalschlitzverfahren zur Abdichtung von Untergrund vor Wasser sind bereits bekannt und im Einsatz. Sie weisen eine Reihe von Nachteilen auf, die sich einerseits vor allem im schwierigen, kostenaufwendigen Baubetrieb und erforderlichen Spezialgeräte bedarf, andererseits in der wenigen Zuverlässigkeit der dichten Erstellung der Wand beziehen.Narrow slot methods for sealing subsurface from water are already known and in use. They have a number of disadvantages that stand out on the one hand, especially in difficult, costly construction operations and required Special equipment requires, on the other hand, in the low reliability of the tight creation refer to the wall.

Zum Beispiel werden I - Träger gerammt und dann wieder gezogen, wobei beim Ziehen der Träger die abdichtende Tasse ohne jegliche Kontrolle eingedrückt wird. Nicht selten steht wegen der Rückstellkraft und Rückstellbewegung des Bodens mit einer bestimmten Elastizität der Abdichtungsmasse kein hohlraum mehr zur Verfügung. Das Rammen und gleichzeitige Auspressen verlangt Spezialgeräte. Diese Verfahren sind überdies nur für die Abdichtungsaufgaben einseitig einsetzbar.For example, I-beams are rammed and then pulled again, whereby when pulling the carrier, the sealing cup is pressed in without any control will. It is not uncommon for the floor to stand still because of the restoring force and restoring movement With a certain elasticity of the sealing compound, there is no longer a cavity available. Ramming and pressing out at the same time requires special equipment. These procedures can only be used on one side for sealing tasks.

Das hier beschriebene Verfahren dagegen läßt den Einsatz üblicher Rammverfahren oder Einbringungsverfahrenzu, die Verwendung von üblichen Rammeräten; die sichere Abd2c.htung im geschützten Hohlraum ist gewährleistet, mehrere, im Einzelfall besonders geeignete kostensparende Materialien zur Auswahl können eingesetz@ werden, das Rammgewicht und die Rammas;sen sind hering.The procedure described here, on the other hand, leaves its use more usual Ramming or driving methods, the use of conventional ramming equipment; The secure closure in the protected cavity is guaranteed, several in individual cases particularly suitable cost-saving materials to choose from used, the ram weight and rams are pegs.

Auf der einen Seite wird die Zuverlässigkeit der Abdichtung des Untergrundes erhöht bzw. erst sichergestellt, auf der anderen Seite werden die Abdichtungskosten bis um menr als die Hälfte vermindert.On the one hand, there is the reliability of the waterproofing of the subsoil increased or only ensured, on the other hand, the sealing costs are increased reduced by more than half.

Das Neuartige, den technischen Stand durchbrechende Untergrund- Schmalwand- Verfahren beruht auf einer besonderen Koordination verschiedener Technologien.The new, the technical state-of-the-art underground narrow wall Procedure is based on a special coordination of different technologies.

Das Verfahren ist in den beiliegenden Blättern - Fig. 1 bis Fig. 22 systematisch dargestellt.The procedure is in the accompanying sheets - Figures 1 through 22 systematically presented.

Fig. 1 zeigt im Querschnitt (Grundriß) die Hohlbohle in der Achsenfolge in der Arbeitsrichtung.Fig. 1 shows in cross section (plan) the hollow plank in the axis sequence in the working direction.

Fig. 2 zeigt den Querschnitt einer einwandigen und doprelwandigen Hohlhöhe mit einliegendem Rammschwert als Hohlkörper.Fig. 2 shows the cross section of a single-walled and double-walled Cavity height with enclosed ram sword as a hollow body.

Fig. 3 zeigt einen Querschnitt einer Hohlhöhe mit einem sich überwölbenden Führungsende.Fig. 3 shows a cross section of a cavity with an arching Leader.

Fig. 4 zeigt im Querschnitt eine Hohlhöhe mit rechteckiger Form.Fig. 4 shows in cross section a cavity with a rectangular shape.

Fig. 5 zeigt im Querschnitt eine Hohlhöhe mit gewellter Wand.Fig. 5 shows in cross section a cavity with a corrugated wall.

Fig. 6 zeigt eine Bohlenfolge mit einliegendem Rammschwert und teilweise eingeführter Lamelle oder eines Streifens sowie mit Hinterfüllung.Fig. 6 shows a sequence of planks with an enclosed ram blade and partially introduced lamella or a strip as well as with backfilling.

Fig. 7 zeigt eine Bohlenfolge mit z.T. eingebrachtem Dichtungsmaterial wie Zementmörtel oder Tongemisch.Fig. 7 shows a sequence of planks with partially inserted sealing material like cement mortar or clay mixture.

Fig. 8 zeigt im Querschnitt die Doppelhöhe zur teleskopartigen stufenweise@ Einramman@.Fig. 8 shows in cross section the double height to the telescopic stepwise @ Einramman @.

Fig. 9 zeigt im Querschnitt eine Hohlhöhe mit einliegendem Rammschwert und eingebrachter Spül- oder Aufschwimmflüssigkeit.Fig. 9 shows in cross section a cavity with an inserted ram blade and introduced flushing or floating liquid.

Fig. 10 zeigt im Querschnitt eine Stahlblechlamelle oder Kunststoffstreifen mit schneckenartig eingebogenen Enden zur Verkoppelung.Fig. 10 shows a sheet steel lamella or plastic strip in cross section with snail-like bent ends for coupling.

Fig. 11 wie Fig. 10, jedoch in einer Anordnung ei Doppellage Fig. 12 wie Figur 10, jedoch-mit einem zweiten Verkoppelungselement.Fig. 11 like Fig. 10, but in an arrangement of a double layer Fig. 12 as in FIG. 10, but with a second coupling element.

Fig. 13 wie Fig.ll, jedoch mit einem zweiten Verkoppelung-selemen-t.Fig. 13 as Fig.ll, but with a second coupling-selemen-t.

Fig. 14 zeigt im Querschnitt eine Hohlihöhe mit gewölbter Form für eine breitere Schmalwand verzugsweise zur Auspressung von verbleibenden Kies-Sandgemisch mit Zementflüssigkeit.14 shows in cross section a hollow height with a curved shape for a wider narrow wall is used to squeeze out the remaining gravel-sand mixture with cement liquid.

Fig. 15 wie Fig. 14,jedbch mit doppelwand#ger Bohle.Fig. 15 like Fig. 14, but with a double-walled plank.

Fig. 16 zeigt im Längsschnitt eine Hohlbohle mit einliegendem Rammschwert.16 shows a longitudinal section of a hollow pile with an inserted ram.

Fig. 17 zeigt im Längsschnitt eine Hohlbohle in gewölbter Form zur Auspressung sonst wie Figur 14 oder Figur 15.Fig. 17 shows in longitudinal section a hollow plank in a curved shape for Pressing out otherwise as in Figure 14 or Figure 15.

Fig. 18 zeigt im Querschnitt eine Scnmalwand mit abbindender Dichtungsmasse, Fig. 19 zeigt im Querschnitt eine Schmalwand aus Stahlblechlamelle oder Kunststoffstreifen.18 shows in cross section a narrow wall with setting sealant, 19 shows in cross section a narrow wall made of sheet steel lamellae or plastic strips.

Fig. 20 zeigt im Querschnitt eine Hohlbohle mit einliegendem Fiihrungskörper und mit Kunststoffstreifen.Fig. 20 shows in cross section a hollow pile with an enclosed guide body and with plastic strips.

Fig. 21 zeigt im Längsschnitt eine Hohlbohle mit einliegendem Rammschwert, verbunden mit Hohlraumabschlußblech.Fig. 21 shows a longitudinal section of a hollow pile with an inserted ram, connected with cavity end plate.

Fig. 22 zeigt im Längsschnitt das Einbetten der Lamelle das Nachschlagen der Hohlbohle.Fig. 22 shows in longitudinal section the embedding of the lamella and looking up the hollow plank.

Die gestellte Aufgabe ist wie folgt gelöst.The problem posed is solved as follows.

Eine Hohlbohle mit versr=-hieden :m9glicher Querschnittform (1, 18, 19, 22, 23, 28, 30, 38) wird eingerammt oder eingespült.A hollow pile with different heights: possible cross-sectional shape (1, 18, 19, 22, 23, 28, 30, 38) is rammed in or washed in.

Die hohlbohle ist entgegen der in Achse (2) fortschreitenden Arbeitsrichtung (3) offen. Die freinen Enden wie 17,26 berühren die Wand der jeweils vorher gerammten Bohle und sind mit Flanschen (13, 14, 15, 16, 25,39, 40,) zum Zwecke der sicheren Rammfuhrung ausgestattet. Die Führung kann auch durch @berwölbung der Wand (17, 18) erzielt werden.The hollow screed is opposite to the working direction advancing in axis (2) (3) open. The free ends such as 17.26 touch the wall of the previously rammed Bohle and are with flanges (13, 14, 15, 16, 25, 39, 40,) for the purpose equipped for safe ramming guidance. The tour can also be performed by arching the Wall (17, 18) can be achieved.

Das Übereinandergreifen des freien Ende mit der Front der vor@er gerammten Bohle schafft ein geschützten@ Raum zum Verkoppeln (21) der Stahlblechlamellen (20)oder Kunststoffstreifen, die Abdichtungsfunktion tragen.The overlapping of the free end with the front of the front @ he rammed Bohle creates a protected space for coupling (21) the sheet steel lamellas (20) or Plastic strips that have a sealing function.

Das Rammschwert ( (9) schafft den Hohlraum (36); nach dem Entfernen werden die Abdichtungsmasse (42) oder die Streifen und Lamellen (20) eingeführt. Als Hohlkörper schwimmt (54) er bei Einleitung von Wasser (8) auf. Er besit-zt eine Rammscheide (46).The ram (9) creates the cavity (36); after removal the sealing compound (42) or the strips and lamellas (20) are introduced. As a hollow body (54) it floats when water (8) is introduced. He owns one Ram sheath (46).

Die Hohlbohle- erhält ebenfalls eine Rammschneide. Der Längs schnitt der Hohlbohle kann sich in der Rammrichtung zur Verminderung der Rammwiderstände erweitern (49, 5o) Die Rammkräfte (45) können von dem geschlagenen Rammschwert über Druckteile (47, 48) oder das Hohlraumabschlußblech (55) auf die Holbohle übertragen werden.The hollow pile also receives a ram cutter. The longitudinal cut the hollow pile can move in the direction of driving to reduce the driving resistance expand (49, 5o) The ramming forces (45) can be transferred from the hammered ram blade Transfer pressure parts (47, 48) or the cavity closure plate (55) to the wooden plank will.

Die Flüssigkeit (8, 42) kann über den Hohlraum (6) einer doppelwandigen , durchlöcherten, versteiften (5) Bohle, oder über eine Einspülbohle (Rohr) (43,56) zugeführt (7) werden. (Gleitflüssigkeiten, vermindern die Rammwiderstandes Die Hohlbohle kann auch eingespült werden; dann kann der Hohlraum unmittelbar abgedichtet werden.The liquid (8, 42) can be double-walled via the cavity (6) , perforated, stiffened (5) screed, or via a flushing screed (pipe) (43,56) fed (7). (Sliding fluids, reduce the ramming resistance can also be washed in; then the cavity can be sealed immediately.

Ein Führungskörper (52) versteift die dünnwandigen Lamellen oder Streifen (20) und erleichtert das Verkoppeln (21).A guide body (52) stiffens the thin-walled lamellae or strips (20) and makes coupling easier (21).

Die Hohlbohle dient auch als Schalung, wenn das Boden material (41) wie Kiessand im Hohlraum verbleibt und mit Verfergtigungsflüssigkeiten (8, 42) z. B. Zement oder sonstigen Chemikalien über (5ffnungen der doppelwandigen Bohle oder Einspüllanzen (43) ausgepresst wird, um eine Betonwand zu erhalten.The hollow pile also serves as formwork if the soil material (41) such as gravel sand remains in the cavity and with Verfergtigungsverbindungen (8, 42) z. B. cement or other chemicals over (5 openings of the double-walled screed or Einspüllanzen (43) is pressed out to obtain a concrete wall.

Das fertige Bauelement ist eine zusammenhängende, dichte entweder massive Schmalwand (5) oder elastische schürze (20) aus Stahl oder Kunststoff wie PE oder PV oder GFK, wobei die Scnürze mit geeignet Boden wie Sand oder Schluff mechanisch oder hydraulischlinterfüllt (51) wird.The finished component is a coherent, dense one either solid narrow wall (5) or elastic skirt (20) made of steel or plastic such as PE or PV or GRP, where the apron with suitable soil like sand or silt is mechanically or hydraulically linter-filled (51).

Das dargestellte Verkoppelungsende wird schneckenartig (21) eingerollt, vorzugsweise an beiden Enden in gleicher Richtung. Die Dichtheit wird durch eine zweite# Schnecke erhöht. Die Enden (21) werdendann beim Einführen verkoppelt.The coupling end shown is rolled up like a helix (21), preferably at both ends in the same direction. The tightness is achieved by a second # snail increased. The ends (21) are then coupled on insertion.

Die lamellen oder Streifen (20) können damit auch zweilagig eingebracht werden.The lamellae or strips (20) can thus also be introduced in two layers will.

Die Lamellen oder Streifen (20) erhalt@n an der Hohlraum frontspitze (59) den ersten Halt dadurch, daß nach dem Ausfahren des Rammschwertes die Hohlbohle nachgeschlagen (58) wird und damit Boden aus dem Seilbereich zur Lamelle (Streifen) hinbewegt (57) wird.The lamellae or strips (20) get @ n at the cavity front tip (59) the first stop in that, after the ram blade has been extended, the hollow pile is looked up (58) and thus soil from the rope area to the lamella (strip) is moved towards (57).

Claims (17)

PatentansprücheClaims 1. Untergrund- Schmalwand- Verfahren, dadurch gekennzeichnet, daß längliche, entgegen der Arbeitsrichtung offene Stahlhohlbohlen in den abzuschließenden Untergrund eingeschlagen, eingerüttelt oder eingespült werden und im Hohlraum zwischen Bohlenir-nden die abdichtende Schürze aus Stahlblechlamellen mit sich gegenseitig verbindenden Enden, aus Kunststoffstreifen mit dicht sich koppelnden Enden geschützt vor dem Boden eingeführt werden, wobei zum druckschlüssigen Hinterfüllen der Stahlblech- oder Kunststoffstreifenschürze die Hohlbohle gezogen wird.1. Underground narrow wall method, characterized in that elongated hollow steel piles open against the working direction in the to be locked The substrate can be hammered in, shaken in or washed in and in the cavity between The planks enclose the sealing apron made of sheet steel lamellas with each other connecting ends, protected from plastic strips with tightly coupling ends be introduced in front of the floor, whereby for pressure-locking backfilling of the sheet steel or plastic strip apron the hollow pile is pulled. 2. Wie Anspruch 1, jedoch, daß im Hohlraum zwischen den Bohlenwänden eine flüßig, breiige abbindende Dichtungsmasse eingebracht wird und die Bohlen vor dem Abbinden unter Verdichtung der Nasse gezogen werden. 2. As in claim 1, but that in the cavity between the plank walls a liquid, pasty setting sealant is introduced and the planks in front the setting with compaction of the wet be pulled. 3. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Hohlbohle mit einem im Hohlraum befindlichen Rammschwert zusammen-gerammt wird, wobei das Schwert eine Rammspitze erhält, die vorzugsweise über die Rammbohle greift. 3. As in claim 1, but characterized in that the hollow pile is rammed together with a ram blade located in the cavity, whereby the Sword receives a ram point, which preferably grips over the ram pile. 4. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß das Rammschwert über ein Hohlraumabschlußblech oder ein Drucklager den Rammdruck in die Hohlbohle leitet. 4. As in claim 1, but characterized in that the ram sword The ramming pressure is applied to the hollow pile via a cavity cover plate or a thrust bearing directs. 5. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Hohlbohle als Doppelbohle ausgebildet ist, wobei die Außenbohle im oberen Bereich des abzuschließenden Untergrundes gerammt wird und aus deren Hohlraum in weiterer Tiefe eine in der äußeren Bohle liegenden, geführten inneren Bohle teleskopartig geschlagen wird. 5. As in claim 1, but characterized in that the hollow pile is designed as a double pile, the outer pile in the upper area of the to be completed Underground is rammed and from its cavity in a further depth one in the outer Screed lying, guided inner screed is struck telescopically. 6 Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Hohlbohlen ohne Rammschwert (9) gerammt werden und der im Hohlraum verbleibende Boden wie entweder grober Sand oder Kies mit Zementflüssigkeit (42) verpreßt wird, wo eine Einspüllanze (43) eingeführt wird oder im Hohlraum (6) eine zweiwandige Bohle verwendet wird, oder ferner Sand und Schluff mit Geel-Flüssigkeit verpreßt wird. 6 As in claim 1, but characterized in that the hollow piles be rammed without a ram (9) and the soil remaining in the cavity as either coarse sand or gravel is pressed with cement liquid (42), where a flushing lance (43) is introduced or a double-walled one in the cavity (6) Bohle is used, or sand and silt are grouted with Geel liquid will. 7. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die ohlbohlen ohne Rammschwert (9) eingespült werden, wobei das Spülwasser unter Druck über den Hohlraum einer doppelwandigen Bohle oder über eine Einspüllanze eingeführt wird, und der Boden aus dem Hohlraum der Hohlboh le ausgespült wird, sowie im Hohlraum die abdichtende, sich verfestigende Masse wie Zement - Ton -Gemisch oder Zementmörtel eingebracht wird bzw. die Stahlblechlamellen und Kuns-tsto-ffstreifen verkoppelnd einfahren werden.7. As in claim 1, but characterized in that the planks be flushed in without ram (9), the flushing water under pressure over the The cavity of a double-walled plank or a filling lance is introduced, and the soil is flushed out of the cavity of the Hohlboh le, as well as in the cavity the sealing, solidifying mass such as cement-clay mixture or cement mortar is introduced or the sheet steel lamellas and plastic strips are coupled will be retracted. 8. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß im durch Spülen oder Rammen des Rammschwertes geschaffenen Hohlraum unter dem Schutz der Hohlbohle die Stahlblechlamellen oder die Kunststoffstreifen sich koppelnd in der Weise eingeführt werden, daß im Fühil:tngskörper verwendet wird, der die Stahlblecklamellen oder Kunststoffstreifen schützend und stabilisierend in den abzuschließenden IJntergrund bringt.8. As in claim 1, but characterized in that by rinsing or ramming the ram sword created cavity under the protection of the hollow pile the sheet steel lamellas or the plastic strips are introduced coupling one another in this way be that in the Fühil: tngskkör is used, which the sheet steel lamellae or Protective and stabilizing plastic strips in the underground to be locked brings. 9. Wie Anspruchl, jedoch dadurch gekennzeichnet, daß in den Hohlraum der Hohlbohle Wasser eingeleitet wird, welches das Rammschwert nach abschluß dr Rammens aufschwimmen läßt und damit den Hohlraum zum Einbringen des Abschließungselementes wie Stahlblechlamellen,Kunststoffstreifen, Unterwasser-Zementmörtel freigibt.9. Like Claiml, but characterized in that in the cavity the hollow pile water is introduced, which the ram sword after completion of dr Ram can float and thus the cavity for introducing the closure element such as sheet steel lamellas, plastic strips, underwater cement mortar releases. 10. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß das beim Einspülen freiwerdende Bodenmaterial wie Sand unmittelbar in den zur hinterfüllenden Raum zwischen eingeführter Stahlblechlamelle oder Kunststoffstreifen eingespült wird.10. As in claim 1, but characterized in that the flushing Freed soil material such as sand directly into the space to be backfilled is flushed in between inserted sheet steel lamellas or plastic strips. 11. tie Anspruch 1, jedoch dadurch gekennzeichnet, daf ber eine Zuführungsleitung (7) und entweder den Hohlraum eier do@pelwandigen Doppelbohle oder im Raum zwischen der nd der Honlbohle und dem Rammschwert (9) oder über eine Druckleitung (56) Gleitmittel, wie Wasser, Ton-Wassergemisch eingeleitet wird, wobei das Gleitmittel entweder aus Öffnungen in der Wand der doppelwandigcn Hohlbohle oder aus der Druckleitung an die unter Reibung stehenden Arbeitsflächen gelangt.11. tie to claim 1, but characterized in that there is a feed line (7) and either the cavity egg do @ pelwandigen double plank or in the space between the nd of the screed and the ram (9) or lubricant via a pressure line (56), like water, clay-water mixture is introduced, with the lubricant either off Openings in the wall of the double-walled hollow pile or from the pressure pipe the work surfaces that are subject to friction. 12. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Hohlbohle im Querschnitt mit einer oder mehreren Wellen versehen wird.12. As in claim 1, but characterized in that the hollow pile is provided with one or more waves in cross section. 13. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Hohlbohle entgegen der Arbeitsrichtung (3) soweit offen ist, daß die gewölbte Spitze im Querschnitt der Hohlbohle um ein Naß in den Hohlraum der später gerammten Bohle reicht, das ausreicht, um die dichte Koppelung der Stahlblechlamelle oder Kunststoffstreifen in ihren entsprechend geformten Enden unter dem Druckschutz der später gerammten und zu ziehenden Hohlbohle sichern zu können.13. As in claim 1, but characterized in that the hollow pile against the working direction (3) is open so far that the curved tip in cross section the hollow pile reaches around a wet into the cavity of the later rammed pile that sufficient to ensure the tight coupling of the sheet steel lamella or plastic strips in their correspondingly shaped ends under the pressure protection of the later rammed and to be able to secure the hollow plank to be drawn. 14. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß der Rammführungsschluß durch Führungsflansche an den Wänden der Hohlbohle geschaffen wird, wobei die Führungsflansche der vorher gerammten Hohlbohle in Führungsnuten der später zu rammenden Hohlbohle eingreift-.14. As in claim 1, but characterized in that the ram guide closure is created by guide flanges on the walls of the hollow pile, the guide flanges the previously rammed hollow pile in guide grooves of the hollow pile to be driven later intervenes-. 15. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß der Querschnitt der Hohlbohle im Aufriß in Richtung der Rammkraft verbreitert wird, bzw. in Richtung der Rammaufschlagstelle verjüngt wird.15. As in claim 1, but characterized in that the cross section the hollow pile is widened in elevation in the direction of the driving force, or in the direction the ram impact point is tapered. 16. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß die Stahlblechlamelle ein Koppelungselement mit Längsachse in Richtung der Rammkraft angebogen oder angeschweißt wird, welches schneckenartig eingebogen ist und an beiden Enden der Lamelle oder des Streifens jeweils in eine Richtung aus def Ebene der Lamellen oder Streifenfläche abrückt.16. As in claim 1, but characterized in that the sheet steel lamella a coupling element with a longitudinal axis bent or welded in the direction of the ramming force is, which is inflected like a helix and at both ends of the lamella or of the strip each in one direction from the plane of the lamellae or strip surface moves away. 17. Wie Anspruch 1, jedoch dadurch gekennzeichnet, daß in einem geeigneten Abstand am Ende einer Lamelle oder Streifens ein zweites schneckenartig gebogenes Koppelungselement anesc hwcißt oder angeklebt wird.17. As in claim 1, but characterized in that in a suitable Distance at the end of a lamella or strip is a second curved spiral Coupling element is welded or glued on. L e e r s e i t eL e r s e i t e
DE19742456886 1974-12-02 1974-12-02 Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground Pending DE2456886A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19742456886 DE2456886A1 (en) 1974-12-02 1974-12-02 Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19742456886 DE2456886A1 (en) 1974-12-02 1974-12-02 Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground

Publications (1)

Publication Number Publication Date
DE2456886A1 true DE2456886A1 (en) 1976-08-12

Family

ID=5932259

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19742456886 Pending DE2456886A1 (en) 1974-12-02 1974-12-02 Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground

Country Status (1)

Country Link
DE (1) DE2456886A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0135584A1 (en) * 1983-02-22 1985-04-03 Finic Bv Environmental cut-off for deep excavations.
DE3542313A1 (en) * 1984-12-06 1986-06-19 Funderingstechnieken Verstraeten B.V., Oostburg Method and apparatus for forming a sealing wall in the ground
DE4303742C1 (en) * 1993-02-09 1994-08-04 Keller Grundbau Gmbh Dewatering ground with high water content

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0135584A1 (en) * 1983-02-22 1985-04-03 Finic Bv Environmental cut-off for deep excavations.
EP0135584A4 (en) * 1983-02-22 1986-11-26 Finic Bv Environmental cut-off for deep excavations.
DE3542313A1 (en) * 1984-12-06 1986-06-19 Funderingstechnieken Verstraeten B.V., Oostburg Method and apparatus for forming a sealing wall in the ground
DE4303742C1 (en) * 1993-02-09 1994-08-04 Keller Grundbau Gmbh Dewatering ground with high water content

Similar Documents

Publication Publication Date Title
DE69000562T2 (en) METHOD AND DEVICE FOR DETACHING A SEAL ADHESIVE TO THE CONCRETE OF A WALL SECTION IN THE GROUND.
DE2250369C3 (en) Tunnel lining
DE2751972A1 (en) METHOD OF MANUFACTURING REINFORCED UNDERGROUND BUILDING PANEL
DE2545572B2 (en) Foundation in subsoil susceptible to subsidence, especially for a dam
EP1134319B1 (en) Method and apparatus for obtaining a cast in situ concrete pile
DE68912648T2 (en) Construction method.
DE2456886A1 (en) Narrow wall under ground system - has hollow steel battens with interconnecting plastic strips driven into ground
DE952787C (en) Process for the production of a dike from lowerable concrete floating boxes
DE3914736C2 (en)
AT330677B (en) METHOD FOR MANUFACTURING UNDERGROUND WALLS MANUFACTURED BY THE DIAPHRAGM METHOD, AND THE FINISHED PART AND DAM PART FOR PERFORMING THE METHOD
EP0190409B1 (en) Underground walls with impermeable sheets
DE2543997C2 (en) Method for pressing a particularly tubular structure into an earth dam or the like.
DE871426C (en) Method and device for the production of sheet pile walls made of reinforced concrete or the like.
DE4126408C2 (en) Method and device for producing a sealing wall and sealing wall suitable therefor
DE609238C (en) Method for producing a sufficiently watertight construction pit enclosure within the soil surrounding the pit
DE1634431A1 (en) Procedure for restoring the load-bearing capacity of foundation bodies that have become damaged
DE806117C (en) Schalkoerper for construction pits, especially for those for laying cables, pipes and. like
DE3727752A1 (en) Method of constructing a retaining wall
DE2459691C3 (en) Heaped earth dam as well as process for the production of the core seal
DE953689C (en) Reinforced concrete sheet pile
AT263845B (en) Method of excavating an underground cavity, e.g. to accommodate a traffic structure to be built later
DE2410575A1 (en) Mast foundation for transmission line pylons - shaft has cov, base and openings through which compression substance is injected
DE4032646A1 (en) Prevention of seepage from refuse dump - by digging narrow trench around dump and filling it with sealing compound
AT393286B (en) TOOL FOR MAKING SLOT WALLS
CH347788A (en) Ramming bodies, in particular for foundations of buildings

Legal Events

Date Code Title Description
OHJ Non-payment of the annual fee