DE2444773A1 - Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, pallets - Google Patents

Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, pallets

Info

Publication number
DE2444773A1
DE2444773A1 DE19742444773 DE2444773A DE2444773A1 DE 2444773 A1 DE2444773 A1 DE 2444773A1 DE 19742444773 DE19742444773 DE 19742444773 DE 2444773 A DE2444773 A DE 2444773A DE 2444773 A1 DE2444773 A1 DE 2444773A1
Authority
DE
Germany
Prior art keywords
tower crane
ring plate
rotatable
production
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19742444773
Other languages
German (de)
Other versions
DE2444773C2 (en
Inventor
Benedikt Christa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Praeton Haus & Co Fertigb GmbH
Original Assignee
Praeton Haus & Co Fertigb GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Praeton Haus & Co Fertigb GmbH filed Critical Praeton Haus & Co Fertigb GmbH
Priority to DE19742444773 priority Critical patent/DE2444773C2/en
Publication of DE2444773A1 publication Critical patent/DE2444773A1/en
Application granted granted Critical
Publication of DE2444773C2 publication Critical patent/DE2444773C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

A concrete casting installation designed for continuous stepped operation, is circular in plan view, with a tower crane (T) in the centre with its boom extending horizontally overhead, and with the working positions arranged concentrically around the mast of the crane. An inner ring (1) is formed by stacks of prefabricated ports to be inserted, a second ring (2) has stacks of reinforcing grids, and the work stations (3) are in the next circle, with radiating guttering channels terminating in a collector channel and washing trough. The concrete distributor (11) can then be conveyed from position to position around the circle. Covering plates are stacked around the next ring (8), followed by containers or pallets (9) and the concrete mixer is located at a position beyond this circle.

Description

Vorrichtung zum Herstellen von Betonfertigteilen Die Erfindung betrifft eine Vorrichtung zum Hersteten von Betonfertigteilen nach dem Taktverfahren unter Verwendung aufeinanderfolgender Montagestationen auf Fertigungstischen. Apparatus for producing precast concrete parts The invention relates to a device for the production of precast concrete parts according to the clock process below Use of successive assembly stations on production tables.

Bei bekannten Vorrichtungen sind die Nbntagestationen und eine Härtungsstation hintereinander in einer Reihe angeordnet. Des führt zu dem Nachteil, daß die Gesanltanlage, welche üblicherweise als Hallenkonstruktion aBsgebildet ist, einen erheblichen Platzbedarf aufweist. Die vom Arbeitspersonal ZU-rückzulegenden Wege sind erheblich. Ein weiterer Nachteil ist darin zu sehen, daß die Lagerstellen für die fertigen Betonteile außerhalb der Halle einen erheblichen zusätzlichen Platz benötigen, woei üblicherweise aus Platzgründen die Lagerstellen außerhalb der alle parallel zu dieser angeordnet werden. Innerhalb der Halle muß ein Fahrkran zum Transport der Hilfsmittel und der Ilaibfertigfabrikate vorgesehen werden. Ein weiterer Transportkran ist außerhaib der llalle fjjr den Tratlsport der fertigen Betonteile erforderlich. Zum Transport der Fertigungstische von Station zu Station werden die von Rollen getragenen Tische an eine Transportkette angehängt welche taktmäßig bewegt wird.In known devices, the processing stations and a hardening station are arranged one behind the other in a row. This leads to the disadvantage that the sanitary facility, which is usually shown as a hall construction, a considerable Space requirement having. The distances to be covered by the workforce are considerable. Another The disadvantage is that the bearings for the finished concrete parts are outside the hall require a considerable amount of additional space, which is usually the case To save space, the storage locations outside of which are all arranged parallel to this. A traveling crane has to be used inside the hall to transport the tools and the finished Ilaib products are provided. Another transport crane is outside the all fjjr den Tratlsport the finished concrete parts required. For transporting the production tables From station to station, the tables, carried by rollers, are attached to a transport chain appended which is moved clockwise.

Durch den aufwendigen Aufbau und den erheblichen Platzbedarf sind diese Anlagen sehr teuer. Durch die langen Wege ist eine rationelle Fertigung nur bedingt möglich.Due to the complex structure and the considerable space required are these systems are very expensive. Due to the long distances, an efficient production is only possible conditionally possible.

Diese Nachteile versuchte man zum Teil dadurch zu beseitigen, daß man die Montagestation parallel zur Härtungsstation anordnete. Hierdurch wird die Gesamtlänge der Anlage vermindert, jedoch entstehen Transportprobleme für die Fertigungstische.These disadvantages were attempted in part to eliminate that the assembly station was arranged parallel to the curing station. This will make the Overall length of the system reduced, but transport problems arise for the production tables.

Diese müssen bei der Übergabe von der letzten Montagestation zur Härtungsstation zweimal rechtwinklig umgelenkt werden. Dabei kann es zusätzlich erforderlich sein, die Fertigungstische auf ein anderes Niveau anzuheben.These must be transferred from the last assembly station to the hardening station be deflected twice at right angles. It may also be necessary to to raise the production tables to another level.

Es besteht daher die Aufgabe, eine Vorrichtung zum Herstellen von Betonfertigteilen so au-szubilden, daß sie kostengünstig erstellt werden kann, einen minimalen Platz beansprucht, einen optimalen Materialfluß ermöglicht und eine rationelle Fertigung sicherstellt.There is therefore the object of a device for producing Precast concrete parts so au-szubilden that they can be created inexpensively, a takes up minimal space, enables an optimal material flow and an efficient one Manufacturing ensures.

Diese Aufgabe wird durch die in Anspruch l beschriebene Erfindung gelöst. Vorteilhafte Ausführungsformen und Weiterbildungen sind in den Unteransprüchen beschrieben.This object is achieved by the invention described in claim l solved. Advantageous embodiments and developments are in the subclaims described.

Die Erfindung wird im folgenden anhand von Ausführungsbeispielen mit Bezug auf die Zeichnung näher erläutert; es zeigen Fig. l eine schematische Draufsicht auf eine erste Ausführungsform der Erfindung; Fig. 2 einen Schnitt durch Fig. 1, gesehen aus der Richtung des Pfeiles B in Fig. 1; Fig. 3 einen Schnitt durch Fig. 1, gesehen aus der Richtung des Pfeiles A in Fig. 1; Fig. 4 eine Draufsicht auf eine weitere Ausfiihrungsform der Erfindung; Fig. 5 einen Schnitt durch Fig. 4, gesehen aus der Richtung des Pfeiles fl in Fig. 4; Fig. 6 einen Schnitt durch Fig. 4, gesehen aus der Richtung des Pfeiles A in Fig. 4.The invention is illustrated below with the aid of exemplary embodiments Referring to the drawing explained in more detail; FIG. 1 shows a schematic plan view to a first embodiment of the invention; FIG. 2 shows a section through FIG. 1, viewed from the direction of arrow B in Fig. 1; 3 shows a section through FIG. 1, viewed from the direction of arrow A in Fig. 1; Fig. 4 is a plan view of a further embodiment of the invention; Fig. 5 is a section through Fig. 4, seen from the direction of the arrow fl in Fig. 4; 6 shows a section through FIG. 4, viewed from the direction of arrow A in FIG. 4.

Die Figuren l bis 3 zeigen schematisch eine erste Ausführui'gsform der Erfindung in Draufsicht und in Schnittdarstellungen.Figures 1 to 3 show schematically a first embodiment of the invention in plan view and in sectional views.

Die gesamte Vorrichtung ist auf mehrere konzentrische preise oder Ringe aufgeteilt. Im Zentrum steht der Turmdrehkran T. Sein Ausleger erreicht die gesamte dargestellte Anordnung. Der Turmdrehkran T übernimmt - abgesehen von der noch zu den portalkranartig ausgebildeten Betonmaschine -alle Transportaufgaben, insbesondere in radialer Richtung.The entire device is on several concentric prices or Split rings. In the center is the tower crane T. Its jib reaches the entire arrangement shown. The tower crane T takes over - apart from the still to the gantry crane-like concrete machine - all transport tasks, especially in the radial direction.

In einem ersten1 engsten Kreis um den Turmdrehkran T sind Stellwände l für vorgefertigte Teile, die in die Betonfertigteile einzubauen sind, angeo,ret.In a first1 narrowest circle around the tower crane T there are partition walls l for prefabricated parts that are to be built into the precast concrete parts, angeo, ret.

Je nach Bedarf könne diese St e llwände sich üher einen größeren oder kleineren Teil des Kreisumfangs erstrecken.Depending on requirements, these walls can be larger or larger extend the smaller part of the circumference.

In einem zweiten, zentrumsferneren Ring befinden sich Stelwände 2 für Baustahlgewebe, das in die Betonfertigteile eingebracht werden soll. Weitere Ringe zur Vorratshaltung von einzubauenden Teilen können nach Bedarf vorgesehen sein.In a second ring, further away from the center, there are stilt walls 2 for structural steel mesh that is to be incorporated into the precast concrete elements. Further Rings for storing parts to be installed can be provided as required be.

Es schließt sich ein weiterer Kreis mit den eigentlichen Fertigungstischen 3 an. An den Tischen 3 können offene oder verdeckte Rinnen 12 vorgesehen sein.Another circle closes with the actual production tables 3 at. Open or covered channels 12 can be provided on the tables 3.

Durch sie und über den Ringkanal 13 kann das bei der Herstellung von Waschbetonplatten anfallende Abwasser zur Waschgrube 4 abgeleitet werden. This can be done through them and through the annular channel 13 during manufacture Waste water accumulating from exposed aggregate concrete slabs can be diverted to the washing pit 4.

Der Ring der Montagetische 3 wird von der portalicranartig ausgebildeten Betoermaschipe 11 überspreizt. Sie ist auf der Kranbahnschiene 5 verfahrbar.The ring of the assembly tables 3 is designed like a portalic crane Betoermaschipe 11 overstretched. It can be moved on the crane runway rail 5.

Um den Kreis der Montagetische 3 befindet sich konzentrisch ein Lagerplatzring zur Stapelung der fertigen Produkte. Wandelemente werden senkrecht in einen umlaufenden Rechen 7 eingestellt; Deckenplatten 8 werden wahlweise auch waagerecht gestapelt.A storage bin ring is concentrically located around the circle of the assembly tables 3 for stacking the finished products. Wall elements are vertically in a circumferential Rake 7 set; Ceiling panels 8 are optionally also stacked horizontally.

Die Fertigprodukte werden dann weiter radial nach außen in bereitstehende Container 9 oder auf Paletten 9 verladen. Am äußersten Bereich der kreisflächigen Fertigungsvorrichtung befindet sich die Betoischmaschine 10.The finished products are then available further radially outwards Container 9 or loaded onto pallets 9. At the outermost area of the circular The production device is the concrete mixing machine 10.

Zum Schutz vor Witterungseinfliissen ist ein Dach 15 vorgesehen. Damit der ganze Arbeitsbereich vom Turmdrehkran T erreichbar ist, läßt sich das Dach 15, das mit einem segmentartigen Ausschnitt versehen ist, verdrehen. Der segmentartige Ausschnitt ist in Abbildung 1 gestrichelt angedeutet. Er wird außerhalb der Betriebszeit unter ein (nicht dargestelltes) feststehendes Dachteil eingedre11t. Dieses feststehende Dachteil befindet sich direkt gegeniiber der Betonmischmaschine 10. Es ist so groß, daB es den beweglichen, segmentartigen Ausschnitt im Dach 15 voll abdeckt.A roof 15 is provided for protection against the effects of the weather. In order to the entire working area can be reached by the tower crane T, the roof 15, which is provided with a segment-like cutout, twist. The segment-like The section is indicated by dashed lines in Figure 1. He will be out of hours screwed under a (not shown) fixed roof part. This fixed Roof part is directly opposite the concrete mixer 10. It is so big that it completely covers the movable, segment-like cutout in the roof 15.

Da der Bereich unter dem fest stehenden Dachteil dem Turmdrehkran T nicht zugänglich is-t, wird hier die Waschgrube 11 angeordnet. Sie dient unter anderem dazu, alle Geräte, insbesondere auch die Betoniermaschine, nach Arbeitsende zu säubern.Because the area under the fixed roof section is the tower crane T is not accessible, the washing pit 11 is arranged here. She serves under among other things, all devices, especially the concreting machine, after the end of work to clean up.

Der überdachte Raum ist nach außen durch die Wand 6, dem Turmdrehkran T zu durch die Wand 17 abgeschlossen.The covered space is to the outside through the wall 6, the tower crane T closed by the wall 17.

Im Betrieb geht das Arbeitspersonal im Kreis von Tisch 3 zu Tisch 3. Einzubauende Teile werden radial nach außen geholt und auf dem jeweils bearbeiteten Tisch 3 montiert. Die Betoniermaschine 10 und der segmentartige Ausschnitt des Daches werden entsprechend mitgeführt.In operation, the workforce goes in a circle from table 3 to table 3. Parts to be installed are brought out radially and placed on the machined Table 3 assembled. The concreting machine 10 and the segment-like section of the roof are carried accordingly.

Die abgebundenen Betonfertigteile werden von den Tischen abgehoben und weiter nach außen an ihre Stapelplätze gebracht und von dort aus verladen.The set precast concrete elements are lifted from the tables and brought further outside to their stacking areas and loaded from there.

In der schematischen Figur 2 befindet sich die Betoniermaschine gerade über einen Fertigungstisch 3, in der schematischen Figur 3 über der Waschgrube 4.In the schematic Figure 2, the concreting machine is currently via a production table 3, in the schematic FIG. 3 above the washing pit 4.

Ein weiteres Ausfiihrungsbeispiel der Erfindung ist in den Figuren 4 bis 6 dargestellt. Es ist für manche Anwendungsbereiche besser geeignet. Im Aufriß (Fig. 4) erkennt man wieder die konzentrische Anordnung der Lager von Vorfertigteilen 1 und Baustahlgewebe 2, Montage tischen 3 und Stapelplätze bzw. Container 9 für die Fertigprodukte. Im Zentrum steht der Turmdrehkran T, der den ganzen Bereich der Vorrichtung bis zur peripher angeordneten Betonmischmaschine 10 überstreicht.Another exemplary embodiment of the invention is shown in the figures 4 to 6 shown. It is more suitable for some areas of application. In elevation (Fig. 4) one recognizes again the concentric arrangement of the bearings of prefabricated parts 1 and structural steel mesh 2, assembly tables 3 and stacking areas or containers 9 for the finished products. In the center is the tower crane T, which covers the whole area the device up to the peripherally arranged concrete mixer 10 sweeps over.

Der Hauptunterschied dieser Ausführungsform gegenüber der Ausführungsform nach den Figuren l bis 3 besteht darin, daß die einzelnen Fertigungstische 3 auf einem drehbaren Ringteller 17 angeordnet sind.The main difference of this embodiment from the embodiment according to Figures l to 3 is that the individual production tables 3 on a rotatable ring plate 17 are arranged.

Die Tische 3 drehen sich mit konstanter Geschwindigkeit im Kreise oder bewegen sich taktweise vorwärts. Dadurch wird es möglich, daß räumlich an derselben Station immer derselbe Arbeitsschritt ausgeführt wird. Das Arbeitspersonal braucht nicht selbst von Tisch zu Tisch im Kreise zu gehen. Die Lager l, 2 der Vorfertigteile brauchen nicht gleichmäßig über den Umfang verteilt zu sein.The tables 3 rotate in circles at a constant speed or move forward in steps. This makes it possible that spatially at the same Station the same work step is always carried out. The workforce needs not going in circles from table to table yourself. the Warehouse l, 2 of the prefabricated parts do not need to be evenly distributed over the circumference.

Der Ringteller 17 ist l bis 2 Meter unter Geländeniveau auf Rollen ge]agert. Über einen gewissen Winkelbereich hinweg verläuft er in einem Tunnel 18, der als Härtungsstation ausgebildet ist. Die ebenerdige Oberseite 19 des Härtungstunneis kann als Fertigteillager 20 genutzt werden.The ring plate 17 is 1 to 2 meters below ground level on rollers ge] agert. Over a certain angular range it runs in a tunnel 18, which is designed as a hardening station. The level top 19 of the hardening tunnel can be used as a finished parts store 20.

Die ersten beiden Stationen nach Austritt des Ringgestells 17 aus dem Härtungstunnel befinden sich im Freien. Hier erfolgt das Ausschalen und Abheben der Betonfertigteile. Danach folgen elf weitere Stationen, die von einem Ringdach 2l geschützt sind. Unter dem Ringdach 21 kann wieder ein portalkranartiger Hebezug verlaufen, der hier die Transportaufgaben übernimmt. Die verschiedenen Arbeitsschritte können an den einzelnen Stationen beispielsweise wie folgt ausgeführt werden: An der dritten Station nach Austritt aus dem Härtungstunnel 18 wird eingeschalt, an der, Vierten Station eingeölt. An der fünften Station werden die Fenster- und Türaussparungen, an der sechsten Station die Bewehrung eingebracht. An der siebten Station werden Montageösen und InstaXlationsmaterial montiert. An der in Nähe der Betonmischmaschi ne iQ befindlichen achten Station wird betoniert und gerüttelt. Die neunte bis 13. Station dienen der Fertigstellung (versehen mit Isolationsmaterial, Glätten, Bewehren, Abkehren). An der 14. Station, also vor Eintritt in den Härtungstunnel i8, kann ein Abwaschen erfolgen. Zu diesem Zweck ist dort mindestens ein Kipptisch angeordnet. Dann wandern die Fertigungsteile 3 in den Härtungstunnel 18.The first two stations after the ring frame 17 exits the curing tunnel are in the open air. Stripping and lifting takes place here the precast concrete parts. This is followed by eleven more stations, which are covered by a ring roof 2l are protected. A gantry crane-like hoist can again under the ring roof 21 run, which takes on the transport tasks here. The different work steps can be carried out at the individual stations as follows, for example: An the third station after exiting the curing tunnel 18 is switched on the, fourth station oiled. At the fifth station, the window and door recesses, the reinforcement was installed at the sixth station. Be at the seventh station Mounting eyelets and installation material mounted. At the nearby concrete mixer The eighth station located next to the iQ will be concreted and shaken. The ninth to 13th stations are used for completion (provided with insulation material, Smoothing, reinforcing, sweeping). At the 14th station, i.e. before entering the hardening tunnel i8, washing off can be done. There is at least one tilting table there for this purpose arranged. The production parts 3 then migrate into the curing tunnel 18.

Vorteilhafterweise können in einer Ringzone direkt um den Turmdrehkran T Aufenthalts- und Magazinräu nie 22 yorgesehen sein. Mit einer Vorrichtung dieser Art können beispielsweise bei einer Taktzeit von 17,5 Mitten, bei einer 8-Stundenschicht und mit 13 Mann pro Schicht 24 Bauelemente mit einer Gesamtfläche von 240 qm hergestellt werden.Advantageously, in a ring zone directly around the tower crane Stay and storage rooms must never be seen. With a device this Art can, for example, with a cycle time of 17.5 mids, with an 8-hour shift and with 13 men per shift we produced 24 components with a total area of 240 square meters will.

AnsprücheExpectations

Claims (18)

Ansprüche 1. Vorrichtung zum Herstellen von Betonfert:igteien flach dem Taktverfahren unter Verwendung aufeinanderfolgender Montagestationen auf Fertigungstischen, dadurch g e k e n n z e i c h -n e t , daß die Lager (1 2) der einzubauenden Vorfertigteile, die Fertigungstische (3), die Lager (7, 8) der Fertigteile und die Verladungsstatic>nen in Containern und Paletten (9) in konzentrischen Ringen angeordnet sind, wobei im Mitteipunkt der konzentrischen Ringe ein Turmdrehkran (T) vorgesehen ist, der den gesamten Bereich der Vorrichtung überstreicht. Claims 1. Device for the production of Betonfert: igteien flat the cycle method using successive assembly stations on production tables, in that the bearings (1 2) of the prefabricated parts to be installed, the production tables (3), the bearings (7, 8) of the finished parts and the loading station are arranged in concentric rings in containers and pallets (9), with im Center point of the concentric rings a tower crane (T) is provided, which the sweeps over the entire area of the device. 2. Vorrichtung nach Anspruch l, dadurch g e -k e n n z e i c h n e t , daß die Fertigungstische (3) feststehend in gleichen Abständen über den entsprechenden Ring verteilt angeordnet sind. 2. Apparatus according to claim l, characterized in that g e -k e n n z e i c h n e t that the production tables (3) fixed at equal intervals over the corresponding Ring are arranged distributed. 3. Vorrichtung nach Anspruch 2, dadurch g e -k e n n z e i c h n e t , daß über den Fertigungs tischen (3) ein drehbares Dach (ins) vorgesehen ist, das einen segmentartigen Ausschnitt aufweist. 3. Apparatus according to claim 2, characterized in that g e -k e n n z e i c h n e t that a rotatable roof (ins) is provided over the production tables (3), which has a segment-like cutout. 4. Vorrichtung nach Anspruch 3, dadurch g e -k e n n z e i c h n e t , daß ein feststehendes Dachteil vorgesehen ist, das in einer Stellung des drehbaren Dachs (15) den segmentartigen Ausschnitt überdeckt.4. Apparatus according to claim 3, characterized in that g e -k e n n z e i c h n e t that a fixed roof part is provided, which is in a position of the rotatable Badger (15) covers the segment-like cutout. 5. Vorrichtung nach einem der Anspriiche 2 bis 4, dadurch g e k e n n z e i c h n e t , daß über den Fertigungstischen (3) eine portalkranartige, verfahrbare Betoniermaschine (10) vorgesehen ist.5. Device according to one of claims 2 to 4, thereby g e k e n n z e i c h n e t that a gantry crane-like, movable concreting machine (10) is provided. 6. Vorrichtung nach einem der Ansprüche 2 bis 5, dadurch g e k e n n z e i c h n e t , daß neben und zwischen den Fertigungstischen (3) offene oder verdeckte Rinnen (12) vorgesehen sind, die zu einem wasserableitenden Ringkanal (13) führen.6. Device according to one of claims 2 to 5, characterized g e k e n n z e i c h n e t that next to and between the production tables (3) open or concealed channels (12) are provided which lead to a water-draining ring channel (13) lead. 7. Vorrichtung nach Anspruch 4, dadurch g e -k e n n z e i c h n e t , daß das feststehende Dachteil gegenüber einer an der Peripherie der Vorrichtung befindlichen Betonmischmaschine (io) angeordnet ist.7. Apparatus according to claim 4, characterized in that g e -k e n n z e i c h n e t that the fixed roof part opposite one on the periphery of the device located concrete mixer (io) is arranged. 8. Vorrichtung nach Anspruch 4 oder 7, dadurch g e k e n n z e i c h n e t , daß unter dem feststehenden Dachteil eine Waschgrube (4) vorgesehen ist.8. Apparatus according to claim 4 or 7, characterized in that g e k e n n z e i c h n e t that a washing pit (4) is provided under the fixed roof part. 9. Vorrichtung nach Anspruch 1, dadurch g e -k e n n z e i c h n e t , daß die Fertigungstische (3) auf einem drehbaren Ringteller (17) angeordnet sind. 9. The device according to claim 1, characterized in that g e -k e n n z e i c h n e t that the production tables (3) are arranged on a rotatable ring plate (17) are. 10. Vorrichtung nach Anspruch 9, dadurch g e -k e rl n z e i c h n e t , daß der drehbare Ringteller (17) ein bis zwei Meter unter Geländelliveau angeordnet ist.10. The device according to claim 9, characterized in that g e -k e rl n z e i c h n e t that the rotatable ring plate (17) is arranged one to two meters below ground level is. 1 1. Vorrichtung nach Anspruch 10, dadurch g e -k e n n z e i c h n e t , daß der drehbare Ringteller (17) teilweise in einem als Härtungsstation ausgebildeten Tunnel (l8) verläuft.1 1. Apparatus according to claim 10, characterized in that g e -k e n n z e i c h n e t that the rotatable ring plate (17) is partially used as a hardening station trained tunnel (l8) runs. 12. Vorrichtung nach Anspruch ll,- dadurch g e -k e n n z e i c h n e t , daß die Oberseite (19) des Härtungstunnels (l8) ebenerdig ist und auf ihr ein Fertigteilelager (20) vorgesehen ist.12. The device according to claim ll, - thereby g e -k e n n z e i c h n e t that the top (19) of the hardening tunnel (l8) is at ground level and on her a precast parts store (20) is provided. 13. Vorrichtung nach einem der Ansprüche 9 bis 12, dadurch g e k e n n z e i c h n e t , daß der drehbare Ringteller (17) zumindest teilweise unter einem Ringdach (21) liegt.13. Device according to one of claims 9 to 12, characterized g e k e n n z e i c h n e t that the rotatable ring plate (17) at least partially under a ring roof (21). 14. Vorrichtung nach einem der Ansprüche 9 bis 13, dadurch g e k e n n z e i c h n e t , daß der drehbare Ringteller (17) zumindest teilweise von einem fahrbaren, portalkranartigen Hebezug überstrichen wird.14. Device according to one of claims 9 to 13, characterized g e k e n n z e i c h n e t that the rotatable ring plate (17) at least partially from a mobile, gantry crane-like hoist is painted over. 15. Vorrichtung nach einem der Ansprüche 9 bis 14, dadurch g e k e n n z e i c h n e t , daß in der Ringzone unmittelbar um den Turmdrehkran (T) Aufenthalts- und Magazinräume (22) vorgesehen sind.15. Device according to one of claims 9 to 14, characterized g e k e n n z e i n e t that in the ring zone directly around the tower crane (T) and magazine spaces (22) are provided. 16. Vorrichtung nach Anspruch 13, dadurch g e -k e n n z e i c h n e t , daß mindestens die zwei ersten Stationen nach Austritt aus dem ilärtungstunnel (18) unüberdacht sind.16. The device according to claim 13, characterized in that it is -k e n n z e i c h n e t that at least the first two stations after exiting the curing tunnel (18) are uncovered. 17. Vorrichtung nach Anspruch 13, dadurch g e -k e n n z e i c h n e t , daß mindestens die letzte Station vor Eintritt in den Härtungstunnel (18) unüberdacht ist.17. The device according to claim 13, characterized in that g e -k e n n z e i c h n e t that at least the last station before entering the hardening tunnel (18) is unthought. 18. Vorrichtung nach einem der Ansprüche 9 bis 17, dadurch g e k e n n z e i c h n e t , daß der drehbare Ringteller (17) auf Rollen gelagert ist.18. Device according to one of claims 9 to 17, characterized g e k e It is not stated that the rotatable ring plate (17) is mounted on rollers.
DE19742444773 1974-09-19 1974-09-19 Plant for the production of precast concrete parts Expired DE2444773C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19742444773 DE2444773C2 (en) 1974-09-19 1974-09-19 Plant for the production of precast concrete parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19742444773 DE2444773C2 (en) 1974-09-19 1974-09-19 Plant for the production of precast concrete parts

Publications (2)

Publication Number Publication Date
DE2444773A1 true DE2444773A1 (en) 1976-04-08
DE2444773C2 DE2444773C2 (en) 1985-09-12

Family

ID=5926196

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19742444773 Expired DE2444773C2 (en) 1974-09-19 1974-09-19 Plant for the production of precast concrete parts

Country Status (1)

Country Link
DE (1) DE2444773C2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4427164A1 (en) * 1994-08-01 1996-02-15 Christa Gmbh & Co Kg Plant for producing precast concrete articles
EP0735334A1 (en) * 1995-03-25 1996-10-02 Keller GmbH Installation for the production of bricks and/or of rooftiles
CN108262842A (en) * 2017-01-03 2018-07-10 蓝思科技(长沙)有限公司 Profiling is automatically positioned center of circle device and copying apparatus
CN111267206A (en) * 2020-01-21 2020-06-12 福建群峰机械有限公司 Wallboard steam curing production line equipment and steam curing production process thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1301751B (en) * 1966-05-11 1969-08-21 Heinrich Krog Bauunternehmung Plant and process for the production of concrete slabs
DE1808176A1 (en) * 1968-03-05 1969-12-04 Betonkombinat Rostock Veb Device for the production of concrete elements using the carousel principle

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1301751B (en) * 1966-05-11 1969-08-21 Heinrich Krog Bauunternehmung Plant and process for the production of concrete slabs
DE1808176A1 (en) * 1968-03-05 1969-12-04 Betonkombinat Rostock Veb Device for the production of concrete elements using the carousel principle

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4427164A1 (en) * 1994-08-01 1996-02-15 Christa Gmbh & Co Kg Plant for producing precast concrete articles
EP0735334A1 (en) * 1995-03-25 1996-10-02 Keller GmbH Installation for the production of bricks and/or of rooftiles
CN108262842A (en) * 2017-01-03 2018-07-10 蓝思科技(长沙)有限公司 Profiling is automatically positioned center of circle device and copying apparatus
CN108262842B (en) * 2017-01-03 2019-10-22 蓝思科技(长沙)有限公司 Profiling is automatically positioned center of circle device and copying apparatus
CN111267206A (en) * 2020-01-21 2020-06-12 福建群峰机械有限公司 Wallboard steam curing production line equipment and steam curing production process thereof
CN111267206B (en) * 2020-01-21 2022-03-15 福建群峰机械有限公司 Wallboard steam curing production line equipment and steam curing production process thereof

Also Published As

Publication number Publication date
DE2444773C2 (en) 1985-09-12

Similar Documents

Publication Publication Date Title
EP2210850A1 (en) Facility used for the production and/or assembly of goods
DE2334646A1 (en) METHOD FOR MANUFACTURING ROOM BOXES FOR FABRIC HOUSES
DE2008457B2 (en) Production line for the production of panels, beams, etc. from reinforced concrete
DE2156263A1 (en) Machine for treating molds
DE1784146C3 (en) Multi-story storage device for automobiles and other items
DE3520788A1 (en) METHOD AND DEVICE FOR WALLING WALL PANELS FROM BLOCKS
DE2444773A1 (en) Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, pallets
DE1559127A1 (en) Vertical garage for vehicles
EP2174898A2 (en) Transport system for conveying and unloading bulk, in particular concrete
EP0232700B1 (en) Apparatus for the production of compost from organic waste
DE2242131C3 (en) Transformer station, substation or the like
EP1972731A2 (en) Turning device for a building
DE2032793C3 (en) System and method for shuttering, demoulding, cleaning and emptying of mold trolleys
DE1301751B (en) Plant and process for the production of concrete slabs
DE4427164A1 (en) Plant for producing precast concrete articles
DE102010005866A1 (en) System for manufacturing concrete slab for hall in e.g. storehouse, has pallet rotating system for transporting pallets, roller conveyor formed from conveyor modules, and supporting rollers arranged at modules for accommodating pallets
DE4025681C2 (en) Rotting bed plant
DE1955048A1 (en) Compact plant for the production of concrete
DE2329249C3 (en) Device for hot-dip galvanizing of bulk parts
DE2325218B2 (en) Process for the circulation of pallets in the production of large panels from reinforced concrete and system for carrying out the process
DE19628414A1 (en) Modular bio-recycling diverse organic wastes
DE2516401B2 (en) System for the construction and dismantling of mixed-bed heaps
DE102005038338A1 (en) Rotary palette system with continuous palette transport for producing concrete parts has rotary palettes that are transported manually or by machinery in production direction during processing
DD143065A1 (en) ONE AND MULTI CHAMBER RINGSILO
DE3404934A1 (en) Cylindrical silo

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee