DE2444773A1 - Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, pallets - Google Patents
Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, palletsInfo
- Publication number
- DE2444773A1 DE2444773A1 DE19742444773 DE2444773A DE2444773A1 DE 2444773 A1 DE2444773 A1 DE 2444773A1 DE 19742444773 DE19742444773 DE 19742444773 DE 2444773 A DE2444773 A DE 2444773A DE 2444773 A1 DE2444773 A1 DE 2444773A1
- Authority
- DE
- Germany
- Prior art keywords
- tower crane
- ring plate
- rotatable
- production
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 13
- 238000005266 casting Methods 0.000 title abstract 2
- 238000005406 washing Methods 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims description 20
- 238000000034 method Methods 0.000 claims description 2
- 241000282346 Meles meles Species 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 abstract description 2
- 239000011178 precast concrete Substances 0.000 description 7
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
Description
Vorrichtung zum Herstellen von Betonfertigteilen Die Erfindung betrifft eine Vorrichtung zum Hersteten von Betonfertigteilen nach dem Taktverfahren unter Verwendung aufeinanderfolgender Montagestationen auf Fertigungstischen. Apparatus for producing precast concrete parts The invention relates to a device for the production of precast concrete parts according to the clock process below Use of successive assembly stations on production tables.
Bei bekannten Vorrichtungen sind die Nbntagestationen und eine Härtungsstation hintereinander in einer Reihe angeordnet. Des führt zu dem Nachteil, daß die Gesanltanlage, welche üblicherweise als Hallenkonstruktion aBsgebildet ist, einen erheblichen Platzbedarf aufweist. Die vom Arbeitspersonal ZU-rückzulegenden Wege sind erheblich. Ein weiterer Nachteil ist darin zu sehen, daß die Lagerstellen für die fertigen Betonteile außerhalb der Halle einen erheblichen zusätzlichen Platz benötigen, woei üblicherweise aus Platzgründen die Lagerstellen außerhalb der alle parallel zu dieser angeordnet werden. Innerhalb der Halle muß ein Fahrkran zum Transport der Hilfsmittel und der Ilaibfertigfabrikate vorgesehen werden. Ein weiterer Transportkran ist außerhaib der llalle fjjr den Tratlsport der fertigen Betonteile erforderlich. Zum Transport der Fertigungstische von Station zu Station werden die von Rollen getragenen Tische an eine Transportkette angehängt welche taktmäßig bewegt wird.In known devices, the processing stations and a hardening station are arranged one behind the other in a row. This leads to the disadvantage that the sanitary facility, which is usually shown as a hall construction, a considerable Space requirement having. The distances to be covered by the workforce are considerable. Another The disadvantage is that the bearings for the finished concrete parts are outside the hall require a considerable amount of additional space, which is usually the case To save space, the storage locations outside of which are all arranged parallel to this. A traveling crane has to be used inside the hall to transport the tools and the finished Ilaib products are provided. Another transport crane is outside the all fjjr den Tratlsport the finished concrete parts required. For transporting the production tables From station to station, the tables, carried by rollers, are attached to a transport chain appended which is moved clockwise.
Durch den aufwendigen Aufbau und den erheblichen Platzbedarf sind diese Anlagen sehr teuer. Durch die langen Wege ist eine rationelle Fertigung nur bedingt möglich.Due to the complex structure and the considerable space required are these systems are very expensive. Due to the long distances, an efficient production is only possible conditionally possible.
Diese Nachteile versuchte man zum Teil dadurch zu beseitigen, daß man die Montagestation parallel zur Härtungsstation anordnete. Hierdurch wird die Gesamtlänge der Anlage vermindert, jedoch entstehen Transportprobleme für die Fertigungstische.These disadvantages were attempted in part to eliminate that the assembly station was arranged parallel to the curing station. This will make the Overall length of the system reduced, but transport problems arise for the production tables.
Diese müssen bei der Übergabe von der letzten Montagestation zur Härtungsstation zweimal rechtwinklig umgelenkt werden. Dabei kann es zusätzlich erforderlich sein, die Fertigungstische auf ein anderes Niveau anzuheben.These must be transferred from the last assembly station to the hardening station be deflected twice at right angles. It may also be necessary to to raise the production tables to another level.
Es besteht daher die Aufgabe, eine Vorrichtung zum Herstellen von Betonfertigteilen so au-szubilden, daß sie kostengünstig erstellt werden kann, einen minimalen Platz beansprucht, einen optimalen Materialfluß ermöglicht und eine rationelle Fertigung sicherstellt.There is therefore the object of a device for producing Precast concrete parts so au-szubilden that they can be created inexpensively, a takes up minimal space, enables an optimal material flow and an efficient one Manufacturing ensures.
Diese Aufgabe wird durch die in Anspruch l beschriebene Erfindung gelöst. Vorteilhafte Ausführungsformen und Weiterbildungen sind in den Unteransprüchen beschrieben.This object is achieved by the invention described in claim l solved. Advantageous embodiments and developments are in the subclaims described.
Die Erfindung wird im folgenden anhand von Ausführungsbeispielen mit Bezug auf die Zeichnung näher erläutert; es zeigen Fig. l eine schematische Draufsicht auf eine erste Ausführungsform der Erfindung; Fig. 2 einen Schnitt durch Fig. 1, gesehen aus der Richtung des Pfeiles B in Fig. 1; Fig. 3 einen Schnitt durch Fig. 1, gesehen aus der Richtung des Pfeiles A in Fig. 1; Fig. 4 eine Draufsicht auf eine weitere Ausfiihrungsform der Erfindung; Fig. 5 einen Schnitt durch Fig. 4, gesehen aus der Richtung des Pfeiles fl in Fig. 4; Fig. 6 einen Schnitt durch Fig. 4, gesehen aus der Richtung des Pfeiles A in Fig. 4.The invention is illustrated below with the aid of exemplary embodiments Referring to the drawing explained in more detail; FIG. 1 shows a schematic plan view to a first embodiment of the invention; FIG. 2 shows a section through FIG. 1, viewed from the direction of arrow B in Fig. 1; 3 shows a section through FIG. 1, viewed from the direction of arrow A in Fig. 1; Fig. 4 is a plan view of a further embodiment of the invention; Fig. 5 is a section through Fig. 4, seen from the direction of the arrow fl in Fig. 4; 6 shows a section through FIG. 4, viewed from the direction of arrow A in FIG. 4.
Die Figuren l bis 3 zeigen schematisch eine erste Ausführui'gsform der Erfindung in Draufsicht und in Schnittdarstellungen.Figures 1 to 3 show schematically a first embodiment of the invention in plan view and in sectional views.
Die gesamte Vorrichtung ist auf mehrere konzentrische preise oder Ringe aufgeteilt. Im Zentrum steht der Turmdrehkran T. Sein Ausleger erreicht die gesamte dargestellte Anordnung. Der Turmdrehkran T übernimmt - abgesehen von der noch zu den portalkranartig ausgebildeten Betonmaschine -alle Transportaufgaben, insbesondere in radialer Richtung.The entire device is on several concentric prices or Split rings. In the center is the tower crane T. Its jib reaches the entire arrangement shown. The tower crane T takes over - apart from the still to the gantry crane-like concrete machine - all transport tasks, especially in the radial direction.
In einem ersten1 engsten Kreis um den Turmdrehkran T sind Stellwände l für vorgefertigte Teile, die in die Betonfertigteile einzubauen sind, angeo,ret.In a first1 narrowest circle around the tower crane T there are partition walls l for prefabricated parts that are to be built into the precast concrete parts, angeo, ret.
Je nach Bedarf könne diese St e llwände sich üher einen größeren oder kleineren Teil des Kreisumfangs erstrecken.Depending on requirements, these walls can be larger or larger extend the smaller part of the circumference.
In einem zweiten, zentrumsferneren Ring befinden sich Stelwände 2 für Baustahlgewebe, das in die Betonfertigteile eingebracht werden soll. Weitere Ringe zur Vorratshaltung von einzubauenden Teilen können nach Bedarf vorgesehen sein.In a second ring, further away from the center, there are stilt walls 2 for structural steel mesh that is to be incorporated into the precast concrete elements. Further Rings for storing parts to be installed can be provided as required be.
Es schließt sich ein weiterer Kreis mit den eigentlichen Fertigungstischen 3 an. An den Tischen 3 können offene oder verdeckte Rinnen 12 vorgesehen sein.Another circle closes with the actual production tables 3 at. Open or covered channels 12 can be provided on the tables 3.
Durch sie und über den Ringkanal 13 kann das bei der Herstellung von Waschbetonplatten anfallende Abwasser zur Waschgrube 4 abgeleitet werden. This can be done through them and through the annular channel 13 during manufacture Waste water accumulating from exposed aggregate concrete slabs can be diverted to the washing pit 4.
Der Ring der Montagetische 3 wird von der portalicranartig ausgebildeten Betoermaschipe 11 überspreizt. Sie ist auf der Kranbahnschiene 5 verfahrbar.The ring of the assembly tables 3 is designed like a portalic crane Betoermaschipe 11 overstretched. It can be moved on the crane runway rail 5.
Um den Kreis der Montagetische 3 befindet sich konzentrisch ein Lagerplatzring zur Stapelung der fertigen Produkte. Wandelemente werden senkrecht in einen umlaufenden Rechen 7 eingestellt; Deckenplatten 8 werden wahlweise auch waagerecht gestapelt.A storage bin ring is concentrically located around the circle of the assembly tables 3 for stacking the finished products. Wall elements are vertically in a circumferential Rake 7 set; Ceiling panels 8 are optionally also stacked horizontally.
Die Fertigprodukte werden dann weiter radial nach außen in bereitstehende Container 9 oder auf Paletten 9 verladen. Am äußersten Bereich der kreisflächigen Fertigungsvorrichtung befindet sich die Betoischmaschine 10.The finished products are then available further radially outwards Container 9 or loaded onto pallets 9. At the outermost area of the circular The production device is the concrete mixing machine 10.
Zum Schutz vor Witterungseinfliissen ist ein Dach 15 vorgesehen. Damit der ganze Arbeitsbereich vom Turmdrehkran T erreichbar ist, läßt sich das Dach 15, das mit einem segmentartigen Ausschnitt versehen ist, verdrehen. Der segmentartige Ausschnitt ist in Abbildung 1 gestrichelt angedeutet. Er wird außerhalb der Betriebszeit unter ein (nicht dargestelltes) feststehendes Dachteil eingedre11t. Dieses feststehende Dachteil befindet sich direkt gegeniiber der Betonmischmaschine 10. Es ist so groß, daB es den beweglichen, segmentartigen Ausschnitt im Dach 15 voll abdeckt.A roof 15 is provided for protection against the effects of the weather. In order to the entire working area can be reached by the tower crane T, the roof 15, which is provided with a segment-like cutout, twist. The segment-like The section is indicated by dashed lines in Figure 1. He will be out of hours screwed under a (not shown) fixed roof part. This fixed Roof part is directly opposite the concrete mixer 10. It is so big that it completely covers the movable, segment-like cutout in the roof 15.
Da der Bereich unter dem fest stehenden Dachteil dem Turmdrehkran T nicht zugänglich is-t, wird hier die Waschgrube 11 angeordnet. Sie dient unter anderem dazu, alle Geräte, insbesondere auch die Betoniermaschine, nach Arbeitsende zu säubern.Because the area under the fixed roof section is the tower crane T is not accessible, the washing pit 11 is arranged here. She serves under among other things, all devices, especially the concreting machine, after the end of work to clean up.
Der überdachte Raum ist nach außen durch die Wand 6, dem Turmdrehkran T zu durch die Wand 17 abgeschlossen.The covered space is to the outside through the wall 6, the tower crane T closed by the wall 17.
Im Betrieb geht das Arbeitspersonal im Kreis von Tisch 3 zu Tisch 3. Einzubauende Teile werden radial nach außen geholt und auf dem jeweils bearbeiteten Tisch 3 montiert. Die Betoniermaschine 10 und der segmentartige Ausschnitt des Daches werden entsprechend mitgeführt.In operation, the workforce goes in a circle from table 3 to table 3. Parts to be installed are brought out radially and placed on the machined Table 3 assembled. The concreting machine 10 and the segment-like section of the roof are carried accordingly.
Die abgebundenen Betonfertigteile werden von den Tischen abgehoben und weiter nach außen an ihre Stapelplätze gebracht und von dort aus verladen.The set precast concrete elements are lifted from the tables and brought further outside to their stacking areas and loaded from there.
In der schematischen Figur 2 befindet sich die Betoniermaschine gerade über einen Fertigungstisch 3, in der schematischen Figur 3 über der Waschgrube 4.In the schematic Figure 2, the concreting machine is currently via a production table 3, in the schematic FIG. 3 above the washing pit 4.
Ein weiteres Ausfiihrungsbeispiel der Erfindung ist in den Figuren 4 bis 6 dargestellt. Es ist für manche Anwendungsbereiche besser geeignet. Im Aufriß (Fig. 4) erkennt man wieder die konzentrische Anordnung der Lager von Vorfertigteilen 1 und Baustahlgewebe 2, Montage tischen 3 und Stapelplätze bzw. Container 9 für die Fertigprodukte. Im Zentrum steht der Turmdrehkran T, der den ganzen Bereich der Vorrichtung bis zur peripher angeordneten Betonmischmaschine 10 überstreicht.Another exemplary embodiment of the invention is shown in the figures 4 to 6 shown. It is more suitable for some areas of application. In elevation (Fig. 4) one recognizes again the concentric arrangement of the bearings of prefabricated parts 1 and structural steel mesh 2, assembly tables 3 and stacking areas or containers 9 for the finished products. In the center is the tower crane T, which covers the whole area the device up to the peripherally arranged concrete mixer 10 sweeps over.
Der Hauptunterschied dieser Ausführungsform gegenüber der Ausführungsform nach den Figuren l bis 3 besteht darin, daß die einzelnen Fertigungstische 3 auf einem drehbaren Ringteller 17 angeordnet sind.The main difference of this embodiment from the embodiment according to Figures l to 3 is that the individual production tables 3 on a rotatable ring plate 17 are arranged.
Die Tische 3 drehen sich mit konstanter Geschwindigkeit im Kreise oder bewegen sich taktweise vorwärts. Dadurch wird es möglich, daß räumlich an derselben Station immer derselbe Arbeitsschritt ausgeführt wird. Das Arbeitspersonal braucht nicht selbst von Tisch zu Tisch im Kreise zu gehen. Die Lager l, 2 der Vorfertigteile brauchen nicht gleichmäßig über den Umfang verteilt zu sein.The tables 3 rotate in circles at a constant speed or move forward in steps. This makes it possible that spatially at the same Station the same work step is always carried out. The workforce needs not going in circles from table to table yourself. the Warehouse l, 2 of the prefabricated parts do not need to be evenly distributed over the circumference.
Der Ringteller 17 ist l bis 2 Meter unter Geländeniveau auf Rollen ge]agert. Über einen gewissen Winkelbereich hinweg verläuft er in einem Tunnel 18, der als Härtungsstation ausgebildet ist. Die ebenerdige Oberseite 19 des Härtungstunneis kann als Fertigteillager 20 genutzt werden.The ring plate 17 is 1 to 2 meters below ground level on rollers ge] agert. Over a certain angular range it runs in a tunnel 18, which is designed as a hardening station. The level top 19 of the hardening tunnel can be used as a finished parts store 20.
Die ersten beiden Stationen nach Austritt des Ringgestells 17 aus dem Härtungstunnel befinden sich im Freien. Hier erfolgt das Ausschalen und Abheben der Betonfertigteile. Danach folgen elf weitere Stationen, die von einem Ringdach 2l geschützt sind. Unter dem Ringdach 21 kann wieder ein portalkranartiger Hebezug verlaufen, der hier die Transportaufgaben übernimmt. Die verschiedenen Arbeitsschritte können an den einzelnen Stationen beispielsweise wie folgt ausgeführt werden: An der dritten Station nach Austritt aus dem Härtungstunnel 18 wird eingeschalt, an der, Vierten Station eingeölt. An der fünften Station werden die Fenster- und Türaussparungen, an der sechsten Station die Bewehrung eingebracht. An der siebten Station werden Montageösen und InstaXlationsmaterial montiert. An der in Nähe der Betonmischmaschi ne iQ befindlichen achten Station wird betoniert und gerüttelt. Die neunte bis 13. Station dienen der Fertigstellung (versehen mit Isolationsmaterial, Glätten, Bewehren, Abkehren). An der 14. Station, also vor Eintritt in den Härtungstunnel i8, kann ein Abwaschen erfolgen. Zu diesem Zweck ist dort mindestens ein Kipptisch angeordnet. Dann wandern die Fertigungsteile 3 in den Härtungstunnel 18.The first two stations after the ring frame 17 exits the curing tunnel are in the open air. Stripping and lifting takes place here the precast concrete parts. This is followed by eleven more stations, which are covered by a ring roof 2l are protected. A gantry crane-like hoist can again under the ring roof 21 run, which takes on the transport tasks here. The different work steps can be carried out at the individual stations as follows, for example: An the third station after exiting the curing tunnel 18 is switched on the, fourth station oiled. At the fifth station, the window and door recesses, the reinforcement was installed at the sixth station. Be at the seventh station Mounting eyelets and installation material mounted. At the nearby concrete mixer The eighth station located next to the iQ will be concreted and shaken. The ninth to 13th stations are used for completion (provided with insulation material, Smoothing, reinforcing, sweeping). At the 14th station, i.e. before entering the hardening tunnel i8, washing off can be done. There is at least one tilting table there for this purpose arranged. The production parts 3 then migrate into the curing tunnel 18.
Vorteilhafterweise können in einer Ringzone direkt um den Turmdrehkran T Aufenthalts- und Magazinräu nie 22 yorgesehen sein. Mit einer Vorrichtung dieser Art können beispielsweise bei einer Taktzeit von 17,5 Mitten, bei einer 8-Stundenschicht und mit 13 Mann pro Schicht 24 Bauelemente mit einer Gesamtfläche von 240 qm hergestellt werden.Advantageously, in a ring zone directly around the tower crane Stay and storage rooms must never be seen. With a device this Art can, for example, with a cycle time of 17.5 mids, with an 8-hour shift and with 13 men per shift we produced 24 components with a total area of 240 square meters will.
AnsprücheExpectations
Claims (18)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19742444773 DE2444773C2 (en) | 1974-09-19 | 1974-09-19 | Plant for the production of precast concrete parts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19742444773 DE2444773C2 (en) | 1974-09-19 | 1974-09-19 | Plant for the production of precast concrete parts |
Publications (2)
Publication Number | Publication Date |
---|---|
DE2444773A1 true DE2444773A1 (en) | 1976-04-08 |
DE2444773C2 DE2444773C2 (en) | 1985-09-12 |
Family
ID=5926196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19742444773 Expired DE2444773C2 (en) | 1974-09-19 | 1974-09-19 | Plant for the production of precast concrete parts |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2444773C2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4427164A1 (en) * | 1994-08-01 | 1996-02-15 | Christa Gmbh & Co Kg | Plant for producing precast concrete articles |
EP0735334A1 (en) * | 1995-03-25 | 1996-10-02 | Keller GmbH | Installation for the production of bricks and/or of rooftiles |
CN108262842A (en) * | 2017-01-03 | 2018-07-10 | 蓝思科技(长沙)有限公司 | Profiling is automatically positioned center of circle device and copying apparatus |
CN111267206A (en) * | 2020-01-21 | 2020-06-12 | 福建群峰机械有限公司 | Wallboard steam curing production line equipment and steam curing production process thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1301751B (en) * | 1966-05-11 | 1969-08-21 | Heinrich Krog Bauunternehmung | Plant and process for the production of concrete slabs |
DE1808176A1 (en) * | 1968-03-05 | 1969-12-04 | Betonkombinat Rostock Veb | Device for the production of concrete elements using the carousel principle |
-
1974
- 1974-09-19 DE DE19742444773 patent/DE2444773C2/en not_active Expired
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1301751B (en) * | 1966-05-11 | 1969-08-21 | Heinrich Krog Bauunternehmung | Plant and process for the production of concrete slabs |
DE1808176A1 (en) * | 1968-03-05 | 1969-12-04 | Betonkombinat Rostock Veb | Device for the production of concrete elements using the carousel principle |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4427164A1 (en) * | 1994-08-01 | 1996-02-15 | Christa Gmbh & Co Kg | Plant for producing precast concrete articles |
EP0735334A1 (en) * | 1995-03-25 | 1996-10-02 | Keller GmbH | Installation for the production of bricks and/or of rooftiles |
CN108262842A (en) * | 2017-01-03 | 2018-07-10 | 蓝思科技(长沙)有限公司 | Profiling is automatically positioned center of circle device and copying apparatus |
CN108262842B (en) * | 2017-01-03 | 2019-10-22 | 蓝思科技(长沙)有限公司 | Profiling is automatically positioned center of circle device and copying apparatus |
CN111267206A (en) * | 2020-01-21 | 2020-06-12 | 福建群峰机械有限公司 | Wallboard steam curing production line equipment and steam curing production process thereof |
CN111267206B (en) * | 2020-01-21 | 2022-03-15 | 福建群峰机械有限公司 | Wallboard steam curing production line equipment and steam curing production process thereof |
Also Published As
Publication number | Publication date |
---|---|
DE2444773C2 (en) | 1985-09-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2210850A1 (en) | Facility used for the production and/or assembly of goods | |
DE2334646A1 (en) | METHOD FOR MANUFACTURING ROOM BOXES FOR FABRIC HOUSES | |
DE2008457B2 (en) | Production line for the production of panels, beams, etc. from reinforced concrete | |
DE2156263A1 (en) | Machine for treating molds | |
DE1784146C3 (en) | Multi-story storage device for automobiles and other items | |
DE3520788A1 (en) | METHOD AND DEVICE FOR WALLING WALL PANELS FROM BLOCKS | |
DE2444773A1 (en) | Circular concrete casting plant around tower crane - concentric circles of components, grids, work stations, covers, pallets | |
DE1559127A1 (en) | Vertical garage for vehicles | |
EP2174898A2 (en) | Transport system for conveying and unloading bulk, in particular concrete | |
EP0232700B1 (en) | Apparatus for the production of compost from organic waste | |
DE2242131C3 (en) | Transformer station, substation or the like | |
EP1972731A2 (en) | Turning device for a building | |
DE2032793C3 (en) | System and method for shuttering, demoulding, cleaning and emptying of mold trolleys | |
DE1301751B (en) | Plant and process for the production of concrete slabs | |
DE4427164A1 (en) | Plant for producing precast concrete articles | |
DE102010005866A1 (en) | System for manufacturing concrete slab for hall in e.g. storehouse, has pallet rotating system for transporting pallets, roller conveyor formed from conveyor modules, and supporting rollers arranged at modules for accommodating pallets | |
DE4025681C2 (en) | Rotting bed plant | |
DE1955048A1 (en) | Compact plant for the production of concrete | |
DE2329249C3 (en) | Device for hot-dip galvanizing of bulk parts | |
DE2325218B2 (en) | Process for the circulation of pallets in the production of large panels from reinforced concrete and system for carrying out the process | |
DE19628414A1 (en) | Modular bio-recycling diverse organic wastes | |
DE2516401B2 (en) | System for the construction and dismantling of mixed-bed heaps | |
DE102005038338A1 (en) | Rotary palette system with continuous palette transport for producing concrete parts has rotary palettes that are transported manually or by machinery in production direction during processing | |
DD143065A1 (en) | ONE AND MULTI CHAMBER RINGSILO | |
DE3404934A1 (en) | Cylindrical silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |