DE2434494A1 - Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line - Google Patents

Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line

Info

Publication number
DE2434494A1
DE2434494A1 DE2434494A DE2434494A DE2434494A1 DE 2434494 A1 DE2434494 A1 DE 2434494A1 DE 2434494 A DE2434494 A DE 2434494A DE 2434494 A DE2434494 A DE 2434494A DE 2434494 A1 DE2434494 A1 DE 2434494A1
Authority
DE
Germany
Prior art keywords
climbing frame
concrete
crane
climbing
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE2434494A
Other languages
German (de)
Inventor
Heinz Bille
Rolf Griesbach
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCHEELE MASCHF W
Original Assignee
SCHEELE MASCHF W
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCHEELE MASCHF W filed Critical SCHEELE MASCHF W
Priority to DE2434494A priority Critical patent/DE2434494A1/en
Publication of DE2434494A1 publication Critical patent/DE2434494A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0427Devices for both conveying and distributing with distribution hose on a static support, e.g. crane

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The jib (4) comprises three sections, a lower arm (4a) a central arm (4b) and an upper arm (4c). The angular position of the lower arm can be adjusted about its swivel point (3) by a cable hoist mechanism (5). As in a normal tower crane, the climbing frame (2) is fitted with a counter-weight (11) positioned on the other side of the frame from the jib (4). An hydraulically operated climbing unit is provided on a lower part (2a) of the frame (2) whereby an upper part (2c) can swivel about a vertical axis relative to the lower part. This upper part carries the jib (4), the hoist mechanism (5) and the counter-weight.

Description

Betonverteilermast Die Erfindung betrifft einen Betonverteilermast in Porm eines Kletterkranes, dessen Kransäule mit einer Betonförderleitung versehen ist und an dessen Elettergerüst ein die Betonförderleitung tragender Auslegerarm winkelverstellbar befestigt ist, der einen Unterarm und mindestens einen sich daran anschließen den Arm aufweist, wobei die einzelnen Arme durch hydraulisch verstellbare Gelenke miteinander verbunden sind0 Bei bekannten Betonverteilermasten der genannten Art ist der Auslegerarm so ausgebildet und an dem Klettergerüst befestigt, wie es bei Autobetonpumpen mit hydraulisch betätigtem Auslegerarm bekannt ist. Das heißt, der Unterarm des Auslegerarmes ist mittels Hydraulikzylindern gegen das Elettergerüst schwenkbar und feststellbar0 Diese Art der Befestigung des Unterarmes hat den Nachteil, daß der Unterarm und damit der gesamte Auslegerarm nur eine sehr begrenzte Länge haben kennen. Dies ist darauf zurückzuSuhren, daß bei einem langen Auslegerarm imi Bereich der Verlagerung des Unterarmes sehr große Kräfte in das Klettergerüst eingeleitet werden müssen, die eine besonders schwere Konstruktion im Bereich der Verlagerung und der hFdraulischen Verstellvorrichtung verlangen Weiterhin muß der Unterarm aus einen sehr stabilen Profil bestehen, wodurch dessen Gewicht in unvorteilhafter Weise-vergrößert wirdO Nach dem Stande der Technik sind auch ein- oder zweiteilige Kranausleger an Kletterkranen bekannt, bei denen das Gelenk zwischen dem Auslegerarm und dem Klettergerüst und das Gelenk im Auslegerarm mittels Seilhubwerken verstellt werden0 Solche Seilhubwerke, von denen die zum Verschwenken des Auslegerarmes dienenden Kräfte nicht im Bereich des Gelenkes, sondern am äußeren Ende des jeweils zu verachwenkendeneArmes eingeleitet werden, erlauben eine große Reichweite des Auslegerarmes bei verhältnismäßig leichter Bauweise. Ein solcher durch Seilhubwerke betätigter Auslegerarm ist jedoch für Betonierungsarbeiten nicht ausreichend manövrierfähig, denn die durch die Seilhubwerke verstellbaren Gelenke können nicht über die lotrechte Stellung hinaus nach Innen verschwenkt werden so daß die Betonierungsarbeiten im Nahbereich der Kransäule Schwierigkeiten bereiten, Es ist deshalb Aufgabe der Erfinung, den Verteilermsst der eingangs genannten Art dahingehend weiterzubilden, daß der Auslegerarm bei leichter Bauweise eine erheblich gesteigerte Reichweite erhalten kann, ohne die Fähigkeit zu verlieren, mit dem an der Spitze des Auslegerarmes angeordneten Betonaustrag jeden beliebigen Punkt innerhalb der Reichweite zu erreichen, Zur Lösung dieser Aufgabe schlägt die Erfindung ausgehend von einem Betonverteilermast der eingangs genannten Art vor, daß die Winkelstellung des Unterarmes des Auslegerarmes mittels eines dem Klettergerüst zugeordneten Seilhubwerkes um das Gelenk zwischen Klettergerüst und Unterarm verstellbar ist0 Die erfindungsgemäß vorgeschlagene Weiterbildung des Verteilermastes bietet den Vorteil, daß der Auslegerari im Bereich des Unterarmes beliebig lang ausgebildet werden kann, ohne daß hierzu ein schwereres Profil für den Unterarm verwendet werden muß oder eine aufwendige hydraulische Veratellvorrichtung im Bereich der Verlagerung des Unterarmes an dem Klettergerüst erforderlich ist. Weiterhin können die Gelenke zwischen den einzelnen Armen des Auslegerarmes über die lotrechte Stellung hinaus beliebig nach innen geknickt werden, so daß diese Arme bei jeder Winkelstellung des Unterarmes über einen sehr breiten Bereich nach innen und außen bewegt werden können Die Erfindung verbindet also in besonders vorteilhafter Weise die durch die Verwendung eines Seilhubwerkes mögliche große Auslegerlänge bei leichter Konstruktion mit der durch die hydraulisch betätigten Knickgelenke ermöglichten guten Manövrierfähigkeit. Ein weiterer Vorteil liegt darin, daß die Befestigung des Auslegerarmes für die Betonverteilung an dem Klettergerüst ebenso ausgebildet ist, wie die Befestigung eines herkömmlichen Kranauslegerarmes, so daß der für die Betonverteilung dienende Auslegerarm nach tierabklettern des Klettergerüstes ohne besondere Umstände gegen einen herkömmlichen Kran-ausleger vertauscht werden kann, wenn die Betonierungsarbeiten abgeschlossen sind und der Kletterkran für EranaÆbeiten benötigt wird. Gegebenenfalls können auch am zur Betonverteilung dienenden Auslegerarm Kranhaken befestigt sein, so daß dieser für leichtere Kranarbeiten als Kranausleger verwendbar ist.Concrete placing boom The invention relates to a concrete placing boom in the form of a climbing crane, the crane column of which is provided with a concrete delivery line is and on its Elettergerüst a cantilever arm carrying the concrete delivery line Attached at an adjustable angle, one forearm and at least one attached to it connect the arm, the individual arms by hydraulically adjustable Joints are connected to one another in known concrete placing booms of the ones mentioned Art, the extension arm is designed and attached to the climbing frame as it is is known in truck-mounted concrete pumps with hydraulically operated boom. This means, the forearm of the extension arm is against the Eletter frame by means of hydraulic cylinders swiveling and lockable 0 This type of fastening of the forearm has the disadvantage that the forearm and thus the entire boom arm only has a very limited length have to know. This is due to the fact that with a long cantilever arm imi In the area of shifting the forearm, very large forces are introduced into the climbing frame Need to become, which is a particularly heavy construction in the area the displacement and the hydraulic adjustment device must continue to require the forearm consist of a very stable profile, which makes its weight in unfavorable way-is enlarged O According to the state of the art, or two-part crane boom known on climbing cranes, in which the joint between the extension arm and the climbing frame and the joint in the extension arm by means of cable hoists 0 Such cable hoists, of which the one for pivoting the boom serving forces not in the area of the joint, but at the outer end of each arms to be deflected allow a large range of the Cantilever arm with a relatively light construction. One such by cable hoists However, the actuated boom arm is not sufficiently maneuverable for concreting work, because the joints that can be adjusted by the cable hoists cannot go over the perpendicular Position also pivoted inwards so that the concreting work in Difficulties in the vicinity of the crane column, It is therefore the task of the invention to further develop the distribution measure of the type mentioned at the outset so that the Outrigger arm with a light construction get a considerably increased range can, without losing the ability, with the one arranged at the tip of the boom arm Concrete discharge to reach any point within reach, To the The invention proposes a solution to this problem on the basis of a concrete placing boom of the type mentioned above that the angular position of the forearm of the cantilever arm by means of a cable hoist assigned to the climbing frame around the joint between The climbing frame and forearm are adjustable the placing boom has the advantage that the boom in the area of the forearm can be made as long as you like without having to use a heavier profile for this the forearm must be used or a complex hydraulic adjustment device is required in the area of the forearm shift on the climbing frame. Furthermore, the joints between the individual arms of the cantilever arm can be over the vertical position can also be bent inwards at will, so that this Arms over a very wide range in every angular position of the forearm can be moved inside and outside The invention thus combines in a particularly advantageous manner The large boom length possible through the use of a cable hoist in the case of a light construction with the hydraulically operated articulated joints allowed good maneuverability. Another advantage is that the Attachment of the extension arm for the concrete distribution on the climbing frame as well is designed as the attachment of a conventional crane boom arm, so that the cantilever arm that is used to distribute the concrete after the animals have climbed the climbing frame can be exchanged for a conventional crane boom without any special inconvenience can if the Concreting work is complete and the climbing crane is required for EranaÆ work. If necessary, you can also use the for concrete distribution serving cantilever arm crane hook be attached, so that this for lighter crane work can be used as a crane boom.

Um dem-Verteilermast trotz großer Auslegerlänge eine gute Standfestigkeit zu geben, ist das Klettergerüst auf der dem Auslegerarm gegenüberliegenden Seite mit einem an einem Gegenausleger befestigten Kontergewicht versehen0 Zweckmäßig weist das Klettergerüst einen mit einer hydraulisch betätigten Klettervorrichtung versehenen Unterteil auf, der an der Kransäule des Kletterkranes und einen gegen den Unterteil um eine lotrechte Achse drehbaren Oberteil auf, der den Auslegerarm, das Seilhubwerk und das Kontergewicht trägt. Hierdurch kann das Klettergerüst bei jeder beliebigen Stellung des Auslegerarmes Kletterbetegungen ausführen und der Auslegerarm beliebig um die Kransäule verdreht werden.In order to give the placing boom good stability despite the large jib length, the climbing frame is provided with a counterweight attached to a counter-jib on the side opposite the jib arm0 The climbing frame expediently has a lower part with a hydraulically operated climbing device, which is attached to the crane column of the climbing crane and an upper part which can be rotated about a vertical axis relative to the lower part and which carries the boom arm, the cable hoist and the counterweight. As a result, the climbing scaffold can carry out climbing movements in any position of the boom arm and the boom arm can be rotated around the crane column as desired.

Um ohne Unterbrechung des Betonförderbetriebea weitere Schüsse der Kransäule montieren zu können und weitere Eletterbewegungen des Klettergerüstes zu ermöglichen, sind der Unterteil des Klettergerüstes und der Oberteil des Klettergerüstes durch ein Zwischenstück verbunden, das seitlich neben der Kransäule angeordnet ist, derart, daß der Raum über dem oberen Schuß der Kransäule mindestens über die Länge eines Schusses der Kransäule freigelassen wird. Zur Montage von weiteren Schüssen der Kransäule «2,Ge. rA SC,.9er7ff/ ist des Klettergerüstes mit einem Hilfskran zum Heben und Einhängen von weiteren Schüssen der Kransäule versehen.In order to be able to assemble further sections of the crane column without interrupting the concrete conveying operation and to enable further Eletter movements of the climbing frame, the lower part of the climbing frame and the upper part of the climbing frame are connected by an intermediate piece, which is arranged laterally next to the crane column, such that the space above the upper section of the crane column is released at least over the length of one section of the crane column. For the assembly of further sections of the crane column «2, Ge. rA SC, .9er7ff / is of the climbing frame is provided with an auxiliary crane for lifting and attaching further sections of the crane column.

Zweckmäßig weist weiterhin der der Kransäule zugeordnete Abschnitt der Betonförderleitung einen Xeilabschnitt auf, der in Längsrichtung der Kransäule verlängerbar ist. Hierdurch brauchen auch für die Verlängerung der Betonförderleitung keine Pausen bei den Betonierungsarbeiten eingelegt werden.The section assigned to the crane column expediently also has the concrete delivery line on a Xeilabschnitt, which runs in the longitudinal direction of the crane column is renewable. This also makes it necessary for the extension of the concrete delivery line no breaks are taken during the concreting work.

Der längenveränderbare eilabschnitt besteht zweckmäßig aus zickzackförmig angeordneten Rohrabschnitten, die durch Gelenke miteinander verbunden sind0 Ein Ausführungsbeispiel eines Betonverteilermastes gemäß der Erfindung wird im Folgenden anhand der Zeichnung näherferläutert. Der in der Zeichnung dargestellte Betonverteilermast in Form einss Kletterkranes weist eine aus mehreren Schüssen zusammengesetzte Kransäule auf, die mit dem Bezugazeichen 1 bezeichnet ist. Diese Kransäule 1 kann wie beim Ausführungsbeispiel als Gittermast oder auch als Rohrmast oder dergleiche ausgeführt sein, Die Kransäule 1 trägt ein Klettergerüst, das in seiner Gesamtheit mit dem Bezugszeichen 2 bezeichnet ist.The length-adjustable part section expediently consists of a zigzag shape arranged pipe sections, which are connected to one another by joints 0 A Embodiment of a concrete placing boom according to the invention is described below explained in more detail using the drawing. The concrete placing boom shown in the drawing in the form of a climbing crane has a crane column composed of several sections on, which is denoted by the reference numeral 1. This crane column 1 can as in Embodiment executed as a lattice mast or as a tubular mast or the like The crane column 1 carries a climbing frame, which in its entirety with the Reference numeral 2 is designated.

Dieses Klettergerüst 2 weist einen Unterteil 2a auf, der die Kransäule umfasst und mit einer hydraulisch betätigten Klettervorrichtung versehen ist, die in der Zeichnung nicht näher dargestellt ist. Seitlich neben der Kransäule ist an dem Unterteil 2a des Klettergerüstes 2 ein Zwischenstück 2b befestigt. Dieses Zwischenstück 2b läßt den Raum über dem obersten Schuß der Kransäule 1 frei, derart, daß der nächste Schuß unbehindert eingehängt und montiert werden kann, ohne von dem Klettergerüst 2 behindert zu werden. Der zu montierende nächste Schluß der Kransäule 1 ist in der Zeichnung in gestrichelten Linien dargestellt und mit dem Bezugszeichen 1a bezeichnet.This climbing frame 2 has a lower part 2a, which is the crane column comprises and is provided with a hydraulically operated climbing device which is not shown in the drawing. The side of the crane column is on an intermediate piece 2b is attached to the lower part 2a of the climbing frame 2. This intermediate piece 2b leaves the space above the top section of the crane column 1 free, so that the next Shot can be hooked and assembled unhindered without being hindered by the climbing frame 2 to become. The next end of the crane column 1 to be assembled is shown in the drawing shown in dashed lines and denoted by the reference numeral 1a.

Am oberen Ende des Zwischenstückes. 2b ist um eine lotrechte Achse drehbar der Oberteil 2c des Klettergerüstes 2 befestigt. Am Oberteil 2c des Klettergerüstes 2 ist um ein Gelenk 3 verschwenkbar ein dreiteiliger Auslegerarm 4 befestigt, der einen Unterarm 4a, einen Mittelarm 4b und einen Oberarm 4c aufweist. Der Unterarm 4a ist mittels eines Seilhubwerkes 5 um das Gelenk 3 winkelverstellbar.At the upper end of the intermediate piece. 2b is about a perpendicular axis rotatably attached to the upper part 2c of the climbing frame 2. On the upper part 2c of the climbing frame 2, a three-part cantilever arm 4 is attached so that it can pivot about a hinge 3 a forearm 4a, a middle arm 4b and an upper arm 4c. Forearm 4a can be adjusted in angle about the joint 3 by means of a cable hoist 5.

Das Seilhubwerk 5 weist einen Flaschenzug 5a auf, der zwischen dem äußeren Ende des unteren Auslegerarmes 4a und einer am Oberteil 2c des Klettergerüstes 2 befestigten, nach oben vorstehenden Tragekonsole 5b angeordnet ist. Der Flaschenzug 5a wird von einer auf dem Oberteil 2c des Klettergerüstes 2 angeordneten Seilwinde 5c angetrieben.The cable hoist 5 has a pulley block 5a, which is between the outer end of the lower arm 4a and one on the upper part 2c of the climbing frame 2 attached, upwardly protruding support bracket 5b is arranged. The pulley 5a is controlled by a winch arranged on the upper part 2c of the climbing frame 2 5c powered.

Am äußeren Ende des Unterarmes 4a ist über ein Gelenk 6 der Mittelarm 4b befestigt und mittels eines Hydraulikzylinders 7 um mindestens 1800 winkelverstellbar. Am äußeren Ende des armes 4 ist über ein Gelenk 8 der Oberarm 4c befestigt und mittels eines Hydraulikzylinders 9 um mindestens 1800 winkelverstellbar.The middle arm 4b is attached to the outer end of the lower arm 4a via a joint 6 and can be adjusted in angle by at least 1800 by means of a hydraulic cylinder 7. At the far end of the arm 4, the upper arm 4c is attached via a joint 8 and the angle can be adjusted by at least 1800 by means of a hydraulic cylinder 9.

Auf der dem Auslegerarm 4 gegenüberliegenden Seite des Klettergerüstes 2 ist an einem Gegenausleger 10 ein Kontergewicht 11 befestigt, das zum Gewichtsausgleich dient und eine sehr große Länge des Auslegearmes 4 ermöglicht.On the side of the climbing frame opposite the extension arm 4 2, a counterweight 11 is attached to a counter-jib 10, which is used to counterbalance the weight serves and allows a very large length of the extension arm 4.

Weiterhin ist an dem Zwischenstück 2b des Klettergerüstes 2 ein Hilfskran 12 angeordnet, der zum Heben und Einhängen der neu zu montierenden Schüsse 1a der Kransäule 1 dient.Furthermore, an auxiliary crane is on the intermediate piece 2b of the climbing frame 2 12 arranged, which is used for lifting and hanging the new shots to be assembled 1a the Crane column 1 is used.

Dieser Hilfskran kann an das Zwischenstück 2b derart heraneklannt werden, daß er den Klettervorgang des Klettergeristes nicht behindert.This auxiliary crane can be clipped to the intermediate piece 2b in this way that it does not hinder the climbing process of the climbing frame.

Die Kransaule 1 und der Auslegerarm 4 tragen eine al- Rohrleitung ausgebildete Betonförderleitung 13, die im Bereich der Gelenke -"6 und 8 mit Gelenken versehen ist. Im unteren Bereich weist diese Betonförderleitung 13 einen ausziehbaren Teilabschnitt 13 a auf, der aus zickzackförmigen Rohrabschnitten besteht, die durch Gelenke miteinander verbunden sind. Dieser ausziehbare Teilabschnitt gestattet es, auch während der Kletterbewegungen der Kletterbühne 2 Beton zu fördern, so daß die Betonierungsarbeiten nicht unterbrochen zu werden brauchen.The crane column 1 and the boom arm 4 carry an al pipeline trained concrete delivery line 13, which in the area of the joints - "6 and 8 with joints is provided. In the lower area, this concrete delivery line 13 has an extendable one Section 13 a, which consists of zigzag-shaped pipe sections through Joints are connected to each other. This extendable section allows also to promote concrete during the climbing movements of the climbing platform 2, so that the Concreting work need not be interrupted.

Zur Ausführung von leichten Kranarbeiten sind an dem Unterarm 4a und dem Oberarm 4c des Auslegearmes 4 Kranhaken 14a und 14b vorgesehen.To carry out light crane work are on the forearm 4a and the upper arm 4c of the extension arm 4 crane hooks 14a and 14b are provided.

Claims (1)

P a t e n t a n s p r ü c h e P a t e n t a n s p r ü c h e 1. Betonverteilermast in Form eines Kletterkranes, dessen Kransäule mit einer Betonförderleitung versehen ist und an dessen Klettergerüst ein die Betonförderleitung tragender Auslegerarm winkelverstellbar befestigt ist, der einen Unterarm und mindestens einen erich daran anschließenden Arm aufweist, wobei die Arme durch hydraulisch verstellbare Gelenke miteinander verbunden sind, dadurch gekennzeichnet, daß die Winkelstellung des Unterarmes (4a) des Auslegerarmes (4) mittels eines dei Klettergerüst (2) zugeordneten Seilhubwerkes (5> um das Gelenk (3) zwischen Klettergerüst (2) und Unterarm (4a) verstellbar ist.1. Concrete placing boom in the form of a climbing crane, its crane column is provided with a concrete delivery line and a concrete delivery line on its climbing frame supporting cantilever arm is attached at an adjustable angle, the one forearm and at least an arm connected to it erich, the arms by hydraulic adjustable joints are interconnected, characterized in that the Angular position of the forearm (4a) of the extension arm (4) by means of a climbing frame (2) associated cable hoist (5> around the joint (3) between the climbing frame (2) and forearm (4a) is adjustable. 2. Betonverteilermast nach Anspruch 1., dadurch gekennzeichnet, daß das Klettergerüst (2) auf der dem Auslegerarm (4) gegenüberliegenden Seite mit einem an einem Gegenausleger (10) befestigtem Kontergewicht (11) versehen ist. 2. Concrete placing boom according to claim 1, characterized in that the climbing frame (2) on the side opposite the extension arm (4) with a is provided on a counter-jib (10) attached counterweight (11). 3. Betonverteilermast nach den Ansprüchen 1. und 24, dadurch gekennzeichnet, daß das Klettergerüst (2) einet mit einer hydraulisch betätigten Klettervorrichtung versehenen Unterteil (2a) aufweist, der an der Kransäule (1) des Kletterkranes befestigt ist, und einen gegen den Unterteil (2a) um eine lotrechte Achse drehbaren Oberteil (2c) aufweist, der den Auslegerarm (4), das Seilhubwerk (5) und das Kontergewicht (11) trägt. 3. Concrete placing boom according to claims 1 and 24, characterized in that that the climbing frame (2) unites with a hydraulically operated climbing device provided lower part (2a) which is attached to the crane column (1) of the climbing crane is, and a relative to the lower part (2a) rotatable about a vertical axis upper part (2c) has the boom (4), the cable hoist (5) and the Counterweight (11) carries. 4. Betonverteilermast nach Anspruch 3., dadurch gekennzeichnet, daß der Unterteil (2a) des Klettergerüstes (2) und der Oberteil (2c) des Klettergerüstes (2) durch ein Zwischenstück (2b) verbunden sind, das seitlich neben der Kransäule (1) angeordnet ist, derart, daß der Raum über dem obersten Schuß der Kransäule (1) mindestens über die Länge eines Schusses der Kransäule (1) durch das Zwischenstück (2b) und den Oberteil (2c) des Klettergerüstes (2) freigelassen wird, So Betonverteilermast nach Anspruch 4., dadurch gekennzeichnet, a ;-,, h daß i des
Klettergerüstes (2) mit einem Hiltskran (12) zum Heben und Einhängen von weiteren Schüssen (la) der Kransäule (1) versehen ist.
4. Concrete placing boom according to claim 3, characterized in that the lower part (2a) of the climbing frame (2) and the upper part (2c) of the climbing frame (2) are connected by an intermediate piece (2b) which is laterally next to the crane column (1) is arranged in such a way that the space above the top section of the crane column (1) is left free at least over the length of one section of the crane column (1) through the intermediate piece (2b) and the upper part (2c) of the climbing frame (2), such as a concrete placing boom according to claim 4, characterized in that Ah that i des
Climbing frame (2) is provided with a Hiltskran (12) for lifting and hanging further sections (la) of the crane column (1).
6. Betonverteilermast nach einem oder mehreren der Ansprüche 1 - 5, dadurch gekennzeichnet, daß der der Kransäule (1) zugeordnete Abschnitt der Betonförderleitung einen Teilabschnitt (13a) aufweist, der in Längsrichtung der transäule (1) verlängerbar ist0 7. Betonverteilermast nach Anspruch 6., dadurch gekennzeichnet, daß der längenveränderbare Teilabschnitt (13a) der Betonförderleitung (13) aus zickzackSörmig angeardneten Rohrabschnitten besteht, die durch Gelenke miteinander verbunden sind.6. Concrete placing boom according to one or more of claims 1 - 5, characterized in that the section of the concrete delivery line assigned to the crane column (1) has a section (13a) which can be extended in the longitudinal direction of the trans-column (1) ist0 7. concrete placing boom according to claim 6, characterized in that the variable length Section (13a) of the concrete delivery line (13) made of zigzag-shaped angeardneten There is pipe sections that are connected to one another by joints. 8o Betonverteilermast nach einem oder mehreren der Ansprüche 1 - 7, dadurch gekennzeichnet, daß der Auslegerarm (4) mit einem oder mehreren Lasthaken (14a, 14b) versehen ist08o concrete placing boom according to one or more of claims 1 - 7, characterized in that the extension arm (4) has one or more load hooks (14a, 14b) is provided 0
DE2434494A 1974-07-18 1974-07-18 Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line Pending DE2434494A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2434494A DE2434494A1 (en) 1974-07-18 1974-07-18 Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2434494A DE2434494A1 (en) 1974-07-18 1974-07-18 Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line

Publications (1)

Publication Number Publication Date
DE2434494A1 true DE2434494A1 (en) 1976-02-05

Family

ID=5920862

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2434494A Pending DE2434494A1 (en) 1974-07-18 1974-07-18 Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line

Country Status (1)

Country Link
DE (1) DE2434494A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2619334A1 (en) * 1976-04-30 1977-11-03 Schwing Gmbh F Rotary tower crane concrete distributor - has sectioned mast with own rotating mechanism on platform and supporting duct
FR2383115A1 (en) * 1977-03-10 1978-10-06 Schwing Gmbh F TOWER CRANE FOR CONSTRUCTION SITES WITH A CONCRETE DISTRIBUTOR
DE2660734C2 (en) * 1976-04-30 1987-05-27 Friedrich Wilh. Schwing Gmbh, 4690 Herne Climbing crane designed as a neck turner for construction purposes with at least one concrete distribution device
US5100278A (en) * 1990-12-20 1992-03-31 Eastern Railway Supplies, Inc. Railroad locomotive crane boom apparatus
WO1993014288A1 (en) * 1992-01-14 1993-07-22 Putzmeister-Werk Maschinenfabrik Gmbh Device for conveying concrete with an adjustable height concrete distribution mast
WO2008055282A1 (en) * 2006-11-07 2008-05-15 Garard Pty Limited Construction apparatus and an associated method
CN105026662A (en) * 2013-03-07 2015-11-04 普茨迈斯特工程有限公司 Working device with stationary mast and rotary head
WO2021129193A1 (en) * 2019-12-28 2021-07-01 广东博智林机器人有限公司 Distribution control method, device, apparatus, and storage medium

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2619334A1 (en) * 1976-04-30 1977-11-03 Schwing Gmbh F Rotary tower crane concrete distributor - has sectioned mast with own rotating mechanism on platform and supporting duct
DE2660734C2 (en) * 1976-04-30 1987-05-27 Friedrich Wilh. Schwing Gmbh, 4690 Herne Climbing crane designed as a neck turner for construction purposes with at least one concrete distribution device
FR2383115A1 (en) * 1977-03-10 1978-10-06 Schwing Gmbh F TOWER CRANE FOR CONSTRUCTION SITES WITH A CONCRETE DISTRIBUTOR
US5100278A (en) * 1990-12-20 1992-03-31 Eastern Railway Supplies, Inc. Railroad locomotive crane boom apparatus
WO1993014288A1 (en) * 1992-01-14 1993-07-22 Putzmeister-Werk Maschinenfabrik Gmbh Device for conveying concrete with an adjustable height concrete distribution mast
WO2008055282A1 (en) * 2006-11-07 2008-05-15 Garard Pty Limited Construction apparatus and an associated method
CN105026662A (en) * 2013-03-07 2015-11-04 普茨迈斯特工程有限公司 Working device with stationary mast and rotary head
WO2021129193A1 (en) * 2019-12-28 2021-07-01 广东博智林机器人有限公司 Distribution control method, device, apparatus, and storage medium

Similar Documents

Publication Publication Date Title
DE3113763C2 (en)
DE102009048846A1 (en) crane
DE2432581C3 (en) Device for distributing concrete
DE2355370C2 (en) Mobile lifting platform
DE60113546T2 (en) CRANE WITH KRANARM CONSISTING OF MEMBERS
DE2434494A1 (en) Distributing mast for liquid concrete - is constructed as climbing crane with hinge-linked jib carrying concrete supply line
EP1516849B1 (en) Crane
DE19814636A1 (en) Ring lift crane
DE1281128B (en) Mobile multi-purpose crane
DE2438439A1 (en) Slewing jib crane - has tailweight unit with travel gear slewing superstructure with main jib and gantry
EP0893392B1 (en) Telescopic crane with luffable jib extension
DE2300643A1 (en) VEHICLE CRANE
DE202005003207U1 (en) Mobile telescopic crane, for construction work, has stay trestle with stay carrier able to be erected centrally above telescopic boom
DE3126377A1 (en) LIFTING DEVICE WITH AN EXTENSION ARM AND A COUNTERWEIGHT SUPPORT WITH ADJUSTABLE POSITIONS
DE2628016A1 (en) MOBILE CRANE WITH TELESCOPIC BOOM AND EQUIPMENT WITH ADDITIONAL BOOM DEVICES
DE2556216A1 (en) Tower crane with concrete distributor - has concrete distribution boom on tower acting as tailweight jib
DE3604130A1 (en) Mechanical bricklayer's aid
DE1198981B (en) Assembly device for tube antenna elements and mast structures
DE2731942A1 (en) Ground or floor covering slabs laying machine - has boom slewing axis above storage point for slabs
AT218225B (en) Suspended platform arrangement with a suspended platform that can be moved horizontally and vertically on a building wall
DE2752636B2 (en)
DE1259537B (en) Bridge crane
DE1257391B (en) Jib crane with jib
DE2351776A1 (en) Lorry-mounted jib crane - has duplex telescopic jib halves supported in separate brackets with derricking rams below
CH459502A (en) Crane with a driver's cab

Legal Events

Date Code Title Description
OHW Rejection