DE2422434A1 - PROCESS FOR PREPARING ASBESTOS-CEMENT SUSPENSION AND EQUIPMENT FOR CARRYING OUT THE PROCEDURE - Google Patents

PROCESS FOR PREPARING ASBESTOS-CEMENT SUSPENSION AND EQUIPMENT FOR CARRYING OUT THE PROCEDURE

Info

Publication number
DE2422434A1
DE2422434A1 DE2422434A DE2422434A DE2422434A1 DE 2422434 A1 DE2422434 A1 DE 2422434A1 DE 2422434 A DE2422434 A DE 2422434A DE 2422434 A DE2422434 A DE 2422434A DE 2422434 A1 DE2422434 A1 DE 2422434A1
Authority
DE
Germany
Prior art keywords
asbestos
cement
gypsum
cement clinker
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE2422434A
Other languages
German (de)
Other versions
DE2422434B2 (en
DE2422434C3 (en
Inventor
Jurij S Grisak
Wasilij D Lysenko
Aleksandr G Naumow
Leonid J Sanko
Eduard A Waljukow
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
G WESESOJUSNY NI I PI ASBESTOZ
Original Assignee
G WESESOJUSNY NI I PI ASBESTOZ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from SU731914689A external-priority patent/SU528736A1/en
Priority claimed from SU731914688A external-priority patent/SU525265A1/en
Application filed by G WESESOJUSNY NI I PI ASBESTOZ filed Critical G WESESOJUSNY NI I PI ASBESTOZ
Publication of DE2422434A1 publication Critical patent/DE2422434A1/en
Publication of DE2422434B2 publication Critical patent/DE2422434B2/en
Application granted granted Critical
Publication of DE2422434C3 publication Critical patent/DE2422434C3/en
Expired legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/36Manufacture of hydraulic cements in general
    • C04B7/48Clinker treatment
    • C04B7/52Grinding ; After-treatment of ground cement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C17/00Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls
    • B02C17/04Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls with unperforated container
    • B02C17/06Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls with unperforated container with several compartments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/40Mixing specially adapted for preparing mixtures containing fibres
    • B28C5/404Pre-treatment of fibres
    • B28C5/406Pre-treatment of fibres and mixing with binding material
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mechanical Engineering (AREA)
  • Food Science & Technology (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • Crushing And Grinding (AREA)
  • Processing Of Solid Wastes (AREA)

Description

PAT E NTA N W A UTPAT E NTA N W A UT

' Dipfc-Phyd. R. Luyken'Dipfc-Phyd. R. Luyken

8 M Ü N C H E N 2 · TA L 2 78 M Ü N C H E N 2 · TA L 2 7

TELEFON 2J 15 «■·? TTL EX 5'· "i Ό 7TELEPHONE 2J 15 «■ ·? TTL EX 5 '· "i Ό 7

Gosudarstwennyj Wsesojusnyj nautschno- P 56 068Gosudarstvennyj Vzezoyusnyj nautschno- P 56 068

issledowatelskij i projektnyj Insitut 9. Mai 1974issledowatelskij i projektnyj Institute May 9, 1974

asbestozementnych isdelij L/Br Moskau/UdSSRasbestozementnych isdelij L / Br Moscow / USSR

VSHPaBBEN ZUM ZJJESSEITES EIIiSR ASEESTZHffill-D-SUSEElTSIOIT IEID AITLAGB ZUIl DÜHCBPÜHSEK DESVSHPaBBEN ZUM ZJJESSEITES EIIiSR ASEESTZHffill-D-SUSEElTSIOIT IEID AITLAGB ZUIl DÜHCBPÜHSEK DES

Die vorliegende Erfindung bezieht sich auf ein Verfahren zum' Zubereiten einer Asbestzement-Suspension, die zum Herstellen von ; unterschiedlichen Asbestzement-Erzeugnissen verwendet wird, und'1 auch auf eine Anlage, die zum Durchführen des erflndungsgenaßQn':Ve: fahrens bestimmt ist. . .."'Λ-.The present invention relates to a method for 'preparing an asbestos cement suspension which can be used for the manufacture of ; different asbestos cement products is used, and '1 on an installation for performing the erflndungsgenaßQn': Ve: driving is determined. . .. "' Λ -.

Die Erfindung kann auch in anderen Industriezweigen vervvaiijaeil·' «erden, m denen Materialien mit unterschiedlicher Härte zerkleinert und dann miteinander gemischt werden müssen· -< y s Es ist ein Verfahren zum Zubereiten einer Asbestzenient-Susperi.·The invention can vervvaiijaeil in other industries · '' ground, m which materials crushed with different hardness and must then be mixed together · -. <Y s It is a method of preparing a Asbestzenient-Susperi ·

slon, die zum Herstellen von Asbestzement-Erzeugnissen dient, Yi ;■slon, which is used to manufacture asbestos cement products, Yi ; ■

bekannt. Dieses Verfahren sieht ein Zerkleinern von Zement-\-{." klinker mit Gips, bis Zement erhalten wird, ein nasses Asbestaer'i·"known. This process involves crushing cement - \ - {. " clinker with plaster of paris until cement is obtained, a wet Asbestaer'i · "

fasern und darauffolgendes Mischen der Bestandteile in einem «1 ■ . ' ; fibers and subsequent mixing of the ingredients in a «1 ■. ';

409848/1019409848/1019

ORIGINAL INSPECTEDORIGINAL INSPECTED

wäßrigen iledlum vor.aqueous iledlum before.

Zementklinker mit Gips wird nach dam !Trockenverfahren in \ Cement clinker with gypsum is made according to the dam! Dry process in \

einer Zementfabrik zerkleinert, während Asbest in einer Asbest- [). sementfabrik zerfasert wird. Das trockene Zementpulver wird zur:,; Asbestzement-Fabrik gebracht, wo es mit nach dem liaßverfahren T'. zerfasertem Asbest und V/asser gemischt wird.a cement factory while asbestos is crushed in an asbestos [). cement factory is frayed. The dry cement powder is used to : ,; Asbestos cement factory brought where it is with after the liaßverfahren T '. fiberized asbestos and water is mixed.

Zum Zerkleinern von Zementklinker und Gips zur Herstellung von Zement werden in den Sementfabriken unterschiedliche Sroncielmühlen verwendet, in denen die Stoffe ununterbrochen trockenzerkleinert werden· Die Trommelmühlen besitzen ein Aspirationssystem mit eingebauten Filtern zum Auffangen des Zementstaubs, der näh--."' rend des Trockenmahlens entsteht.For crushing cement clinker and gypsum for manufacture different Sronciel mills are used in the cement factories used, in which the substances are continuously dry-shredded · The drum mills have an aspiration system with built-in filters to catch the cement dust, the sewing -. "' rend of dry grinding.

Die Kühlen werden mit kontinuierlichen Förderanlasen-.ausgerüstet, welche den fertigen aermahlenen Zement von den Zementmühlen zu Behältern (Bunkern) fördern, die zur Aufbewahrung dienen Aus den Bunkern wird der Zement durch eine der nachstehenden Ecförderungswelsen (pneumatischer Kraftfahrzeug - oder Eisenbahn- ■'ν transport) zur Asbestzement-Fabrik gebracht, ■ ■;/.The chillers are equipped with continuous conveyor systems. which the finished poorly ground cement from the cement mills promote to containers (bunkers) that are used for storage The cement is extracted from the bunkers through one of the following catfish (pneumatic motor vehicle or railway ■ 'ν transport) to the asbestos cement factory, ■ ■; /.

Der Asbest wird in der Asbestzement-Fabrik in zvjei Stufen ' 'The asbestos is produced in the asbestos cement factory in zvjei stages ''

naßzerfasert. Zuerst werden die Asbestfasern untö-r Zugabe einer.'..wet-frayed. First the asbestos fibers are added with a. '..

geringen V/assermenge in einem Kollergang geknetet, um ihre Yer·^ - V bindung su brechen. Dann werden sie in einem anderen Apparat in;'/' einem wäsü^en Medium zu feinen Fasern aufgeteilt, d.h. sie werdci:kneaded a small amount of water in a pan mill to get their Yer · ^ - V to break ties. Then they are in another apparatus in; '/' divided into fine fibers in a watery medium, i.e. they are:

zerfasert· Der folgende Arbeltsgang beim Zubreiten einer Asbest^,,*The following work step when preparing an asbestos ^ ,, *

409848/1019 .?.■■% 409848/1019 .?. ■■%

.'.ν ORIGiMAL INSPECTED . '. ν ORIGiMAL INSPECTED

zementsuapenslon besteht im Zugeben von Zementpulver in die
wäßrige Suspension zerfaserten Asbests und m einem Sorgfa
Durchmischen der Bestandteile In Mischern unterschiedlicher Bauart
cement suapenslon consists of adding cement powder to the
aqueous suspension of shredded asbestos and m a Sorgfa
Mixing the ingredients in mixers of different designs

Auf diese Welse 1st das Zubereiten einer Asbestzement-Suspension nach den zur Zelt bestehenden Verfahren mit der Verwendung
eines ganzen Komplexes energie aufwendig er großer Maschinen und Ausrüstungen zum Vorbehandeln der Ausgangsrohstoff-Bestandteile
vor dem Mischen verbunden.
In this way, the preparation of an asbestos-cement suspension according to the existing methods is used
a whole complex of energy-consuming large machines and equipment for pretreating the raw material components
connected before mixing.

Außerdem ist das Zerkleinern von Zementklinker nach dec: -Trockenverfahren mit sehr starker Staubentwicklung verbunden, so daß
•!Filter zum Auffangen des Zsmentstaubs verwendet werden müssen,
während zur Aufbewahrung des Zements teure Großraumbunker erforderlich sind· < ■ ',
In addition, the crushing of cement clinker according to the dec: drying process is associated with a very high level of dust, so that
•! Filters must be used to collect the dust,
while expensive large bunkers are required to store the cement · <■ ',

Zur Beförderung des Zementpulvers zu a.en Asbestzement-Fabriken müssen Verdichtung^- und pneumatische Pumpen(bel Verwendung _) pneumatischer Beförderung) aufgestellt werden oder es müssen, ^e- ! schlossene Behälter für die Beförderung mittels Eisenbahn- oder
Kraftfahrzeugtransportes verwendet werden.
To transport the cement powder to a.en asbestos-cement factories, compression ^ - and pneumatic pumps (if using _) pneumatic transport) must be installed or ^ e- ! closed containers for transport by rail or
Motor vehicle transport can be used.

Die verwendetenApparate und die Ausrüstung zum Zerfasern do£ Asbests sowie zum Zubereiten einer Asbestzement-Suspension arbeiten periodisch, wodurch^rschwert wlrd^ ein kontinuierliches Herstellen von Erzeugnissen, z.B. Bohren und Safe In auf Rohr- und' ■
Tafelformmaschmen.^ y.
The apparatus and equipment used for shredding the asbestos and for preparing an asbestos-cement suspension work periodically, which makes it difficult to continuously manufacture products, e.g. drilling and safe-in on pipe and pipe
Tafelformmaschmen. ^ Y.

Es sind auch verschiedenartig gebaute Trommel-i.Iehi'kammeiimÜhlen bekannt, die nach dem Haß- und TrockenproduktionsverfahroiThere are also differently built drum-iehi'kammei i mills known, which after the hate and dry production method

409848/1019409848/1019

ORIGINAL INSPi=CTEDORIGINAL INSPi = CTED

arbeiten. Diese llühlen bestehen aus einem, um eine Zentralachse ro»* tierenden Zylindergehäuse, welches durch gelochte Trennwände m Kammern unterteilt ist, die zu 350 bis 40% mit Mahlkörpern (Kugeln und Zylpebs) gefüllt sind. Diese llühlen sind zum Zerkleinern von Stoffen mit gleicher Festigkeit bestimmt.work. These mills consist of a cylinder housing rotating around a central axis, which is subdivided by perforated partition walls into chambers that are 350 to 40% filled with grinding media (balls and cylinders). These mills are designed for grinding materials with the same strength.

Es wurden Versuche unternommen, sie zum gleichzeitigen Zerkleinern von Bestandteilen einer Rohstoffcharge mit unterschiedlicher Festigkeit in einer Kühle zu verwenden. Dies führte abery^u sr wünschten'iR'Däultaten^icht^ da hierbei der Mahlfeiiiheltsgrad der Bestandteile des Mahlguts unterschiedlich wird. So wird beispielsweise der Stoff mit einer geringeren Festigkeit zu stark gemahlen·, während em fosterer Stoff ungenügend gemahlen wird. Daher ist cc unzulässig, Klinker, Gips und Asbest jemeinsam <und gleichzeitig!. In., einer Kühle zu mahlen, da der Asbest zu staJck gemahlen wird, wobei/-seine Fasern gekürzt werden und er selbst eine Bewehrungseljcncch.a.f ten verliert.Attempts have been made to crush them simultaneously of components of a raw material batch with different To use firmness in a cool. This resulted in abery ^ u sr wished 'iR'Deultaten ^ icht ^ because here the grinding degree of the Components of the grist is different. For example the material with a lower firmness is ground too much, while a foster substance is insufficiently ground. Hence cc inadmissible, clinker, plaster of paris and asbestos together <and at the same time !. In., to grind in a cool place, since the asbestos is ground to stiff, with / -is Fibers are shortened and he himself a Reinforcement Eljcncch.a.f ten loses.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren Susi Zubereiten einer Asbestzement-Suspension mit einer gerneig-«;.The invention is based on the object of a method Susi Preparing an asbestos-cement suspension with a happy- «;.

samen Vermahlung von Klinker und Gips zu entwickeln, das es er- ■'■} mÖgllcht, den technologischen Prozeß bedeutend zu vereinfachen unaVto develop seed grinding of clinker and gypsum, which is to simplify ER ■ '■} mÖgllcht, the technological process significantly UNAV

es in einem Aggregat direkt an der Verbrauchsstelle der Asbestzement -Suspenion durchzuführen sowie auch eine Anlage zum Durchführen dieses Verfahrens zu schaffen, deren konstruktive Ausführung das Senken der Kosten für die Ausrüstung und des. 2norgit in an aggregate directly at the point of consumption of the asbestos cement -Suspension to carry out as well as an installation to carry out to create this process, its constructive execution lowering the cost of equipment and the. 2norg

409848/ 1019409848/1019

ORfSiNAL INSPECTEDORfSiNAL INSPECTED

Landes . gewährleistet.Country. guaranteed.

Diese Aufgabe wird dadurch gelöst, das be la Zubercl- .This problem is solved by the be la Zubercl-.

tn einer Asbestzement-Suspension durcii gemeinsames Zernahloii von Zementklinker· und Gips, ITaßserfasarn von Asbest und darauffolgendes Mischen erfindungsgemäa -Zementklinker und Gips).,.^ tn an asbestos-cement suspension by common Zernahloii of cement clinker · and gypsum, ITassserfasarn of asbestos and subsequent mixing according to the invention -cement clinker and gypsum).,. ^

Semeinsam in einem wäßrigen Medium zermahien werden. vy Zweckmäßigerweise werden während des gemeinsamen !.lahlens v&. Zementklinker und Gips Abfälle der Asbest zement-Produkt lon, z.B. ■' Schieferscharben, bei der Bearbeitung von Asbestzenient-HohrendGri ;jBe ground together in an aqueous medium. vy Appropriately, v &. Cement clinker and gypsum waste of asbestos cement product lon, e.g. ■ ' Slate, when working on Asbestzenient-HohrendGri; j

erhaltene Späne und auch nasse Endabfälle von AsbastsecenttafGin ''/Shavings received and also wet final waste from AsbastecenttafGin '' /

Die erfindun^syemase Anlage besitzt In einem auf Zapfen ro- \<\ The inventive syemase plant has in a cone ro- \ <\

—\ 1 - - \ 1

tierenden Zylinder gehäuse untergebrachte ilanitaern, zwo i\von dqnon, 'j eine Zwlschenkatanerviand und eine mit Schlitzen versehende Zv/iscylinder housing housed ilanitaern, two i \ from dqnon, 'j an intermediate catanerviand and a zv / is provided with slits

wand am Austritt besitzen und eine Kuge!trommelmühle darstellen, ψ die zum gemeinsamen Zermahien von Zementklinker und Gips in eines" wäßrigen Medium dient und die sich an einer der Gehäusestirnseite"'*· anschließt, welche'mit einer Aufgabevorrichtung für Hohstoffe veribunden 1st,"während die dritte Kammer, die von der Kugelmühle durc eine Zwischenwand mit Zentraloffnung getrennt ist und sich an die , entgegengesetzte GehäuseStirnseite anschließt, als Vorrichtungwall at the outlet and represent a spherical drum mill ψ which is used to grind cement clinker and gypsum together in an "aqueous medium and which is connected to one of the front side of the housing" which is connected to a feed device for raw materials, " while the third chamber of the ball mill Pieter a partition wall is separated by Zentraloffnung and adjoins the, opposite housing end face, as a device

zum iiaßzerfasern von Asbest dient, wobei die Kammer, welche zwischen ihnen liegt und zum Durchmischen der aufbereiteten Bestandteile dient, mindestens zwei öffnungen zum Entladen der zubereiteten Suspension und eine entsprechende Anzahl von Mischschaufeln hais used to shred asbestos, the chamber, which between them and serves to mix the prepared ingredients, at least two openings for unloading the prepared Suspension and a corresponding number of mixing blades ha

409848/1019409848/1019

ORIGINAL INSPECTEDORIGINAL INSPECTED

ί; 'solche diese öffnungen überdecken, wobei sich diese Klschkancer in·· einen unbeweglich befestigten Blechkörper mit einem Entladestützen ■ befindet.ί; 'such a cover these openings, whereby these Klschkancer in ·· an immovably fixed sheet metal body with an unloading support ■ is located.

Das Thesen der Erfindung besteht in folgenden.The theses of the invention are as follows.

Da Zementklinker und Gips gemeinsam in einem \7a3rigen Liadlun
zermahlen werden, wurde es möglich, den ganzen Prozeß des Zubers 1-tens einer Asbestzement-Suspension in einem Aggregat durchzuführen, das direkt an der Verbrauchsstelle der Suspension, d.h. in der Asbestzement-Fabrik, wo die Erzeugnisse hergestellt werden, aufgestellt ist. - :■
Because cement clinker and gypsum together in one Liadlun
be ground, it became possible to carry out the whole process of the first preparation of an asbestos-cement suspension in a unit that is set up directly at the point of use of the suspension, ie in the asbestos-cement factory where the products are manufactured. -: ■

Zementklinker und Gips werden mittels eines beliebigen Baför~ ' derung 3mittels zur Asbestzement-Fabrik gebracht. Aus den Aufgabe- bunkern, welche für ein kontinuierliches und gleichmäßiges Zuführen sorgen, gelangt der Stoff in eine Zerkleinerungsanlage. Das erfindimgs."emä3e Mahlverfahren für Zementklinker und Gips sieht vor, da3 zum zerkleinerten Gemisch Wasser in einer Menge von 3>5 kls 4-0>o hinzugefügt wird. Die genaue Wassermenge, welche in das Gemisch aus v. Zg cent kl inker und Gips eingeführt werden soll, hängt von der UaturVCement clinker and gypsum are removed using any Baför ~ ' change 3means brought to the asbestos cement factory. From the task bunkers, which ensure a continuous and even supply, the material reaches a shredding plant. The invention. "Emä3e The grinding process for cement clinker and gypsum stipulates that 3 added water in an amount of 3> 5 kls 4-0> o to the crushed mixture will. The exact amount of water which is in the mixture of v. Zg cent kl inker and gypsum should be introduced depends on the UaturV

des verwandten Stoffs ab. Asbest wird in einem wäßrigen Median in Iof the related substance. Asbestos is found in an aqueous median in I.

derselben Anlage zerfasert, in der Zementklinker und Gips zerklei-;· nert werden. Der Asbest wird jedoch getrennt vom. Zementklinker und j Gips la einer Kammer, die durch, eine Zwischenwand abgeteilt ist, {-zerfasert· the same plant in which cement clinker and gypsum are crushed; · be nert. However, the asbestos is separated from the. Cement clinker and j Plaster of paris la a chamber, which is divided by a partition, {-fribed ·

Da der Asbest, welcher zum Zerfasern über einen AufgabebunkerAs the asbestos, which has to be shredded via a feed bunker

409848/1019409848/1019

ORIGINAL INSPECTEDORIGINAL INSPECTED

der Anlage gleichet Ig zugeführt wird, aus einem vorbereiteten Geniisch, unterschiedlicher Asbestsorten besteht, wird eine solche , VYassermenge m den zu zerfasernden Asbest eingegossen, daß eine Asbestzement-Suspension mit 88 bis SOf0 Endfeucht; igkei^sjchalt er- ; halten wird. Das Wasser soll derartig m das Gemisch eingeführt werden, daß die V/asserdosis ltn vorgegebenen Bereich des Prozentge-. halts mit großer Genauigkeit eingehalten werden kann· Hierdurch ι v/erden die Arbeiten beim Formen der Asbestzement-Erzeugnisse oriai* chtert. Der zerfaserte Asbest wird mit dc-ia sermahlenan Zornont und" Glsp in derselben Anlage In einer getrennten Llschkacimer gemischt· Zum besseren Verständnis des Wesens der Erfindung sind derthe plant gleichet Ig is fed, consists of a prepared Geniisch, different types of asbestos, is one which the VYassermenge m poured to fraying asbestos that an asbestos cement suspension with 88 to SOF 0 Endfeucht; igkei ^ sjchalt er ; will hold. The water should be introduced into the mixture in such a way that the water dose is in the specified range of the percentage. can be adhered to with great accuracy. The shredded asbestos is mixed with dc-ia sermahlenan Zornont and "Glsp" in the same plant In a separate Llschkacimer · For a better understanding of the essence of the invention are the

erfindungsjcemäßen Beschreibung Zeichnungen einer . v^usfuhrung der Anlageaccording to the invention Description drawings of a. v ^ execution of the plant

zum Zubereiten einer Asbeatzement-Suspenslon beigelegt; es zeigt Pig· 1 die Gesamtansicht der erfindungsgemäßen Anlage, Flg· 2 einen Längsschnitt durch dieselbe Anlage, Fig. 3 einen Schnitt nach Ljnle III-III der Fig. 2 in vergrößerten Maßstab,included for preparing an asbeat cement suspension; it shows Pig 1 the general view of the plant according to the invention, Flg 2 a longitudinal section through the same system, Fig. 3 shows a section according to Ljnle III-III of FIG. 2 in an enlarged Scale,

Flg. 4 einen Schnitt nach Linie IV-IY der Fig. 2 im vergrößerten Haßstab undFlg. 4 shows a section along line IV-IY of FIG. 2 on an enlarged scale Hatred and

Flg. 5 einen Schnitt nach Linie V-V der Fig. 2 im vergrößerten Maßstab.Flg. 5 shows a section along line V-V of FIG. 2 on an enlarged scale Scale.

Die In den Zeichnungen abgebildete Anlage besteht aus einem auf Zapfen 1 (Fig. 2) rotierenden Zylindergehäuse 2 (Flg. 1, 2) und in ihn befindlichen Kammern 5, 4, 5 und 6, welche voneinander .The system shown in the drawings consists of one on pin 1 (Fig. 2) rotating cylinder housing 2 (Flg. 1, 2) and in it located chambers 5, 4, 5 and 6, which are from each other.

409848/1019409848/1019

- 8 - 4 - 8 - - 4

durch Zwischenwände 7 und 7' getrennt sind.are separated by partitions 7 and 7 '.

Die Kammern J> und 4 bilden eine Kugeltrommelmühle 8 zum gemeinsamen Zermahlen von Zementklinker und Gips in einem wäßrigen Medium. Die Kugelmühle schließt sich an eine Stirnseite des Ge- . häuses 2 an, welche über eine Schnecke 9 El" einem (aus der Zeichnung nicht ersichtlichen) Gewichtsdosator verbunden ist.The chambers J> and 4 form a ball drum mill 8 for the joint grinding of cement clinker and gypsum in an aqueous medium. The ball mill closes on an end face of the Ge. housing 2, which is connected via a screw 9 E l ″ to a weight meter (not shown in the drawing).

Eine Kammer 5 schließt sich an die entgegengesetzte Stirnseite des Gehäuses 2 an und dient als Vorrichtung zum ITaszerfasern von Asbest, welcher durch eine Speiseschnecke 10, die sich im Zapfen 1 befindet, zugeführt wird.A chamber 5 closes on the opposite end face of the housing 2 and serves as a device for ITaszerfibers from Asbestos, which is produced by a feed screw 10, which is located in the spigot 1 is located, is supplied.

Die zwischen den Kammern 4 und 5 angeordnete Kammer 6 dient zum Hlschen des zerfaserten Asbests mit zerkleinertem Zementklinker und Gips.The chamber 6 arranged between the chambers 4 and 5 is used to the cup of the frayed asbestos with crushed cement clinker and plaster of paris.

Die Kammer 6 besitzt an ihren Wänden vier, gleichmäßig über den Umfang verteilte Öffnungen 11 (Flg. 3) zum Entladen dc-r zubereiteten Suspension. Diese Öffnungen sind längs der gesamten Lan;; der löschkammer 6 angeordnet.The chamber 6 has four on its walls, evenly across the circumference distributed openings 11 (Flg. 3) prepared for unloading dc-r Suspension. These openings are along the entire length of the Lan ;; the arcing chamber 6 is arranged.

Jede öffnung 11 wird durch eine I-lischschaufel 12 überdeckt. Die Schaufeln 12 begünstigen das Homogenisieren des zerfaserten 'Each opening 11 is covered by an I-table scoop 12. The blades 12 favor the homogenization of the frayed '

Asbests mit dem Zement schlamm und verhindern ein direktes Austreten der Suspension aus der Anlage. '-. Die lilschkammer S befindet sich in einem Blechkörper 14 mit1, einem Snt lade stutzen 15 und sitzt unbeweglich auf Stützen 13 und'Asbestos sludge with the cement and prevent the suspension from escaping directly from the plant. '-. The lilschkammer S is located in a sheet metal body 14 with 1 , a Snt loading nozzle 15 and sits immovable on supports 13 and '

Die Zapfen 1 (Flg. 2) laufen in Lagern 16, welche auf Funda~ 409848/1019The pins 1 (Flg. 2) run in bearings 16, which on Funda ~ 409848/1019

menten 17 aufgesetzt sind·elements 17 are put on

Dia Innenfläche des Gehäuses 2 ist mit einer auskleidung 18 versehen, welche es gegen Verschleiß schützt„ Jeda der Kan-mem 3, 4- und 5 der .Anlage hat ο in Kannloch, welches durch einen Deckel 19 geschlossen ist. ITach dem abnehmen des letzteren wird der Zugang möglich, um. Mahlkörper In die Kammer hineinzulegen, dio Auskleidung auszubessern sowie, viqhil es erforderlich ist, die dt Schlitzen versehenen Zwischenwände auszuwechseln und zu reinigen.The inner surface of the housing 2 is provided with a lining 18 which protects it against wear. After removing the latter, access will be possible to. Place grinding media in the chamber, repair the lining and, if necessary, replace and clean the partition walls with the slots.

Die erste Kammer 3 wird mit Mahlkörper», mit 90 , 80, 60 mm Durchmesser gefüllt. Dar !/Süil.ungsgrad beträgt 0,32 bis 0,35. Die zweite Kammer 4- wird mit Zylpebs gefüllt. Die vierte Kammer 5 der Anlage wird mit Me tails täben mit 50 bis 80 mm Durchras ss er gefüllt, welche den Asbest' Im wäßrigen Medium zerfasern. Ss wird ein füllung sgr ad dieser Kammer von 0,32 bis 0,35 vorgesehen.The first chamber 3 is with grinding media », with 90, 80, 60 mm Diameter filled. Dar! / Sul. Degree is 0.32 to 0.35. the second chamber 4- is filled with Zylpebs. The fourth chamber 5 of the The system is filled with metal blocks with a 50 to 80 mm diameter, which fray the asbestos in an aqueous medium. Ss becomes a filling sgr ad this chamber provided from 0.32 to 0.35.

Die Zwischenkammerwände 7 und 7' bestehen aus Segmenten. Die* Zwischenkammerwand 7·* besteht aus Segmenten, hat keine Schlitze und nur eine Zentralöffnung 20 (Fig. 5). Die Größe der Zenüraloffnung 20 in der Zwischenkammerwand 7'gewährleistet ein ungehindert? überfließen der Suspension aus zerfasertem Asbest und soll nicht kleiner als der Innendurchmesser des Zapfens 1 sein.The intermediate chamber walls 7 and 7 'consist of segments. The* Intermediate chamber wall 7 * consists of segments and has no slots and only one central opening 20 (Fig. 5). The size of the central opening 20 in the intermediate chamber wall 7 'ensures unhindered? The suspension of fiberized asbestos overflows and should not be smaller than the inner diameter of the pin 1.

Die Zwlschenkammerwände 7 haben schlitzförmige öffnungen 21The intermediate chamber walls 7 have slot-shaped openings 21

(Flg. 4) für den Durchgang dos Stoffs.(Flg. 4) for the passage of the fabric.

Nachstehend wird die Arbeitsweise der erfIndungsgemäßon Anlage beschrieb&niiie^bei wird auch das erfmdungsgcmäse Verfahrzum Zubereiten einer Asbestzement-Suspension klar ersichtlich.The following is the operation of the invention The system described & niiie ^ with the process according to the invention is also used Preparing an asbestos-cement suspension clearly visible.

4Q9848/1Q194Q9848 / 1Q19

Rohstoffe: Zementklinker, Gips und auch, feste Abfälle dei1 Asbestzement-Produkt lon· Sie werden durch den Dosator in die Anlage und zwar über dsn Zapfen 1 (S1Ig. 2) in die Kammer 3 entsprechend dem Pfeil na" kontinuierlich eingeführt. Eierher wird auch \7asser ge le It et.Raw materials: cement clinker, gypsum and also solid waste dei 1 Asbestos cement product lon · They are continuously introduced through the doser into the system via the pin 1 (S 1 Ig. 2) into the chamber 3 according to the arrow n a " Eierher is also called \ 7asser ge le It et.

Die Rohstoffzusammensetzung ist wie folgt:The raw material composition is as follows:

97 bis 98 Gewichtsteile Zementklinker, j97 to 98 parts by weight of cement clinker, j

2 bis 3 Gewicht stelle Gips ' \ 2 to 3 weight place plaster ' \

auf 40 bis pO Gewichtstelie Wasser· \ to 40 to pO part by weight of water \

über den anderen Zapfen 1 wird durch die Speiseschnecke 1O ; aus einem Asbestbunker Asbest in Sichtung des Pfeils "b" (S1Ig. 1) : der Eammer 5 der Anlage kontinuierlich zugeführt· Der Asbest wird ; In einer LIenge von 15 bis 20 Gew.% vom Zement-', Gips- und £rassarijefticht genommen. Die zusammen mit dem Asbest zugeleitete Wasser- ' menge wird so reguliert, daß die fertige Asbestzement-Suspension . eine Feuchtigkeit von 88 bis 90^3 hat· Abfälle der Asbestzement-Produktion werden in einer Menge von 1 bis 3 Gew.% vom Rohstoff-Gesamtgewicht hinzugefügt. Unter der Einwirkung des Staudrucks, welcher durch die in die Anlage tretenden Stoffe erzeugt wird, und während der Rotation des Gehäuses 2 um seine Achse werden die Stoffe in Richtung des Pfeils "c" längs der Aniagenachse verschoben. Auf ihrem Weg vom Zapfen 1 zur !.Ilschkammer 6 werden -Zementklinker, Gips und feste Abfälle in den Hämmern 3 und 4· in einem wäa^isen Medium zerkleinert und verwandeln sich in ZemeiLtschlamm, welcher über die schlitzförmigen öffnungen, dar ZwIseherikamaerwandThe feed screw 1O; from an asbestos bunker asbestos in sighting of the arrow "b" (S 1 Ig. 1): the chamber 5 of the system is continuously fed · the asbestos is ; In a LIenge 15 to 20 wt.% Of the cement ', gypsum and £ r assarijefticht taken. The amount of water supplied together with the asbestos is regulated so that the finished asbestos-cement suspension. has a humidity of 88 to 90 ^ 3 · Waste from asbestos cement production is added in an amount of 1 to 3 % by weight of the total weight of the raw material. Under the action of the dynamic pressure which is generated by the substances entering the system, and during the rotation of the housing 2 about its axis, the substances are displaced in the direction of the arrow "c" along the system axis. On their way from the peg 1 to the isle chamber 6, cement clinker, plaster of paris and solid waste are crushed in the hammers 3 and 4 in a white medium and turn into cement sludge, which, through the slit-shaped openings, forms the wall of the wall

409848/1019409848/1019

7 Ln die Löschkammer 6 gelangt. Hierher wird auch aus der7 Ln the extinguishing chamber 6 arrives. This is also where the

5 über die Zentralöffnung 20 in der Zwlschenkanmerv.:and 7' dor im wäßrigen Medium zerfaserte Asbest zugeführt. In der Lllschkammer5 via the central opening 20 in the Zwlschenkanmerv. : and 7 'dor asbestos fiberized in an aqueous medium. In the baby room

6 wird der Zementschiainm mit «/zerfaserten asbest homogenisiert, d.h. es wird eine Asbestzement-Suspension zubereitet. Die fertige Suspension wird über die öffnungen 11 (Flg. 2) in den Entladestutzen 15 gegossen, von wo sie durch eine Pumpe zu den Verbrauohsbehäitarn befördert wird. V/enn im Stärunssfall die Anlage länjer als 1,5 bis 2 Stunden abgeschaltet wird, so werden die Kammern 3 und 4, in denen Zement zerkleinert wird, mit "asser ausgewaschen· 6 the cement slurry is homogenized with / defibrated asbestos, i.e. an asbestos cement suspension is prepared. The finished one The suspension is fed into the unloading connection via the openings 11 (Fig. 2) 15 poured, from where they are pumped to the Verbrauohsbehäitarn is promoted. If the system is longer in the event of a power failure than 1.5 to 2 hours is turned off, so the chambers 3 and 4, in which cement is crushed, washed out with "water ·

409848/1019409848/1019

Claims (9)

PiESIiTilTSHlüCHSPiESIiTilTSHlüCHS P 56 o68 9. Mai 1974 L/BrP 56 o68 May 9, 1974 L / Br Verfahren zum Zubereiten einer Asbestzement-Suspension durch gemeinsames Zermahlen von Zementklinker '.und Gips, ITaßserfasern von Asbest und darauffolgendes lllsehen derselben, dadurch gekennzeichnet ,daß Zementklinker und Gips gemeinsam in Glnem vorigen Medium zermahlen werden.Process for preparing an asbestos-cement suspension by jointly grinding cement clinker and gypsum, fiberglass of asbestos and subsequent seeing the same, characterized in that cement clinker and The plaster of paris can be ground together in the previous medium. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet ,daß wahrend des gemeinsamen ilahlens von Zementklinker und Gips Abfälle der Asbestzement-Produktion hinzugefügt vj er den,2. The method according to claim 1, characterized that during the joint grinding of cement clinker and gypsum added waste from asbestos cement production vj he the, Anlage zum Durchführen des Verfahrens nach Anspruch 1, dadurch gekennzeichnet ',daß sie in einem 3 · Plant for performing the method according to claim 1, characterized in that it is in one auf Zapfen (1) rotierenden Zylindergehäuse (2) untergebrachte Kammern (3» 4» 5jü2iä. 6) besitzt, ^zwei fron denen eine Zwischenkäuferwand und eine alt Schlitzen versehene Austrittszwischenwand (7) besitzen und eine Zuge!trommelmühle (8) darstellen, die zum £jecelnsainen Zermahlen von Zementklinker und Gips in eine ei wäßrigen Ledluia dient und die sich an eine der Stirnselten des Gehäuses (2 anschließt, welche mit einer .Aufgabevorrichtung für Sohstoffe verbunden ist, während die dritte Eacmer (5)» die von der Kugelmühle durch eine Zwischenwand (7') mit einer Zentralöffnung (20) getrenron pin (1) rotating cylinder housing (2) housed chambers (3 »4» 5jü2iä. 6) has, ^ two front of which an intermediate buyer wall and an outlet partition wall (7) with old slits own and represent a pulley drum mill (8), which is used to jecelnsainen Grinding cement clinker and gypsum into an egg aqueous Ledluia is used and which is attached to one of the front faces of the housing (2 connected, which is connected to a feed device for Sohstoffe is, while the third eacmer (5) »that of the ball mill separated by a partition (7 ') with a central opening (20) ist und sich an die entgegengesetzte Gehäusestirnseite anschließt sowie mit einer Speiseschnacke (10) für .asbest verbunden ist, alsis and connects to the opposite housing face as well as with a snack (10) for .asbestos, as 409848/101 9409848/101 9 zun Haßzerfasern vonAsbest dient, wobei die ICair.ner (5), welche zwischen ihnen liegt und zum Durchmischen der aufbereiteten Bestandteile dient, in Ihren Wänden mindestens zwei öffnungen (11) zum Entladen der zubereiteten Suspension und eine entsprechende Anzahl von llischschaufein (12) hat, welche diese öffnungen überdecken, wobei sich die Mischkammer (6) m einem unbeweglich befestigten Blechkörper (14) mit einem Entladestutzen (15) befindet. is used to shred asbestos, whereby the ICair.ner (5), which lies between them and for mixing the processed Components serves, in your walls at least two openings (11) for unloading the prepared suspension and a corresponding Has number of table scoops (12) which cover these openings, wherein the mixing chamber (6) m one fixed immovably Sheet metal body (14) with a discharge nozzle (15) is located. 409848/1019409848/1019 Leersei'teBlank page
DE19742422434 1973-05-11 1974-05-09 Process for producing an asbestos cement suspension and device for carrying out the process Expired DE2422434C3 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
SU1914688 1973-05-11
SU1914689 1973-05-11
SU731914689A SU528736A1 (en) 1973-05-11 1973-05-11 Method for preparing asbestos cement suspension
SU731914688A SU525265A1 (en) 1973-05-11 1973-05-11 Drum mill

Publications (3)

Publication Number Publication Date
DE2422434A1 true DE2422434A1 (en) 1974-11-28
DE2422434B2 DE2422434B2 (en) 1976-11-25
DE2422434C3 DE2422434C3 (en) 1977-07-14

Family

ID=

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2407244A3 (en) * 2010-06-16 2014-12-24 ThyssenKrupp Industrial Solutions AG Method for comminution of material by a tube mill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2407244A3 (en) * 2010-06-16 2014-12-24 ThyssenKrupp Industrial Solutions AG Method for comminution of material by a tube mill

Also Published As

Publication number Publication date
FR2228586A1 (en) 1974-12-06
FR2228586B1 (en) 1976-06-25
DE2422434B2 (en) 1976-11-25
IT1034049B (en) 1979-09-10

Similar Documents

Publication Publication Date Title
DE69607992T2 (en) Method and system for reprocessing aggregate from concrete waste material
DE2637558A1 (en) METHOD AND DEVICE FOR GENERATING A CONTINUOUS FLOW OF MATERIAL
DE602006000909T2 (en) MIXING MACHINE WITH VERTICAL AXLE FOR PROCESSING MIXTURES
DE2423087A1 (en) METHOD AND DEVICE FOR THE CONTINUOUS PRODUCTION OF SEALED PANELS
DE4132906C2 (en) Using a plasterboard reconditioning machine
DE69424776T2 (en) METHOD FOR PRODUCING A MOLDED BODY
DE19781515C1 (en) Device for crushing and mixing soil material
DE2827912A1 (en) METHOD AND DEVICE FOR PRODUCING ACTIVATED MIXTURE MINERAL COMPONENTS
DE1558105C3 (en) Method and device for mixing molding materials
DE19822490A1 (en) Fine mill
WO2020030729A1 (en) Method and system for treating concrete residual water
DE2319146A1 (en) DEVICE FOR MACHINING WORK PIECES
DE2422434A1 (en) PROCESS FOR PREPARING ASBESTOS-CEMENT SUSPENSION AND EQUIPMENT FOR CARRYING OUT THE PROCEDURE
DE400229C (en) Process for continuous wet grinding in ball mills
DE922267C (en) Mixing drum
DE387995C (en) Process for the dry crushing of solid materials down to a particle size below 0.008 mm in diameter
DE60105266T2 (en) HIGHLY FLEXIBLE THIN AGGLOMERATED PLATES OR PANELS AND METHOD AND APPARATUS FOR THE PRODUCTION THEREOF
DE2422434C3 (en) Process for producing an asbestos cement suspension and device for carrying out the process
DE3113129A1 (en) Process for mixing water, cement and filler
DE1236915B (en) Process for processing fine-grained raw building material
DE676586C (en) Process and device for the continuous production of superphosphate
DE3815053A1 (en) Apparatus for mixing
DE2948983C2 (en) Device for activating building material binders such as cement
DE2061422A1 (en) Bowl crushing machine foundry sand
CH351555A (en) Process for comminuting and slurrying chalk and similar substances and apparatus for carrying out this process

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
E77 Valid patent as to the heymanns-index 1977
8339 Ceased/non-payment of the annual fee