DE2351953A1 - Tower crane with folding jib - has sections joined by intermediate frame with pivot pins in end faces - Google Patents

Tower crane with folding jib - has sections joined by intermediate frame with pivot pins in end faces

Info

Publication number
DE2351953A1
DE2351953A1 DE19732351953 DE2351953A DE2351953A1 DE 2351953 A1 DE2351953 A1 DE 2351953A1 DE 19732351953 DE19732351953 DE 19732351953 DE 2351953 A DE2351953 A DE 2351953A DE 2351953 A1 DE2351953 A1 DE 2351953A1
Authority
DE
Germany
Prior art keywords
boom
foot part
jib
tip part
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19732351953
Other languages
German (de)
Other versions
DE2351953C2 (en
Inventor
Klaus Dr Ing Hoesler
Hans Tax
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peiner Hebe- und Transportsysteme 5500 Trier GmbH
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19732351953 priority Critical patent/DE2351953C2/en
Publication of DE2351953A1 publication Critical patent/DE2351953A1/en
Application granted granted Critical
Publication of DE2351953C2 publication Critical patent/DE2351953C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/346Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes with locking devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/342Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes with telescopic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The crane has a jib foot section pivoting on it about a horizontal axis, and a head section, both of triangular section with the apex upwards, being particularly of the type with a travelling crab. A V-shaped recess is formed between the adjacent jib section ends, with the axis of its apex at the bottom and running transversely. The head section folds parallel to the foot section so that their longitudinal members which are lowest in the working position lie against each other. The two jib sections are joined by means of an intermediate frame, attached to each section by a link with a pivot pin in each section end face.

Description

Patentanwälte Dipl.,~Ixg. E¥e;ckmäkk. 2351953Patent attorneys Dipl., ~ Ixg. E ¥ e; ckmäkk. 2351953

DlP£.-ING.. EL Wj&ICKMANN,- DΓPL1-PHnTSL Dr. K., FeNCKEDlP £. -I NG .. EL Wj & ICKMAN N, - DΓPL 1 -PHnTSL Dr. K., FeNCKE

'- DiPL.,-lN(i. RÄ,We:εCKJSiann, Dipl-Ckim- B.. Hubee'- DiPL., - lN (i. RÄ, We: εCKJSiann, Dipl-Ckim- B .. Hubee

8: MÖNCHEN 86, DEN POSTFACH 860,820 QfJM 8: MÖNCHEN 86, THE POST BOX 860,820 QfJ M

MÖHL&TRASSE Z2,: RUFNUMMER. 48 39 21/22Möhl & ROUTE Z2: NUMBER. 48 39 21/22

C9839 21722)C9839 21722)

Hans: T a χ t
8 M ΐι η C hen 40 , Potsdamer Straße 3
Hans: T a χ t
8 M ΐι η C hen 40, Potsdamer Strasse 3

T u r m k r a η.
(Stichwort: Zusammenklappharer Ausleger)
T urmkra η.
(Keyword: collapsible arm)

Die Erfindung- betrifft einen Turmkran mit einem Kranturm und einem aus einem, an dem Eranturm um- eine horizontale Achse schwenkbar angelenkten Auslegerfußteil und einem Auslegerspitzenteil bestehenden Ausleger, insbesondere Laufkatzenaus!eger> bei dem der Äuslegerfußteil und der Auslegerspitzenteil einen im wesentlichen gleichen, gleichschenklig-dreieckigen Querschnitt besitzen, die Spitze des gleichschenklig-dreieckigen Querschnitts (Obergurt) - in der Arbeitslage des Auslegers betrachtet - oben liegt und zwischen den einander zugekehrten Endflächen der Auslegerteile ein V-förmiger Einschnitt gebildet ist mit in der Basis des gleichschenklig-dreieckigen Querschnitts liegender und senk- .The invention relates to a tower crane with a crane tower and one of one, on the Eran tower around a horizontal one Axis pivoted boom foot part and a boom consisting of a boom tip part, in particular a trolley boom in which the boom foot part and the boom tip part have an essentially identical, isosceles triangular cross section own, the tip of the isosceles triangular cross-section (top flange) - in the working position of the boom considered - lies above and between each other facing end faces of the boom parts a V-shaped incision is formed with in the base of the isosceles triangular Cross-section lying and submerged.

509817/01^//509817/01 ^ //

_ 2; —._ 2; -.

recht zur Auslegerlängsachse stehender V-Scheitelachse und zur Längsachse des Auslegers im wesentlichen senkrechter ¥inkelhalbierungsebene»V-vertex axis standing right to the longitudinal axis of the boom and to the longitudinal axis of the boom essentially perpendicular ¥ angle bisector plane »

Solche Turmkräne sind bekannt.Such tower cranes are known.

Es ist weiter aus der DAS-1 556 346 bekannt, bei einem Turmkran mit einem zweiteiligen Ausleger die beiden Auslegerteile durch Gelenke miteinander verbindbar zu machen, derartf daß der Auslegerspitzenteil an den Auslegerfußteil achsparallel zu diesem beiklappbar ist, derart, daß je eine Seitenfläche und die Obergurte des Auslegerfußteils und des Auslegerspitzenteils einander benachbart liegen. Diese Ausführungsform hat den Vorteil, daß nach Beiklappung des Auslegerfußteils an den Turm und Beiklappung des Auslegerspitzenteile an den Auslegerfußteil die Gesamthöhe des durch Beiklappen entstan^- denen Pakets senkrecht zur Längsachse der Auslegerteile und senkrecht zur Gelenkachse zwischen Kranturm und Auslegerfußteil gemessen allein durch den Turmquerschnitt und den einfachen Auslegerquerschnitt bestimmt ist, ohne daß der Auslegerspitzenteil zusätzlich zur Höhe des Pakets beiträgt. Dies ist bedeutsam, weil die Gesamthöhe des Krans beim Straßentransport dadurch verringert wird, was wiederum im Hinblick auf das Durchfahren von Tunnels und Unterfahren von Straßen überspannenden Leitungen wesentlich ist.It is to continue from the DAS 1556346 known to a tower crane with a two-piece boom, the two boom parts by joints connected to one another in such a way f that the cantilever tip part to the Auslegerfußteil axially parallel to this is beiklappbar such that each have a side surface, and the upper chords of the boom foot part and the boom tip part are adjacent to one another. This embodiment has the advantage that after folding the boom foot part onto the tower and folding the boom tip parts onto the boom foot part, the total height of the package created by folding in is perpendicular to the longitudinal axis of the boom parts and perpendicular to the hinge axis between the crane tower and the boom foot part, measured solely by the tower cross-section and the simple boom cross-section is determined without the boom tip portion additionally contributing to the height of the package. This is significant because it reduces the overall height of the crane during road transport, which in turn is essential with regard to driving through tunnels and driving under lines spanning roads.

Nachteilig bei der bekannten Ausführungsform ist, daß das Beiklappen des Auslegerfußteils an den Turm und des Auslegerspitzentells an den Auslegerfußteil mit einem Kraftaufwand bewirkt werden muß, der nicht mit den am Kran ohnehin installierten liindwerken aufgebracht werden kann, sondern entweder besondere Kraftgeräte, oderThe disadvantage of the known embodiment is that the folding of the boom foot part on the tower and the boom tip part on the boom foot part a force must be effected that does not come with the liindwerke already installed on the crane can be, but either special strength equipment, or

509817/0151509817/0151

eine Handbetätigung erfordert.requires manual operation.

Auch in der DT-OS 2 121 232 wird ein Turmkran beschrieben, dessen Auslegerteile derart zusammengeklappt werden können,daß der Auslega^pitzenteil beim Ausklappen an den Auslegerfußteil um eine zur Ausleger- und Turmlängsachse senkrechte Achse gleichzeitig seitlich versetzt wird,, so daß er mit seinem Obergurt zu unterst neben dem Auslegerfußteil zu'liegen kommt. Nachteilig ist hierbei der konstruktive Aufwand: zwei kardanisch an beide Auslegerteile angelenkte Lenker, die auf Biegung beansprucht werden und entsprechend groß dimensioniert sein müssen und eine aus dem Ausleger herausragende Rahmenkonstruktion«A tower crane is also described in DT-OS 2 121 232, the boom parts of which can be folded up in such a way that the boom tip part stops when it is unfolded the boom foot part at the same time laterally offset about an axis perpendicular to the boom and tower longitudinal axis so that it comes to rest with its upper belt at the bottom next to the boom foot part. Disadvantageous here is the constructive effort: two gimbals hinged to both boom parts, which bend are stressed and must be dimensioned accordingly large and one protruding from the boom Frame construction «

Der Erfindung liegt die Aufgabe^ zugrunde, einen Turmkran der eingangs bezeichneten Art so auszugestalten·, daß der Auslegerspitzenteil im Verlaufe der Vorgänge des Anlegens des Auslegerfußteils an den Turm und des Auslegerspitzenteils an den Auslegerfußteil im wesentlichen zwangsläufig in diejenige Stellung gelangt, in der ge eine Seitenfläche und die Obergurte des Auslegerfußteils und des Auslegerspitzenteils einander benachbart liegen.The invention is based on the object ^ a tower crane of the type described at the outset in such a way that the boom tip part in the course of the processes the application of the jib foot part to the tower and the jib tip part to the jib foot part essentially inevitably arrives in the position in which ge a side surface and the upper chords of the boom foot part and the boom tip portion are adjacent to each other.

Zur Lösung dieser Aufgabe wird erfindungsgemäß vorgeschlagen, daß die beiden Auslegerteile durch einen Zwischenräumen miteinander verbunden sind, welcher mit jedem der Auslegerteile durch ein Gelenk mit annähernd in -, der jeweiligen Endfläche liegender Gelenkachse verbunden ist.To solve this problem, it is proposed according to the invention that that the two boom parts through a gap are connected to each other, which is connected to each of the boom parts by a joint with approximately in -, the respective end face lying joint axis is connected.

Bei einer bevorzugten Ausführungsform der Erfindung ist der Zwischenrahmen mit dem Auslegerfußteil durch einIn a preferred embodiment of the invention, the intermediate frame with the boom foot part is through one

509817/0151509817/0151

erstes Gelenk verbunden, dessen Gelenkachse in der.Kante zwischen der Endfläche und einer Seitenfläche des Auslegerfußteils liegt und mit dem Auslegerspitzenteil durch ein zweites Gelenk verbunden, dessen Gelenkachse in der Kante zwischen der Basisfläche und der Endfläche des Auslegerspitzentexls liegt; dabei ist der Zv/ischenrahmen an dem Auslegerfußteil durch lösbare Verbindungsmittel im Bereich der V-Sdieitelachse derart feststellbar, daß die zweite Gelenkachse parallel zur Kante zwischen der Endfläche und der Basisfläche des Auslegerfußteils liegt.first joint connected, the joint axis of which is in the edge lies between the end face and a side face of the boom foot part and with the boom tip part connected by a second hinge, the hinge axis of which is in the edge between the base surface and the end surface of the boom tip is located; the intermediate frame is attached to the boom foot part by releasable connecting means so identifiable in the area of the V-Sdieitelachse, that the second hinge axis is parallel to the edge between the end face and the base face of the boom foot part lies.

Diese Ausführungsform ist aus verschiedenen Gründen besonders vorteilhaft:This embodiment is particularly advantageous for various reasons:

509817/0151509817/0151

Das Beiklappen des Auslegerfußteils an den Kran und des Auslegerspitzenteils an den Auslegerfußteil bis in die Stellung t in der je eine Seitenfläche und die Obergurte des Auslegerfußteils und des Auslegerspitzenteils einander benachbart sind, kann hier ausschließlich durch Seile bewirkt werden, die zur Abspannung der Auslegerteile in der Arbeitsstellung ohnehin benötigt werden, wobei die Lage der Auslegerteile während des Beiklappvorgangs in jeder Zwischenstellung durch die. jeweilige Seillänge eindeutig bestimmt ist.The folding of the jib foot part on the crane and the jib tip part on the jib foot part up to the position t in which one side surface and the upper chords of the jib foot part and the jib tip part are adjacent to one another can only be achieved here by ropes that are used to brace the jib parts in the Working position are required anyway, the position of the boom parts during the folding process in each intermediate position by the. respective rope length is clearly determined.

Zum anderen braucht beim Beiklappen nur einmal eine Gelenkumstellarbeit vorgenommen zu werden, nämlich dann, wenn der zunächst während des Beiklappens des Auslegerfußteils an den Turm mit dem Auslegerfußteil fixierte Zwischenrahmen vom Auslegerfußteil soweit gelöst werden muß, daß der Zwischenrahmen nachfolgend um die erste Gelenkachse geschwenkt werden kann. Diese Umstellarbeit kann aber - und dies ist ein besonderer Vorteil - durchgeführt werden, wenn der Auslegerfußteil bereits an dem Turm beigeklappt und die Arbeitsstelle deshalb so weit nach unten abgesenkt ist, daß ihr Zugang ohne Gefahr für die Arbeitsperson möglich ist..On the other hand, a joint changeover work only needs to be carried out once when folding in, namely when the intermediate frame, which is initially fixed to the tower with the cantilever foot part during the folding in of the boom foot part, has to be detached from the boom foot part to such an extent that the intermediate frame can subsequently be pivoted about the first hinge axis . However, this conversion work can - and this is a particular advantage - be carried out when the jib foot section has already been folded up on the tower and the work area is therefore lowered so far that it can be accessed without danger to the worker.

Im Regelfall werden die Endflächen des- Auslegerfußteils und des Auslegerspitzenteils mit der jeweiligen Basisfläche einen ¥inkel von 45° einschließen; die erste Phase der Beiklappvorgänge umfaßt dann das Beiklappen des Auslegerfußteils an den Turm und ein Verschwenken des ,Auslegerspitzenteils gegenüber dem Ausleger fußteil um 90°, so daß am Ende dieser Phase der AuslegerfußteilAs a rule, the end faces of the boom foot part and the boom tip part with the respective base area enclose an angle of 45 °; the first phase the folding processes then include folding the boom foot part on the tower and pivoting the , Boom tip part relative to the boom foot part by 90 °, so that at the end of this phase the boom foot part

5 0 9 8 1 7 / ÖI 515 0 9 8 1 7 / ÖI 51

in vertikaler Lage hängt und der Auslegerspitzenteil sich in horizontaler Stellung an den Auslegerfußteil anschließt und der V-förmige Spalt geschlossen ist.hangs in a vertical position and the boom tip part is in a horizontal position on the boom foot part connects and the V-shaped gap is closed.

Um die Beiklappvorgänge durchführen zu können, wird man eine Auslegerfußteilverstelleinrichtung vorsehen, welche eine Verstellung des Auslegerfußteils zwischen einer hängenden Stellung und der Arbeitsstellung gestattet; weiter wird man eine Auslegerspitzenteilversteileinrichtung vorsehen, welche mit der Auslegerfußteilverstelleinrichtung derart synchronisierbar ist, daß der Auslegerspitzenteil bei der Überführung des Auslegerfußteils von der Arbeitsstellung in die Hängestellung bei am Auslegerfußteil festgestelltem Zwischenrahmen um die zweite Gelenksachse bis zur Anlage der Endfläche des Auslegerspitzenteils an den Zwischenrahmen geschwenkt wird; die gleiche Auslegerspitzenteilver-1 Stelleinrichtung ist dann auch dafür zuständig, bei vom Auslegerfußteil gelöstem Zwischenrahmen das Beiklappen des Auslegerspitzenteils zusammen mit dem Zwischenräumen um die erste Gelenkachse an den Auslegerfußteil zu bewirken.In order to be able to carry out the folding processes, a boom foot part adjustment device will be provided which allows the boom foot part to be adjusted between a hanging position and the working position; Furthermore, a boom tip part adjustment device will be provided, which can be synchronized with the boom foot part adjustment device in such a way that the boom tip part is pivoted when the boom foot part is transferred from the working position to the hanging position with the intermediate frame fixed on the boom foot part around the second articulation axis until the end surface of the boom tip part rests on the intermediate frame ; Auslegerspitzenteilver- the same actuator 1 is then also responsible for causing at Auslegerfußteil dissolved from the intermediate frame folded in the cantilever tip part together with the intermediate spaces about the first hinge axis to the Auslegerfußteil.

Der Auslegerspitzenteilversteilantrieb kann von einem Auslegerspitzenteilverstellseil gebildet sein, welches von einem im Turmbereich angeordneten Auslegerspitzenteilverstellwindv/erk zu einer in einem mittleren Längenbereich des Auslegerfußteils angeordneten Umlenkstelle und von dort frei bis zu einer in einem mittleren Längenbereich des Auslegerspitzenteils angeordneten Angriffsstelle geführt ist. Um mit diesem Seil den Auslegerspitzenteil vollständig an den Auslegerfußteil beiklappen zu können und möglichst geringe SeilkräfteThe boom tip part adjustment drive can be from a Be formed jib tip part adjustment rope, which is arranged in the tower area by a jib tip part adjustment wind / Erk to a deflection point arranged in a central length area of the boom foot part and from there freely to a point of attack arranged in a central length region of the boom tip part is led. In order to fully attach the jib tip part to the jib foot part with this rope to be able to fold in and the lowest possible rope forces

509817/0151509817/0151

Jb- ■Jb- ■

und Reaktionskräfte an den Seilumlenkstellen zu haben, wird man den Abstand der Angriffsstelle von der Winkelhalbierungsebene des V-Einschnitts kleiner, vorzugsweise aber annähernd gleich dem Abstand der Umlenkstelle von dieser Winkelhalbierungsebene machen. Bevorzugt wird man die Umlenkstelle und die Angriffsstelle im Bereich des Obergurts anordnen, um möglichst große Angriffshebelarme gegenüber der z\^eiten Gelenkachse auch schon beim Beginn der ersten Phase des Beiklappvorgangs zu haben. and reaction forces at the rope deflection points, one becomes the distance between the point of attack and the bisecting plane of the V-incision smaller, but preferably approximately equal to the distance of the deflection point make of this bisector plane. The deflection point and the point of attack in the area are preferred of the upper chord, around the largest possible attack lever arms in relation to the two joint axis to have at the beginning of the first phase of the folding process.

Der Auslegerfußteil und der Auslegerspitzenteil können in der Arbeitsstellung durch je ein vom Kranturm hergeführtes Abspannseil getragen sein, dabei kann das den Auslegerfußteil haltende Abspannseil der Auslegerfußteilvers teil einrichtung zugehörig sein.In the working position, the jib foot part and the jib tip part can each come from the crane tower Guy rope be worn, while the guy rope holding the boom foot part can verse the boom foot part part of the facility.

Die beiden Abspannseile können von einer an der Turmspitze schwenkbar angeordneten Abspannspreize ausgehen, welche gegebenenfalls über eine Zwischenspreize vermittels eines. Abspannspreizenverstellseilzugs verstellbar ist.The two guy ropes can be from one at the top of the tower Pivotably arranged guy braces go out, which optionally mediate via an intermediate spreader one. Bracing spreader adjustment cable is adjustable.

Bei einer anderen, weniger bevorzugten Ausführungsform sind die beiden Ausle'gerteile in der Arbeitsstellung durch eine lösbare Verbindung im Bereich der V-Scheitelachse miteinander verbunden und die Gelenkachsen der den Zwischenrahmen und die beiden Ausleger verbindenden Gelenke sind - in der Arbeitsstellung betrachtet - in einer zur Längsachse des Auslegers parallelen, gegenüber der Basisfläche des Auslegers jedoch geneigten Ebene angeordnet .In another, less preferred embodiment the two boom parts are in the working position a detachable connection in the area of the V-apex axis and the joint axes of the intermediate frame and the joints connecting the two arms are - viewed in the working position - in one arranged parallel to the longitudinal axis of the boom, but inclined with respect to the base surface of the boom plane .

Die beiliegenden Figuren erläutern die Erfindung anhand eines Ausführungsbeispiels. Es stellen dar:The accompanying figures explain the invention using an exemplary embodiment. They represent:

.- 7 509817/0151 .- 7 509817/0151

Fig« 1 Einen erfindungsgemäßen Kran in Arbeitsstellung, Fig «1 A crane according to the invention in the working position,

Fig. 2 den Kran nach Fig. 1 in einer Zwischenstellung während des Beiklappens der Auslegerteile an den Turm,FIG. 2 shows the crane according to FIG. 1 in an intermediate position during the folding of the Boom parts to the tower,

Fig. 3 in Vergrößerung die Verbindungsstelle zwischen den beiden Auslegerteilen in der Arbeitsstellung gemäß Fig. 1,Fig. 3 shows an enlargement of the junction between the two boom parts in the working position according to FIG. 1,

Fig. 4 in Vergrößerung die Verbindungsstelle zwischen den beiden Auslegerteilen in der Zwischenstellung gemäß Fig. 2,Fig. 4 shows the connection point between the two boom parts in enlargement the intermediate position according to FIG. 2,

Fig. 5 die beiden Auslegerteile in der zueinander und zum Turm beigeklappten Stellung» Fig. 5 shows the two boom parts in the folded position to one another and to the tower »

Fig. 6 die Verbindungsstelle zwischen den beiden Auslegerteilen bei einer anderen Ausführungsform in Seitenansicht der Arbeitsstellung, 6 shows the connection point between the two boom parts in another embodiment in side view of the working position,

Fig. 7 eine Draufsicht zu Fig. 6 und7 shows a plan view of FIGS. 6 and

Fig. 8 eine Endansicht der beiden einanderFigure 8 is an end view of the two facing each other

beigeklappten Auslegerteile gem. Fig. 6 u.7.folded boom parts according to Fig. 6 and 7.

In der Ausführungsform nach den Figuren 1 bis 5 ist ein Laufgestell des Krans mit 10 bezeichnet. Dieses Laufgestell trägt einen Kranfuß 12. Über dem Kranfuß erhebt sich ein im Beispielsfall teleskopisch verkürzbarer Kranturm 14, der um eine horizontale Schwenkachse 16 nach hinten abklappbar ist.In the embodiment according to FIGS. 1 to 5, a running gear of the crane is designated by 10. This The bogie carries a crane foot 12. Above the crane foot rises a telescopically shortenable one in the example Crane tower 14, which can be folded down about a horizontal pivot axis 16 to the rear.

An dem Kranturm 14 ist um eine horizontale Schwenkach-On the crane tower 14 is a horizontal pivot axis

509817/0151509817/0151

se "TS ein Ausleger schwenkbar angelenkt* der· ganz allgemein mit: 20 bezeichnet ist;., Dieser- Ausleger 20 setzt sich aus einem AuslegerfuötedLl 22 und einem Auslegerspitzentell 24 zusammen... Die beiden Auslegerteile 22 und 24 sind bei 26 gelenkig: miteinander verbunden;: auf die Ausbildung der* Verbindungsstelle wird noch einzugenen sein« Jeder- der- Auslegerteile 22, 24 hat gleichschenklig-dreieckigen Querschnitt. Die Basisfläche des Auslegerftißtells ist mit 22a bezeichnet (Untergurt);, die Spitzenlinie ist mit 22b bezeichnet (Obergurt) ? die dem, Auslegerspitzenteil zugekehrte Endfläche des Auslegerfußteils ist mit 22c bezeichnet.. Entsprechiend ist die Basis— fläcne des Aus-legerspltzentells; mit 24a (Untergurt.},, die Spitzenlinie mit 24b (Obergurt); und die dem Auslegerfußteil zugekehrte Endfläche mit 24c bezeichnet-. Die Endflächen 22c und 24c· definieren zwischen sich . einen T-formigen Einschnitt 3&-r dessen Scheitellinie mit T-V bezeichnet ist. In. der Arbeitsstellung sind die beiden Auslegerteile 22 und 24 um. die Scheitellinie V-V miteinander^^ gelenkig, verbunden., -. .se "TS a boom pivotably articulated * which is generally designated by: 20;., This boom 20 is composed of a boom foot 22 and a boom tip part 24 ... The two boom parts 22 and 24 are articulated at 26: with one another connected ;: the formation of the * connection point will be discussed "Each of the boom parts 22, 24 has an isosceles triangular cross-section. The base area of the boom support is designated 22a (lower chord); the top line is designated 22b (upper chord) The end surface of the boom foot part facing the boom tip part is denoted by 22c .. The base area of the boom base part is correspondingly indicated by 24a (lower chord), the top line with 24b (upper chord); and the end surface facing the boom foot part with 24c The end surfaces 22c and 24c define between them a T-shaped incision 3 & - r, the apex line of which is denoted by TV the two boom parts 22 and 24 around. the apex line VV with each other ^^ articulated, connected., -. .

Die beiden Auslegerteile 22 und 24 sind in der Arbeitsstellung durch, je ein Abspannseil 22d und 24d abgespannt. Die beiden Abspannseile 22d und 24d gehen von einer Abspamispreize 2S aus, die um die Qelenkachse 18 gelenkig an dem lurm 14 befestigt ist« Diese Abspannspreize 28 ist vermittels eines Abspannsprei— ζenverStellseilzugs 30 gehalten und verstellbar,, der von einer nicht eingezeichiieten ¥lnde auf dem Laufgestell ausgeht und über eine Zwlsch-enspreize 3:2 läuft.In the working position, the two boom parts 22 and 24 are guyed by one guy rope 22d and 24d each. The two guy ropes 22d and 24d emanate from a spreader spreader 2S which is articulated to the tower 14 around the articulated axis 18 Running frame goes out and runs over an intermediate spreader 3 : 2.

Die Verbindung· zwischen den beiden Aus leger teilen 22 und 24 ist wie aus Fig.. 3 ersichtlich aufgebautrThe connection between the two cantilever parts 22 and 24 is constructed as shown in FIG

- 9- 9

50t817/015150t817 / 0151

An dem Auslegerfußteil 22 1st ein Zwischenräumen 34 um eine erste Gelenkachse I-I schwenkbar angelenkt; die Gelenkachse 1-1 fällt zusammen mit einer Kante der Endfläche 22c'des'Auslegerfußteils 22.At the boom foot part 22 there is a gap 34 a first articulation axis I-I pivotably articulated; the Joint axis 1-1 coincides with an edge of the End surface 22c 'of the boom foot part 22.

An dem Zwischenrahmen 34 Ist um eine zweite Gelenkachse II-II der Aus leger spitzenteil 24 schwenkbar angeordnet. Die zweite Gelenkachse H-II fällt mit der Scheitelachse V-V der Flg. 1 zusammen. BIe beiden Auslegerteile 22, sind durch In der Gelenkachse H-II liegende, losbare Einsteckbolzen 36 gelenkig miteinander verbunden. Solange die Einsteckbolzen 36 die beiden Auslegerteile 22, 24 an der Scheltelachse V-V zusammenhalten, liegt der Zwischen rain en 34 an der Endfläche 22c des AuslegerfußteiIs 22 an.On the intermediate frame 34 is about a second hinge axis II-II of the casual tip part 24 is pivotably arranged. The second joint axis H-II coincides with the vertex axis V-V of Flg. 1 together. The two boom parts 22, are detachable by lying in the joint axis H-II Insert pins 36 are articulated together. As long as the Insert pin 36 on the two boom parts 22, 24 hold together the rocker axis V-V, the intermediate rain en 34 on the end surface 22c of the boom foot 22.

Wenn der Aus leger spitzenteil 24 zum Zwecke des Zusammenlegens des Krans für späteren Straßentransport an den Aus leger fuß teil 22 und gemeinsam mit diesem an den Turm beigeklappt werden soll, so wird,, wie folgt vorgegangen:If the off casual tip part 24 for the purpose of collapsing of the crane for later road transport to the From the casual foot part 22 and together with it is to be folded up to the tower, proceed as follows:

Zunächst wird der Auslegerfußteil 22 SQ1 wie in Fig. 2 dargestellt,an den Turm 14 beigeklappt. Synchron dazu ViIrd durch Mittel, auf die noch einzugehen sein wird, der Auslegerspitzenteil 24 gegenüber dem Auslegerfußteil 22 um die zweite Gelenkachse H-II geschwenkt,- so daß der Auslegerspitzenteil· 24 eine im wesentlichen horizontale Stellung einnimmt* sobald der Auslegerfußteil 22 eine hängende Im wesentlichen vertikale Stellung einnimmt. Dabei schließt sich der V-förmige Einschnitt 38.' Der Zwischenrahmen 34 bleibt während dieses Vorgangs an dem Auslegerfußteil 22 fixiert.First, the jib foot part 22 SQ 1 is folded onto the tower 14, as shown in FIG. 2. Synchronously with this ViIrd by means, which will be discussed later, the jib tip part 24 is pivoted relative to the jib foot part 22 about the second hinge axis H-II, - so that the jib tip part 24 assumes an essentially horizontal position * as soon as the jib foot part 22 is suspended occupies a substantial vertical position. This closes the V-shaped incision 38. ' The intermediate frame 34 remains fixed on the boom foot part 22 during this process.

509 817/01 SI509 817/01 SI

Wenn die Stellung der Fig. 4 erreicht ist, so werden die Einsteck"bolzen 36 herausgezogen. Der Zwischenrahmen kann nunmehr zusammen mit dem Auslegerspitzenteil 24 um die erste Gelenkachse I-I geschwenkt werden, wobei der Zwischenrahmen 34 seine mit der Endfläche 24c zusammenfallende Position gegenüber dem Auslegerspitzenteil 24 "beibehält. Eine Sicherung-des ZwischenrahmensWhen the position of FIG. 4 is reached, the insert bolts 36 are pulled out. The intermediate frame can now be pivoted together with the boom tip part 24 about the first joint axis I-I, wherein the intermediate frame 34 its coincident with the end surface 24c Maintains position opposite the boom tip part 24 ". A securing of the intermediate frame

5 0 9 817/01515 0 9 817/0151

•A-• A-

34 an der Endfläche 24c des Auslegerspitzenteils 24 mag vorgesehen sein, ist aber nicht notwendig. Durch das Verschwenken des Auslegerspitzenteils 24 um die erste Gelenkachse I-1"wird schließlich die Endstellung gemäß Fig. 5 erreicht, in der der Obergurt 24b dem Obergurt 22b benachbart liegt und die Seitenfläche 24e des Auslegsrspitzenteils 24 der Seitenfläche 22e des Auslegerfußteils 22 benachbart liegt.34 on the end face 24c of the boom tip part 24 may be provided, but is not necessary. By the pivoting of the boom tip part 24 about the first Joint axis I-1 "is finally reached the end position according to FIG. 5, in which the upper belt 24b the Upper belt 22b is adjacent and the side surface 24e of the boom tip part 24 of the side surface 22e of the boom foot part 22 is adjacent.

Man erkennt, daß in der Stellung der Fig. 5 die Gesamthöhe des aus Turm 14, Auslegerfußteil 22 und Auslegerspitzenteil 24 gebildeten Pakets im wesentlichen nur durch den Turmquerschnitt und den Querschnitt des Auslegerfußteils bestimmt ist und die Höhe des Auslegerspitzenteils 24 zu der Höhe nichts beiträgt. It can be seen that in the position of FIG. 5, the total height of the tower 14, jib foot part 22 and Boom tip part 24 formed package substantially is only determined by the tower cross-section and the cross-section of the boom base and the height of the boom tip part 24 does not add anything to the height.

Die Überführung des Auslegerfußteils 22 aus der Stellung gemäß Figuren 1 und 3 in die Stellung gemäß Figuren 2 und 4 erfolgt durch entsprechendes Loslassen des Abspannseiles 22d; dieses Seil wiederum wird dadurch nachgelassen, daß der Abspannspreizenverstellseilzug 30 nachgelassen wird, wobei die Abspannspreize 28 und die Zwischenspreize 32 in Fig. 1 im Uhrzeigersinn schwenken. Gleichzeitig mit dem Nachlassen des Abspannseils 22d wird ein AuslegersOitzenverstellseil 40 angezogen, das von einer Auslegerspitzenverstellseilwinde 42 kommend über eine Umlenkrolle 44 an der Turmspitze und eine Umlenkstelle 45 im Bereich des Obergurts 22b des Auslegerfußteils 22 zu einer Angriffsstelle 46 im Bereich des Obergurts 24b des Auslegerspitzenteils 24 verläuft. Zu beachten istj daß dieses Seil, das von der Umlenkrolle 44 bis zu der Um-The transfer of the jib foot part 22 from the position according to FIGS. 1 and 3 into the position according to FIGS 2 and 4 takes place by releasing the guy rope 22d accordingly; this rope in turn is thereby subsided, that the brace adjustment cable 30 is slackened, wherein the brace 28 and the intermediate spreader 32 pivot clockwise in FIG. 1. Simultaneously with the decrease in the Guy rope 22d is drawn to a jib tip jib rope 40 driven by a jib jib jib rope winch 42 coming via a pulley 44 at the top of the tower and a deflection point 45 in the area of the Upper chord 22b of the jib foot part 22 to an attack point 46 in the area of the upper chord 24b of the jib tip part 24 runs. It should be noted that this rope, which runs from the pulley 44 to the

- 11 -- 11 -

509817/0151509817/0151

lenkstelle 45 innerhalb des Ausleger-fuSteils 22 verläuft, an der Umlenkstelle 45 aus dem. Inneren des Auslegerfußteils 22 herausgeführt ist und von dort völlig frei "bis zu der Angriffsstelle 46 läuft. Das Abspannseil 24d des Auslegerspitzenteils wird bei der Überführung des Auslegers von der Stellung der Fig. 1 und 3 in die Stellung der Figuren 2 und 4 schlaff» Die Synchronisierung zwischen dem Abspannseil 22d und dein Auslegerspitzenverstellseil 40 1st nicht dargestellt, versteht sich aber von selbst.steering point 45 runs within the boom base 22, at the deflection point 45 from the. Inside the Outrigger foot part 22 is led out and from there "runs completely free" to the point of attack 46. The Guy rope 24d of the jib tip part is moved from the position of FIG. 1 when the jib is transferred and 3 in the position of Figures 2 and 4 slack » The synchronization between the guy rope 22d and your boom tip adjustment rope 40 is not shown, but it goes without saying.

Das gleiche Auslegerspitzenverstellseil 40» das beim Übergang von der Stellung der Figuren 1 und 3 In die Stellung der Figuren 2 und 4 dafür sorgt,; daß der Äuslegerspitzentell 24 gegenüber dem Äuslegerfußteil 22 um etwa 90° im Gegenzeigersinn (betrachtet In FIg. 1) verschwenkt wird, wird auch dazu benutzt, um aus der Stellung der Figuren 2 und 4 heraus den Auslegerspit— zenteil 24- an den bereits zum. Turm 1.4 beigeklappten Auslegerfußteil 22 auch^noch beizuklappen. Der Seilverlauf in FIg. 2 zeigt, daß dies ohne weiteres möglich ist, weil das Auslegerspitzenverstellseil 40 auf seinem Verlauf von der Umlenkstelle 45 zur Angriffs- * stelle 46 ein Moment um die Gelenkachse Γ-Ί erzeugen kann.The same jib Spitz-adjusting cable 40 "that in the transition from the position of Figures 1 and 3. In the position of Figures 2 and 4 ensures; that the Äuslegerspitzentell 24 opposite the Äuslegerfußteil 22 (as viewed in FIG. 1) by about 90 ° in the counterclockwise direction is pivoted, is also used to order from the position of Figures 2 and 4 out the Auslegerspit- zenteil 24 to the already on. Tower 1.4 folded boom foot part 22 also ^ still to be folded. The course of the rope in Fig. 2 shows that this is easily possible because the jib tip adjustment cable 40 can generate a moment about the hinge axis Γ-Ί on its course from the deflection point 45 to the point of application 46.

Zu beachten ist auch noch, daß der Abstand der Umlenkstel le 45 und der Angriffsstelle 46 von der Winkelhalbierungsebene ¥-¥ ungefähr gleich ist. Die Bedeutung dieser Aussage ergibt sich ohne weiteres aus Fig. 2: wäre der Abstand der Angriffsstelle 46 von der Winkelhalbierungsebene ¥-¥ großer als der Abstand der Umlenkstelle 45 von der ¥inkelhalbierungsebene ¥-¥, so könnte der Auslegerspitzenteil 24 aus der Stellung der Fig. heraus nicht ganz an den Auslegerfußteil 22 beigeklapptIt should also be noted that the distance between the deflectors le 45 and the point of attack 46 from the bisector plane ¥ - ¥ is roughly the same. The meaning of this statement is readily apparent from FIG. 2: would the distance of the point of attack 46 from the bisector plane ¥ - ¥ greater than the distance of the deflection point 45 from the ¥ angle bisector ¥ - ¥, so could the boom tip part 24 from the position of FIG. not fully folded out onto the boom foot part 22

-12--12-

509817/0151509817/0151

werden; wäre^ andererseits der Abstand der UmIenksteile 45 von der ¥inkellialbierungsebene ¥-¥ wesentlich größer als der Abstand der Angriffsstelle 46 von dieser Ebene, so würden sehr große Seilkräxte und Reaktionskräfte an der Umlenkstelle 45 auftreten, um den Auslegerspitzenteil 24 ganz an den AuslegerfuSteil 22 beizuklappen.will; on the other hand would be the distance between the deflectors 45 from the ¥ incellialbeing level ¥ - ¥ much larger than the distance between the point of attack 46 and this plane, very large rope forces and reaction forces would arise of the deflection point 45 occur around the boom tip part 24 to be fully folded onto the jib foot part 22.

In der Ausführungsform der Figuren 6, 7 und 8 sind gleiche Teile mit gleichen Bezugszeichen versehen,jeweils vermehrt um die Zahl 100«In the embodiment of Figures 6, 7 and 8 are Identical parts are provided with the same reference numerals, respectively increased by the number 100 «

Die beiden Auslegerteile 122 und 124 sind in der Arbeitsstellung gemäß Figuren 6 und 7 um eine Gelenkachse, die mit der V-rScheitelachse V-V zusammenfällt, gelenkig miteinander verbunden. Diese Gelenkverbindung ist lösbar. Außerdem sind die beiden Auslegerteile durch den Zwi— schenrahmen 134 miteinander verbunden. Dieser Zwischenrahmen 134 ist einerseits durch ein Gelenk 148 mit der Gelenkachse III-III mit dem Auslegerfußteil 122 und andererseits durch ein Gelenk 150 mit der'Gelenkachse IV-IV mit dem Ausleger spitz enteil 124 verbunden.The two boom parts 122 and 124 are in the working position according to FIGS. 6 and 7, articulated with one another about a hinge axis which coincides with the V-r vertex axis V-V tied together. This articulation is releasable. In addition, the two boom parts are through the intermediate interconnecting frame 134 connected to each other. This intermediate frame 134 is on the one hand by a joint 148 with the joint axis III-III with the boom foot part 122 and on the other hand through a joint 150 with the joint axis IV-IV with the boom pointed enteil 124 connected.

Um den Auslegerspitzenteil 124 an den Auslegerfußteil 122 beizuklappen, wird die Verbindung zwischen den beiden Teilen in der V-Scheitelachse V-V gelöst, so daß sich dann, der Rahmen 134 um die Gelenkachse III-III und der Auslegerspitzenteil um die Gelenkachse IV-IV drehen kann, bis die Stellung der Fig. 8 erreicht ist. In dieser Stellung liegt wieder Obergurt 124b an Obergurt 122b und auch die Seitenflächen 122e und 124e liegen aneinander an.Around the boom tip portion 124 to the boom foot portion 122 close, the connection between the two parts in the V-vertex axis V-V is released, so that Then, the frame 134 rotate about the hinge axis III-III and the boom tip portion about the hinge axis IV-IV can until the position of FIG. 8 is reached. In this position, the upper belt 124b again lies on the upper belt 122b and the side surfaces 122e and 124e also lie against one another at.

Damit eine Parallelstellung der Auslegerteile eintritt, ist es notwendig, daß die durch die beiden GelenkachsenSo that a parallel position of the boom parts occurs, it is necessary that the two joint axes

- 13 -- 13 -

509817/0151509817/0151

- iär- - iär-

III-III und ,IV-IV bestimmte Ebene parallel zur Längsachse des Auslegers - in Arbeitsstellung betrachtet liegt. Die Lage, welche die beiden Gelenkachsen III—III und IV-IV einnehmen müssen, damit einerseits die Auslegerteile beim Zusammenklappen nicht im Bereich der Endflächen 122c,124c zusammenstoßen und sich die Parallelstellung deshalb nicht erreichen läßt und andererseits die Seitenflächen 122e, 124e nach Beiklappung in einem möglichst geringen Abstand von einander liegen, läßt sich rechnerisch oder experimentell ohne weiteres bestimmen. III-III and IV-IV certain plane parallel to the longitudinal axis of the boom - viewed in the working position. The position which the two joint axes III-III and IV-IV must take, so that on the one hand the boom parts when collapsing are not in the area of the end faces 122c, 124c collide and the parallel position cannot therefore be achieved and on the other hand the side surfaces 122e, 124e after folding in one The smallest possible distance from one another can easily be determined by calculation or experiment.

Nachzutragen ist noch zu beiden Ausführungsformen, daß der Ausleger von'einer Laufkatze befahren wird, die in Fig. 1 eingezeichnet und dort mit 50 bezeichnet ist.It should be added to both embodiments that the boom is driven on by a trolley which is in Fig. 1 is drawn in and denoted by 50 there.

- 14 509817/0151 - 14 509817/0151

Claims (1)

PatentansprücheClaims 1.7Turmkran mit einem Kranturm und einem aus einem ^-^ an dem Kranturin um eine horizontale Achse schwenkbar angelenkten Auslegerfußteil und einem Auslegerspitzenteil bestehenden Ausleger, insbesondere Laufkatzenausleger,, bei dem der Auslegerfußteil und der Auslegerspitzenteil einen im wesentlichen gleichen, gleichschenklig-dreieckigen Querschnitt besitzen, die Spitze des gleichschenklig-dreieckigen Querschnitts (Obergurt) - in der Arbeitslage des Auslegers betrachtet - oben liegt und zwischen den einander zugekehrten Endflächen der Auslegerteile ein V-förmiger Einschnitt gebildet ist mit in der Basis des gleichschenklig-dreieckigen Querschnitts liegender und senkrecht zur Auslegerlängsachse stehender V-Scheitelachse und zur Längsachse des Auslegers im wesentlichen senkrechter Winkelhalbierungsebene, wobei die beiden Auslegerteile durch Gelenke miteinander verbunden sind, derart, daß der Auslegerspitzenteil an den Auslegerfußteil achsparallel zu diesem beiklappbar ist, derart, daß je eine Seitenfläche und die Obergurte des Auslegerfußteils und des Auslegerspitzenteils einander benachbart liegen, dadurch gekennzeichnet, daß die beiden Auslegerteile (22, 24) durch einen Zwischenrahmen (34) miteinander verbunden sind, welcher mit jedem der Auslegerteile (22, 24) durch ein Gelenk mit in der jeweiligen Endfläche t (22c, 24c) liegender Gelenkachse verbunden ist. * ,1.7Turmkran with a crane tower and one of a ^ - ^ wherein the Auslegerfußteil and the boom tip portion have a substantially same isosceles-triangular cross-section on the crane Turin about a horizontal axis pivotably articulated Auslegerfußteil and a cantilever tip part existing boom, in particular trolleys boom ,,, the tip of the isosceles triangular cross-section (top chord) - viewed in the working position of the boom - lies at the top and a V-shaped incision is formed between the facing end surfaces of the boom parts with a base of the isosceles triangular cross section lying perpendicular to the boom axis V-apex axis and to the longitudinal axis of the boom essentially perpendicular bisector plane, the two boom parts are connected to one another by joints, in such a way that the boom tip part can be folded axially parallel to the boom foot part, such that each a side surface and the upper chords of the jib foot part and the jib tip part are adjacent to one another, characterized in that the two jib parts (22, 24) are connected to one another by an intermediate frame (34) which is connected to each of the jib parts (22, 24) by a joint is connected in the respective end surface t (22c, 24c) lying joint axis. *, 2. Turmkran nach Anspruch 1, dadurch gekennzeichnet, daß der Zwischenräumen (34) mit dem Auslegerfußteil (22) durch ein erstes Gelenk verbunden ist, dessen Gelenkachse (I-I) (erste Gelenkachse) in der Kante zwischen der Endfläche (22c) und einer Seitenfläche (22e)2. Tower crane according to claim 1, characterized in that that the intermediate spaces (34) with the boom foot part (22) is connected by a first joint, the Joint axis (I-I) (first joint axis) in the edge between the end surface (22c) and a side surface (22e) - 15 5 09817/0151 - 15 5 09817/0151 des Auslegerfußteiles (22) liegt und mit dem Auslegerspitzenteil (24) durch ein zweites Gelenk verbunden ist, dessen Gelenkachse (IT-II)(zweite Gelenkachse)in . der Kants zwischen der Basisfläche (24a) und der Endfläche (24c) des Auslegerspitzenteiles (24) liegt und daß der'Zwisehenrahmen (34) an dem Auslegerfußteil (22) durch lösbare Verbindungsmittel (36) derart feststellbar ist, daß die zweite Gelenkachse (II-II) parallel zur Kante zwischen der Endfläche (22c) und der Basisfläche (22a) des Auslegerfußteiles (22) liegt.of the boom foot part (22) and connected to the boom tip part (24) by a second joint whose joint axis (IT-II) (second joint axis) in. the edge lies between the base surface (24a) and the end surface (24c) of the boom tip part (24) and that the toe frame (34) on the boom foot part (22) can be fixed in this way by releasable connecting means (36) is that the second hinge axis (II-II) is parallel to the edge between the end surface (22c) and the base surface (22a) of the boom foot part (22) is located. Turmkran nach einem der Ansprüche 1 und 2, dadurch gekennzeichnet, daß die Endflächen (22c, 24c) des Auslegerfußteiles (22) und des Auslegerspitzenteiles (24) mit der je\^eiligen Basisfläche (22a, 24a) einen Winkel von ca. 45° einschließen.Tower crane according to one of Claims 1 and 2, characterized in that the end faces (22c, 24c) of the jib foot part (22) and the jib tip part (24) with the respective base surface (22a, 24a) enclose an angle of approx. 45 °. Turmkran nach einem der Ansprüche 2 und 3, dadurch gekennzeichnet, daß eine Auslegerfußteilverstelleinrichtung vorgesehen ist, welche eine Verstellung des Auslegerfußteils (22) zwischen einer hängenden Stellung und der Arbeitsstellung gestattet und daß eine Auslegerspitzenteilverstelleinrichtung vorgesehen ist, welche mit der Auslegerfußteilverstelleinrichtung derart synchronisiert ist, daß der Auslegerspitzenteil (24) bei der Überführung des Auslegerfußteils (22) von der Arbeitsstellung in die Hängestellung bei am Auslegerfußteil (22) festgestelltem Zwisehenrahmen (34) um die zweite Gelenkachse (II-II) bis zur Anlage der Endfläche (24c) des Auslegerspitzenteils. (24) an den Zwischenrahmen (34) geschwenkt wird und welche sodann bei vom Auslegerfußteil (22) gelöstem Zwisehenrahmen (34) ein Beiklappen des Auslegerspitzenteils (24) zusammen mit dem Zwisehenrahmen (34) um die erste Gelenkachse (i-I)an den Auslegerfußteil (22) gestattet.Tower crane according to one of Claims 2 and 3, characterized in that a jib foot part adjustment device is provided, which an adjustment of the boom foot part (22) between a hanging position and the working position and that a boom tip part adjustment device is provided, which is synchronized with the boom foot part adjustment device in such a way that the boom tip part (24) when transferring the boom foot part (22) from the working position to the hanging position with the toe frame (34) fixed on the boom foot part (22) around the second hinge axis (II-II) up to the abutment the end face (24c) of the boom tip part. (24) is pivoted to the intermediate frame (34) and which then, with the toe frame (34) detached from the jib foot part (22), the jib tip part is folded in (24) together with the toe frame (34) around the first hinge axis (i-I) on the jib foot part (22). - -16 509817/0151 - -16 509817/0151 5. Turmkran nach. Anspruch 4, dadurch gekennzeichnet , daß der Auslegerspitzenteilverstellantrieb'ein Auslegerspitzenteilverstellseil (40) umfaßt, welches von einem im Turmbereich angeordneten Auslegerspitzenteilverstellwindwerk zu einer in einem mittleren Längenbereich des Auslegerfußteils (22) angeordneten Umlenkstelle (.45) und von dort frei bis zu einer in einem mittleren Längenbereich des Auslegerspitzenteils (24) angeordneten Angriffsstelle (46) geführt ist, wobei der Abstand der Angriffsstelle (46) von der Winkelhalbierungsebene (VMf) des V-Einschnitts (38) kleiner, vorzugsweise aber annähernd gleich dem Abstand der Umlenkstelle (45) von dieser ¥inkelhalbierungsebene (¥-¥) ist.5. Tower crane after. Claim 4, characterized in that the boom tip part adjustment drive'ein Comprises boom tip part adjustment rope (40), which is arranged in the tower area from a boom tip part adjustable winch to one in one middle length range of the boom foot part (22) arranged deflection point (.45) and from there free up to an attack point (46) arranged in a central length region of the boom tip part (24) is performed, the distance of the point of attack (46) from the bisector plane (VMf) of the V-incision (38) smaller, but preferably approximately the same as the distance between the deflection point (45) and this bisecting plane (¥ - ¥) is. 6. Turmkran nach Anspruch 5, dadurch gekennzeichnet, daß die 'Umlenkstelle (45) und die* Angriffsstelle (46) im Bereich des Obergurts (22b, 24b) angeordnet sind.6. Tower crane according to claim 5, characterized in that the 'deflection point (45) and the * Attack point (46) are arranged in the area of the upper belt (22b, 24b). 7. Turmkran nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet , daß der Auslegerfußteil (22) und der Auslegerspitzenteil (24) in der Arbeitsstellung durch je ein vom Kranturm hergeführtes Abspannseil (22d, 24d) abgespannt ist.7. Tower crane according to one of claims 1 to 6, characterized characterized in that the boom foot part (22) and the boom tip part (24) in the working position by one guy rope each from the crane tower (22d, 24d) is tensioned. 8. Turmkran nach Anspruch 7, dadurch gekennzeichnet , daß die beiden Abspannseile (22d, 24d) von einer an der Turmspitze schwenkbar angeordneten Abspannspreize (28) ausgehen, welche ggf. über eine Zwischenspreize (32) vermittels eines Abspannspreizenverstellseilzuges (30) verstellbar ist.8. Tower crane according to claim 7, characterized in that the two guy ropes (22d, 24d) start from a brace (28) which is pivotably arranged at the top of the tower and which, if necessary, extends over an intermediate spreader (32) can be adjusted by means of an anchoring spreader adjustment cable (30). 9. Turmkran nach Anspruch 1, dadurch gekennzeichnet , daß die beiden Auslegerteile (22, 9. Tower crane according to claim 1, characterized in that the two boom parts (22, - 17 -- 17 - 5 09817/01515 09817/0151 24) in der Arbeitsstellung durch eine lösbare Verbindung (36) im Bereich der V-Scheitelachse V-V miteinander verbunden sind und daß die Gelenkachsen der den Zv/ischenr ahmen (34) und die beiden Auslegerteile (22, 24) verbindenden Gelenke - in der Arbeitsstellung betrachtet - in einer zur Längsachse des Auslegers (20) parallelen gegenüber der Basisfläche des Auslegers (20) -jedoch geneigten Ebene liegen.24) in the working position by a detachable connection (36) in the area of the V-apex axis V-V with one another are connected and that the hinge axes of the Zv / ischenrames (34) and the two boom parts (22, 24) connecting joints - viewed in the working position - in one to the longitudinal axis of the boom (20) are parallel to the base of the boom (20) -but inclined plane. 509817/01S1509817 / 01S1
DE19732351953 1973-10-16 1973-10-16 Tower crane with collapsible boom Expired DE2351953C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19732351953 DE2351953C2 (en) 1973-10-16 1973-10-16 Tower crane with collapsible boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19732351953 DE2351953C2 (en) 1973-10-16 1973-10-16 Tower crane with collapsible boom

Publications (2)

Publication Number Publication Date
DE2351953A1 true DE2351953A1 (en) 1975-04-24
DE2351953C2 DE2351953C2 (en) 1983-10-20

Family

ID=5895594

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732351953 Expired DE2351953C2 (en) 1973-10-16 1973-10-16 Tower crane with collapsible boom

Country Status (1)

Country Link
DE (1) DE2351953C2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2614223A1 (en) * 1975-04-03 1976-10-14 Roger Benoit Cadillon BOOM ARRANGEMENT ON A TELESCOPIC MAST OF A TOWER CRANE
DE2747048A1 (en) * 1976-10-22 1978-04-27 Grues Boilot Pingon Richier S FOLDING BOOM FOR AN EXTENDING CRANE
DE3229949C1 (en) * 1982-08-12 1983-11-17 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane
FR2531054A2 (en) * 1982-07-30 1984-02-03 Potain Sa Unfoldable crane having a telescopic mast and a jib made of several articulated elements.
DE3303524A1 (en) * 1983-02-03 1984-08-09 Wilhelm 5020 Frechen König Revolving tower crane
DE3311588A1 (en) * 1983-03-30 1984-10-11 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with split jib

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104973519B (en) * 2015-06-10 2017-10-03 南京工业大学 A kind of derrick crane of pair of lifting arm joint
CN109467016B (en) * 2018-12-29 2021-02-09 徐州重型机械有限公司 Crane with a movable crane
CN110697436B (en) * 2019-10-16 2020-12-01 长沙理工大学 Horizontal rotation's folding arm conveyer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1556346B2 (en) * 1967-01-19 1970-07-23 Loirecord Crane with extendable column
DE2134083A1 (en) * 1970-11-13 1972-05-18 Edilmac Spa Horizontally collapsible tower crane
DE2020238C (en) * 1970-04-25 1973-05-10 Herbert, Eduard, Dipl.-Ing., 6750 Kaiserslautern; König, Wilhelm, 5020 Frechen Construction crane

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1556346B2 (en) * 1967-01-19 1970-07-23 Loirecord Crane with extendable column
DE2020238C (en) * 1970-04-25 1973-05-10 Herbert, Eduard, Dipl.-Ing., 6750 Kaiserslautern; König, Wilhelm, 5020 Frechen Construction crane
DE2134083A1 (en) * 1970-11-13 1972-05-18 Edilmac Spa Horizontally collapsible tower crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2614223A1 (en) * 1975-04-03 1976-10-14 Roger Benoit Cadillon BOOM ARRANGEMENT ON A TELESCOPIC MAST OF A TOWER CRANE
DE2747048A1 (en) * 1976-10-22 1978-04-27 Grues Boilot Pingon Richier S FOLDING BOOM FOR AN EXTENDING CRANE
FR2531054A2 (en) * 1982-07-30 1984-02-03 Potain Sa Unfoldable crane having a telescopic mast and a jib made of several articulated elements.
DE3229949C1 (en) * 1982-08-12 1983-11-17 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane
DE3303524A1 (en) * 1983-02-03 1984-08-09 Wilhelm 5020 Frechen König Revolving tower crane
DE3311588A1 (en) * 1983-03-30 1984-10-11 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with split jib

Also Published As

Publication number Publication date
DE2351953C2 (en) 1983-10-20

Similar Documents

Publication Publication Date Title
DE69200225T2 (en) Automatically foldable crane boom.
DE102009048846A1 (en) crane
DE2227451A1 (en) BACKHOE EXCAVATOR WITH BOOM
DE2351953A1 (en) Tower crane with folding jib - has sections joined by intermediate frame with pivot pins in end faces
EP0132572B1 (en) Crane with a telescopic tower
DE20218971U1 (en) Mobile crane with long arms
DE2914265A1 (en) CRANE WITH EXTENDING MAST AND FOLDING CABINET
DE1075812B (en) A crane that is arranged on a vehicle and can be folded into the traffic position
EP1524235B1 (en) Crane and method for errecting its jib
DE2931421C2 (en) Jib tower crane with extendable trolley jib
DE2815467C2 (en) Pipe drawing machine for pulling a drill pipe out of the ground
DE3441573A1 (en) Tower crane with split jib
EP0150344B1 (en) Crane with telescopic tower
DE102011014585A1 (en) Method for erecting beam of crane, particularly for erecting lattice jib, involves erecting beam from laid down position, in which traction force is exerted on beam by traction element, particularly restraint
DE8234374U1 (en) Tower crane
DE2525844B1 (en) Tower crane transportable by road - has connector on double link between jib sections engaging with hook
DE3245262A1 (en) Tower crane
DE3311588A1 (en) Tower crane with split jib
DE2364789A1 (en) FOLDABLE TOWER CRANE
DE2101842C (en) Tower crane
DE2222738A1 (en) boom
DE1259537B (en) Bridge crane
DE2923146A1 (en) ADJUSTABLE CRANE BOOM SYSTEM
DE1531251C (en) Foldable crane
DE2447883C3 (en) Reversible tower crane

Legal Events

Date Code Title Description
OD Request for examination
8127 New person/name/address of the applicant

Owner name: PEINER HEBE- UND TRANSPORTSYSTEME GMBH, 5500 TRIER

8125 Change of the main classification

Ipc: B66C 23/34

8126 Change of the secondary classification

Ipc: B66C 23/68

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee