DE2330801A1 - PROCEDURE OR ANCHOR REMOVAL FOR ANCHORING AN ANCHOR BOLT IN A DRILLING HOLE - Google Patents

PROCEDURE OR ANCHOR REMOVAL FOR ANCHORING AN ANCHOR BOLT IN A DRILLING HOLE

Info

Publication number
DE2330801A1
DE2330801A1 DE2330801A DE2330801A DE2330801A1 DE 2330801 A1 DE2330801 A1 DE 2330801A1 DE 2330801 A DE2330801 A DE 2330801A DE 2330801 A DE2330801 A DE 2330801A DE 2330801 A1 DE2330801 A1 DE 2330801A1
Authority
DE
Germany
Prior art keywords
anchor
borehole
cement mortar
vessel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE2330801A
Other languages
German (de)
Inventor
Rudolf Gruber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gd Anker & Co KG GmbH
Original Assignee
Gd Anker & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gd Anker & Co KG GmbH filed Critical Gd Anker & Co KG GmbH
Publication of DE2330801A1 publication Critical patent/DE2330801A1/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/06Inhibiting the setting, e.g. mortars of the deferred action type containing water in breakable containers ; Inhibiting the action of active ingredients
    • C04B40/0666Chemical plugs based on hydraulic hardening materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material
    • F16B13/143Fixing plugs in holes by the use of settable material using frangible cartridges or capsules containing the setting components
    • F16B13/144Fixing plugs in holes by the use of settable material using frangible cartridges or capsules containing the setting components characterised by the shape or configuration or material of the frangible cartridges or capsules
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material
    • F16B13/143Fixing plugs in holes by the use of settable material using frangible cartridges or capsules containing the setting components
    • F16B13/145Fixing plugs in holes by the use of settable material using frangible cartridges or capsules containing the setting components characterised by the composition of the setting agents contained in the frangible cartridges or capsules

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)
  • Rock Bolts (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

G-D-Anker Gebirgs-Dübel-Anker Ges.m.b.H. & Co. K.G.,G-D anchor mountain anchor anchor Ges.m.b.H. & Co. K.G.,

A-9872 ix Millstatt am See, Großdombra (Körnten, Österreich)A-9872 ix Millstatt am See, Großdombra (Körnten, Austria)

Verfahren bzw. Ankerausbau zum Verankern eines AnkerbolzensMethod or anchor removal for anchoring an anchor bolt

ia einen Bobrloob ·ia a Bobrloob

Priorität: österreichische" Potentanmeldung Ä 5473/72 vom 26. Juni 1972Priority: Austrian "Potentanmeldung Ä 5473/72 from June 26, 1972

Die Erfindung betrifft ein Verfahren zum Verankern eines Ankerbolzene in einem Bohrloch, wobei in das Bohrloch ein Sohnellbindemittel und Zementmörtel eingebracht werden,The invention relates to a method for anchoring an anchor bolt in a borehole, wherein a Sonell binding agent and cement mortar are introduced,

sowie einen Ankerausbau ait einer Einrichtung zur Duron- 'as well as an anchor extension with a facility for Duron- '

führung des Verfahrens« r ;* *conduct of the procedure « r ; * *

Solche Ankerbolzen werden vorwiegend im Tunnel- oder Stollenbau, aber auch im Hochbau verwendet, Xm Stollenbau haben sie die Aufgabe, anstelle einer zeitweiligen Zimmerung das Ablösen des Gebirges zu verhindern, bis die endgültige Ausmauerung des Tunnels- bzw. Stollens <Such anchor bolts are mainly used in tunnel or gallery construction, but also in building construction, Xm gallery construction they have the task of preventing the mountains from falling apart instead of temporarily moving them up the final lining of the tunnel or gallery <

309882/0583 . - 2 - ,309882/0583. - 2 -,

OfMQiNAL INSPECTiDOfMQiNAL INSPECTiD

erfolgt. *he follows. *

In die Decke bzw. Wänden der Stollen oder Tunnel werden naoh der Art des Gebirges entsprechend lange Saoklöoher gebohrt und in diese mittels Druokluft oder Pumpen Zementmörtel unter Verwendung eines Sohlauehes gedruckt, wobei der Schlauch in das Bohrloch bis zu dessen Ende eingeschoben und entsprechend der Einfüllung zurückgezogen wird. Sodann werden die aus profiliertem Stahl, z.B. Rippentorstahl, hergestellten Ankerbolzen eingetrieben. Auf die aus den Bohrlöchern ragenden Enden der Bolzen werden Arierplatten aufgeschoben und durch Muttern gegen das Gestein gepreßt, die auf an den Bolzenenden vorgesehenen Gewinden aufschraubbar sind. Solohe Ankerbolzen werden als sohlaffe Anker bezeichnet. Es setzen sich aber immer mehr die vorgespannten Ankerbolzen durch, deren Köpfe in den Bohrlöchern verankert werden, damit sie durch Anziehen der gegen die Ankerplatten abgestützten Muttern vorgespannt werden können.Depending on the type of mountain, the ceiling or walls of the tunnels or tunnels will be long Saoklöoher drilled and in this by means of Druokluft or pumps cement mortar using a Sohlauehes printed, with the hose in the borehole is inserted to the end and withdrawn according to the filling. Then the made of profiled steel, e.g. ribbed gate steel Anchor bolts driven in. Aryan plates are placed on the ends of the bolts protruding from the drill holes pushed on and pressed against the rock by nuts, the threads provided on the ends of the bolts can be screwed on. Solo anchor bolts are referred to as flat anchors. But they always sit down more through the pre-tensioned anchor bolts, the heads of which are anchored in the drill holes, so that they can pass through Tightening the nuts supported against the anchor plates can be preloaded.

Eine solohe Vorspannung der Ankerbolzen soll insbesondere in gebräofeön Gebirgen rasch erfolgen. Es muß daher der zur Verankerung der Bolzenköpfe verwendete Zementmörtel in kurzer Zeit abbinden, wozu dem Zementmörtel Sohnellbindezusätze beigemengt werden.A solo pre-tensioning of the anchor bolts should be done quickly, especially in Gebräofeön mountains. It must therefore be the Cement mortar used to anchor the bolt heads set in a short time, including the addition of Sohnell binding agents to the cement mortar be added.

..309882/0583..309882 / 0583

Es wurde auch eohon vorgeschlagen, in das Bohrloch zuerst über eine Länge von 50 bis 100 otn einen schneller— härtenden Zementmörtel einzubringen, dann den restlichen Teil des Loches mit einem normal abbindenden Zementmörtel zu verfüllen und den Ankerbolzen einzutreiben. Nach dem Erhärten des sohnellbärtenden Zementmörtels kann der Ankerbolzen bereits vorgespannt werden, während die Abbindung des normal abbindenden Mörtels einige Stunden später erfolgt. Diese Arbeitsweise konnte sich aber nicht durchsetzen, da einerseits von Ort die genaue Mischung des Scnnellbindemörtels sohwierig war und anderseits dieser Mörtel bereits in dem Einbringegerät und im Schlauch zum Teil erhärtete; auch die notwendige zweite Einbringeeinriohtung für den normal abbindenden Mörtel maobte die Arbeit umständlich. Außerdem mußte in Jodes so verfUllte Bohrloch der Ankerbolzen sofort eingetrieben werden, so daß ein fortlaufendes, wirtsohaftliobes Verankern der Bolzen nioht möglioh war.It was also suggested eohon to go into the borehole first over a length of 50 to 100 otn one faster— hardening cement mortar, then the remaining part of the hole with a normal setting cement mortar to backfill and drive in the anchor bolt. After the hardening of the cement mortar has hardened the anchor bolts are already pre-tensioned while the setting of the normally setting mortar takes a few hours takes place later. This way of working could not prevail, however, because on the one hand the exact location Mixing of the quick-setting mortar was so difficult and on the other hand, this mortar has already partially hardened in the application device and in the hose; also the necessary second insertion device for the normally setting Mortar made the work cumbersome. In addition, in Jodes so-filled borehole of the anchor bolts is immediately driven in, so that a continuous, economic Anchoring the bolts was not possible.

Es ist ferner bekannt, in das vorgebohrte Looh mittels ' eines Ankerbolzens eine perforierte, mit einem fließbaren Zementmörtel gefüllte Hülse einzuschieben und nachdem die Hülse das Ende des Bohrloches erreicht hat, den Ankerbolzen in die Hülse einzutrieben. Der in die Hülse eindringende Ankerbolzen preßt dabei den Zementmörtel duroh die Perforierungen der Hülse in das Bohrloch·It is also known, in the pre-drilled Looh by means of 'an anchor bolt a perforated, with a flowable Insert cement mortar-filled sleeve and after the sleeve has reached the end of the borehole, the Drive anchor bolts into the sleeve. The one in the sleeve penetrating anchor bolts press the cement mortar through the perforations of the sleeve into the drill hole

309882/0583309882/0583

Obwohl die Hülse die Verwendung von wasserarmen Zementmörtel ermöglicht, ist die Abbindezeit des Mörtels doch noch so lang, daß der Anker erst nach 8 bis IO h belastbar ist. Eine Vorspannung des Ankerbolzens ist bei dieser Arbeitsweise nicht möglich.Although the sleeve the use of low-water cement mortar made possible, the setting time of the mortar is still so long that the anchor can only be loaded after 8 to 10 hours. A preload of the anchor bolt is not possible with this method of operation.

Es ist auoh bereits ein Verfahren zur Befestigung von Ankern in den sie aufnehmenden Bohrlöchern mittels einer in das Bohrlochtiefste eingebrachten gekammerten Patrone für die Vergußmasse bekannt. Die eine Kammer der leicht zerstörbaren Patrone enthält beispielsweise ein Kunstharz mit Beschleuniger, die andere einen Härter. Durch den eingeschobenen Anker wird die Patrone zerstört. Das Mischen der nur das Bohrlochtiefste ausfüllenden Masse erfolgt durch drehendes Eintreiben der in ihrem Endbereicb als Mischschnecke ausgebildeten Ankerstange. Eine brauchbare Vergußmasse wird nur durch intensives Drehen des eingetriebenen Ankers, der infolge seiner Form eine Durchmisohung hervorruft, erzielt. Bei. im modernen Bergbau vorkommenden Längen von Ankerbolzen bis zu 12 m ist es verständlich, daß ein Drehen des Ankers nicht mehr möglich ist. Ferner hat das Vergießen nur des Ankerkopfes den Nachteil, daß der freie Schaft also der überwiegende Teil des Ankers — keinerlei Halte— funktionen ausübt.There is also already a method for fastening anchors in the boreholes receiving them by means of a known chambered cartridge introduced into the deepest borehole for the potting compound. The one chamber of the easily destructible For example, the cartridge contains a synthetic resin with an accelerator, the other a hardener. Through the inserted Armature will destroy the cartridge. The compound, which only fills the deepest part of the borehole, is mixed rotating driving in of the anchor rod, which is designed as a mixing screw in its end area. A useful potting compound is only possible through intensive turning of the driven-in anchor, which due to its shape causes a mismatch, achieved. At. Lengths of anchor bolts up to 12 m occurring in modern mining, it is understandable that turning of the anchor is no longer possible. Furthermore, the casting of only the anchor head has the disadvantage that the free shaft so the majority of the anchor - does not have any holding functions.

Die Erfindung zielt darauf ab, die Nachteile derThe invention aims to address the disadvantages of

. 309882/0583. 309882/0583

bekannten Arbeitsnethoden zu vermeiden. Das erfindungs— gemäße Verfahren ist dadurch gekennzeichnet, daß das Bohrlooh vollständig mit Zementmörtel einer Mischung gefüllt wird und gleichzeitig mit dem Zementmörtel ein Gefäß mit dem Sohnellbindemittel im Bohrlochtiefsten deponiert wird, wobei in an sioh bekannter Weise das Gefäß duroh Einschieben des Ankerbolzens zertrümmert wird.to avoid known work nets. The inventive method is characterized in that the Bohrlooh completely with a mixture of cement mortar is filled and at the same time with the cement mortar a container with the Sohnell binding agent is deposited in the deepest part of the borehole is, the vessel is smashed in a known manner duroh insertion of the anchor bolt.

Das erfindungsgemäße Verfahren ermöglicht die Verwendung einer einzigen Mörtelsorte, zudem eines normal abbindenden Zementmörtels, der über eine lange Zeit verarbeitbar ist. Es können daher eine große Anzahl Bohrlöcher nacheinander nit dem Mörtel verfüllt werden, da keine Gefahr einer frühzeitigen Erhärtung besteht, solange das Gefäß ait den Sobnellbindezusatz nicht zertrümmert wird. Die Ankerbolzen werden ebenfalls nacheinander in die Bohrlöcher eingetrieben.The method according to the invention enables the use of a single type of mortar, moreover one normal setting cement mortar that can be worked over a long period of time. There can therefore be a large number The drill holes are filled one after the other with the mortar, as there is no risk of early hardening, as long as the vessel with the Sobnell binding accessory is not shattered. The anchor bolts are also driven one after the other into the boreholes.

Dadurch ist eine zeitsparende Arbeitsweise, eine einfache Mörtelzubereitung und eine einfache Wartung und Reinigung der Einbringvorrichtungen und Schläuche raöglioh. Beim Zertrümmern des Gefäßes duroh den Ankerbolzen durchsetzt der Sohnellbindezusatz den Zementmörtel, der im Bereioh des kopfseitigen Bolzenendes rasch abbindet, sodaß der Bolzen kurze Zeit nach seinem Eintreiben vorgespannt werden kann. Die Abbindezeit kann durch die Wahl in ihrer chemischen Zusammensetzung unter—As a result, a time-saving method of working, simple mortar preparation and simple maintenance and cleaning of the feeding devices and hoses are possible. When the vessel is smashed through the anchor bolt, the cement mortar penetrates the cement mortar, which quickly sets in the area of the head end of the bolt, so that the bolt can be prestressed a short time after it has been driven in. The setting time can be varied by choosing its chemical composition under-

- 6 309882/0583 - 6 309882/0583

schiedlicher Schnellabbinder weitgehend beeinflußt werden.different quick-setting binders can be largely influenced.

Der Zementmörtel wird, wie bereits erwähnt, unter Druckeinwirkung mittels eines Schlauches in das Bohrloch eingebracht. Erfindungsgemäß kann das Gefäß durch den unter Druck eingepreßten Zementmörtel in das Bohrloch eingeschoben werden.As already mentioned, the cement mortar is introduced into the borehole under the action of pressure by means of a hose. According to the invention, the vessel can be pushed into the borehole through the cement mortar pressed in under pressure will.

Für dieses Einschieben ist das Gefäß zylindrisch aus— gebildet und sein Außendurchmesser etwas kleiner als der Innendurchmesser des Einpreßschlauches. Es wird in das freie Ende des Mörtelschlauches eingeschoben und mit diesen in das Bohrloch zu dessen Ende gebracht. Der in den Schlauch gepreßte Mörtel drückt das Gefäß aus dem Schlauch und bettet es während der weiteren Verfüllung des Bohrloches ein. Das Gefäß kann aus Glas oder aus einem anderen durch den Ankerbolzen zerstörbaren Werkstoff hergestellt werden.For this insertion, the vessel is cylindrical and its outside diameter is somewhat smaller than the inner diameter of the press-fit hose. It is pushed into the free end of the mortar hose and brought with these in the borehole to its end. The mortar pressed into the hose squeezes out the vessel the hose and embeds it during the further backfilling of the borehole. The vessel can be made of glass or be made of another material that can be destroyed by the anchor bolt.

Nach einem weiteren Merkmal der Erfindung sind in des Gefäß außer dem Sohnellbindezusatz auch Kugeln aus Keramik, Kunststoff od.dgl. oder feinkörniger Steinsplit als Verdrängungskörper enthalten. Sobald das Glasgefäß durch den vorzugsweise mit einem kegeligen Ende versehenen Ankerbolzen zertrümmert ist, durchnäßt der Schnellbindezusatz den Mörtel, wobei die Durchmisohung durch die vom Anker und die Kugeln bewirkte Verdrängung und Verschiebung desAccording to a further feature of the invention, in addition to the Sohnell binding additive, ceramic balls are also in the vessel, Plastic or the like. or fine-grain stone chippings as a displacement body contain. As soon as the glass vessel through the anchor bolt, which is preferably provided with a conical end is smashed, the Schnellbindezusatz soaks the mortar, the Durchmisohung through that of the anchor and the balls caused displacement and displacement of the

- 7 . 309882/0583- 7th 309882/0583

Mörtels gefördert wird. Der Werkstoff der Kugeln spielt keine Rolle, es ist jedoch zweckmäßig, wenn die Kugeln hart und widerstandsfähig sind. Der Ankerbolzen wird dann durch die Ku/reln gegen die Bohrlochwand verkeilt, wodurch seine Verankerung noch verstärkt wird. Das Eintreiben des Ankerbolzens wird durch die Kugeln nicht erschwert, da diese zwischen des Anker und der Bohrlochwand abrollen können, wenn gemäß einem weiteren Merkmal der Erfindung der Durchmesser der Kugeln maximal der Differenz zwischen Bohrlochradius und Ankerkopfradius entspricht.Mortar is promoted. The material of the balls does not matter, but it is useful if the balls are hard and resistant. The anchor bolt is then wedged against the wall of the borehole by the screws, whereby its anchoring is further strengthened. Driving in the anchor bolt is not made difficult by the balls, since they can roll between the anchor and the borehole wall if, according to a further feature of the invention, the diameter of the balls corresponds at most to the difference between the borehole radius and the anchor head radius.

Die Größe der Kugeln richtet sich also nach dem Durchmesser des Bohrloches.The size of the balls depends on the diameter of the drill hole.

In der Zeichnung ist ein Ausführungsbeispiel des er— findungsgemäßen Ankerausbaues dargestellt. Fig. 1 zeigt einen Schnitt durch ein Bohrloch kurz vor dem Eintreiben des Ankers und Fig. 2 einen Schnitt durch einen befestigten Anker.In the drawing is an embodiment of the he- inventive anchor expansion shown. Fig. 1 shows a section through a borehole shortly before the anchor is driven in; and FIG. 2 is a section through a fixed one Anchor.

In das Bohrloch 1 wird gleichzeitig mit dem Einführen des Zementmörtels 2 das Gefäß 3 eingebracht. Dieses befindet sioh im Bohrlochtiefsten und enthält neben dem Schnellbindemittel 4 noch Kugeln 5» die beim Eintreiben des Ankers 6 der Durohnisohung von Zementmörtel 2 und Schnellbindemittel k dienen. Wird der Anker 6 nun in dasThe vessel 3 is introduced into the borehole 1 at the same time as the cement mortar 2 is introduced. This is located at the deepest point of the borehole and, in addition to the rapid bonding agent 4, also contains balls 5 »which serve to dissolve cement mortar 2 and rapid bonding agent k when the anchor 6 is driven in. If the anchor 6 is now in the

- 8 •3 0 9 882/0583- 8 • 3 0 9 882/0583

Bohrlooh eingetrieben, dann zertrümmert er ,kurz vor Erreiohon seiner Endlage das Gefäß 3, das Sobnellbindemittel 4 tritt aus und kommt infolge der guten Durohmisohung durch die vom Ankerbolzen verdrängten Kugeln 5 sehr rasch zur Wirkung.Bohrlooh driven in, then smashed just before Erreiohon its end position the vessel 3, the Sobnell binder 4 occurs and comes as a result of the good Durohmisohung through the balls 5 displaced by the anchor bolt take effect very quickly.

Fig. 2 zeit den befestigten Anker im Sohnitt. Im Bereioh des Ankerkopfes liegt die rasch verfestigte Zone des Expreßmörtels 7, wobei die Kugeln 5 für einen zusätzlichen Halt sorgen. Daran sohließt der Bereich der normalen Mörtel— misohung 2. Es ist dabei wesentlich, daß dieser Bereich des Ankers bzw. des Bohrloches ausgefüllt ist, denn nur dann ergibt sich eine Kraftwirkung (Kraftlinien 8) auf das Gebirge über die gesamte Länge des vorgespannten Ankers. Zum Spannen des Ankers dient in bekannter Weise eine Ankerplatte 9 und eine Mutter 10 auf dem Gewindesohaft des Ankerbolzens.Fig. 2 shows the attached anchor in the Sonitt. In the area of the anchor head is the rapidly solidified zone of the express mortar 7, the balls 5 providing additional support. This is followed by the area of normal mortar drilling 2. It is essential that this area of the anchor or the borehole is filled, because only then is there a force (lines of force 8) on the rock over the entire length of the prestressed anchor. An anchor plate 9 and a nut 10 on the threaded shaft of the anchor bolt are used in a known manner to tension the anchor.

309882^0583-309882 ^ 0583-

Claims (4)

G-D-Anker Gebirgs-DUbel-Anker Gos.m.b.H S. Co. K.G. A*9872 Millstatt « i2 Patentansprüche:G-D anchor Gebirgs-DUbel-anchor Gos.m.b.H S. Co. K.G. A * 9872 Millstatt «i2 patent claims: 1. Verfahren zum Verankern eines Ankerbolzens in einem Bohrloch, wobei in* das Bohrloch ein Sobnellbindemittel und Zementmörtel eingebracht werden, daduroh gekennzeichnet, daß das Bohrloch vollständig mit Zementmörtel einer Mischung gefüllt wird urtf gleichzeitig mit dem Zementmörtel ein Gefäß mit dem Sohnellbindemittel im Bohrlocbtiefsten deponiert wird, wot ei in an sioh bekannter Weise das Gefäß durch Einschieben des Anker— bolzens zertrümmert wird«1. Method of anchoring an anchor bolt in one Borehole, where * a Sobnell binder and cement mortar are introduced into the borehole, daduroh marked, that the borehole is completely filled with cement mortar mixture urtf at the same time as the Cement mortar a container with the sonell binder in the The deepest of the borehole is deposited, whereby the vessel is deposited in a manner known per se by pushing in the anchor. bolt is smashed " 2. Verfahren nach Anspruch I1 daduroh gekennzeichnet, daß das Gefäß durch den unter Druck eingepreßten Zementmörtel in daa Bohrloahtiefste eingeschoben wird.2. The method according to claim I 1 daduroh characterized in that the vessel is pushed through the cement mortar pressed in under pressure in daa Bohrloahtiefste. 3. Ankerausbau nach Anspruch 1 oder 2, daduroh gekennzeichnet, daß das Gefäß (3) außer dem Sohnellbindezusatz (**) auch Kugeln (5) aus Keramik, Kunststoff od. . \ dgl. oder Steinsplitt enthält.3. Anchor support according to claim 1 or 2, characterized in that the vessel (3) in addition to the Sohnellbindezusatz (**) also balls (5) made of ceramic, plastic or od. \ like. Or stone chippings contains. 4. Ankerauebau naob Anspruoh 3, daduroh gekennzeichnet, daß der Durohmesser eier Kugeln (5) maximal der Differenz4. Ankerauebau naob Anspruoh 3, daduroh characterized that the Durohmesser eier balls (5) maximum of the difference - 10 -- 10 - 309882/0583309882/0583 zwisohon Bohrloobradius und Ankarkop:Cr<n3iuä οηΐ— sprioht.between Bohrloobradius and Ankarkop: Cr <n3iuä οηΐ— sprits. 3 0 9 8 8 2/05833 0 9 8 8 2/0583
DE2330801A 1972-06-26 1973-06-16 PROCEDURE OR ANCHOR REMOVAL FOR ANCHORING AN ANCHOR BOLT IN A DRILLING HOLE Pending DE2330801A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT547372A AT315108B (en) 1972-06-26 1972-06-26 Method or anchor removal for anchoring an anchor bolt in a borehole

Publications (1)

Publication Number Publication Date
DE2330801A1 true DE2330801A1 (en) 1974-01-10

Family

ID=3576182

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2330801A Pending DE2330801A1 (en) 1972-06-26 1973-06-16 PROCEDURE OR ANCHOR REMOVAL FOR ANCHORING AN ANCHOR BOLT IN A DRILLING HOLE

Country Status (12)

Country Link
US (1) US3892101A (en)
JP (1) JPS5423497B2 (en)
AT (1) AT315108B (en)
BR (1) BR7304665D0 (en)
CA (1) CA1009433A (en)
CH (1) CH564144A5 (en)
DE (1) DE2330801A1 (en)
FR (1) FR2191018B1 (en)
IT (1) IT989425B (en)
SE (1) SE395504B (en)
YU (1) YU36060B (en)
ZA (1) ZA734311B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4431348A (en) * 1980-07-31 1984-02-14 Powondra Dipl Ing Franz Force transmission device
DE3410101A1 (en) * 1983-04-26 1984-10-31 Osakeyhtiö Tampella AB, Tampere METHOD AND DEVICE FOR ANCHORING BOLTS IN ROCKS

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5821080B2 (en) * 1974-08-28 1983-04-27 岡部株式会社 lock bolt no sekohou
GB1538102A (en) * 1976-09-15 1979-01-10 Ici Ltd Calcium sulphate hemihydrate plaster
ES472534A1 (en) * 1977-08-12 1979-04-01 Fosroc Ag Method of anchoring a borehole anchor
DE3735592A1 (en) * 1987-10-21 1989-05-11 Hilti Ag METHOD FOR ATTACHING ANCHOR RODS
US5127769A (en) * 1991-07-22 1992-07-07 The United States Of America As Represented By The Secretary Of The Interior Thrust bolting: roof bolt support apparatus
US6176638B1 (en) * 1995-02-14 2001-01-23 Roger C. Kellison Chemically bonded anchor systems
DE19510307A1 (en) * 1995-03-22 1996-09-26 Hilti Ag Mortar container for the chemical fastening of anchoring agents in boreholes
CN109854285B (en) * 2019-02-28 2020-10-02 长沙有色冶金设计研究院有限公司 Deep vertical shaft supporting structure and construction method
CN115075608B (en) * 2022-07-28 2023-07-18 北京建工四建工程建设有限公司 Reinforced concrete foundation beam enlarged section mechanical connection bar planting method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE523279A (en) * 1952-10-18
BE544161A (en) * 1955-03-24
US2952129A (en) * 1958-01-09 1960-09-13 Joseph B Dempsey Mine roof bolt installation
US3324662A (en) * 1963-10-21 1967-06-13 American Cyanamid Co Valved rock bolt
US3283513A (en) * 1964-12-23 1966-11-08 Thomas W Kierans Process of mounting elongated members in drill holes
GB1202478A (en) * 1967-08-29 1970-08-19 African Explosives & Chem Method of and apparatus for loading boreholes
US3618326A (en) * 1969-10-24 1971-11-09 American Cyanamid Co Resin anchored reinforced brittle structures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4431348A (en) * 1980-07-31 1984-02-14 Powondra Dipl Ing Franz Force transmission device
DE3410101A1 (en) * 1983-04-26 1984-10-31 Osakeyhtiö Tampella AB, Tampere METHOD AND DEVICE FOR ANCHORING BOLTS IN ROCKS

Also Published As

Publication number Publication date
YU172373A (en) 1981-02-28
YU36060B (en) 1981-11-13
CH564144A5 (en) 1975-07-15
ZA734311B (en) 1974-09-25
JPS4957619A (en) 1974-06-04
US3892101A (en) 1975-07-01
CA1009433A (en) 1977-05-03
SE395504B (en) 1977-08-15
JPS5423497B2 (en) 1979-08-14
IT989425B (en) 1975-05-20
FR2191018B1 (en) 1977-02-18
AT315108B (en) 1974-05-10
FR2191018A1 (en) 1974-02-01
BR7304665D0 (en) 1974-08-15

Similar Documents

Publication Publication Date Title
DE1126823B (en) Process for fastening anchors in the boreholes receiving them and anchors for carrying out the process
DE3145824C2 (en)
DE2707238C3 (en) Corrosion-protected tension member for a prestressable anchor in solid rock
EP0371463B1 (en) Method for installing an anchor and injection drill anchoring for performing the method
DE1945188U (en) DEVICE FOR INSERTING ANCHORS IN LOOSE AND SOLID SOIL.
DE2330801A1 (en) PROCEDURE OR ANCHOR REMOVAL FOR ANCHORING AN ANCHOR BOLT IN A DRILLING HOLE
AT392517B (en) METHOD AND DEVICE FOR SECURING NON OR. Moderately stable, non-cohesive to slightly cohesive geological formations
DE102007006277A1 (en) Rock anchor with flow geometry for mortar
DE102010014612A1 (en) Hollow rod shear connector e.g. two-phase anchor, for use in e.g. inclined roadway construction, has armature tube coated with addition mixed filling material, where clamping path is affiliated with anchor member through clamping sleeve
DE3204417C2 (en) Arrangement for setting a rock nail
DE2209821A1 (en) Process for consolidating fragile rock layers
DE3322198C2 (en)
DE3410101C2 (en) Device for anchoring bolts in rocks
DE4201419C1 (en) Rock anchor for location in rock with low cohesion factor - comprises outer bore anchor for making borehole and stabilising hole wall and injection anchor of hardenable material
AT224588B (en) Cartridge for an anchor support to be used in particular in underground mining operations
AT259462B (en) Method for attaching an anchor, in particular for components in the ground, mountains or the like, and anchors for carrying out this method
CH693934A5 (en) Method for earth and rock anchor bore drilling uses drill crown to which drill pipe is attached to define annular space for evacuation of hardened material
DE4032682C2 (en) Mountain anchors
EP3808934A1 (en) Pretensioning anchor for securing a geological formation
DE2102391A1 (en) Mountain anchorage
EP0348545A1 (en) Anchor fixation, process and means for its manufacture
DE2412667A1 (en) ANCHORS FOR STRENGTHENING THE MOUNTAIN OF STOLLEN, TUNNEL AND DGL
DE102011078769A1 (en) rock bolt
DE2207076A1 (en) Method for anchoring bolts or bars
DE2410212A1 (en) Sealing device for rock consolidating plastics grouting - includes tensioner arm, bored probe, and foam plastics recessed end plug