DE2308928A1 - DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER - Google Patents

DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER

Info

Publication number
DE2308928A1
DE2308928A1 DE19732308928 DE2308928A DE2308928A1 DE 2308928 A1 DE2308928 A1 DE 2308928A1 DE 19732308928 DE19732308928 DE 19732308928 DE 2308928 A DE2308928 A DE 2308928A DE 2308928 A1 DE2308928 A1 DE 2308928A1
Authority
DE
Germany
Prior art keywords
pipe
pouring
pipe section
flowable
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19732308928
Other languages
German (de)
Inventor
Henricus Fredericus Jos Hillen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ROTEWA BV
Original Assignee
ROTEWA BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROTEWA BV filed Critical ROTEWA BV
Publication of DE2308928A1 publication Critical patent/DE2308928A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/121Devices for applying linings on banks or the water bottom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water

Description

Rotewa B.V. Katwijk aan Zee, Niederlande Rotewa B. V. Katwijk aan Zee, The Netherlands

Vorrichtung zum unter Wasser Vorsehen einer fliessfähigen, wohl oder nicht hartbaren Masse wie (Beton )mortel, Asphaltbitumen und dergleichenDevice for providing a flowable, well or not hardenable mass such as (concrete) mortar, asphalt bitumen and the like under water

Die Erfindung bezieht sich auf eine Vorrichtung zum unter Wasser Vorsehen einer fliessfahigen, wohl oder nicht hartbaren Masse wie (Beton )mortel, Asphaltbitumen und dergleiche, versehen mit einem von einer Tragkonstruktion abhangenden Schüttrohr mit Einfüllvorrichtung.The invention relates to a device for providing a flowable, well or not hardenable mass such as (concrete) mortar, asphalt bitumen and the like under water, provided with a pouring pipe hanging from a supporting structure with a filling device.

Derartige Vorrichtungen, welche zum Beispiel zum unter Wasser Schütten von Beton bei der Errichtung von Wasserbauwerken oder zum mit Asphalt(beton) Verkleiden der Boden von Wasserwegen benutzt werden, sind bereits in verschiedenen Ausführungen bekannt. So ist es zum unter Wasser Schütten von Beton bekannt gemäss dem sogenannten Kontraktorprinzip zu arbeiten, nach welchem das Schüttrohr permanent mit Beton gefüllt bleiben soll um das Lindringen von Wasser zu begegnenSuch devices, which are used, for example, for pouring concrete under water in the construction of hydraulic structures or for lining the floor of waterways with asphalt (concrete), are already known in various designs . Thus, it is to work under water pouring of concrete according to the known so-called Kontraktorprinzip remain after which the bulk tube permanently filled with concrete is to meet water to the Lindringen

309837/0379309837/0379

-2--2-

und mit Schüttöffnung permanent unterhalb der bereits geschütteten Betonmasse zu halten ist um Entmischung bei der Ausströmung vorzubeugen. Dabei kommt es darauf an dass die ausströmende Masse, welche unter Einfluss des Druckes der Materialsäule im Schüttrohr, an der Aussenwand des Schüttrohrs entlang über einen gewissen Abstand hochgestaut wird, sich in einem relativ grossen Gebiet ausbreiten kann. Dies bedeutet dass man beim Arbeiten gemäss diesem Prinzip relativ leicht fliessende Massen (zum Beispiel Betonmassen mit ziemlich grossem "Setzmass") verarbeiten kann und dass in dieser Weise nur Schichten bzw. Böden mit relativ grosser Dicke erhalten werden können. Zum Bekleiden von Böden von Wasserwegen mit einer relativ dünnen Verkleidungsschicht oder zur Herstellung von dünnen Böden ist diese Vorrichtungsart deshalb nicht geeignet.and with pouring opening permanently below the already The poured concrete mass is to be held in order to prevent segregation during the outflow. It is important that the outflowing mass, which under the influence of the pressure of the material column in the discharge pipe, on the outer wall of the discharge pipe is dammed along over a certain distance, is in can spread over a relatively large area. This means that working according to this principle is relatively easy Flowing masses (for example concrete masses with a fairly large "slump") can process and that in this way only layers or soils with a relatively large thickness can be obtained. For lining the floors of waterways with a This type of device is therefore not suitable for a relatively thin cladding layer or for the production of thin floors.

Aus der zur Einsicht gelegten niederländischen Patentanmeldung 6808349 ist eine Vorrichtung bekannt welche zur Verarbeitung von Betonmassen mit kleineren Setzmassen geeignet ist. Dabei weist das Schüttrohr biegsame Wände auf, durch welche dieses Rohr Neigung hat sich unter Einfluss des umgebenden Wasserdruckes plattdrücken zu lassen bzw. sich um die durch das Rohr herunter sinkende Masse zu schliessen. Mittels einer in dieser Heise ausgeführten, gleichmässig über dem zu beschüttenden Untergrund fortbewegenden Vorrichtung können relativ dünne Verkleidungsschichten über Böden von Wasserwegen angeordnet werden, welche Verkleidungsschichten dabei ausserdem eine gleichmassige Dicke aufweisen infolge des Umstandes dass das Ausstromende des biegsamen Schüttrohrs sich nach den Unebenheiten im zu verkleidenden Boden fügen kann. Zum Schütten von Schichten oder Böden deren Oberfläche nicht gemäss den Unebenheiten des Untergrunds verläuft, sondern flacheren Artes sein soll, könnte das biegsame Schüttrohr an ihrem unteren Ende mit einem formbeständigen rohrförmigen Endstück oder "Schild" umgeben sein. Der Vorteil der Benutzung eines derartigen "zusammengesetzten" Schüttrohrs über dem gemäss dem Kontraktorprinzip arbeitenden Schüttrohr ist dass praktisch jede gewünschte Schichtdicke und zwar insbesondere Dicken welche weit unterhalb der für das KontraktorverfahrenFrom the Dutch patent application 6808349 put for inspection, a device is known which for Processing of concrete masses with smaller settlements is suitable. The pouring pipe has flexible walls through which this pipe inclination has to be flattened under the influence of the surrounding water pressure or by the passage through the pipe to close falling mass. By means of one executed in this way, evenly over the to be poured Subsurface locomotives may have relatively thin layers of cladding placed over bottoms of waterways which cladding layers also have a uniform thickness due to the fact that the outflow end of the flexible pouring pipe follows the unevenness in the can add to clad floor. For pouring layers or soils whose surface does not follow the unevenness of the subsoil, but should be flatter, this could be flexible pouring tube at its lower end with a dimensionally stable tubular end piece or "shield" be surrounded. The advantage of using such a "composite" pour tube over the pouring pipe, which works according to the contractor principle, is practically any desired layer thickness, in particular Thicknesses which are far below those for the contractor procedure

309837/0379309837/0379

gelterden Mlniaumdicke liegen, verwirklicht werden können.Applied Mlniaumdicke lie, can be realized.

Ein Nachteil sowohl des Kontraktor-Schüttrohrs wie des zusammengesetzten Schüttrohrs ist dass infolge von Variationen in der Höhe der Materialsäule im Schüttrohr, Variationen im Abstand, über welchen die ausströmende Masse an der Aussenseite des Schüttrohrs entlang bzw. des Endstücks oder des Schildes aufgestaut wird, auftreten können, wodurch Unebenheiten in der Oberfläche der geschütteten Schicht oder des geschütteten Bodens auftreten können.A disadvantage of both the contractor chute and the composite chute is that due to variations in the height of the material column in the chute, variations in the Distance over which the mass flowing out along the outside of the pouring pipe or the end piece or the shield accumulated, can occur, causing unevenness in the surface of the poured layer or soil may occur.

Die Erfindung bezweckt nunmehr die Behebung der obengenannten Bedenken und erreicht dieses Ziel dadurch dass das Schüttrohr an ihrem Ausstromende unter Zwischenschaltung eines Zwischenraums von wenigstens einem kurzen Rohrstück umgeben ist.The invention now aims to remedy the above concerns and achieves this aim in that the Chute pipe is surrounded at its outflow end with the interposition of a space by at least one short pipe section.

Bei Anwendung der erfindungsgemässen Vorrichtunq wird das Material, welches unter Einfluss des Druckes innerhalb des Schüttrohrs am unteren Teil dieses Schüttrohrs entlang hochgestaut wird, an erster Stelle in den ringförmigen Raun zwischen dem Schüttrohr und dem Rohrstück aufgenommen. Von diesem ringförmigen Raum aus wird die Zone um den Rohrstück herum "gespeist", wobei das Material wieder und nun an der Aussenseite des Rohrstäcks entlang hochgestaut wird. Es stellt sich dabei an der Aussenseite des Rohrstücks ein Niveau ein das niedriger als das. Niveau innerhalb des Rohrstücks liegt. Ausgehend von einer' bestimmten Position des Ausstromendes des Schüttrohrs, zum Beispiel in kurzem Abstand oberhalb der zu beschüttenden Oberfläche bei Anwendung des obengenannten Kontraktorprinzips, wird das erfindungsgemäss um das Ausstromende des Schüttrohrs herum vorgesehene Rohrstück deshalb dazu führen dass die Dicke der Verkleidungsschicht bzw. des Bodens mit dem Niveau-unterschied zwischen der Innen- und Aussenseite des Rohrstücks herabgesetzt wird. Dieser Niveau-unterschied hängt natürlich stark von der Viskosität der verarbeitetenMasse ab. Wo beim Kontraktorverfahren, wie oben bemerkt wurde, gewöhnlich mit grösseren Setzmassen und deshalb mit leichter fliessenden Massen gearbeitet wird, könnte es sich deshalb bei dieser Methode empfehlen um das Rohrstück herum noch ein oder mehrere weitere Rohrstücke vorzusehen. Die Rohrstücke bewirken dann eine Art van Labyrinthwirkung dankWhen using the device according to the invention, the Material which, under the influence of the pressure inside the chute, is dammed up along the lower part of this chute, in the first place in the annular space between added the chute and the pipe section. The zone around the pipe section is "fed" from this annular space, whereby the material is backed up again and now along the outside of the pipe. It arises from the Outside of the pipe section a level that is lower than the level inside the pipe section. Starting from a ' certain position of the outflow end of the chute, for example at a short distance above the surface to be poured When using the above-mentioned contractor principle, the pipe section provided according to the invention around the outflow end of the pouring pipe will therefore lead to the thickness of the The cladding layer or the floor with the difference in level between the inside and outside of the pipe section is reduced will. This difference in level depends, of course, on the viscosity of the mass being processed. Where in the contractor procedure, As noted above, it is usually possible to work with larger masses and therefore with more easily flowing masses It is therefore advisable to use this method to provide one or more further pipe sections around the pipe section. the Pipe pieces then cause a kind of labyrinth effect thanks to

-4--4-

3098 3 7/03793098 3 7/0379

welcher man den Schüttprozess nach Wunsch beherrschen kann und insbesondere auch auf kleineren Schichtdicken einstellen kann. Die Variation im definitiven Schüttniveau, das heisst das Niveau um das aussere Rohrstück herum, bei variierender Höhe der Materialsäule innerhalb des eigentlichen Schüttrohrs, wird weiter desto kleiner sein nachdem mehr Rohrstücke angewandt werden,which one can control the pouring process as desired and, in particular, can also be adjusted to smaller layer thicknesses. The variation in the definitive bulk level, i.e. the level around the outer pipe section, with a varying height the material column within the actual chute, will be further the smaller after more pipe pieces are used,

Wenn die Materialsäule innerhalb des Schüttrohrs eine relativ geringe Höhe aufweist, zum Beispiel infolge der Anwendung eines Schüttrohrs mit biegsamen Wänden, könnte ein einziges Rohrstuck um das Endstück oder den Schild eines derartigen Schüttrohrs herum bereits genügen. Bei den in solchen Fällen gewöhnlich angewandten kleineren Setzmassen wird das Material gewöhnlich wenig oder keine Neigung zum Hochstauen an der Aussenseite des Rohrstücks entlang aufweisen. Dies bedeutet dass der Unterrand des Schüttrohrs bzw. des Rohrstücks in diesem Falle die definitive Oberfläche der geschütteten Schicht bzw. des geschütteten Bodens bestimmt. Variationen im Materialniveau im Zwischenraum zwischen dem Schüttrohr-Endstück und dem Rohrstück infolge von Höhen-variationen in der Materialsäule innerhalb des Schüttrohrs werden dann keine Folgen für das Schüttniveau ausserhalb des Rohrstücks haben. Man könnte dann das Schüttrohr einfach mit dem Unterrand des umgebenden Rohrstücks bis auf das gewünschte Niveau des zu schüttenden Bodens oder der zu schüttenden Verkleidungsschicht absenken und das Schüttrohr weiter unter Zuführung der zu verarbeitenden Masse in horizontaler Richtung über das zu bestreichenden Gebiet verstellen. Das im Raum zwischen dem eigentlichen Schüttrohr (bzw. den Endstück desselben) und dem umgebenden Rohrstück vorhandene "überschüssige" Material wird dabei mit dem sich verstellenden Schüttrohr mitgenommen und es hat sich aufgezeigt dass dieses Material dabei wenig oder kein Widerstand bildet, da dieses Material noch vollauf in Bewegung ist.When the material column within the chute has a relatively low height, for example as a result of the application a chute with flexible walls, a single piece of pipe could be around the end piece or the shield of such The chute around it is enough. With the smaller slurries usually used in such cases, the material usually have little or no tendency to build up along the outside of the pipe section. this means that the lower edge of the pouring pipe or the pipe section in this case is the definitive surface of the poured layer or of the poured soil. Variations in the material level in the space between the discharge pipe end piece and the pipe section as a result of height variations in the material column inside the pouring pipe will then have no consequences for the pouring level outside the pipe section. One could then Simply place the pouring pipe with the lower edge of the surrounding pipe section down to the desired level of the soil to be poured or lower the lining layer to be poured and continue the pouring pipe while feeding in the mass to be processed Adjust in the horizontal direction over the area to be coated. That in the space between the actual chute (resp. the end piece of the same) and the surrounding piece of pipe existing "excess" material is with the adjusting Taken the chute and it has been shown that this material forms little or no resistance because this Material is still in full motion.

Die erfindungsgemässe Vorrichtung weist weiter noch den Vorteil auf dass damit auch diejenigen Teile der zu bestreichenden Oberfläche, welche zum Beispiel in einer von Spundbohlen begrenzten Baugrube eine unterschnittene Lage gegenüber an derThe device according to the invention also has the The advantage of this is that those parts of the surface to be coated which, for example, are in one of sheet piles limited excavation an undercut position opposite to the

-5--5-

309837/0379309837/0379

Oberseite dieser Baugrube vorgesehenen Gurten oder derartigen Obstruktionen einnehmen, gut beschüttbar sind.Take up the upper side of this construction pit provided belts or such obstructions, are easily pourable.

Die Erfindung wird unten an Hand der Zeichnung mit einem Ausführungsbeispiel näher erläutert.The invention is explained in more detail below with reference to the drawing with an exemplary embodiment.

Fig. 1 zeigt einen schematischen Vertikalschnitt durch ein Schuttrohr mit zwei um das untere Ende desselben herum vorgesehenen Rohrstücken gemäss der Erfindung}Fig. 1 shows a schematic vertical section through a rubble pipe with two around the lower end of the same provided pipe pieces according to the invention}

Fig. 2 zeigt einen Vertikalschnitt durch eine Baugrube ■it der darin angeordneten erfindungsgemässen Vorrichtung undFIG. 2 shows a vertical section through an excavation pit with the device according to the invention and arranged therein

Fig. 3 zeigt einen Schnitt gemäss der Linie III-III in Fig. 2.Fig. 3 shows a section along the line III-III in Fig. 2.

In Fig. 1 ist mit 1 der untere Teil eines Schüttrohrs dargestellt, mittels welchem auf einem unter Wasser liegenden Untergrund 2 eine Verkleidungsschicht oder ein Boden 3 zum Beispiel aus Beton hergestellt werden soll. Während des Schüttens der Schicht oder des Bodens 3 wird das Schüttrohr 1 mit Beton gefüllt gehalten. Die Höhe der Materialsäule im J'schüttrohr ist alt R angedeutet. Die am unteren Ende des Schüttrohrs 1 ausströmende Betonmasse wird gemäss den Pfeilen P> an der Aussenseite des Schüttrohrs entlang hochgestaut und zwar bis zur HöheIn Fig. 1, the lower part of a pouring pipe is shown with 1, by means of which a cladding layer or a floor 3, for example made of concrete, is to be produced on a sub-surface 2 lying under water. During the pouring of the layer or the soil 3, the pouring pipe 1 is kept filled with concrete. The height of the material column in the J 'pouring tube is indicated in old R. The concrete mass flowing out at the lower end of the pouring pipe 1 is dammed up along the outside of the pouring pipe according to the arrows P>, namely up to the height

Das Schüttrohr 1 ist am Ausstromende von einem Rohrstück 4 umgeben, durch welches die gemäss den Pfeilen P. aus dem Schüttrohr 1 hochstauende Betonmasse aufgefangen wird im ringförmigen Raun 5 zwischen dem Schüttrohr 1 und dem Rohrstück 4. Normal, das heisst ohne dass das Rohrstück 4 vorgesehen ist, wie dies beim normalen Kontraktorrohr der Fall ist, würde die ganze Umgebung um das Schüttrohr 1 herum bis zur Höhe H. beschüttet werden. Diese letztgenannte Höhe würde dann zugleich die Minimumdicke der betreffenden Verkleidungsschicht oder des betreffenden Bodens bedeuten, welche in der normalen Weise, ausgehend von einer Materialsäule mit einer Höhe H und einem Minimumabstand A «wischen dem unteren Rand des Schüttrohrs 1 und dem zu beschütteten Untergrund 2 verwirklicht werden könnte.The pouring pipe 1 is at the outflow end of a pipe section 4, through which the concrete mass accumulating from the pouring pipe 1 according to the arrows P is caught in the annular space 5 between the pouring pipe 1 and the pipe section 4. Normally, that is to say without the pipe section 4 being provided, as is the case with the normal contractor pipe, the whole would Environment around the pouring pipe 1 to be poured up to the height H. This last-mentioned height would then at the same time be the minimum thickness of the relevant cladding layer or of the relevant one Ground, which in the normal way, starting from a column of material with a height H and a minimum distance A. «Between the lower edge of the pouring pipe 1 and the underground 2 to be filled could be realized.

Auf dem durch das Rohrstück 4 umschlossenen ringförmigen Raum findet eine Hochstauung um das untere Ende des Rohrstücks statt und zwar gemäss den Pfeilen P. und zwar bis zu einer HöheIn the annular space enclosed by the pipe section 4, there is a build-up around the lower end of the pipe section instead, namely according to the arrows P. and up to a height

-6--6-

309837/0379309837/0379

B0 welche bedeutend kleiner ist als die Höhe H1. Die Höhe H wurde zugleich das Niveau der geschütteten Schicht oder des geschütteten Bodens bestimmen wenn keine weiteren Rohrstücke vorgesehen wären. Im Beispiel von Fig. 1 ist jedoch in einem radialen Abstand um das Rohrstück 4 herum ein zweites Rohrstück 4* angewandt, wodurch die (Minimum)bodendicke noch weiter reduziert ist und zwar zu einem Wert entsprechend der Schütthöhe H3.B 0 which is significantly smaller than the height H 1 . The height H would also determine the level of the poured layer or the poured soil if no further pipe sections were provided. In the example of FIG. 1, however, a second pipe section 4 * is used at a radial distance around the pipe section 4, as a result of which the (minimum) floor thickness is reduced even further, to a value corresponding to the bed height H 3 .

In Ausführungsbeispiel nach Fig. 2 und 3 ist die erfindungsgemässe Vorrichtung mit einem Schüttrohr speziellen Typs versehen, bestehend aus einem Rohr la mit biegsamen Wänden, welches Rohr unten von einem formbeständigen rohrförmigen Endstück Ib umgeben ist. Das biegsame Schüttrohr la ist an ihrem oberen Ende mittels einer Klemme 6 um das Ausstromende des Einfülltrichters 7 befestigt und reicht mit ihrem unteren Ende lose in das Endstück Ib. Das Endstück Ib 1st mittels Verbindingsstangen 8 am Einfülltrichter 7 aufgehängt. Statt Verbindungsstangen könnten auch biegsame Verbindungsorgane wie Ketten angewandt werden. Im betrachteten Ausführungsbeispiel ist der Einfülltrichter 7 mit dem daran hängenden Schüttrohr la, Ib auf Laufradern 9 verfahrbar von einem Tragrahmen unterstützt, welcher Tragrahmen aus den als Führungsschienen für die Laufräder 9 dienenden Langsbalken 11 und den Querbalken 12 besteht.In the embodiment according to FIGS. 2 and 3, the device according to the invention is provided with a pouring pipe of a special type, consisting of a pipe la with flexible walls, which pipe is surrounded at the bottom by a dimensionally stable tubular end piece Ib. The flexible pouring pipe la is fastened at its upper end by means of a clamp 6 around the outflow end of the filling funnel 7 and extends loosely with its lower end into the end piece Ib. The end piece 1b is suspended from the hopper 7 by means of connecting rods 8. Instead of connecting rods, flexible connecting elements such as chains could also be used. In the exemplary embodiment under consideration, the hopper 7 with the pouring pipe 1 a, 1 b attached to it is movably supported on impellers 9 by a support frame, which support frame consists of the longitudinal beams 11 serving as guide rails for the impellers 9 and the transverse beams 12.

Der Tragrahmen 10 ist seinerseits mittels vier in den Querbalken 12 gelagerten Laufrädern 13 in Querrichtung über ein Paar Schienen 14 verfahrbar. Die Schienen 14 sind im gezeichneten Ausführungsbeispiel von Rohren gebildet, welche zum Beispiel durch Schweissen am oberen Rand der Spundbohlen 15 befestigt sind, welche Spundbohlen eine Baugrube begrenzen, auf dem unter Wasser, liegenden Boden 2 derselben eine Schicht 3 zum Beispiel aus Beton zu schütten ist, welche Schicht als Boden, Stützschicht zwischen den Spundbohlen 15 oder als Arbeitsboden oder Stützboderi zum Beispiel für einen Pfeiler dienen könnte.The support frame 10 can for its part be moved in the transverse direction over a pair of rails 14 by means of four running wheels 13 mounted in the crossbeam 12. In the exemplary embodiment shown, the rails 14 are formed by pipes which are fastened, for example, by welding to the upper edge of the sheet piles 15, which sheet piles delimit an excavation pit, and a layer 3 of concrete, for example, is to be poured onto the submerged floor 2 of the same which layer could serve as a floor, support layer between the sheet piles 15 or as a work floor or support floor, for example for a pillar.

Fig. 2 zeigt die erfindungsgemässe Vorrichtung mit dem in die Baugrube herunterhangenden Schüttrohr la, Ib in einer Lage in welcher der Einfülltrichter 7 mit dem daran hängenden Schüttrohr la, Ib wahrend des Schüttens in Pfeilrichtung amFig. 2 shows the inventive device with the pouring pipe la, Ib hanging down in the excavation pit in one Position in which the funnel 7 with the pouring pipe la, Ib hanging on it during pouring in the direction of the arrow on

309837/0379 7_309837/0379 7 _

Tragrahmen 10 entlang versetzt wird.Support frame 10 is offset along.

Entsprechend dem oben an Hand von Fig. 1 Besprochenen wird die am unteren Ende des Rohrstucks Ib auftretende Betonmasse unter Einfluss des Druckes der Materialsäule h an der Aussenseite des Rohrstücks Ib entlang hochgestaut werden. Dadurch jedoch dass die Säulenhöhe h infolge der Anwendung eines Schuttrohrs la mit biegsamen Wänden (wodurch diese Wände sich unter Einfluss des Druckes des umgebenden Wassers fortwährend zusammenzuziehen versuchen) nur relativ klein zu sein braucht» wird der Abstand über welchen das Material an der Aussenseite des Rohrstücks Ib' entlang hochgestaut wird, relativ gering sein. Dieser Abstand h konnte dennoch bei variierendet Höhe h der Materialsäule innerhalb des Endstücks Ib derart variieren, dass eine unregelmässige Oberfläche der Schicht 3 entstehen würde. Um dies zu vermeiden ist um das Endstück Ib herum ein Rohrstück 4a vorgesehen, dessen Wirkung mit der des Rohrstücks 4 um das Schüttrohr 1 in Fig. 1 herum vergleichbar ist. Im Zusammenhang mit der verh-ältnismässig kleinen Säulenhöhe h könnte die Höhe des Rohrstücks 4a viel kleiner als die des Rohrstücks 4 in Fig. 1 gewählt werden. Die variierende Höhe h. des Materials im ringförmigen Raum Sa zwischen dem Endstück Ib und dem Rohrstück 4a ist selbst so klein dass wenig oder keine Neigung zur Hochstauung des Materials an der Aussenseite des Rohrstücks 4a entlang besteht. Dies bedeutet dass im Ausführungsbeispiel nach Fig. 2 und 3 die Anwendung eines einzigen Rohrstücks 4a genügt um eine Schicht oder ein Boden 3 mit einer ebenen Oberfläche zu erhalten. Diese Oberfläche ist dann durch die Ebene durch den unteren Rand des Rohrstücks 4a bestimmt.In accordance with what has been discussed above with reference to FIG. 1, the concrete mass occurring at the lower end of the pipe stucco Ib is under the influence of the pressure of the material column h on the Be dammed up along the outside of the pipe section Ib. As a result, however, that the column height h as a result of the use of a rubble pipe la with flexible walls (which causes these walls to fall under Under the influence of the pressure of the surrounding water constantly trying to contract) only needs to be relatively small »the The distance over which the material is dammed up along the outside of the pipe section Ib 'can be relatively small. This Distance h could nevertheless vary with a varying height h of the material column within the end piece Ib in such a way that a irregular surface of the layer 3 would arise. To avoid this, a piece of pipe is around the end piece 1b 4a is provided, the effect of which is comparable to that of the pipe section 4 around the pouring pipe 1 in FIG. In connection with the relatively small column height h, the height could be of the pipe section 4a can be selected to be much smaller than that of the pipe section 4 in FIG. The varying height h. of the material in annular space Sa between the end piece Ib and the pipe section 4a itself is so small that there is little or no tendency for the material to accumulate on the outside of the pipe section 4a along consists. This means that in the exemplary embodiment according to FIGS. 2 and 3, the use of a single pipe section 4a is sufficient to obtain a layer or floor 3 with a flat surface. This surface is then through the plane through the determined lower edge of the pipe section 4a.

Hat das zusammengesetzte Schüttrohr la, Ib in Fig. 2 ihren Arbeitsgang von links nach rechts beendet, so wird der Tragrahmen 10 in eine Richtung senkrecht zur Zeichnungsebene "verholt"» wonach das Schüttrohr la, Ib einen nächsten Arbeitsgang von rechts nach links anfangen könnte.Has the assembled pouring pipe la, Ib in Fig. 2 their End of the operation from left to right, the support frame 10 is in a direction perpendicular to the plane of the drawing "Wrong" »after which the pouring pipe la, Ib could start a next operation from right to left.

Zur Verstellung des Schüttrohrs la, Ib bzw. des Tragrahmens 10 können konventionellen Mittel angewandt werden, wie Windenvorrichtungen, welche nicht näher erläutert zu werden brauchen und auch in der Zeichnung nicht näher dargestellt sind.To adjust the pouring pipe la, Ib or the support frame 10, conventional means can be used, such as Winch devices which do not need to be explained in more detail and are also not shown in more detail in the drawing.

309837/0379309837/0379

-8--8th-

Die Rohrstücke 4 bzw. 4' bzw. 4a sind zum Beispiel durch nicht näher in der Zeichnung dargestellten Speichen oder derartigen Befestigungsorgane mit dem Schuttrohr 1 bzw. dem Endstück Ib verbunden. Der untere Rand des Rohrstücks bzw. der Rohrstücke braucht nicht in derselben Ebene mit dem Unterrand des Endstücks Ib bzw. des Schüttrohrs 1 zu liegen, sondern könnte auch in einigem Abstand oberhalb oder unterhalb dieses Randes gelegen sein.The pipe sections 4 or 4 'or 4a are, for example, by spokes or not shown in detail in the drawing such fastening members connected to the rubble pipe 1 or the end piece Ib. The lower edge of the pipe section or the Pipe pieces need not lie in the same plane with the lower edge of the end piece 1b or the pouring pipe 1, but could also be located at some distance above or below this edge.

Insbesondere bei Anwendung der Erfindung bei einem Schüttrohr arbeitend gemäss dem Kontraktorprinzip, nach welchem man gewöhnlich das Schüttrohr bis relativ dicht am zu beschütteten Untergrund absinkt, ist es von Vorteil das Rohrstück bzw. die Rohrstücke in Langenrichtung verstellbar um den unteren Teil des Schüttrohrs herum zu montieren. Man hat dann die Möglichkeit das Rohrstück bzw. das aussere Rohrstück in einer solchen Höhe einzustellen, dass es keine Hochstauung von Material an der Aussenseite des Rohrstücks entlang bzw. des ausseren Rohrstücks entlang mehr gibt und der Unterrand jenes Rohrstücks also das definitive Schüttniveau bestimmt. Unter Verweisung nach Fig. würde dies bedeuten dass man das aussere Rohrstuck 4' soweit gegenüber dem Schüttrohr 1 nach oben anordnet, dass der untere Rand dieses Rohrstücks auf dem mit H. angedeuteten Niveau zu liegen kommt. Dazu könnte das betreffende Rohrstück in Höhenrichtung am eigentlichen Schüttrohr 1 entlang geführt sein und mittels Ketten oder dergleichen mehr oder weniger "gefiert" werdenIn particular when the invention is used in a chute, working according to the contractor principle, according to which one Usually the pouring pipe sinks relatively close to the ground to be filled, it is advantageous to use the pipe section or the Pipe sections adjustable lengthways around the lower part of the chute to mount around. You then have the option of placing the pipe section or the outer pipe section at such a height set that there is no accumulation of material on the outside of the pipe section or along the outer pipe section along there is more and the lower edge of that piece of pipe thus determines the definitive bulk level. With reference to Fig. this would mean that the outer piece of pipe 4 'is arranged so far opposite the pouring pipe 1 upwards that the lower The edge of this piece of pipe comes to rest on the level indicated by H. For this purpose, the pipe section in question could be guided along the actual pouring pipe 1 in the vertical direction and are more or less "celebrated" by means of chains or the like

Die Andeutung "fliessfahige Masse" umfasst nicht nur dickflüssigen Massen. Die erfindungsgemSsse Vorrichtung könnte zum Beispiel auch zum unter Hasser Schütten von anderen Arten fliessfahigen Materials wie Sand oder Kies angewandt werden, wenn es sich darum handelt eine ebene Basis zur Anordnung zum Beispiel von Caissons oder Tunnelabschnitten zu erhalten.The suggestion "flowable mass" does not only include viscous masses. The inventive device could for For example, other types of flowable material such as sand or gravel can also be used under haters, when it comes to obtaining a level base for the arrangement of caissons or tunnel sections, for example.

-9--9-

309837/0379309837/0379

Claims (2)

A W SPRUECHEA W SPARDS { 1. /Vorrichtung zum unter Wasser Vorsehen einer fliess- fähigen, wohl oder nicht härtbaren Masse, wie , (Beton)mörtel, Asphaltbitumen und dergleiche, versehen mit einem von einer Tragkonstruktion herunterhangenden Schüttrohr mit Einfüllvorrichtung, dadurch gekennzeichnet, dass das Schuttrohr an Ihrem Ausstromende unter Zwischenschaltung eines Zwischenraums von wenigstens einem kurzen Rohrstück umgeben ist.{1. / Device for providing a flowable , well or not hardenable mass under water, such as (concrete) mortar, asphalt bitumen and the like, provided with a pouring pipe hanging down from a supporting structure with a filling device, characterized in that the pouring pipe on your Outflow end is surrounded by at least one short piece of pipe with the interposition of a space. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass das Rohrstück bzw. das aussere Rohrstück in I.angenrichtung versteilbar um das untere Teil des Schüttrohrs herum montiert ist.2. Device according to claim 1, characterized in that the pipe section or the outer pipe section is mounted so that it can be adjusted in the lengthwise direction around the lower part of the pouring pipe. 309837/0379309837/0379
DE19732308928 1972-03-01 1973-02-23 DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER Pending DE2308928A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL7202734A NL7202734A (en) 1972-03-01 1972-03-01

Publications (1)

Publication Number Publication Date
DE2308928A1 true DE2308928A1 (en) 1973-09-13

Family

ID=19815491

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732308928 Pending DE2308928A1 (en) 1972-03-01 1973-02-23 DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER

Country Status (8)

Country Link
US (1) US3861157A (en)
JP (1) JPS531965B2 (en)
BE (1) BE796145A (en)
DE (1) DE2308928A1 (en)
ES (1) ES412424A1 (en)
FR (1) FR2174630A5 (en)
GB (1) GB1367867A (en)
NL (1) NL7202734A (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51140307A (en) * 1975-05-28 1976-12-03 Kajima Corp Tremie pipe
US4033281A (en) * 1976-01-07 1977-07-05 Poseidom Marketing And Development Co. Extra heavy duty hydrostatic anchor together with its extra heavy duty tether cable
US4043909A (en) * 1976-12-22 1977-08-23 Takenaka Komuten Co., Ltd. Apparatus and method for solidification of sludges
US4266889A (en) * 1979-11-23 1981-05-12 The United States Of America As Represented By The Secretary Of The Navy System for placing freshly mixed concrete on the seafloor
US4614460A (en) * 1981-01-26 1986-09-30 Klas Heyman Support structure
US4583882A (en) * 1984-02-01 1986-04-22 Szabo Miklos T Method for forming artificial islands
JPS60242219A (en) * 1984-05-14 1985-12-02 Takenaka Komuten Co Ltd Formation of offshore seabed mound
GB2475688A (en) * 2009-11-25 2011-06-01 Gael Force Aqua Ltd An anchor having a number of floodable chambers
WO2014201267A1 (en) * 2013-06-12 2014-12-18 Meedl68 Lp Offshore preparation system
CN112411554A (en) * 2020-10-21 2021-02-26 江苏长江机械化基础工程有限公司 Underwater concrete pouring device for cast-in-situ bored pile

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1256074A (en) * 1915-07-27 1918-02-12 Harrison S Taft Stopppe for treme-tubes.
US2979913A (en) * 1953-12-14 1961-04-18 Entpr Fougerolle Pour Travaux Devices for casting concrete under water
NL6808349A (en) * 1968-06-13 1969-12-16
US3712066A (en) * 1970-08-06 1973-01-23 Raymond Int Inc Filling sand drain holes

Also Published As

Publication number Publication date
BE796145A (en) 1973-07-02
JPS48100907A (en) 1973-12-19
FR2174630A5 (en) 1973-10-12
US3861157A (en) 1975-01-21
ES412424A1 (en) 1976-01-01
GB1367867A (en) 1974-09-25
JPS531965B2 (en) 1978-01-24
NL7202734A (en) 1973-09-04

Similar Documents

Publication Publication Date Title
DE19647160C2 (en) Method and device for half shield driving
DE2025449A1 (en) Method and device for location fixing of a building
DE1584691A1 (en) Machine and method for producing concrete structural parts
CH635885A5 (en) Anchorage for structural members in soil or in rock and method of producing this anchorage
DE2840195A1 (en) DEVICE FOR ATTACHING STORAGE BOXES USING THE FUEL ELEMENT BUNCHES TO THE BOTTOM OF A WATER BASIN
DE2308928A1 (en) DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER
DE2751972A1 (en) METHOD OF MANUFACTURING REINFORCED UNDERGROUND BUILDING PANEL
DE2365445A1 (en) METHOD OF MANUFACTURING SANDDRAENS
DE3624202C2 (en) Twist drill
DE2246125A1 (en) FORMWORK DEVICE FOR PACKING PIT DRAINING MATERIAL
EP0516942B1 (en) Method and device for stabilising friction soils and bordering cohesive soils
DE1811682C3 (en) Lost formwork for a retaining wall
DE2062998A1 (en) Method for the full connection of a concrete body to an irregularly shaped surface using elastic formwork
DE2357533B2 (en) DEVICE FOR DUST CONTROL IN A SHIELD REMOVAL
DE4219078C2 (en) Device for lowering a foundation part of a building into an excavation pit filled with groundwater
DE1928993B2 (en) Device for the installation of surfacing material that solidifies under water on the bottom of a body of water
DE2639792A1 (en) Increased bearing strength device for porous ground - includes driving open-ended linings into soil to reduce lateral movement
DE3914736A1 (en) Pipe laying machine for concrete or stone pipes - consists of milling unit, with basket with back outlet and underneath cutter, with retainer
DE3519225A1 (en) Method of constructing slope-supporting bodies required for hydraulic spoil heaps, and arrangement for carrying out the method
DE1920285C3 (en) Device for filling underwater structures with sand
DE4122413C2 (en) Method and device for producing a collecting space
DE8331340U1 (en) DEVICE FOR DRAINING SEWAGE BY UNDERFLOOR LOCKING
DE2754577A1 (en) Conveyor installation method - by excavating for foundations, then casting in whilst support members are held up in position
DE1928471A1 (en) Process and device for compacting and draining soil
EP0346941B1 (en) Method for producing construction elements in the soil, such as piles, anchors or the like, and apparatus for applying this method

Legal Events

Date Code Title Description
OHA Expiration of time for request for examination