DE2306569A1 - FORMWORK FOR POURING A SPIRAL STAIR - Google Patents

FORMWORK FOR POURING A SPIRAL STAIR

Info

Publication number
DE2306569A1
DE2306569A1 DE2306569A DE2306569A DE2306569A1 DE 2306569 A1 DE2306569 A1 DE 2306569A1 DE 2306569 A DE2306569 A DE 2306569A DE 2306569 A DE2306569 A DE 2306569A DE 2306569 A1 DE2306569 A1 DE 2306569A1
Authority
DE
Germany
Prior art keywords
vertical stand
formwork
contact surface
support
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE2306569A
Other languages
German (de)
Inventor
Anton Prim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE2306569A priority Critical patent/DE2306569A1/en
Publication of DE2306569A1 publication Critical patent/DE2306569A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Schalung zum Gießen einer Wendeltreppe ====================================== Die Erfindung betrifft eine Schalung zum Gießen einer Wendeltreppe.Formwork for casting a spiral staircase ====================================== The invention relates to formwork for casting a spiral staircase.

Der Erfindung liegt die Aufgabe zugrunde, eine Schalung zu schaffen, die nach dem Baukastenprinzip aus verschiedenen Gruppen von Bauelementen errichtet werden kann, die je Gruppe im wesentlichen gleichgestaltet und somit beliebig gegeneinander austauschbar sind. Dabei soll insbesondere die Möglichkeit geschaffen werden, die einzelnen Bauelemente zum Errichten von Schalungen verwenden zu können, mit denen Wendeltreppen unterschiedlicher Abmessungen, d.h.The invention is based on the object of creating a formwork built according to the modular principle from different groups of components can be, which are essentially the same for each group and thus against each other at will are interchangeable. In particular, the possibility should be created that to be able to use individual components for erecting formwork with which Spiral stairs of different dimensions, i.e.

unterschiedlicher Laufbreiten bzw. Stufenlängen, unterschiedlicher Trittflächengrößen, unterschiedlicher Unterbaustärke u. dgl. gegossen werden können, wobei die einzelnen Elemente zum Aufbau weiterer Schalungen wieder verwendbar sein sollen.different tread widths or step lengths, different Tread sizes, different substructure thicknesses and the like can be poured, whereby the individual elements can be reused for the construction of further formwork should.

Zur Lösung dieser Aufgabe ist die erfindungsgemäße Schalung dadurch gekennzeichnet, daß sie einen Vertikalständer, in verschiedenen Winkelstellungen von oben auf den Vertikalständer aufschiebbare Halterungen, seitlich in die Halterungen einschiebbare Schalungsbretter zur Begrenzung der Setzstufe und ebenfalls seitlich in die Halterungen einschiebbare Stützbalken zur Abstützung einer Bahn zur unteren Begrenzung des Gießraumes aufweist. Eine derartige Schalung ist zum Gießen von Wendeltreppen mit offener Spindel vorgesehen.The formwork according to the invention is used to solve this problem through this characterized in that they have a vertical stand, in different angular positions Brackets that can be pushed onto the vertical stand from above, into the brackets from the side Retractable shuttering boards to limit the riser and also to the side Support beams which can be pushed into the brackets to support a path to the lower one Has limitation of the casting space. Such formwork is used for pouring spiral staircases provided with an open spindle.

Zum Errichten einer Schalung werden die einzelnen einander identischen Halterungen von oben auf den in geeigneter Weise lösbar im Boden verankerten Vertikalständer aufgeschoben, wobei die einzelnen Halterungen in eine solche Relativstellung zueinander gedreht werden, daß sie eine der Wendelung der Treppe entsprechende Winkelstellung zueinander einnehmen.To erect a formwork, the individual pieces are identical to each other Mounts from above onto the vertical stand that is detachably anchored in a suitable manner in the ground pushed on, the individual brackets in such a position relative to one another be rotated so that they have an angular position corresponding to the turn of the stairs take to each other.

Die Halterungen werden dann mittels Bolzen, Klammern od. dgl.The brackets are then od by means of bolts, brackets.

in dieser der Wendelung der zu errichtenden Treppe entsprechenden Stellung verankert. Anschließend werden in die einzelnen Halterungen einerseits die Schalungsbretter und andererseits die Stützbalken seitlich eingeschoben, wobei die Schalungsbretter und die Stlltzbälken infolge der Verschiebemöglichkeit nicht in Abhängigkeit von dem erwünschten Maß der Laufbreite bzw. Stufenlänge der Treppe zugeschnitten werden müssen, sondern durch Verschieben in jeder gewünschten Länge verstellt werden können. So besteht insbesondere die Möglichkeit, beispielsweise in Abhängigkeit von den örtlichen Gegebenheiten mit ein und denselben Bauelementen eine Schalung für unterschiedlich große Laufbreiten bzw. Stufenlängen benachbarter Stufen zu errichten. Die einzelnen Schalungsbretter und Stützbalken werden dann mittels Keilen od. dgl.in this corresponding to the turn of the staircase to be built Anchored position. Then on the one hand in the individual brackets the shuttering boards and on the other hand the support beams pushed in laterally, with the shuttering boards and the supporting beams are not due to the ability to move depending on the desired dimension of the running width or step length of the stairs Need to be cut to size, but by moving in any desired length can be adjusted. In particular, there is the possibility, for example depending on the local conditions with one and the same components a formwork for different widths or step lengths of adjacent ones To erect steps. The individual formwork boards and support beams are then by means of wedges or the like.

verankert bzw. festgestellt. Anschließend wird auf die Stützbalken als untere Begrenzung für den Gießraum in üblicher Weise eine Bahn beispielsweise in Form einer Streckmetall-oder Stahlmatte aufgelegt. Anschließend werden im Bereich des Vertikal ständers zur Begrenzung der Lichtwangen der einzelnen Treppenstufen und zum Begrenzen der äußeren Wangen Schalungsbretter angebracht.anchored or established. Then it is on the support beams as a lower limit for the casting space in the usual way a web, for example placed in the form of an expanded metal or steel mat. Subsequently, in the area of the vertical stand to limit the light stringers of the individual steps and formwork boards attached to delimit the outer cheeks.

Für das Errichten der erfindungsgemäßen Schalung sind keine aufwendigen Berechnungen mehr erforderlich, und die Schalung kann selbst von ungelernten Arbeitern in kurzer Zeit fertiggestellt werden.For the erection of the formwork according to the invention there are no complex ones Calculations more required, and the formwork can be done even by unskilled workers be completed in a short time.

Die erfindungsgemäße Schalung ist weiterhin dadurch gekennzeichnet, daß jede Halterung eine vertikal verlaufende U-förmige Führung zum Aufschieben auf den Vertikal ständer und eine im wesentlichen mit dem Steg der U-förmigen Führung zusammenfallende Anlagefläche für ein Schalungsbrett aufweist, und daß der Anlagefläche in einem mindestens der Dicke eines Schalungsbrettes entsprechenden Abstand eine Stützwand gegenüberliegt, die durch obere und untere Stützflächen mit der Anlagefläche verbunden ist, derart, daß die Anlagefläche, die Stützwand und die Stützflächen einen im wesentlichen rechteckigen Spalt begrenzen, dessen Höhe der Höhe eines Schalungsbrettes entspricht.The formwork according to the invention is further characterized by that each bracket has a vertically extending U-shaped guide to slide on the vertical stand and one essentially with the web of the U-shaped guide has coincident contact surface for a shuttering board, and that the contact surface in a distance corresponding to at least the thickness of a shuttering board Opposite support wall, which is through upper and lower support surfaces with the contact surface is connected in such a way that the contact surface, the support wall and the support surfaces limit a substantially rectangular gap, the height of which is the height of a shuttering board is equivalent to.

In dem auf diese Weise gebildeten Spalt läßt sich das Schalungsbrett in Abhängigkeit von der Größe der zugeordneten fertigen Stufe in die notwendige Stellung verschieben, in der das Schalungsbrett dann in geeigneter Weise beispielsweise mittels eines Keiles od. dgl. gegen seitliche Bewegungen, d.h.In the gap formed in this way, the shuttering board can be depending on the size of the assigned finished stage into the necessary Move position in which the shuttering board then in a suitable manner, for example by means of a wedge or the like against lateral movements, i.e.

Bewegungen in der Horizontalebene, festgelegt wird. Die oberen und unteren Stützflächen verhindern ein Kippen des Schalungsbrettes um eine Horizontalachse.Movements in the horizontal plane. The top and lower support surfaces prevent the shuttering board from tilting about a horizontal axis.

Die erfindungsgemäße Schalung ist weiterhin dadurch gekennzeichnet, daß an dem unteren Ende der U-förmigen Führung jeder Halterung zwei im wesentlichen in den gleichen Ebenen wie die beiden Schenkel der U-förmigen Führung liegende, sich relativ zur Anlagefläche nach hinten erstreckende Bügel angebracht sind, die zwei sich gegenüberliegende Öffnungen mit im wesentlichen rechteckigem Querschnitt zum seitlichen Einschieben eines Stützbalkens begrenzen.The formwork according to the invention is further characterized by that at the lower end of the U-shaped guide of each bracket essentially two lying in the same planes as the two legs of the U-shaped guide, are attached relative to the contact surface to the rear extending bracket, which two opposing openings with a substantially rectangular cross-section limit for the lateral insertion of a support beam.

ei dieser Ausführungsform lassen sich die einzelnen Stützbalken seitlich in die durch die Bügel gebildeten Öffnungen einschieben und anschließend in Abhängigkeit von der Laufbreite bzw. Stufenlänge der einzelnen Stufe in der notwendigen Stellung beispielsweise mittels Keilen od. dgl. festlegen.In this embodiment, the individual support beams laterally Push into the openings formed by the bracket and then depending on the width or length of the steps of the individual step in the required position for example by means of wedges or the like.

Um die Stärke des Unterlaufs bzw. Unterbaus in Abhängigkeit Von der notwendigen Treppenfestigkeit verändern zu können, sind die durch die Bügel begrenzten Öffnungen in horizontaler Richtung länger als die Breite bzw. Dicke der Stützbalken, so daß die einzelnen Stützbalken in unterschiedlichen Abständen von den Vertikalständer verankert werden können.To the strength of the underflow or substructure depending on the To be able to change the necessary stability of stairs, are those limited by the bracket Openings in the horizontal direction longer than the width or thickness of the support beams, so that the individual support beams at different distances from the vertical stand can be anchored.

Der Vertikal ständer hat vorzugsweise einen kreisrunden Querschnitt, so daß die einzelnen Halterungen im wesentlichen frei um den Vertikalständer drehbar sind, insbesondere jedoch um einen Winkel zwischen 20 bis 400. Auf diese Weise besteht die Möglichkeit, die Steigung der Wendeltreppe durch entsprechende Anpassung der Stufenbreite in Abhängigkeit von den räumlichen Gegebenheiten festzulegen.The vertical stand preferably has a circular cross-section, so that the individual brackets are essentially freely rotatable about the vertical stand are, in particular, however, at an angle between 20 and 400. In this way, there is the possibility of adjusting the slope of the spiral staircase accordingly Determine the step width depending on the spatial conditions.

Der Vertikalständer kann jedoch vorzugsweise auch einen polygonalen Querschnitt mit sich jeweils parallel gegenüberliegenden Seiten gleicher Länge haben, so daß die einzelnen Halterungen bereits eine feste Führung haben und die Steigung bzw. das Wendlungsmaß von vorneherein durch die Anzahl der einander parallelen Seitenflächen des Vertikalständers festgelegt ist.The vertical stand can, however, preferably also be a polygonal one Have a cross-section with parallel opposite sides of the same length, so that the individual brackets already have a firm guide and the slope or the degree of twist from the outset by the number of parallel side surfaces of the vertical stand is fixed.

Die Erfindung wird im folgenden anhand der beiliegenden Zeichnungen näher beschrieben. Es zeigen: Fig. 1 eine teilweise im Schnitt wiedergegebene Seitenansicht eines Vertikal ständers mit darauf aufgeschobenen Halterungen und in die Halterungen seitlich eingeschobenen Schalungsbrettern und Stützbalken der erfindungsgemäßen Schalung; Fig. 2 eine Draufsicht auf die Anordnung gemäß Fig. 1 mit zwei Halterungen, die, bezogen auf eine Bezugsebene, unterschiedliche Winkelstellungen entsprechend der Steigung bzw. Wendelung der mittels der erfindungsgemäßen Schalung zu gießenden Wendeltreppe einnehmen; Fig. 3 teilweise im Schnitt in der Seitenansicht eine Abwicklung der erfindungsgemäßen Schalung mit bereits vergossenem Betonkörper; Fig. 4 eine Seitenansicht der Halterung, und Fig. 5 in schematischer Darstellung eine Draufsicht auf eine nach dem erfindungsgemäßen Prinzip errichtete Schalung zum Gießen einer Treppe, bei der zwei Podeste am Antritt und Austritt teilweise oder ganz durch Wendlung ersetzt sind.The invention is described below with reference to the accompanying drawings described in more detail. The figures show: FIG. 1 a side view partially shown in section a vertical stand with brackets pushed onto it and into the brackets laterally inserted shuttering boards and support beams of the invention Formwork; FIG. 2 shows a plan view of the arrangement according to FIG. 1 with two brackets that have different angular positions in relation to a reference plane corresponding to the slope or twist of the means of the formwork according to the invention to occupy spiral staircase to be poured; Fig. 3 partially in section in side view a development of the formwork according to the invention with already cast concrete body; FIG. 4 shows a side view of the holder, and FIG. 5 shows a schematic representation a plan view of a formwork constructed according to the principle of the invention for pouring a staircase with two platforms at the entrance and exit partially or are completely replaced by a twist.

Die wesentlichen Bauelemente, die zum Errichten der erfindungsgemäßen Schalung benötigt wnrden, sind der in Fig. 1 schematisch dargestellte und in geeigneter Weise im Boden zu verankernde Vertikalständer 1, der aus einem Stahlrohr od. dgl. bestehen kann, die auf den Vertikalständer 1 von oben aufschiebbaren Halterungen 2, die seitlich in die Halterungen 2 einschiebbaren Schalungsbretter 3 und die ebenfalls seitlich in die Halterungen 2 einschiebbaren Stützbalken 4. Die aus Gründen der Ubersichtlichkeit in Fig. 1 senkrecht übereinander an dem Vertikal ständer 1 angebrachten Halterungen 2 werden zum Bau einer Schalung zum Gießen einer Wendeltreppe in die in Fig. 2 dargestellte Relativstellung verschwenkt, so daß die einzelnen Halterungen der Wendelung der zu gießenden Treppe entsprechende Stellungen einnehmen.The essential components required to build the inventive Formwork wnrden are required, those shown schematically in Fig. 1 and are suitable Way to be anchored in the ground vertical stand 1, which is made of a steel pipe or the like. may exist, the brackets which can be pushed onto the vertical stand 1 from above 2, the shuttering boards 3 which can be pushed into the brackets 2 and also the laterally in the brackets 2 retractable support beam 4. For reasons of Clarity in Fig. 1 mounted vertically one above the other on the vertical stand 1 Brackets 2 are used to build formwork for pouring a spiral staircase into the Pivoted relative position shown in Fig. 2, so that the individual brackets take positions corresponding to the turn of the stairs to be poured.

Jede Halterung 2 hat eine im wesentlichen U-förmige Führung, deren Steg durch eine vertikale Anlagefläche 5 und deren Schenkel durch zwei an der Anlagefläche 5 befestigte, z.B.Each bracket 2 has a substantially U-shaped guide whose Web by a vertical contact surface 5 and its legs by two on the contact surface 5 attached, e.g.

aus Stangenmaterial gebogene Bügel 6 gebildet sind. Der Anlagefläche 5 liegt in einem mindestens der Dicke eines Schalungsbrettes 3 entsprechenden Abstand eine Stützwand 7 gegenüber, die durch obere und untere Stützflächen 8 bzw. 9 mit der Anlagefläche verbunden ist. Auf diese Weise wird von der Anlagefläche 5, der Stützwand 7 und den Stützflächen 8 und 9 ein im wesentlichen rechteckiger Spalt 10 begrenzt, dessen Höhe der Höhe eines Schalungsbrettes entspricht und dessen Breite größer ist als die Dicke eines Schalungsbrettes.bent brackets 6 are formed from rod material. The contact surface 5 lies in a distance corresponding at least to the thickness of a shuttering board 3 a support wall 7 opposite that by upper and lower support surfaces 8 or 9 is connected to the contact surface. In this way, the contact surface 5, the support wall 7 and the support surfaces 8 and 9 are essentially rectangular Gap 10 limited, the height of which corresponds to the height of a shuttering board and which Width is greater than the thickness of a shuttering board.

An dem unteren Ende der U-förmigen Führung jeder Halterung sind zwei im wesentlichen in den gleichen Ebenen wie die beiden Schenkel 6 der U-förmigen Führung liegende, sich relativ zur Anlagefläche 5 nach hinten erstreckende Bügel 11 angebracht, die zwei sich gegenüberliegende Öffnungen 12 mit im wesentlichen rechteckigen Querschnitt zum seitlichen Einschieben eines Stützbalkens 4 begrenzen. Die Öffnungen 12 sind in horizontaler Richtung länger als die Breite bzw.At the bottom of the U-shaped guide of each bracket are two essentially in the same planes as the two legs 6 of the U-shaped Guide lying, relative to the contact surface 5 to the rear extending bracket 11 attached, the two opposite openings 12 with substantially Limit rectangular cross-section for the lateral insertion of a support beam 4. The openings 12 are longer in the horizontal direction than the width or

Dicke eines Stützbalkens 4, so daß, beispielsweise bezogen auf die Darstellung von Fig. 1 und 3, die Stützbalken 4 in unterschiedlichen Abständen von dem Vertikalständer 1, beispielsweise mit dem in Fig. 2 angedeuteten Keil 13, festgelegt werden können.Thickness of a support beam 4, so that, for example, based on the Representation of Fig. 1 and 3, the support beams 4 at different distances from the vertical stand 1, for example with the wedge 13 indicated in FIG. 2, fixed can be.

Die Schalungsbretter 3 werden ihrerseits mittels der beispielsweise in Fig. 1 abgebildeten Keile 15 in den Spalten 10 der Halterungen 2 festgehalten.The shuttering boards 3 are in turn by means of, for example Wedges 15 shown in FIG. 1 are held in the columns 10 of the brackets 2.

Die Befestigung der Halterungen 2 ihrerseits an den Vertikalständer 1, der einen kreisrunden oder einen polygonalen Querschnitt haben kann, erfolgt mittels geeigneter Klemmen oder Anker oder mittels der in den Fig. schematisch angedeuteten Stifte 15.The attachment of the brackets 2 in turn to the vertical stand 1, which can have a circular or a polygonal cross-section, takes place by means of suitable clamps or anchors or by means of those indicated schematically in the figures Pins 15.

Zum Errichten einer Schalung wird der Vertikalständer 1 in geeigneter Weise im Boden verankert, bevor die Halterungen 2 in der notwendigen Anzahl von oben her auf ihn aufgeschoben und in der den Abmessungen der zu gießenden Wendeltreppe entsprechenden Stellung an dem Vertikal ständer verankert werden. -Anschließend werden die Schalungsbretter 2 und die Stützbalken 4 in die dafür vorgesehene Spalte 10 bzw. Öffnungen 12 eingeschoben und in Abhängigkeit von den jeweiligen Stufenlängen bzw. Laufbreiten mittels der Keile 13 bzw.To erect a formwork, the vertical stand 1 is suitable Way anchored in the ground before the brackets 2 in the necessary number of pushed up on him and in the dimensions of the spiral staircase to be cast corresponding position to be anchored on the vertical stand. -Afterward the formwork boards 2 and the Support beam 4 in the for it provided column 10 or openings 12 inserted and depending on the respective step lengths or widths by means of the wedges 13 or

14 verankert bzw. festgelegt. Über die Stützbalken 4 wird anschließend, so wie es aus der Abwicklung der Fig. 3 ersichtlich ist, eine -aus Streckmetall, einer Stahlmatte oder anderem geeigneten Material bestehende Bahn 16 gelegt und auf den Stützbalken beispielsweise durch Vernagelung befestigt. Nach Anbringen von weiteren Schalungsbrettern im Bereich der Stufenwangen kann in den durch die Schalungsbretter und die Bahn 16 gebildeten Gießraum Beton eingegossen werden, und zwar von unten her mit den einzelnen Stufen ansteigend. Die einzelnen Stufenoberflächen werden anschließend glatt gestrichen und nach Verfestigung des Betons kann die Schalung wieder entfernt und erneut verwendet werden.14 anchored or fixed. About the support beam 4 is then, as can be seen from the development of FIG. 3, one made of expanded metal, a steel mat or other suitable material existing web 16 laid and attached to the support beam, for example by nailing. After attaching further shuttering boards in the area of the step stringers can be inserted through the shuttering boards and the web 16 formed casting space concrete are poured, from below ascending with the individual levels. The individual step surfaces are then smoothed and after the concrete has solidified, the formwork can be used removed and used again.

Claims (6)

Patentansprüche Claims c7 1.Schalung zum Gießen einer Wendeltreppe, dadurch gekennzeichnet, daß sie einen Vertikalständer (1), in verschiedenen Winkelstellungen von oben auf den Vertikal ständer aufschiebbare Halterungen (2), seitlich in die Halterungen einschiebbare Schalungsbretter (3) zur Begrenzung der Setzstufe und ebenfalls seitlich in die Halterungen einschiebbare Stützbalken (4) zur Abstützung einer Bahn (16) zur unteren Begrenzung des Gießraumes aufweist.c7 1st formwork for casting a spiral staircase, characterized in that that they have a vertical stand (1), in different angular positions from above Holders (2) that can be pushed onto the vertical stand, laterally in the holders Retractable shuttering boards (3) to limit the riser and also to the side Support beams (4) that can be pushed into the holders to support a web (16) to the lower limit of the casting space. 2. Schalung nach Anspruch 1, dadurch gekennzeichnet, daß jede Halterung (2) eine vertikal verlaufende U-förmige Führung zum Aufschieben auf den Vertikalständer (1) und eine im wesentlichen mit dem Steg der U-förmigen Führung zusammenfallende Anlagefläche (5) für ein Schalungsbrett (3) aufweist, und daß der Anlagefläche (5) in einem mindestens der Dicke eines Schalungsbrettes (3) entsprechenden Abstand eine Stützwand (7) gegenüberliegt, die durch obere und untere Stützflächen (8, 9) mit der Anlagefläche (5) verbunden ist, derart, daß die Anlagefläche (5), die Stützwand (7) und die Stützflächen (8, 9) einen im wesentlichen rechteckigen Spalt (10) begrenzen, dessen Höhe der Höhe eines Schalungsbrettes (9) entspricht.2. Formwork according to claim 1, characterized in that each holder (2) a vertical U-shaped guide to slide onto the vertical stand (1) and one substantially coinciding with the web of the U-shaped guide Has contact surface (5) for a shuttering board (3), and that the contact surface (5) at a distance corresponding at least to the thickness of a shuttering board (3) a supporting wall (7) is opposite, which is defined by upper and lower supporting surfaces (8, 9) is connected to the contact surface (5) in such a way that the contact surface (5), the support wall (7) and the support surfaces (8, 9) delimit an essentially rectangular gap (10), whose height corresponds to the height of a shuttering board (9). 3. Schalung nach Anspruch 2, dadurch gekennzeichnet, daß an dem unteren Ende der U-förmigen Führung jeder Halterung (2) zwei im wesentlichen in den gleichen Ebenen wie die beiden Schenkel (6) der U-förmigen Führung liegende, sich relativ zur Anlagefläche (5) nach hinten erstreckende Bügel (11) angebracht sind, die zwei sich gegenüberliegende Öffnungen (12) mit im wesentlichen rechteckigennQuerschnitt zum seitlichen Einschieben eines Stützbalkens (4) begrenzen.3. Formwork according to claim 2, characterized in that on the lower End of the U-shaped guide of each bracket (2) two essentially in the same Levels like the two legs (6) of the U-shaped guide are located relatively to the contact surface (5) rearwardly extending brackets (11) are attached, the two opposing openings (12) with a substantially rectangular cross-section limit for lateral insertion of a support beam (4). 4. Schalung nach Anspruch 3, dadurch gekennzeichnet, daß die Öffnungen (12) in horizontaler Richtung länger sind als die Breite bzw. Dicke eines Stützbalkens (4).4. Formwork according to claim 3, characterized in that the openings (12) are longer in the horizontal direction than the width or thickness of a support beam (4). 5. Schalung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß der Vertikalständer (1) einen kreisrunden Querschnitt hat und die einzelnen Halterungen (2) in dem auf den Vertikal ständer aufgeschobenen Zustand relativ zu den jeweils benachbarten Halterungen frei um den Vertikalständer, insbesondere um einen Winkel zwischen 20 bis 400 drehbar sind.5. Formwork according to one of claims 1 to 4, characterized in that that the vertical stand (1) has a circular cross-section and the individual Brackets (2) in the state pushed onto the vertical stand relative to the respective adjacent brackets freely around the vertical stand, in particular around an angle between 20 and 400 can be rotated. 6. Schalung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß der Vertikalständer einen polygonalen Querschnitt mit sich jeweils parallel gegenüberliegenden Seiten gleicher Länge hat.6. Formwork according to one of claims 1 to 4, characterized in that that the vertical stand has a polygonal cross-section with each parallel opposite sides of the same length.
DE2306569A 1973-02-10 1973-02-10 FORMWORK FOR POURING A SPIRAL STAIR Pending DE2306569A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2306569A DE2306569A1 (en) 1973-02-10 1973-02-10 FORMWORK FOR POURING A SPIRAL STAIR

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2306569A DE2306569A1 (en) 1973-02-10 1973-02-10 FORMWORK FOR POURING A SPIRAL STAIR

Publications (1)

Publication Number Publication Date
DE2306569A1 true DE2306569A1 (en) 1974-08-15

Family

ID=5871493

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2306569A Pending DE2306569A1 (en) 1973-02-10 1973-02-10 FORMWORK FOR POURING A SPIRAL STAIR

Country Status (1)

Country Link
DE (1) DE2306569A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995004202A1 (en) * 1993-08-02 1995-02-09 Olivier Caverzasio Method for placing forms for a staircase, particularly a curved staircase, and resulting formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995004202A1 (en) * 1993-08-02 1995-02-09 Olivier Caverzasio Method for placing forms for a staircase, particularly a curved staircase, and resulting formwork

Similar Documents

Publication Publication Date Title
DE2040328B2 (en) Mobile interior formwork for concrete and reinforced concrete structures
DE2354696A1 (en) SUPPORTING PART FOR DESIGNS
DE2123351C3 (en) Formwork device for a reusable formwork of a composite floor
DE19640396C2 (en) Beam arrangement of a cornice formwork
DE2912122C2 (en) Holding device for a front formwork
DE19956474A1 (en) Method of making a solid carriageway and apparatus for use therein
DE3587713T2 (en) Pull-off track.
DE29908482U1 (en) Cap shutter device
DE9107201U1 (en) Formwork for concreting caps or cornices on an elongated structure, preferably a bridge
DE69212026T2 (en) Prefabricated stairs
DE2832295A1 (en) MOLDING TABLE FOR PRECAST PLATES
DE3803649C2 (en)
DE4204788A1 (en) Head support for ceiling shuttering parts - has retainers for shuttering parts and supports arranged to form uniform shuttering face
DE2306569A1 (en) FORMWORK FOR POURING A SPIRAL STAIR
DE3440828C2 (en)
DE2530639A1 (en) FORMWORK SCAFFOLDING FOR CEILINGS
EP0857834B1 (en) Method and frame for erecting concrete walls
DE2528114C3 (en) Feed scaffolding for the production of the superstructure of prestressed concrete bridges or similar supporting structures from prefabricated parts
DE2610737C3 (en) Anchoring a column or a machine base in concrete
DE613080C (en) Extendable box-shaped formwork support
DE2441002A1 (en) Shuttering for concrete walls - prop adjustable for length and vertically
DE3310278A1 (en) Ramp for loading and unloading goods of all kinds
DE1907715A1 (en) Formwork frame for the production of recesses in concrete walls or the like., In particular for door and window openings