DE2264599A1 - BUILDING CONSTRUCTION - Google Patents

BUILDING CONSTRUCTION

Info

Publication number
DE2264599A1
DE2264599A1 DE19722264599 DE2264599A DE2264599A1 DE 2264599 A1 DE2264599 A1 DE 2264599A1 DE 19722264599 DE19722264599 DE 19722264599 DE 2264599 A DE2264599 A DE 2264599A DE 2264599 A1 DE2264599 A1 DE 2264599A1
Authority
DE
Germany
Prior art keywords
beams
precast concrete
construction according
flanges
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19722264599
Other languages
German (de)
Inventor
Spaeter Genannt Werden Wird
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOPORTA BAUTRAEGER GmbH
Original Assignee
TOPORTA BAUTRAEGER GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOPORTA BAUTRAEGER GmbH filed Critical TOPORTA BAUTRAEGER GmbH
Priority to DE19722264599 priority Critical patent/DE2264599A1/en
Publication of DE2264599A1 publication Critical patent/DE2264599A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Description

Baukonstruktion Die Erfindung betrifft eine Baukonstruktion aus Betonfertigteilen mit Stützsäulen, Unterzügen und Betonfertigträgern. Building construction The invention relates to a building construction made of precast concrete parts with support columns, beams and precast concrete girders.

Eine solche BaulOonstra tion ist tür ein Bauwerk mit mehreren Stockwerken vorgesehen, wobei eine Klimaanlage auf dem Dach oder in einem Stociwerk angeordnet und durch Rohrleitungen mit den einzelnen Stockwerken verbunden ist. Dabei betrifft die Erfindung insbesondere Fertigbauelemente, die zur Erstellung dieses Bauwerks vorgesehen sind. Solche Fertigbauelemente sind in vielfacher Ausführung bekannt, wobei es insbesondere bei aus Beton bestehenden Fertigbauelementen auch bekannt ist, diese Fertigbauelemente zugleich als Träger für Installationen auszunutzen, indem Kabelkanäle und LuStzufAhrungskanäle eingegossen sind.Such a construction plan is a building with several floors provided, with an air conditioning system arranged on the roof or in a storage facility and is connected to the individual floors by pipelines. It concerns the invention in particular prefabricated elements that are used to create this structure are provided. Such prefabricated elements are known in multiple designs, it is also known in particular in the case of prefabricated structural elements made of concrete is to use these prefabricated elements as a carrier for installations at the same time, by casting in cable ducts and air ducts.

Bezüglich der Fertigbauelemente bezweckt die Erfindung ein System, das zwar in diesen Elementen auch Installationskanäle aufweist oder diese bildet, zugleich aber eine weitestgehende Veränderung oder Anpassung an verschiedene Raumgrößen zuläßt, wobei nicht nur der Bau vereinfacht werden soll, in dem die Installationen vorbereitet bereits eingefügt sind oder nach Erstellung des Bauwerks leicht einfügbar sind, sondern auch eine leichte Wartung erreicht wird.With regard to the prefabricated elements, the invention aims at a system which also has or forms installation ducts in these elements, at the same time, however, the greatest possible change or adaptation to different room sizes allows, and not only simplifies the construction should be in the the installations have already been prepared or inserted after the building has been created are easily insertable, but also easy maintenance is achieved.

Eine Anpassungsmöglichkeit an verschiedene Bedingungen war bei bisherigen Ausführungen nicht ohne weiteres gegeben. Die Erfindung bezieht sich aber in der bevorzugten Ausführung auf ein Funktionsbauwerk, wie eine Schule oder ein Bürohaus, welches nicht nur in der Unterteilung der Stockwerke in verschieden große Räume variabel sein muß, sondern vor allem auch eine nachträgliche änderung mit sich ändernden Anschlußwerten der Installation zulassen muß.The previous one was able to adapt to different conditions Explanations are not given without further ado. However, the invention relates to preferred execution on a functional building, such as a school or an office building, which not only in the subdivision of the floors into rooms of different sizes must be variable, but above all a subsequent change with changing ones Must allow connection values of the installation.

Bekannte Bauwerke werden in erster Linie e mit einer mittleren Säule aufgebaut, in welcher die Naßzelien, v tschafts-Waschräume und Toiletten, beispielsweise Fahrstühle und auch die durchgehenden Installatioslitungen und -kanäle untergebracht sind. Diese Ausführung beschränkt die Ausgestaltung der einzelnen Stockwerke des Bauwerks erheblich. Einerseits befinden sich die Wirtschaftsräume eines Stockwerks immer im mittleren Bereich, so daß an diesem bei größeren Stockwerken ein Zusammenlauf stattfindet. Dies ist beispielsweise gerade bei Schulen nachteilig, in denen ja zu bestimmten Zeiten Pausen gegeben werden, in denen alle Personen die Versorgungseinrichtungen in Anspruch nehmen wollen.Well-known buildings are primarily e with a central column built in which the wet rooms, v tschafts washrooms and toilets, for example Elevators and the continuous installation lines and ducts are housed are. This design limits the design of the individual floors of the Structure considerably. On the one hand there are the utility rooms on one floor always in the middle area, so that there is a convergence in this area with larger floors takes place. This is particularly disadvantageous in schools, for example, where yes breaks are given at certain times during which all persons use the utilities want to take advantage of.

Der mittlere Sockel mit den Naßzellen und den Versomgsleitungen hat weitere Nachteile. Es muß eine zentrische Kanalanordnung für alle Installationen von oben nach unten durchgehen und dann eine stockwerksweise Verzweigung zu den einzelnen Stellen des Stockwerks stattfinden. Diese Verzweigung wird dann normalerweise von der mittleren äule aus zu mittleren Raumabschnitten geführt. Hierdurch ergibt sich ein erheblicher Aufwand an Installationskanälen, weil nicht nur die Höhe des Gebäudes durchmessen werden muß, sondern in jedem Stockwerk horizontale Kanäle zur mittleren erteilung zu führen sind.The middle base with the wet cells and the supply lines has other disadvantages. There must be a central channel arrangement for all installations go through from top to bottom and then a storey branch to the take place at individual points on the floor. This branch is then normally from the central column to central sections of the room. This results in There is a considerable expense in installation ducts, because not only the amount of Building must be measured, but horizontal channels on each floor middle grant are to be led.

Diese bekannte Installation wirft weiterhin Probleme hinsichtlich der Querschnittsabstimmung, beispielsweise der Klimatisierungskanäle, auf, weil nach dem, ob die Zentrale oben oder unten angeordnet ist, eine erhebliche Querschnittsveränderung mit zunehmendem Abstand von der Zentrale notwendig ist, die genauen Bedingungen aber nicht Immer vorgesehen werden können.This known installation continues to pose problems as to the cross-sectional coordination, for example the air conditioning ducts, because depending on whether the center is arranged above or below, a considerable change in cross-section with increasing distance from the control center it is necessary to specify the exact conditions but not always can be provided.

Wenn oben eine Anpassung oder Veränderung der Raumaufteilung erwähnt wurde, dann trifft das besonders für Schulen zu. Im Schulunterricht werden zu manchen Themen mebrere Schülergruppen, die unter sich Lerneinheiten bilder, zusammengezogen, und zwar insbesondere bei Unterrichten, die über Kommunikationsmittel dargeboten werden. Zur Verarbeitung dieser Unterrichte müssen dann die Gruppen wieder in Einzelräume untergebracht werden, wobei es unzweckmäßig wäre, die einzelnen Gruppen aus einem Saal in verschiedene kleinere Räume oder Klassenzimmer su fül@@n.If an adjustment or change in the room layout is mentioned above then this is especially true for schools. Become some in school lessons Topics mixed groups of pupils, who picture learning units among themselves, drawn together, in particular in the case of lessons that are presented via means of communication will. In order to process these lessons, the groups then have to go back to individual rooms be accommodated, whereby it would be inexpedient to separate the individual groups from one Hall in various smaller rooms or classrooms su fül @@ n.

Es ist bereits bekannt, Säle durch beweghare Wan@ in einere Raumeinheiten zu unterteilen. Dabei werden aber große Ansprüche beispielsweise an die Klimatisierung gestellt, weil äe nach Raumgröße und Anzahl der in dem Raum befindlichen Personen unterschiedliche Klimatisierungsbedingungen herrschen. Weiterhin besteht ein Bedürfnis darin, daß die Unterteilung in einzelne kleinere Räume in einer azieise erfolgen kann, die keinen zu großen Aufwand erfordert. Wird weiterhin berücksichtigt, daß in den kleineren räumen für verschiedene Unterrichtsthemen beispielsweise Versuche durchgeführt werden, dann wird die oben erwärmte Anpassungsfähi Biii,keit oder Variabilität beispielsweise der Elektroinstallation verständlich, wobei auch zu berücksichtigen ist, dAX sich im Laufe der Zeit der Zweck einzelner Räume oder Raumabschnitte ändern kann.It is already known to move halls into one room unit by moving Wan @ to subdivide. However, this places great demands on the air conditioning, for example due to the size of the room and the number of people in the room different air conditioning conditions prevail. There is still a need in that the subdivision into individual smaller rooms takes place in an azieise that does not require too much effort. It is also taken into account that In the smaller rooms, for example, experiments for various subjects then the above-mentioned adaptability or variability For example, the electrical installation understandable, which must also be taken into account is, dAX the purpose of individual rooms or room sections change over time can.

Wenn bisher von Klimatisierung und Elektro-Installationen gesprochen wird, so liegt zugleich ein besonderes Problem auch darin, mit möglichst einfachen Mitteln eine gute Schalldämmung der Räume herbeizuführen. Das ist besonders problematisch, wenn sich die Raumgröße in der oben beschriebenen Art von Fall zu Fall ändert, weil verschiedene Raumgrößen im allgemeinen auch verschiedene Maßnahmen zur Schalldämmung erfordern.When talking about air conditioning and electrical installations so far is, at the same time, there is also a special problem with the simplest possible Means to bring about a good sound insulation of the rooms. This is particularly problematic when the room size changes from case to case in the manner described above, because Different room sizes generally also different measures for sound insulation require.

Der Erfindung liegt die Aufgabe zugrunde, eine Baukonstruktion der eingangs angegebenen Art mit Fertigelementen zu schaffen, die durch Ausbildung der Stützsäulen in Verbindung mit einer neuartigen Kanal- und Installationsführung eine vielfältige Raumaufteilung unter Einsparung von Kosten und Material gegenüber bisheriger Bauweise zuläßt und aus Fertigelementen aufgebaut ist, welche in besonders günstiger Weise Kanal-, Rohr und Installationsführungen aufnehmen und wenigstens teilweise solche Kanäle mit bilden.The invention is based on the object of a structural design of To create specified type with prefabricated elements by training the Support pillars in connection with a new type of duct and installation guide diverse room layouts while saving costs and material compared to previous ones Construction allows and is made up of prefabricated elements, which in particularly favorable Way take up channel, pipe and installation guides and at least partially to form such channels.

Diese Aufgabe wird für das Bauwerk dadurch gelöst, daß die zwischen den Stützsäulen angeordneten Unterzüge neben einem mittleren Trägerkörper seitliche Tragflanschen aufweisen und die zwischen den Unterzügen vorgesehenen Betonfertigträger einen oberen Wandteil und nach unten gerichtete Seitenwände besitzen, und daß zwischen den Stirnenden der Betonfertigträger und dem mittleren Trägerkörper der Unterzüge an den seitlichen Tragflanschen sowie an den Unterzügen Installationskanäle vorgesehen sind.This object is achieved for the structure in that the between the support columns arranged joists next to a central support body lateral Have support flanges and the precast concrete girders provided between the beams have an upper wall part and downwardly directed side walls, and that between the front ends of the precast concrete girders and the middle girder body of the joists Installation ducts are provided on the side support flanges and on the joists are.

Hierdurch werden die Kanäle und Installationsleitungen etc.This means that the ducts and installation lines etc.

durch nur eine horizontale Leitung an die Stelle mehrerer Raumabschnitte gebracht, wo die Verzweigung dann stattfindet.by just one horizontal line in place of several room sections brought where the branching then takes place.

Dadurch werden erhebliche Kosten eingespart. Diese Profilierung schafft nicht nur stabile Bauelemente, die zur Zusammenfügung in Form eines Fertigbauwerks zweckmäßig ausgestaltet sind, sondern auch durch ihre Profilierung zugleich Installationskanäle, die dann nicht besonders eingegossen zu werden brauchen.This saves considerable costs. This profiling creates not just stable building elements that can be put together in the form of a prefabricated structure Are appropriately designed, but also by their profiling at the same time Installation ducts, which then do not need to be specially poured in.

In einer besonders vorteilhaften Ausgestaltung sind am oberen Längsrand des mittleren Trägerkörpers Aussparungen für langgestreckte Auflageransätze an den Stirnseiten der Betonfertigträger vorgesehen, und diese Auflageransätze sind so lang ausgeführt, daß die Stirnseiten der Betonfertigträger mit ihrem unteren Rand in Höhe der unteren Ebene der Unterzüge gehalten sind. Dabei wird bevorzugt, daß die Unterzüge seitliche Tragflanschen für Installations-und/oder Klimatisiereinrichtungen aufweisen.In a particularly advantageous embodiment are on the upper longitudinal edge the middle support body recesses for elongated support approaches to the End faces of the precast concrete beams are provided, and these support approaches are like that executed long that the end faces of the precast concrete beams with their lower edge are held at the level of the lower level of the beams. It is preferred that the joists lateral support flanges for installation and / or air-conditioning equipment exhibit.

Gemäß einer weiteren Ausgestaltung ist zwischen den Gragflanschen und der Stirnseite der Betonfertigträger ein Abstand vorgesehen, wobei von der Stirnseite oben die Auflageransätze ausgehen.According to a further embodiment, it is between the base flanges and the end face of the precast concrete girder a distance is provided, whereby from the end face the support approaches go out at the top.

Einbezogen wird gemäß einer besonders bevorzugten Atasbil dung, daß in den Seitenwänden der Betonfertigträger Durchlässe insbesondere für die Belüftung in den Räumen über die Länge der Unterzüge verteilt angeordnet sind. Hierdurch läßt sich mit dem angegebenen Profil der Betonfertigträger die Installation, insbesondere für die Belüftung, wesentlich erleichtern. Dadurch kann die klimatisierte Luft wirbelfrei unter Umlenkung eingeführt werden, so daß sich eine zugfreie Klimatisierung ergibt.Is included according to a particularly preferred Atasbil training that in the side walls of the precast concrete girders passages, especially for ventilation are arranged in the rooms over the length of the beams. This lets the installation, in particular, with the specified profile of the precast concrete girder for ventilation, make it much easier. This allows the conditioned air to be free from eddies be introduced with deflection, so that there is a draft-free air conditioning.

Ein besonders vorteilhaftes Merkmal liegt darin, daß die Stützsäulen als Doppelsäulen ausgeführt sind und die Säulenteile am oberen Ende bezüglich Boden Geschosses knexlzförmige Köpfe haben, auf welche eine entsprechende Profilierung einer Unterzug-Stirnwand aufsetzbar ist. Dadurch ergibt sich bei der Zusammensetzung nicht nur eine slc:lere Abstützung, sondern es wird auc@ jegliche Verkantung vermieden.A particularly advantageous feature is that the support columns are designed as double columns and the column parts at the upper end with respect to the floor Bullets have knexlz-shaped heads on which a corresponding profiling can be placed on a beam front wall. This results in the composition not only a slc: ler support, but also any tilting is avoided.

Während die bisherigen zentralen Säulen in Bauwerken turmartig ausgeführt waren, um welche das Bauwerk sich erstreckte, schaffen die Doppelsäulen dezentralisierte, vertikale Installationskanäle.While the previous central columns in buildings are designed like towers around which the building extended, the double columns create decentralized, vertical installation ducts.

Hierdurch wird eine überraschend einfache Lösung erreicht.This results in a surprisingly simple solution.

Die Doppel säulen sind nicht mehr als tragende Raumzellen vorgesehen, sondern nur als Säulen. Aber infolge ihrer Ausbildung als Doppel säule begrenzen sie zwischen sich einen Raum vom Keller bis zum Dach eines Bauwerks durchgehend, weil nämlich beiderseits dieses durchgehenden Installationsraumes benachbarte Stützen vorgesehen sind, an denen tragende Bauteile aufgehängt oder angeordnet werden können.The double columns are no longer intended as load-bearing room cells, but only as pillars. But limit as a result of their training as a double pillar they go through a space between them from the basement to the roof of a building, because there are adjacent supports on both sides of this continuous installation space are provided on which load-bearing components can be hung or arranged.

Diese dezentralisierte Ausführung mit Zugängen zwischen den Elementen der Doppel säule ist ausgesprochen reparaturfreundlich und ermöglicht darüberhinaus auch die zeitweise Stilllegung einzelner Installationszweige, ohne daß dadurch die gesamte Versorgung des Bauwerks unterbrochen werden muß.This decentralized design with access between the elements the double column is extremely easy to repair and also enables also the temporary shutdown of individual installation branches without affecting the entire supply of the structure must be interrupted.

Aus der Verbindung zwischen den Doppel säulen und den Unterzügen, zwischen denen und gegebenenfalls Außenwänden senkrecht zu den Unterzügen verlaufende Beton-Fertigträger vorgesehen sind, wobei sowohl Unterzüge als auch Fertigträger Kanäle für Installationen wenigstens aufweisen und/oder teilweise bilden, ergibt sich eine Raumdeckenkonstruktion, die durch vorbereitete Bauteile erstellbar ist und dabei zugleich durch ihre Erstellung die erforderlichen Vorkehrungen für Installationen bildet.From the connection between the double columns and the beams, between them and possibly outer walls perpendicular to the beams Prefabricated concrete girders are provided, with both joists and prefabricated girders Have channels for installations at least and / or partially form, results a room ceiling construction that can be created using prepared components and at the same time by creating the necessary precautions for installations forms.

Es wird bevorzugt, daß die Unterzüge in einer Richtung vorgesehen sind, welche durch eine mittel senkrechte Ebene durch beide Säulenteile einer Doppelsäule bestimmt ist Dadurch ist die Aufteilung der Stützsäulen in Doppel säulen besonders sweckm;Rig, weil die Unterzüge als tragende Elemente jeweils zwischen Teilen zweier Doppel säulen fest abgestiitzt sind.It is preferred that the joists are unidirectional are, which by a middle vertical plane through both column parts of a double column This means that the division of the support columns into double columns is special sweckm; Rig, because the beams act as load-bearing elements between parts of two Double columns are firmly supported.

Es wird einbezogen, daß der Abstand zweier Säulenteile, die eine Doppel säule bilden, je nach erforderlichem Querschnitt der Installation, insbesondere auch der Luftführung, veränderbar ist. Diese Veränderbarkeit ist für die Bauplanung vorgesehen, weil ermöglicht wird, daß mit gleichen Fertigbauelementen verschieden große Bauwerke erstellt werden können, indem die beiden Teile einer Doppel säule mehr oder weniger nahe aneinander angeordnet werden Der größte Abstand wird durch die Breitenabmessung der Betonfertigträger bestimmt.It is taken into account that the distance between two pillar parts that form a double Form a column, depending on the required cross-section of the installation, in particular also the air flow, is changeable. This changeability is for the construction planning provided because it is made possible that different with the same prefabricated components Large structures can be created by making the two parts of a double column be arranged more or less close to each other The greatest distance is due to determines the width dimension of the precast concrete beams.

Gemäß einer zweckmäßigen Ausgestaltung weisen die kreuzförmigen Köpfe ausladende Arme und ein oberes Ende auf, wobei die Unterzüge einen mittleren Trägerkörper besitzen, der kürzer als die l'ragflanschen der Unterzüge ausgeführt ist, und an dem Trägerkörper an den Enden eine zu den Stirnseiten offene Aussparung vorgesehen ist, die auch verlängernde Randteile der Tragflanschen durchbricht. Ferner sind über den Endabschnitten der Tragflanschen quer verlaufende seitliche Durchbrüche angeordnet, in welche sich beim Zusammenfügen die seitlich ausladenden Arme e res Säulenteiles erstrecken.According to an expedient embodiment, the cross-shaped heads have cantilevered arms and an upper end, with the joists having a central support body that is shorter than the l'rag flanges of the beams, and on the carrier body is provided with a recess open to the end faces at the ends is, which also breaks through extending edge parts of the support flanges. Furthermore are Lateral breakthroughs running transversely over the end sections of the support flanges arranged, in which the laterally projecting arms e res Extend column part.

In einer vorteilhaften Ausgestaltung sind die Installationskanäle über den Randflanschen der Betonfertigträger durch einen eingesetzten Doppelboden unterteilt, über welchem die Verkabelungen angeordnet sind und unter welchem die Installationskanäle selbst in Verbindung mit dem Doppelboden Buftführungskanäle bilden.In an advantageous embodiment, the installation channels are over the edge flanges of the precast concrete girders through an inserted double floor divided over which the wiring is arranged and under which the Installation ducts themselves in connection with the raised floor ventilation ducts form.

In diesem Zusammenhang wird bevorzugt, daß die Betonfertigträger eine Breite haben, die bezüglich des hochgezogenen Teils etwa 1.200 mm beträgt, wobei die Randflansche eine Breite in der Größenordnung von 400 mm aufweisen können.In this context, it is preferred that the precast concrete beams a Have width which is about 1,200 mm with respect to the raised part, wherein the edge flanges can have a width of the order of 400 mm.

Insofern ergibt sich für die Installationskanäle über den unteren Randflanschen eine gewisse Breite, die mindestens 800mm beträgt.In this respect, this results for the installation ducts above the lower one Edge flanges a certain width, which is at least 800mm.

Dabei wird bevorzugt, daß in einer oberen Abdeckung der Kanäle Elektranten abwechselnd jeweils an verschiedenen Kanalseiten angeordnet sind und daß zwischen oder an benachbarten Flanschen nebeneinanderliegende Fertigträger j eweil s eine Führung für eine zusammenschiebbare, insbesondere Faltwand vorgesehen ist.It is preferred that electrants in an upper cover of the channels are alternately arranged in each case on different channel sides and that between or prefabricated beams lying next to one another on adjacent flanges Guide for a collapsible, in particular folding wall is provided.

Hierdurch schafft die erfindungsgemäße Deckenausbildung der Baukonstruktion für ein oberes Stockwerk eine Elektranten-Anordnung, welche bei einer Raumteilung im Bereich der Installationskanäle über den unteren Randflanschen der Betonfertigträger Elektranten in jedem der abgeteilten Räume aufweist, während für das untere Stockwerk durch die erfindungsgemäße Ausbildung der Betonfertigträger zugleich eine Aufhängung für eine Faltwand oder eine in anderer Weise zusammenschiebbare Wand geschaffen wird.In this way, the ceiling construction according to the invention creates the building structure for an upper floor an arrangement of electrants, which in the case of a room division in the area of the installation ducts over the lower edge flanges of the precast concrete girders Has electrants in each of the partitioned rooms, while for the lower floor by the inventive design of the precast concrete girder at the same time a suspension created for a folding wall or a wall that can be collapsed in some other way will.

Bei der vorgesehenen Ausführung ist der Installationskanal auf einem Tragflansch des Unterzuges durch die Stirnseite des Profils zugänglich, dessen Randflansche mit ihren unteren Ebenen mit der Unterseite der Unterzüge fluchten. Dadurch ergibt sich ein leichter uebergang, wobei besonders die Installationen zwischen den Unterzügen und den Fertigträgern leicht umgelenkt werden können. Schon die nach unten offenen Ausnehmungen der Fertigträger schaffen eine gute Schallschluckwirkung, da die nach unten offenen Ausnehmungen auf die Länge der Fertigträger zwischen zwei Unterzügen beschränkt sind.In the intended design, the installation duct is on a Support flange of the beam accessible through the face of the profile, its edge flanges their lower levels are flush with the underside of the beams. This results in a slight transition, especially the installations between the joists and the prefabricated girders can be easily deflected. Even the ones that are open at the bottom Recesses in the prefabricated beams create a good sound-absorbing effect, as the after Open recesses at the bottom along the length of the prefabricated beams between two beams are limited.

Die Schallschluckwirkung wird dadurch verbessert, daß die nach unten offenen langgestreckten Räume der Betonfertigträger in gleichmäßigen Abständen durch Querschnitteile abgeschottet sind. Dabei wird einbezogen, daß die Querschnitteile nachträglich in einbetonierte U-Schienen einsetzbar sind und daß vorzugsweise an den unteren Rändern der Querschnitteile Schienenführungen für Leuchten und/oder zusammenschiebbare, insbesondere faltbare Wände angeordnet sind. Zweckmäßig ist der Abstand der Querschnitteile untereinander gleich der unteren Breite der Betonfertigträger. Hierdurch ergibt sich zugleich ein gutes optisches Bild. Dabei versteht sich jedoch, daß die oben erwähnten Durchlässe in den Seitenwänden der Profile so verteilt sind, daß zweckmäßig zwischen einzelnen Querschnitteilen Durchlässe vorhanden sind.The sound-absorbing effect is improved by the fact that the downward open, elongated spaces of the precast concrete girders at regular intervals Cross-sectional parts are sealed off. It is taken into account that the cross-section parts can be used subsequently in cast-in U-rails and that preferably on the lower edges of the cross-section parts rail guides for lights and / or collapsible, in particular foldable walls are arranged. The distance between the cross-sectional parts is expediently the same as the lower one Width of the precast concrete beams. This also results in a good visual appearance Image. It goes without saying, however, that the above-mentioned passages in the side walls the profiles are distributed so that it is useful between individual cross-sectional parts Passages are present.

Hierbei wird einbezogen, daß solche Durchlässe an verschiedenen Seitenwänden einer Ausnehmung einmal in einen Zuluft-, zum anderen in einen Abluftkanal münden, wobei eine solche Durchlaßanordnung, welche Anschluß an ver-schiedene Kanäle, d.h. für Zuluft oder Abluft gibt, in verschiedene, durch Abschottung voneinander unterteilten Abschnitten der Ausnehmung angeordnet sind.This includes the fact that such passages on different side walls one recess open into a supply air duct and the other into an exhaust air duct, such a passage arrangement, which connection to different channels, i. for supply air or exhaust air, in different, separated from each other by partitioning Sections of the recess are arranged.

Gerade auch in Verbindung mit der Abschottung liegt eine weitere Ausgestaltung darir, daß die B^tc,nfertiguräger an ihrer Unterseite vorzugswelse innerhalb der nach unten offenen Ausnehmungen nutenartige Rinnen zur Verlegung von Kabel aufweisen.There is a further refinement, particularly in connection with the foreclosure darir that the B ^ tc, n finishers on their underside preferentially within the have downwardly open recesses groove-like grooves for laying cables.

Die Erfindung wird im folgenden anhand von Ausführungsbeispielen erläutert, die in der Zeichnung dargestellt sind.The invention is explained below on the basis of exemplary embodiments, which are shown in the drawing.

In der Zeichnung zeigen: Fig. 1: einen Grundriß von einem Stockwerk eines erfindungsgemäßen Bauwerks zur Brläuterung der Anordnung von Doppel säulen, denen Instailationskanäle zugeordnet sind; Fig. 2: eine Ansicht eines Säulenteiles einer Doppelsäule, wie sie für ein Stockwerk vorgesehen ist Fig. 3: eine Draufsicht auf einen Fertigträgerteil; Fig. 4: einen Schnitt längs der Linie IV - IV durch Fig. 3; Fig. 5: eine Seitenansicht des Fertigträgerteils nach Fig. 4; Fig. 6: eine Draufsicht auf einen Unterzug; Fig. 7: einen Schnitt längs der Linie VII - VII in Fig. 6; Fig. 8: eine Seitenansicht von Fig. -Fig. 9: eine Seitenansicht eines Anschlusses von Unterzügen @n eine Doppelsäule; Fig.10: eine Draufsicht auf Fig. 9, wobei Fig. 9 und 10 in Teildarstellungen gezeigt sind; Fig.11: eine Draufsicht auf einen Abschnitt einer Baukonstruktion im Bereich einer Stockwerk ecke bei Anordnung eines Unterzuges und viez Fertigträgerteilen; Fig.12: einen Schnitt längs der Linie XII - XII in Fig. 11; Fig.13: eine der Fig. 11 entsprechende Darstellung einer anderen Ausführungsform; Fig.14: einen Schnitt längs der LinieXTV -XIV durch Fig. 13; Fig. 15: eine Seitenteilansicht im Schnitt durch einen Stoß zwischen zwei Beton-Fertigträgern; Fig. 16: eine Draufsicht auf Fig. 15 in Teildarstellung; Fig. 17: eine perspektivische Ansicht einer anderen Ausführung eines Beton-Fertigträgers, von denen einer mit seinem Ende im Eingriff mit einem Unterzug dargestellt ist; Fig. 18: eine Draufsicht auf eine Anordnung nach Fig. 17 unter Einbeziehung einer Doppelsäule; Fig. 19: eine Stirnansicht eines Betonfertigträgers mit einem eingesetzten Querschnitteil in einer speziellen Ausführung; Fig. 20: eine Teilansicht der benachbarten Randflanschen zweier Betonfertigträger in einer besonderen Ausgestallt Fig. 21: eine auseinandergezogene.Darstellung @@er Verbindung für eine Anordnung zwischen Doppelsäulen, Unterzüge und Betonfertigträger einer bestimmten Ausführung zwecks Erläuterung einer Stockwerksbildung; Fig. 22: einen Ausschnitt aus einer zusammengesetzten Ausführungsform einer der Fig. 21 entsprechenden Lösung auch in perspektivischer Darstellung.The drawings show: FIG. 1: a plan view of one floor of a structure according to the invention for browning the arrangement of double columns, to which instailation channels are assigned; Fig. 2: a view of a column part a double column, as it is intended for one floor Fig. 3: a plan view of a finished carrier part; 4: a section along the line IV - IV through Figure 3; FIG. 5: a side view of the finished carrier part according to FIG. 4; 6: a plan view of a girder; 7: a section along the line VII - VII in Figure 6; Fig. 8: a side view of Fig. -Fig. 9: a side view a connection of beams @n a double column; Fig.10: a plan view of 9, FIGS. 9 and 10 being shown in partial representations; Fig. 11: a top view on a section of a building structure in the area of a floor corner when arranged a girder and viez prefabricated girder parts; Fig. 12: a section along the line XII - XII in Figure 11; 13: a representation corresponding to FIG. 11 of another Embodiment; FIG. 14: a section along the line XTV -XIV through FIG. 13; Fig. 15: a partial side view in section through a joint between two prefabricated concrete girders; FIG. 16: a plan view of FIG. 15 in partial representation; FIG. 17: a perspective View of another version of a precast concrete beam, one of which with its end is shown engaged with a joist; Fig. 18: a top view to an arrangement according to FIG. 17 including a double column; Fig. 19: a Front view of a precast concrete girder with an inserted cross-section part in one special execution; Fig. 20: a partial view of the adjacent edge flanges two precast concrete girders in a special configuration Fig. 21: an exploded view @@ er connection for an arrangement between double columns, beams and precast concrete girders a specific version for the purpose of explaining a storey formation; Fig. 22: a section from an assembled embodiment of one of FIG. 21 corresponding Solution also in perspective.

In dem Grundriß nach Fig. 1 sind Doppel säulen angeordnet, welche beispielsweise mit 27, 28, 29, 30 bzw. 31, 32, 33, 34 ..* bezeichnet sind.In the plan of Fig. 1, double columns are arranged, which for example with 27, 28, 29, 30 or 31, 32, 33, 34 .. * are designated.

Beispielsweise besteht die Doppelsäule 31, welche eine Stützsäule bildet, aus zwei Säulenteilen 35, 36, welche zwischen sich einen Abstand freilassen, in dem ein Doppelkanal 37 und auch andere Installationen geführt sind.For example, there is the double column 31, which is a support column forms, from two column parts 35, 36, which leave a gap between them, in which a double channel 37 and other installations are performed.

Es ist erkennbar, daß die Doppelkanäle und auch andere Installationen zwischen den Säulenteilen 35, 36 geschützt und abgestützt geführt sind. Die Doppel säulen erstrecken sich über die gesamte Höhe des Bauwerks als tragende BaUteile, Obgleich sie natürlich stockwerksweise unterteilt sein können.It can be seen that the double channels and other installations are guided between the column parts 35, 36 protected and supported. The doubles pillars extend over the entire height of the structure as load-bearing components, Although they can of course be divided into floors.

Wenn bei der beschriebenen Ausführungsform in der Mitte des Daches eine Klimazentrale angeordnet ist, dann sind auf dem Dach horizontale Kanäle zu allen Doppel säulen 27 bis 34 bzw. auch zu den nicht näher gezeigten Doppelsäulen geführt, wobei dann eine Einsparung auch dadurch erreicht werden kann, daß von einer mittleren Klimazentrale 38 beispielsweise die Doppelkanäle 39, 40 durch einen horizontalen Kanal 41 und die Doppelkanäle 42, 43, 44, 45 durch einen horizontalen Kanal 46 mit den Abzweigen 47, 48 gespeist werden können.If in the described embodiment in the middle of the roof a climate control center is arranged, then horizontal ducts are closed on the roof all double columns 27 to 34 or also to the double columns not shown in detail out, in which case a saving can also be achieved in that of one central air conditioning center 38, for example, the double channels 39, 40 through a horizontal one Channel 41 and the double channels 42, 43, 44, 45 through a horizontal channel 46 with the branches 47, 48 can be fed.

Dieses rasterartige Schema der dezentralisierten Aufteilung von Bauwerkstutzen, wie es durch die Doppel säulen 27 bis 34 in Fig. 1 gezeigt ist, macht erkennbar, daß Grundrisse beliebiger Größe erstellt werden können, weil nicht mehr von einem zentralen Turm ausgegangen wird, sondern dezenrealisierte Installationseinspeisungen in einem bestimmten Rastermaß beliebig aneinander reihbar sind. Die Fassaden, die nicht näher beschrieben sind, werden dabei durch Fertigelemente gebildet.This grid-like scheme of the decentralized division of structural nozzles, As shown by the double columns 27 to 34 in Fig. 1, it can be seen that floor plans of any size can be created, because no more of one central tower is assumed, but decentralized installation feeds can be lined up in a certain grid dimension as desired. The facades that are not described in more detail, are formed by prefabricated elements.

In Fig. 2 ist ein Säulenteil 49 einer Doppelsäule gezeigt, wobei erkennbar ist, daß am oberen Ende durch zwei seitlich in gleicher Höhe ausladende Arme 50, 51 eine kreuzartige Gestalt vorliegt. Das ist zum Ineinanderfugen von Fertigbauteilen, in diesem Falle zur drehfesten Anordnung von Unterzügen besonders zweckmäßig.In Fig. 2, a column part 49 of a double column is shown, which can be seen is that at the upper end by two laterally projecting arms 50, 51 is a cross-like shape. This is for joining prefabricated components, in this case particularly useful for the non-rotatable arrangement of beams.

Der Säulenteil 49 hat die Höhe eines Stockwerks, wobei Säulenteile verschiedener Stockwerke übereinander gesetzt werden können. Hierbei ist eine Verbindung übereinander angeordneter Säulenteile mit bekannten Mitteln möglich, indem beispielsweise an einem Ende vorragende Zapfen, die von Armierungsteilen gebildet werden können, und am anderen Ende des Säulenteils entsprechende Ausnehmungen vorgesehen sind.The column part 49 has the height of one floor, with column parts different floors can be placed on top of each other. Here is a connection Column parts arranged one above the other possible with known means, for example by at one end protruding pins that can be formed by reinforcement parts, and corresponding recesses are provided at the other end of the column part.

In Fig. 1 ist erkennbar; daß die Säulenteile 35, -36 einer Doppelsäule alle gleichen Abstand aufweisen. Dieser Abstand kann generell geändert werden, wenn es das Volumen der Versorgungskanäle in Abhängigkeit von der Bauwerkshöhe erfordert.In Fig. 1 it can be seen; that the column parts 35, -36 of a double column all have the same distance. This distance can generally be changed if it requires the volume of the supply ducts depending on the height of the structure.

Gemäß Fig. 1 sind Unterzüge in einer Richtung vorgesehen, welche durch eine mittel senkrechte Ebene durch beide Säulenteile 35, 36 einer Doppelsäule 31 bestimmt ist. Diese Richtung ist bezüglich der Doppel säule 31 durch die Pfeile 52, 53 bestimmt. Somit sind beispielsweise Unterzüge bei 54, 55, 56, 57 angeordnet.According to Fig. 1 beams are provided in a direction which through a central vertical plane through both column parts 35, 36 of a double column 31 is determined. This direction is with respect to the double column 31 by the arrows 52, 53 determined. Thus, for example, beams are arranged at 54, 55, 56, 57.

Die Fig. 6 bis 8 zeigen einen Unterzug, der mit 58 bezeichnet ist. Dieser Unterzug 58 hat einen mittleren Trägerkörper 59, an dessen Unterseite 60 seitlich Tragflanschen 61, 62 abstehen. Diese Tragflanschen erstrecken sich über die gesamte Länge der Unterzüge.FIGS. 6 to 8 show a girder which is designated by 58. This girder 58 has a central carrier body 59, on the underside 60 of which Laterally supporting flanges 61, 62 protrude. These support flanges extend over the entire length of the joists.

Insbesondere aus Fig. 6 und 8 ist ersichtlich, daß der Trägerkörper 59 kürzer als die Tragflanschen 61, 62 ausgeführt ist. Der an sich massiv ausgeführte Trägerkörper 59 hat an seinen Enden eine zu den Stirnenden offene Aussparung 63, 64, welche auch verlängernde Randteile 65, 66, 67, 68 der Tragflanschen 61, 62 durchbricht. ber den Endabschnitten der Tragflanschen 61, 62 hat das Ende des Trägerkörpers quer verlaufende seitliche Durchbrüche bei 69, 70, 71, 72, durch welche beim Zusammenfügen des Bauwerks die seitlichen Arme 50, 51 (Fig. 2) eines Säulenteils hindurchragen, wobei sich dann das obere Ende 73 des Säulenteils 49 durch die senkrechte Ausnehmung 63, 64 des Trägerkörpers 59 bis zu dessen oberer Ebene erstreckt. Die Arme 50, 51 verlaufen dabei mit ihren unteren Abschnitten in der Höhe der Tragflanschen 61, 62.In particular from Fig. 6 and 8 it can be seen that the carrier body 59 is made shorter than the support flanges 61, 62. The one that is massive in itself Carrier body 59 has at its ends a recess 63 open to the front ends, 64, which also extends edge parts 65, 66, 67, 68 of the support flanges 61, 62 breaks through. Over the end sections of the support flanges 61, 62, the end of the support body is transverse running lateral openings at 69, 70, 71, 72, through which when joining the side arms 50, 51 (Fig. 2) of a column part protrude through the structure, the upper end 73 of the column part 49 then passes through the vertical recess 63, 64 of the carrier body 59 extends up to its upper level. Arms 50, 51 run with their lower sections at the level of the supporting flanges 61, 62.

Fig. 7 zeigt kanalförmige Ausnehmungen 74, 75 im Trägerteil 59. Hierin liegt eine besondere Ausgestaltung.7 shows channel-shaped recesses 74, 75 in the support part 59. Herein is a special design.

Bezüglich Fig. 1 sind beispielsweise zwischen den Unterzügen 54, 56 in Richtung des Doppelpfeils 76 Beton-Fert igträger angeordnet, von denen einer, 77, in den Fig. 3 bis 5 gezeigt ist. Dieser Beton-Fertigträger hat einen Querschnitt nach Fig. 4. Von einem oberen Wandteil 78 gehen nach unten gerichtete Seitenwände 79, 80 aus, die sich am unteren Ende an parallel zum Wandteil 78 erstreckenden Randflanschen 81, 82 fortsetzen. Diese Randflanschen 81, 82 sind kürzer als der Fertigträger ausgeführt, so daß sich der obere Wandteil 78 und die Seitenwände 79, 80 über die Randflanschen 81, 82 hinaus erstrecken. Dadurch bilden die Seitenwände 79, 80 mit ihren Enden am unteren Rand Auflagerflächen 83, 84, mit denen sie auf die Tragflanschen 61, 62 eines Unterzuges aufsetzbar sind.With regard to FIG. 1, for example, between the beams 54, 56 arranged in the direction of the double arrow 76 prefabricated concrete girders, one of which, 77, shown in Figs. 3-5. This precast concrete beam has a cross section 4. From an upper wall part 78 go downwardly directed side walls 79, 80, which extend at the lower end on edge flanges extending parallel to the wall part 78 81, 82 continue. These edge flanges 81, 82 are made shorter than the prefabricated beam, so that the upper wall part 78 and the side walls 79, 80 extend over the edge flanges 81, 82 extend beyond. As a result, the side walls 79, 80 form with their ends at the lower edge bearing surfaces 83, 84, with which they are attached to the supporting flanges 61, 62 of a beam can be attached.

Die Seitenwände 79, 80 sind mit Durchlässen 85, 86, 87, 88 versehen, die Zugänge zu der kanalförmigen Ausnehmung 89 haben, die nach unten offen sind. ueber den Randflanschen 81, 82 benachbarter Träger werden beim Zusammenbau kanalförmige Räume für Kanäle oder Installationsmittel geschaffen.The side walls 79, 80 are provided with passages 85, 86, 87, 88, the accesses to the channel-shaped recess 89 have that after are open at the bottom. over the edge flanges 81, 82 of adjacent beams are at Assembling channel-shaped spaces created for channels or installation means.

Die Fig. 9 und 10 verdeutlichen die Anordnung von Unterzügen 90, 91, die entsprechend dem Unterzug 58 ausgeführt sind, an den Säulenteilen 92, 93 von Doppel säulen, wie bisher beschrieben. Es ist erkennbar, daß zwischen diesen Säulenteilen beispielsweise zwei zur Klimaanlage gehörende Rohre 94 95 in senkrechter Richtung verlaufen.9 and 10 illustrate the arrangement of beams 90, 91, which are designed corresponding to the girder 58, on the column parts 92, 93 of Double pillars, as described so far. It can be seen that between these pillar parts For example, two pipes 94 95 belonging to the air conditioning system in the vertical direction get lost.

Der Zwischenraum 96 zwischen den Säulenteilen 92, 93 wird im Bereich der ragflanscken, die bezüglich des Unterzuges 90 mit gleichen Bezugszeichen, wie in Fig. 6 bis 8 bezeichnet und die Bezugsnummern 61, 62 tragen, durch deren verlängernde Abschnitte 65, 66 eingefaßt. Hierdurch können zugleich Wandteile gehalten werden. Die Querarme der Säulenteile 92, 93 erstrecken sich in den seitlichen Durchbrüchen 71, 72.The space 96 between the column parts 92, 93 is in the area of the ragflanscken, with respect to the beam 90 with the same reference numerals as in Fig. 6 to 8 and bear the reference numerals 61, 62, through their lengthening Sections 65, 66 bordered. This allows wall parts to be held at the same time. The transverse arms of the column parts 92, 93 extend in the lateral openings 71, 72.

Der Boden der Ausnehmung 64 ist an dem Säulenteil 92 angefügtJ Es ist erkennbar, daß durch diesen Aufbau nicht nur eine drehfeste und stabile Abstützung, sondern auch eine solche Verfugung erreicht wird, daß zugleich der Zwischenraum 96 eingefaßt wird, in welchem weitere Versorgungsleitungen angeordnet sein können.The bottom of the recess 64 is attached to the column part 92 it can be seen that this structure not only provides a non-rotatable and stable support, but also such a jointing is achieved that at the same time the gap 96 is bordered, in which further supply lines can be arranged.

Horizontale Kanäle 97 (Fig. 9) gehen von den senkrechten Kanälen 94, 95 über der Höhe der Tragflansche 61, 62 ab, so daß solche Kanäle im Bereich ihrer Abzweigung zugleich auf den verlängernden Abschnitten 65, 66 der Tragflanschen abgestützt werden.Horizontal channels 97 (Fig. 9) extend from vertical channels 94, 95 above the height of the support flanges 61, 62, so that such channels in the area of their Branch at the same time supported on the extending sections 65, 66 of the support flanges will.

An dieser Stelle wird eingefügt, daß an den Doppelsäulen ferner Anschlußkästen mit Schaltern für die einzelnen Installationsleitungen bzw. Schiebern und dergleichen angeordnet sind.At this point it is added that connection boxes are also attached to the double columns with switches for the individual installation lines or slides and the like arranged are.

In den Fig. 11 und 12 ist die Ecke eines Bauwerks gezeigt, dessen Außenwände 98, 99 von Fertig-Fassadenteilen einer bekannten Ausführung und Anordnung gebildet sind. Erkennbar ist dabei, daß zum Innern des Bauwerks hin eine Doppelsäule 100 angeordnet ist, von deren Säulenteilen die Unterzüge 101 und 102 ausgehen. Letztere geht zur Außenwand 98, vor der eine halbe Doppel säule, also lediglich ein Säulenteil 103 angeordnet ist. Bei der Lösung nach den Fig. 11 und 12 ist dabei die Außenwand 99 selbst als tragende Wand ausgebildet und in den Fassadenteilen eine Stufe 104 zur Aufnahme eines Endes von Fertigträgern 105, 106, 107, 108 vorgesehen. Diese Ausbildung zeigt zugleich eine bevorzugte Proportion derart, daß die Breite eines Fertigträgers 105 bis 108 einem Viertel der Länge eines Unterzuges 102 entspricht. Damit läßt sich eine günstige Bauweise erreichen, wobei zugleich bemerkt wird, daß die wirksame Länge eines Fertigträgers 105 bis 108 der Länge eines Unterzuges, vermindert um die halbe effektive Breite eines Unterzuges entspricht. Dadurch lassen sich in einer Stockwerksecke quadratische Raumabschnitte erreichen.11 and 12, the corner of a building is shown, the Outer walls 98, 99 of prefabricated facade parts of a known design and arrangement are formed. It can be seen that there is a double column towards the inside of the building 100 is arranged, from the column parts of which the beams 101 and 102 extend. Latter goes to the outer wall 98, in front of the half double column, so only one column part 103 is arranged. In the solution according to FIGS. 11 and 12, this is the outer wall 99 itself designed as a load-bearing wall and a step 104 in the facade parts provided for receiving one end of prefabricated beams 105, 106, 107, 108. These Training also shows a preferred proportion such that the width of a Finished girders 105 to 108 correspond to a quarter of the length of a girder 102. A favorable construction can thus be achieved, it being noted at the same time that the effective length of a prefabricated girder 105 to 108 the length of a girder, reduced corresponds to half the effective width of a beam. This means that in achieve square sections of the room in a floor corner.

Eine andere Lösung, die auch in einer Raumecke angeordnet sein kann, wobei dann keine tragenden Fassadenteile notwendig sind, die aber auch im mittleren Bereich eines Stockwerks zu quadratischen Raumabschnitten führt, ist in den Fig. 13 und 14 gezeigt. Diese Lösung entspricht im wesentlichen derjenigen, die in Fig. 1 dargestellt ist.Another solution, which can also be arranged in a corner of the room, In this case, no load-bearing facade parts are necessary, but those in the middle are also necessary Area of a floor leading to square sections of space is shown in Figs. 13 and 14 shown. This solution essentially corresponds to that shown in Fig. 1 is shown.

Nach den Fig. 13 und 14 sind an einer Außenwand 109 Säulenteile 110, 111 in einer Ausrichtung parallel zu dieser Außenwand angeordnet, wobei der Säulenteil 111 in der Ecke neben der anderen benachbarten Außenwand 112 vorgesehen ist. In der Länge von Unterzügen 113, 114 entsprechendem Abstand sind dann Doppel säulen 115, 116 vorgesehen, so daß die Unterzüge 113, t4 nur an Säulenteilen und nicht an Fassadenelementen abgestützt sind. Zwischen diesen Unterzügen 113, 114 sind vier Beton-Fertigträger 117, 118, 119, 120 angeordnet, deren wirksame Länge derjenigen eines Unterzuges, vermindert um die gesamte effektive Breite eines Unterzuges entspricht, so daß in diesem Bereich auch mit nicht tragenden Außenwänden eine quadratische Raumzelle erreichbar ist, wie auch im mittleren Bereich eines Stockwerks.According to FIGS. 13 and 14, column parts 110 are on an outer wall 109, 111 arranged in an orientation parallel to this outer wall, the column part 111 is provided in the corner next to the other adjacent outer wall 112. In the length of beams 113, 114 corresponding spacing are then double columns 115, 116 provided so that the beams 113, t4 only on column parts and are not supported on facade elements. Between these beams 113, 114 four concrete prefabricated girders 117, 118, 119, 120 are arranged, their effective length that of a joist, reduced by the total effective width of a joist corresponds, so that in this area a square one even with non-load-bearing outer walls Room cell is accessible, as well as in the middle area of a floor.

Aus den Fig. 11 bis 14 ist erkennbar, daß zur Raummitte hin zwischen den Säulenteilen der Doppel säule 100, 115 sowie 116 Luftführungs-Doppelkanäle 121, 122, die über schematisch angegebene Rohrleitungen 123, 124, 125 in benachbarte Raumabschnitte führen, angeordnet sind. An der Außenwand 98, 109 sind entsprechende Doppelrohrleitungen 126, 127 geringeren Querschnitts vorgesehen, weil nur nach einer Seite gespeist zu werden braucht, während von den Doppelsäulen 100, 115 zugleich auch in Raumabschnitte in Richtung der Unterzüge 101, 128 versorgt werden muß. Gleiches gilt für den Bereich der Doppel säule 116.From FIGS. 11 to 14 it can be seen that towards the center of the room between the column parts of the double column 100, 115 and 116 double air ducts 121, 122, the via schematically indicated pipelines 123, 124, 125 in adjacent Lead room sections are arranged. Corresponding ones are provided on the outer wall 98, 109 Double pipes 126, 127 provided smaller cross-section because only after one Side needs to be fed while from the double columns 100, 115 at the same time must also be supplied in room sections in the direction of the beams 101, 128. Same thing applies to the 116 double pillar area.

Es ist erkennbar, daß auf den Tragflanschen 129 des Unterzuges 102 bzw. 130 des Unterzugs 113 die Rohrleitungen 123, 125 und auch nicht näher dargestellte elektrische Installationsleitungen geführt sind, von denen Abzweige 131, 132, 133 beispielsweise in die Kanäle über den Randflanschen 134, 135, 136, 137 ... zwischen den Fertigträgern 117 bis 119 führen.It can be seen that on the supporting flanges 129 of the girder 102 or 130 of the beam 113, the pipelines 123, 125 and also not shown in detail electrical installation lines are guided, of which branches 131, 132, 133 for example in the channels over the edge flanges 134, 135, 136, 137 ... between the prefabricated girders 117 to 119 lead.

Dabei sei darauf hingewiesen, daß an verschiedene Seiten eines Fertigträgers Zu- und Abluft geführt sein kann.It should be noted that on different sides of a finished beam Supply and exhaust air can be guided.

Beispielsweise ist ein Kanal über den Randflanschen 134, 135 der Fertigträger 117, 118 beispielsweise in den Fig. 15 und 16 gezeigt. Dabei ist erkennbar, daß bei dieser Lösung die Randflanschen 134, 135 in der Mitte mit Abstand voneinander enden. Uber dem dadurch gebildeten kanalförmigen Zwischenraum 138 ist eine Lichtquelle 139 installiert. Der diese Lichtquelle umgebende kanalförmige Reflektor 140 schließt mit seinen'Seitenwänden 141, 142 den Zwischenraum 138 vom Innenraum des gebildeten Kanals ab.For example, a channel over the edge flanges 134, 135 is the prefabricated beam 117, 118 shown in FIGS. 15 and 16, for example. It can be seen that in this solution, the edge flanges 134, 135 in the middle at a distance from one another end up. A light source is located above the channel-shaped intermediate space 138 thus formed 139 installed. The channel-shaped reflector 140 surrounding this light source closes with its side walls 141, 142, the gap 138 from the interior of the formed Channel.

Ein Zwischenboden 143, z.B. in Verbindung mit dem Reflektor 140, trennt über den Randflanschen 134, 135 zwei Kanalabschnitte 144, 145 voneinander und von einem oberen Kanalteil 146. In den unteren Kanalteilen 144, 145, welche durch Durchlässe 147, 148 in den Seitenwänden 149, 150 mit den nach unten offenen kanalförmigen Ausnehmungen in Verbindung stehen können, sind Zu- und Abluft geführt. In dem oberen Kanalteil 146, der nach oben durch eine Abdeckung 151 geschlossen ist, die abhebbar ist, sind elektrische Installationen verlegt. In der Abdeckung sind beispielsweise Elektranten als Hohlführungen zum Anschluß an die elektrischen Installationen vorgesehen, wobei bevorzugt wird, daß solche Elektranten 152, 153, 154 wechselweise an verschiedenen Seiten der Abdeckung 151 zu derem Rand hin versetzt angeordnet sind.An intermediate floor 143, e.g. in connection with the reflector 140, separates over the edge flanges 134, 135 two channel sections 144, 145 from each other and from an upper channel part 146. In the lower channel parts 144, 145, which through passages 147, 148 in the side walls 149, 150 with the downwardly open channel-shaped recesses can be connected, supply and exhaust air are routed. In the upper part of the canal 146, which is closed at the top by a cover 151 which can be lifted off electrical installations laid. For example, there are electrants in the cover provided as hollow guides for connection to the electrical installations, wherein It is preferred that such electrants 152, 153, 154 alternately at different Sides of the cover 151 are arranged offset towards the edge.

Wenn daher im Bereich des Zwischenraumes 138 an den einander zugekehrten Enden der Randflanschen 134, 135 Führungsmittel für eine Faltwand angeordnet sind, verläuft diese im ausgezogenen Zustand - wenn man verschiedene Stockwerke betrachtet - zwischen den Elektranten 152, 154 einerseits und dem Elektranten 153 andererseits, so daß verschiedene von der Faltwand getrennte Räume an die elektrische Installation anschließbar sind.Therefore, if in the area of the gap 138 to the facing Ends of the edge flanges 134, 135 guide means for a folding wall are arranged, this runs in the extended state - if you look at different floors - between the electrants 152, 154 on the one hand and the electrants 153 on the other hand, so that different rooms separated from the folding wall to the electrical installation are connectable.

Die Fig. 17 und 18 zeigen eine andere Ausführungsform, insbesondere der Betonfertigträger. Diese Betonfertigträger sind an Unterzügen entsprechend beispielsweise Fig. 6 und 7 abstützbar, wobei aber der Unterzug 160 mit dem seitlichen Tragflansch 161 und dem mittleren Trägerkörper 162 am oberen Rand des Trägerkörpers Aussparungen 163, 164 zum Einsatz von langgestreckten Auflageransätzen 165, 166 aufweist, die von den oberen Ecken der Stirnseiten von Betonfertigträgern 167 ausgehen, die auch mit Randflanschen 168 ausgeführt sind.Figures 17 and 18 show another embodiment, in particular the precast concrete beam. These precast concrete girders are correspondingly, for example, on girders 6 and 7 can be supported, but the girder 160 with the lateral support flange 161 and the middle support body 162 at the top Edge of the carrier body Recesses 163, 164 for the use of elongated support extensions 165, 166 which extend from the upper corners of the end faces of precast concrete girders 167, which are also designed with edge flanges 168.

Diese Auflageransätze 165, 166 sind durch Stahlarmierungen genügend verfestigt, daß sie so lang ausgeführt sein könnten, daß die bei 169 liegenden Stirnseiten der Betonfertigträger 167 mit ihrem unteren Rand in Höhe der unteren Ebene der Unterzüge 160 gehalten sind. Besonders wird dabei bevorzugt, daß ein Abstand 170 zwischen den Tragflanschen 161 und der Stirnseite der Betonfertigträger verbleibt. Dieser Abstand erleichtert die Installation wesentlich und ist ein besonderes Merkmal. Hierin liegt eine Abwandlung gegenüber der eingangs beschriebenen Ausführung, deren Merkmale im übrigen aber prinzipiell beibehalten werden.These support approaches 165, 166 are sufficient by steel reinforcement solidified that they could be made so long that the end faces at 169 the precast concrete girder 167 with its lower edge at the level of the lower level of the beams 160 are held. It is particularly preferred that a distance 170 between the support flanges 161 and the end face of the precast concrete beam remains. This Clearance makes installation much easier and is a special feature. This is a modification of the version described at the beginning, whose The rest of the features are retained in principle.

Die in Fig. 18 gezeigte Draufsicht zeigt den Unterzug 160, bei welchem in die bereits beschriebenen Profilierungen 171 am stirnseitigen Ende das obere Ende eines Säulenteils 172 eingesetzt ist, dessen zugeordneter Säulenteil mit 173 bezeichnet ist. Zwischen diesen Säulenteilen sind Installationsrohre 174, 175 angeordnet.The plan view shown in FIG. 18 shows the girder 160, in which in the already described profiling 171 at the front end the upper End of a column part 172 is inserted, the associated column part with 173 is designated. Installation pipes 174, 175 are arranged between these column parts.

An den oberen Seitenrändern 176, 177 des mittleren Trägerkörpers sind beispielsweise die Aussparungen 163, 164 für Auf lageransätze 165, 166 eines Betonfertigträgers 167 angeordnet, dessen Stirnseite 169 vor der äußeren Randlinie des Tragflansches 161 endet.On the upper side edges 176, 177 of the middle support body For example, the recesses 163, 164 for stock approaches 165, 166 of a precast concrete beam 167 arranged, the end face 169 in front of the outer edge line of the support flange 161 ends.

Die Aussparung 178 und der Auflageransatz 179 gehören zu dem benachbarten Betonfertigträger 180, dessen Randflansch 181 benachbart zum Randflansch 182 des Betonfertigträgers 167 endet. Auch diese Aussparung hat den besonderen Vorteil, daß eine Installation von elektrischen Leitungen, Rohrleitungen und dergleichen von oben möglich ist, so daß ein oberkopfarbeiten vermieden wird. Hierin liegt, wie auch bei der anderen Ausführung der Erfindung, ein wesentlicher Fortschritt, der insbesondere für eine schnelle Erstellung von Bauwerken beiträgt. Dabei werden durch die Zusammenfügung der Fertigbauteile automatisch Kanäle geschaffen, die durch die Tragflanschen und Randflanschen nach unten mit Abstützungs flächen versehene Auflagerungen schaffen, die aber seitlich zugänglich sind, so daß von Installationsleitungen, beispielsweise 174, 175, die zwischen den Teilen einer Doppelsäule hochgezogen sind, Verteilerkanäle in die eigentlichen Stockwerke geführt werden können.The recess 178 and the support shoulder 179 belong to the neighboring one Precast concrete beam 180, the edge flange 181 of which is adjacent to the edge flange 182 of the Precast concrete beam 167 ends. This recess also has the particular advantage that an installation of electrical lines, pipelines and the like is possible from above, so that overhead work is avoided. In this lies as with the another embodiment of the invention, an essential Progress that contributes in particular to the rapid construction of structures. By joining the prefabricated components, channels are automatically created, through the support flanges and edge flanges downwards with support surfaces create provided supports, but which are accessible from the side, so that of Installation lines, for example 174, 175, between the parts of a double column are raised, distribution ducts are led into the actual floors can.

Fig. 19 zeigt in schematischer Darstellung einen Betonfertigträger 183 in Stirnansicht, wobei beispielsweise von dieser Stirnseite Auflageransätze 184, 185 ausgehen können, oder aber in Höhe der Oberkanten der Randflanschen 186, 187 stufenartige Einziehungen vorgesehen sind, wie beispielsweise in Fig. 5 durch die Auflagerflächen 83, 84, um eine Abstützung zu ermöglichen.19 shows a schematic representation of a precast concrete beam 183 in an end view, with support approaches from this end face, for example 184, 185, or at the level of the upper edges of the edge flanges 186, 187 step-like withdrawals are provided, for example in FIG. 5 by the bearing surfaces 83, 84 to enable support.

In gleichmäßigen Abständen, welche in der bevorzugten Ausführungsform etwa dem Innenabstand zwischen den Seitenwänden 188, 189 eines Betonfertigträgers 183 entsprechen, sind im Querschnitt U-profilartige Schienen 190, 191, 192 in die Seitenwände und in die Unterseite der oberen Wand 193 des Betonfertigträgers 183 eingegossen. In diese Kanäle ist ein Querschnitteil 194 als Platte eingesetzt. Dabei ist äe nach Ausführung, ob dieser Querschnitteil an einer Stelle liegt, an welcher in seiner Längserstreckung eine Faltwand zur Raumunterteilung zu ziehen ist, der Querschnitteil 194 als Isolierplatte ausgeführt oder lediglich als flächenniäßige Unterteilung, die insbesondere auch gelocht sein kann. Bei Ausbildung als Isolierplatte wird einbezogen, daß beidseitig eine Rigipsbeschichtung an einer Styropor- oder Schaumstoffzwischenlage angebracht ist, wobei ferner übliche Schallschluck verbessernde Maßnahmen getroffen sein können, die an sich bekannt sind.At regular intervals, which in the preferred embodiment about the inner distance between the side walls 188, 189 of a precast concrete girder 183 correspond, are in cross section U-profile-like rails 190, 191, 192 in the Side walls and in the underside of the top wall 193 of the precast concrete beam 183 poured. A cross-sectional part 194 is inserted into these channels as a plate. Included depending on the execution, whether this cross-section part lies at a point at which In its longitudinal extension a folding wall is to be drawn to divide the room, the Cross-section part 194 designed as an insulating plate or only as a flat one Subdivision, which in particular can also be perforated. When training as an insulating plate is included that on both sides a plasterboard coating on a styrofoam or Foam intermediate layer is attached, furthermore conventional sound absorption improving Measures can be taken that are known per se.

Wenn lediglich über einem nicht räumlich zu unterteilenden Abschnitt ein Querschnitteil angeordnet wird, der der Ausfachung des nach unten offenen langgestreckten Raumes als Betonfertigträger dient, kann eine Eunststoff-, Kunstfaser-oder Asbest- oder Presshoizplatte verwendet werden, weil schon die Ausfachung als solche eine Schallschluckwirkung fördert, wobei die unteren Ränder der Querschnitteile in der unteren Ebene der Randflanschen auch das flächige Aussehen der Decke gegebenenfalls in Verbindung mit Lampen verbessern.If only over a section that cannot be spatially divided a cross-sectional part is arranged, the infill of the downwardly open elongated Room serves as a precast concrete beam, a plastic, synthetic fiber or asbestos or Presshoizplatte can be used because the infill as such is a Promotes sound absorption, with the lower edges of the cross-section parts in the lower level of the edge flanges also the flat appearance of the ceiling if necessary improve in connection with lamps.

Solche Querschnitteile können im übrigen zur Verbesserung der Schallschluckwirkung, gegebenenfalls zur Aussiebung bestimmter Frequenzen mit Durchbrechungen bestimmter oder verschiedener Größen vorgesehen sein.Such cross-sectional parts can also be used to improve the sound-absorbing effect, possibly for filtering out certain frequencies with breakthroughs certain or different sizes can be provided.

Die Querschnitteile 194 können in die nach innen offenen U-Schienen 190 bis 192 randweise eingebracht und durch Verklebung oder dergleichen festgelegt werden. Ferner können Rastmittel zur Festlegung angeordnet sein, um wahlweise Querschnitteile leicht einfügen oder herausnehmen zu können, was für bestimmte Schallschluckwirkungen förderlich ist, äe nachdem, zu welchem Zweck der darunter befindliche Raum ausgenutzt werden kann. Beispielsweise können die U-Schienen 190 bis 192, wie dargestellt, mit ihren Flanschen in dem langgestreckten Raum vorgezogen sein, so daß durch Randöffnungen 195, 196 Splinte zur Festlegung der Querschnitteile hindurchführbar sind.The cross-section parts 194 can be inserted into the inwardly open U-rails 190 to 192 introduced at the edges and fixed by gluing or the like will. Furthermore, locking means can be arranged for fixing to selectively cross-section parts easy to insert or take out, what certain sound-absorbing effects depending on the purpose for which the space below is used can be. For example, the U-rails 190 to 192, as shown, be preferred with their flanges in the elongated space, so that through edge openings 195, 196 split pins for fixing the cross-sectional parts can be passed through.

Fig. 19 zeigt zugleich eine Lösung, bei welcher am unteren Rand des Querschnitteils 194 eine Schiene 197 befestigt ist, die gegebenenfalls teilweise eingebettet in Ausnehmungen 198, 199 auch an der Unterseite benachbarter Randflanschen 186, 187 geführt ist und entweder als Träger von Lampen oder als Führungselement für Vorhänge, Faltwände oder dergleichen dienen kann. Insofern haben die wandartigen Querschnitteile 194 die zusätzliche Aufgabe einer Halterung von F5hrungselementen.Fig. 19 also shows a solution in which at the bottom of the Cross section 194 a rail 197 is attached, optionally partially embedded in recesses 198, 199 also on the underside of adjacent edge flanges 186, 187 is performed and either as a carrier of lamps or as a guide element can be used for curtains, folding walls or the like. In this respect, the wall-like Cross-sectional parts 194 have the additional task of holding guide elements.

Bevorzugt wird aufgrund des Raster systems eine Lösung nach Fig. 20. In dieser sind in Teildarstellung zwei Abschnitte zweier Betonfertigträger 200, 201 mit benachbarten Randflanschen 202, 203 gezeigt. Diese Randflanschen haben an ihren unteren einander zugekehrten Längsrändern Aussparungen 204, 205, in welche eine Halteschiene 206 für eine Faltwand eingesetzt ist. Wie anhand der Abdeckung 207 über dem Installationsraum 208 an der Oberseite der Randflanschen 2C2, 203 gezeigt ist, kann diese Abdeckung mittig eine Führungsausnehmung 20 9 für den unteren Rand einer Faltwand besitzen, so daß ein definierter Abschluß zwischen benachbarten Räumen erreichbar ist.A solution according to FIG. 20 is preferred due to the grid system. In this, two sections of two precast concrete girders 200, 201 shown with adjacent edge flanges 202, 203. These edge flanges have their lower longitudinal edges facing each other, recesses 204, 205 into which a support rail 206 is used for a folding wall. As with the cover 207 above the installation space 208 at the top of the edge flanges 2C2, 203 is, this cover can have a central guide recess 20 9 for the lower edge have a folding wall, so that a defined conclusion between adjacent rooms is attainable.

Die Randflanschen 202, 203 sind in der bereits beschriebenen Weise unten mit nach unten offenen Querausnehmungen 210, 211 zur Aufnahme einer Querschiene versehen, wie sie in Fig. 20 mit 197 bezeichnet ist, die aber im Bereich der Halteschiene 206 mit einer Aussparung versehen sind.The edge flanges 202, 203 are in the manner already described below with downwardly open transverse recesses 210, 211 for receiving a transverse rail provided, as it is denoted by 197 in FIG. 20, but in the area of the holding rail 206 are provided with a recess.

Die Fig. 21 und 22 sonnen den Zusammenbau anhand der bisher beschriebenen aus+''ührungsform verdeut ichen. Dabei wird lediglich der Bereich einer Doppelsäule gezeigt, weil im Bereich von Außenwänden an diesen entsprechende Abstützungen vorgesehen sein können.21 and 22 sun the assembly based on the previously described from + '' elucidate. Only the area of a double column is used shown because corresponding supports are provided in the area of outer walls on these could be.

Es ist im Hinblick auf die in den Fig. 2 bis 10 gezeigte susführungsform erkennbar, daß auf dem Boden einer Stockwerksfläche angeordneter Säulenteile eine Doppel säule 212 angeordnet ist, deren Säulenteile entsprechend den Säulenteilen, beispielsweise 92, 93, mit 213, 214 bezeichnet sind.It is in view of the susführungsform shown in Figs recognizable that arranged on the floor of a floor area column parts a Double column 212 is arranged, the column parts corresponding to the column parts, for example 92, 93, are designated 213, 214.

Beide Säulenteile haben oben kreuzförmige Köpfe 215, 216.Both column parts have cross-shaped heads 215, 216 at the top.

Für den Kopf 216 ist der benachbarte Endabschrdtt eines Unterzuges 217 mit den bereits beschriebenen stirnseitigen Profilierungen 218 versehen, der in allen Richtungen verschiebungsfest aufsetzbar ist. Auf die Tragflanschen 219, 220 des Unterzuges 217 sind die Betonfertigträger 221, 222 etc.For the head 216, the adjacent end section is a joist 217 provided with the end face profiles 218 already described, the is displaceable in all directions placed. On the support flanges 219, 220 of the girder 217 are the precast concrete beams 221, 222 etc.

von verschiedenen Seiten aufsetzbar. Diese Betonfertigträger sind in einer bereits beschriebenen Weise ausgeführt und daher nicht näher beschreben. Bemerkt wird lediglich, daß die den Auflagerflächen 83, 84 entsprechenden Auflagerflächen 223, 224 mit bstand über den oberen Flächen der Randflanschen 225, 226 angeordnet sind, was sich aus Festigkeitsgründen und der Bemessung der Tragflanschen 219, 220 ergeben kann.can be put on from different sides. These precast concrete beams are executed in a manner already described and therefore not described in detail. It is only noted that the bearing surfaces corresponding to the bearing surfaces 83, 84 223, 224 spaced above the upper surfaces of the edge flanges 225, 226 are, which is due to reasons of strength and the dimensioning of the supporting flanges 219, 220 can result.

Auf den Kopfseiten 227, 228 der Säulenteile 213, 214 sind weitere Säulenteile 229, 230 einer Doppel säule für ein oberes Stockwerk angeordnet. Daraus ist erkennbar, daß sich die Doppel säulen als Stützen mit einem Installationsraum zwischen sich über die gesamte Gebäudehöhe fortsetzen und aufgrund der usgestaltung Kanalisationskanäle bilden, die eine einfache Installation ermöglichen.On the head sides 227, 228 of the column parts 213, 214 are more Column parts 229, 230 of a double column arranged for an upper floor. From it it can be seen that the double columns are used as supports with an installation room continue between them over the entire height of the building and due to the design Form sewer channels that allow easy installation.

In Fig. 22 sind gleiche Teile wie in Fig. 21 mit gleichen Bezugszeichen bezeichnet, um den Zusammenbau zu verdeutlichen. Dabei ist erkennbar, daß in Verlängerung des Unterzuges 217 ein weiterer Unterzug 231 angeordnet ist, und an den mittleren Trägerkörpern aus dem durchgehenden Raum zwischen den Säulenteilen Zugang zu- Installationskanälen entsprechend dem Pfeil 232, 233 geschaffen wird, wobei von diesen Kanälen wiederum zwischen Betonfertigträgern Abzweige entsprechend den Pfeilen 234, 235, 236 in die Installationskanäle über den Randflanschen 225 ausgehen. Hierdurch wird eine schnelle und einfache zusammenfügbare Konstruktion geschaffen.In Fig. 22, the same parts as in Fig. 21 are given the same reference numerals to clarify the assembly. It can be seen that in extension of the girder 217 a further girder 231 is arranged, and to the middle Carrier bodies from the continuous space between the column parts access to installation channels is created according to the arrow 232, 233, of these channels in turn between precast concrete girders branches according to the arrows 234, 235, 236 in the Installation ducts go out over the edge flanges 225. This will make a quick and simple assemblable construction.

Claims (15)

Neue Patentansprüche - AUSSCHEIDUNGNew patent claims - DISCONTINUED 1. Baukonstruktion aus Betonfertigteilen mit Stützsäulen, Unterzügen und Betonfertigträgern, dadurch gekennzeichnet, dass die zwischen den Stützaäulen (27-34, 100, 115, 116, 212) angeordneten Unterzüge neben einem mittleren Trägerkörper (59, 162, 176, 177) seitliche Tragflanschen (61, 62, 129, 130, 161, 219, 220) aufweisen und die zwischen den Unterzügen vorgesehenen Betonfertigträger (77, 105-108, 117-120, 167, 10, 13, 200, 201, 221-222) einen oberen Wandteil (78) und nach unten gerichtete Seitenwände (79, 90, 188, 189) besitzen, und dass zwiachen den Stirnenden der Betonfertigträger (77, 105-108, 117-120, 167, 180, 13, 200, 201, 221-222) und dem mittleren Trägerkörper (59, 162, 176, 177) der Unterzüge an den seitlichen Tragflanschen (61, 62, 129, 130, 161, 219, 220) sowie an den Unterzügen Installationskanäle vorgesehen sind.1. Building construction made of precast concrete parts with supporting columns, beams and precast concrete girders, characterized in that the between the support columns (27-34, 100, 115, 116, 212) arranged beams next to a central support body (59, 162, 176, 177) have lateral support flanges (61, 62, 129, 130, 161, 219, 220) and the precast concrete girders (77, 105-108, 117-120, 167, 10, 13, 200, 201, 221-222) an upper wall part (78) and directed downwards Side walls (79, 90, 188, 189) have, and that between the front ends of the precast concrete beams (77, 105-108, 117-120, 167, 180, 13, 200, 201, 221-222) and the middle support body (59, 162, 176, 177) of the beams on the side support flanges (61, 62, 129, 130, 161, 219, 220) and installation ducts are provided on the beams. 2. Baukonstruktion nach Anspruch 1, dadurch gekennzeichnet, dass am oberen Lqngerand dea mittleren Trägerkörpers (59, 162, 176, 177) Aussparungen (163, 164, 178) fUr langgestreckte Auflageransätze (165, 166, 179, 184, 185) an den Stirnseiten der Betonfertigträger vorgesehen sind und dass diese Auflageransätze so lan ausgeführt sind, dass die Stirnseiten der Betonfertigträger mit ihrem unteren Rand in Höhe der unteren Ebene der Unterzüge gehalten sind.2. Construction according to claim 1, characterized in that on upper longitudinal edge of the middle support body (59, 162, 176, 177) recesses (163, 164, 178) for elongated support extensions (165, 166, 179, 184, 185) on the end faces the precast concrete beams are provided and that these support approaches are designed so long that the front sides of the precast concrete beams with their lower Edge at the level of the lower level of the beams are held. 3. Baukonstruktion nach Anspruch 2, dadurch gekennzeichnet, dass die Unterzüge (58, 90, 91, 101, 102, 113, 114, 10, 217, 231) seitliche Tragflanschen (61, 62, 129, 130, 161, 219,220) für Installations- und/oder Klimatisiereinrichtungen aufweiaen.3. Construction according to claim 2, characterized in that the Beams (58, 90, 91, 101, 102, 113, 114, 10, 217, 231) side support flanges (61, 62, 129, 130, 161, 219,220) for installation and / or air conditioning equipment show. 4. Baukonstruktion nach Anspruch 3, gekennzeichnet durch einen Abstand (170) zwischen den Tragflanschen (161) und der Stirnseite (169) der Betonfertigträger (167), von welcher Stirnseite oben die Auflageransätge (165, 166) ausgehen.4. Construction according to claim 3, characterized by a distance (170) between the supporting flanges (161) and the end face (169) of the precast concrete beams (167), from which end face at the top the Auflageransätge (165, 166) extend. 5. Baukonstruktion nach Anspruch 1, dadurch gekennzeichnet, dass in den Seitenwänden (79, 80, 188, 189) der Betonfertigträger (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) Durchlässe (147, 148) insbesondere für die Beläftung in den Räumen über die Länge der Ünterzüge verteilt angeordnet sind.5. Construction according to claim 1, characterized in that in the side walls (79, 80, 188, 189) of the precast concrete beams (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) openings (147, 148), especially for ventilation are arranged in the rooms over the length of the girders. 6. Baukonstruktion nRch einen der Ansprüche 1 bis 5, dadurch gekennseichnet, dass die Stützsäulen als Doppelsäulen (27-34, 100, 115, 116, 212) ausgeführt sind und die Säulenteile (35, 36, 49, 92, 93, 103, 110, 111, 172, 173, 213, 214, 229, 230) am oberen Ende bezüglich jeden Geschosses kreusförmige Köpfe (215, 216) haben, auf welche eine entsprechende Profilierung (218) einer Unterzug-Stirnwand aufsetzbar ist.6. Construction according to one of claims 1 to 5, characterized in that that the support columns are designed as double columns (27-34, 100, 115, 116, 212) and the column parts (35, 36, 49, 92, 93, 103, 110, 111, 172, 173, 213, 214, 229, 230) have circular heads (215, 216) at the upper end with respect to each floor, on which a corresponding profiling (218) of a beam end wall can be placed is. 7. Baukonstruktion nach Anspruch 6,. dadurch gekennzeichnet, dass die kreuzförmigen Köpfe (215, 216) ausladende Arme (50, 51) und ein oberes Ende (73) aufweisen, dass die Unterzüge (58) einen mittleren Trägerkörper (59) besitzen, der kürzer als die Tragflanschen (61, 62) der Unterzüge ausgeführt ist, und dass an dem Trägerkörper (59) an den Enden eine zu den Stirnseiten offene Aussparung (63, 64) vorvesehe ist, die auch verlängernde Randteile (65-68) der Tragflanschen (61, 62) durchbricht, und dass über teilen Endabschnitten der Tragflanachen ouer verlaufende seitliche Durchbrüchen (69-72) angeordnet sind, in welche sich heim Zusammenfügen die seitlich ausladenden Arme (50, 51) eines Säulenteiles erstrecken.7. Construction according to claim 6 ,. characterized in that arms (50, 51) extending over the cross-shaped heads (215, 216) and an upper end (73) show that the Beams (58) have a central support body (59), which is shorter than the supporting flanges (61, 62) of the beams is, and that on the carrier body (59) at the ends an open to the end faces Recess (63, 64) is provided, which also lengthening edge parts (65-68) of the supporting flanges (61, 62) breaks through, and that over parts of the end sections of the wings ouer extending lateral breakthroughs (69-72) are arranged, in which home Assemble the laterally projecting arms (50, 51) of a column part extend. 8. Baukonstruktion nach einem der Anspruche 1 his 4, dadurch gekennzeichnet, dass die Betonfertigträger (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) seitlich abstehende Randflanschen (81, 82, 134, 135-137, 168, 181, 182 186, 187, 202, 203, 225, 226) aufweisen, welche in einer Ebene nit den Tragflanachen (61, 62, 123, 13, 161, 21s, 220) der ünterzüge angeordnet sind. 8. Building construction according to one of claims 1 to 4, characterized in that that the precast concrete beams (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) laterally protruding edge flanges (81, 82, 134, 135-137, 168, 181, 182 186, 187, 202, 203, 225, 226), which in one plane with the support surfaces (61, 62, 123, 13, 161, 21s, 220) of the girders are arranged. 9. Baukonstruktion nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, das Installationskanäle (144-146) Uber den Randflanschen (134, 136) der Betonfertigträger (117, 118) durch einen eingesetzten Doppelboden (13) unterteilt sind, über der die Verkabelung angeordnet ist und unter dem die Kanäle als Luftführungskanäle in Verhindung mit den Durchlässen (147, l48) ausgebildet sind. 9. Building construction according to one of claims 1 to 4, characterized in that the installation channels (144-146) over the edge flanges (134, 136) of the precast concrete beams (117, 118) are divided by an inserted double floor (13) over which the Cabling is arranged and under which the channels as air ducts in prevention with the passages (147, 148) are formed. 10. Baukonstruktion nach Anspruch ), dadurch gekennzeichnet, dass in einer oberen Abdeckung (151) der Kanäle Elektranten (152-154) abwechselnd jeweils an verschiedenen Kanäle seiten angeordnet ein und dass zwischen oder an benachbarten Randflanschen (134, 135) nebeneinander liegender Betonfertigträger (117, 118) jeweils eine Führung für eine zusammenschiebbare, insbesondere Faltwand vorgesehen ist.10. Construction according to claim), characterized in that in a top cover (151) of the channels electrants (152-154) alternately in each case arranged on different channels sides one and that between or on adjacent ones Edge flanges (134, 135) of precast concrete beams (117, 118) lying next to one another, respectively a guide is provided for a collapsible, in particular folding wall. 11. Baukonstruktion nach Anspruch 1, dadurch gekennzeichnet, dass nach unten ofFene langgestreckte Räume zwischen den Seitenwänden (79, 80, 188, l8) er Petonfertigträger in gleichmässigen Abständen durch Querschnittsteile (194) abgeschottet sind.11. Construction according to claim 1, characterized in that elongated spaces open at the bottom between the side walls (79, 80, 188, 18) he prefabricated peton girders are sealed off at regular intervals by cross-sectional parts (194) are. 12. Baukonstruktion nach Anspruch 11, dadurch gekennzeichnet, dass flächige Querschnittsteile (194) lösbar in den langgestreckten Räumen der Betonfertigträger (183) angeordnet sind.12. Construction according to claim 11, characterized in that flat cross-sectional parts (194) detachable in the elongated spaces of the precast concrete girders (183) are arranged. 13. Baukonstruktion nach einer der Ansprüche 11 oder 12, dadurch gekennzeichnet, das die Querschnittsteile (194) zur Verbesserung der Schallschluckwirkung mit gleich oder verschieden grossen Durchlassöffnungen versehen sind.13. Building construction according to one of claims 11 or 12, characterized in that that the cross-sectional parts (194) to improve the sound-absorbing effect with the same or openings of different sizes are provided. l4. Baukonstruktion nach den Ansprüchen 11 bis 13, dadurch gekennzeichnet, dass der Abstand zwischen dan Querschnittsteilen (194) gleich der unteren Breite des langgestreckten Raumps der Betonfertigträger (183) ist.l4. Building construction according to Claims 11 to 13, characterized in that that the distance between the cross-sectional parts (194) is equal to the lower width of the elongated Raumps is the precast concrete beam (183). 15. Baukonstruktion nach Anspruch 1, dadurch gekennzeichnet, dass die Betonfertigträger (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) an ihrer Unterseite, vorzugsweise innerhalb nach unten offener Ausnehmungen, neben den nacn unten gerichteten Seitenwänden (79, 80, 188, 189) nutenartige Rinnen zur Verlängerung von Kabeln aufweisen.15. Construction according to claim 1, characterized in that the precast concrete girders (77, 105-108, 117-120, 167, 180, 183, 200, 201, 221-222) their underside, preferably within recesses that are open at the bottom, next to to the side walls (79, 80, 188, 189) directed downwards, groove-like grooves Have extension of cables. L e e r s e i t eL e r s e i t e
DE19722264599 1972-07-05 1972-07-05 BUILDING CONSTRUCTION Pending DE2264599A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19722264599 DE2264599A1 (en) 1972-07-05 1972-07-05 BUILDING CONSTRUCTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19722264599 DE2264599A1 (en) 1972-07-05 1972-07-05 BUILDING CONSTRUCTION

Publications (1)

Publication Number Publication Date
DE2264599A1 true DE2264599A1 (en) 1974-05-09

Family

ID=5865997

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19722264599 Pending DE2264599A1 (en) 1972-07-05 1972-07-05 BUILDING CONSTRUCTION

Country Status (1)

Country Link
DE (1) DE2264599A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5072554A (en) * 1990-04-27 1991-12-17 The United States Of America As Represented By The Secretary Of The Air Force Prefabricated modular storage building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5072554A (en) * 1990-04-27 1991-12-17 The United States Of America As Represented By The Secretary Of The Air Force Prefabricated modular storage building

Similar Documents

Publication Publication Date Title
AT395453B (en) WALL ELEMENT ARRANGEMENT
EP0772719B1 (en) Finished wall element with integral ducts
WO1990008866A1 (en) Building element for erecting buildings, parts of buildings or the like
DE2020607C3 (en) Multi-storey building made up of standardized, prefabricated room cells
DE69701998T2 (en) ASSEMBLY WITH A PANEL-SHAPED FLOOR ELEMENT, ASSEMBLY WITH AT LEAST TWO SPACELY SEPARATE COMPONENTS AND AT LEAST ONE FLOOR ELEMENT, WHICH IS BETWEEN THESE COMPONENTS, AND ONE TOGETHER, AND FOR ITSELF
DE2324224A1 (en) SKYSCRAPER
DE2264599A1 (en) BUILDING CONSTRUCTION
DE3410658A1 (en) Roofing element
DE19520712C2 (en) House with wall elements and process for its production
DE19611388A1 (en) Prefabricated wall element with integrated cable ducts
DE2612048A1 (en) PRE-FABRICATED ELEMENTS IN MODULAR DESIGN
DE2232870A1 (en) BUILDING AND PRE-FABRICATED ELEMENTS FOR ITS CREATION
DE2043736A1 (en) Building complex
DE2312643A1 (en) COMPONENT KIT FOR BUILDINGS ASSEMBLED USING PRE-FABRICATED COMPONENTS
DE1683278C3 (en) Cladding of interiors
DE3312824A1 (en) WALL ELEMENT
DE2312510C3 (en) Building skeleton made of prefabricated parts
WO1992003624A1 (en) Profile for a steel skeleton construction
DE2345602A1 (en) CONSTRUCTION
DE3426831A1 (en) PRE-PREPARED WALL AND CEILING PANELS COMPOSITION SYSTEM FOR SHIPS AND SIMILAR BUILDINGS
CH572559A5 (en) Reinforced concrete holed room cell with building - with upward and downward bends on ceiling and floor edges for longitudinal reinforcement
DE2546932A1 (en) Prefabricated building - complex volumetric units form lightweight material load bearing structure
DE3415278A1 (en) Self-supporting ceiling structure
DE2112335C3 (en) Prefabricated, transportable room element for the erection of structures
DE2513067A1 (en) Parallelepiped base-framed room structure element - with attachable wall components of uniform size matching shorter frame sides