- DE2146689A1 DE2146689A1 DE19712146689 DE2146689A DE2146689A1 DE 2146689 A1 DE2146689 A1 DE 2146689A1 DE 19712146689 DE19712146689 DE 19712146689 DE 2146689 A DE2146689 A DE 2146689A DE 2146689 A1 DE2146689 A1 DE 2146689A1
- Authority
- DE
- Germany
- Prior art keywords
- crane
- carriage
- construction
- arrangement
- erecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
ici?!C iii'K-„ / '".n ijn'i M.Oi er---ici?! C i i i'K- "/ '" .n ijn'i M.Oi er ---
υ;-,. Dir-!.. C-.ϊ-:^:ϊν-.. ν/, r-^Cr. f.; ^ ^υ; - ,. Dir -! .. C-.ϊ -: ^: ϊν- .. ν /, r- ^ Cr. f .; ^^
P 4217P 4217
roro
17. Sept. 197117th Sept. 1971
Eagnar O. Lindlaolm ABEagnar O. Lindlaolm AB
12 A, Eudsvägen12 A, Eudsvagen
S-654- 63 Karlstad/SchwedenS-654- 63 Karlstad / Sweden
Verfahren und Anordnung znn Errichten von TiirakonstruktionenMethod and arrangement znn erecting Tiirakonstruktionen
Die Erfindung bezieht sich auf ein Verfahren zum Errichten von Turnikoriüti^uktionen aus aufeinander zu setzenden Teilstücken von beliebiger Querschnittsfοrm, sowie auf eine Anordnung zum Durchführen des Verfahrens.The invention relates to a method of erecting of Turnikoriüti ^ uktion from parts to be placed on top of each other of any cross-sectional shape, as well as one Arrangement for carrying out the method.
to Beim Errichten von Turrakonstruktionen wie etwa Turrakochernto When erecting tower constructions such as turbo cookers
00 für die Papierindus brie, GiIos, Kaminen und dergl. werden 00 for the paper industries, GiIos, chimneys and the like
-P- derzeit r.o große Höhen, beisx^ioleweifio 80 bis 100 ra oder-P- currently r.o great heights, beisx ^ ioleweifio 80 to 100 ra or
ο mehr, erreicht., daß die Hubhöhe vorhandener beweglicherο more, achieved. that the lifting height of existing movable
^ Kräne gewöhnlich nicht mehr für das Aufsetzen der obersten^ Cranes are usually no longer used for setting up the top ones
·* Teile der Konstruktion ausreicht. Für das Errichten von· * Parts of the construction are sufficient. For building
ii: Il Atilh i.js'.-r, Münclifr, ι7Ί'..Ύ, Deuls'lir: Hunk, f'ur.iliun 1Ä/25U7B · PcrlirliLclikii: Il Atilh i.js '.- r, Münclifr, ι7Ί' .. Ύ, Deuls'lir: Hunk, f'ur.iliun 1Ä / 25U7B · PcrlirliLclik
rilaMünchfin «212rilaMünchfin "212
2H66892H6689
T'urrakochern fand bisher ein normaler· 'Kran Verwendung;. Au Be-IVlGK w-sr dann ein fest auf dem Kocher montierter Krari für VJartungsarbeiten erforderlich. Der letztere Kren mußte nach Fertigstellung'des Kochei-n oben auf diesem montiert werden, wan beträchtliche Schwierigkeiten wit rich brachte, insbesondere auf beengter: Bau ,-teilen, auf conen ein bewe glich er Kran nur unter erheblichen Schwierigkeiten ein.yetabar war.T'urrakochern was previously a normal · 'crane use ;. Au Be-IVlGK w-sr then a Krari permanently mounted on the stove required for maintenance work. The latter horseradish had to be mounted on top of the cooker after completion be in considerable trouble with rich brought, especially on cramped: construction, parts, on cones a moving crane only with considerable difficulty a.yetabar was.
Bsi der Errichtung von Konstruktionen der genannten Art ^ unter /.rwendung des eri'indungsgemäßen Verfahrens und. eines für die Durchführung des Verfahrens geschaffenen Kran?, lassen sich die vorstehend angeführten sowie weitere Nachteile bekannter Verfahren und Vorrichtungen vermeiden.Bsi the erection of structures of the type mentioned ^ using the method according to the invention and. one crane created to carry out the procedure? the above-mentioned and other disadvantages of known methods and devices can be avoided.
Bei einem Verfahren der eingangs genannten Art iet erfin-dungsgemäß vorgesehen, daß man an jedem (Der Teilf.tücke wenigstens einen Träger oder ein Profilteil anordnet, welcher bzw. welches eine Führung oder Schiene für einen an den Teilstücken entlang aufwärts bewegbaren Kran bildet, daß man die Träger oder-Profilteile beim Errichten der Konstruktion zu einer kontinuierlichen Führung aneinandersetzt, welche beim Aufsetzen jedes weiteren Teils:tückes P verlängert wird, und daß man den Kran derart gestaltet, daß er während des Errichtens der Konstruktion an deren Außenseite aufwärts zu klettern vermag.In a method of the type mentioned at the outset, it is in accordance with the invention provided that at each (Der Teilf.tücke at least one carrier or a profile part arranged, which or which a guide or rail for a forms on the sections along upwardly movable crane that one the girders or profile parts when building the Construction to form a continuous guide, which when each additional part is placed on top of each other: tückes P is extended, and that the crane is designed in such a way that he while erecting the structure on its outside able to climb upwards.
Bei einer Anordnung zum Durchführen des erfindungsgemäßen Verfahrens sieht die Erfindung vor, daß ein im Laufe der Errichtung der Konstruktion auf Führungsschienen an der Außenseite der Konstruktion aufwärts bewegbarer Kran einen den Kran tragenden Schlitten aufweist, welcher über längenveränderliche Hubeinrichtungen mit einem weiteren, als Stützlager dienenden Schlitten verbunden ist, und daß die beiden Schlitten mittels Verriegelungseinrichtungen wechselweise an den Führungsschienen verriegelbar und mittels der Hubeinrichtungen wechselweise aufwärts bewegbarIn an arrangement for performing the method according to the invention, the invention provides that one in the course of Erection of the structure on guide rails on the outside of the structure, a crane that can be moved upwards has a carriage carrying the crane, which via variable length lifting devices with a further, serving as a support carriage is connected, and that the two carriages by means of locking devices alternately lockable on the guide rails and alternately moved upwards by means of the lifting devices
Sind· Ζ''-' 2098U/09B8 Are · Ζ '' - '2098U / 09B8
V/citcrö Hf-i.vl.-.iViri'l ο . "Ii in ι:· ο lh ei ten um! Vo;_-t;a.i Il ο do?.- Erfindung; GTt.-ebejj i^ich aus der folgenden 23cch:;vjb'iii^ eines Ausführun^rbeicpicls anhand der Zeichnung, deren einzige Figur nine Schrägansieht eine ö Turmkoch er η während der Errichtung unter Anwendung der. erfindungsgeraäßen Verfahrens mittels eines dazu gerdiaffeuer: Krans zeigt.V / citcrö Hf-i.vl .-. IViri'l ο. "Ii in ι: · ο lh ei ten um! Vo; _- t; ai Il ο do? .- Invention; GTt.-ebejj i ^ i from the following 23cch:; vjb'iii ^ an embodiment based on the drawing, the single figure of nine oblique viewing a cooking ö tower he η gerdiaffeuer during the construction using the erfindungsgeraäßen method by means of a thereto. crane shows.
Der im Bau befindliche Turmkocher 1 setzt sich, zusammen a\i.r; oinor Ansah! T eil stück en 2, an welche als Schienen dienende I]-Pi1OTiIe od. dergl. angeschweißt; sind. Der einen Ausleger 5 aufweisende Kran 4 ist auf einem Kran-Echlitten 6 montiert. Der Kranschlitten 6 weist eine den Kran 4 tragende obere Bühne 7 und eine eine Windenanordnung 3 tragende untere Bühne 71 auf. Der Schlitten 6 ist mittels in die Schienen 3 eingreifenden Gleitschuhen 9 entlang den Schienen J beweglich geführt. Die Gleitschuhe 9 sind an den Schienen 3 verriegelbar.The tower cooker 1 under construction is composed of a \ i. r ; oinor Ansah! Sections 2, to which I] -Pi 1 OTiIe or the like serving as rails are welded; are. The crane 4, which has a boom 5, is mounted on a crane slide 6. The crane carriage 6 has an upper platform 7 supporting the crane 4 and a lower platform 7 1 supporting a winch arrangement 3. The carriage 6 is movably guided along the rails J by means of sliding shoes 9 engaging in the rails 3. The sliding shoes 9 can be locked on the rails 3.
Unterhalb de κ Kranschlittens 6 ist ein vzeiterer, getrennter Schlitten 10 angeordnet, welcher als Stützlager dient und über ein Paar aus Kolben und Zylindern zusammengesetzter hydraulischer Heber 12 mit dem Kranschlitten verbunden ist. Der untere Schlitten 10 trägt einen Pumpensatκ 11 und v/eist Gleitschuhe 9 der gleichen Art auf wie der Schlitten 6. Die Bühnen 7 und 7' sind mittels eines en einem Gerüst 14 seitlich des Kochers 1 geführten Fahrkorbes 13 erreichbar.Below the crane slide 6 there is a longer, separate slide 10 which serves as a support bearing and is connected to the crane slide via a pair of hydraulic jacks 12 composed of pistons and cylinders. The lower carriage 10 carries a Pumpensatκ 11 and v / eist sliding blocks 9 of the same kind as the carriage 6. The lifts 7 and 7 'are connected by a s a frame 14 laterally of the cooker 1 run the elevator car 13 to reach.
Ausgehend von der in der Zeichnung dargestellten Lage geht das Errichten der Konstruktion mittels der erfindungsgemäßen Anordnung folgendermaßen vor sich: Ein Teilstück 2 für den Kocher 1 wird mittels des Krans 4 in seine Stellunggehoben. Daz\i ist der Kran 4 auf seinem Sockel 15 drehbar, so daß das neue Teil 2 auf ein früher aufgesetztes Teilstück 2! aufr:etzbar ist. Beim Aufsetzen des Teiles 2 ist besonders darauf zu achten, daß die Schienen J genpu aufeinander ousgerichtet worden. Anschließend wird das Teilstück 2 mit demStarting from the position shown in the drawing, the construction of the construction by means of the arrangement according to the invention proceeds as follows: A section 2 for the cooker 1 is lifted into its position by means of the crane 4. In addition, the crane 4 can be rotated on its base 15, so that the new part 2 is placed on a previously placed part 2 ! aufr: etzbar. When placing part 2, particular care must be taken that the rails J genpu have been aligned with one another. Subsequently, the section 2 with the
20981 U / 0 9 B 820981 U / 0 9 B 8
840840
- /+ - 2U6689- / + - 2U6689
früher eufgesetzten Teilstück 2: verschweißt. Nach dem Verschweißen des Teilstückes 2 mit tiere Teil stück 2f bilden die H-Profile 5 eine eich über die gesamte Hohe des KoChOx1S erstreckende kontinuierliche Führung, Vor dein Aufsetzen des nächsten Teil Stückes muß nun der Kran 4 aufwärts verschoben v/erden. Daau wird, der untere »Schlitten 10 in der in der Zeichnung dargestellten Lage verriegelt, worauf die Verriegelung des Kranscblittens G gelöst wird.. Das Verriegeln geschieht vorzugsweise dadurch, daß (nicht dargestellte) Verriegelungsbolzen od. d.ergl» unter elektronischer Steuerung mittels einer Druckmitteleinrichtung oder einer elektromagnetischen Betätigungseinrichtung mit an den Führungsschienen 3 vorhandenen Anschlägen, Bohrungen od. dergl. in Eingriff gebracht verden. Dazu sind die Verriegelungseinrichtungen vor zug sv/ei se in bzw. an den Gleitschuhe!: 9 angeordnet« Zur Erleichterung des Verlegene der dazu erforderlichen Kabel und Leitungen kann eine Druckmittelquelle an jedem der Schlitten vorgesehen sein, wobei die Bedienung von Ventilen, od. dergl. für das Druckmittel elektrisch über ein zentrales Steuerpult erfolgen kann.Previously added section 2 : welded. After the welding of the part 2 with the animal part 2 f , the H-profiles 5 form a continuous guide that extends over the entire height of the KoChOx 1 S. Before you place the next part, the crane 4 must be moved upwards. The lower slide 10 is then locked in the position shown in the drawing, whereupon the locking of the crane element G is released Pressure medium device or an electromagnetic actuating device with stops, bores or the like on the guide rails 3 are brought into engagement. For this purpose, the locking devices are preferably arranged in or on the sliding shoes !: 9 To facilitate the laying of the cables and lines required for this purpose, a pressure medium source can be provided on each of the slides, whereby the operation of valves or the like for the pressure medium can be done electrically via a central control panel.
Ist nun der Schlitten 10 an den Schienen 3 verriegelt und der Kranschlitten 6 entriegelt, so werden die hydraulischen Heber 12 mittels des Pumpensatzes 11 mit Druck gespeist, so daß sich der Kranschlitten 6 vom unteren Schlitten 10 weghebt. Die Heber können so bemessen sein, daß die erforderliche Hübhöhe mit einem Schritt erreichbar ist, oder derart, daß der Kran in mehreren Schritten gehoben wird. Nach dem Anheben des.Kranschlittens 6 in die gewünschte Höhe wird er in der erreichten Stellung verriegelt. Daraufhin kann die Verriegelung des Schlittens 10 gelöst und. mittels der Heber in eine der in der Zeichnung dargestellten entsprechende, je-·" doch um ein Teilstück 2 höhere Stellung nachgezogen werden. Anschließend kann ein neuer Hubvorgang eingeleitet werden. Um die Gefahr zu vermeiden, daß die Verriegelungen des Kranschlittens 6 und. des unteren Schlittens 10 gleichzeitig gelöst werden, sind Sicherungseinrichtungen vorgesehen, welche dasIf the slide 10 is now locked on the rails 3 and the crane slide 6 is unlocked, the hydraulic jacks 12 are supplied with pressure by means of the pump set 11, so that the crane slide 6 lifts away from the lower slide 10. The jacks can be dimensioned so that the required lifting height can be achieved in one step, or in such a way that the crane is lifted in several steps. After lifting des.Kranschlitten 6 to the desired height, it is locked in the position it has reached. Then the lock of the carriage 10 can be released and. in the drawing corresponding JE · "but higher at a portion of 2 the position shown to be tightened by means of the jack in one of the. Subsequently, may be introduced a new lifting cycle. In order to avoid the risk that the locking devices of the crane carriage 6 and. the lower Slide 10 are released at the same time, safety devices are provided which the
209 8 14/0958209 8 14/0958
SAD G'NASSAD G'NAS
■ 1} -. 2H66 89■ 1} -. 2H66 89
Lösen einer "Vsrrieselmiß nur dann freigeben., wenn sich die andere(η) Verriegelung^ en) sicher in Eingriff an den Schiener; 5 befinden« Die SicherTirigseinrichtung kann so ausgebildet sein, daß elektromagnetisch betätigte Aboperro:c*;Tsr>G für die Verriegelungsbolzen beispielsweise des Kranscblittoiis 6 in der Verriegelungsst,el?Lung stromlos sind und ihnen nur dann ein Strom zum Lösen der Verriegelung zufuhrbar ißt, vjenn die v^rriegelungsbolsen des anderen Schlittens 10 eine diesen sicher verriegelnde Stellung eingee^n haben.Release a "Vsrrieselmiß" only if the other (η) locking ^ en) securely in engagement with the Schiener; 5 are located «The safety device can do so be designed that electromagnetically operated Aboperro: c *; Tsr> G for the locking bolts, for example of the Kranscblittoiis 6 in the interlocking valve are de-energized and they can only be supplied with a current to release the lock eat, if the locking bolts of the other sled 10 a securely locking position to have.
Nach Abcchluß der Errichtung des Turmkochers kann der Kran an dessen oberem Ende angeschweißt oder sonstwie befestigt v/erden, wo er zum Durchführen späterer Wartungs- und Reparaturarbeiten dient. Die nach dem Errichten des Kochers nicht mehr benötigten, für die Aufwärtsbewegung des Krans erforderlichen Einrichtungen werden abmontiert und. können beim Errichten weiterer ähnlicher Konstruktionen wieder verwendet werden. Ec ist unschwer zu erkennen, daß das erfindungcgemäße Verfahren und die Anordnung zu seiner Durchführung vorteilhaft auch beim Errichten von Turmkränen oder ähnlichen Konstruktionen anwendbar sind.After the construction of the tower cooker has been completed, the crane welded or otherwise attached to its upper end, where it can be used for later maintenance and repair work serves. Those that are no longer needed after the digester has been erected and are required for the crane to move upwards Facilities are dismantled and. can be reused when building other similar structures will. It is easy to see that the The method and the arrangement for its implementation are also advantageous when erecting tower cranes or the like Constructions are applicable.
2098 U/09582098 U / 0958
Claims (4)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE1307970 | 1970-09-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2146689A1 true DE2146689A1 (en) | 1972-03-30 |
Family
ID=20296788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19712146689 Pending DE2146689A1 (en) | 1970-09-25 | 1971-09-17 | Method and arrangement for erecting tower structures |
Country Status (5)
Country | Link |
---|---|
US (1) | US3789565A (en) |
CA (1) | CA958512A (en) |
DE (1) | DE2146689A1 (en) |
FR (1) | FR2106321A5 (en) |
IT (1) | IT940941B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2324843A1 (en) * | 1973-05-17 | 1974-12-12 | Bbc Brown Boveri & Cie | DEVICE FOR THE ASSEMBLY OF MULTIPLE MASTS |
DE19741988A1 (en) * | 1997-09-23 | 1999-04-01 | Karin Peiter | Construction method for wind power plant |
DE10212305A1 (en) * | 2002-03-20 | 2003-10-02 | Walter Bau Ag | Procedure for erecting of tower for wind power plant from prefabricated elements, involves lifting and mounting elements by assembly unit which is moved by walking support |
DE102009000963A1 (en) * | 2009-02-18 | 2010-08-19 | Berbuer, Jürgen, Dr.-Ing. | Method and conveyor for mounting a tower and tower segment |
US20160369778A1 (en) * | 2011-05-11 | 2016-12-22 | Daniel E. Davis | Method of assembling a wind turbine |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3950913A (en) * | 1972-12-08 | 1976-04-20 | Mitsui Shipbuilding & Engineering Co., Ltd. | Method and apparatus for constructing a suspension bridge tower |
US4524873A (en) * | 1982-11-26 | 1985-06-25 | The Marley Cooling Tower Company | Method and apparatus for disassembling sectional boom of tower crane at terminal heights |
US5645395A (en) * | 1995-06-06 | 1997-07-08 | Huang; Hsin-Tsung | Building crane apparatus climbable on building walls |
JPH1018595A (en) * | 1996-07-04 | 1998-01-20 | Kabuki Kensetsu Kk | Tower-shaped carrying device |
US7290672B2 (en) | 2001-03-21 | 2007-11-06 | Federated Equipment Co. Llc | Tower crane device |
ES2234392B1 (en) * | 2003-03-31 | 2006-10-16 | Manuel Torres Martinez | PROCESS FOR THE ASSEMBLY OF THE TOWER OF AN AEROGENERATOR AND TOWER BUILT ASI. |
ES2235599B1 (en) * | 2003-04-01 | 2006-07-01 | Alberto Munarriz Aldaz | AEROGENERATOR ASSEMBLY EQUIPMENT. |
US7367461B2 (en) * | 2005-06-08 | 2008-05-06 | Mhe Technologies, Inc. | Movable girder mounted jib |
RU2376234C2 (en) * | 2005-07-25 | 2009-12-20 | Павел Владимирович Корчагин | Elevator system to service high-rise structures |
CA2567024C (en) * | 2006-09-14 | 2012-10-23 | Innovative Tank Manufacturing Inc. | Apparatus for manufacturing structures with a continuous sidewall |
WO2009080047A2 (en) * | 2007-12-21 | 2009-07-02 | Vestas Wind Systems A/S | A method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method |
DE102008022654A1 (en) * | 2008-05-07 | 2009-11-12 | Berg, Mario, Dr. | Method and device for mounting a modular structure, such as a wind turbine |
US20090282747A1 (en) * | 2008-05-14 | 2009-11-19 | Epp Richard J | Grain bin with person elevator |
WO2011031577A2 (en) * | 2009-09-09 | 2011-03-17 | National Oilwell Varco, L.P. | Method and apparatus for wind turbine erection |
US8801330B2 (en) * | 2009-09-10 | 2014-08-12 | National Oilwell Varco, L.P. | Windmill installation system and method for using same |
CN101774511B (en) * | 2010-01-21 | 2012-03-07 | 南通市盛东航道工程有限公司 | Climbing type hoist and using method thereof |
US8584429B2 (en) * | 2011-09-30 | 2013-11-19 | Tindall Corporation | Tower erection system and method |
ES1090131Y (en) * | 2012-11-12 | 2013-12-18 | Merino Pablo Gascon | Helical energy accumulator |
WO2014082176A1 (en) | 2012-11-27 | 2014-06-05 | Marmen Inc. | Lifting system for wind turbine towers and method for erecting a wind turbine tower |
US9388599B2 (en) | 2014-02-27 | 2016-07-12 | Parsons Corporation | Wind tower erection system |
US9650840B2 (en) | 2015-04-27 | 2017-05-16 | National Oilwell Varco, L.P. | Method and apparatus for erecting a drilling rig |
US9657495B2 (en) * | 2015-10-14 | 2017-05-23 | James D. Lockwood | Crane system incorporated into a tower |
NL2018176B1 (en) | 2017-01-16 | 2018-07-26 | Mammoet Holding B V | Method for onshore or offshore erecting an upstanding construction |
CN112359959A (en) * | 2020-11-03 | 2021-02-12 | 中交一公局第二工程有限公司 | Construction method of high-altitude steel beam corridor |
FR3123990A1 (en) | 2021-06-15 | 2022-12-16 | Psa Automobiles Sa | METHOD FOR PROTECTING A BATTERY CIRCUIT WITH DETECTION OF A DEFECTIVE SCREWED ELECTRICAL CONNECTION |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3207475A (en) * | 1960-09-22 | 1965-09-21 | Byggforbattring Ab | Arrangement for stepwise lifting of hoisting cranes preferably tower cranes |
US3366251A (en) * | 1965-10-23 | 1968-01-30 | Link Belt Co | Climbing crane |
US3298462A (en) * | 1966-01-17 | 1967-01-17 | Beaver Advance Corp | Traction lift for scaffolding towers |
US3464169A (en) * | 1967-06-26 | 1969-09-02 | Etablis F Potain | Lifting device for a telescopic mast |
US3656631A (en) * | 1970-03-25 | 1972-04-18 | Hydro Tower Co | Self-lifting crane |
-
1971
- 1971-09-17 DE DE19712146689 patent/DE2146689A1/en active Pending
- 1971-09-24 CA CA123,661A patent/CA958512A/en not_active Expired
- 1971-09-24 FR FR7134519A patent/FR2106321A5/fr not_active Expired
- 1971-09-24 US US00183342A patent/US3789565A/en not_active Expired - Lifetime
- 1971-09-24 IT IT53076/71A patent/IT940941B/en active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2324843A1 (en) * | 1973-05-17 | 1974-12-12 | Bbc Brown Boveri & Cie | DEVICE FOR THE ASSEMBLY OF MULTIPLE MASTS |
DE19741988A1 (en) * | 1997-09-23 | 1999-04-01 | Karin Peiter | Construction method for wind power plant |
DE10212305A1 (en) * | 2002-03-20 | 2003-10-02 | Walter Bau Ag | Procedure for erecting of tower for wind power plant from prefabricated elements, involves lifting and mounting elements by assembly unit which is moved by walking support |
DE102009000963A1 (en) * | 2009-02-18 | 2010-08-19 | Berbuer, Jürgen, Dr.-Ing. | Method and conveyor for mounting a tower and tower segment |
US20160369778A1 (en) * | 2011-05-11 | 2016-12-22 | Daniel E. Davis | Method of assembling a wind turbine |
Also Published As
Publication number | Publication date |
---|---|
CA958512A (en) | 1974-12-03 |
IT940941B (en) | 1973-02-20 |
FR2106321A5 (en) | 1972-04-28 |
US3789565A (en) | 1974-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2146689A1 (en) | Method and arrangement for erecting tower structures | |
CH710478A2 (en) | A method for laterally moving an industrial machine for maintenance thereof. | |
DE3007162A1 (en) | METHOD FOR TRANSFERRING A CRANE FROM A TOWER TO THIS NEIGHBORHOOD | |
DE2743273B1 (en) | Method for producing elongated supporting structures, in particular multi-span bridge superstructures made of reinforced or prestressed concrete | |
DE3112702A1 (en) | LIFTING DEVICE FOR AN OFFSHORE CONSTRUCTION | |
DE1484507B1 (en) | Lifting device for a floating jack-up platform | |
DE102008048356A1 (en) | Prefabricated lining installing device for e.g. underground station, has vertical supports with telescopic links attached with hydraulic cylinder and impellers to change height of telescopic link | |
DE102004060653B4 (en) | Formwork arrangement and method for constructing a formwork arrangement | |
DE4238484A1 (en) | Lifting roof of house to enlarge loft - involves large number of hydraulic actuators on common pressure supply | |
DE2944111A1 (en) | METHOD AND DEVICE FOR REMOVING THE TURNTABLE FROM A CRANE ATTACHED TO A BASE | |
EP2025859A1 (en) | Deep drilling device and method for mounting a deep drilling device | |
EP4001046B1 (en) | Maintenance device for railway vehicles, running gear of a railway vehicle and maintenance method | |
EP0690547B1 (en) | Mounting of a stator in a housing | |
DE2157669A1 (en) | PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE | |
DD277296A1 (en) | DEVICE FOR MOUNTING PIPES IN INDUSTRIAL STONES | |
DE3545965A1 (en) | Method and device for dismantling, assembling and inspecting the rotary connections of cranes | |
DE2132597C3 (en) | Method and device for erecting an elongated vertical structure, e.g. a chimney | |
DE2126826A1 (en) | Lifting device for lifting and lowering large loads | |
DE1285163B (en) | Process for the production of tall structures and apparatus for carrying out this process | |
DE102022110726A1 (en) | Crane jacking system | |
DE1227632B (en) | Chimney with a framework and the method for its assembly | |
WO2019121935A1 (en) | Lattice mast as tower of a wind turbine | |
DE2363019A1 (en) | PROCESS AND DEVICE FOR ERECTING HIGH SLIM BUILDINGS FROM PRE-FABRICATED BUILDING COMPONENTS AND BY THIS ACHIEVED BUILDING | |
DE2449315A1 (en) | Travelling portal crane erection system - jacks up gantry beam in stages along supporting columns | |
DE2124039C3 (en) | Device for erecting at least one cylindrical pipe within a shoring tower |