DE2137417A1 - LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate - Google Patents

LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate

Info

Publication number
DE2137417A1
DE2137417A1 DE19712137417 DE2137417A DE2137417A1 DE 2137417 A1 DE2137417 A1 DE 2137417A1 DE 19712137417 DE19712137417 DE 19712137417 DE 2137417 A DE2137417 A DE 2137417A DE 2137417 A1 DE2137417 A1 DE 2137417A1
Authority
DE
Germany
Prior art keywords
pipes
laying
foot
cavities
lines according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19712137417
Other languages
German (de)
Inventor
Alfred Dipl Ing Bley
Otto-Heinrich Heitz
Erich Dipl Ing Henkel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gruen und Bilfinger AG Austria
Original Assignee
Gruen und Bilfinger AG Austria
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gruen und Bilfinger AG Austria filed Critical Gruen und Bilfinger AG Austria
Priority to DE19712137417 priority Critical patent/DE2137417A1/en
Publication of DE2137417A1 publication Critical patent/DE2137417A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

Verlegen von Leitungen zum Abführen von Grund- und Sickerwasser Die Erfindung bezieht sich auf das Verlegen von Leitungen zum Abführen von Grund- und Sickerwasser in rutschgefährdeten Hängen und Böschungen, wobei die Leitungen am Fuße einer Folge verrohrter Bohrungen angeordnet werden. Laying of pipes for the discharge of groundwater and seepage water Invention relates to the laying of lines for the discharge of ground and Leachate in slopes and embankments at risk of slipping, with the pipes on Be arranged at the foot of a sequence of cased bores.

Bekannt sind Verfahren zum Herstellen von Sickerwänden, bestehend aus einer Reihe sich überschneidender Bohrungen, die mit wasserdurchlässigen Baustoffen gefüllt werden9 und aus auf der Sohle angeordneten Drainrohren (OS 1 634 368 a;;d Pat. Anm. P 1 634 375.2). Weiterhin ist ein Verfahren bekannt, bei dem rechteckige stahlerne Brunnen abgesenkt werden, auf deren Sohle Rohre verlegt werden können (ER PS 1 008301).Processes for the production of seepage walls are known from a series of intersecting holes made with water-permeable building materials be filled9 and from drain pipes arranged on the floor (OS 1 634 368 a ;; d Pat. Note P 1 634 375.2). Furthermore, a method is known in which rectangular steel wells are lowered, on the bottom of which pipes can be laid (ER PS 1 008301).

Beide Verfahren sind aufwandreich; das erstere durch die Vielzahl der Bohrungen, das zweite durch die Kühen von Brunnenabsenkungen und dem folgenden Wiedergewinnen.Both procedures are time-consuming; the former by the multitude the drilling, the second by the cows of well subsidence, and the following Regain.

Die Erfindung hat es sich zur Aufgabe gemacht, für den Zweck des Verlegens von Abflußleitungen ein vereinfachtes, zeitsparendes und wirtschaftliches Verfahren zu entwickeln, ohne durch den Eingriff zu irgendeinem Zeitpunkt der Herstellung, auch bei sehr tiefer Lage der Leitungen, das Standvermögen des Hanges oder einzelner Bodenschichten zu gefährden.The invention has made it its business for the purpose of laying of drainage pipes a simplified, time-saving and economical process to develop without going through the intervention at any stage of manufacture, even if the lines are very low, the stability of the slope or individual ones Endangering soil layers.

G Die Aufgabe wird dadurch gelöst, daß Großbohrrohre in Abständen niedergebracht werden, und daß von ihrem Fuße nach beiden Seiten aufeinander zu Hohlräume in das Erdreich eingearbeitet werden, daß darin die Rohre durchgehend und im Gefälle verlegt, und daß anschließend die Bohrlöcher mit Kies oder anderem geeigneten Material, z. B. Filterbeton, verfüllt und die Bohrrohre gezogen werden. G The object is achieved in that large drill pipes be brought down at intervals, and that from their foot to each other on both sides to be incorporated into cavities in the ground that the pipes are continuous and laid on a slope, and that then the boreholes with gravel or other suitable material, e.g. B. filter concrete, filled and the drill pipes pulled.

Der erzielbare Vorteil besteht darin, daß je nach den Bodenverhältnissen eine erhebliche Zahl von Bohrungen gespart wird, und daß mit Großbohrrohren viel schneller und wirtschaftlicher gearbeitet wird als mit rechteckigen Brunnen.The achievable advantage is that depending on the soil conditions a considerable number of bores is saved, and that much with large drill pipes you work faster and more economically than with rectangular fountains.

Weitere Ausgestaltungen der Erfindung beziehen sich darauf, daß einzelne Bohrrohre als Kontrollschächte offen belassen werden, und daß bei der Herstellung der Hohlräume vom Fuße der Rohre mit bergmännischen Methoden, mit Horizontalbohrungen ode iittels Rohrdurchpressungen vorgegangen wird.Further embodiments of the invention relate to the fact that individual Drill pipes are left open as inspection shafts, and that during manufacture the cavities at the foot of the pipes using mining methods, with horizontal drilling or by means of pipe pressings.

Ein Ausführungsbeispiel der Erfindung ist in der Zeichnung dargestellt. Es zeigen: Fig. 1 einen Längsschnitt durch die Bohrungen und die verlegte Abflußleitung, Fig. 2 eine Draufsicht auf die Anordnung der Bohrungen.An embodiment of the invention is shown in the drawing. They show: FIG. 1 a longitudinal section through the bores and the laid drain line, Fig. 2 is a plan view of the arrangement of the bores.

Zum Herstellen einer Abflußleitung werden die Bohrungen 1 und 1a in Abständen voneinander niedergebracht. Die Größe dieser Abstände hängt von den örtlichen Gegebenheiten ab.To create a drain line, holes 1 and 1a in At a distance from each other. The size of these distances depends on the local Circumstances.

Von je 2 Rohren aus werden in Richtung aufeinander zu die Hohlräume 2 geschaffen, in welche die Rohre 3 durchgehend und in Gefälle verlegt werden. Anschließend werden Bohrlöcher und Hohlräume verfüllt und die Bohrrohre gezogen.The cavities are drawn from each of 2 tubes in the direction of each other 2 created, in which the pipes 3 are laid continuously and at a gradient. Afterward become drill holes and filled cavities and pulled the drill pipes.

Dabei kann die Füllung aus Kies oder anderem geeigneten Material, z. B. aus Filterbeton bestehen. Zweckmäßigerweise wird sie in einem unteren Teil aus Filterbeton und in einem oberen Teil aus Kies bestehen. Bei größerer Länge der Leitungen können einzelne Bohrrohre 1a als Eontrollschächte offen belassen werden. Schließlich kann das Herstellen der Hohlräume 2 auch mit bergmännischen Methoden, mit Horizontalbohrungen oder mittels Rohrdurchpressungen erfolgen.The filling can be made of gravel or other suitable material, z. B. consist of filter concrete. Appropriately, it is in a lower part consist of filter concrete and gravel in an upper part. If the length of the Lines can be left open as individual drill pipes 1a as control shafts. Finally, the production of the cavities 2 can also be done using mining methods, be carried out with horizontal bores or by means of pipe pressings.

Fig. 2 zeigt eine Draufsicht auf die Bohrungen und das Minimum an Aushub, das bei standfestem oder vorübergehend standfestem Boden genügt.Fig. 2 shows a top view of the holes and the minimum Excavation that is sufficient for stable or temporarily stable soil.

- Ansprüche - - Expectations -

Claims (5)

Patentansprüche 1. Verlegen von Leitungen zum Abführen von Grund- und Sikkerwasser in rutschgefährdeten Hängen und Böschungen wobei die Leitungen am Fuß einer Folge verrohrter Bohrungen angeordnet sind, dadurch gekennzeichnet, daß Großbohrrohre (1) und (1a) in Abständen niedergebracht werden, und daß von ihrem Fuße nach beiden Seiten aufeinander zu Hohlräume (2) in das Erdreich eingearbeitet werden, daß darin die Rohre (3) durchgehend und im Gefälle verlegt, und daß anschließend die Bohrlöcher mit Kies oder anderem geeigneten Material, z. B. Filterbeton, verfüllt und die Bohrrohre (1) und (1a) gezogen werden. Claims 1. Laying of lines for discharging ground and seepage water in slopes and embankments at risk of slipping, whereby the pipes are arranged at the foot of a series of cased bores, characterized in that that large drill pipes (1) and (1a) are brought down at intervals, and that of their Work into the ground to form cavities (2) on both sides of each other be that in it the pipes (3) laid continuously and on a slope, and that then the boreholes with gravel or other suitable material, e.g. B. filter concrete, filled and the drill pipes (1) and (1a) are pulled. 2. Verlegen von Leitungen nach Anspruch 1, dadurch gekennzeichnet, daß einzelne Bohrrohre (1a} als Eontrollschächte offen belassen werden.2. Laying lines according to claim 1, characterized in that that individual drill pipes (1a} are left open as control shafts. 3. Verlegen von Leitungen nach den Ansprüchen 1 luld 2, dadurch gekennzeichnet, daß bei der Herstellung a3r Hohlräume (2) vom Fuß der Großbohrrohre mit bergmännischen Methoden vorgegangen wird.3. Laying of lines according to claims 1 luld 2, characterized in that that in the production of a3r cavities (2) from the foot of the large drill pipes with mining Methods is proceeded. Verlegen von Leitungen nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß bei der Herstellung der Hohlräume (2) vom Fuß der Großbohrrohre mit Horizontalbohrungen vorgegangen wird.Laying lines according to Claims 1 and 2, characterized in that that in the production of the cavities (2) from the foot of the large bore pipes with horizontal bores is proceeded. 5. Verlegen von Leitungen nach den Ansprüchen 1 und 2, dadurch gekennzleichnet, daß zur Herstellung der Hchlräume (2) vom Fuß der Großbohrrohre mittels Rohrdurchpressungen vorgegangen wird.5. Laying of lines according to claims 1 and 2, thereby gekennzleichnet, that for the production of the hollow spaces (2) from the foot of the large bore pipes by means of pipe penetrations is proceeded.
DE19712137417 1971-07-27 1971-07-27 LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate Pending DE2137417A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19712137417 DE2137417A1 (en) 1971-07-27 1971-07-27 LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19712137417 DE2137417A1 (en) 1971-07-27 1971-07-27 LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate

Publications (1)

Publication Number Publication Date
DE2137417A1 true DE2137417A1 (en) 1973-02-08

Family

ID=5814892

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19712137417 Pending DE2137417A1 (en) 1971-07-27 1971-07-27 LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate

Country Status (1)

Country Link
DE (1) DE2137417A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1983004276A1 (en) * 1982-05-24 1983-12-08 Bernhard Wietek Hollow foundation element and manufacturing method thereof
FR2596082A1 (en) * 1986-03-21 1987-09-25 Comporgan Rendszerhaz Kozos Va METHOD OF CONSTRUCTING A DRAINAGE SYSTEM
WO2012163266A1 (en) * 2011-05-30 2012-12-06 中国葛洲坝集团股份有限公司 Method for discharging water from dam concrete placing area via concealed pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1983004276A1 (en) * 1982-05-24 1983-12-08 Bernhard Wietek Hollow foundation element and manufacturing method thereof
FR2596082A1 (en) * 1986-03-21 1987-09-25 Comporgan Rendszerhaz Kozos Va METHOD OF CONSTRUCTING A DRAINAGE SYSTEM
US4820080A (en) * 1986-03-21 1989-04-11 Comporgan System House Process for the construction of a drain system
WO2012163266A1 (en) * 2011-05-30 2012-12-06 中国葛洲坝集团股份有限公司 Method for discharging water from dam concrete placing area via concealed pipe

Similar Documents

Publication Publication Date Title
DE3741001C2 (en)
DE3708081A1 (en) METHOD FOR BUILDING SEEDER PLANTS
DE3419163A1 (en) METHOD AND DEVICE FOR SEALING AGAINST SEPARATE SEPARATE
DE3047803A1 (en) "SHAFT METHOD FOR MINING A PETROLEUM-LAYING LAYER WITH SOIL WATER"
DE19622159A1 (en) Plant for passive treatment of contaminated ground water
DE2137417A1 (en) LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate
DE1934170A1 (en) Removal of mineral oil impregnant from - vicinity of bore holes
DE4311917C2 (en) Process for making hardening areas
DE3703534C2 (en)
DE1634375C3 (en) Method of making drainage slots
DE593664C (en) Installation on caissons for the foundation of structures
DE2621680C3 (en) Method and device for the complete dismantling of deposits in the Arctic
DE2357709A1 (en) Binding of slit trench in cliff or stony ground - pipes are arranged vertically in trench and holes bored through to be filled with concrete
DE2052184A1 (en) Method for producing a deep foundation body
DE599787C (en) Process for the production of bored piles with a widened pile base
DE628610C (en) Process for the foundation of dams or similar structures on peatland
DE1784335C3 (en) Procedure for lowering the water table in the area of a building site
DE936561C (en) Procedure for sinking sheep
DE975626C (en) Method for creating a groundwater well
DE970760C (en) Process for the production of concrete piles in the ground by pressing the sunk borehole filled with aggregate with cement milk or the like while gradually withdrawing the press pipe
DE815327C (en) Process for the production of deep foundations
DE2747507A1 (en) Hydraulic structure forming dam or dyke - consists of row of interlocking filled sacks of alternate circular and hollow dumb=bell form in horizontal section
DE2510912C3 (en) Method for building the lining of a bunker, in particular in underground mining and device for carrying out the method
DE2143837A1 (en) Process for building a road body or a runway on a poorly stable ground, as well as road bodies or runways obtained by these processes
DE1658747C (en) Method for producing a tunnel body