DE2132781A1 - MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS - Google Patents

MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS

Info

Publication number
DE2132781A1
DE2132781A1 DE19712132781 DE2132781A DE2132781A1 DE 2132781 A1 DE2132781 A1 DE 2132781A1 DE 19712132781 DE19712132781 DE 19712132781 DE 2132781 A DE2132781 A DE 2132781A DE 2132781 A1 DE2132781 A1 DE 2132781A1
Authority
DE
Germany
Prior art keywords
grid
modular system
chemical plant
chemical
plants
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19712132781
Other languages
German (de)
Inventor
Wolf-Dieter Dipl-Chem Hahn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19712132781 priority Critical patent/DE2132781A1/en
Priority to GB2890172A priority patent/GB1380352A/en
Priority to FR7223806A priority patent/FR2144417A5/fr
Publication of DE2132781A1 publication Critical patent/DE2132781A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/005Modulation co-ordination
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)
  • Pipeline Systems (AREA)

Description

Dipl.-Chem. UoIf- Diether Hahn 6 Frankfurt/m, 26.6.71Dipl.-Chem. UoIf- Diether Hahn 6 Frankfurt / m, 6/26/71

Myliusstraße 36Myliusstrasse 36

An dasTo the

Deutsche PatentamtGerman Patent Office

B München 2
Zweibrückenstraße 12
B Munich 2
Zweibrückenstrasse 12

P at sntanmeldungP at snt registration Baukastensystem für chemische Versuchsanlagen und Produktionsanlaqen:Modular system for chemical test systems and production systems:

Die Entwicklung der Arbeitslöhne macht es erforderlich, die bisher geübte Art des Chemieanlagenbaues zu rationalisieren. Eine sinnvolle Rationalisierung ist aber nur möglich durch ein komplettes System vorfertigbarer Bauteile, die in ihren Maßen so aufeinander abgestimmt pind, daß sie in jeder beliebigen Anordnung und Zusammenstellung montiert u/erden können, ohne daß Anpaßarbeiten erforderlich werden.The development of wages makes it necessary to keep the practice up to now To rationalize the type of chemical plant construction. A sensible rationalization but is only possible through a complete system that can be prefabricated Components whose dimensions are matched to one another so that they can be used in can be assembled and / or grounded in any arrangement and composition, without adaptation work being necessary.

Uleiterhin ist eine sinnvolle Rationalisierung des Chemieanlagenbaues nur möglich, wenn die erforderlichen Planungsarbeiten auf ein flinimum beschränkt und zudem so einfach durchgeführt werden können, daß sie auch von weniger gut vorgebildeten Ingenieuren, deren normale Tätigkeit nicht auf dem Gebiet der Anlagenplanung liegt, ausgeführt werden können·Uleiterhin is only a sensible rationalization of chemical plant construction possible if the necessary planning work is limited to a minimum and, moreover, can be carried out so easily that even less well-trained engineers cannot do their normal job is in the field of system planning, can be carried out

Es wurde gefunden, daß sich diese Forderungen durch die Anwendung eines an sich einfachen Konstruktionsprinzipes in idealer Weise realisieren lgssan. Es wurde darüber hinaus gefunden, daß sich die nach diesem Konstruktionsprinzip hergestellten Systemteile aus überraschend wenigen Normteilen aufbauen lassen und sich daher hervorragend zur Serienfertigung eignen* It has been found that these requirements can be met by the application of a Realize simple construction principles in an ideal way lgssan. It was also found that according to this design principle manufactured system parts can be built up from surprisingly few standard parts and are therefore ideally suited for series production *

Es ergibt sich bei" konsequenter Anwendung des erfindungsgemäßen Konstruktionsprinzips ein Baukastensystem, aus dessen einzelnen Systemteilen sich jede beliebige Chemieanlage zusammensetzen läßt.It results from "consistent application of the construction principle according to the invention a modular system from whose individual system parts any chemical plant can be put together.

Dieses erfindungsgemäße Baukastensystem wird wie folgt näher beschrieben.This modular system according to the invention is described in more detail as follows.

1« Konstruktionsprinzip1 «construction principle

L>as erfindungsgemäße Konstruktionsprinzip ist in Fig. 1 und 2 dargestellt.The construction principle according to the invention is shown in FIGS. 1 and 2.

209882/0945209882/0945

Eine nicht dargestellte Chemieanlage der Länge L, der Breite B und der Höhe H erfüllt den durch diese Abmessungen gegebenen Raum. Unterteilt man diesen Raum in Würfel der einheitliehen Kantenlänge a mm, so ergibt sich das in Fig. 1 dargestellte räumliche Rastersystem, das aus den Rasterachsen Ll bis L ; BL bis Bn und H- bis H so wie den sich in dem Anlagenraum befindlichen, in Fig. 1 nicht dargestellten, weiteren Rasterachsen besteht. Alle Rasterachsen haben von den in gleicher Ebene in gleicher Richtung verlaufenden Nachbarachsen den Abstand a mm.A chemical plant, not shown, of length L, width B and height H fulfills the space given by these dimensions. If this space is subdivided into cubes of uniform edge length a mm, the spatial grid system shown in FIG. 1 results, which consists of the grid axes Ll to L; BL to B n and H- to H as well as the further grid axes located in the plant room, not shown in FIG. 1. All grid axes have a distance of a mm from the neighboring axes running in the same plane in the same direction.

Es wird nun erfindungsgemäQ festgelegt, daß die Achsen der Rohrleitungen einer beliebigen Chemieanlage vorzugsweise nur entlang einer Rasterachse geführt Berden dürfen.It is now determined according to the invention that the axes of the pipelines any chemical plant, preferably only along a grid axis led Berden.

Demnach sind alle Teile einer Chemieanlage, wie Behälter, Kolonnen, Wärmetauscher, Pumpen etc. so zu konstruieren, daö ihre Stutzen ( Rohranschlüsse ) entweder direkt auf einer Rasterachse liegen oder aber um das Rastermaß a/2 versetzt. Dieser Versatz kann in der Höhe, Breite oder Länge des Raumes ausgeführt werden, jedoch ntlE so, daß nach Anschluß eines Rohrbogens der Schenkellänge a/2 wieder eine Rasterachse erreicht qird.Accordingly, all parts of a chemical plant, such as tanks, columns, heat exchangers, To design pumps etc. in such a way that their nozzles (pipe connections) either lie directly on a grid axis or offset by the grid dimension a / 2. This offset can be in the height, width or length of the room be carried out, but ntlE in such a way that after connecting a pipe bend the Leg length a / 2 reaches a grid axis again.

Ferner sind diese Teile so zu konptruieren, daß ihre Rohranschlüsse (Stutzen), die üblicherweise als Flansche ausgebildet sind, jedoch auch aus Rohrverschraubungen und ähnlichen Uerbindungselementen bestehen können, entweder direkt im Schnittpunkt zweier Rasterachsen enden oder um das Rastermaß a/2 vor einem solchen Schnittpunkt.Furthermore, these parts are to be designed in such a way that their pipe connections (nozzles), which are usually designed as flanges, but also from screwed pipe connections and similar connecting elements can exist, either end directly at the intersection of two grid axes or by the grid dimension a / 2 in front of such an intersection.

In Fig. 2 ist das Konstruktionsprinzip dieser Anlagenteile näher erläutert.In Fig. 2, the design principle of these parts of the system is explained in more detail.

In Fig. 2 AA und 2 AB ist z.B. eine einfache Uorlage dargestellt, die stellvertretend für alle übrigen ^eiie wie Kolonnen, Wärmetauscher, Pumpen etc. stehen möge.In FIGS. 2 AA and 2 AB, for example, a simple template is shown which may represent all other elements such as columns, heat exchangers, pumps, etc.

Fig. 2 AA ist die Draufsicht der in Fig. 2 AB in Seitenansicht dargestellten Uorlage. Alle mit 1 a-n bezeichneten Stutzen liegen direkt auf einer Rasterachse und enden am Schnittpunkt dieser Rasterachse mit den senkrecht dazu laufenden Raseerachsen. Der Stutzen 2 liegt nicht auf einer Rasterachse, : seine Achse ist um a/2 gegenüber der Behälterachse, die ebenfalls auf einer Rasterachse liegt, versetzt. Er sndet jedoch am Schnittpunkt seiner Rohrachse mit einer Rasterachse; eine hier anzuschließende Rohrleitung kann mit einem Rohrbogen, dessen einer Schenkel die Länge a/2, dessen anderer Sehen-Fig. 2 AA is the plan view of the Uorlage shown in Fig. 2 AB in side view. All nozzles labeled 1 on lie directly on a grid axis and end at the intersection of this grid axis with the Raseer axes running perpendicular thereto. The connector 2 is not on a grid axis: its axis is offset by a / 2 with respect to the container axis, which is also on a grid axis. However, it ends at the intersection of its pipe axis with a grid axis; a pipe to be connected here can be connected to a pipe bend, one leg of which has a length of a / 2, the other

209882/0945209882/0945

kel die Länge a besitzt, jedoch wieder auf einer Rasterachse Riegen. Der Stutzen 3 am Behälterboden liegt zwar auf einer Rasterachse, endet jedoch a/2 mm vor dem Schnittpunkt zweier Rasterachsen· Auch eine hier anzuschließende Rohrleitung kann entweder mit dem gleichen Bogen wie bei Stutzen 2 oder mit einem sonstigen Paßstück wieder auf einer Rastsrachse liegen.kel has the length a, but again on a grid axis Riegen. Of the Connector 3 on the container bottom is on a grid axis, but ends a / 2 mm in front of the intersection of two grid axes A pipe to be connected here can also either have the same bend as for nozzle 2 or rest on a locking axle with another fitting piece.

In Fig. 2 BA und 2 BB ist dargestellt, nach welchen konstruktiven Gesichtspunkten die Befestigungskonstruktionen ausgeführt werden müssen, an denen die Teile einer Chemieanlage» uie Behälter, Kolonnen« Wärmetauscher, so wie die Rohrleitungen selbst, befestigt werden· Dabei möge die aus den beiden Stützen 4 und den beiden Trägern 5 bestehende einfache Eckkonstruktion stellvertretend für ein ganzes Gebäude stehen· Die Stützen 4 sollen beispielsweise aus sogenannten Breitflanseh-Trägern, die Träger 5 aus sogenannten Doppel- T - Trägern handelsüblicher Abmessungen bestehen· "In Fig. 2 BA and 2 BB it is shown according to which structural aspects the fastening structures must be carried out on which the parts of a chemical plant "uie tanks, columns" heat exchangers, such as the pipelines themselves are fastened · The simple corner construction consisting of the two supports 4 and the two beams 5 is representative Stand for an entire building · The supports 4 should, for example, consist of so-called wide-flanged girders, the girders 5 of so-called There are double T-beams of commercial dimensions "

Die Stützen 4 werden vorteilhaft so angeordnet, daß die Schnittpunkte ihrer χ und y - Achsen (Bezeichnung nach DIN) in der Aufsicht Fig· 2 BB jeweils um das Maß a/2 von den parallel zur Stützenachse verlaufenden Rasterachsen versetzt sind.The supports 4 are advantageously arranged so that the points of intersection of their χ and y axes (designation according to DIN) in the plan view Fig. 2 BB each are offset by a / 2 from the grid axes running parallel to the column axis.

Die waagerecht angeordneten Träger 5 nüssen stets so angeordnet werden, daß ihre χ - Achse (nach DiN) in der aus den waagerecht verlaufenden Rasterachsen gebildeten Ebenen zu liegen kommt und ihre y — Achse in der Mitte zwischen 2 Rasterachsen liegt·The horizontally arranged carriers 5 must always be arranged in such a way that that their χ - axis (according to DiN) in that of the horizontally running grid axes formed planes come to rest and their y-axis lies in the middle between 2 grid axes

In Fig. 3 sind die Achsen χ und y der beiden Hauptträgheitsmomente zur Erläuterung dargestellt· Sie bedarf daher keiner näheren Erläuterung.In Fig. 3, the axes χ and y of the two main moments of inertia are for explanation · It therefore does not require any further explanation.

2« Die einzelnen Teile des Baukastensystems2 «The individual parts of the modular system

Nach den unter 1 dargelegten Konstruktionsrichtlinien lassen sich nun alle zum Bau einer Chemieanlage erforderlichen Teile herstellen· Diese Teile sind:According to the construction guidelines set out under 1, all Manufacture the Parts Required to Build a Chemical Plant · These parts are:

2.1 Träger und Stützen, Treppen etc. für die Errichtung des Gebäudes, in das die betreffende Chemieanlage montiert werden soll. ("Gebäudeteile11)2.1 Beams and supports, stairs, etc. for the construction of the building in which the chemical plant in question is to be installed. ("Building parts 11 )

2*2 Behälter, Wärmetauscher, Kolonnen, Pumpen et··, die die eigentlichen Teile der Chemieanlage bilden. ("Apparate und Maschinen")2 * 2 tanks, heat exchangers, columns, pumps et ·· which are the actual Form parts of the chemical plant. ("Apparatus and Machines")

2.3 Rohrleitungen und Armaturen, die die einzelnen Teile nach Punkt 2.2. verbinden.2.3 Pipelines and fittings that the individual parts according to Point 2.2. associate.

2.4 Montagematerial, das zum Befestigen der Teile nach den Punkten 2.2 und 2.3 an den Teilen nach Punkt 2.1 dient.2.4 Assembly material that is used to fasten the parts according to points 2.2 and 2.3 on the parts according to point 2.1.

20 9 8 82/09 4520 9 8 82/09 45

Die konsequente"Anwendung der unter 1 dargelegten Konstruktionsrichtlinien ergibt, daß die kennzeichnenden Abmessungen aller Gebäudeteile stets ein ganzzahliges Vielfaches des Rastermaßes a mm sein müssen. Es hat sich für die Erleichterung der Montage als zweckmäßig erwiesen, alle verwendeten Bauelemente mit vorgefertigten Löchern zu versehen, die gemäß Fig. 4 einen Abstand von a/n rom voeinander besitzen* Dabei muß η eine ganze Zahl sein* Zweckmäßigerweise wird, wenn als Rastermaß beispielsweise a'i = 25o mm gewählt wird, der Lochabstand a/n zu 5o mm, also η = 5 gewählt, wenn die Flanschbreite der verwendeten Träger und Stützen z.B. loo mm beträgt.The consistent "application of the design guidelines set out under 1 shows that the characteristic dimensions of all parts of the building must always be an integral multiple of the grid dimension a mm. It has to be for the ease of assembly proved to be useful, all components used to be provided with prefabricated holes, which according to FIG. 4 a distance of a / n rom each other * where η must be an integer * It is expedient if, for example, a'i = 25o mm is selected as the grid dimension is selected, the hole spacing a / n to 50 mm, i.e. η = 5, if the flange width the beams and supports used are e.g. 100 mm.

ü/eiterhin ergibt die konsequente Anwendung der unter 1 dargelegten Konstruktionsrichtlinien, daß die Anschlußmaße aller Apparate und Maschinen stets ein ganzzahliges Vielfaches -des Rastermaßes a/2, vorzugsweise jedoch des Rastermaßes a sein müssen« Ausgenommen hiervon sind die Anschlußmaße für die Befestigungselemente wie Pratzen und Füße, so wie die Anschiußmaße zur Verbindung zweier Apparateteile zu einem vollständigen Apparat.The consistent application of the design guidelines set out under 1 also results, that the connection dimensions of all apparatus and machines are always an integral multiple of the grid dimension a / 2, but preferably des Grid dimension a must be «Excepted from this are the connection dimensions for the fastening elements such as claws and feet, as well as the connection dimensions for the connection two parts of the apparatus to form a complete apparatus.

Schließlich ergibt sich, daß auch die Anschlußmaße der Rohrleitungen stets ein ganzzahliges Vielfaches des Rastermaßes a/2, vorzugsweise jedoch des Rastermaßes a sein müssen. Ausgenommen hiervon sind nur die Anschlußmaße von Paßstücken zur Anpassung von Armaturen mit Anschlußmaßen nach DIN 33oo an das Rastersystenu Dedoch ergeben diese Paßstücke zusammen mit einer Armatur nach DIN 33oo wieder ein ganzzahliges Vielfaches des Rastermaßes a/2.Finally, it follows that the connection dimensions of the pipelines always must be an integral multiple of the grid dimension a / 2, but preferably of the grid dimension a. Only the connection dimensions are excluded from this of fitting pieces for the adaptation of fittings with connection dimensions according to DIN 33oo to the Rastersystenu Dedoch these fitting pieces result together with a fitting according to DIN 33oo again an integral multiple of the grid dimension a / 2.

Die Anschlußmaße des Rontagematerials sind zwar direkt nicht ganzzahlige Vielfache des Rastermaßes a/2, jedoch ergibt ihr Anschlußmaß zuzüglich der halben Stützenstärke brz« Trägerstärke wieder ein ganzzahliges Vielfaches des Rastermaßes a/2·The connection dimensions of the assembly material are not directly integer Multiples of the grid dimension a / 2, but their connection dimension plus half the column thickness brz «girder thickness again results in an integral multiple of the grid dimension a / 2

Demzufolge besteht das Baukastensystem aus im Rastermaß a bzw. a/2 konstruierten montagefertigen Einzelteilen» die nur noch zusammengeschraubt werden müssen, um hieraus eine komplette Chemieanlage beliebiger Art herstellen zu können. Alle feile werden hierdurch leicht untereinander austauschbar.As a result, the modular system consists of a and / or a / 2 grid ready-to-assemble individual parts »which only need to be screwed together must in order to be able to manufacture a complete chemical plant of any kind from this. This makes all files easily interchangeable with one another.

Eine nach diesem Konstruktionsprinzip erreichtete Chemieanlage besitzt gegenüber der bisherigen Art Chemieanlagen zu planen, zu konstruieren, zu fertigen und zu montieren, erehebliche und entscheidende technische Vorteile.A chemical plant achieved according to this construction principle has opposite the previous way of planning, designing, manufacturing and assembling chemical plants, considerable and decisive technical advantages.

209882/0945209882/0945

Diese Vorteile sind:These advantages are:

1. Die bisher übliche Praxis, jedes einzelne Teil einer Anlage, angefangen vom Gebäude bis zum Appafcat und dessen Rohrleitungen Stück für Stück zu konstruieren, anhand der Konstruktionszeichnungen die erforderlichen Einzelteile zu bestellen, diese einzeln zu fertigen, wobai dann immer Unstimmigkeiten in den Einzelabmessungen auftreten, wird abgelöst durch ein System genormter Einzelteile, deren Abmessungen bekannt sind· Diese Einzelteile sind in moderner Serienfertigung und daher erheblich billiger herstellbar und können ohne die bisher übliche Detailplanung zu Anlagen zusammengesetzt werden.1. The usual practice up to now, every single part of a system, started from the building to the Appafcat and its pipelines piece by piece construct the required individual parts based on the construction drawings to order, to manufacture these individually, wobai then always discrepancies occur in the individual dimensions is replaced by a system of standardized individual parts, the dimensions of which are known · These individual parts can be manufactured in modern series production and are therefore considerably cheaper and can be assembled into systems without the detailed planning that has been customary up to now will.

2· Die bisher übliche Psaxip, die Planunf einer Chemieanlage in unzähligen Zeichnungen festzuhalten, kann ersetzt werden durch Planung an einem Modell { im Maßstab l:lo, das aus einem Modellbaukasten erstellbar wird. Dieser Modell— baukasten kann, da alle Einzelteile genormt sind, ebenfalls für jede neue Chemieanlage wieder benutzt werden· Da es das bevorzugte Rastersystem von a = 25o mm bei fotografischer Fixierung des Modellas ohne weiteres gestattet auch ohne Maßangaben zu erkennen, in welcher Höhe z»B. eine geplante Leitung verlaufen soll, entfällt die bisher übliche Notwendigkeit alle Teile zu vermessen· .adurch werden Planungsfehler praktisch völlig ausgeschaltet und zudem die Planung selbst weniger anfällig gegenüber Änderungen, die infolge neuer Ergebnisse der Planung erforderlich werden·2 · The hitherto common practice of recording the planning of a chemical plant in countless drawings can be replaced by planning on a model { on a scale of 1: 10, which can be created from a model kit. Can modular This model, as all items are standardized, be used again also for each new chemical plant · D a well to recognize it the preferred scanning system of a = 25o mm photographic fixing the Modellas readily permitted without dimensions, in what amount, for »B. If a planned line is to run, the previously usual need to measure all parts is no longer necessary.

3· Bisher war es kaum möglich und wenn, dann nur unter sehr hohen Kosten, eine bestehende Chemieanlage zu ändern· Eine im Rastersystem gebaute Chemieanlage ist jedoch sehr leicht zu ändern, wobei alle überflüssig gewordenen \ ^eile an anderen Stillen wieder einsetztbar sind·3 · So far it was hardly possible and if so, are einsetztbar only at very high cost to modify an existing chemical plant · A built in grid system chemical plant, however, is very easy to change, all become superfluous \ ^ hasten to other breastfeeding again ·

Die bisher übliche Art der Montage, bei der jede einzelne Leitung von hochqualifizierten Fachkräften angepaßt und hergestellt werden mußte, wird abgelöst durch ein einfaches Anschrauben vorgefertigter Teile, eine Arbeit, die auch von angelernten fachfrenden Kräften durchgeführt werden kann· Da gleichzeitig alle TeiiB montagefertig vorbereitet sind, kann die Montage selbst in wesentlich kürzerer Zeit als biöher üblich durchgeführt werden.The previously common type of assembly, in which each individual line had to be adapted and manufactured by highly qualified specialists, is being replaced by simply screwing on prefabricated parts, a job that can also be carried out by semi-skilled workers, since all T e ii B are prepared ready for assembly, the assembly itself can be carried out in a much shorter time than usual.

5. Bisher war es kaum möglich ohne genaue Kenntnis der Konstruktion einer Chemieanlage, die an einer solchen gewonnene Erkenntnis auf andere Anlagen zu übertragen. Dadurch gingen viele, an sich wertvolle Erkenntnisse wissenschaftlicher Art verloren oder waren nur bedingt verwendbar. Eine im Haster-5. Until now it was hardly possible without precise knowledge of the construction of a chemical plant to transfer the knowledge gained from such a system to other systems. As a result, many findings that were valuable in themselves went more scientific Art lost or could only be used to a limited extent. One in the haster

209882/0945209882/0945

system aus serienmäßig hergestellten Teilen gebaute Chemieanlage gestattet es jedoch» einmal gewonnene Erkenntnisse jederzeit wieder zu reproduzieren«chemical plant built from mass-produced parts however, "to reproduce knowledge once again at any time"

6. Die bisher übliche Art, besonders Versuchsanlagen, nach erfüllter Aufgabe zu verschrotten, luird abgelöst durch eine beliebig häufige Idiederveruiendbarkeit der im Rastersystem aufgebauten Uersuchsanlagentaile. Ferner werden die bei Versuchsanlagen besonders häufig erforderlichen Umbauten, die bisher nicht nur hohe Kosten verursachten, sondern auch einen erheblichen Zeitaufwand erforderten, drastisch vereinfacht und daher verbilligt.6. The type that has been customary up to now, especially test facilities, after the task has been completed to be scrapped, is replaced by an arbitrarily frequent reusability of the search system sections built up in the grid system. Furthermore, the conversions that have been required so far in test systems are particularly frequent not only caused high costs, but also a considerable expenditure of time required, drastically simplified and therefore cheaper.

^er entscheidende Fortschritt der bisher geübten Praxis Chemeieanlagen zu bauen, liegt also darin, durch den Einsatz serienmäßig hergestellter, genormter Einzelteile nicht nur die Investitionskosten drastisch zu senken, sondern auch die Bauzeit einer Chemieanlage ebenso drastisch zu verkürzen·^ he made decisive progress in the practice of chemical plants building means not only drastically reducing the investment costs by using series-produced, standardized individual parts, but also also drastically shorten the construction time of a chemical plant

Der beantragte Schutzumfang soll auch nicht dadurch eingeschränkt werden, daß es bereits z.B. Purnpün und Meßarmaturen gibt, die handelsüblich mit Anschlußmaßen von ganzzahligen Vielfachen das bevorzugten Rastermaßes a = 25o mm hergestellt werden. Diese Tatsache war vielmehr ausschlaggebend zur Wahl des bevorzugten Rastermaßes, um möglichst viele, bereits handelsüblich hergeptellts Teile einsetzen zu können.The requested scope of protection should also not be restricted by that there are already e.g. Purnpün and measuring fittings that are commercially available with connection dimensions of integer multiples the preferred grid dimension a = 25o mm getting produced. Rather, this fact was decisive in choosing the preferred grid size, to as many as possible, already commercially available To be able to use parts.

20 9 882/094520 9 882/0945

Claims (5)

PatentansprücheClaims 1. Baukastensystem für chemische Versuchs- und Produktionsanlagen bestehend aus Bauteilen für Gerüste zur Aufnahme der Chemieanlagen, den Apparaten und Maschinen für die Chemieanlage selbst, so utie Rohrleitungen und Montagematerial zur Befestigung der Apparate und Maschinen so wie der Rohrleitungen an dem Gerüst, dadurch gekennzeichnet daß alle, zur Verbindung der einzelnen Bauteile einer Chemieanlage miteinander wichtigen Konstruktionsmaße ein gazzahliges Vielfaches eines Rastermaßes a/2 sind, das durch Aufteilung des von der gesamten Chemieanlage einegnommenen Raumes in Würfel der Kantenlänge a mm in Verbindung mit der Forderung hergeleitet ist, daß Rphrleitungen vorzugsweise nur entlang der durch die Uürfelkanten gebildeten Rasterachsen laufen dürfen.1. Modular system for chemical testing and production systems consisting of components for scaffolding to accommodate the chemical plants, the apparatus and machines for the chemical plant itself, so utie pipelines and assembly material for attaching the apparatus and machines as well as the pipelines to the scaffolding, characterized in that All construction dimensions that are important for connecting the individual components of a chemical plant to one another are a whole-number multiple of a grid dimension a / 2, which is derived by dividing the space occupied by the entire chemical plant into cubes with an edge length of a mm in connection with the requirement that pipelines preferably only are allowed to run along the grid axes formed by the edges of the cubes. 2. Baukastensystem nach Anspruch lt dadurch gekennzeichnet daß alle Bauteile in diesen Rastermaß montagefertig vorgefertigt ^sind Und die Montage der einzelnen Bauteile zu einer kompletten Chemieanlage nur noch durch Zusammenschrauben dieser Bauteile durchgeführt wird.2. Modular system according to claim l t characterized in that all components are prefabricated ready for assembly in this grid dimension ^ And the assembly of the individual components to a complete chemical plant is carried out only by screwing these components together. 'Baukastensystem nach Anspruch 1 und 2, dadurch gekennzeichnet daß als Rastermaß a eine Länge von 25o mm bevorzugt wird.Modular system according to Claims 1 and 2, characterized in that a length of 25o mm is preferred as the grid dimension a. 4. Baukastensystem nach Anspruch 1 und 2, dadurcn gekennzeichnet daß als Rastermaß a Längen zwischen 5o und looo mm verwendet werden4. Modular system according to claim 1 and 2, characterized dadurcn that lengths between 5o and looo mm are used as the grid dimension a 5. Baukastensystem nach Anspruch 1 bis 3, bzw. 1, 2 und 4, dadurch gekennzeichnet daß als Konstruktionsmaterial Stahl, Edelstahl, so wie sonstige, für Chemieanlagen gebräuchliche Werkstoffe Verwendung finden. 5. Modular system according to claim 1 to 3, or 1, 2 and 4, characterized in that steel, stainless steel, as well as other materials commonly used for chemical plants are used as the construction material. 209882/0 9 45209882/0 9 45
DE19712132781 1971-07-01 1971-07-01 MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS Pending DE2132781A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE19712132781 DE2132781A1 (en) 1971-07-01 1971-07-01 MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS
GB2890172A GB1380352A (en) 1971-07-01 1972-06-20 Unit construction system for experimental and production chemical plant
FR7223806A FR2144417A5 (en) 1971-07-01 1972-06-30

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19712132781 DE2132781A1 (en) 1971-07-01 1971-07-01 MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS

Publications (1)

Publication Number Publication Date
DE2132781A1 true DE2132781A1 (en) 1973-01-11

Family

ID=5812398

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19712132781 Pending DE2132781A1 (en) 1971-07-01 1971-07-01 MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS

Country Status (3)

Country Link
DE (1) DE2132781A1 (en)
FR (1) FR2144417A5 (en)
GB (1) GB1380352A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19545252A1 (en) * 1995-11-24 1997-05-28 Helmut Kaeufer Modular and flexible plant for processing extremely hazardous materials

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2551122A2 (en) * 1983-08-05 1985-03-01 David Jean Constructive building system and elements for the implementation of this system.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19545252A1 (en) * 1995-11-24 1997-05-28 Helmut Kaeufer Modular and flexible plant for processing extremely hazardous materials

Also Published As

Publication number Publication date
FR2144417A5 (en) 1973-02-09
GB1380352A (en) 1975-01-15

Similar Documents

Publication Publication Date Title
DE1565994A1 (en) Method and device for assembling electronic devices
DE2545478C3 (en) Door leaf
DE8417057U1 (en) DRAWER
DE2615891C2 (en)
DE2132781A1 (en) MODULAR SYSTEM FOR CHEMICAL TEST PLANTS AND PRODUCTION PLANTS
DE1960222C3 (en) Wall
DE2058725A1 (en) Process for sealing joints between components
DE2006934A1 (en) Connection corner for angled connection of plates and flat pieces for model construction kit
DE2055790A1 (en) Component connection in box construction
DE3027239A1 (en) Abutting prefab. grooved concrete component connection - involves two=way threaded socket joining hooks on bridge linking undercut abutments
DE7711131U1 (en) BASE ELEMENT MADE OF CAST MATERIAL FOR THE MANUFACTURE OF A MOLDED CASTING
EP0182935A1 (en) Spacer for reinforcements in concrete constructions or the like
DE2339807B2 (en) Device for adjusting and connecting components made of concrete
DE7905408U1 (en) CLAMPS FOR THE PRODUCTION OF FORMWORK
DE7121606U (en) Parts and fasteners for demountable truss structures
DE7228866U (en) Shoring
DE8604969U1 (en) framework
DE7215162U (en) Spacers for reinforcing bars
DE2907579A1 (en) Concrete column type formwork clamp frame - has corner fish-plates with holes fitting truss elements with holes and with anchor guideway
DE7113243U (en) Multi-part assembly kit for a non-positive connection in the case of demountable truss constructions
CH597495A5 (en) Mass produced variable ornamental wrought iron trellis
DE1940894B2 (en) VALVE BATTERY
DE7609923U1 (en) FLAT GRID FOR FRAMEWORK TOY MODELS
DE6752682U (en) TWO-PIECE CORNER STRUCTURE WITH A DEVICE TO CONNECT THE TWO PIECES.
DE1287297B (en) Construction board