DE204705C DENDAT204705D DE204705DA DE204705C DE 204705 C DE204705 C DE 204705C DE NDAT204705 D DENDAT204705 D DE NDAT204705D DE 204705D A DE204705D A DE 204705DA DE 204705 C DE204705 C DE 204705C
Authority
DE
Germany
Prior art keywords
supports
frame
bulk
scaffolding
branch rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DENDAT204705D
Other languages
German (de)
Publication of DE204705C publication Critical patent/DE204705C/de
Active legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/52Cableway excavators

Description

KAISERLICHESIMPERIAL

PATENTAMT.PATENT OFFICE.

PATENTSCHRIFTPATENT LETTERING

-JVl 204705-KLASSE 19 e. GRUPPE-JVl 204705-CLASS 19 e. GROUP

Patentiert im Deutschen Reiche vom 11. März 1906 ab.Patented in the German Empire on March 11, 1906.

Bei der Ausführung von Dammschüttungen mit Hilfe von Drahtseilbahnen war es bisher üblich, die Fördergefäße von hochliegenden Seilen zu stürzen, die über so hohe Traggerüste geführt sind, daß unter den Tragseilen der für die Schüttung erforderliche freie Raum vorhanden war. Um. hohe Gerüste zu vermeiden, ist vorgeschlagen worden, senkrecht verstellbare Stützen, z. B. Schraubenpfähle, zu benutzen, die sich mit dem Wachsen der Schüttung in die Höhe schrauben, nicht aber vorwärts bewegen lassen. Ferner ist es bei diesen Anordnungen meist üblich, den äußeren Endpunkt für die Seile auf ein hohes Gerüst zu verlegen, nach welchem die Förder-• gefäße ihre Bewegung fortsetzen und von wo sie durch eine etwa halbkreisartige Schienenbahn vom einkommenden Seil auf das auslaufende Seil geleitet werden, doch sind auch Vorrichtungen bekannt, bei denen die Wagen an der Schüttungsstelle von einem Seil auf das andere abgelenkt und so ohne Berührung der Endstation nach der Ausgangsstelle zurückgeleitet werden können.It was previously the case when embankments were filled with the help of cable cars It is common to overthrow the hoist vessels from high ropes that are above such high supporting structures are performed that under the ropes of the free required for the bed Space was available. Around. To avoid tall scaffolding, it has been suggested to be vertical adjustable supports, e.g. B. Screw piles, to be used, which deal with the waxing screw up the bed, but do not let it move forward. Furthermore it is It is usually common in these arrangements to set the outer end point for the ropes at a high level To lay scaffolding, after which the conveyor • vessels continue their movement and from where it by an approximately semicircular rail track from the incoming rope to the outgoing one Rope are guided, but devices are also known in which the carriages at the dumping point of a rope on the others are distracted and thus guided back to the starting point without touching the terminus can be.

Die vorliegende Einrichtung ist dazu bestimmt, die erwähnten hohen. und teueren, u. U. auch senkrecht verstellbaren Gerüste zu vermeiden. Sie ist ebensowohl für Seilbahnen verwendbar, bei denen ein einziges Seil die doppelte Bestimmung hat, die Lasten zu tragen und sie fortzubewegen, wie auch für Seilbahnen mit festliegenden Tragseilen, auf denen die Fördergefäße mittels besonderen, endlosen Zugseiles fortbewegt werden.·
. In den Zeichnungen sind Fig. 1 und 2 sehematische Ansichten der Einrichtung zum Ausführen von Schüttungen gemäß der Erfindung.
The present device is designed to achieve the aforementioned high. and avoid expensive, possibly vertically adjustable scaffolding. It can be used just as well for ropeways, where a single rope has the dual purpose of carrying the loads and moving them, as well as for ropeways with fixed carrying ropes on which the conveyors are moved by means of special, endless pulling ropes.
. In the drawings, FIGS. 1 and 2 are schematic views of the device for carrying out pouring according to the invention.

Fig. 3 zeigt den Aufriß undFig. 3 shows the elevation and

Fig. 4 den Grundriß einer Ausführungsform des Schüttgerüstes. Fig. 4 is a plan view of an embodiment of the bulk frame.

Fig. 5 und 6 sowie Fig. 7 und 8 zeigen in Seiten- und Endansicht je eine andere Ausführungsform der Einrichtung.FIGS. 5 and 6 and FIGS. 7 and 8 each show a different embodiment in side and end views the facility.

Fig. 9 stellt ein Ausführungsbeispiel schematisch dar. ■Fig. 9 shows an embodiment schematically. ■

Fig. 10 zeigt im Grundriß einen Teil eines Schüttgerüstes mit Mitteln zur Fortbewegung über eine Zweigschiene.Fig. 10 shows in plan a part of a bulk structure with means for locomotion via a branch rail.

Fig. 11 ist ein senkrechter Schnitt nach Linie A-A von Fig. 10,Fig. 11 is a vertical section along line AA of Fig. 10,

Fig. 12 in größerem Maßstabe ein Teilgrundriß der Vorrichtung nach Fig. 10 und 11.Fig. 12 is a partial plan on a larger scale the device according to FIGS. 10 and 11.

Fig. 13 zeigt im Grundriß eine andere Ausführungsform der Umführung, undFig. 13 shows another embodiment in plan the bypass, and

Fig. 14 und 15 zeigen in Seiten- und Oberansieht eine Anordnung, bei der zwei Seile, ein Tragseil und ein Zugseil, benutzt werden.14 and 15 show in side and top views an arrangement in which two ropes, a suspension rope and a pull rope, are used.

Das endlose Seil mit den beiden parallel nebeneinander laufenden Trümerna a1 (Fig. 1) führt um Scheiben an der Ladestation b überThe endless rope with the two rubble a 1 running parallel to each other (Fig. 1) leads to disks at the charging station b

den Schüttplatz c hinweg nach dem jenseits der Schüttung liegenden Endpunkt b1 und nach b zurück. Der Schüttplatz sei beispielsweise ein Tal, in dem die Schüttung, etwa, ein Damm e (Fig. 2), ausgeführt werden soll. Das Schüttgerüst / (Fig. 1, 2 und 4) ist mit einer Zweigschiene g versehen, die die Gefäßlaufwerke d1 (Fig. 3) von dem einkommenden Trum α aufnimmt und sie, nachdem die Gefäße d gestürzt worden sind, auf das auslaufende Trum a1 übergehen läßt. Zum Führen der beiden. Seiltrümer sind Leitrollen h vorgesehen. the pouring place c away to the end point b 1 lying on the other side of the pouring and back to b . The pouring site is, for example, a valley in which the pouring, for example a dam e (FIG. 2), is to be carried out. The bulk frame / (Fig. 1, 2 and 4) is provided with a branch rail g , which receives the vessel drives d 1 (Fig. 3) from the incoming strand α and, after the vessels d have been overturned, on the outgoing strand a 1 lets pass. To guide the two. Guide pulleys h are provided for rope chunks.

Zum Heben des Gerüstes / dienen im dargestellten Beispiel drei Schraubenwinden k (Fig. 3), die durch Schneckengetriebe m und Wellen η von Hand oder sonstwie angetrieben werden können. Die senkrechte Schraubenspindel q eines jeden Hebebockes ist im Bock drehbar, aber nicht verschiebbar gelagert und durch ein Querstück s hindurchgeführt, das am oberen Ende der senkrechten Stütze r sitzt; das Querstück j gleitet beim Drehen der Spindel q in Schlitzen t an den gegenüberliegenden Seiten des Gerüstes und hebt und senkt so die Stützen r. Diese gehen unten durch eine am Gerüst angebrachte Führung u und endigen in Schuhen v, die sich entwederIn the example shown, three screw jacks k (FIG. 3), which can be driven by hand or otherwise by worm gears m and shafts η, are used to lift the scaffolding. The vertical screw spindle q of each jack can be rotated but not displaced in the jack and is passed through a cross piece s which sits at the upper end of the vertical support r; the crosspiece j slides in slots t on the opposite sides of the frame when the spindle q is turned and thus raises and lowers the supports r. These go down through a guide u attached to the frame and end in shoes v, which are either

. auf den Boden oder auf die Schüttung e aufsetzen können.. can sit on the ground or on the embankment e.

Die Mittel zum wagerechten Bewegen des Gerüstes f bestehen in diesem Beispiel aus drei pendelnd aufgehängten Stützen 1, deren jede an ihrem oberen Ende an das Gerüst angehängt ist und an ihrem unteren Ende einen Schuh 3 trägt. Die Verbindungen zwischen den Stützen 1 einerseits und dem Gerüst f und den Schuhen 3 anderseits sind gelenkig. Infolgedessen kann jede Stütze um den oberen Gelenkpunkt 2 um einen in Fig. 3 gestrichelt angedeuteten Winkel schwingen. Eine dieser Stützen ist mittels Schubstange 4 mit einer Kurbelscheibe 5 verbunden,, die mittels Schneckengetriebes 6, 7 von einer Welle 8 aus von Hand oder sonstwie gedreht werden kann.The means for moving the frame f horizontally in this example consist of three pendulum suspended supports 1, each of which is attached to the frame at its upper end and carries a shoe 3 at its lower end. The connections between the supports 1 on the one hand and the frame f and the shoes 3 on the other hand are articulated. As a result, each support can swing about the upper pivot point 2 by an angle indicated by dashed lines in FIG. 3. One of these supports is connected by means of a push rod 4 to a crank disk 5, which can be rotated by hand or otherwise by means of a worm gear 6, 7 from a shaft 8.

Um die Leitrollen h in die VerlängerungAround the guide rollers h in the extension

des Seiles α α1 einstellen zu können, kann das Gerüst f seitlich verstellt werden, zu welchem Zwecke das obere Ende jeder Stütze 1 an eine in den Gelenkpunkten 2 stellbare Schraube 50 angeschlossen wird (Fig. 4). Durch Drehen dieser Schraube 5ß kann man das Gerüst, wenn es auf den Stützen 1 ruht, um ein kleines Maß seitlich verschieben.of the rope α α 1 , the frame f can be adjusted laterally, for which purpose the upper end of each support 1 is connected to a screw 5 0 adjustable in the pivot points 2 (FIG. 4). By turning this screw 5 ß you can move the frame, when it rests on the supports 1, to the side by a small amount.

Die Betriebsweise ist folgende: Das Gerüst / ruht zunächst auf den Schuhen ν der festen Stützen r, bis die Schüttung an die Unterseite der Stützschuhe 3 der Gelenkstützen ι heranreicht. Durch Drehung der Schrauben q werden dann die Stützen r so weit eingezogen, daß die Gelenkstützen 1 das Gerüst tragen. Nach Unterfüllen der Schuhe ν wird durch Drehen der Schrauben q das Gerüst wieder gehoben, wodurch die Stützschuhe 3 von der Schüttung abgehoben werden. Nun wird das Schüttgut weiter bis an die Unterseite der Stützschuhe 3 aufgeschüttet, sodann die Stützen r eingezogen und so in regelmäßigem Wechsel fortgefahren.The mode of operation is as follows: The frame / rests initially on the shoes ν of the fixed supports r until the bed reaches the underside of the support shoes 3 of the articulated supports ι. By turning the screws q , the supports r are drawn in so far that the articulated supports 1 support the frame. After underfilling the shoes ν , the scaffolding is raised again by turning the screws q , whereby the support shoes 3 are lifted from the bed. Now the bulk material is poured further up to the underside of the support shoes 3, then the supports r are drawn in and so continued in regular alternation.

Zur Erweiterung der Schüttung bringt man die Stützschuhe 3 zum Aufsetzen, so daß die Gelenkstützen 1 das Gerüst f tragen. Dann wird das Gerüst dadurch wagerecht verschoben, daß man die Stützen 1 um ihre unteren Gelenkpunkte an den Stützschuhen 3 durch Antreiben der Vorrichtung 5, 6, 7, 8 ausschwingt; dabei werden die oberen Enden der Stützen 1 und das an den Gelenkpunkten 2 damit verbundene Gerüst vorwärts bewegt. Darauf werden wieder die festen Stützen r gesenkt, so daß sie das Gerüst tragerf; die Stützen ι werden um die Gelenkpunkte 2 vorwärts geschwenkt, und so wird durch entsprechenden Wechsel das Gerüst schrittweise vorwärts bewegt.To expand the bed, the support shoes 3 are put on so that the joint supports 1 support the frame f . Then the frame is shifted horizontally by swinging the supports 1 about their lower hinge points on the support shoes 3 by driving the device 5, 6, 7, 8; in the process, the upper ends of the supports 1 and the scaffolding connected to them at the pivot points 2 are moved forward. Thereafter, the solid supports are r lowered again so that they tragerf the scaffold; the supports ι are pivoted forward about the hinge points 2, and so the frame is moved forward step by step by means of a corresponding change.

Fig. 5 und 6 zeigen in Seiten- und Endansicht eine andere Ausführungsform des Schüttgerüstes.Figs. 5 and 6 show in side and end views another embodiment of the Bulk structure.

Hier hat das Gerüst f zwei Paar Stützen r mit Schuhen v. Auf jede Stütze kann man mit einer besonderen Schraubenwinde k1 einwirken, die mittels Zahnräder m1 von einer Welle μ1 aus bewegt wird und deren Schraubenspindel q in ein oben an der betreffenden Stütze r sitzendes Querstück .5 eingeschraubt ist. Jedes der zwei Paar Stützschuhe 3 sitzt an einer Stütze 7a, die durch eine Schraubenmutter 8° mit einer Schraubenspindel 9 verbunden ist; letztere kann in Lagern 10 am Gerüst f gedreht, aber nicht verschoben werden. Die Drehung kann mittels Kegelräder 11 von einer von Hand oder sonstwie zu drehenden Welle 12 erfolgen. Werden die Stützen r mit ' den Schuhen ν eingezogen, so daß die Stützschuhe 3 sich auf die Schüttung e aufsetzen 105 ■ und das Gerüst / tragen, so kann letzteres durch gleichzeitiges Vorwärtsschrauben aller Schraubenspindeln 9 in den Muttern 8a vorwärts bewegt werden.Here the frame f has two pairs of supports r with shoes v. A special screw jack k 1 can act on each support, which is moved by means of gear wheels m 1 from a shaft μ 1 and whose screw spindle q is screwed into a crosspiece .5 at the top of the relevant support r. Each of the two pairs of support shoes 3 sits on a support 7 a , which is connected by a screw nut 8 ° with a screw spindle 9; the latter can be rotated in bearings 10 on the frame f , but not moved. The rotation can take place by means of bevel gears 11 from a shaft 12 to be rotated by hand or in some other way. If the supports r with 'the shoes ν are drawn in, so that the support shoes 3 sit on the bed e 105 ■ and carry the frame /, the latter can be moved forward by simultaneously screwing all the screw spindles 9 forward in the nuts 8 a .

Bei dieser Ausführungsform ist auch ein seitliches Einstellen des Gerüstes vorgesehen. Die oberen Enden der Stützen r sind an den Querstücken s gelenkig aufgehängt (Fig. 6), und es kann durch Schwingen dieser Stützen r mittels passender Bewegungsvorrichtungen, wie z. B. der Teile 15 bis 18, eine Querbewegung derselben Art ausgeführt werden, wie bei der Anordnung nach Fig. 3 die Längsbewegung durch Schwingen der Stützen 1.In this embodiment, a lateral adjustment of the frame is also provided. The upper ends of the supports r are hinged to the cross pieces s (Fig. 6), and by swinging these supports r by means of suitable movement devices, such as. B. of parts 15 to 18, a transverse movement of the same type can be carried out as in the arrangement according to FIG. 3, the longitudinal movement by swinging the supports 1.

Fig. 7 und 8 zeigen Seiten- und Kopfansichten einer anderen Ausführungsform der Vorrichtung für die Seitenbewegung des Schutt-Figures 7 and 8 show side and top views of another embodiment of the device for the lateral movement of the rubble

Claims (6)

gerüstes f mittels Spindeln. Hier sind, wie in Fig. 5 und 6, die Stützen r an ihren oberen Enden gelenkig mit dem Gerüst verbunden, gehen aber nahe an ihren unteren Enden durch je einen am Gerüst sitzenden Führungsring 23. Durch seitliche Ansätze 24 des letzteren führt ein Paar Schraubenspindeln 25, die durch feste Lager 26 mit dem Gerüst drehbar verbunden sind, jede der Spindeln kann mittels Schneckengetriebes 27 von einer Welle 28 gedreht werden, die durch Kegelräder 29 mit einer .von Hand oder sonstwie zu drehenden Antriebswelle 30 in Verbindung steht. Durch Drehung der Schraubenspindehi: 25 lassen sich die Führungsringe 23 nach der einen oder anderen Seite zur seitlichen Verlegung des Gerüstes / bewegen. Bei dem in Fig. 9 schematisch gezeigten Ausführungsbeispiel können sowohl die senkrechten als die wagerechten Bewegungen mittels der Stützen r erreicht werden. Hier sind die beiden Stützen mit ihren oberen Enden an die Querstücke s angelenkt, mit denen die Schrauben q der Hebeböcke verbunden sind, und sie können in senkrechten Ebenen bis zu den gestrichelten Lagen rs und r4 ausschwingen. Jede Stütze ist durch einen Lenker 31 beispielsweise mit einer Zahnstange 32 verbunden , die mittels Zahnrades 33 und Schneckengetriebes 34 von einer Welle 35 bewegt werden kann, um die Stütze um ihr oberes Ende auszuschwingen, nachdem sie von der Schüttung abgehoben ist, oder um sie um ihren Schuh ν auszuschwingen, wenn dieser auf die Schüttung aufgesetzt ist. In diesem Beispiel sind außerdem an. der Unterseite des Gerüstes f Schuhe 3" befestigt. Die Vorgänge beim Heben und Vorrücken des Gerüstes sind im wesentlichen dieselben wie die bereits be-. schriebeneni; es wird nämlich das Gerüstgewicht abwechselnd von den Schuhen ν und 3° aufgenommen. Wie Fig. 5 zeigt, kann das Schüttgerüst / mit einem bekannten Verteilorgan, z. B. einem endlosen Band 36, versehen sein, um das Schüttgut aus den Gefäßen d über die Schüttung e zu verteilen. Das Verteilband läuft um Scheiben 37, die an einem Ausleger 38 ge-. lagert sind; dieser ist an seinem inneren Ende um eine durch die Zapfen 39 und 41 gehende senkrechte Achse drehbar. Er ist mit einem Füllrumpf 42 versehen, der das aufgenommene Schüttgut dem, Verteilband 36 zuführt. Die hintere von den Leitscheiben 37 des Verteilers wird von einem Motor 43 angetrieben. Fig. 10 bis 12 zeigen- einen Teil eines Schüttgerüstes, das mit bekannten Mitteln versehen ist, um die Gefäßlaufwerke d1 über die Zweigschiene g fortzubewegen. Hier ist eine endlose Kette 44 mit Rollen 45 vorgesehen, die um einen festen, der Innenseite der Zweigschiene konzentrisch gegenüberliegenden Stützkörper 46 und um eine Treibscheibe 47 führt. Die Kette trägt in gewissen Abständen wagerecht drehbare, nach außen vortretende Mitnehmer 48, die die Vorsprünge 49 der Gefäßlaufwerke d1 ergreifen und diese mit den daran hängenden Gefäßen an der Zweigschiene g entlang bewegen. Fig. 13 zeigt eine andere Ausführungsform der Umführung, bei der ein Arm 50, der am Gerüst drehbar ist und von diesem aus bewegt wird, auf die Gefäßlaufwerke einwirkt und sie über die Zweigschiene g fortbewegt. Zu diesem Zwecke können auch zwei oder mehr an einer gemeinsamen Nabe sitzende Arme vorgesehen sein. Bei der Anordnung in Fig. 14 und Γ5 sind außer den Tragseilen 51° und ζΐα noch besondere Zugseile α und α1 vorgesehen. Mittels am Schüttgerüst / gelagerter Leitrollen h1 werden die Tragseile 51° und 510 getragen und,über und an der Zweigschiene g vorbeig'eführt. Am Schüttgerüst gelagerte Leitrollen h führen die Zugseile aa1 über die Zweigschiene. In jedem Fall werden mit dem Fortschreiten der Schüttung e auf dieser in passenden Abständen hinter dem Schüttgerüst / kurze Stützen 51 (Fig. 2) angebracht, um die zwischen dem Gerüst / und der Ladestelle liegenden Seilteile zu stützen. Statt als Schüttgerüst kann die Einrichtung auch als Ladegerüst benutzt'werden, etwa derart, daß die Gefäße von einem einkommenden Seil auf eine Zweigschiene übergeführt werden, dort beladen und sodann auf das auslaufende Seil befördert werden. Paten τ-Ansprüche:scaffolding f by means of spindles. Here, as in FIGS. 5 and 6, the supports r are articulated to the frame at their upper ends, but pass close to their lower ends through a guide ring 23 each seated on the frame. A pair of screw spindles lead through lateral lugs 24 of the latter 25, which are rotatably connected to the frame by fixed bearings 26, each of the spindles can be rotated by means of worm gear 27 from a shaft 28 which is connected by bevel gears 29 to a drive shaft 30 to be rotated by hand or in some other way. By turning the screw spindles 25, the guide rings 23 can be moved to one side or the other to move the scaffolding sideways. In the embodiment shown schematically in FIG. 9, both the vertical and the horizontal movements can be achieved by means of the supports r. Here the two supports are hinged with their upper ends to the cross pieces s, with which the screws q of the lifting jacks are connected, and they can swing out in vertical planes up to the dashed positions rs and r4. Each support is connected by a link 31, for example, to a rack 32, which can be moved by a shaft 35 by means of a gear 33 and worm gear 34 in order to swing the support around its upper end after it has been lifted from the bed, or around it to swing their shoe ν when it is placed on the bed. This example is also on. The processes of lifting and advancing the scaffolding are essentially the same as those already described; namely, the weight of the scaffolding is alternately taken up by the shoes ν and 3 °. As FIG. 5 shows , the bulk structure / can be provided with a known distribution element, e.g. an endless belt 36, in order to distribute the bulk material from the vessels d over the bulk material e. This is rotatable at its inner end about a vertical axis passing through the pins 39 and 41. It is provided with a filling body 42, which feeds the received bulk material to the distributor belt 36. The rear one of the guide disks 37 of the distributor driven by a motor 43. Figures 10 to 12 show part of a bulk structure provided with known means for moving the vessel drives d1 over the branch rail G. Here is an endless chain te 44 provided with rollers 45, which leads around a fixed support body 46 concentrically opposite the inside of the branch rail and around a traction sheave 47. The chain carries horizontally rotatable, outwardly protruding drivers 48 at certain intervals, which grip the projections 49 of the vessel drives d1 and move them along with the vessels hanging thereon along the branch rail g. 13 shows another embodiment of the bypass, in which an arm 50, which is rotatable on the framework and is moved from this, acts on the vessel drives and moves them along the branch rail g. For this purpose, two or more arms seated on a common hub can also be provided. In the arrangement in Fig. 14 and Γ5, in addition to the suspension cables 51 ° and ζΐα, special traction cables α and α1 are provided. The carrying ropes 51 ° and 510 are carried by means of guide rollers h1 mounted on the bulk frame / mounted and guided over and past the branch rail g. Guide rollers h mounted on the bulk structure guide the pull cables aa1 over the branch rail. In any case, as the bulk material progresses, short supports 51 (FIG. 2) are attached to it at suitable intervals behind the bulk structure in order to support the rope parts lying between the structure / and the loading point. Instead of being used as a pouring frame, the device can also be used as a loading frame, for example in such a way that the vessels are transferred from an incoming rope to a branch rail, where they are loaded and then conveyed onto the outgoing rope. Sponsorship τ claims: 1. · Einrichtung an Seilbahnen zur Massenförderung, wobei die Gefäßlaufwerke vom einkommenden Seil auf das auslaufende Seil übergeführt werden, dadurch gekennzeichnet, daß die Seile, die sich von einer Ladestelle über die Schüttstelle nach einer Endstelle erstrecken und zum Tragen und Bewegen der Gefäßlaufwerke dienen, durch ein senkrecht und wagerecht bewegbares Schüttgerüst hindurchgeführt sind.1. · Facility on cable cars for mass transportation, with the vascular drives be transferred from the incoming rope to the outgoing rope, thereby marked that the ropes that extend from a loading point over the dumping point after extend to a terminal point and serve to carry and move the vessel drives, are passed through a vertically and horizontally movable bulk structure. 2. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Schüttgerüst mit Schrauben zum genauen seitlichen Einstellen in die Richtung der Seile versehen ist.2. Device according to claim 1, characterized in that the bulk structure is provided with screws for precise lateral adjustment in the direction of the ropes. 3. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß an dem Schüttgerüst ff) zwei Gruppen von Stützen angebracht sind, von denen die eine zur Höhenbewegung, die andere zur Längsbewegung des Gerüstes dient.3. Device according to claim 1, characterized in that two groups of supports are attached to the bulk frame ff) , one of which is used for vertical movement, the other for longitudinal movement of the frame. 4. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die zur Längs-4. Device according to claim 1, characterized in that the longitudinal bewegung dienenden Stützen pendelnd an dem Gerüst angehängt sind und an ihrem unteren Ende gelenkig angehängte Schuhe tragen, sowie daß diese Stützen mit einem Antrieb versehen sind, durch den sie aus ihrer senkrechten Lage ausgeschwungen werden können.Movement serving supports are pendulum attached to the frame and to their lower end to wear articulated shoes, as well as that these supports with a Drive are provided by which they can be swung out of their vertical position. 5. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die zur Längsbewegung des Gerüstes dienenden Schuhe5. Device according to claim 1, characterized in that the longitudinal movement the scaffolding shoes (3) derart an dem Gerüst angebracht sind, daß dieses über die Schuhe nach vorwärts gleitet.(3) are attached to the scaffolding in such a way that it is forward over the shoes slides. 6. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß eine Gruppe der am Schüttgerüst angebrachten Stützen weder in der Länge noch in der Höhe verschiebbar ist, während die zweite Gruppe dieser Stützen sowohl für Längs- als auch für Höhenbewegung eingerichtet ist.6. Device according to claim 1, characterized in that a group of The supports attached to the bulkhead can neither be moved in length nor in height, while the second group this supports is set up for both longitudinal and vertical movement. Hierzu 2 Blatt Zeichnungen.For this purpose 2 sheets of drawings.
DENDAT204705D Active DE204705C (en)

Publications (1)

Publication Number Publication Date
DE204705C true DE204705C (en)

Family

ID=467011

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT204705D Active DE204705C (en)

Country Status (1)

Country Link
DE (1) DE204705C (en)

Similar Documents

Publication Publication Date Title
DE3032559A1 (en) MOVABLE BAND CONVEYOR, IN PARTICULAR PLATE BAND CONVEYOR FOR CRUSHING PLANTS
DE2742498C3 (en) Device for picking up and conveying bulk goods
DE2231268C3 (en) Storage device for round, preferably conical, bulk material heaps
DE204705C (en)
DE3642718A1 (en) STEEP CONVEYOR
DE891730C (en) Luffing crane
DE556238C (en) Loading machine
DE1756635C3 (en) Device for reloading bulk material from a dump
DE959677C (en) A crane that is arranged on a vehicle and can be folded into the traffic position
DE3490207T1 (en) Scraper device for sedimentation basins
DE3026884C2 (en)
DE803527C (en) Conveyor device
DE464912C (en) Mobile manure loader with loading bridge
AT139890B (en) Device for continuous cleaning of the ballast of railway lines.
DE3210013C2 (en) Mobile or stationary conveyor basket loading device
DE692254C (en) Mobile track lifting winch
DE2543545A1 (en) DEVICE FOR STORAGE OF FLAT BODIES, IN PARTICULAR TILES
DE2350097C3 (en)
DE1125355B (en) Open pit mining equipment
DE1243103B (en) System for removing a heap of debris from a storage area
DE1032298B (en) Mobile device for loosening, picking up and loading the bedding residues lying on the edge of a railroad track
DE1813955C3 (en) Return of the conveyor belt system with a loading trolley
DE669024C (en) Adjustment mechanism for roller heads of combined bridge and cantilever track back machines
DE943217C (en) Conveyor equipment such as spreaders, excavators or the like with a conveyor which can be pivoted in a horizontal and vertical plane and is provided with a counterweight arm
DE968991C (en) Device intended for open-cast mining to withstand deposits in coal