DE2040949A1 - Pipe handling device for oil drilling towers or the like. - Google Patents

Pipe handling device for oil drilling towers or the like.

Info

Publication number
DE2040949A1
DE2040949A1 DE19702040949 DE2040949A DE2040949A1 DE 2040949 A1 DE2040949 A1 DE 2040949A1 DE 19702040949 DE19702040949 DE 19702040949 DE 2040949 A DE2040949 A DE 2040949A DE 2040949 A1 DE2040949 A1 DE 2040949A1
Authority
DE
Germany
Prior art keywords
arrangement
pipe
assembly
derrick
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19702040949
Other languages
German (de)
Inventor
Mitchell Joseph A
Dyer Norman D
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dresser Industries Inc
Original Assignee
Dresser Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dresser Industries Inc filed Critical Dresser Industries Inc
Publication of DE2040949A1 publication Critical patent/DE2040949A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

DRESSER INDUSTRIES INC. Republic National Bank Building Dallas, Texas 75221, USADRESSER INDUSTRIES INC. Republic National Bank Building Dallas, Texas 75221, USA

Rohrhandhabungsvorrichtung für ölbohrtürrae oder dgl.Pipe handling device for oil drilling turret or the like.

Es wird eine Rohrhandhabungsvorrichtung geschaffen, die ineinem Bohrturm währenddes Bohrens von öl- und Gasquellen oder dgl. angewandt wird. Während der Reisen in und aus dem Bohrloch wird Bohrrohr entfernt oder zusätzlich angeordnet in Form von Zügen, die aus einer Mehrzahl kurzer Rohrabschnitte bestehen. Diese Rohrhandhabungsvorrichtung weist einen überführungsarm auf, der aus einem Pantographmechanlsmus besteht, welcher ein mit dem Rohr in Eingriff kommendes und dasselbe abstützendes Bauteil trägt. Der überführungsarm liegt beweglich auf Gleisen vor, wodurch die Rohrzüge senkrecht zwischen der Rohrhandhabungsfläche und der Mittellinie des Bohrlochs bewegt werden können.A pipe handling device is provided which is incorporated in a Rig is used during drilling of oil and gas wells or the like. While traveling in and out of the borehole will Drill pipe removed or additionally arranged in the form of trains consisting of a plurality of short pipe sections. These Pipe handling device has a transfer arm consisting of a pantograph mechanism which is connected to the Pipe engaging and carries the same supporting member. The transfer arm is movable on rails, whereby the pipe runs can be moved perpendicularly between the pipe handling surface and the centerline of the wellbore.

Die Erfindung betrifft allgemein eine Rohrhandhäbungsvorrlchtung und Insbesondere,jedoch nicht ausschließlich, eine Rohrhandhabungsvorrichtung für das Handhaben senkrecht angeordneter Rohrabschnitte in einem Bohrturm, wie er zum Erbohren von öl und Gasquellen oder dgl. angewandt wird.The invention relates generally to a pipe handle device and particularly, but not exclusively, a pipe handling device for handling vertically arranged pipe sections in a derrick, such as those used for drilling oil and gas wells or the like. Is applied.

Es sind bereits verschiedene Arten an Rohrhandhabungsvorrlchtungen für den Zweck eines Bewegens der Rohrabschnitte zwischen der Mittellinie des Bohrlochs und einer Rohrhandhabungsbühne in dem Bohrturm bekannt geworden. Eine typischer derartige Vorrichtung nach dem Stand der Technik für die Handhabung von Rohren ist in der US-Patentschrift 2 730 246 beschrieben.There are already several types of pipe handling devices for the purpose of moving the pipe sections between the Center line of the wellbore and a pipe handling platform in the derrick become known. A typical such device prior art for pipe handling is disclosed in U.S. Patent 2,730,246.

Nach dieser Patentschrift sind Rohrhandhabungsvorrichtungen bekannt, die gieismechanismen oder Schraubenspindeln für das Handhaben des Rohreingriffteils derselben in geradliniger Weise besitzen, so daß die Rohrzüge in dem Bohrturm in der recht kleinen Fläche gehandhabt werden können, die für diesen Zweck vorliegt.According to this patent, pipe handling devices are known the casting mechanisms or screw spindles for handling of the pipe engagement part of the same in a straight line, so that the pipe runs in the derrick in the very small Surface can be handled that is available for this purpose.

109809/0278 - 2 -109809/0278 - 2 -

Da die Vorrichtung auf geradlinige Bewegungen beschränkt ist, muß die Rohrnandhabung einen vorbeschriebenen Verfahren folgen, wobei jeder der Rohrzüge notwendigerweise aufgrund der begrenzten Bewegungen der Rohrhandhabungsvorrichtung angeordnet wird.Since the device is limited to linear movements, the pipe handling must follow a previously described procedure, each of the pipe runs being necessarily positioned due to the limited movements of the pipe handling device.

Eine der Erfindung zugrundeliegende Aufgabe besteht darin, eine verbesserte Rohrhandhabungsvorrichtung für das Anwenden in einem Bohrturm für die Handhabung senkrecht angeordneter Rohrabschnitte zu schaffen, die schnell angewandt und in gewünschter Weise wirksam die Rohrabschnitte in entsprechende Lagen bringt.An underlying object of the invention is to provide a to provide improved pipe handling apparatus for use in a derrick for handling vertically arranged pipe sections that are quickly applied and in the desired manner Way effectively brings the pipe sections in appropriate positions.

Eine weitere der Erfindung zugrundeliegende Aufgabe besteht darin, eine verbesserte Rohrhandhabungsvortichtung zu schaffen, die extrem unanfällig ist und leicht an bereits vorhandenen Bohranlaaen installiert werden kann und Vielseitigkeit dergestalt besitzt, daß man in der Lage ist die Rohrabschnitte in einer sehr kompakten Fläche der Rohranlage anzuordnen.Another object of the invention is to provide an improved pipe handling device, which is extremely unsusceptible and easy to install on existing drilling rigs and has the versatility to be able to cut pipe sections in to be arranged in a very compact area of the pipe system.

Eine weitere der Erfindung zugrundeliegende Aufgabe besteht darin, eine verbesserte Rohrhandhabungsvorriehtung zu schaffen, die vollständig automatosiert werden kann, wodurch die manuelle Arbeitskraft verringert wird, die ansonsten bei der herkömmlichen Rohrhandhabung erforderlich ist.Another object of the invention is to provide an improved pipe handling device, which can be fully automated, reducing the manual labor otherwise required in traditional pipe handling.

Die erfindungsgemäße Vorrichtung zur Handhabung von Rohren zwecks Bewegen und Tragen senkrechter Rohrabschnitte in einem Bohrturm ist dadurch gekennzeichnet, daß eine Befestigungsanordnung für das Tragen der Vorrichtung in dem Bohrturm, eine Übertragungsanordnung getragen durch die Befestigungsanordnung, wobei die Armanordnung ein äußeres Teil aufweist, das praktisch senkrecht angeordnet ist und schwenkbar an der Befestigungsanordnung angeordnet ist, ein inneres Teil in einem parallelen Verhältnis zu dem äußeren Teil vorliegt, sowie eine Verbindungsanordnung sich zwischen den inneren und äußeren Teilen erstreckt und mit denselben in Arbeitsverbindung steht unter Aufrechterhalten eines parallelen Verhältnisses derselben, sowie eine Rohreingriffsanordnung angeordnet an dem inneren Teil für einen Eingriff und das Tragen der senkrechten Abschnitte des Rohrs in dem Bohrturm vorgesehen sind.The inventive device for handling pipes for the purpose Moving and carrying vertical pipe sections in a derrick is characterized in that a fastening arrangement for carrying the device in the derrick, a transmission assembly carried by the mounting assembly, the Arm assembly comprises an outer part which is arranged practically perpendicularly and is pivotably arranged on the mounting arrangement, an inner part in a parallel relation to it the outer part is present and a connector assembly extends between and is operatively connected to the inner and outer parts while maintaining one parallel relationship thereof, as well as a pipe engagement arrangement disposed on the inner part for engagement and the support of the vertical sections of the pipe are provided in the derrick.

- 3 -109809/0278 - 3 - 109809/0278

Lin Ausführungsbeispiel der Erfindung ist in den beigefügten Zeichnungen dargestellt und wird im folgendennäher beschrieben: Es zeigen:An embodiment of the invention is shown in the accompanying drawings Drawings and is described in more detail below: They show:

Fig. l/v und IE stellen zusammengenommen einen Seitenaufriß eines Bohrturms einschließlich der erfindungsgemäßen Rohrhandhabungs vorrichtung dar, v.'obei zwecks deutlicher Darstellung gewisse Teile weggelassen sind;Figures l / v and IE taken together represent a side elevation a derrick including the pipe handling device according to the invention device, v.'this for the purpose of clear representation certain parts are omitted;

Fig. 2Λ und 2B stellen zusammengenommen einen Vorderaufriß des Bonrturms dar, in dem die erfindungsgemäße Rohrhandhabungsvorrichtung angeordnet ist; Figs. 2Λ and 2B, taken together, represent a front elevation of the Bonrturm represents in which the pipe handling device according to the invention is arranged;

rig. 3 eine Ansicht querseitlg zu dein Bohrturm und zeigt das Hoitrhandhabungs gebiet;rig. 3 shows a transverse view of your derrick and shows this Hoitr Handling Area;

Fig. 4 ist ein vergrößerter Aufriß des Uberführungsarms der Rohrhandhabungsvorrichtung;Fig. 4 is an enlarged elevational view of the transfer arm of the pipe handling apparatus;

Fig. 5 eine Querschnittsansicht praktisch längs der Linie54-45 nacn der Fig. 4,·Figure 5 is a cross-sectional view taken substantially along line 54-45 according to Fig. 4, ·

Fig.6 eine schematische Ansicht und zeigt den Laufweg der Rohrabschnitte zwischen der Mittellinie des Bohrlochs und einer Lage in der Handhabungsfläche des Bohrturms.6 is a schematic view and shows the path of the pipe sections between the center line of the borehole and a position in the handling surface of the derrick.

Unter Bezugnahme auf die Fig. IA und IB ist dort eine Bohranlage IO mit einem Bohrturm 12 gezeigt, der schwenkbar bei 14 an dem Basisteil oder Bühne 16 angelenkt ist. Streben 18 tieren untere Enden mit dem Basisteil 16 verbunden sind, sind in geeigneter Welse an dem Bohrturn unter Halten desselben in der senkrechte oder aufrechten Lage, wie gezeigt, befestigt.Referring to Figures IA and IB, there is a drilling rig IO shown with a derrick 12 pivotable at 14 is hinged to the base part or stage 16. Strive 18 animals lower ends connected to the base part 16 are in a suitable catfish on the drilling turn while keeping the same in the vertical or upright position as shown.

Das Basisteil 16 trägt ein Hebewerk, nicht gezeigt, und einen Drehtisch 20, der auf der Mittellinie des Bohrloehes angeordnet ist. Abfangkeile 22 und Gestängezangen 24 sind für den Zweck vorgesehen, die Bohrkolonne 26 in dem Bohrloch zu tragen, sowie zu dem Zweck die Bohrkolonne 26 aus Zügen 28 des Bohrrohrs zusammenzusetzen oder die Bohrkolonne 26 in die Züge 28 zu zerlegen. The base part 16 carries an elevator, not shown, and a turntable 20 which is arranged on the center line of the borehole is. Slips 22 and linkage tongs 24 are for the purpose provided to support the drilling column 26 in the borehole, and for the purpose of assembling the drilling column 26 from pulls 28 of the drill pipe or to disassemble the drilling column 26 into the trains 28.

Ein Zug 28 besteht aus einer oder mehreren Einheiten aus Bohrrohr. Jede Einheit weist eine Länge von etwa 7 bis 14 in auf. Die Bohrkolonne 26 besteht aus einer Mehrzahl von miteinander verschraubten Sügen 28.A train 28 consists of one or more units of drill pipe. Each unit is approximately 7-14 inches in length. The drilling column 26 consists of a plurality of screws 28 screwed together.

10 9809/0278 ' 4 "10 9809/0278 ' 4 "

BADBATH

Die Bohranlage 10 weist ebenfalls eine Fläche für das Handhaben der Züge 28 auf. Diese Fläche trägt das Bezugszeichen 30 fcnd ist in der Fig. IA als ein Teil des Basisteils 16 gezeigt. Die Fläche 3O ist gegenüber der Mittellinie des Bohrloches versetzt, so daß die Züge 28 in der Bohranlage 10 dort gehandhabt werden können, wo die entsprechenden Vorgänge die Arbeitsgänge nicht beeinträchtigen, die längs der Mittellinie des Bohrloches ausgeführt werden.The drilling rig 10 also has a surface for handling the pulls 28. This area bears the reference number 30 and is shown as part of the base part 16 in FIG. 1A. The area 3O is offset from the center line of the borehole so that the trains 28 in the drilling rig 10 can be handled there, where the operations involved do not interfere with operations being carried out along the center line of the borehole.

Längere Gleise oder Führungen 32 sind am Bohrturm 12 befestigt und erstrecken sich über ein erhebliches Teil des Bohrturms 12. Die Gleise 32 sind für das Einstellen der Lage des Laufblocks 34 und eines Elevators 36 vorgesehen, der mit dem unteren Ende des Laufblockes 34 verbunden ist.Longer tracks or guides 32 are attached to the derrick 12 and extend over a substantial portion of the derrick 12. The tracks 32 are for adjusting the position of the running block 34 and an elevator 36, which is connected to the lower end of the barrel block 34.

Der Laufblock34 ist mit dem Hebewerk (nicht gezeigt), über ein Kabelsystem 38 verbunden, das sich von dem Laufblock 34 aus nach oben über einen Kronenblock 4O erstreckt, der an dem oberen Ende des Bohrturms 12 angeordnet ist. Das Kabelsystem 38 ermöglicht das Anheben und Absenken des Laufblocks 34 in dem Bohrturm 12 längs der Gleise 32.The barrel block 34 is connected to the elevator (not shown) via a Cable system 38 connected, which extends from the barrel block 34 to extends above a crown block 4O, which at the upper end of the derrick 12 is arranged. The cable system 38 enables the running block 34 to be raised and lowered longitudinally in the derrick 12 of track 32.

Die Bohranlage 10 weist eine obere Rohrhandhabungsvorrichtung und eine untere Rohrhandhabungεvorrichtung 44 auf. Wie in der Fig. 1 b gezeigt, weist die obere Rohrhandhabungsvorrichtung einen Rahmen 46 auf, der ein Paar im Abstandeverhältnis vorliegender Gleisteile 48 und 50 trägt. An den Gleisen 48 und 50 ist beweglich eine obere Überführungsarmanordnung 52 vorgesehen, uieliQ einzelnen in den Fig. 4 und 5 wiedergegeben ist.The drilling rig 10 has an upper pipe handling device and a lower pipe handling device 44. Like in the Fig. 1b shown, the upper pipe handling device on a frame 46, the a pair in the spacing ratio present Track parts 48 and 50 carries. An upper transfer arm assembly 52 is movably provided on tracks 48 and 50, uieliQ is shown individually in FIGS. 4 and 5.

Die oberen und unteren Träger 54 und 56 verbinden beweglich den Uberführungsarm 52 mit den Gleisen 48 und 50. Die Träger 54 und/ oder 56 können mit einem Motor oder ähnlicher Vorrichtung für die Bewgung des überführungsarms 52 längs der Gleise 48 und 50 versehen sein. Weiterhin wird entweder der obere oder untere Träger 54 oder 56 einen Servomotor 58 aufweisen für das Schwenken des Überführungsanne 52 relativ zu den Gleisen 48 und 50. Gegebenenfalls können die Träger 54und 56 mit den Gleisen 46 und 50 verbunden und die Gleise relativ zu dem Rahmen 46 bewegt werden.The upper and lower beams 54 and 56 movably connect the transfer arm 52 to the tracks 48 and 50. The beams 54 and / or 56 may be provided with a motor or similar device for moving the transfer arm 52 along the tracks 48 and 50. Furthermore, either the upper or lower beam 54 or 56 will have a servomotor 58 for pivoting the transfer pan 52 relative to the rails 48 and 50. If necessary, the beams 54 and 56 can be connected to the rails 46 and 50 and the rails relative to the frame 46 be moved.

Zwischen den Trägern 54 und 56 erstreckt sich ein äußeres Teil 60. Das äußere Teil CD liegt in Form eines hohlen Trägers vorAn outer part 60 extends between the beams 54 and 56. The outer part CD is in the form of a hollow beam

109809/0278 " 5 "109809/0278 " 5 "

2OA09492OA0949

und 1st so angeordnet, daß hierdurch beweglich das untere Ende eines Paares Verbindungsglieder oder Teile 62 getragen und schwenkbar das obere Ende eines zweiten verbindungsteils 64 getragen wird. Die Verbindungsteile 62 und 64 sind schwenkbar vermittels eines Stiftes 66 verbunden.and is arranged to thereby movably support and pivot the lower end of a pair of links or members 62 the upper end of a second connector 64 is carried. The connecting parts 62 and 64 are pivotable by means of a Pin 66 connected.

Die oberen Enden der Teile 62 sind schwenkbar mit dem oberen Ende eines oberen Teils eines Inneren Endes 68 verbunden, das praktisch parallel zu dem äußeren Teil 60 angeordnet ist. Das innere Teil 68 ist ebenfalls ein hohler Träger und so angeordnet, daß hierdurch beweglich das untere Ende des Verbindungsteils 64 getragen wird.The upper ends of the parts 62 are pivotable with the upper end an upper part of an inner end 68 connected, practically is arranged parallel to the outer part 60. The inner part 68 is also a hollow support and is arranged to movably support the lower end of the connector 64 therethrough.

Der überführungsarm 52 ist eine geoaetrische Konstruktion, die gelegentlich als ein Pantograph bezeichnet wird. Dies bedeutet, daß die Bauart dergestalt gewählt 1st, daß die Bewegung der unteren Ende der Verbindungsteile 62 und 64 dazu führt, daß die Verbindungsteile um den Stift 66 geschwenkt werden, wodurch das innere Teil 68 relativ in Richtung auf und weg von dem äußeren Teil 60 bewegt wird.The transfer arm 52 is a geoaetrische construction that occasionally referred to as a pantograph. This means that the design is chosen in such a way that the movement of the lower End of the connecting parts 62 and 64 leads to the fact that the connecting parts are pivoted about the pin 66, whereby the inner part 68 is moved relatively toward and away from the outer portion 60.

Um die Bewegung der Enden der Verbindungsteile 62 und 64 zu beiwirken, ist eine linerare Betätigungsvorrichtung 70, wie ein hydraulischer Zylinder in dem äußeren Teil 60 so angeordnet, daß dessen unteres Ende in Verbindung mit den unteren Enden der Verbindungsteile 62 steht. Das Betätigen der linearen Betätigungsvorrichtung 70 bewegt die unteren Enden der Verbindungstelle 62 und 64 relativ in Richtung auf die schwenkbar angelenkten oberen Enden, wodurch das innere Teil68 relativ zu dem äußeren Teil 60 bewegt wird. An dem inneren Teil 68 liegt beweglich angeordnet ein Rohreingriff steil 72 vor. Das Rohreingriffsteil 72 weist eine Ausnehmung 74 in dessen äußeren Endteil mit entsprechender Größe für die Aufnahme des Bohrrohrs auf. Die Ausnehmung 74 ist so angeordnet, daß dieselbe über das Rohr paßt, jedoch ausreichend klein dergestalt, daß die vergrößerten Kupplungsstücke, die die Rohrabschnitte verbinden unter Ausbilden der Rohrzüge nicht hindurchgehen können. Somit kann das Rohreingriffsteil 72 in einen Eingriff mit den Kragen angehoben werden unter Ausüben einer nach oben gerichteten Kraft auf die Rohrzüge 28.To assist in the movement of the ends of the connectors 62 and 64, is a linear actuator 70, such as a hydraulic one Cylinder arranged in the outer part 60 so that its lower end in connection with the lower ends of the connecting parts 62 stands. Actuation of the linear actuator 70 moves the lower ends of the joint 62 and 64 relatively towards the hinged upper ends, thereby moving the inner part 68 relative to the outer part 60 will. A steep pipe engagement 72 is movably arranged on the inner part 68. The pipe engaging part 72 has a recess 74 in its outer end part with an appropriate size for receiving the drill pipe. The recess 74 is arranged so that that the same fits over the pipe, but sufficiently small such that the enlarged coupling pieces which the pipe sections connect to form the pipe runs can not go through. Thus, the tube engaging part 72 can be engaged with the Collars are raised with an upward force being exerted on the pipe runs 28.

Wie anhand der Figur 2B ersichtlich, erstreckt sich ein Kabelsystem 76 von den Rohreingriffsteilen 72 zu einer Kabelscheibe 78, die in dem Bohrturm 12 aufgehängt 1st und sodann zu einem Hebelwerk (nicht gezeigt). - 6 . As can be seen from FIG. 2B, a cable system extends 76 from the pipe engaging parts 72 to a cable pulley 78 suspended in the derrick 12 and then to a lever mechanism (not shown). - 6.

109809/0270109809/0270

Die Anordnung ist dergestalt, daß das Kabelsystem 76 für das Anheben und Absenken as Rohreingriffsteile 72 längs des inneren Teils 68 des Uberführungsarms 72 angewandt werden kann, wodurch der hiermit in Eingriff stehende Zug 28 angehoben und abgesenkt wird.The arrangement is such that the cable system along the inner part 68 of 72 may Uberführungsarms 76 for raising and lowering pipe as engaging portions 72 are applied, is raised and whereby the hereby-engaging train 28 lowered.

Die untere Rohrhandhabungsvorrichtung 44 weist einen Rahmen 80 auf, der mit dem Bohrturm 12 und mit dem Basisteil 16 verbunden ist unter Tragen eines Paares von im Abstandsverhältnis vorliegenden Gleisen 82 und 84. Es ist eine Überführungsannvorrichtung 86 beweglich an den Gleisen 82 und 84 angeordnet. Der UberfUhrungsarm 86 ist in praktisch jeder Hinsicht identisch zu dem weiter oben beschriebenen ÜberfUhrungsarm 52 ausgeführt. Der Überführungarm 86 weist vorzugsweise ein Rohreingriffsteil 88 auf, das an dem inneren Arm 63 befestigt ist und nicht längs desselben beweglich ausgeführt 1st, wie dies welter oben im Zusammenhang mit dem Überführungsarm 52 beschrieben 1st.The lower pipe handler 44 includes a frame 80 which is connected to the derrick 12 and to the base 16 supporting a pair of spaced apart rails 82 and 84. It is a transfer jig 86 movably arranged on tracks 82 and 84. The transfer arm 86 is identical in practically every respect to the transfer arm 52 described above. The transfer arm 86 preferably includes a tube engaging portion 88 that is attached to the inner arm 63 and is not movable along the same is carried out as described above in connection with the transfer arm 52.

Anhand der obigen Ausführungen ergibt sich, daß entsprechende Energie, wie elektrische oder hydraulische Energie den verschiedenen Motoren und Betätigungsvorrichtungen zugeführt werden kann, die in den Rohrhandhabungsvorrichtungen 42 und 44 zur Anwendung kommen. Es ist weiterhin bevorzugt, daß die Uberführungsarme 52 und 86 für eine synchrone Bewegung durch eine Bedienungsperson gesteuert werden, die ihren Arbeitsplatz auf dem Basisteil oder Bühne 16 hat. Eine derartige Steuervorrichtung weist herkömmliche Bauart auf und wird somit hier nicht im einzelnen erläutert.Based on the above, it follows that corresponding energy, such as electrical or hydraulic energy, the different Motors and actuators used in pipe handling devices 42 and 44 can be supplied. It is further preferred that the transfer arms 52 and 86 can be controlled for synchronous movement by an operator who has his workplace on the base part or stage 16. Such a control device has a conventional design and is therefore not explained in detail here.

Die Figur 3 ist eine querseitige Ansicht des Bohrturns 12 unmittelbar über dem Rahmen 46 in Blickrichtung nach unten. Das Gleis 50 wird sich in dem Bohrturm 12 befinden und in angenähert der gleichen Lage wie das Fallwerk eines herkömmlichen Bohrturms. Im Abstandsverhältnis vorliegende Handhabungsfinger erstrecken sich in den Rahmen 46 in Richtung auf das Gleis 50 und ergeben eine Mehrzahl an d Handhabungsschlitzen 92. Die Finger 90 sind direkt über der Fläche 30 angeordnet.FIG. 3 is a transverse view of the drilling turn 12 directly above the frame 46 in the downward direction of view. The track 50 will be in the derrick 12 and in approximately the same position as the drop weight of a conventional derrick. Handling fingers present in the spaced relationship extend into the frame 46 in the direction of the track 50 and result in a plurality of d handling slots 92. The fingers 90 are arranged directly above the surface 30.

Die erfindungsgemäßen Rohrhandhabungsgeräte 42 und 44 werden in der Bohranlage 10 während des Entfernens des Bohrrohrs aus dem Bohrloch und Ersatz des Bohrrohrs anqewandt. Da die RohrhandhabungThe pipe handling devices 42 and 44 of the present invention are shown in FIG of the drilling rig 10 during removal of the drill pipe from the wellbore and replacement of the drill pipe. As the pipe handling

109809/0278 " ? "109809/0278 " ? "

wäxireni des. Ersatzes des Bohrrohrs praktisch den umgekehrten VorTang zu d?r Il3hrhandhabung während des Entfernens des Bohrrohrs darstellt, wird lediglcih Jas Verfahren der Entfernung beschtieben.wäxireni represents the. replacement of the drill pipe practically the reverse VorTang to d? r Il 3hrhandhabung during the removal of the drill pipe, lediglcih Jas method of removal is beschtieben.

Das Hebewerk wird betätigt, wodurch das Kabelsystem 38 den Laufblack 34 una die Elevatoren 36 nach unten absenkt, bis die Elevatoren 35 an den oberen Ende der Bohrgestänge 26, die sich von dem Bohrloch aus erstrekcen, befestigt werden kann. Sodann wird das Kabelsystem 33 betätigt unterAnheben des Laufblocks 34 und der Elevatoren 30 in dem Bohrturm 12, wodurch die BohrkolAnne 26 hiermit angehoban wird. Sobald ein Zug 23 der Bohrkolonne 26 in den Bohrturm 12 angehoben worden ist, v/erden die *tbfangkeile 22 in Dingriff unJ halten aie Bohrkolonne 26 in eiern Bohrloch derqestalt, daß der Zug 28 sich von hier aus erstreckt.The elevator is operated, causing the cable system 38 to run the black 34 una the elevators 36 lowered until the elevators 35 at the upper end of the drill pipe 26, which extends from the Borehole from extend, can be attached. Then the cable system 33 is actuated by lifting the running block 34 and the Elevators 30 in the derrick 12, whereby the drilling column 26 hereby is raised. As soon as a train 23 of the drilling column 26 has been raised into the derrick 12, the safety wedges 22 are grounded in Thing reef and hold a drilling column 26 in a borehole of the same shape, that the train 28 extends from here.

Der Laufblock 34 wird sodann abaesenkt, sobald die den Zuf 28 mit den restlichen Teil der Bohriolonne 26 verbindenue Schraubverbindung aufgeschraubt wird. Während der Zuo 28 abgeschraubt wird, warden J ie l'berführungsarrae 52 und 86 nach innen in Rieht unq auf die Mittellinie ües Bohrloches bewegt, bis die Rohreingriffsteile 72 und 83 mit den Zug 28 in Eingriff gekommen sind. Sobald der Zug 28 von der Bohrkolonne 26 abgeschraubt worden ist, wird das Kabelsystem 76 betätigt und das Rohreingriffsteil 72 angehoben unter Anheben des Zuges 23 weg von dem restlichen Teil der Bohrkolonne 26.The barrel block 34 is then lowered as soon as the feed 28 comes with it the remaining part of the Bohriolonne 26 connectue screw connection is unscrewed. While the Zuo 28 is being unscrewed, Were transferring arrae 52 and 86 to the inside of the building the center line of the borehole moves until the pipe engaging parts 72 and 83 have come into engagement with the train 28. Once the Cable 28 has been unscrewed from the drilling column 26, the cable system 76 is actuated and the pipe engaging part 72 is raised below Raise the train 23 away from the remainder of the drilling string 26th

Sobald die Kolonne 28 frei ist, wird die Betätigungsvorrichtung erregt, wodurch die überführungsarme 52 und 36 zusammengefaltet und der Zug 28 nach außen weg von der Mittellinie des Bohrloches und in Richtung auf die Rohrhandhabungsfläche beweqt wird. Die überführungsarme 52 und 86 und der daran befestigte Rohrzug 28 werden sodann längs der Gleise in die entsprechende Handhabung lage über der Fläche bewegt. Wie in der Fiq. 6 gezeigt, werden sodann das Rohreingriffsteil 72 und der Zug 23 geschwenkt und hydraulische Betätiqungsvorrichtung erregt unter Bewegen des inneren Teils 68 weg von dem äußerenTeil 60, so daB der Zug 26 in dem richtigen Schlitz 92 zwischen den Handhabungsfingern 90 angeordnet ist. Das Kabelsystem 76 wird sodann für das Absenken des Zuges 28 und des Rohreingriffsteils 72 angewandt, bis das untere Ende des Zuges 28 auf der Fläche 30 ruht. Sodann werden die überfUhrungsanne 52Once the column 28 is free, the actuator is energized, causing the transfer arms 52 and 36 to collapse and the pull 28 is moved outwardly away from the centerline of the wellbore and toward the pipe handling area. the Transfer arms 52 and 86 and the attached pipe 28 are then positioned along the tracks in the appropriate handling moved over the surface. As in the Fiq. 6, the pipe engaging member 72 and train 23 are then pivoted and hydraulic Actuator energizes moving inner member 68 away from outer member 60 so that pull 26 is in the correct position Slot 92 is arranged between the handling fingers 90. The cable system 76 is then used to lower the train 28 and pipe engaging portion 72 to the lower end of the train 28 rests on the surface 30. Then the transfer can 52

109809/0278109809/0278

BAD ORIGINALBATH ORIGINAL

und 86 zusammengeführt, zu der Fläche der Mittellinie des Bohrlocheszurückgeführt und in eine Lage praktisch ausgerichtet tau der Länge der Gleise angeordnet, um so nachfolgende Rohrzüge 28 aufzunehmen, sobald die Bohrkolonne 26 aus dem Bohrloch herausgezogen wird.and 86 are merged, returned to the surface of the centerline of the wellbore and in a practically aligned position Arranged length of track so as to accommodate subsequent pipe runs 28 as soon as the drilling column 26 is pulled out of the borehole will.

Da die Winkellage der Uberführungsarme 52 und 86 durch einen Servomotor gesteuert wird, ist es nicht erforderlich, daß der Laufblock 34 an der Führung 32 angeordnet 1st. Die Fähigkeit das Rohreingriffsteil 72 in verschiedenen Winkellagen anzuordnen, ermöghct es einer Bedienungsperson der Rohrhandhabungsvorrichtungen 42 und 44 den Zug 28 zu suchen, während derselbe in dem Bohrturm 12 hängt.Since the angular position of the transfer arms 52 and 86 is controlled by a servomotor, it is not necessary for the barrel block 34 to be arranged on the guide 32. The ability to arrange the tube engaging member 72 in various angular positions enables it is an operator of the pipe handling devices 42 and 44 to look for the train 28 while it is hanging in the derrick 12.

Wenn auch die Fig. 6dle Bewegung des Rohreingriffsteils 72 lediglich in Richtung nach rechts zeigt, versteht es sich doch, daß das Rohreingriffsteil 72 nach links geschwenkt werden kann, um so die Handhabungsfläche links von den Gleisen 48 und 50 auszunutzen. Das Anwenden des in die Uberführungsarme 52 und 86 eingebauten zusammenfaltbaren Mechanismus ermöglicht es, daß die Arme stabil ausgeführt sind und sich an schweren Gleisen angeordnet befinden, die nicht die normalen Arbeitsgänge in der Bohranlage 10 beeinflussen, wenn dieselben relativ kurz sind. Auch ermöglicht es die zusammenfaltbare Anordnung der Uberführungsarme, daß die Uberführungsarme in einer relativ kleinen Fläche geschwenkt werden können, wodurch in dem Bohrturm 12 Raum gespart wird.While Fig. 6 shows the movement of the tube engaging member 72 only in the rightward direction, it should be understood that the pipe engaging part 72 can be pivoted to the left so as to utilize the handling area to the left of the tracks 48 and 50. Employing the collapsible mechanism built into transfer arms 52 and 86 enables the arms to be stable are carried out and are located on heavy tracks that do not affect the normal operations in the drilling rig 10 when the same are relatively short. It also enables the collapsible arrangement of the transfer arms that the transfer arms are pivoted in a relatively small area can, whereby 12 space is saved in the derrick.

109809/0278109809/0278

Claims (8)

Dipi.-ing. Walter Meissner jj Dipi.-ing. Herbert Tischer 1 BERLIN 33, Herbertstraße 22 MÜNCHEN Fernsprecher: 8 87 72 37 - Drahtwort: Invention Berlin . Postscheckkonto: W. Maleenar, Berlin West 12282 Bankkonto: W. Meissner, Berliner Bank A.-G., Depk« 36, ^s ii,. 4Mfl Berlln-Halensee,KurfDr»tendamm 130 Konto Nr. 86 718 1 BERLIN 33 (GRUNEWALD), den | I. AüO. 1970 HarbertatraBe 22 Dresser Industries Inc. PatentansprücheDipi.-ing. Walter Meissner jj Dipi.-ing. Herbert Tischer 1 BERLIN 33, Herbertstrasse 22 MUNICH Telephone: 8 87 72 37 - Wire word: Invention Berlin. Postal check account: W. Maleenar, Berlin West 12282 Bank account: W. Meissner, Berliner Bank A.-G., Depk «36, ^ s ii ,. 4Mfl Berlln-Halensee, KurfDr »tendamm 130 Account No. 86 718 1 BERLIN 33 (GRUNEWALD), the | I. AüO. 1970 HarbertatraBe 22 Dresser Industries Inc. claims 1. Rohrhandhabungsvorrichtung für das Bewegen und Tragen senkrechter Rohrabschnitte in einem Bohrturm, dadurch gekennzeichnet, daß eine Befestigungsanordnung für das Tragen der Vorrichtung in dem Bohrturm, eine Übertragungsanordnung getragen durch iie Befestigungsanordnung, woei die Armanrdnung ein äußeres Teil aufweist, das praktisch senkrecht angeordnet ist und schwenkbar an der Befestigungsanordnung angeordnet ist, ein inneres Teil in einem parallelen Verhältnis zu dem äußeren Teil vorliegt, sowie eine Verbindungsanordnung sich zwischen den Inneren und äußeren Teilen erstreckt und mit denselben in Arbeitsverbindung steht enter Aufrechterhalten eines parallelen Verhältnisses derselben, sowie eine Rohreingriffsanordnung angeordnet an dem inneren Teil für einen Eingriff und das Tragen der senkrechten Abschnitte des Rohrs in dem Bohrturm vorgesehen sind.1. Pipe handling device for moving and carrying vertical Pipe sections in a derrick, characterized in that that a mounting assembly for supporting the device in the derrick, a transmission assembly carried by the mounting assembly, where the arm assembly has an outer part which is arranged practically vertically and can be pivoted the mounting assembly is arranged, an inner part in a parallel relationship with the outer part and a connecting arrangement between the inner and outer parts Share extends and is in working connection with the same enter maintaining a parallel relationship of the same, and a tube engaging arrangement disposed on the inner member for engaging and supporting the vertical portions of the Pipe are provided in the derrick. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Verbindungsanordnung ein erstes Verbindungsteil, wobei ein Ende schwenkbar mit dem äußeren Teil verbunden und das andere Ende beweglich mit dem inneren Teil verbunden ist, ein zweites Verbindungsteil, dessen eines Ende schwenkbar mit dem inneren Teil und dessen anderes Ende beweglich mit dem äußeren Teil verbunden ist, aufweist, sowie die Verbindungsteile schwenkbar zuwischen den Enden verbunden sind.2. Apparatus according to claim 1, characterized in that the connecting arrangement has a first connecting part, one end pivotally connected to the outer part and the other end movably connected to the inner part, a second connecting part, one end of which is pivotally connected to the inner part and the other end of which is movably connected to the outer part is, has, and the connecting parts are pivotally connected between the ends. 3. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß die Verbindungsanordnung auch eine Antriebsanordnung für das Bewegen der anderen Enden der Verbindungstelle in Richtung auf und weg von den Enden der Verbindungsteile aufweist, wodurch die inneren und äußeren Teile weg und in Richtung aufeinander bewegt werden.3. Apparatus according to claim 2, characterized in that the Link assembly also includes a drive assembly for moving the other ends of the junction up and down from the ends of the connecting parts, whereby the inner and outer parts are moved away and towards each other. 4. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß eine Anordnung für das Schwenken der tiberführungsanordnung relativ zu der Befestigungsanordnung vorliegt.4. Apparatus according to claim 1, characterized in that a Arrangement for pivoting the transfer assembly relative to the fastening arrangement is present. - 2 10 9809/0270- 2 10 9809/0270 2CMU949 402CMU949 40 5. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Rohreingriffsanordnung längs des inneren Teils beweglich ist, sowie die Vorrichtung weiterhin eine Anordnung fUr das Bewegen der Rohreingriffsanordnung für das Anheben und Absenken der Rohrabschnitte im Eingriff hiermit aufweist.5. Apparatus according to claim 1, characterized in that the Tube engagement assembly is movable along the inner portion, as well the apparatus further includes an arrangement for moving the pipe engagement assembly for raising and lowering the pipe sections has in engagement therewith. 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß die Anordnung für das Bewegen der Rohreingriffsanordnung eine Hebevorrichtung aufweist, die in Arbeiteverbindung dlt der Rohreingriffsanordnung steht und so angeordnet ist, daß dieselbe an dem Bohrturm vorliegt.6. Apparatus according to claim 5, characterized in that the Arrangement for moving the pipe engagement assembly includes a hoist has, which is in working connection dlt of the pipe engagement assembly stands and is arranged so that it is present on the derrick. 7. Vorrichtung nach Anspruch 2,dadurch gekennzeichnet, daß die Befestigungsanordnung im Abstandsverhältnis vorliegende obere und untere Gleisteile besitzt, die UberfUhrungsarmanordnung einen oberen Schlitten aufweist, der längs des oberen Gleisteils beweglich ist und schwenkbar ein oberes Ende des äußere Teils trägt, ein unterer Schlitten beweglich längs des unteren Gleisteils vorliegt und schwenkbar ein unteres Ende des äußeren Teils trägt, sowie wenigstens einer der Schiiten eine Anordnung für den Antrieb der UberfUhrungsarmanordnung längs der Gleisteile aufweist.7. Apparatus according to claim 2, characterized in that the Fastening arrangement in the spacing ratio present upper and has lower track parts, the UberfUhrungsarmanordnung has an upper slide which is movable along the upper track part and pivotally supporting an upper end of the outer member, a lower slide is moveable along the lower track member and pivotally supporting a lower end of the outer member and at least one of the slides an arrangement for the drive the UberfUhrungsarmanordnung along the track parts. 8. Rohrhandhabungevorrichtung für das Bewegen und Tragen senkrechter Rohra bshhnitte in einem Bohrturm, gekennzeichnet durch die folgenden Merkmale: eine Befestigungsanordnung für das Tragen der Vorrichtung in dem Bohrturm , die Befestigungsanordnung im Abstandsverhältnis vorliegende obere und untere Gleisteile aufweist, eine UberfUhrungsarmanordnung, die durch die Befestigungsanordnung getragen wird, wobei die Armanordnung ein äußeres Teil angeordnet praktisch senkrecht und schwenkbar an der Befestigungsanordnung, ein inneres Teil parallel zu dem äußeren Teil angeordnet auf v/eist, die Verbindungsanordnung sich zwischen und in Arbeitsverbindung mit dem inneren und dem äußeren Teil erstreckt zwecks Verändern der Entfernung zwischen den Inneren und äußeren Teilen unter Aufrechterhalten eines parallelen Verhältnisses, die Verbindungsanordnung ein erstes Verbindungsteil aufweist, dessen eines Ende schwenkbar mit dem äußeren Teil verbunden ist, sowie das andere Ende beweglich mit dem inneren Teil verbunden ist, ein zweites Verbindungsteil vorliegt, dessen eines Ende schwenkbar mit der. inneren Teil verbunden ist und das andere Ende beweglich mit i.era8. Pipe handling device for moving and carrying upright Rohra bshhnitte in a derrick, characterized by the following features: a mounting arrangement for supporting the Apparatus in the derrick having spaced-apart upper and lower track portions of the mounting arrangement, a transfer arm assembly carried by the mounting assembly, the arm assembly including an outer portion practically perpendicular and pivotable on the fastening arrangement, an inner part arranged parallel to the outer part on v / eist, the connection arrangement is between and in working connection with the inner and outer parts extending underneath to vary the distance between the inner and outer parts Maintaining a parallel relationship, the connection arrangement has a first connection part one end of which is pivotally connected to the outer part, and the other end is movably connected to the inner part, a second Connecting part is present, one end of which is pivotable with the. inner part is connected and the other end is movable with i.era 1 09809/02781 09809/0278 BAD ORiGiNALBAD ORiGiNAL äußeren Teil verbunden ist, sowie die Verbindungsteile schwenkbar zwischen den Enden verbunden sind, eine Antriebsanordnung für das Bewegen der äußeren Enden der Verbindungsteile in Richtung auf und weg von dem einen Ende der Verbindungsteile, wodurch die inneren unu äußeren Teile weg voeinander und in Richtung aufeinander bewegt werden, einen oberen Schlitten, der längs des oberen Gleisteils beweglich 1st und schwenkbar ein oberes Ende des äußeren Teils trägt, einen unteren Schlitten, der längs des unteren Gleisteils beweglich ist und schwenkbar ein unteres Ende des äußeren Teils trägt, sowie wenigstens einer der Schlitten eine Anordnung für den Antrieb der UBerführungsarmanordnung längs der Gleisteile aufweist, Rohreingriffsanordnung, die beweglich an dem inneren Teil für einen Eingriff und das Tragen der senkrechten Rohrab- ™ schnitte in dem Bohrturm vorliegt, ein· Anordnung für das Bewegen der iohreingriffsanordnung für das Anheben oder Absenken der Rohrabschnitte, sobald dieselben im Eingriff hiermit vpi±i&qen£ sowie eine Anordnung für das Schwenken der Uberführungsa^iynordn^ng relativ zu der Befestigungsanordnung.outer part is connected, and the connecting parts are pivotally connected between the ends, a drive arrangement for moving the outer ends of the connecting parts towards and away from one end of the connecting parts, thereby moving the inner and outer parts away from one another and towards one another an upper slide which is movable along the upper track part and pivotally supports an upper end of the outer part, a lower slide which is movable along the lower track part and pivotally supports a lower end of the outer part, and at least one of the carriages An arrangement for driving the transfer arm assembly along the track portions, pipe engagement assembly moveable on the inner portion for engaging and supporting the vertical pipe sections in the derrick, an assembly for moving the pipe engagement assembly for raising or lowering the Pipe sections as soon as the same engaging herewith vpi ± i & qen £ as well as an arrangement for pivoting the Uberführungsa ^ iynordn ^ ng relative to the mounting arrangement. BAD ORIGINAL 109809/0276 ORIGINAL BATHROOM 109809/0276 L Ä ·,L Ä ·, LeerseiteBlank page
DE19702040949 1969-08-12 1970-08-11 Pipe handling device for oil drilling towers or the like. Pending DE2040949A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US84940769A 1969-08-12 1969-08-12

Publications (1)

Publication Number Publication Date
DE2040949A1 true DE2040949A1 (en) 1971-02-25

Family

ID=25305709

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19702040949 Pending DE2040949A1 (en) 1969-08-12 1970-08-11 Pipe handling device for oil drilling towers or the like.

Country Status (5)

Country Link
US (1) US3633767A (en)
AT (1) AT299093B (en)
DE (1) DE2040949A1 (en)
FR (1) FR2058231B1 (en)
GB (1) GB1297044A (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3921823A (en) * 1970-12-15 1975-11-25 Activite Atom Avance Movement compensating apparatus for floating drilling
NO144976C (en) * 1976-04-01 1981-12-16 Golar Nor Offshore As OUR DEVICE FOR HANDLING AND STORAGE OF RIGS AND DRILLS
US4453884A (en) * 1982-08-20 1984-06-12 Zena Equipment, Inc. Hook rotating mechanism
EP0121545A1 (en) * 1982-10-13 1984-10-17 Moss Rosenberg Verft A/S Assembly for handling and racking drill pipe in a derrick
NO154703C (en) * 1983-11-11 1986-12-03 Maritime Hydraulics As DEVICE MANAGEMENT DEVICE.
NO154933B (en) * 1984-06-18 Kjell Haughom STEERING HANDLING APPLIANCE.
US4696207A (en) * 1985-04-26 1987-09-29 Varco International, Inc. Well pipe handling machine
US4709766A (en) * 1985-04-26 1987-12-01 Varco International, Inc. Well pipe handling machine
FR2585066B1 (en) * 1985-07-19 1988-05-13 Brissonneau & Lotz METHOD AND INSTALLATION FOR VERTICAL STORAGE OF DRILL RODS ON A DRILL TOWER
US4725179A (en) * 1986-11-03 1988-02-16 Lee C. Moore Corporation Automated pipe racking apparatus
US7794192B2 (en) * 2004-11-29 2010-09-14 Iron Derrickman Ltd. Apparatus for handling and racking pipes
EP1953334B1 (en) * 2007-01-08 2016-11-09 National Oilwell Varco, L.P. A pipe handling system and method
ITTO20120863A1 (en) * 2012-10-04 2014-04-05 Drillmec Spa MOBILE DRILLING SYSTEM.
US9181764B2 (en) 2013-05-03 2015-11-10 Honghua America, Llc Pipe handling apparatus
NO20170702A1 (en) * 2016-04-29 2017-10-30 Cameron Int Corp Vertical pipe handling system and method for its use
US10316597B2 (en) 2017-03-08 2019-06-11 Forum Us, Inc. Tubular clamp system
US10329854B2 (en) * 2017-03-08 2019-06-25 Forum Us, Inc. Tubular transfer system and method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2416815A (en) * 1946-01-14 1947-03-04 Ingram X Calhoun Drill pipe manipulator
US2616578A (en) * 1949-05-12 1952-11-04 Clark Equipment Co Industrial truck
US2628725A (en) * 1951-11-03 1953-02-17 Standard Oil Dev Co Apparatus for racking pipe in derricks
US2730246A (en) * 1951-11-03 1956-01-10 Exxon Research Engineering Co Apparatus for handling pipe in a derrick
GB941961A (en) * 1959-09-28 1963-11-20 Dowty Rotol Ltd Improvements relating to earth boring equipment
US3145786A (en) * 1960-07-11 1964-08-25 Leyman Corp Portable drill rig
US3262593A (en) * 1963-07-10 1966-07-26 Gen Mills Inc Wall-mounted support structure

Also Published As

Publication number Publication date
AT299093B (en) 1972-06-12
GB1297044A (en) 1972-11-22
FR2058231A1 (en) 1971-05-28
US3633767A (en) 1972-01-11
FR2058231B1 (en) 1974-08-23

Similar Documents

Publication Publication Date Title
DE3327739C2 (en) Device for the production of boreholes
DE69908144T2 (en) DEVICE AND METHOD FOR CONNECTING DRILLED PIPES USING A HEAD DRIVE
DE2542432C2 (en) Rotary drive for a drilling rig and a method for removing a drill string from a borehole
DE2040949A1 (en) Pipe handling device for oil drilling towers or the like.
DE3689129T2 (en) Machine for handling borehole rods.
DE69909297T2 (en) DEVICE AND METHOD FOR CONNECTING DRILLED PIPES USING A HEAD DRIVE
DE69121320T2 (en) Device for supporting a direct drive drilling unit in a position offset from the borehole axis
DE69220014T2 (en) Hydraulic drill with telescopic tower
DE2834033C2 (en) Device for establishing a flow connection between an underwater block and a stationary underwater pipeline
DE1223776B (en) Drilling device for continuous and automatic lowering and lifting of the drill pipe string in deep drilling
DE3785698T2 (en) DEVICE FOR LAYING A CABLE IN A PIPE.
DE2357603B2 (en) Device for positioning pipe wrenches
DE2606252A1 (en) DRILLING DEVICE
DE2615086A1 (en) DEVICE FOR HANDLING DRILL PIPE
DE3048523A1 (en) DEVICE FOR MOVING PIPES IN A TOWER
DE10245304B4 (en) The vise assembly
DE2635199A1 (en) ROTARY DRILLING DEVICE
DE2718514A1 (en) DEVICE FOR CUTTING CABINETS IN DRILLING HOLES AND PROCEDURE FOR RECOVERY OF THE HOUSING
DE68903297T2 (en) TORQUE SUPPORT FOR HEAD DRIVE.
EP0593803B1 (en) Positioning device for loads
DE60014596T2 (en) PIPES FOR ARRANGEMENT UNDER PRESSURE STANDED HOLES
DE2845878C2 (en) Drilling device for earth drilling
DE3125013C2 (en) Deep drilling device
DE2952525C2 (en)
EP2864068B1 (en) Device for bending pipes for pipelines