DE202015005439U1 - Fixed barrier system city protection - Google Patents

Fixed barrier system city protection Download PDF

Info

Publication number
DE202015005439U1
DE202015005439U1 DE202015005439.0U DE202015005439U DE202015005439U1 DE 202015005439 U1 DE202015005439 U1 DE 202015005439U1 DE 202015005439 U DE202015005439 U DE 202015005439U DE 202015005439 U1 DE202015005439 U1 DE 202015005439U1
Authority
DE
Germany
Prior art keywords
rail
protection
foot
arm
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202015005439.0U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
City Schutz GmbH
Original Assignee
City Schutz GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by City Schutz GmbH filed Critical City Schutz GmbH
Priority to DE202015005439.0U priority Critical patent/DE202015005439U1/en
Publication of DE202015005439U1 publication Critical patent/DE202015005439U1/en
Expired - Lifetime legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B17/00Cattle guards connected to the permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B26/00Tracks or track components not covered by any one of the preceding groups
    • E01B26/005Means for fixing posts, barriers, fences or the like to rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

Feste Absperrung System City Schutz, dadurch gekennzeichnet, dass der Schienenfuß (Z2; Z4), der innenseitig der Schiene mittels Feststellflügelmutter befestigt und unter der Schiene auf dem Schotter geführt wird, besonders gegen äußere physikalische Einflüsse gesichert ist und ein Verrutschen verhindert wird.Fixed shut-off System City protection, characterized in that the rail foot (Z2, Z4), which is fastened on the inside of the rail by means of locking nut and guided under the rail on the ballast, is particularly secured against external physical influences and slipping is prevented.

Description

Feste Absperrungen dienen zur Abwendung von Gefahren im Gleisbereich, die von Schienengeführten Fahrzeugen ausgehen und schützen neben dem Gleis arbeitende Arbeitskräfte vor dem unbeabsichtigten Betreten bzw. dem Hineingeraten in den Gefahrenbereich des Gleisbereiches, in dem das Lichtraumprofil der Schienengebundenen Fahrzeuge durch die Feste Absperrung vom Arbeitsbereich neben dem Gleis abgegrenzt wird. Feste Absperrungen können im standardisierten RIMINI Verfahren der Deutschen Bahn AG als Sicherungsmaßnahme der höchsten Schutzklasse festgelegt werden.Fixed barriers serve to avert hazards in the track area emanating from rail-guided vehicles and protect workers working on the track from unintentional entry or entry into the danger zone of the track area where the gauge of the rail-bound vehicles is adjacent to the fixed area the track is demarcated. Fixed barriers can be defined in the standardized RIMINI procedure of Deutsche Bahn AG as a safety measure of the highest protection class.

Dem System City Schutz sind folgende Grundüberlegungen vorausgegangen:The System City protection was preceded by the following basic considerations:

Schutzfaktor:Protection factor:

  • – eine Feste Absperrung muss vorrangig den Schutz gewährleisten, für den sie wie in der Einleitung beschrieben, gedacht ist- a hard barrier must primarily provide the protection for which it is intended as described in the introduction

Zeitfaktor:Time factor:

  • – eine Feste Absperrung muss den zeitlichen Erfordernissen für den Auf- und Abbau auf Gleisbaustellen genügen- A fixed barrier must meet the time requirements for the construction and dismantling on track construction sites

Wartung und Ersatzfaktor:Maintenance and replacement factor:

  • – eine Feste Absperrung muss leicht zu Warten und beschädigte Komponenten zügig ersetzbar sein- A hard barrier must be easy to maintain and damaged components must be quickly replaced

Schutzfaktor:Protection factor:

Für eine sichere Befestigung wird die Feste Absperrung innenseitig der Schiene festgeklemmt. Durch die Auflage des Schienenfußes (Z2; Z4) auf dem Schotterbett wird eine zusätzliche Festigkeit erreicht, so dass selbst bei leichtem Einwirken von Maschinen auf die Feste Absperrung immer noch eine Schutzfunktion gewährleistet ist.For a secure attachment, the hard barrier is clamped on the inside of the rail. By placing the rail foot (Z2, Z4) on the ballast bed, an additional strength is achieved, so that a protective function is still ensured even with slight impact of machines on the fixed barrier.

Die Absperrstangen (Z6) sind aus verzinkten Eisen und mit rot weißem Band umwickelt. Die optische Wahrnehmung der Absperrstangen und der physikalische Schutz der Arbeitskräfte vor einem Durchbrechen der Absperrstangen werden dadurch wesentlich gesteigert.The Absperrstangen (Z6) are made of galvanized iron and wrapped in red white tape. The visual perception of the Absperrstangen and the physical protection of the workers from breaking through the Absperrstangen be substantially increased.

Zeitfaktor:Time factor:

Die flache Bauweise des Schienenfußes (Z2; Z4) erlaubt ein zügiges Durchschieben des Fußes zwischen Schienenunterseite und Schotterbett. Beim Aufbau von vielen hundert Metern kann dadurch viel Zeit beim Aufbau eingespart werden. Die Befestigung mittels einer Feststellflügelmutter und nicht wie meist üblich durch Verwendung einer einfachen Schraubenmutter hat den Vorteil, dass die Klemme schnell handfest gedreht und durch leichte Hammerschläge die Flügelmutter fest gedreht werden kann. Das erspart die Handhabe eines Schraubenschlüssels, der umständlich am Schotterbett zu handhaben wäre. Auch hier steht die Zeitersparnis im Vordergrund.The flat design of the rail foot (Z2; Z4) allows for a quick push through of the foot between the underside of the rail and ballast bed. In the construction of many hundreds of meters, this can save a lot of time in the construction. The attachment by means of a locking wing nut and not as usual by using a simple nut has the advantage that the clamp can be quickly turned hand-tight and by slight hammer blows the wing nut can be firmly turned. This saves the handle of a wrench, which would be awkward to handle on gravel bed. Again, the time savings are in the foreground.

Wartung und Ersatzfaktor:Maintenance and replacement factor:

Die Modulbauweise der Festen Absperrung erlaubt einen zügigen Austausch beschädigter Komponenten, ohne dabei größere Mengen der Festen Absperrung demontieren zu müssen. Oft wird das rot weiße Band durch physikalische Einwirkungen beschädigt. Da es einfach umwickelt ist, kann bei Bedarf die betreffende Absperrstange schnell neu umwickelt werden. Die Wartung geht schnell und unkompliziert.The modular construction of the fixed shut-off allows a quick replacement of damaged components without having to disassemble larger quantities of the fixed shut-off. Often the red-white band is damaged by physical influences. Since it is simply wrapped, if necessary, the relevant barrier rod can be quickly wrapped again. Maintenance is quick and easy.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

  • (Z1)(Z1)
    Sicherungsklammersecuring clip
    (Z2)(Z2)
    Schienenfuß DraufsichtRail foot top view
    (Z3)(Z3)
    Schienenarm SeitenansichtRail arm side view
    (Z4)(Z4)
    Schienenfuß SeitenansichtRail foot side view
    (Z5)(Z5)
    Schienenfuß und Schienenarm GesamtdarstellungRail foot and rail arm Overall view
    (Z6)(Z6)
    Feste Absperrung Frontalansicht GesamtdarstellungFixed barrier Frontal view Overall view

Claims (6)

Feste Absperrung System City Schutz, dadurch gekennzeichnet, dass der Schienenfuß (Z2; Z4), der innenseitig der Schiene mittels Feststellflügelmutter befestigt und unter der Schiene auf dem Schotter geführt wird, besonders gegen äußere physikalische Einflüsse gesichert ist und ein Verrutschen verhindert wird.Fixed barrier system City protection, characterized in that the rail foot (Z2, Z4), which is fastened on the inside of the rail by means of locking wing nut and guided under the rail on the ballast, is particularly secured against external physical influences and slipping is prevented. Schienenfuß nach Anspruch 1, dadurch gekennzeichnet, dass der Schienenfuß eine Aufnahme des Schienenarms (Z3; Z5), der als Schiebestück fungiert, aufweist. Mittels Einstecksystem und Nivellierung durch eine Imbusschraube kann das Schiebestück mit dem Schienenfuß fest verbunden werden. Die Klemme am Schienenfuß ist isoliert und verhindert, dass Fehlerströme sich im System der Festen Absperrung ausbreiten können.Rail foot according to claim 1, characterized in that the rail foot has a receptacle of the rail arm (Z3, Z5), which acts as a sliding piece. By means of plug-in system and leveling by a Allen screw, the sliding piece can be firmly connected to the rail foot. The clamp on the rail base is insulated and prevents fault currents from spreading in the fixed shut-off system. Schienenarm nach Anspruch 2, dadurch gekennzeichnet, dass 5 Bohrungen zum Verstellen des Schienenarmes (Z3) der Festen Absperrung System City Schutz vorgesehen sind und somit regulierbare Abstände zur Schienenmitte gemäß den Vorgaben des Auftraggebers gewährleistet sind. Der Schienenarm (Z3; Z5) hat zwei Aufnahmen für erforderliche Absperrstangen (Z6).Rail arm according to claim 2, characterized in that 5 holes are provided for adjusting the rail arm (Z3) of the fixed barrier system City protection and thus adjustable distances to the rail center are guaranteed in accordance with the instructions of the client. The rail arm (Z3, Z5) has two receptacles for required locking bars (Z6). Absperrstangen nach Anspruch 3, dadurch gekennzeichnet, dass sie mit einer Kunststoffisolierung versehen sind und somit zusätzlich zur Isolierung der Klemme am Schienenfuß (Z2; Z4) ein Mindestmaß an Schutz vor Fehlerströmen bieten, wenn Arbeitskräfte mit den Absperrstangen (Z6) in Berührung kommen. Barrier rods according to claim 3, characterized in that they are provided with a plastic insulation and thus in addition to the isolation of the clamp on the rail (Z2, Z4) provide a minimum level of protection against leakage currents when workers with the Absperrstangen (Z6) come into contact. Absperrstangen nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass diese mit einem rot-weißen Band (Z6) umwickelt sind, um die optische Wahrnehmung der Arbeitskräfte bei Tag und Nacht zu verstärken.Absperrstangen according to any one of the preceding claims, characterized in that they are wrapped with a red-white band (Z6) in order to enhance the visual perception of the workforce day and night. Absperrstangen nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass diese mit Hilfe einer Sicherungsklammer (Z1) befestigt werden.Barrier rods according to one of the preceding claims, characterized in that they are fastened by means of a securing clip (Z1).
DE202015005439.0U 2015-07-31 2015-07-31 Fixed barrier system city protection Expired - Lifetime DE202015005439U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202015005439.0U DE202015005439U1 (en) 2015-07-31 2015-07-31 Fixed barrier system city protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202015005439.0U DE202015005439U1 (en) 2015-07-31 2015-07-31 Fixed barrier system city protection

Publications (1)

Publication Number Publication Date
DE202015005439U1 true DE202015005439U1 (en) 2015-10-26

Family

ID=54481835

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202015005439.0U Expired - Lifetime DE202015005439U1 (en) 2015-07-31 2015-07-31 Fixed barrier system city protection

Country Status (1)

Country Link
DE (1) DE202015005439U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3705665A4 (en) * 2017-10-31 2021-08-04 Ye, Kong Meng Simple guardrail locking device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3705665A4 (en) * 2017-10-31 2021-08-04 Ye, Kong Meng Simple guardrail locking device

Similar Documents

Publication Publication Date Title
DE102012014980A1 (en) Mounting system for the arrangement of, for example, electrical devices, especially in cabinets
DE102010020419A1 (en) Fastening and protection device for a Euro-Balise
DE202013101217U1 (en) scaffolding anchors
DE102014001456B4 (en) Fastening device for a busbar and catenary system
DE202015005439U1 (en) Fixed barrier system city protection
DE102006001442B3 (en) Pantograph contact rail connection device for local passenger train has contact rail connected with insulator foot where rail console is composed of base plate, platform connected at right angle and two seal plates
DE202011101596U1 (en) Track safety device (fixed barrier)
DE102014108102A1 (en) Rail safety device
CN204727406U (en) Triple channel telescopic staircase
DE102018128994A1 (en) Device for mobile track protection system
DE202020000714U1 (en) Transversely adjustable, lockable on rails and switches, which can be operated from outside the danger zone, as a protective device on the superstructure against unintentional entry into the track by workers when working in the area of railway systems
CN204517270U (en) A kind of steel pipe type shaft tower front-operated platform
CN204691290U (en) A kind of building site protector
DE202009013254U1 (en) Signal tower for non-stationary signals at railway facilities
EP2153449B1 (en) Electrical transformer with protection against falling
DE102014110152B4 (en) Auxiliary traverse for the mast of high voltage power lines for temporarily receiving a Erdseiles and method for changing the Erdseiles using the auxiliary traverse
CN205713443U (en) A kind of security protection intensifier
CN204517273U (en) A kind of steel pipe type shaft tower side operating platform
DE202014101239U1 (en) Safety device for trenching
AT112476B (en) Arrangement to prevent damage to the mast due to broken conductors in overhead electrical lines.
CN104779553A (en) Front operating platform for steel tube type pole tower
CN205276915U (en) Construction safety protective guard
DE202015002356U1 (en) Universal attachment point for scaffold tubes
CN204017202U (en) Safe strap bolt hanging device for dismounting derrick
DE202014100504U1 (en) Rail foot mount for a railroad track safety fence

Legal Events

Date Code Title Description
R207 Utility model specification
R156 Lapse of ip right after 3 years