DE202009017409U1 - Combination special drill for wood fiber insulation board façade bores - Google Patents

Combination special drill for wood fiber insulation board façade bores Download PDF

Info

Publication number
DE202009017409U1
DE202009017409U1 DE200920017409 DE202009017409U DE202009017409U1 DE 202009017409 U1 DE202009017409 U1 DE 202009017409U1 DE 200920017409 DE200920017409 DE 200920017409 DE 202009017409 U DE202009017409 U DE 202009017409U DE 202009017409 U1 DE202009017409 U1 DE 202009017409U1
Authority
DE
Germany
Prior art keywords
drill
drilling
protection
diameter
wood fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200920017409
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MOSCH WOLFGANG
Original Assignee
MOSCH WOLFGANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MOSCH WOLFGANG filed Critical MOSCH WOLFGANG
Priority to DE200920017409 priority Critical patent/DE202009017409U1/en
Publication of DE202009017409U1 publication Critical patent/DE202009017409U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • B28D1/146Tools therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B51/00Tools for drilling machines
    • B23B51/009Stepped drills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27GACCESSORY MACHINES OR APPARATUS FOR WORKING WOOD OR SIMILAR MATERIALS; TOOLS FOR WORKING WOOD OR SIMILAR MATERIALS; SAFETY DEVICES FOR WOOD WORKING MACHINES OR TOOLS
    • B27G15/00Boring or turning tools; Augers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2226/00Materials of tools or workpieces not comprising a metal
    • B23B2226/75Stone, rock or concrete

Abstract

Stufenbohrer für Beton/Mauerwerk-Holzfaserplatte dadurch gekennzeichnet, dass der Bohrer zwei, oder mehr, verschiedene Bohrstufen mit jeweils unterschiedlichen Bohrdurchmesser besitzt, wobei die zweite Stufe eine schneidende Geometrie (Schnitt- und Freiwinkel), Flächenanfräsung sowie einen Tiefenbegrenzer aufweist.Step drill for concrete / masonry fiberboard characterized in that the drill has two or more, different drill stages, each with different bore diameter, the second stage has a cutting geometry (cutting and clearance angle), Flächenanfräsung and a depth limiter.

Figure 00000001
Figure 00000001

Description

Bei privaten und öffentlichen Gebäude, die energiesparende Aussenfassaden Aufweisen, ist es zeitgemäss ökonomisch begründet, die Fassade nachträglich Effizient mit Wärmedämmplatten zu isolieren.at private and public Building, Having the energy-saving exterior facades, it is up to date economically justified the facade later Efficient with thermal insulation panels to isolate.

Hierzu stellt die Industrie vielfältige Materialien zur Verfügung (Bsp.: Styropor, Holzfaser, Steinwolle, Polystrol-Hartschaum, Kork).For this represents the industry diverse Materials available (Example: Styrofoam, wood fiber, rock wool, polystyrene hard foam, cork).

In meinem fall wählte ich die Holzfaserplatte, die meiner Meinung nach die besten Isolationswerte vorweisen.In chose my case I use the wood fiber board, which in my opinion have the best insulation values.

Beim anbringen dieser Holzfaserplatten auf die Fassade wird zuerst mit einem Diffusionskleber geklebt und nach der Trocknungszeit zusätzlich noch mit Dübel befestigt.At the Attaching these fiberboard panels to the facade is done first with glued to a diffusion adhesive and after the drying time additionally with Dowels attached.

Hierzu ist es Standart, die Dämmplatte mit einem Steinbohrer (in Länge und Durchmesser abhängig von der gewählten Dübelart) zu durchbohren, und im gleichen Arbeitsgang das Dübelloch in die Fassade zu bohren, bevor man den Bohrer aus dem Bohrloch zieht.For this It is standard, the insulation board with a stone drill (in length and diameter dependent from the chosen one Generic type) to pierce, and in the same operation the dowel hole to drill into the facade before getting the drill out of the borehole draws.

Eine Holzfaserplatte mit einem Steinbohrer zu durchbohren, bringt ein unzufriedenstellendes Ergebnis, da die Hartmetallplatte eines Steinbohrers die Faser nicht schneidend, sondern verdrängt durchbohrt.A Piercing wood fiber board with a stone drill inserts unsatisfactory result, since the hard metal plate of a stone drill the Fiber not cutting, but displaced pierced.

Beim rausziehen des Bohrers verdichtet sich das Bohrloch und der, für das Mauerwerk bestimmte, Dübel lässt sich nur schwer durch den verengten Bohrkanal in die Fassadenbohrung einschlagen, um abschliessend in einem weiteren Arbeitsgang die passende Schraube einzudrehen, welche letztendlich die sichere Fixierung der Faserplatte an der ursprünglichen Fassadenwand gewährt.At the Pulling out the drill, the well and the, for the masonry certain, dowels let yourself difficult through the narrowed drill hole in the facade bore turn to finally in a further operation, the appropriate Screw in, which ultimately secure fixation the fiberboard at the original Facade wall granted.

Beim durchbohren der Holzfaserplatte werden die letzten Millimeter der Faserplatte durch die Hartmetallplatte des Steinbohrers Holzfaser so verdrängt, dass die Hartmetallplatte des Bohrers beim herausziehen noch zusätzlich Fasermaterial ins Bohrloch hineinzieht und den Bohrkanal zusätzlich verengt.At the piercing the fiberboard will be the last millimeter of the Fiber board through the hard metal plate of the stone drill wood fiber so displaced, that the hard metal plate of the drill when pulling out even more fiber material draws into the borehole and additionally narrows the borehole.

Alle Handwerker tragen das Risiko, dass der einzutreibende Dübel abbricht, bevor er das Mauerwerk der Fassade erreicht. Nun muss im Zwischenarbeitsgang der Dübel erst wieder entfernt werden und die Bohrung der Holzfaserplatte durch aufwendiges nachbohren vergrössert werden.All Craftsmen bear the risk that the dowel to be collected breaks off, before reaching the masonry of the facade. Now, in the intermediate work the dowel only to be removed again and the bore of the fiberboard be enlarged by elaborate re-drilling.

Dieses nervenaufreibende und Zeitaufwendige Bohren der Dübelbohrungen liessen in mir den Geist wecken und Ich kam somit auf die Erfindung eines Spezialkombinationsbohrers der sowohl Holzfaserplatten (Werkstoff A) wie auch Beton/Mauerwerk (Werkstoff B) optimal in einem Bohrarbeitsgang bohrt.This nerve-wracking and time-consuming drilling of the dowel holes let the spirit awaken in me and I came thus to the invention a special combination drill of both wood fiber boards (material A) as well as concrete / masonry (material B) drills optimally in a Bohrarbeitsgang.

Somit ist die zuvor beschriebene und bis heute bestehende Problematik nun restlos beseitigt (kein Abknicken der Dübel, kein zeitaufwendiges nachbohren).Consequently is the problem described above and still exists today now completely eliminated (no kinking of the dowels, no time-consuming re-drilling).

Eine grosse Dankbarkeit wird von allen zu erwarten sein die ständig diese Arbeit durchführen müssen.A great gratitude will be expected of all who are constantly these Need to perform work.

Nochmals zu erwähnen ist die Kosteneinsparung durch den geringeren Verbrauch der Spezialdübel, sowie die Zeit-/Kosteneinsparung des nachbohrens.again to mention is the cost savings due to the lower consumption of special dowels, as well the time / cost saving of re-drilling.

– Lösung:- Solution:

Ein Spezialbohrer, der in der Lage ist zwei unterschiedliche Materialien optimal in einem Arbeitsgang – sowohl Holzfaserplatten mit einem gewünschten Bohrdurchmesser Schneidend (in Holzbohrerqualität)
als auch die Fassadenwand aus Beton oder Mauerwerk in dem geforderten Dübeldurchmesser schlagbohrend (Steinbohrerqualität)
so durchbohren kann, damit durch die beiden unterschiedlichen Bohrlöcher die dafür vorgesehene Befestigungsdübel ohne Abknicken und ohne Kraftanstrengung eingetrieben werden kann.
A special drill that is capable of optimally handling two different materials in one operation - both wood fiber boards with a desired drilling diameter Cutting (wood drill quality)
as well as the façade wall of concrete or masonry in the required dowel diameter impact drilling (stone drill quality)
so can pierce, so that through the two different holes the designated fixing dowel can be driven without kinking and without exerting force.

– Beschreibung des Bohrers:- Description of the drill:

Zwei-Stufenbohrer/zwei Materialien-Bohrer (Beton/Mauerwerk) für Standart-Dübelmass 8 mm und gleichzeitig schneidender Holzbohrer (Holzfaserbohrer) mit 11 mm Durchmesser mit einer Flächenanfräsung von 4 mm Breite und 2 mm Tiefe zum fixieren der in verschiedenen längen auswechselbaren Tiefenbegrenzer.Two-step drill / two Material drills (concrete / masonry) for standard dowel dimensions 8 mm and simultaneously cutting wood drill (wood fiber drill) with 11 mm diameter with a surface milling of 4 mm width and 2 mm depth for fixing the depth limiter which can be exchanged in different lengths.

Claims (6)

Stufenbohrer für Beton/Mauerwerk-Holzfaserplatte dadurch gekennzeichnet, dass der Bohrer zwei, oder mehr, verschiedene Bohrstufen mit jeweils unterschiedlichen Bohrdurchmesser besitzt, wobei die zweite Stufe eine schneidende Geometrie (Schnitt- und Freiwinkel), Flächenanfräsung sowie einen Tiefenbegrenzer aufweist.Step drill for concrete / masonry fiberboard characterized in that the drill has two or more, different drill stages, each with different bore diameter, the second stage has a cutting geometry (cutting and clearance angle), Flächenanfräsung and a depth limiter. Stufenbohrer nach Schutzanspruch 1, dadurch gekennzeichnet, dass sich die Längen der ersten Bohrstufe nach der erforderlichen mindestbohrtiefe des Dübels (Herstellerdaten) und der Durchmesser der ersten Bohrstufe nach dem Durchmesser des Dübels (Herstellerdaten) richten kann. Dies muss jedoch nicht zwingend so sein.Step drill according to protection claim 1, characterized in that the lengths of the first drilling step after the required minimum drilling depth of the anchor (manufacturer data) and the diameter of the first drilling step according to the diameter of the Dü bels (manufacturer data). However, this does not necessarily have to be the case. Stufenbohrer nach Schutzanspruch 1, dadurch gekennzeichnet, dass die Schneide (S1) der zweiten Bohrstufe 45° zur Bohrachse ausgerichtet sind. Dies muss jedoch nicht zwingend so sein.Step drill according to protection claim 1, characterized the cutting edge (S1) of the second drilling step is oriented 45 ° to the drilling axis are. However, this does not necessarily have to be the case. Stufenbohrer nach Schutzanspruch 1, dadurch gekennzeichnet, dass sich die Länge der zweiten Bohrstufe nach der Holzfaserplattenstärke und der Durchmesser der zweiten Bohrstufe nach dem Dübel (Herstellerdaten) richten kann. Dies muss jedoch nicht zwingend so sein.Step drill according to protection claim 1, characterized that is the length the second drilling stage according to the wood fiber board thickness and the diameter of the second drilling step after the dowel (manufacturer data) can. However, this does not necessarily have to be the case. Stufenbohrer nach Schutzanspruch 1, dadurch gekennzeichnet, dass die Position, Länge sowie die Breite der Flächenanfräsung auf der zweiten Bohrstufe sich nach dem Schutzanspruchstellers richten kann.Step drill according to protection claim 1, characterized that the position, length and the width of the Flächenanfräsung on the second drilling stage can be based on the claimant protection. Stufenbohrer nach Schutzanspruch 1, dadurch gekennzeichnet, dass die Position, die Länge sowie die Durchmesser des Tiefenbegrenzers sich nach dem Schutzanspruchstellers richten kann.Step drill according to protection claim 1, characterized that the position, the length and the diameter of the depth limiter after the protection claimant can judge.
DE200920017409 2009-12-23 2009-12-23 Combination special drill for wood fiber insulation board façade bores Expired - Lifetime DE202009017409U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200920017409 DE202009017409U1 (en) 2009-12-23 2009-12-23 Combination special drill for wood fiber insulation board façade bores

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200920017409 DE202009017409U1 (en) 2009-12-23 2009-12-23 Combination special drill for wood fiber insulation board façade bores

Publications (1)

Publication Number Publication Date
DE202009017409U1 true DE202009017409U1 (en) 2010-04-15

Family

ID=42105647

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200920017409 Expired - Lifetime DE202009017409U1 (en) 2009-12-23 2009-12-23 Combination special drill for wood fiber insulation board façade bores

Country Status (1)

Country Link
DE (1) DE202009017409U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012104066A1 (en) * 2011-02-02 2012-08-09 MAPAL Fabrik für Präzisionswerkzeuge Dr. Kress KG Drilling tool and method for producing drill holes
CN106378834A (en) * 2016-11-29 2017-02-08 梧州市三禾添佰利五金加工有限公司 Improved wood product machining straight knife

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012104066A1 (en) * 2011-02-02 2012-08-09 MAPAL Fabrik für Präzisionswerkzeuge Dr. Kress KG Drilling tool and method for producing drill holes
CN106378834A (en) * 2016-11-29 2017-02-08 梧州市三禾添佰利五金加工有限公司 Improved wood product machining straight knife

Similar Documents

Publication Publication Date Title
EP1857607B1 (en) Element for and method of fixing insulation panels
DE3346704C2 (en)
EP2840201B1 (en) Device for driving an expansion element into a dowel.
DE102007046323B3 (en) Fastening element and method for recessed mounting of an insulation board
EP1691086B1 (en) Insulating material fixing means
DE102005046092A1 (en) Expansion dowel for fixing insulation boards
EP2397705B1 (en) Anchoring system for distanced tension-free mounting of an element to an anchoring base
DE202009017409U1 (en) Combination special drill for wood fiber insulation board façade bores
EP3421678B1 (en) Method for the application of insulating panels and fixing system for the same
EP2527550A2 (en) Fitting for connecting the planks of a terrace covering with a substructure beneath it
EP3138974B1 (en) Fastening system for attaching insulating boards or similar insulating material to a supporting base
DE102010045445A1 (en) Mounting system for insulating panels
DE2803709A1 (en) Facade cladding panel stay bolt - is hollow with outside opening to hold spreader pin
DE10213490B4 (en) Method for mounting insulation boards
EP2138642A2 (en) Composite wall
EP2336444B1 (en) Method for attaching insulation panels using assembly aid
EP2409821A1 (en) Method for manufacturing panel elements
EP3176357A1 (en) Receiving element for a shading device and method for fixing same on the outside of a building
DE102006014084A1 (en) Device for furring of wood slats, comprises threaded rod of different length, is centrally connected with metal or plastic disk, and metal sleeve is continuous opened with internal thread
EP0810376A1 (en) Adjusting screw for assembly
EP3239430B1 (en) Method for manufacturing a facade system and device for executing the method
DE102016110478A1 (en) Fastening element with screw section and sliding shaft
DE202009005336U1 (en) Dowels for driving into a hole
DE102012017730A1 (en) Connector for connecting component e.g. sand-lime brick component for wall, has mounting element that is provided with several specific sections which are connected with open threaded sleeve
WO2023062135A1 (en) Frame screw

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20100520

R156 Lapse of ip right after 3 years

Effective date: 20130702