DE202006011748U1 - Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals - Google Patents

Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals Download PDF

Info

Publication number
DE202006011748U1
DE202006011748U1 DE202006011748U DE202006011748U DE202006011748U1 DE 202006011748 U1 DE202006011748 U1 DE 202006011748U1 DE 202006011748 U DE202006011748 U DE 202006011748U DE 202006011748 U DE202006011748 U DE 202006011748U DE 202006011748 U1 DE202006011748 U1 DE 202006011748U1
Authority
DE
Germany
Prior art keywords
precast concrete
masts
concrete foundation
foundation
signals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202006011748U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DB Bahnbau Gruppe GmbH
Original Assignee
DB Bahnbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DB Bahnbau GmbH filed Critical DB Bahnbau GmbH
Priority to DE202006011748U priority Critical patent/DE202006011748U1/en
Publication of DE202006011748U1 publication Critical patent/DE202006011748U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/658Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing
    • E01F9/673Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing for holding sign posts or the like
    • E01F9/681Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing for holding sign posts or the like the sign posts being fastened by removable means, e.g. screws or bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

u The anchorage device has a precast concrete part foundation, which is usable for steel narrow masts of signals, in particular by HL-signals. In a centric position, into the precast concrete part foundation (1) and between armouring (2), two holes (7) are provided, with rails (3, 4) inclined to each other. The rails have two spacers (5, 6) positioned to each other. The holes allow a bolt (8) to be screwed in or welded with its end having a thread extending from the precast concrete part foundation.

Description

Die Erfindung betrifft eine Verankerungsvorrichtung zur Bodenverankerung von Masten, insbesondere von Verkehrssignalanlagen des Schienenverkehrs, wobei ein Betonfertigteilfundament zur Anwendung kommt, welches für Stahlschmalmasten von Signalen, insbesondere von HL-Signalen, verwendet wird.The The invention relates to an anchoring device for ground anchoring of masts, in particular rail signaling systems, wherein a precast concrete foundation is used, which for steel pylons from Signals, in particular of HL signals, is used.

Es ist bekannt, Masten für Verkehrssignalanlagen entweder direkt in den Boden einzulassen und über eine reine Erdverdichtung zu stabilisieren oder über eine einfassende Ortbetonschüttung aus Magerbeton im Erdreich zu verankern.It is known masts for Traffic signal systems either directly into the ground and over a stabilize pure soil compaction or over a enclosing in-situ concrete fill To anchor lean concrete in the ground.

Während ersteres für den Fuß des Mastes eine verstärkte Korrosion und zudem eine unsichere Standfestigkeit bedeutet, ist letztere Variante damit verbunden, dass der Mast zumeist nur mit der Ortbetonschüttung wieder aus dem Erdreich entnommen werden kann und der Beton mühsam vom Fuß des Mastes entfernt werden muss. Zudem muss beim Rückbau der Urzustand des Geländes wieder hergestellt werden.While the former for the Foot of the Mastes a reinforced Corrosion and also an unsafe stability means is the latter variant associated with it, that the mast mostly only with the in-situ concrete pouring can be taken out of the ground again and the concrete laboriously from Foot of the mast must be removed. In addition, the original state of the terrain must be restored when dismantling getting produced.

Dies ist bei temporären Zuständen sehr aufwendig.This is at temporary states very expensive.

Weiterhin ist es bekannt, Masten mittels eines Schraubpfahles und/oder eines schraubenförmigen Kopfes in das Erdreich einzudrehen. Der Schraubanker verbleibt danach im Erdreich ( DE 1953 597 U1 ). Die DE 24 33 270 A1 beschreibt eine Kombination aus Beton- und Schraubpfahlgründung. Diese Art der Gründung setzt voraus, dass der Untergrund das Einführen/Eindrehen einer Schraubverankerung in der notwendigen Tiefe zulässt (gewachsener Boden). Das Eindrehen von Schraubankern für Verkehrssignalanlagen kann nicht mehr per hand erfolgen. Hierfür sind aufwendige maschinelle Verfahren notwendig.Furthermore, it is known to turn masts by means of a screw pile and / or a helical head in the ground. The screw anchor then remains in the ground ( DE 1953 597 U1 ). The DE 24 33 270 A1 describes a combination of concrete and screw pile foundation. This type of foundation requires that the substrate allows the insertion / insertion of a screw anchoring in the necessary depth (grown soil). The screwing of screw anchors for traffic signal systems can no longer be done by hand. For this complex mechanical procedures are necessary.

Aus der DE 42 38 181 A1 ist eine Verankerungsvorrichtung für Maste bekannt, die sich aus mehreren in den Beton einzulassenden rohrförmigen Ankerhülsen zusammensetzt, welche über eins Querplatte positioniert und über Schraubdübel verbunden werden. Darauf wird der Mastfuß mit seinem vorgefertigten Unterteil aufgesetzt und befestigt. Die Verwendung von Hülsen in Verbindung mit Schraubdübeln setzt eine sehr genaue Positionierung der Hülsen im Beton voraus, damit der Mastfuß exakt passend aufgesetzt werden kann.From the DE 42 38 181 A1 An anchoring device for masts is known, which is composed of several einzulassenden into the concrete tubular anchor sleeves, which are positioned over a transverse plate and connected via screw plugs. Then the mast base with its prefabricated lower part is placed and fastened. The use of sleeves in conjunction with screw anchors requires a very accurate positioning of the sleeves in the concrete, so that the mast base can be placed exactly fitting.

Der Erfindung liegt die Aufgabe zugrunde, eine Mastverankerungsvorrichtung zu entwickeln, die in ein multivalent einsetzbares Fertigteilfundamentes eingebunden, kostengünstig herstellbar und für eine Vielzahl von Mastaufnahmen verwendbar ist. Das Fertigteilfundament soll dabei einfach und für den Mast standsicher auf den Boden aufgesetzt werden können und wieder verwendbar sein.Of the Invention is based on the object, a mast anchoring device to be integrated into a multi-purpose precast foundation, economical manufacturable and for a variety of pole mounts is usable. The precast foundation should be simple and for the mast can be safely placed on the ground and be reusable.

Dies wird erfindungsgemäß dadurch erreicht, dass in mittiger Positionierung in das Betonfertigteilfundament zwischen die Bewehrung zwei Bohrungen aufweisende und mit ihren senkrechten Wangen zueinander angeordnete Winkelschienen eingelassen sind, wobei die Winkelschienen durch mehrere, vorzugsweise zwei Abstandshalter zueinander positioniert sind und in die Bohrungen jeweils Ankerbolzen eingelassen oder eingeschraubt oder eingeschweißt sind, die mit ihren jeweils ein Gewinde aufweisenden Enden aus dem Betonfertigteilfundament herausragend angeordnet sind.This is characterized according to the invention achieved that in central positioning in the precast concrete foundation between the reinforcement having two holes and with their vertical cheeks to each other arranged angle rails embedded are, wherein the angle rails by a plurality, preferably two Spacers are positioned to each other and into the holes anchor bolts are inserted or screwed in or welded in, the outstanding with their respective threaded ends of the precast concrete foundations are arranged.

Das Betonfertigteilfundament ist rechteckförmig ausgebildet und mit seiner breiteren Aufstandsfläche auf den Boden aufgesetzt. Bei HL-Fundamenten zwischen den Gleisen wird das Betonfertigteilfundament seitlich eingeschottert. Dies ist notwendig, um unzulässige Schwingungen des HL-Signales bei Zugfahrten zu vermeiden.The Precast concrete foundation is rectangular in shape and with its wider footprint put on the floor. For HL foundations between the tracks the concrete precast foundation is laterally encased. This is necessary to improper Avoid vibrations of the HL signal during train movements.

Das Verhältnis von Länge zu Höhe des Betonfertigteilfundamentes ist zwischen 7:1 bis 11:1 und von Breite zu Höhe zwischen 4:1 bis 7:1 ausgeführt (es ist ein konkreter Bezug auf die jeweilige Ausführung/Zeichnung notwendig, da die Statik auf die Bemaßung abhebt).The relationship of length to height precast concrete foundation is between 7: 1 to 11: 1 and from Width to height between 4: 1 to 7: 1 executed (it a concrete reference to the respective execution / drawing is necessary, because the statics on the dimensioning apart).

Das Betonfertigteilfundament weist mindestens einen mit der Bewehrung verbundenen und in einer Aussparung für das Lastaufnahmemittel eingesetzten Transportanker auf.The Prefabricated concrete foundation has at least one with the reinforcement connected and inserted in a recess for the load-carrying means Lift anchor on.

Im Betonfertigteilfundament ist mindestens eine abgewinkelte Steckhülse für ein im Bahnsteigbereich zu verwendendes einsteckbares Geländer angeordnet.in the Precast concrete foundation is at least one angled receptacle for a in Platform area to be used pluggable railing arranged.

In das Betonfertigteilfundament ist mindestens eine Schutzhülse für die Durchführung von Kabelanschlüssen eingebettet ist.In the precast concrete foundation is at least one protective sleeve for the implementation of cable connections is embedded.

In das Betonfertigteilfundament sind gerade Steckhülsen für ein Steckgeländer eingelassen.In the precast concrete foundations are straight recessed sockets for a Steckgeländer.

Der Erfindung liegen folgende Vorteile zugrunde:

  • 1. Das Fertigteilfundament mit Mastbefestigung ist einfach und kostengünstig herstellbar und variabel an den verschiedensten Orten einsetzbar.
  • 2. Die Mastgründung ist wieder verwendbar und benötigt nur eine plane Fläche zum Aufsetzen.
  • 3. Auf der erfindungsgemäßen Mastverankerung sind die Stahlschmalmaste für HL-Signale bis zur technischen Maximalbestückung des Signalschirmes aufsetzbar.
  • 4. Aufgrund der sehr flachen und hierzu relativ breiten sowie langen Ausführung des Fundamentes ist es sehr standsicher ausgelegt.
  • 5. In die im Fertigteilfundament eingelassenen Steckhülsen können die verschiedensten Steckgeländer eingeführt werden.
  • 6. Auch die elektrischen Zu- sowie Ableitungen des Mastes können problemlos durch das Fundament geführt werden.
  • 7. Das Fertigteilfundament ist für Anwendung bei temporären Zuständen vorgesehen, wobei das sonst übliche Ein- und Ausgraben von Erdfüßen für Stahlschmalmaste entfällt.
The invention is based on the following advantages:
  • 1. The prefabricated foundation with mast attachment is simple and inexpensive to produce and variable used in a variety of places.
  • 2. The mast foundation is reusable and only needs a flat surface for placement.
  • 3. On the mast anchorage according to the invention, the Stahlschmalmaste for HL signals to the maximum technical equipment of the signal shield can be placed.
  • 4. Due to the very flat and this relatively wide and long version of the foundation, it is designed very stable.
  • 5. The various plug-in railings can be inserted into the receptacles embedded in the prefabricated foundation.
  • 6. The electrical supply and discharge of the mast can be easily passed through the foundation.
  • 7. The precast foundation is intended for use in temporary conditions, eliminating the usual burial and excavation of soil feet for steel pylons.

Ausführungsbeispielembodiment

Nachfolgend soll die Erfindung anhand eines Ausführungsbeispieles näher erläutert werde.following the invention will be explained in more detail using an exemplary embodiment.

Dabei zeigen:there demonstrate:

1 – das Fertigteilfundament mit Mastaufnahme im Längsschnitt 1 - The prefabricated foundation with mast support in longitudinal section

2 – das Fertigteilfundament mit Mastaufnahme in der Draufsicht 2 - The prefabricated foundation with mast support in plan view

3 – das Fertigteilfundament mit Mastaufnahme im Querschnitt 3 - The prefabricated foundation with mast support in cross section

4 – die Winkelschienenkonstruktion als detail in der Draufsicht 4 - The angle rail construction as detail in the plan view

5 – die Winkelschienenkonstruktion im Querschnitt 5 - The angle rail construction in cross section

6 – die Ausführung und Einbindung der abgewinkelten Steckhülse in das Fundament im Querschnitt 6 - The execution and integration of the angled socket in the foundation in cross section

Das Betonfertigteilfundament 1 weist in mittiger Positionierung zwischen der Bewehrung 2 die beiden Winkelschienen 3; 4 auf, die über die Abstandshalter 5; 6 miteinander verbunden sind. Jede Winkelschiene 3; 4 weist mehrere Bohrungen 7 auf, in die jeweils die Ankerbolzen 8 eingelassen bzw. eingeschraubt werden.The precast concrete foundation 1 points in central positioning between the reinforcement 2 the two angle rails 3 ; 4 on that over the spacers 5 ; 6 connected to each other. Every angle rail 3 ; 4 has several holes 7 on, in each of the anchor bolts 8th be inserted or screwed.

Das Betonfertigteilfundament 1 weist darüber hinaus mindestens einen Transportanker 9, mindestens eine abgewinkelte Steckhülse 10 für ein nicht dargestelltes einsteckbares Bahnsteiggeländer sowie mindestens eine Schutzhülse 11 für die Durchführung von Kabelanschlüssen des abzustützen Mastes auf.The precast concrete foundation 1 also has at least one transport anchor 9 , at least one angled socket 10 for an unillustrated plug-in platform railing and at least one protective sleeve 11 for carrying out cable connections of the mast to be supported.

Zur Einführung eines ebenfalls nicht dargestellten weiteren Steckgeländers weist das Betonfertigteilfundament 1 zudem gerade Steckhülsen 12 auf.For the introduction of another plug rail also not shown, the precast concrete foundations 1 also straight sockets 12 on.

11
BetonfertigteilfundamentPrecast concrete foundation
22
Bewehrungreinforcement
33
Winkelschieneangle rail
44
Winkelschieneangle rail
55
Abstandshalterspacer
66
Abstandshalterspacer
77
Bohrungdrilling
88th
Ankerbolzenanchor bolts
99
TransportankerLifting anchor
1010
abgewinkelte Steckhülseangled receptacle
1111
Schutzhülseprotective sleeve
1212
gerade Steckhülsejust receptacle

Claims (7)

Verankerungsvorrichtung zur Bodenverankerung von Masten, insbesondere von Verkehrssignalanlagen des Schienenverkehrs, wobei ein Betonfertigteilfundament zur Anwendung kommt, welches für Stahlschmalmasten von Signalen, insbesondere von HL-Signalen, verwendbar ist, gekennzeichnet dadurch, dass in mittiger Positionierung in das Betonfertigteilfundament (1) zwischen die Bewehrung (2) zwei Bohrungen (7) aufweisende und mit ihren senkrechten Wangen zueinander angeordnete Winkelschienen (3; 4) eingelassen sind, wobei die Winkelschienen (3; 4) durch mehrere, vorzugsweise zwei Abstandshalter (5; 6) zueinander positioniert sind und in die Bohrungen (7) jeweils Ankerbolzen (8) eingelassen oder eingeschraubt oder eingeschweißt sind, die mit ihren jeweils ein Gewinde aufweisenden Enden aus dem Betonfertigteilfundament (1) herausragend angeordnet sind.Mooring device for ground anchoring of masts, in particular of traffic signal systems of rail transport, using a concrete precast foundation, which is used for steel masts of signals, in particular HL signals, characterized in that in central positioning in the precast concrete foundation ( 1 ) between the reinforcement ( 2 ) two holes ( 7 ) and with their vertical cheeks to each other arranged angle rails ( 3 ; 4 ) are embedded, wherein the angle rails ( 3 ; 4 ) by a plurality, preferably two spacers ( 5 ; 6 ) are positioned to each other and into the holes ( 7 ) anchor bolts ( 8th ) are embedded or screwed or welded, which with their respective threaded ends of the precast concrete foundation ( 1 ) are arranged outstanding. Vorrichtung nach Anspruch 1, gekennzeichnet dadurch, dass das Betonfertigteilfundament (1) rechteckförmig ausgebildet und mit seiner breiteren Aufstandsfläche auf den Boden aufgesetzt ist oder bei HL-Fundamenten zwischen den Gleisen eine seitliche Einschotterung aufweist.Apparatus according to claim 1, characterized in that the precast concrete foundation ( 1 ) has a rectangular shape and is placed with its wider footprint on the ground or HL-foundations between the tracks has a lateral ballast gravel. Vorrichtung nach Anspruch 1 und 2, gekennzeichnet dadurch, dass das Verhältnis von Länge zu Höhe des Betonfertigteilfundamentes zwischen 7:1 bis 11:1 und von Breite zu Höhe zwischen 4:1 bis 7:1 ausgeführt ist (konkreter Bezug auf die jeweilige Zeichnung notwendig, da die Statik darauf abhebt).Apparatus according to claim 1 and 2, characterized in that the ratio of length to height precast concrete foundation between 7: 1 to 11: 1 and of width to height between 4: 1 to 7: 1 is (concrete reference to the respective drawing necessary because the Statics stands out). Vorrichtung nach Anspruch 1 bis 3, gekennzeichnet dadurch, dass das Betonfertigteilfundament (1) mindestens einen mit der Bewehrung (2) verbundenen und in einer Aussparung für das Lastaufnahmemittel eingesetzten Transportanker (9) aufweist.Apparatus according to claim 1 to 3, characterized in that the precast concrete foundation ( 1 ) at least one with the reinforcement ( 2 ) and used in a recess for the load-carrying means transport anchor ( 9 ) having. Vorrichtung nach Anspruch 1 bis 4, gekennzeichnet dadurch, dass im Betonfertigteilfundament (1) mindestens eine abgewinkelte Steckhülse (10) für ein im Bahnsteigbereich zu verwendendes einsteckbares Geländer angeordnet ist.Apparatus according to claim 1 to 4, characterized in that in the precast concrete foundation ( 1 ) at least one angled plug-in sleeve ( 10 ) for einsteck to be used in the platform area Bares railing is arranged. Vorrichtung nach Anspruch 1 bis 5, gekennzeichnet dadurch, dass in das Betonfertigteilfundament (1) mindestens eine Schutzhülse (11) für die Durchführung von Kabelanschlüssen eingebettet ist.Apparatus according to claim 1 to 5, characterized in that in the precast concrete foundation ( 1 ) at least one protective sleeve ( 11 ) is embedded for the passage of cable connections. Vorrichtung nach Anspruch 1 bis 6, gekennzeichnet dadurch, dass in das Betonfertigteilfundament (1) gerade Steckhülsen (12) für ein Steckgeländer eingelassen sind.Apparatus according to claim 1 to 6, characterized in that in the precast concrete foundation ( 1 ) straight sockets ( 12 ) are embedded for a plug railing.
DE202006011748U 2006-07-28 2006-07-28 Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals Expired - Lifetime DE202006011748U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202006011748U DE202006011748U1 (en) 2006-07-28 2006-07-28 Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202006011748U DE202006011748U1 (en) 2006-07-28 2006-07-28 Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals

Publications (1)

Publication Number Publication Date
DE202006011748U1 true DE202006011748U1 (en) 2006-11-09

Family

ID=37440412

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202006011748U Expired - Lifetime DE202006011748U1 (en) 2006-07-28 2006-07-28 Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals

Country Status (1)

Country Link
DE (1) DE202006011748U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2468597A (en) * 2009-03-13 2010-09-15 Unipart Rail Ltd Free standing railway signal
DE102009016892A1 (en) 2009-04-08 2010-10-14 Nordex Energy Gmbh Device for detachable connection of hybrid tower section, with base plate of wind energy plant, has anchoring component comprising reinforcement element, which protrudes from anchoring component
EP2447420A1 (en) 2010-10-28 2012-05-02 Alpine-Energie Österreich GmbH Mast
IT201800010469A1 (en) * 2018-11-20 2020-05-20 Tecnoteam Italia Soc A Responsabilita Limitata Semplificata RAILWAY SIGNAGE DEVICE INTENDED TO BE INSTALLED NEAR A TRACK.

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2468597A (en) * 2009-03-13 2010-09-15 Unipart Rail Ltd Free standing railway signal
DE102009016892A1 (en) 2009-04-08 2010-10-14 Nordex Energy Gmbh Device for detachable connection of hybrid tower section, with base plate of wind energy plant, has anchoring component comprising reinforcement element, which protrudes from anchoring component
EP2447420A1 (en) 2010-10-28 2012-05-02 Alpine-Energie Österreich GmbH Mast
IT201800010469A1 (en) * 2018-11-20 2020-05-20 Tecnoteam Italia Soc A Responsabilita Limitata Semplificata RAILWAY SIGNAGE DEVICE INTENDED TO BE INSTALLED NEAR A TRACK.

Similar Documents

Publication Publication Date Title
DE102005007721B4 (en) Fixing anchor and arrangement of the same in a porous material
DE102009037175A1 (en) System for anchoring various building structures e.g. masts, to ground, has fixing part transversely fitted by anchor plate and including end section that projects outside over anchor plate for supporting weight
DE202006011748U1 (en) Anchorage device e.g. for ground anchoring of masts for traffic signs for railway traffic, has precast concrete part foundation which is usable for steel narrow masts of signals
EP2159354A1 (en) Device for fixing posts for protective walls
DE29623605U1 (en) Device for attaching bolt anchors to concrete structures
DE202006018112U1 (en) Fixing device for signal post, has fastening bolts that are fixed in fastening base, and spacer blocks, where each spacer block comprises supporting surface for foot of signal post, and surface is supported on base
DE102011050340B4 (en) Edge formwork element
DE10250257B4 (en) Straßenleitpfostenfuß
DE2939472A1 (en) Concrete column with prestressed rods - also has after stressing rods wedged in anchor plate with screw holes
DE202011001106U1 (en) System for horizontal alignment of a track rail of a fixed rail track
DE102009056332A1 (en) Connection element for supports, has spring element and pin arranged such that connection element is fastened at joint by insertion of support on connection element and locking receiving device corresponding to spring element and pin
DE3742217C1 (en) Anchorage of a pillar crane
CH677683A5 (en)
DE19603682A1 (en) Releasable anchor element for configuration and service objects in public traffic areas
DE19922005C2 (en) Gesimsbearbeitung
EP0346524B1 (en) Securing device for sleeve-joints in scaffolding
DE202009018841U1 (en) Drill foundation with cylindrical base body
EP3147411B1 (en) Supporting wall
DE102004013945B4 (en) Method and device for buoyancy and position assurance for lines of all kinds, especially in civil engineering when filling or refilling trenches or channels
DE102007018335B4 (en) Foundation for a mast
AT396278B (en) SUPPORT DEVICE
AT385553B (en) Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like
AT513575B1 (en) Device for fastening a frame element of a machine
AT521695B1 (en) MOLDED STONE FOR AN OVERFLOW GUTTER
DE10330878B3 (en) Method for the subsequent insertion of push-through connections in concrete sleepers

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20061214

R150 Term of protection extended to 6 years

Effective date: 20090819

R081 Change of applicant/patentee

Owner name: DB BAHNBAU GRUPPE GMBH, DE

Free format text: FORMER OWNER: DB BAHNBAU GMBH, 06108 HALLE, DE

Effective date: 20101214

R151 Term of protection extended to 8 years
R151 Term of protection extended to 8 years

Effective date: 20120928

R152 Term of protection extended to 10 years
R152 Term of protection extended to 10 years

Effective date: 20140811

R071 Expiry of right