DE19961705A1 - Vorrichtung zur dezentralen Einspeisung regenerativer Energie - Google Patents

Vorrichtung zur dezentralen Einspeisung regenerativer Energie

Info

Publication number
DE19961705A1
DE19961705A1 DE1999161705 DE19961705A DE19961705A1 DE 19961705 A1 DE19961705 A1 DE 19961705A1 DE 1999161705 DE1999161705 DE 1999161705 DE 19961705 A DE19961705 A DE 19961705A DE 19961705 A1 DE19961705 A1 DE 19961705A1
Authority
DE
Germany
Prior art keywords
voltage
komp
setpoint
inverter
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE1999161705
Other languages
English (en)
Other versions
DE19961705B4 (de
Inventor
Guenther Cramer
Werner Kleinkauf
Mike Meinhardt
Peter Zacharias
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMA Solar Technology AG
Original Assignee
SMA REGELSYSTEME GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SMA REGELSYSTEME GmbH filed Critical SMA REGELSYSTEME GmbH
Priority to DE1999161705 priority Critical patent/DE19961705B4/de
Publication of DE19961705A1 publication Critical patent/DE19961705A1/de
Application granted granted Critical
Publication of DE19961705B4 publication Critical patent/DE19961705B4/de
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/12Arrangements for reducing harmonics from ac input or output

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Inverter Devices (AREA)

Abstract

Beschrieben ist ein insbesondere für den Einsatz in der Photovoltaik ausgelegter Wechselrichter 10 zur Ankopplung eines Solargenerators 11 an ein elektrisches Energieversorgungsnetz 12. Der Wechselrichter 10 weist eine Regelungseinheit 20 auf, die eine wechselrichterinterne dynamische Berechnung eines zur Kompensation von im Netz etwa auftretenden Oberschwingungen und Blindleistung dienenden Kompensationsstromes ermöglicht und somit zur Verbesserung der Netzspannungsqualität beiträgt. Die Kompensation erfolgt mittels eines Regelkreises auf der Grundlage des berechneten Kompensationsstromes, wobei ein Kompensationsstrom-Sollwert, basierend auf gemessenen Ist-Werten der Netzspannung und Netzimpedanz, dynamisch berechnet wird. Der berechnete Kompensationsstrom-Sollwert wird dem Wechselrichterausgangsstrom-Regelkreis zugeführt, welcher durch Ansteuerung eines Wechselrichterleistungsteils die Einspeisung des Kompensationsstromes und der photovoltaischen Energie in das elektrische Energieversorgungsnetz 12 gewährleistet.

Description

Die Erfindung betrifft eine Vorrichtung zur dezentralen Energieversorgung eines Energienetzes, aufweisend Mittel zur Einspeisung regenerativer Energie in das Energienetz. Ferner bezieht sich die Erfindung auf einen entsprechenden Stromrichter.
Auf dem Gebiet der Photovoltaik (PV) sind PV-Wechselrichter bekannt, die Stromrichter darstellen, deren Aufgabe die Umwandlung von Gleich­ spannungsleistung in Wechselspannungsleistung darstellt, mit dem Ziel, photovoltaisch erzeugte Leistung in ein elektrisches Inselnetz oder in ein großräumiges elektrisches Energieversorgungsnetz einzuspeisen. Die Qualität der elektrischen Energieversorgung ist neben der Verfügbarkeit des Netzes im wesentlichen bestimmt durch Netzspannungseffektivwert, Netzfrequenz und Kurvenform der Netzspannung. Die Liberalisierung des europäischen Strommarktes birgt die Gefahr einer Verschlechterung der Stromversorgungsqualität. Durch die zunehmende Zahl der Anschlüsse elektronischer Geräte mit nicht-linearer Verbraucherkennlinie wird die Notwendigkeit für aktive Maßnahmen zur Verbesserung der Stromqualität noch weiter erhöht.
Eine Verbesserung der Stromversorgungsqualität (Spannungsqualität) kann prinzipiell geschehen durch
  • a) gezieltes Einspeisen bzw. Verbrauchen von Grundschwingungs­ blindleistung zur Anhebung bzw. Absenkung des Netzspannungs­ effektivwertes mittels (geschalteter) Kondensatoren oder geeigneter Stromrichter;
  • b) gezieltes Einspeisen bzw. Herausfiltern von Oberschwingungsströmen zur 'Entzerrung' der Netzspannungskurven (Verringerung des Klirrfaktors) mittels passiver Filter (Bandpässen bzw. Bandsperren) oder geeigneter Stromrichter (aktive Filter).
Um der Verschlechterung der Netzqualität entgegenzuwirken, werden bei PV-Anlagen sogenannte selbstgeführte Wechselrichter eingesetzt, die meist nur reine Wirkleistung ins Netz einspeisen. Nachts werden diese Wechselrichter in der Regel vom Netz getrennt, da dann kein solares Energieangebot vorliegt und Stand by-Verluste vermieden werden sollen. Abhängig von der Schaltfrequenz der Wechselrichter ist der Oberschwingungsgehalt des Klemmenstroms relativ gering, so dass man häufig auch von "ideal sinusförmiger" Einspeisung redet. Die heutigen PV- Wechselrichter können allerdings nicht zur aktiven Verbesserung der Netzspannungsqualität eingesetzt werden.
Maßnahmen zur Spannungsqualitätsverbesserung kommen in den meisten Fällen an zentralen Netzpunkten (Sammelschienen oder Unterverteilungen) zum Einsatz. Um eine optimale Wirkung zu erzielen, muss die Kompensation von Oberschwingungsströmen und Blindleistung jedoch dezentral statt­ finden, da auch deren Generierung in den Verbrauchern dezentral geschieht. Derzeit hierfür eingesetzte Filter werden allerdings ausschließlich 'gesteuert' betrieben, d. h. die Sollwerte für die zu kompensierende Blindleistung und/oder Oberschwingungsströme werden stationär von außen vorgegeben. Eine 'Regelung' der Spannungsqualität findet nicht statt. Desweiteren erlauben diese aktiven Filter im Allgemeinen nicht die Einspeisung von Wirkleistung in das Netz über einen längeren Zeitraum.
Der vorliegenden Erfindung liegt somit die Aufgabe zugrunde, eine Vorrichtung der eingangs genannten Art bzw. einen entsprechenden Stromrichter anzugeben, welche die vorgenannten Nachteile vermeiden und insbesondere deren Effizienz in bezug auf die Verbesserung der Stromqualität im Netz möglichst zuverlässig zu erhöhen vermögen. Darüber hinaus sollen sie einfach und kostengünstig herstellbar sein.
Die genannten Aufgaben werden durch die Merkmale der unabhängigen Ansprüche gelöst. Vorteilhafte Ausgestaltungen sind in den Unteransprüchen angeführt.
Der Erfindung liegt das Konzept zugrunde, die Kompensation von Oberschwingungsströmen und Blindleistung geregelt und dezentral stattfinden zu lassen. Da auch deren Generierung in den Verbrauchern dezentral geschieht, bietet ein ebenfalls dezentrales Entgegenwirken den höchsten Grad an erzielbarer Wirkung, da es direkt an der Quelle ansetzt. Durch diese dezentrale und geregelte Art der Blindleistungs- und Ober­ schwingungskompensation werden insbesondere Verluste und Störungen vermieden, die durch eventuelle Über- bzw. Unterkompensation und/oder große räumliche Distanz zwischen störaussendender Quelle und Geräte zur Stromversorgungs-Qualitätsverbesserung in unnötiger Weise entstehen.
Die Besonderheit der Erfindung liegt nun darin, die Einspeisung regenera­ tiver Energie in ein Netz und eine kontrollierte Einflussnahme auf die Netzqualität in einer einzigen Vorrichtung gleichzeitig durchzuführen. Zu diesem Zweck wird eine Betriebsführungseinheit des Stromrichters erfindungsgemäß um einen Funktionsblock "Regelung der Spannung am Verknüpfungspunkt (VP)" erweitert, der den Zustand des angeschlossenen Netzes diagnostiziert und entsprechende Sollwerte für die zu kompensierenden Oberschwingungsströme und Blindleistung ermittelt. Dadurch wird eine geregelte Einflussnahme auf das Spannungsspektrum der Versorgungsspannung (Spannung am Verknüpfungspunkt) ermöglicht. Zudem ermöglicht der vorgeschlagene PV-Wechselrichter eine Regelung der Grundschwingungsamplitude der Verknüpfungspunktspannung an entfernt liegenden Verknüpfungs-Einspeisepunkten durch eine gezielte Einspeisung von Wirkleistung und/oder kapazitiver bzw. induktiver Blindleistung.
Natürlich kann die Einspeisung von Oberschwingungsströmen und kapazitiver bzw. induktiver Blindleistung auch weiterhin gesteuert erfolgen.
Der Einsatz eines PV-Wechselrichters mit integrierter, geregelter Filterfunktion ist zudem wirtschaftlich günstiger als der Einsatz von zwei getrennten Einheiten zur Einspeisung von PV-Energie und der Kompensation der Störgrößen, und zwar ein PV-Wechselrichter und daneben ein aktives Filter. Der vorgeschlagene Wechselrichter ist daher billiger und kleiner herstellbar als bekannte Geräte.
Bei der technischen Realisierung eines erfindungsgemäßen Stromrichters, insbesondere im Zusammenhang mit der erforderlichen Signal- bzw. Datenverarbeitung bei der Erfassung und Auswertung der genannten Netzgrößen, können vorteilhaft kostengünstige Digitale Signalprozessoren (DSP) eingesetzt werden.
Weitere Eigenschaften, Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden detaillierten Beschreibung eines Ausführungs­ beispieles.
Im Einzelnen zeigen
Fig. 1 Prinzipieller Aufbau eines erfindungsgemäßen PV-Wechselrichters in schematischer Blockdarstellung;
Fig. 2 die Struktur des Wechselrichterausgangsstrom-Regelkreises;
Fig. 3 die Funktionsgruppen der Verknüpfungspunkt­ spannungs (UVP)-Regelung;
Fig. 4 die Struktur des UVP-Regelkreises;
Fig. 1 zeigt den Prinzipaufbau eines erfindungsgemäßen Photovoltaik (PV)- Wechselrichters 10, der am Verknüpfungspunkt (VP) 15 gemeinsam mit anderen Verbrauchern 16 an das Energieversorgungsnetz 12 angeschlossen ist. Der PV-Wechselrichter 10 verbindet einen Solargenerator 11 mit einem elektrischen Energieversorgungsnetz 12, wobei eine vom Solargenerator 11 gelieferte Gleichspannung über ein Wechselrichterleistungsteil 13 in eine Wechselspannung umgewandelt wird.
Der PV-Wechselrichter 10 ist erfindungsgemäß als aktives Filter zur Regelung der Spannung bzw. Verbesserung der Spannungsqualität am Verknüpfungspunkt ausgebildet. Der PV-Wechselrichter besteht im Einzelnen aus einem leistungselektronischen Stellglied mit hoher Dynamik 13 und einer Betriebsführungs- und Systemsteuerungseinheit (BFS) 14. Die BFS umfasst eine Funktionseinheit 18, die die Überwachung sowie den Schutz des Wechselrichterleistungsteils übernimmt, so dass ein sicherer Betrieb der gesamten Anlage 10-12 gewährleistet ist. Desweiteren übernimmt diese Funktionseinheit die Kommunikation mit dem Benutzer.
Es existieren mehrere, kaskadierte Regelkreise, die ebenso Teil der BFS- Einheit sind. Der innerste Regelkreis ist die Wechselrichterausgangsstrom (IWr)-Regelung. Die überlagerten Regelkreise sind die Maximum Power Point (MPP)-Regelung 19 und die Verknüpfungspunktspannungs(UVP)-Regelung 20. Dabei ist IWR,Wirk* die Stellgröße des MPP-Reglers und IWR,Komp* die Stellgröße des UVP-Reglers.
Wie in Fig. 1 zu erkennen ist, setzt sich der Sollwert des IWR-Regelkreises aus der Summe des Wirkstromsollwertes IWR,Wirk*, der vom MPP-Regler vorgegeben wird, und dem Kompensationsstromsollwert IWR,Komp*, vorgegeben vom UVP-Regler, zusammen.
Die Struktur der IWR-Regelung ist in Fig. 2 dargestellt. Als Überlastungsschutz (z. B. Schutz der Leistungshalbleiter des PV- Wechselrichters vor zu hohen Strömen) enthält der IWR-Regelkreis eine Sollwertbegrenzung. Bei Überschreiten des maximal zulässigen Wertes wird eine Rückmeldung an den UVP- und/oder MPP-Regler gegeben, damit die Sollwerte (IWR,Wirk* bzw. IWR,Komp*) entsprechend verzerrungsfrei reduziert werden können.
Der PV-Wechselrichter dient als leistungselektronisches Stellglied. Die Verknüpfungspunktspannung UVP kann als Störgröße für den IWR-Regelkreis aufgefasst werden.
Die Anforderungen an die IWR-Regelung sind hohe Dynamik sowohl im Führungsverhalten als auch im Störverhalten. Die Grenzfrequenz der Regelung muss in jedem Fall größer sein als die höchste Frequenz des zu kompensierenden Oberschwingungsspektrums.
Die Implementierung dieser Regelung kann sowohl digital in einem Mikrorechner als auch analog geschehen.
Der 'Maximum Power Point Regler' sorgt durch die Vorgabe eines geeigneten Wirkanteils des Wechselrichterausgangsstrom-Sollwertes (IWR,Wirk*) für eine optimale Ausnutzung der vom Solargenerator 11 gelieferten Leistung.
Die vorliegende Erfindung benötigt keine besondere MPP-Regelstrategie. Es kann ein beliebiges aus der Vielzahl der in der Literatur beschriebenen Verfahren gewählt werden. Normalerweise wird die MPP-Regelung in einem Mikrorechner implementiert.
Wie in Fig. 3 zu sehen, umfasst die UVP-Regelung 20 folgende Funktionsblöcke: "Diagnose des Netzzustandes" 31, "Sollwertvorgabe eines gewünschten Spektrums der Verknüpfungspunktspannung" 32 und "Bestimmung des Kompensationsstromsollwertes" 33.
Alle Blöcke werden zyklisch abgearbeitet; somit erreicht man eine dynamische Anpassung des Kompensationsstromsollwertes an den aktuellen Netzzustand und man vermeidet Über- oder Unterkompensation. Die Realisierung der UVP-Regelung kann beispielsweise in einem Mikrorechner bzw. digitalen Signalprozessor geschehen.
Der Funktionsblock "Diagnose des Netzzustandes" stellt das Messglied des UVP-Regelkreises dar. Dieser Funktionsblock ist notwendig, um ein Bild von den Netzverhältnissen am Verknüpfungspunkt zu bekommen. Mögliche Realisierungen sind Messung und spektrale Analyse der Verknüpfungs­ punktspannung U VP und/oder Netzimpedanz Z VP (ZVP-Erfassung ist für die Funktionsweise nicht notwendig).
Für den Fall, dass die Verknüpfungspunktspannungs-Regelung n Frequenzanteile f1 bis fn (z. B. n = 3, f1 = 50 Hz, f2 = 150 Hz, f3 = 250 Hz) berücksichtigt, erhält man als Ausgabe der "Diagnose des Netzzustandes" m = 2n Signale. Dies kann beispielsweise Betrag und Phase oder auch Real- und Imaginärteil des entsprechenden Frequenzanteils der Spannung bzw. Impedanz sein.
Der Funktionsblock "Sollwertvorgabe . . ." 33 liefert die gewünschten spektralen Anteile (Frequenzanteil) der Verknüpfungspunktspannung (einschließlich der gewünschten Amplitude der Grundschwingung). Idealerweise wird man ein Spektrum ohne Oberschwingungsgehalt vorgeben. Da es sich beim Sollwert der Verknüpfungspunktspannung wie auch bei deren Istwert um eine komplexe Größe handelt, sind auch hier zwei Signale für jeden Frequenzanteil, also insgesamt m = 2 × n Signale zur Beschreibung des gewünschten Spektrums der Verknüpfungspunkt­ spannung U VP* notwendig. Dies ist jedoch in vielen Fällen unwirtschaftlich, denn es kann zu einem sehr großen Kompensationsstromsollwert führen. Ein weiterer möglicher Betriebsmodus besteht darin, dass Frequenzanteile der Oberschwingungsspannung unkompensiert bleiben. Dies ist denkbar für den Fall, dass die gemessenen Oberschwingungsspannungen innerhalb eines gewissen, vom Anlagenbetreiber vorgebbaren Toleranzbereiches (z. B. Grenzwerte nach IEC 1000-2-2) liegen.
Für den Fall, dass der Wechselrichterausgangsstrom-Regler eine Sollwertbegrenzung anzeigt, muss der Kompensationsstromsollwert verringert werden. Dies kann durch eine Änderung des gewünschten Spektrums der Verknüpfungspunktspannung geschehen.
Im Funktionsblock "Bestimmung des Kompensationsstromsollwertes" 32 wird der Kompensationsanteil des Wechselrichterausgangsstromsollwertes (IWR,Komp*), basierend auf der Kenntnis des Netzzustandes, so berechnet, dass die vorgegebenen Sollwerte der Oberschwingungsspannungen und der Grundschwingungsspannung eingeregelt werden können. Der Kompen­ sationsstromsollwert wird dann an den unterlagerten Wechselrichter­ ausgangsstrom-Regelkreis übergeben.
Die Funktionsweise der UVP-Regelung wird anhand von Fig. 4 erläutert. Für jeden zu kompensierenden Frequenzanteil f1 . . . fn ist ein gesonderter Regler vorzusehen. Jede dieser n Reglerbaugruppen 41-43 kann, wie beispiels­ weise bei der feldorientierten Regelung von Drehfeldmaschinen weit verbreitet, in einem mit der entsprechenden Frequenz (f1 . . . fn) rotierenden Koordinatensystem realisiert werden. Für den Fall, dass die Netzimpedanz am Verknüpfungspunkt zur Diagnose des Netzzustandes gemessen wird, kann ein dem Quotienten aus gemessener Verknüpfungspunktspannung und Impedanz am Verknüpfungspunkt proportionaler Wert (z. B. I WR,Komp* (f1)" = U VP,ist(f1).K(f1)/Z VP(f1)) auf den Reglerausgang (z. B. I WR,Komp* (f1)') in Form einer Vorsteuerung 45 aufgeschaltet werden. Eine eventuelle notwendige Begrenzung der Höhe des Stromsollwertanteils I WR,Komp*(t) kann durch Anpassung des Proportionalitätsfaktors (z. B. K(f1)) realisiert werden.
Zur Rücktransformation der Sollwerte (I WR,Komp*(fn)) in den Zeitbereich (I WR,Komp*(t) kann beispielsweise die Fouriertransformation verwendet werden.
Das Einsatzspektrum des vorgeschlagenen Stromrichters umfasst allgemein Netzanschlüsse von vorbeschriebenen PV-Anlagen, insbesondere Anschlüsse von PV-Anlagen an Verknüpfungspunkten mit hoher Netzimpedanz, d. h. 'schwachen Netzen'. Es versteht sich, dass der Stromrichter auch - über die beschriebene Anwendung im Bereich der Photovoltaik hinaus - bei Industrieanlagen, in denen sowohl Blind- und/oder Wirkleistungsschwankungen als auch Verzerrungen der Netzspannung in unterschiedlichem Maße auftreten, vorteilhaft eingesetzt werden kann. Letztere Störgrößen können beispielsweise durch einen diskontinuierlichen Produktionsprozess oder stark schwankende Tageslastkurven hervorgerufen sein.

Claims (22)

1. Vorrichtung zur dezentralen Energieversorgung eines Energienetzes (12), aufweisend Mittel (13) zur Einspeisung insbesondere regenerativer Energie in das Energienetz, gekennzeichnet durch eine Spannungsregelung (17, 20) am Verknüpfungspunkt (UVP- Regelung) zur kontrollierten Verbesserung der Qualität der Stromversorgung.
2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Mittel (13) zur Einspeisung von Energie und die UVP-Regelung (17, 20) in einer Baueinheit angeordnet sind.
3. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die UVP-Regelung (17, 20) Mittel (33) zur Vorgabe eines gewünschten Spannungsspektrums am Verknüpfungspunkt, sowie Mittel (31) zur Diagnose des Zustandes des Energienetzes sowie Mittel (32) zur Bestimmung von Sollwerten von zu kompensierenden Oberschwingungen und/oder einer zu kompensierenden Grundschwingungsblindleistung aufweist.
4. Vorrichtung nach Anspruch 3, gekennzeichnet durch Mittel (31) zur Bestimmung eines Netzspannungs-Istwertes sowie Mittel (32) zur insbesondere dynamischen Bestimmung eines Kompensationsstrom-Sollwertes aus dem ermittelten Netzspannungs- Istwert.
5. Vorrichtung nach Anspruch 4, gekennzeichnet durch Mittel zur insbesondere dynamischen Bestimmung eines Soll- Ausgangsstromes unter Berücksichtigung des Kompensationsstrom- Sollwertes und eines Wirkstromes.
6. Vorrichtung nach einem oder mehreren der vorangehenden Ansprüche, gekennzeichnet durch ein geregeltes, aktives Leistungsfilter.
7. Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, dass das geregelte Filter Mittel zur Regelung der Blindleistungsaufnahme aus bzw. Blindleistungslieferung an das Energienetz und/oder Mittel zur Regelung des Spektrums der Spannung am Verknüpfungspunkt mit dem Netz aufweist.
8. Vorrichtung nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass bei der Ermittlung von Sollwerten eine Begrenzung der Höhe des Sollwertes stattfindet, um den Wechselrichter vor Überlast zu schützen.
9. Vorrichtung nach Anspruch 8, dadurch gekennzeichnet, dass durch das Mittel (33) zur Sollwertvorgabe der Verknüpfungsspannung (U VP*) die Begrenzung der Höhe des Wechselrichterausgangsstrom-Sollwertes (I WR) auf der Basis des Frequenzbereiches erfolgt.
10. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass für jeden Frequenzanteil (fi) des Spektrums der Verknüpfungspunktspannung eine Regelbaugruppe (41-43) vorgesehen ist, wobei durch diesen Regler ein Wechselrichterstrom- Sollwert I WR,Komp*(fi) vorgegeben wird, wobei aus der Gesamtheit der Wechselrichterstrom-Sollwerte I WR,Komp*(f1) . . . I WR,Komp*(fn) durch Rücktransformation vom Frequenzbereich zum Zeitbereich der Sollwert des Kompensationsstroms im Zeitbereich I WR,Komp*(t) erzeugt wird.
11. Vorrichtung nach Anspruch 3 oder 10, dadurch gekennzeichnet, dass in Abhängigkeit von der Netzimpedanz am Verknüpfungspunkt und/oder Spannung am Verknüpfungspunkt für jeden Frequenzanteil (fi) ein Stromsollwert I WR,Komp*(fi)", berechnet aus Impedanz und einem der Spannung proportionalen Wert, auf den I WR,Komp*(fi)' aufgeschaltet wird.
12. Vorrichtung nach Anspruch 11, dadurch gekennzeichnet, dass durch Auswahl des Proportionalitätsfaktors der Spannung die Höhe des Stromsollwertes I WR,Komp*(fi)" begrenzbar ist.
13. Stromrichter, insbesondere Photovoltaik-Wechselrichter, mit einer Betriebsführungseinheit (14) zur Einspeisung insbesondere regenerativer Energie in ein Energienetz (12), gekennzeichnet durch eine wenigstens zweite Funktionseinheit (20) zur Diagnose des Zustandes des Energienetzes sowie Mittel (32) zur Ermittlung von Sollwerten von zu kompensierenden Oberschwingungen und/oder einer zu kompensierenden Blindleistung.
14. Stromrichter nach Anspruch 13, gekennzeichnet durch Mittel (31) zur Erfassung eines Netzspannungs-Istwertes sowie Mittel (32) zur dynamischen Bestimmung eines Kompensationsstrom- Sollwertes aus dem ermittelten Netzspannungs-Istwert.
15. Stromrichter nach Anspruch 13 oder 14, gekennzeichnet durch ein integriertes geregeltes Leistungsfilter.
16. Stromrichter nach einem oder mehreren der Ansprüche 13 bis 15, dadurch gekennzeichnet, dass das geregelte Filter Mittel zur Regelung der Blindleistungsaufnahme aus bzw. Blindleistungslieferung an das Energienetz und/oder Mittel zur Regelung des Spannungsspektrums der Spannung am Verknüpfungspunkt mit dem Netz aufweist.
17. Stromrichter nach einem oder mehreren der Ansprüche 13 bis 16, gekennzeichnet durch einen oder mehrere Mikroprozessoren und/oder digitale Signalprozessoren (DSP) zur Ausführung der Diagnose und/oder Ermittlung der Kompensationsstrom-Sollwerte und/oder Vorgabe einer gewünschten spektralen Zusammensetzung der Spannung am Verknüpfungspunkt und/oder Realisierung der Reglerbaugruppen und/oder Rücktransformation in den Zeitbereich.
18. Vorrichtung nach einem der voranstehenden Ansprüche 13 bis 16, dadurch gekennzeichnet, dass bei der Ermittlung von Sollwerten eine Begrenzung der Höhe des Sollwertes stattfindet, um den Wechselrichter vor Überlast zu schützen.
19. Vorrichtung nach Anspruch 18, dadurch gekennzeichnet, dass durch das Mittel (33) zur Sollwertvorgabe der Verknüpfungsspannung (U VP*) die Begrenzung der Höhe des Wechselrichterausgangsstrom-Sollwertes (I WR) auf der Basis des Frequenzbereiches erfolgt.
20. Vorrichtung nach Anspruch 13, dadurch gekennzeichnet, dass für jeden Frequenzanteil (fi) des Spektrums der Verknüpfungs­ punktspannung eine Regelbaugruppe (41-43) vorgesehen ist, wobei durch diesen Regler ein Wechselrichterstrom-Sollwert I WR,Komp*(fi) vorgegeben wird, wobei aus der Gesamtheit der Wechselrichterstrom- Sollwerte I WR,Komp*(f1) . . . I WR,Komp*(fn) durch Rücktransformation vom Frequenzbereich zum Zeitbereich der Sollwert des Kompensationsstroms im Zeitbereich I WR,Komp*(t) erzeugt wird.
21. Vorrichtung nach einem der Ansprüche 13 bis 20, dadurch gekennzeichnet, dass in Abhängigkeit von der Netzimpedanz am Verknüpfungspunkt und/oder Spannung am Verknüpfungspunkt für jeden Frequenzanteil (fi) ein Stromsollwert I WR,Komp*(fi)", berechnet aus Impedanz und einem der Spannung proportionalen Wert, auf den I WR,Komp*(fi)' aufgeschaltet wird.
22. Vorrichtung nach Anspruch 21, dadurch gekennzeichnet, dass durch Auswahl des Proportionalitätsfaktors der Spannung die Höhe des Stromsollwertes I WR,Komp*(fi)" begrenzbar ist.
DE1999161705 1999-12-21 1999-12-21 Vorrichtung zur dezentralen Einspeisung regenerativer Energie Expired - Fee Related DE19961705B4 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1999161705 DE19961705B4 (de) 1999-12-21 1999-12-21 Vorrichtung zur dezentralen Einspeisung regenerativer Energie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1999161705 DE19961705B4 (de) 1999-12-21 1999-12-21 Vorrichtung zur dezentralen Einspeisung regenerativer Energie

Publications (2)

Publication Number Publication Date
DE19961705A1 true DE19961705A1 (de) 2001-07-05
DE19961705B4 DE19961705B4 (de) 2005-12-01

Family

ID=7933600

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1999161705 Expired - Fee Related DE19961705B4 (de) 1999-12-21 1999-12-21 Vorrichtung zur dezentralen Einspeisung regenerativer Energie

Country Status (1)

Country Link
DE (1) DE19961705B4 (de)

Cited By (99)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1906505A1 (de) * 2006-09-23 2008-04-02 Kaco Gerätetechnik GmbH Umrichter und Steuerverfahren für einen Umrichter
DE102007041793A1 (de) 2007-09-03 2009-03-05 Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel e.V. Verfahren und Vorrichtung zur Bestimmung der Verluste eines Energiewandlers, insbesondere eines Stromrichters oder Synchrongenerators
US7807919B2 (en) 2007-11-02 2010-10-05 Tigo Energy, Inc. Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US7898112B2 (en) 2007-12-06 2011-03-01 Tigo Energy, Inc. Apparatuses and methods to connect power sources to an electric power system
US20110210706A1 (en) * 2010-01-14 2011-09-01 Andresen Bjoern Converter device and method for converting electrical power
US8039730B2 (en) 2009-06-18 2011-10-18 Tigo Energy, Inc. System and method for prevention of open loop damage during or immediately after manufacturing
US8058747B2 (en) 2008-08-01 2011-11-15 Tigo Energy, Inc. Systems to connect multiple direct current energy sources to an alternating current system
US8093757B2 (en) 2004-07-13 2012-01-10 Tigo Energy, Inc. Device for distributed maximum power tracking for solar arrays
US8102074B2 (en) 2009-07-30 2012-01-24 Tigo Energy, Inc. Systems and method for limiting maximum voltage in solar photovoltaic power generation systems
EP2445077A1 (de) 2010-10-06 2012-04-25 Adensis GmbH Photovoltaikanlage mit Blindleistungseinspeisung in Abhängigkeit der Netzspannung
EP2463980A2 (de) 2010-12-11 2012-06-13 Adensis GmbH Betrieb eines Energieerzeugers in einem Energieversorgungsnetz
EP2495838A1 (de) 2011-03-01 2012-09-05 Adensis GmbH Verfahren und Vorrichtung zur Stabilisierung des Netzbetriebs eines Energieversorgungsnetzes
US8271599B2 (en) 2010-01-08 2012-09-18 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller and a master controller in a photovoltaic power generation system
US8314375B2 (en) 2009-08-21 2012-11-20 Tigo Energy, Inc. System and method for local string management unit
US8325059B2 (en) 2008-11-12 2012-12-04 Tigo Energy, Inc. Method and system for cost-effective power line communications for sensor data collection
US8405349B2 (en) 2009-06-25 2013-03-26 Tigo Energy, Inc. Enhanced battery storage and recovery energy systems
WO2013060692A2 (de) 2011-10-28 2013-05-02 Sma Solar Technology Ag Nachführverfahren und -einrichtung für einen spannungswandler für eine photovoltaikanlage
DE102012210207A1 (de) * 2012-06-18 2013-12-19 Ge Energy Power Conversion Gmbh Verfahren und eine Vorrichtung zum Einspeisen von elektrischer Leistung in ein elektrisches Energieversorgungsnetz
US8653689B2 (en) 2008-11-12 2014-02-18 Tigo Energy, Inc. Method and system for current-mode power line communications
US8751053B2 (en) 2006-10-19 2014-06-10 Tigo Energy, Inc. Method and system to provide a distributed local energy production system with high-voltage DC bus
US8773236B2 (en) 2009-12-29 2014-07-08 Tigo Energy, Inc. Systems and methods for a communication protocol between a local controller and a master controller
US8823218B2 (en) 2007-11-02 2014-09-02 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US8841916B2 (en) 2011-02-28 2014-09-23 Tigo Energy, Inc. System and method for flash bypass
US8854193B2 (en) 2009-12-29 2014-10-07 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US8853886B2 (en) 2010-06-09 2014-10-07 Tigo Energy, Inc. System for use of static inverters in variable energy generation environments
US8860246B2 (en) 2008-11-26 2014-10-14 Tigo Energy, Inc. Systems and methods to balance solar panels in a multi-panel system
US8860241B2 (en) 2008-11-26 2014-10-14 Tigo Energy, Inc. Systems and methods for using a power converter for transmission of data over the power feed
US8922061B2 (en) 2010-03-22 2014-12-30 Tigo Energy, Inc. Systems and methods for detecting and correcting a suboptimal operation of one or more inverters in a multi-inverter system
US8933321B2 (en) 2009-02-05 2015-01-13 Tigo Energy, Inc. Systems and methods for an enhanced watchdog in solar module installations
US8954203B2 (en) 2009-06-24 2015-02-10 Tigo Energy, Inc. Systems and methods for distributed power factor correction and phase balancing
AT514766A1 (de) * 2013-08-22 2015-03-15 Siemens Ag Oesterreich Verfahren zur Stabilisierung eines Energieverteilnetzes
US8982591B2 (en) 2011-10-18 2015-03-17 Tigo Energy, Inc. System and method for exchangeable capacitor modules for high power inverters and converters
US9007210B2 (en) 2010-04-22 2015-04-14 Tigo Energy, Inc. Enhanced system and method for theft prevention in a solar power array during nonoperative periods
US9043039B2 (en) 2011-02-24 2015-05-26 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US9112379B2 (en) 2006-12-06 2015-08-18 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9143036B2 (en) 2009-09-02 2015-09-22 Tigo Energy, Inc. Systems and methods for enhanced efficiency auxiliary power supply module
US9142965B2 (en) 2011-07-28 2015-09-22 Tigo Energy, Inc. Systems and methods to combine strings of solar panels
US9218013B2 (en) 2007-11-14 2015-12-22 Tigo Energy, Inc. Method and system for connecting solar cells or slices in a panel system
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US9291696B2 (en) 2007-12-05 2016-03-22 Solaredge Technologies Ltd. Photovoltaic system power tracking method
US9312697B2 (en) 2009-07-30 2016-04-12 Tigo Energy, Inc. System and method for addressing solar energy production capacity loss due to field buildup between cells and glass and frame assembly
US9312399B2 (en) 2010-04-02 2016-04-12 Tigo Energy, Inc. Systems and methods for mapping the connectivity topology of local management units in photovoltaic arrays
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
US9324885B2 (en) 2009-10-02 2016-04-26 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US9368965B2 (en) 2011-07-28 2016-06-14 Tigo Energy, Inc. Enhanced system and method for string-balancing
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9401439B2 (en) 2009-03-25 2016-07-26 Tigo Energy, Inc. Enhanced systems and methods for using a power converter for balancing modules in single-string and multi-string configurations
US9407161B2 (en) 2007-12-05 2016-08-02 Solaredge Technologies Ltd. Parallel connected inverters
US9425783B2 (en) 2010-03-15 2016-08-23 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US9431825B2 (en) 2011-07-28 2016-08-30 Tigo Energy, Inc. Systems and methods to reduce the number and cost of management units of distributed power generators
US9438035B2 (en) 2003-05-28 2016-09-06 Solaredge Technologies Ltd. Power converter for a solar panel
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US9673711B2 (en) 2007-08-06 2017-06-06 Solaredge Technologies Ltd. Digital average input current control in power converter
US9680304B2 (en) 2006-12-06 2017-06-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US9853538B2 (en) 2007-12-04 2017-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US9876430B2 (en) 2008-03-24 2018-01-23 Solaredge Technologies Ltd. Zero voltage switching
US9923516B2 (en) 2012-01-30 2018-03-20 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US9960667B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9966766B2 (en) 2006-12-06 2018-05-08 Solaredge Technologies Ltd. Battery power delivery module
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US10218307B2 (en) 2014-12-02 2019-02-26 Tigo Energy, Inc. Solar panel junction boxes having integrated function modules
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
US10396662B2 (en) 2011-09-12 2019-08-27 Solaredge Technologies Ltd Direct current link circuit
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices
CN113852143A (zh) * 2020-06-28 2021-12-28 北京小米移动软件有限公司 电能管理方法及装置、存储介质
US11228278B2 (en) 2007-11-02 2022-01-18 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
WO2022214515A1 (de) * 2021-04-09 2022-10-13 Robert Bosch Gmbh Verfahren zum betrieb eines brennstoffzellensystems
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569660B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US12057807B2 (en) 2016-04-05 2024-08-06 Solaredge Technologies Ltd. Chain of power devices
US12136890B2 (en) 2023-11-14 2024-11-05 Solaredge Technologies Ltd. Multi-level inverter

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010031645A1 (de) 2010-07-22 2012-01-26 Markus Stoiber Anlage zum Einspeisen von elektrischem Strom in ein Stromnetz

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19756777A1 (de) * 1997-12-19 1999-07-01 Aloys Wobben Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage
DE19819869A1 (de) * 1998-04-27 1999-10-28 Ruediger Bredtmann Verfahren zur Kompensation von Stromoberschwingungen in elektrischen Energienetzen mit Verträglichkeitspegelregelung

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19756777A1 (de) * 1997-12-19 1999-07-01 Aloys Wobben Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage
DE19819869A1 (de) * 1998-04-27 1999-10-28 Ruediger Bredtmann Verfahren zur Kompensation von Stromoberschwingungen in elektrischen Energienetzen mit Verträglichkeitspegelregelung

Cited By (253)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11817699B2 (en) 2003-05-28 2023-11-14 Solaredge Technologies Ltd. Power converter for a solar panel
US11075518B2 (en) 2003-05-28 2021-07-27 Solaredge Technologies Ltd. Power converter for a solar panel
US11476663B2 (en) 2003-05-28 2022-10-18 Solaredge Technologies Ltd. Power converter for a solar panel
US9438035B2 (en) 2003-05-28 2016-09-06 Solaredge Technologies Ltd. Power converter for a solar panel
US10135241B2 (en) 2003-05-28 2018-11-20 Solaredge Technologies, Ltd. Power converter for a solar panel
US11658508B2 (en) 2003-05-28 2023-05-23 Solaredge Technologies Ltd. Power converter for a solar panel
US11824398B2 (en) 2003-05-28 2023-11-21 Solaredge Technologies Ltd. Power converter for a solar panel
US10910834B2 (en) 2003-05-28 2021-02-02 Solaredge Technologies Ltd. Power converter for a solar panel
US8093757B2 (en) 2004-07-13 2012-01-10 Tigo Energy, Inc. Device for distributed maximum power tracking for solar arrays
US8963518B2 (en) 2004-07-13 2015-02-24 Tigo Energy, Inc. Device for distributed maximum power tracking for solar arrays
US9594392B2 (en) 2004-07-13 2017-03-14 Tigo Energy, Inc. Device for distributed maximum power tracking for solar arrays
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
EP1906505A1 (de) * 2006-09-23 2008-04-02 Kaco Gerätetechnik GmbH Umrichter und Steuerverfahren für einen Umrichter
US8751053B2 (en) 2006-10-19 2014-06-10 Tigo Energy, Inc. Method and system to provide a distributed local energy production system with high-voltage DC bus
US12032080B2 (en) 2006-12-06 2024-07-09 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11682918B2 (en) 2006-12-06 2023-06-20 Solaredge Technologies Ltd. Battery power delivery module
US10230245B2 (en) 2006-12-06 2019-03-12 Solaredge Technologies Ltd Battery power delivery module
US12068599B2 (en) 2006-12-06 2024-08-20 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11002774B2 (en) 2006-12-06 2021-05-11 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11476799B2 (en) 2006-12-06 2022-10-18 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11031861B2 (en) 2006-12-06 2021-06-08 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9680304B2 (en) 2006-12-06 2017-06-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US12027970B2 (en) 2006-12-06 2024-07-02 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US12027849B2 (en) 2006-12-06 2024-07-02 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US10097007B2 (en) 2006-12-06 2018-10-09 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11043820B2 (en) 2006-12-06 2021-06-22 Solaredge Technologies Ltd. Battery power delivery module
US11063440B2 (en) 2006-12-06 2021-07-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11961922B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11962243B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11073543B2 (en) 2006-12-06 2021-07-27 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US9966766B2 (en) 2006-12-06 2018-05-08 Solaredge Technologies Ltd. Battery power delivery module
US9960731B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US9960667B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9948233B2 (en) 2006-12-06 2018-04-17 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569660B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11575260B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US10673253B2 (en) 2006-12-06 2020-06-02 Solaredge Technologies Ltd. Battery power delivery module
US10447150B2 (en) 2006-12-06 2019-10-15 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11183922B2 (en) 2006-12-06 2021-11-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9112379B2 (en) 2006-12-06 2015-08-18 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US12046940B2 (en) 2006-12-06 2024-07-23 Solaredge Technologies Ltd. Battery power control
US11575261B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US12107417B2 (en) 2006-12-06 2024-10-01 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11658482B2 (en) 2006-12-06 2023-05-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9853490B2 (en) 2006-12-06 2017-12-26 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11579235B2 (en) 2006-12-06 2023-02-14 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11594882B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11598652B2 (en) 2006-12-06 2023-03-07 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11594881B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US10637393B2 (en) 2006-12-06 2020-04-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11594880B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9673711B2 (en) 2007-08-06 2017-06-06 Solaredge Technologies Ltd. Digital average input current control in power converter
US10516336B2 (en) 2007-08-06 2019-12-24 Solaredge Technologies Ltd. Digital average input current control in power converter
US10116217B2 (en) 2007-08-06 2018-10-30 Solaredge Technologies Ltd. Digital average input current control in power converter
US11594968B2 (en) 2007-08-06 2023-02-28 Solaredge Technologies Ltd. Digital average input current control in power converter
DE102007041793A1 (de) 2007-09-03 2009-03-05 Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel e.V. Verfahren und Vorrichtung zur Bestimmung der Verluste eines Energiewandlers, insbesondere eines Stromrichters oder Synchrongenerators
DE102007041793B4 (de) * 2007-09-03 2012-05-24 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren und Vorrichtung zur Bestimmung der Verluste eines Energiewandlers, insbesondere eines Stromrichters oder Synchrongenerators, sowie dazugehöriger Energiewandler
US7807919B2 (en) 2007-11-02 2010-10-05 Tigo Energy, Inc. Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US11228278B2 (en) 2007-11-02 2022-01-18 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US10686403B2 (en) 2007-11-02 2020-06-16 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US10256770B2 (en) 2007-11-02 2019-04-09 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US9397612B2 (en) 2007-11-02 2016-07-19 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US12088248B2 (en) 2007-11-02 2024-09-10 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US8823218B2 (en) 2007-11-02 2014-09-02 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US7884278B2 (en) 2007-11-02 2011-02-08 Tigo Energy, Inc. Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US11646695B2 (en) 2007-11-02 2023-05-09 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US9813021B2 (en) 2007-11-02 2017-11-07 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US9218013B2 (en) 2007-11-14 2015-12-22 Tigo Energy, Inc. Method and system for connecting solar cells or slices in a panel system
US11329599B2 (en) 2007-11-14 2022-05-10 Tigo Energy, Inc. Method and system for connecting solar cells or slices in a panel system
US9853538B2 (en) 2007-12-04 2017-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9407161B2 (en) 2007-12-05 2016-08-02 Solaredge Technologies Ltd. Parallel connected inverters
US12055647B2 (en) 2007-12-05 2024-08-06 Solaredge Technologies Ltd. Parallel connected inverters
US11693080B2 (en) 2007-12-05 2023-07-04 Solaredge Technologies Ltd. Parallel connected inverters
US11894806B2 (en) 2007-12-05 2024-02-06 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11183969B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11183923B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Parallel connected inverters
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US10644589B2 (en) 2007-12-05 2020-05-05 Solaredge Technologies Ltd. Parallel connected inverters
US9979280B2 (en) 2007-12-05 2018-05-22 Solaredge Technologies Ltd. Parallel connected inverters
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9291696B2 (en) 2007-12-05 2016-03-22 Solaredge Technologies Ltd. Photovoltaic system power tracking method
US10693415B2 (en) 2007-12-05 2020-06-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US7898112B2 (en) 2007-12-06 2011-03-01 Tigo Energy, Inc. Apparatuses and methods to connect power sources to an electric power system
US9876430B2 (en) 2008-03-24 2018-01-23 Solaredge Technologies Ltd. Zero voltage switching
US10468878B2 (en) 2008-05-05 2019-11-05 Solaredge Technologies Ltd. Direct current power combiner
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US11424616B2 (en) 2008-05-05 2022-08-23 Solaredge Technologies Ltd. Direct current power combiner
US8058747B2 (en) 2008-08-01 2011-11-15 Tigo Energy, Inc. Systems to connect multiple direct current energy sources to an alternating current system
US8098055B2 (en) 2008-08-01 2012-01-17 Tigo Energy, Inc. Step-up converter systems and methods
US8325059B2 (en) 2008-11-12 2012-12-04 Tigo Energy, Inc. Method and system for cost-effective power line communications for sensor data collection
US8653689B2 (en) 2008-11-12 2014-02-18 Tigo Energy, Inc. Method and system for current-mode power line communications
US8860241B2 (en) 2008-11-26 2014-10-14 Tigo Energy, Inc. Systems and methods for using a power converter for transmission of data over the power feed
US10615603B2 (en) 2008-11-26 2020-04-07 Tigo Energy, Inc. Systems and methods to balance solar panels in a multi-panel system
US8860246B2 (en) 2008-11-26 2014-10-14 Tigo Energy, Inc. Systems and methods to balance solar panels in a multi-panel system
US10110007B2 (en) 2008-11-26 2018-10-23 Tigo Energy, Inc. Systems and methods to balance solar panels in a multi-panel system
US10461687B2 (en) 2008-12-04 2019-10-29 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US8933321B2 (en) 2009-02-05 2015-01-13 Tigo Energy, Inc. Systems and methods for an enhanced watchdog in solar module installations
US9401439B2 (en) 2009-03-25 2016-07-26 Tigo Energy, Inc. Enhanced systems and methods for using a power converter for balancing modules in single-string and multi-string configurations
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US10969412B2 (en) 2009-05-26 2021-04-06 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US11867729B2 (en) 2009-05-26 2024-01-09 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US8039730B2 (en) 2009-06-18 2011-10-18 Tigo Energy, Inc. System and method for prevention of open loop damage during or immediately after manufacturing
US8415552B2 (en) 2009-06-18 2013-04-09 Tigo Energy, Inc. Systems and methods for prevention of open loop damage during or immediately after manufacturing
US8954203B2 (en) 2009-06-24 2015-02-10 Tigo Energy, Inc. Systems and methods for distributed power factor correction and phase balancing
US8405349B2 (en) 2009-06-25 2013-03-26 Tigo Energy, Inc. Enhanced battery storage and recovery energy systems
US8102074B2 (en) 2009-07-30 2012-01-24 Tigo Energy, Inc. Systems and method for limiting maximum voltage in solar photovoltaic power generation systems
US8274172B2 (en) 2009-07-30 2012-09-25 Tigo Energy, Inc. Systems and method for limiting maximum voltage in solar photovoltaic power generation systems
US9312697B2 (en) 2009-07-30 2016-04-12 Tigo Energy, Inc. System and method for addressing solar energy production capacity loss due to field buildup between cells and glass and frame assembly
US11239793B2 (en) 2009-07-30 2022-02-01 Tigo Energy, Inc. Systems and methods to reduce field buildup between cells and glass and frame assembly for solar energy production
US9991842B2 (en) 2009-07-30 2018-06-05 Tigo Energy, Inc. Systems and methods to reduce field buildup between cells and glass and frame assembly for solar energy production
US10756545B2 (en) 2009-08-10 2020-08-25 Tigo Energy, Inc. Enhanced systems and methods for using a power converter for balancing modules in single-string and multi-string configurations
US8314375B2 (en) 2009-08-21 2012-11-20 Tigo Energy, Inc. System and method for local string management unit
US8686333B2 (en) 2009-08-21 2014-04-01 Tigo Energy, Inc. System and method for local string management unit
US9143036B2 (en) 2009-09-02 2015-09-22 Tigo Energy, Inc. Systems and methods for enhanced efficiency auxiliary power supply module
US10333405B2 (en) 2009-09-02 2019-06-25 Tigo Energy, Inc. Systems and methods for enhanced efficiency auxiliary power supply module
US9584021B2 (en) 2009-09-02 2017-02-28 Tigo Energy, Inc. Systems and methods for enhanced efficiency auxiliary power supply module
US9966848B2 (en) 2009-09-02 2018-05-08 Tigo Energy, Inc. Systems and methods for enhanced efficiency auxiliary power supply module
US11967930B2 (en) 2009-09-03 2024-04-23 Tigo Energy, Inc. Systems and methods for an enhanced watchdog in solar module installations
US11201494B2 (en) 2009-10-02 2021-12-14 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US10128683B2 (en) 2009-10-02 2018-11-13 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US9324885B2 (en) 2009-10-02 2016-04-26 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US9377765B2 (en) 2009-12-29 2016-06-28 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US11081889B2 (en) 2009-12-29 2021-08-03 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US10523013B2 (en) 2009-12-29 2019-12-31 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US8854193B2 (en) 2009-12-29 2014-10-07 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US8773236B2 (en) 2009-12-29 2014-07-08 Tigo Energy, Inc. Systems and methods for a communication protocol between a local controller and a master controller
US10063056B2 (en) 2009-12-29 2018-08-28 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US11728443B2 (en) 2009-12-29 2023-08-15 Tigo Energy, Inc. Systems and methods for remote or local shut-off of a photovoltaic system
US9124139B2 (en) 2010-01-08 2015-09-01 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller coupled to control a solar module and a master controller
US10135385B2 (en) 2010-01-08 2018-11-20 Tigo Energy, Inc. Identification protocol between a local controller of a solar module and a master controller
US10749457B2 (en) 2010-01-08 2020-08-18 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller of a solar module and a master controller
US8271599B2 (en) 2010-01-08 2012-09-18 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller and a master controller in a photovoltaic power generation system
US8810211B2 (en) * 2010-01-14 2014-08-19 Siemens Aktiengesellschaft Electrical power converting device and method to accommodate voltage variations in electricity networks
US20110210706A1 (en) * 2010-01-14 2011-09-01 Andresen Bjoern Converter device and method for converting electrical power
US9425783B2 (en) 2010-03-15 2016-08-23 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US10461570B2 (en) 2010-03-15 2019-10-29 Tigo Energy, Inc. Systems and methods to provide enhanced diode bypass paths
US8922061B2 (en) 2010-03-22 2014-12-30 Tigo Energy, Inc. Systems and methods for detecting and correcting a suboptimal operation of one or more inverters in a multi-inverter system
US9312399B2 (en) 2010-04-02 2016-04-12 Tigo Energy, Inc. Systems and methods for mapping the connectivity topology of local management units in photovoltaic arrays
US10355637B2 (en) 2010-04-02 2019-07-16 Tigo Energy, Inc. Systems and methods for mapping the connectivity topology of local management units in photovoltaic arrays
US9007210B2 (en) 2010-04-22 2015-04-14 Tigo Energy, Inc. Enhanced system and method for theft prevention in a solar power array during nonoperative periods
US9882390B2 (en) 2010-06-09 2018-01-30 Tigo Energy, Inc. Method for use of static inverters in variable energy generation environments
US8957544B2 (en) 2010-06-09 2015-02-17 Tigo Energy, Inc. Systems and methods to optimize outputs of static inverters in variable energy generation environments
US9450414B2 (en) 2010-06-09 2016-09-20 Tigo Energy, Inc. Method for use of static inverters in variable energy generation environments
US8853886B2 (en) 2010-06-09 2014-10-07 Tigo Energy, Inc. System for use of static inverters in variable energy generation environments
US9225261B2 (en) 2010-06-09 2015-12-29 Tigo Energy, Inc. Method for use of static inverters in variable energy generation environments
US10454275B2 (en) 2010-06-09 2019-10-22 Tigo Energy, Inc. Method for use of static inverters in variable energy generation environments
EP2445077A1 (de) 2010-10-06 2012-04-25 Adensis GmbH Photovoltaikanlage mit Blindleistungseinspeisung in Abhängigkeit der Netzspannung
US9887551B2 (en) 2010-10-06 2018-02-06 Bob Holding Gmbh Method for operating an energy generator with inverter operation depending on a mains voltage and circuit layout
US10084318B2 (en) 2010-10-06 2018-09-25 Bob Holding Gmbh Method for operating an energy generator with inverter operation depending on a mains voltage and circuit layout
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11349432B2 (en) 2010-11-09 2022-05-31 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10931228B2 (en) 2010-11-09 2021-02-23 Solaredge Technologies Ftd. Arc detection and prevention in a power generation system
US11070051B2 (en) 2010-11-09 2021-07-20 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11489330B2 (en) 2010-11-09 2022-11-01 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US12003215B2 (en) 2010-11-09 2024-06-04 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11271394B2 (en) 2010-12-09 2022-03-08 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US11996488B2 (en) 2010-12-09 2024-05-28 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9935458B2 (en) 2010-12-09 2018-04-03 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
EP2463980A2 (de) 2010-12-11 2012-06-13 Adensis GmbH Betrieb eines Energieerzeugers in einem Energieversorgungsnetz
US8972068B2 (en) 2010-12-11 2015-03-03 Adensis Gmbh Operation of a power generator in a power supply network
US10666125B2 (en) 2011-01-12 2020-05-26 Solaredge Technologies Ltd. Serially connected inverters
US11205946B2 (en) 2011-01-12 2021-12-21 Solaredge Technologies Ltd. Serially connected inverters
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US10754365B2 (en) 2011-02-24 2020-08-25 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US9927822B2 (en) 2011-02-24 2018-03-27 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US9043039B2 (en) 2011-02-24 2015-05-26 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US11429123B2 (en) 2011-02-24 2022-08-30 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US11681310B2 (en) 2011-02-24 2023-06-20 Tigo Energy, Inc. System and method for arc detection and intervention in solar energy systems
US8841916B2 (en) 2011-02-28 2014-09-23 Tigo Energy, Inc. System and method for flash bypass
US9553454B2 (en) 2011-03-01 2017-01-24 Bob Holding Gmbh Method and device for stabilizing network operation of a power supply network
EP2495838A1 (de) 2011-03-01 2012-09-05 Adensis GmbH Verfahren und Vorrichtung zur Stabilisierung des Netzbetriebs eines Energieversorgungsnetzes
EP3503335A1 (de) 2011-03-01 2019-06-26 BOB Holding GmbH Verfahren und vorrichtung zur stabilisierung des netzbetriebs eines energieversorgungsnetzes
US9368965B2 (en) 2011-07-28 2016-06-14 Tigo Energy, Inc. Enhanced system and method for string-balancing
US10819117B2 (en) 2011-07-28 2020-10-27 Tigo Energy, Inc. Systems and methods to combine strings of solar panels
US11728645B2 (en) 2011-07-28 2023-08-15 Tigo Energy, Inc. Enhanced system and method for string balancing
US9142965B2 (en) 2011-07-28 2015-09-22 Tigo Energy, Inc. Systems and methods to combine strings of solar panels
US10673244B2 (en) 2011-07-28 2020-06-02 Tigo Energy, Inc. Enhanced system and method for string balancing
US10312692B2 (en) 2011-07-28 2019-06-04 Tigo Energy, Inc. Systems and methods to reduce the number and cost of management units of distributed power generators
US9847646B2 (en) 2011-07-28 2017-12-19 Tigo Energy, Inc. Systems and methods to combine strings of solar panels
US9431825B2 (en) 2011-07-28 2016-08-30 Tigo Energy, Inc. Systems and methods to reduce the number and cost of management units of distributed power generators
US10396662B2 (en) 2011-09-12 2019-08-27 Solaredge Technologies Ltd Direct current link circuit
US8982591B2 (en) 2011-10-18 2015-03-17 Tigo Energy, Inc. System and method for exchangeable capacitor modules for high power inverters and converters
DE102011054939A1 (de) * 2011-10-28 2013-05-02 Sma Solar Technology Ag Nachführverfahren und -einrichtung für einen Spannungswandler für eine Photovoltaikanlage
WO2013060692A2 (de) 2011-10-28 2013-05-02 Sma Solar Technology Ag Nachführverfahren und -einrichtung für einen spannungswandler für eine photovoltaikanlage
US9444365B2 (en) 2011-10-28 2016-09-13 Sma Solar Technology Ag Tracking method and tracking device for a voltage converter for a photovoltaic system
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US11979037B2 (en) 2012-01-11 2024-05-07 Solaredge Technologies Ltd. Photovoltaic module
US11929620B2 (en) 2012-01-30 2024-03-12 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US11183968B2 (en) 2012-01-30 2021-11-23 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10381977B2 (en) 2012-01-30 2019-08-13 Solaredge Technologies Ltd Photovoltaic panel circuitry
US12094306B2 (en) 2012-01-30 2024-09-17 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10992238B2 (en) 2012-01-30 2021-04-27 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US11620885B2 (en) 2012-01-30 2023-04-04 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9923516B2 (en) 2012-01-30 2018-03-20 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10608553B2 (en) 2012-01-30 2020-03-31 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US10007288B2 (en) 2012-03-05 2018-06-26 Solaredge Technologies Ltd. Direct current link circuit
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US9639106B2 (en) 2012-03-05 2017-05-02 Solaredge Technologies Ltd. Direct current link circuit
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US11177768B2 (en) 2012-06-04 2021-11-16 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US9696741B2 (en) 2012-06-18 2017-07-04 Ge Energy Power Conversion Technology Limited Method and device for feeding electrical power into an electrical power supply network
US20140021804A1 (en) * 2012-06-18 2014-01-23 Ge Energy Power Conversion Gmbh Method and Device for Feeding Electrical Power into an Electrical Power Supply Network
DE102012210207A1 (de) * 2012-06-18 2013-12-19 Ge Energy Power Conversion Gmbh Verfahren und eine Vorrichtung zum Einspeisen von elektrischer Leistung in ein elektrisches Energieversorgungsnetz
EP2677622A3 (de) * 2012-06-18 2017-09-06 GE Energy Power Conversion GmbH Verfahren und eine Vorrichtung zum Einspeisen von elektrischer Leistung in ein elektrisches Energieversorgungsnetz
US11742777B2 (en) 2013-03-14 2023-08-29 Solaredge Technologies Ltd. High frequency multi-level inverter
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US12003107B2 (en) 2013-03-14 2024-06-04 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US11545912B2 (en) 2013-03-14 2023-01-03 Solaredge Technologies Ltd. High frequency multi-level inverter
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US12119758B2 (en) 2013-03-14 2024-10-15 Solaredge Technologies Ltd. High frequency multi-level inverter
US10778025B2 (en) 2013-03-14 2020-09-15 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
US10651647B2 (en) 2013-03-15 2020-05-12 Solaredge Technologies Ltd. Bypass mechanism
US11424617B2 (en) 2013-03-15 2022-08-23 Solaredge Technologies Ltd. Bypass mechanism
US12132125B2 (en) 2013-03-15 2024-10-29 Solaredge Technologies Ltd. Bypass mechanism
AT514766A1 (de) * 2013-08-22 2015-03-15 Siemens Ag Oesterreich Verfahren zur Stabilisierung eines Energieverteilnetzes
AT514766B1 (de) * 2013-08-22 2020-09-15 Siemens Ag Oesterreich Verfahren zur Stabilisierung eines Energieverteilnetzes
US11296590B2 (en) 2014-03-26 2022-04-05 Solaredge Technologies Ltd. Multi-level inverter
US10886831B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11632058B2 (en) 2014-03-26 2023-04-18 Solaredge Technologies Ltd. Multi-level inverter
US11855552B2 (en) 2014-03-26 2023-12-26 Solaredge Technologies Ltd. Multi-level inverter
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
US10886832B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11177769B2 (en) 2014-12-02 2021-11-16 Tigo Energy, Inc. Solar panel junction boxes having integrated function modules
US10218307B2 (en) 2014-12-02 2019-02-26 Tigo Energy, Inc. Solar panel junction boxes having integrated function modules
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
US12057807B2 (en) 2016-04-05 2024-08-06 Solaredge Technologies Ltd. Chain of power devices
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices
US11201476B2 (en) 2016-04-05 2021-12-14 Solaredge Technologies Ltd. Photovoltaic power device and wiring
US11870250B2 (en) 2016-04-05 2024-01-09 Solaredge Technologies Ltd. Chain of power devices
CN113852143A (zh) * 2020-06-28 2021-12-28 北京小米移动软件有限公司 电能管理方法及装置、存储介质
WO2022214515A1 (de) * 2021-04-09 2022-10-13 Robert Bosch Gmbh Verfahren zum betrieb eines brennstoffzellensystems
US12136890B2 (en) 2023-11-14 2024-11-05 Solaredge Technologies Ltd. Multi-level inverter

Also Published As

Publication number Publication date
DE19961705B4 (de) 2005-12-01

Similar Documents

Publication Publication Date Title
DE19961705B4 (de) Vorrichtung zur dezentralen Einspeisung regenerativer Energie
EP2375552B1 (de) Verfahren zur Betriebsführung eines Wechselrichters
Gonzatti et al. Smart impedance: A new way to look at hybrid filters
EP2614573B1 (de) Verfahren zur stabilisierung eines elektrischen versorgungsnetzes
DE102011054002B4 (de) Dezentrale Energieerzeugungsanlage mit Einrichtung und Verfahren zur Inselnetzerkennung
DE102005041927B4 (de) Aktives Netzfilter
WO2020007995A1 (de) Verfahren zum steuern eines windparks zur dämpfung subsynchroner schwingungen
DE202007019355U1 (de) Wechselrichtereinheit
WO2007028349A1 (de) Vorrichtung für die elektroenergieübertragung
DE102012106466B4 (de) Steuerung von Betriebsmitteln über Beeinflussung der Netzspannung
DE102007005165A1 (de) Verfahren, Vorrichtung und Computerprogrammprodukt zur Stromeinspeisung
DE102008034531A1 (de) Windenergieanlage mit doppelt gespeistem Asynchrongenerator und Umrichterregelung
EP2463980B1 (de) Betrieb eines Energieerzeugers in einem Energieversorgungsnetz
EP3358693B1 (de) Photovoltaikanlage mit blindleistungseinspeisung in abhängigkeit der netzspannung
EP1012946A1 (de) Verfahren und vorrichtung zur verbesserung der spannungsqualität eines unterlagerten netzteiles
DE69409987T2 (de) Vorrichtung zum Unterdrücken von Spannungsschwankungen und Oberschwingungen
DE19853464C1 (de) Windenergieanlage
EP3729626B1 (de) Umrichter mit mindestens einem wandlermodul mit drei brückenzweigen, verfahren zum betreiben und verwendung eines solchen umrichters
DE102019000025A1 (de) Windenergieanlage
DE19719308A1 (de) Verfahren zur Regelung der in ein Netz einzuspeisenden Ströme bei Windkraftanlagen sowie nach diesem Verfahren arbeitende Schaltung
EP4360184A1 (de) Verfahren zum betrieb eines energieversorgungssystems, vorrichtung zum austausch elektrischer leistung in einem energieversorgungssystem und energieversorgungssystem
EP2201671B1 (de) Wechselrichter, insbesondere solarwechselrichter, mit lastausgleichsregelung
DE102020134772A1 (de) Verfahren zum betreiben einer energieversorgungs-anlage, anlagenregler für eine energieversorgungs-anlage sowie energieversorgungs-anlage
DE102017105843A1 (de) Elektrisches Energieversorgungsnetz und Verfahren zu dessen Betrieb
DE4308686C2 (de) Schaltungsanordnung zum Ausgleich von Wirk- und Blindleistung zwischen einem niederfrequenten Wechselspannungsnetz und einem Gleichspannungsnetz

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: SMA TECHNOLOGIE AG, 34266 NIESTETAL, DE

8363 Opposition against the patent
8339 Ceased/non-payment of the annual fee