DE19946175A1 - Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores - Google Patents

Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores

Info

Publication number
DE19946175A1
DE19946175A1 DE1999146175 DE19946175A DE19946175A1 DE 19946175 A1 DE19946175 A1 DE 19946175A1 DE 1999146175 DE1999146175 DE 1999146175 DE 19946175 A DE19946175 A DE 19946175A DE 19946175 A1 DE19946175 A1 DE 19946175A1
Authority
DE
Germany
Prior art keywords
flat steel
pos
board
guide
smoothing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE1999146175
Other languages
German (de)
Inventor
Frank Schrade
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1999146175 priority Critical patent/DE19946175A1/en
Publication of DE19946175A1 publication Critical patent/DE19946175A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/01Devices or auxiliary means for setting-out or checking the configuration of new surfacing, e.g. templates, screed or reference line supports; Applications of apparatus for measuring, indicating, or recording the surface configuration of existing surfacing, e.g. profilographs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The master template is for smoothing e.g. gravel before the laying of paving. It is used in combination with a clamp block and suitable for use with conventional smoothing board. It permits large loads to be applied to any smoothing boards. The master consists of a flat steel pressure board (1), with further flat steel sections (3a,b,c) welded to it, a lifting tube (2), and a steel tube (4) with guide bores welded to a flat steel guide (5). The construction is stiffened with steel bracing (6) welded in place, and connected via wing nuts in threaded bores.

Description

1. Abziehmaster/Richtlatten - Abziehhilfe1. Peeling master / straightening staff - peeling aid

2. Der Abziehmaster ist ein Tiefen-und Höhen-Verstellmechanismus für Richtlatten aus Holz oder Metall im Bereich Strassen, Erd-, und Pflasterbau.2. The peeling master is a depth and height adjustment mechanism for Straightening slats made of wood or metal in the area of roads, earth and Paving.

3. Die handelsüblichen Richtlatten/Abziehlatten besitzen keinen Verstellmechanismus. Also muß jedesmal von Hand eine passende Abziehlatte überwiegend aus Holz auf jeder Baustelle extra angefertigt werden.3. The standard straightening battens / pull-off battens do not have any Adjustment mechanism. So you have to find a suitable one by hand every time Removable batten mainly made of wood on every construction site become.

Soll nun zwischen den Rasenborden eine Höhe XY erbracht werden, so wurde diese Höhe auf ein Holzbrett gezeichnet und dementsprechend mit der Stichsäge ausgeschnitten oder mit je einem Stahl-Nagel pro Stirnseite des Brettes gekennzeichnet (Auflagefläche). Die Haltbarkeit dieser provisorischen Abziehlatte ist begrenzt, weil eine sehr starke Scheuerwirkung zwischen dem Brett und dem Betonbord einsetzt und die eingesetzten Nägel beim kräftigen Andrücken krumm biegen. Bei der Vielzahl von verschiedenen Ausgangshöhen (Kiesbett- Rasenbordoberkante) muß nun jedesmal ein neues Brett angefertigt werden.If a height XY is now to be provided between the lawn rims, so this height was drawn on a wooden board and accordingly cut out with a jigsaw or with one steel nail per The face of the board is marked (contact surface). The durability of this temporary pull-off bar is limited because of a very strong abrasion between the board and the concrete board inserts and the inserted nails are crooked when pressed firmly to bend. With the multitude of different starting heights (gravel bed Lawn board top edge) must now each time a new board made become.

Durch den o. g. Abziehmaster entfällt diese zeitraubende und umständliche Handhabung. Mit wenigen Handgriffen befestigt man den Abziehmaster an alle gängigen Richt- und Abziehlatten (siehe Klemmschrauben Pos. 7-8-9). The above-mentioned stripping master eliminates this time-consuming and cumbersome handling. The peeling master can be attached to all standard straightening and peeling slats in a few simple steps (see clamping screws pos. 7-8-9 ).

4. Zum Beispiel ein Steinsetzer muß vor dem Pflastern die Kiesfläche zwischen dem vorhandenen Betonbord auf Plan bringen. Vorher muß er aber die Rasenborde bzw. Hochborde aus Beton auf Höhe in ein Mörtelbett einbringen. Je nach Kundenwunsch muß der Steinsetzer verschiedene Ansichten (Höhen bzw. Tiefen) der Pflastersteine zum Rasenbord bringen.4. For example, a stone setter must pave the gravel surface before paving bring between the existing concrete shelf on plan. Before that, however, he has to open up the lawn shelves or high shelves made of concrete Place the height in a mortar bed. Depending on customer requirements, the Stone setters different views (ups and downs) of the Bring paving stones to the lawn shelf.

Das heißt die vorhandene Kiesflächenhöhe kann zum Rasenbord variieren.That means the existing gravel surface height can be to the lawn board vary.

Nun wird der Abziehmaster an eine Latte rechts und links befestigt und die gewünschten Höhen oder Tiefen mit einem Maßband eingestellt und fixiert. Nun legt man die Abziehlatte samt befestigtem Abziehmaster auf die Borde und zieht so die noch ungerade Kiesoberfläche glatt.Now the peeling master is attached to a crossbar on the right and left and set the desired highs or lows with a tape measure and fixed. Now put on the peel stick with attached peel master the shelves and smoothes the still odd gravel surface.

5. Technische Beschreibung5. Technical description

Pos. Pos.

11

Auflageplattform - Flachstahl 6 × 40 mm, Länge 80 mm, verschweißt mit Hubrohr Pos. Support platform - flat steel 6 × 40 mm, length 80 mm, welded to the lifting tube pos.

22nd

Pos. Pos.

22nd

Hubrohr - Stahlrohr 18 mm, Länge 230 mm, verschweißt mit Auflageplattform Pos. Lift tube - steel tube 18 mm, length 230 mm, welded to support platform pos.

11

Pos. Pos.

33rd

Klemmbock - Breite 80 mm, Höhe 70 mm, Tiefe 40 mm, verschweißt mit Flachstahl Pos. Terminal block - width 80 mm, height 70 mm, depth 40 mm, welded with flat steel Pos.

33rd

a, a,

33rd

b, b,

33rd

c
Pos.
c
Pos.

33rd

a Flachstahl - Breite 80 mm, Höhe 70 mm, Stärke 10 mm, verschweißt mit Flachstahl Pos. a flat steel - width 80 mm, height 70 mm, thickness 10 mm, welded with flat steel Pos.

33rd

c
Pos.
c
Pos.

33rd

b Flachstahl - Breite 80 mm, Höhe 70 mm, Stärke 10 mm, verschweißt mit Flachstahl Pos. b Flat steel - width 80 mm, height 70 mm, thickness 10 mm, welded with flat steel Pos.

33rd

c
Pos.
c
Pos.

33rd

c Flachstahl - Breite 40 mm, Länge 80 mm, Stärke 6 mm, verschweißt mit Flachstahl Pos. c flat steel - width 40 mm, length 80 mm, thickness 6 mm, welded with flat steel Pos.

33rd

a und a and

33rd

b
Pos.
b
Pos.

44th

Stahlrohr - ¾" mit Führungsbohrung von 19 mm, Länge 50 mm, verschweißt mit Führungsflachstahl Pos. Steel tube - ¾ "with guide bore of 19 mm, length 50 mm, welded with flat guide steel Pos.

55

Pos. Pos.

55

Führungsflachstahl - Breite 20 mm, Länge 150 mm, Stärke 6 mm, verschweißt mit Stahlrohr Pos. Flat guide steel - width 20 mm, length 150 mm, thickness 6 mm, welded to steel tube pos.

44th

, Verstrebungsstahl Pos. , Bracing steel Pos.

66

und Flachstahl Pos. and flat steel pos.

33rd

c
Pos.
c
Pos.

66

Verstrebungsflachstahl Breite 20 mm, Länge 110 mm, Stärke 6 mm, verschweißt mit Führungsflachstahl Pos. Bracing flat steel width 20 mm, length 110 mm, thickness 6 mm, welded with flat guide steel Pos.

55

und Flachstahl Pos. and flat steel pos.

33rd

c
Pos.
c
Pos.

77

Gewindebohrung mit M8 Flügelschrauben M8 × 20 mm, im Flachstahl Pos. Tapped hole with M8 wing screws M8 × 20 mm, in flat steel Pos.

33rd

b
Pos.
b
Pos.

88th

Gewindebohrung mit M8 Flügelschrauben M8 × 20 mm, im Flachstahl Pos. Tapped hole with M8 wing screws M8 × 20 mm, in flat steel Pos.

33rd

b
Pos.
b
Pos.

99

Gewindebohrung mit M8 Flügelschrauben M8 × 20 mm, im Flachstahl Pos. Tapped hole with M8 wing screws M8 × 20 mm, in flat steel Pos.

33rd

a
Pos.
a
Pos.

1010th

Gewindebohrung mit M8 Flügelschrauben M8 × 20 mm, im Führungsflachstahl Pos. Tapped hole with M8 wing screws M8 × 20 mm, in flat guide steel Pos.

55

Pos. Pos.

1111

Gewindebohrung mit M8 Flügelschrauben M8 × 20 mm, im Flachstahl Pos. Tapped hole with M8 wing screws M8 × 20 mm, in flat steel Pos.

33rd

aa

Claims (1)

Durch den o. g. Abziehmaster werden Arbeiten mit Abziehlatten im Kiesbett erleichtert. Dank der Aufnahmekapazität des Klemmbockes (Pos. 3) ist der Abziehmaster mit allen handelsüblichen Richtlatten kompatibel. Dadurch spart der Anwender viel Zeit und muß nicht jedesmal ein Provisorium herstellen. Außerdem kann eine mit dem Abziehmaster bestückte Richt- u. Abziehlatte stärker belastet werden, d. h. die Andrückkräfte auf die zu bearbeitende Kiesfläche kann erhöht werden ohne das Schäden am Brett entstehen. Tests bei einer Pflasterbaufirma mit einem Prototyp in der Praxisanwendung verliefen sehr erfolgreich.The above-mentioned peeling master makes working with peeling slats in the gravel bed easier. Thanks to the capacity of the clamp (item 3 ), the honing master is compatible with all standard straightening battens. This saves the user a lot of time and does not have to make a provisional every time. In addition, a straightening and equipped with the stripping master. The pulling bar can be subjected to greater loads, ie the pressing forces on the gravel surface to be processed can be increased without causing damage to the board. Tests at a paving company with a prototype in practice were very successful.
DE1999146175 1999-09-20 1999-09-20 Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores Withdrawn DE19946175A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1999146175 DE19946175A1 (en) 1999-09-20 1999-09-20 Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1999146175 DE19946175A1 (en) 1999-09-20 1999-09-20 Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores

Publications (1)

Publication Number Publication Date
DE19946175A1 true DE19946175A1 (en) 2000-07-06

Family

ID=7923402

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1999146175 Withdrawn DE19946175A1 (en) 1999-09-20 1999-09-20 Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores

Country Status (1)

Country Link
DE (1) DE19946175A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727110A (en) * 2020-12-22 2021-04-30 天蓬智慧建造(广东)科技有限公司 Robot-based cast-in-place wall embedded steel bar positioning construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727110A (en) * 2020-12-22 2021-04-30 天蓬智慧建造(广东)科技有限公司 Robot-based cast-in-place wall embedded steel bar positioning construction method
CN112727110B (en) * 2020-12-22 2023-03-14 广东天凛高新科技有限公司 Robot-based cast-in-place wall embedded steel bar positioning construction method

Similar Documents

Publication Publication Date Title
DE19946175A1 (en) Master template for use with smoothing board consists of flat steel pressure board with lifting tube and guide, welded together and fastened vi wing nuts in threaded bores
EP0119379B1 (en) Scaffolding
DE803243C (en) Procedure for lifting bridge and ceiling beams in the center of the field
DE1684409A1 (en) Formwork beams
DE2530639A1 (en) FORMWORK SCAFFOLDING FOR CEILINGS
DE2825552A1 (en) Floor or wall stone or panel laying tool - comprises grating with openings holding panels and bars providing joint width
DE2738996C2 (en) Rafter foot
DE2544149A1 (en) PROCEDURE AND INSULATION SLAB FOR FORMING A CONCRETE SLAB
DE2437720A1 (en) Wall slab mounting aid appliance - with bottom edge-supporting levelling batten for detachable coupling to vertical bars
DE8409221U1 (en) Device for providing and / or carrying plates
DE809966C (en) Roof battens for wide rafters
DE935089C (en) Method of making a slate roof
DE816748C (en) Attachment for roof panels, especially large panels made of reinforced concrete
DE808283C (en) Formwork for the construction of hollow rib ceilings
DE521483C (en) Method for nailing boards flush on a base
DE19921229A1 (en) Device to establish arrangement of battens for roof tiles has longitudinal beam with fixed batten stop for new roof tile to be laid, adjustable fastening stop, and step plate in lower region of longitudinal beam
DE6809365U (en) DEVICE FOR FASTENING PANELS TO CEILINGS
DE655350C (en) Method for laying and picking up the parts of a parquet floor
DE4226310A1 (en) Method of floor tile laying in mortar bed - spreads tile bed mortar by retractable tool with long shaft and has deposition bar for forming edge for tiles
DE4119429C2 (en) Auxiliary tool for the production of a flat mortar bed for building blocks with exactly parallel bearing surfaces
DE1916085U (en) DEVICE FOR ALIGNMENT, WEIGHING, PLUMBING, STRIPPING, SMOOTHING AND FELTING CONCRETE CEILINGS, PLASTER AND SCREED.
DE1271955B (en) Trough-like formwork stone for the concrete-embedded lower chord of Montagetraegernod. like
DE223940C (en)
DE7403717U (en) Device for supporting and attaching ventilated wall cladding panels to building walls
DE807988C (en) Method of laying floor slabs

Legal Events

Date Code Title Description
OAV Applicant agreed to the publication of the unexamined application as to paragraph 31 lit. 2 z1
8110 Request for examination paragraph 44
8122 Nonbinding interest in granting licenses declared
8130 Withdrawal