DE1772499U - DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS. - Google Patents

DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS.

Info

Publication number
DE1772499U
DE1772499U DE1958F0015044 DEF0015044U DE1772499U DE 1772499 U DE1772499 U DE 1772499U DE 1958F0015044 DE1958F0015044 DE 1958F0015044 DE F0015044 U DEF0015044 U DE F0015044U DE 1772499 U DE1772499 U DE 1772499U
Authority
DE
Germany
Prior art keywords
slide
ring
bar
rail
tongue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1958F0015044
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franke K G H
Original Assignee
Franke K G H
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franke K G H filed Critical Franke K G H
Priority to DE1958F0015044 priority Critical patent/DE1772499U/en
Publication of DE1772499U publication Critical patent/DE1772499U/en
Expired legal-status Critical Current

Links

Landscapes

  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Description

Vorrichtung zur Einzelentnahme von offenen Klemmringes.Device for the individual removal of open clamping rings.

Gegenstand der Neuerung ist eine Vorrichtung zur Einzelentnahme von übereinander auf einer Stapelschiene aufgereihten offenen Klemmringen mit Hilfe eines Klemmgreifwerkzeuges. Die Vorrichtung besteht in bekannter Weise aus einer Grundplatte mit einem Ständer zur Befestigung der Stapelschiene, auf der die Klemmringe aufgereiht sind, sowie Stützmitteln für den von dem Greifwerkzeug zu erfassenden Klemmring.The object of the innovation is a device for the individual removal of Open clamping rings lined up on a stacking rail with the help of a clamp gripping tool. The device consists of a known manner Base plate with a stand for fastening the stacking rail on which the clamping rings are lined up, as well as support means for the to be grasped by the gripping tool Clamping ring.

Es sind bereits verschiedene Vorrichtungen zur Einzelentnahme von auf Stapelschienen aufgereihten offenen Sicherungsringen bekanntgeworden, doch haben sich diese Vorrichtungen stets nur für Klemmringe von einer bestimmten Grösse ab als geeignet erwiesen. Entsprechend ausgebildete Vorrichtungen für die kleinen und kleinsten Grössen der Klemmringe funktionierten nicht in der gewünschten Weise und wiesen immer wieder Funktionsstörungen auf.There are already various devices for individual removal of open locking rings lined up on stacking rails became known, but these devices have always only proven to be suitable for clamping rings of a certain size. Appropriately designed devices for the small and very small sizes of the clamping rings did not function in the desired manner and repeatedly exhibited malfunctions.

Dies beeinträchtigt aber die Arbeit mit den Vorrichtungen und die Montage von Maschinen, Geräten usw., bei denen die Sicherungsringe Anwendung finden, erheblich, da verlangt wird, dass jedesmal beim Ansetzen des Klemmgreifwerkzeuges dieses einen Sicherungsring erfasst.But this affects the work with the devices and Assembly of machines, devices, etc., where the retaining rings use find, considerably, since it is required that every time the clamping gripping tool is applied this captured a locking ring.

Die aufgezeigten Mängel bei den Vorrichtungen zur Einzelentnahme von Elemmringen werden neuerungsgemäss dadurch vermieden, dass zwischen der Auflagefläche für das Entnahmewerkzeug und dem unteren Ende der Stapelschiene ein durch eine Feder stets nach vorn gedrückter Schieber angeordnet ist, der an seiner Ober-und Unterseite mit je einer Nut versehen ist, die in ihrer Breite und Tiefe der Breite und Stärke der Sicherungsringe entspricht. In dem Schieber, und zwar im Bereich der Nut befindet sich eine Durchtrittsöffnung für den unter dem Ringstapel vorgeschobenen untersten Ring des Stapels, der beim Zurückschieben des Schiebers mittels des Entnahmewerkzeuges so weit zurückgeschoben wird, dass der jeweils unterste Ring des Stapels in die Durchtrittsöffnung im Schieber fällt, so dass der Schieber diesen Ring bei seiner Vorwärtsbewegung nach vorn mitnimmt. Unter dem Schieber ist eine die an der Unterseite der Leiste befindliche Nut ausfüllende Leiste angebracht, auf der der in der Durchtrittsöffnung im Schieber liegende Ring aufliegt. Am Ende dieser Leiste fällt der nach vorn vorgeschobene Sicherungsring nach unten aus der Durchtrittsöffnung im Schieber heraus auf die Auflagefläche für das Entnahmewerkzeug, auf der auch der Schieber gleitet. Die Stirnfläche der Leiste ist gleichzeitig das Widerlager für den Ring beim Einführen des Entnahmewerkzeuges.The identified deficiencies in the devices for the individual removal of Elemmringen are avoided according to the innovation that between the support surface for the removal tool and the lower end of the stacking rail by a spring always pushed forward slide is arranged on its top and bottom is each provided with a groove, the width and depth of the width and strength corresponds to the retaining rings. In the slide, in the area of the groove there is a passage opening for the lowest one, which is advanced under the stack of rings Ring of the stack that is released when the slide is pushed back using the removal tool is pushed back so far that the bottom ring of the stack is in the Passage opening in the slide falls so that the slide has this ring at its Forward movement takes with it. Under the slider is the one at the bottom the bar located groove filling bar attached, on which the in the passage opening the ring lying in the slide rests on it. At the end of this bar, the one pushed forward falls Circlip downwards out of the opening in the slide onto the Support surface for the removal tool, on which the slide also slides. The frontal area the bar is also the abutment for the ring when inserting the removal tool.

Am Schieber ist vorteilhafterweise eine in die Durchtrittsöffnung für den Ring hineinragende Zunge vorgesehen, die in die offene Seite des Sicherungsringes eintritt, wodurch der Ring gegen Verdrehungen gesichert wird, so dass seine offene Seite im Maul des Entnahmewerkzeugs nach aussen zeigt. Dementsprechend ist die Stirnfläche der unter dem Schieber befindlichen Leiste ebenfalls mit einer Zunge versehen. In der vordersten Stellung des Schiebers sind die beiden Zungen in Deckung. Um den zur Entnahme bereitliegenden Sicherungsring in seiner Lage festzuhalten, ist vor diesem in Entnahmerichtung eine Flachfeder angeordnet, die verhindert, dass der Ring aus der Entnahme-' Öffnung gleiten kann. Diese Feder wird beim Einführen des Entnahmewerkzeuges nach unten gedrückt, so dass ihre Sperrwirkung dadurch aufgehoben wird.On the slide there is advantageously one in the passage opening for the ring protruding tongue provided in the open side of the locking ring enters, whereby the ring is secured against twisting, so that its open The side in the mouth of the removal tool faces outwards. The face is accordingly the bar located under the slider is also provided with a tongue. In The two tongues are in cover when the slide is in the foremost position. To the To hold the locking ring ready for removal in its position is before This is arranged in the removal direction a flat spring, which prevents the Ring can slide out of the removal 'opening. This spring is when inserting the Removal tool pressed down, so that their locking effect is thereby canceled will.

In den Figuren 1 bis 3 der Zeichnung ist ein besonders bevorzugtes Ausführungsbeispiel der Vorrichtung gemäss der Neuerung dargestellt, welches nachstehend im einzelnen beschrieben ist.In Figures 1 to 3 of the drawing is a particularly preferred one Embodiment of the device according to the innovation shown, which follows is described in detail.

Es zeigen : Fig. 1 eine perspektivische Ansicht der Entnahmevorrichtung mit in dessen Ständer eingesetzter Stapelschiene ; Fig. 2 eine Schiene, deren Oberseite die Auflage-und Gleitfläche für den Schieber bildet ; Fig. 3 den zwischen der Schiene gemäss Fig. 2 und der Stapelschiene gleitend gelagerten Schieber. CD Aus Fig. 1 ist der Aufbau der neuerungsgemässen Vorrichtung ersichtlich. Sie besteht aus der Grundplatte 1, die den Ständer 2 trägt, an der die Stapelschiene 3 mittels des Keilstiftes 4 lösbar abnehmbar befestigt ist. In der Grundplatte 1 befindet sich eine ilut 5, in der die Schiene 6 (Fig. 2) liegt ; die mit der Grundplatte 1 fest verbunden ist. Die Oberseite der Schiene dient als Auflage-und Gleitfläche für das unter dem Deckblech 7 auf der Grundplatte einzuführende Entnahmewerkzeug und den Schieber 8 (Fig. 3). Der Schieber 8 besitzt an seiner Oberseite die Nut 9 und an seiner Unterseite die Nut 10, die in ihrer Breite und Tiefe der Breite und Stärke der Sicherungsringe entsprechen, welche auf der Stapelschiene 3 aufgereiht sind und deren Unterseite jeweils auf dem grund der Nut 9 im Schieber 8 aufliegt. Die an der Unterseite des Schiebers 8 befindliche Nut 10 greift in die auf der Schiene 6 angebrachte Leiste 11 ein.1 shows a perspective view of the removal device with a stacking rail inserted in its stand; 2 shows a rail, the upper side of which forms the support and sliding surface for the slide; Fig. 3 between the rail according to FIG. 2 and the Stacking rail slidably mounted slide. CD From Fig. 1, the structure of the innovation according to the device can be seen. It consists of the base plate 1, which carries the stand 2, to which the stacking rail 3 is detachably and detachably fastened by means of the wedge pin 4. In the base plate 1 there is an ilut 5 in which the rail 6 (FIG. 2) lies; which is firmly connected to the base plate 1. The upper side of the rail serves as a support and sliding surface for the removal tool to be inserted under the cover plate 7 on the base plate and the slide 8 (FIG. 3). The slide 8 has the groove 9 on its upper side and the groove 10 on its underside, the width and depth of which correspond in their width and depth to the width and thickness of the locking rings which are lined up on the stacking rail 3 and their underside in each case on the basis of the groove 9 in the Slide 8 rests. The groove 10 located on the underside of the slide 8 engages in the bar 11 attached to the rail 6.

Der Schieber 8 wird durch eine Feder 12, deren zwei Schenkel durch die Löcher 13 am hinteren Ende des Schiebers 8 gesteckt sind, stets nach vorn gedrückt.The slide 8 is by a spring 12, the two legs through the holes 13 are inserted at the rear end of the slide 8, always pushed forward.

Der Schieber 9 ist mit einer Durchtrittsöffnung 14 für den von ihm vorgeschobenen Sicherungsring versehen. In die Öffnung 14 ragt eine Zunge, die in den nach hinten offenen Sicherungsring eingreift und so dafür sorgt, dass sich der Sicherungsring nicht verdrehen kann. Das vordere Ende der Leiste 11 auf der Schiene 6 ist ebenfalls mit einer Zunge 16 versehen, die sich mit der Zunge 15 des in seiner vorderen Lage befindlichen Schiebers 8 in Deckung befindet.The slide 9 is provided with a passage opening 14 for it provided with an advanced locking ring. In the opening 14 protrudes a tongue that in the locking ring, which is open to the rear, engages and thus ensures that the Locking ring cannot twist. The front end of the bar 11 on the rail 6 is also provided with a tongue 16, which is connected to the tongue 15 of the in his slider 8 located in the front position is in cover.

In einem gewissen Abstand vor der Zunge 16 ist eine Durchtrittsöffnung 17 für das hintere Ende 18 einer unter der Schiene 6 befestigten Blattfeder 19 ; das Ende 18 der Feder 19 legt sich vor den vor der Zunge 16 der Leiste 11 befindlichen Sicherungsring, um zu verhindern, dass dieser nach vorn hinausgleitet.At a certain distance in front of the tongue 16 is a passage opening 17 for the rear end 18 of a leaf spring 19 fastened under the rail 6; the end 18 of the spring 19 lies in front of the one in front of the tongue 16 of the bar 11 Circlip to prevent it from sliding out forwards.

Die Stapelschiene 3 besteht aus einem Blechstreifen, dessen Stärke etwas geringer als der Schlitz in den Sicherungsringen breit ist ; die vordere Kante der Stapelschiene ist etwas verdickt, damit die Sicherungsringe gehalten werden ; diese Verdickung wird dadurch erreicht, dass in die Stirnfläche am vorderen Rand eine Rille eingewalzt wird, wodurch die äusseren vorderen Kanten nach aussen gedrückt werden, so dass die Sicherungsringe hinter ihnen den erforderlichen Halt finden.The stacking rail 3 consists of a sheet metal strip, the strength of which slightly smaller than the slot in the locking rings is wide; the leading edge the stacking bar is slightly thicker so that the retaining rings are held in place ; this thickening is achieved in that in the end face at the front edge a groove is rolled in, whereby the outer front edges are pressed outwards so that the retaining rings find the necessary support behind them.

Die Funktionsweise der neuerungsgemässen Vorrichtung ist folgende : Das Entnahmewerkzeug wird mit seinem vorderen Ende auf die Oberseite der Schiene 6 aufgelegt und in die Öffnung unterhalb des Deckbleches 7 eingeführt ; zur Zentrierung des Entnahmewerkzeugs, insbesondere dessen den Sicherungsring erfassenden Mauls, dienen dabei die schrägen Kanten der vorderen Stirnfläche des Schiebers 8. Beim Ansetzen des Entnahmewerkzeugs wird das Federstück 18 nach unten gedrückt und der Schieber 8 nach hinten bewegt. Sobald die Öffnung 14 im Schieber 8 unter dem Ringstapel 20 angekommen ist, wird die Schieberbewegung begrenzt. Der unterste Sicherungsring 21 fällt in die Öffnung 14 und wird bei der Rückwärtsbewegung des Entnahmewerkzeugs, die eine Vorwärtsbewegung des Schiebers 8 auf Grund der auf ihn wirkenden Feder 12 bedient, nach vorn geschoben, wobei er auf der Leiste 11 der Schiene 6 gleitet, bis sich die beiden Zungen 15 und 16 in Deckung befinden und der Schieber seine vordere Lage erreicht hat. Der Sicherungsring 21 fällt dann nach unten und liegt in der Nut 10 an der Unterseite des Schiebers 8 unterhalb dessen Durchtrittsöffnung 14 und vor der Stirnfläche der Leiste 11 und dessen Zunge 16.The operation of the device according to the innovation is as follows : The removal tool is placed with its front end on the top of the rail 6 placed and inserted into the opening below the cover plate 7; for centering the removal tool, in particular its mouth that grips the locking ring, serve the inclined edges of the front face of the slide 8. When Attaching the removal tool, the spring piece 18 is pressed down and the Slide 8 moved backwards. As soon as the opening 14 in the slide 8 under the ring stack 20 has arrived, the slide movement is limited. The bottom locking ring 21 falls into opening 14 and becomes when moving the Removal tool, the forward movement of the slide 8 due to the on him acting spring 12 operated, pushed forward, where he is on the bar 11 of the Rail 6 slides until the two tongues 15 and 16 are in line and the slide has reached its front position. The locking ring 21 then falls behind below and lies in the groove 10 on the underside of the slide 8 below it Passage opening 14 and in front of the end face of the strip 11 and its tongue 16.

Beim nochmaligen Einführen des Entnahmewerkzeuges wird der Schieber 8 wiederum zurückgedrückt, wobei aber der nach vorn geförderte Sicherungsring 21 in seiner Lage vor der Stirnfläche der Leiste 11 liegenbleibt, bis er von dem Maul des Entnahmewerkzeugs erfasst worden ist. In der rückwärtigen Stellung des Schiebers 8 fällt dann der nunmehr unterste Sicherungsring 22 nach unten in die Öffnung 14 und wird nach vorn transportiert und zwar an die Stelle, die zuvor der Ring 21 eingenommen hatte. lfun erfasst das Entnahmewerkzeug bei jedem Einführen in die Vorrichtung einen Sicherungsring, bis sich keine Sicherungsringe mehr auf der Stapelschiene 3 befinden. Beim Zurückziehen des Entnahmewerkzeuges gleitet der von diesem erfasste Sicherungsring über das von ihm beim Einführen herabgedrückte Ende 18 der Feder 19 ohne Behinderung. Die leere Stapelschiene 3 kann in einfacher Jeise gegen eine neue mit Ringen 11 besetzte Schiene ausgewechselt werden.When the removal tool is inserted again, the slide 8 again pushed back, but the locking ring 21, which is conveyed to the front remains in its position in front of the end face of the bar 11 until it is released from the mouth of the removal tool has been recorded. In the back position of the slide 8, the now lowermost securing ring 22 then falls down into the opening 14 and is transported to the front to the point that the ring 21 previously occupied would have. lfun detects the removal tool every time it is inserted into the device a circlip until there are no more circlips on the stacking rail 3 are located. When the removal tool is withdrawn, the one gripped by it slides Circlip over the end 18 of the spring that is pressed down by it when it is inserted 19 without disabilities. The empty stacking rail 3 can in a simple Jeise against a new rail fitted with rings 11 can be replaced.

Claims (6)

S c hut z ans p rec he 1. Vorrichtung zur Einzelentnahme von übereinander auf einer Stapelschiene aufgereihten offenen Klemm-bzw. Sicherungsringen mittels eines Klemmgreifwerkzeugs, bestehend aus einem Ständer zur Befestigung der Stapelschiene, an dem Stützmittel für den zu erfassenden Klemmring angebracht sind, dadurch gekennzeichnet, dass zwischen der Auflagefläche für das Entnahmewerkzeug und dem unteren Ende der Stapelschiene (3) ein durch eine Feder (12) in seine vordere Endlage gedrückter Schieber (8) angeordnet ist, aer an seiner Ober-und Unterseite mit je einer der Breite und Stärke der Sicherungsringe entsprechend breiten und tiefen Nut (9,10) ausgerüstet ist, in der sich eine Druchtrittrsöffnung (14) für den unter dem Ringstapel (20) vorzuschiebenden untersten Ring (21) befindet.S c hut z ans p rec he 1. Device for individual removal from one another open clamping or lined up on a stacking rail. Circlips by means of a clamping gripping tool, consisting of a stand for fastening the stacking rail, are attached to the support means for the clamping ring to be gripped, characterized in that, that between the support surface for the removal tool and the lower end of the Stacking rail (3) pressed into its front end position by a spring (12) Slide (8) is arranged aer on its top and bottom with one of each Width and thickness of the circlips according to the wide and deep groove (9,10) is equipped, in which there is a through-opening (14) for the under the ring stack (20) the lowest ring (21) to be advanced is located. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass unterhalb des Schiebers (8) auf der Oberseite einer an der Grundplatte (1) befestigten, die Auflage-und Gleitfläche des Entnahmewerkzeugs und des Schiebers (8) bildenden Schiene. (6), eine die an der Unterseite des Schiebers (8) befindliche Nut (10) ausfüllende Leiste (11) angeordnet ist, deren vordere Stirnseite mit einer in die offene Seite der Sicherungsringe eingreifenden Zunge (16) versehen ist.2. Apparatus according to claim 1, characterized in that below of the slide (8) on the top of one of the Base plate (1) attached, the support and sliding surface of the removal tool and the slide (8) forming rail. (6), one on the underside of the slide (8) Groove (10) filling bar (11) is arranged, the front end face with a in the open side of the locking rings engaging tongue (16) is provided. 3. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass in die Durchtrittsöffnung (14) im Schieber (8) für den untersten Ring (21) des Stapels (20) eine Zunge (15) hineinragt.3. Apparatus according to claim 1 or 2, characterized in that into the passage opening (14) in the slide (8) for the lowermost ring (21) of the stack (20) a tongue (15) protrudes. 4. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass in der vordersten Stellung bzw. Endlage des Schiebers (8) die Zunge (15) an dessen Ringdurchtrittsöffnung (14) oberhalb der Zunge (16) der Leiste (11) deckend liegt.4. Apparatus according to claim 3, characterized in that in the foremost position or end position of the slide (8) the tongue (15) at its ring passage opening (14) above the tongue (16) of the bar (11) is opaque. 5. Vorrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, dass vor der Leiste (11) und vor dem vor dieser liegenden, zu entnehmenden Ring eine über die Auflage-und Gleitfläche des Entnahmewerkzeugs durch dieses beim Ansetzen niederdrückbare Flachfeder (18,19) angeordnet ist.5. Apparatus according to claim 1 to 4, characterized in that in front of the bar (11) and in front of the ring to be removed in front of this over the support and sliding surface of the removal tool through this when attaching depressible flat spring (18,19) is arranged. 6. Vorrichtung insbesondere nach einem oder mehreren der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Stapelschiene 3 für die Sicherungsringe aus einem Blechstreifen besteht, in dessen vordere Stirnfläche eine Rille eingewalzt ist.6. Device in particular according to one or more of the claims 1 to 5, characterized in that the stacking bar 3 for the locking rings consists of a sheet metal strip, in the front face of which a groove is rolled is.
DE1958F0015044 1958-06-10 1958-06-10 DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS. Expired DE1772499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1958F0015044 DE1772499U (en) 1958-06-10 1958-06-10 DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1958F0015044 DE1772499U (en) 1958-06-10 1958-06-10 DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS.

Publications (1)

Publication Number Publication Date
DE1772499U true DE1772499U (en) 1958-08-14

Family

ID=32834032

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1958F0015044 Expired DE1772499U (en) 1958-06-10 1958-06-10 DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS.

Country Status (1)

Country Link
DE (1) DE1772499U (en)

Similar Documents

Publication Publication Date Title
DE1921405A1 (en) Device for handling a stack of slides
DE2806526C2 (en) Carrying frame for stacking transportable, open-topped containers
DE2443544A1 (en) Nailing machine safety release device - has movable sections of safety release device attached between protective side walls
DE853340C (en) Device for removing and reinserting files on high shelves
DE1772499U (en) DEVICE FOR INDIVIDUAL REMOVAL OF OPEN CLAMPING RINGS.
DE2916633C2 (en) Transfer device for fastening between a sorting device and the magazine of a driving device
DE680120C (en) Disk-shaped copy device
DE432638C (en) Boxing exercise ball filled with air and attached to its holder with a sleeve that penetrates it
DE1452651A1 (en) Single stage press
DE1171356B (en) Stapling or nailing device
DE725950C (en) Toilet paper containers used to hold horizontally stacked, folded individual sheets
DE1249769B (en)
DE858253C (en) Device for feeding stacks of sheets
DE515371C (en) Automatic upsetting and piercing press
DE168604C (en)
DE887819C (en) Address printing machine with a collecting tray arranged below the drop-through opening for the printed printing plates
DE452212C (en) Machine for notching pieces of dough with a notching die plate sliding in vertical guide tubes by means of guide rods
DE801091C (en) Auxiliary device for setting iron pit punches
DE220106C (en)
DE860315C (en) Box for storing slides
DE177744C (en)
CH181826A (en) Device on typewriters, calculating machines or accounting machines for inserting and setting a preliminary sheet in front of one or more base sheets in the machine.
DE468015C (en) Storage container with a device for automatic removal of congruent workpieces
DE1185129B (en) Device for removing clamping rings lined up on a stacking rail
DE584518C (en) Matrix setting and line casting machine with a device for holding and conveying the lines leaving the casting mold