DE1760119A1 - Equipment on wire stranding machines and procedures for their operation - Google Patents
Equipment on wire stranding machines and procedures for their operationInfo
- Publication number
- DE1760119A1 DE1760119A1 DE19681760119 DE1760119A DE1760119A1 DE 1760119 A1 DE1760119 A1 DE 1760119A1 DE 19681760119 DE19681760119 DE 19681760119 DE 1760119 A DE1760119 A DE 1760119A DE 1760119 A1 DE1760119 A1 DE 1760119A1
- Authority
- DE
- Germany
- Prior art keywords
- conveyor
- bridging
- machine
- empty
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- D—TEXTILES; PAPER
- D07—ROPES; CABLES OTHER THAN ELECTRIC
- D07B—ROPES OR CABLES IN GENERAL
- D07B7/00—Details of, or auxiliary devices incorporated in, rope- or cable-making machines; Auxiliary apparatus associated with such machines
- D07B7/16—Auxiliary apparatus
Landscapes
- Ropes Or Cables (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Winding, Rewinding, Material Storage Devices (AREA)
Description
PATENTANWALT _r i i,lchl ^ndejlwerdunj - 1760119PATENT ADVOCATE _ r ii, lchl ^ ndejlwerdunj - 1760119
DIPL-ING. ERICH SCHUBERT !.■*„,eaTijsa«»DIPL-ING. ERICH SCHUBERT!. ■ * ", eaTijsa" "
Telegramm-Adr.: Patschub, SiegenTelegram address: Patschub, Siegen
Postscheckkonten: Köln 106931, Essen 20362 Bankkonten: Deutsche Bank AG.,Postal check accounts: Cologne 106931, Essen 20362 Bank accounts: Deutsche Bank AG.,
Abs.: Patentanwalt Dipl.-Ing. SCHUBERT, 59 Siegen, Eiserner Straße 227 Filialen Siegen u. Oberhäusen (RhId.)Abs .: Patent attorney Dipl.-Ing. SCHUBERT, 59 Siegen, Eiserner Straße 227 branches Siegen and Oberhäusen (RhId.)
Postfach 325 .P.O. Box 325.
66 043 Fl/ächm - ' 5. April 1968 66 043 Fl / ächm - ' April 5, 1968
Firma British Insulated Callender's Cables LimitedBritish Insulated Callender's Cables Limited
- 21, Bloomsbury Street, London, W.G.1., E η g 1 a nd- 21, Bloomsbury Street, London, W.G.1., E η g 1 a nd
-——-—- —— I-——-—- —— I
Für diese Anmeldung wird die Priorität aus der britischen Patentanmeldung Nr0 15 993/67 vom 7. April 1967 beansprucht,Priority is claimed for this application from British Patent Application No. 0 15 993/67 of April 7, 1967,
Einrichtung an Drahtverseilmaschinen und Verfahren zu ihrem BetriebEquipment on wire stranding machines and procedures for their operation
Die Erfindung bezieht sich auf Drahtverseilmaschinen und Drahtarmierungsmaschinen derjenigen Art, bei welcher die Drähte von Spulen abgezogen werden, welche an freitragenden bzw. einseitig eingespannten Wellen drehbar gelagert sind, die an α i>K'iii Ri }:.n*---> (oder an jedem einer Vielzahl von Rahmen) abgestützt sind, welcher um die Maschinenachse rotiert, und welche, wenn der (oder jeder) Rahmen rotiert, sukzessiv jeweils in eine abhängige bzw. herabhängende Position gebracht werden.The invention relates to wire stranding machines and wire armoring machines of the type in which the wires are drawn from spools which are rotatably mounted on cantilevered or cantilevered shafts which are connected to α i>K'iii Ri} :. n * ---> (or on each of a plurality of frames), which rotates about the machine axis, and which, when the (or each) frame rotates, are successively brought into a dependent position.
109818/0631109818/0631
BADBATH
Drahtverseil- und Drahtarmierungsmaschinen dieser Art werden nachstehend kurz als "Maschinen der genannten Art" bezeichnet. Beim Betrieb einer Maschine der genannten Art wird jede Spule durch eine entriegelbare bzw. auslösbareVerriegelungsvorrichtung auf ihrer Welle festhalten, kann jedoch, wenn sich ihre Welle in einer hängenden Stellung befindet, durch Entriegeln der Verriegelungsvorrichtung entfernt werden. Die Wellen können beispielsweise an dem oder jedem Rahmen in Gruppen von drei, mit ihren entsprechenden Achsen um 120° zueinander versetzt und in einer Ebene senkrecht zur Maschinenachse liegend angeordnet werden. Es kann jede beliebige Anzahl von Gruppen in Abständen längs der Maschinenachse vorhanden sein. Die Erfindung befaßt sich mit Mitteln zum Beladen einer Maschine der beschriebenen Art mit vollen Spulen und zum Entfernen leerer Spulen von der Maschine mittels einer Spulenhebevorrichtung. Wire stranding and wire reinforcement machines of this type are hereinafter referred to for short as "machines of the type mentioned" designated. When operating a machine of the type mentioned, each spool is locked by an unlockable or releasable locking device hold on to their shaft, but can get through when their shaft is in a hanging position Unlocking the locking device can be removed. The waves can for example on the or each frame in Groups of three, with their respective axes offset by 120 ° to one another and arranged lying in a plane perpendicular to the machine axis. It can be any number of groups at intervals along the machine axis. The invention is concerned with means for loading a Machine of the type described with full bobbins and for removing empty bobbins from the machine by means of a bobbin lifting device.
Durch die Erfindung werden verbesserte Verfahren und Vorrichtungen für das Erleichtern des Ent- und Beladens von Drahtverseil- und Drahtarmierungsmaschinen der genannten Art geschaffen.The invention provides improved methods and apparatus for facilitating the unloading and loading of Wire stranding and wire armoring machines of the type mentioned created.
Erfindungsgemäß wird ein Rahmen der Maschine gedreht, bis eine/von ihm getragenen.Gruppe der einseitig eingespannten Wellen sich in einer hängenden Stellung befindet, eine volle Spule wird in einer Hochkantstellung bzw. umgekehrten Stellung /upended position/ durch eine Fördervorrichtung nach einerAccording to the invention, a frame of the machine is rotated until a / is supported by a group of the one-sided clamped Shafts is in a hanging position; a full spool is in an upright or inverted position / upended position / by a conveyor after a
109818/0631109818/0631
Ladestation für den Rahmen "bewegt, wenn notwendig, wird eine leere Spule von der herabhängenden Welle gelöst, wird dann auf einem geradlinigen "Weg parallel zur Spulenachse auf die Fördervorrichtung abgesemct und unter der abhängigen Welle wegbewegt, die volle Spule wird unter der herabhängenden Welle wegbewegt und auf einem geradlinigen Weg parallel mit ihrer Achse von der Fördervorrichtung auf die herabhängende Welle bewegt, wobei die leere Spule durch die Fördervorrichtung von der Ladestation her zum Wiederbewickeln mit Draht bewegt | wird, und der Rahmen wird gedreht, bis nacheinander jede der übrigen Wellen der Wellengruppe sich in einer herabhängenden Position befindet, und die Ent- und Beladevorgänge werden wiederholt.Loading station for the frame "moves, if necessary, a empty bobbin is then detached from the hanging shaft on a straight "path parallel to the spool axis on the conveyor cut off and moved away under the dependent shaft, the full spool is moved away from under the depending shaft and in a straight line parallel to it Axis moved from the conveyor to the depending shaft, the empty spool being moved by the conveyor moved from the charging station for rewinding with wire | and the frame is rotated until each of the remaining shafts of the shaft group is in a hanging position, and the loading and unloading processes are repeated.
Die erfindungsgemäße Vorrichtung weist eine Einrichtung zum Fördern voller Spulen in einer Hocbjzantstellung bzw. umgekehrten Stellung nach einer Ladestation für einen spulentragenden Rahmen der Maschine, Mittel, die sich an der Ladestation befinden und auf einem geradlinigen Weg parallel zu ™ den Spulenachsen bewegbar sind, zum Absenken einer leeren Spule von einer herabhängenden Welle am Rahmen auf die Fördervorrichtung zu und zum Heben einer vollen Spule von der Beförderungsvorrichtung auf die herabhängende Welle, sowie Mittel auf, urn leere Spulen von der Ladestation zum Wiederbewickeln mit Draht wegzufordern. ,The device according to the invention has a device for conveying full bobbins in a Hocbjzantstellung resp. reverse position after a charging station for a coil-carrying Frame of the machine, means that are located at the charging station and on a straight path parallel to ™ the spool axes are movable to lower an empty spool from a depending shaft on the frame onto the conveyor to and for lifting a full spool from the conveyor onto the hanging shaft, as well as means to retrieve empty bobbins from the loading station for rewinding to call away with wire. ,
10 9818/06310 9818/063
Das Bewegen von vollen Spulen nach der Ladestation hin und das Bewegen von leeren Spulen von der Ladestation her wird vorzugsweise durch ein einziges Förderersystem erreicht, falls jedoch gewünscht, kann auch ein separates Förderersystem für das Bewegen der leeren Spulen verwendet werden.Moving full bobbins towards the charging station and moving empty bobbins from the charging station is preferably achieved by a single conveyor system, but a separate conveyor system can be used if desired used for moving the empty bobbins.
Das oder jedes Förderersystem kann ein BandfördererThe or each conveyor system can be a belt conveyor
^ oder ein Kettenförderer sein. In beiden Fällen wird der Förderer so vorgesehen, daß er die Spulen in ihrer Hochkantstellung bzw. umgekehrten Stellung bewegt. Die Einrichtung zum Übermitteln der Spulen zwischen ihren Wellen und dem Förderer weist vorzugsweise einen oder mehrore hydraulische oder pneumatische Stößel auf, welche in Zylindern unterhalb der Höhe oder Ebene des Förderers arbeiten und welcher oder jeder von welchen an seinem oberen Ende eine Stütze für die Spule trägt. In einigen Fällen kann"ein Paar von Stößeln ν erwendet werden, wobei einer auf jeder Seite des Förderers angeordnet wird P und den Bodenflansch einer Spule an diametral entgegengesetzten Seiten erfaßt. In anderen Fällen kann ein einzelner Stößel verwendet werden, der in einem Zylinder direkt unter einem Förderer arbeitet, welcher zumindest im Bereich der Ladestation eine offene Form hat, durch welche hindurch der Stößel vorragen kann. In einem solchen Fall bildet oder trägt das obere Ende des Stößels einen Tisch, auf welchen der untere Flansch einer Spule aufgesetzt werden kann.^ or be a chain conveyor. In both cases the sponsor becomes provided so that it moves the bobbins in their upright or inverted position. The facility to transmit the reels between their shafts and the conveyor preferably have one or more hydraulic or pneumatic ones Rams which work in cylinders below the height or level of the conveyor and which or each of which carries a support for the coil at its upper end. In some cases "a pair of tappets ν can be used, one on each side of the conveyor being placed P and the bottom flange of a spool at diametrically opposite one another Pages captured. In other cases, a single plunger can be used, which is in a cylinder directly below one Conveyor works, which at least in the area of the loading station has an open shape through which the plunger protrudes can. In such a case, the upper end of the ram forms or supports a table on which the lower flange of a Coil can be put on.
109818/D631109818 / D631
• Die Anordnung des Förderers und der Mittel für das übermitteln-der Spulen zwischen dem Förderer und den Wellen, auf denen sie angebracht werdenf ist in einem gewissen Ausmaß von der Form der Verseilmaschine oder Armierungsmaschine abhängig.• The arrangement of the conveyor and the means for forward-of the coil between the conveyor and the shafts on which they are installed is dependent to some extent on the shape of the stranding machine or Armierungsmaschine f.
Bei einer Anordnung, die sich zur Verwendung bei Drahtarmierungsmaschinen derjenigen Art eignet, bei welcher die Spulen . λ an freitragenden bzw. einseitig eingespannten Wellen abgestützt werden, die sich nach außen in Richtungen radial zur Maschinenachse erstrecken, läuft das Förderersystem zum Bewegen von In one arrangement suitable for use in wire armoring machines of the type in which the coils. λ are supported on cantilevered or cantilevered shafts that extend outward in directions radial to the machine axis, the conveyor system runs to move
Spulen nach jeder Ladestation hin und von dieser weg unter der. I-:itt el achse der Maschine her.Coils to and from each charging station the. I-: from the axis of the machine.
Wenn die Art der Verseilmaschine oder Armierungsmaschine sich nicht für eine solche Anordnung des Förderersystems eignet, wie es dort der Fall ist, wo die Wellen tangential zu einem Zylinder angeordnet sind, dessen Achse mit der Maschinen- ' achse zusammenfällt, kann die Anordnung so getroffen werden, daß Spulen nach jeder Ladestation hin durch ein Fördersystem übermittelt werden, welches längs der Verseilmaschine oder Armierungsmaschine läuft, jedoch gegenüber der Ladestation für jede Gruppe von Wellen unterbrochen ist, um eine Lücke zu lassen, welche durch einen Förderer überbrückt wird, der einen abtrennbaren Teil des Förderersysterns bildet und in der Lage ist, eine Anzahl Spulen, .beispielsweise vier oder fünf, aufzunehmen. ■If the type of stranding machine or reinforcing machine is not suitable for such an arrangement of the conveyor system suitable, as is the case where the waves are tangential are arranged to a cylinder, the axis of which with the machine ' axis coincides, the arrangement can be made so that coils after each loading station through a conveyor system be transmitted, which runs along the stranding machine or reinforcement machine, but opposite the loading station for each group of waves interrupted to make a gap to leave, which is bridged by a conveyor that forms a separable part of the conveyor system and in the Is able to have a number of coils, for example four or five, to record. ■
1098 18/06311098 18/0631
Jeder dieser überbrückenden Förderer ist in Hichtung senkrecht zu seiner Länge auf die Maschinenachse zu bewebar, um ihn in Flucht mit der Ladestation zu bringen, damit die Spulen, die auf dem überbrückenden Förderer untergebracht sind, unter jeder Welle her bewegt werden können, wenn sie eine herabhängende Position über dem überbrückenden Förderer einnimmt. Die Bewegung des überbrückenden Förderers in einer Richtung senkrecht zu h seiner Länge wird vorzugsweise durch pneumatische oder hydraulische Mittel gesteuert, kann jedoch auch durch eine motorgetriebene Zahnstangen-Ritzel-Anordnung erfolgen.Each of these bridging conveyors can be moved in the direction perpendicular to its length on the machine axis in order to bring it into alignment with the loading station so that the spools housed on the bridging conveyor can be moved under each shaft if they have one assumes hanging position over the bridging conveyor. The movement of the bridging conveyor in a direction perpendicular to its length h is preferably controlled by pneumatic or hydraulic means, but can also be effected by a motor-driven rack and pinion arrangement.
Eine bevorzugte Ausführungsform einer Vorrichtung zum Erleichtern des Ent- und Beladens einer Drahtverseilmaschine der beschriebenen Art wird nunmehr anhand der die Erfindung beispielsweise wiedergebenden Zeichnung näher beschrieben, und zwar zeigtA preferred embodiment of a device for Facilitating the unloading and loading of a wire stranding machine of the type described will now be based on the invention For example, reproducing drawing described in more detail, namely shows
Fig. 1 eine schsiatische Teil-Draufsicht auf die Maschine und die Spulen-Lade- und Entladevorrichtung,Fig. 1 is a schematic partial plan view of the machine and the reel loading and unloading device,
Fig. 2 einen schematischen Teilschnitt durch die Maschine und Vorrichtung nach der Linie II-II in Fig. .1, in einem größeren Maßstab,Fig. 2 is a schematic partial section through the machine and device along the line II-II in Fig. 1, on a larger scale,
Fig. 3 eine Teil-Draufsicht der Spulenlade- und -entladevorrichtung in einem noch größeren Maßstab, währendFigure 3 is a partial plan view of the reel loading and unloading device on an even larger scale while
Fig. 4 eine Seitenansicht des Teils der Vorrichtung, der in Fig. 3 dargestellt ist, wiedergibt.FIG. 4 shows a side view of the part of the device shown in FIG.
lAD ORIGiisLAL 109818/0631 lAD ORIGiisLAL 109818/0631
Die Drahtverse ilmas chine ist von herkömmlicher Form und weist eine zentrale rohrförmige Läuferwelle 1 auf, welche in Ständerlagern (nicht dargestellt) drehbar gelagert ist und in Abständen über ihre Lä,nge eine Anzahl von Spulenhalterahmen 2 trägt. Jeder Rahmen 2, von denen nur einer in Fig.. 2 dargestellt ist, weist drei radial vorragende Stützarme .5 auf, die um 120° zueinander versetzt sind, und jeder Arm trägt an seinem freien Ende eine vorspringende oder einseitig ' ä eingespannte Welle 4 für die Aufnahme einer Drahtspule 5. Die Achse jeder vorspringenden Welle 4 des Rahmens 2 verläuft tangential zu einem Kreis, der konzentrisch zur Welle 1 liegt, und die Achsen aller drei Wellen sind um 120° zueinander versetzt und liegen in einer "Ebene senkrecht zur Achse der Welle. Die Wellenstützarme 3 an jedem Rahmen 2 sind um 60° relativ zu denjenigen an dem oder jedem angrenzenden Rahmen winklig versetzt.The wire shaft machine is of conventional shape and has a central tubular rotor shaft 1 which is rotatably mounted in stator bearings (not shown) and carries a number of bobbin holding frames 2 at intervals along its length. Each frame 2, of which only one is shown in FIG .. 2, has three radially projecting support arms .5, which are offset by 120 ° to each other, and each arm carries at its free end a projecting or unilaterally 'ä clamped shaft 4 for receiving a wire spool 5. The axis of each projecting shaft 4 of the frame 2 is tangential to a circle which is concentric to the shaft 1, and the axes of all three shafts are offset by 120 ° and lie in a "plane perpendicular to the axis The shaft support arms 3 on each frame 2 are angularly offset by 60 ° relative to those on the or each adjacent frame.
An der Verseilmaschine entlang verläuft ein Fördersystem 10, welches gegenüber der Ladestation 11 für jeden Spulenabstützrahmen 2 unterbrochen ist, um einen Spalt oder eine Lücke zu lassen-, welcher bzw. welche durch einen Förderer 12 überbrückt wird, der in der Lage ist, eine begrenzte Anzahlvon Spulen unterzubringen, Vielehe Anzahl von der Anzahl von Spulen, die durch einen Rahmen abgestützt werden, und vom verwendeten Verfahren des Ent- und Beladens abhängig ist. Jeder überbrückende Förderer 12 ist in einer Richtung senkrecht zu seiner Länge auf die Achse der Maschine zu bewegbar, um ihn in Flucht mit seiner entsprechen-A conveyor system 10 runs along the stranding machine, which opposite the charging station 11 for each coil support frame 2 is interrupted in order to leave a gap or a gap which is bridged by a conveyor 12 capable of accommodating a limited number of coils, Many numbers depend on the number of coils supported by a frame and the method used of loading and unloading is dependent. Each bridging conveyor 12 is on the axis in a direction perpendicular to its length too movable of the machine to align it with its corresponding
109818/0631109818/0631
den Ladestation 11 zu bringen, damit eine Spule 14, die am überbrückenden Förderer aufgebracht ist, unter jede Welle 4 bewegt werden kann, wenn sie eine herabhängende Position über dem überbrückenden Förderer einnimmt, wobei ihre Achse im wesentlichen lotrecht verläuft. Beim Bewegen auf die Maschinenachse zu wird der überbrückende Förderer 12 in eine seitliche Aussparung im Grundrahmen 8 der Maschine und über einen Ladestößel 16 gebracht, der in einem Zylinder 17 in der Aussparung und unter Flurebene arbeitet, und in Flucht mit jeder Welle 4, wenn diese eine senkrechte Stellung über der Aussparung einnimmt.to bring the charging station 11 so that a coil 14, which is on Bridging conveyor is applied, under each shaft 4 can be moved when it is in a depending position above the bridging conveyor with its axis substantially runs perpendicular. When moving towards the machine axis, the bridging conveyor 12 is in a lateral recess in the base frame 8 of the machine and via a loading ram 16 brought, which works in a cylinder 17 in the recess and below the floor level, and in alignment with each shaft 4 when this assumes a vertical position over the recess.
Wie aus den Fign. 3 und 4 hervorgeht, auf welche nunmehr Bezug genommen wird, weist jeder überbrückende Förderer 12 ein Paar von seitlich im Abstand angeadneten endlosen Ketten 20 auf, welche Mitnehmer 21 zum Erfassen des Randteilstücks des Bodenflansches der Spulen H tragen, wobei die Beabstandung der zwei Ketten ausreicht , um ein Passieren des Ladestößels 16 und eines Spulenhaltetisches 18 (Fig. 2), der durch den Stößel abgestützt wird, zwischen diesen zu ermöglichen. Jedes Teilstück des Förderersystems 10 ist von ähnlicher Konstruktion. Die endlosen Ketten 20 des überbrückenden Förderers 12 werden durch einen Motor 23 und ein Getriebe 24 angetrieben, und zwar über ein entsprechendes Untersetzungsgetriebe 25. Alternativ können die. Ketten 20 durch einen Motor angetrieben werden, welcher am überbrückenden Förderer montiert ist. Der überbrückende Förderer 12 wird durch zwei Paare von Führungsrollen 27 an jedem Ende des Förderers zwangsläufig in einer Richtung senkrecht zu seiner Länge bewegt, wobei diese Führungsrollen 27 mit einem Paar vonAs shown in FIGS. 3 and 4, to which reference is now made, each bridging conveyor has 12 a pair of endless chains sewn at a distance from each other 20, which carry driver 21 for detecting the edge portion of the bottom flange of the bobbins H, the spacing of the two chains are sufficient to pass the loading ram 16 and a bobbin holding table 18 (Fig. 2), the through the ram is supported to allow between these. Each section of the conveyor system 10 is of similar construction. The endless ones Chains 20 of the bridging conveyor 12 are driven by a motor 23 and a gearbox 24, via a corresponding reduction gear 25. Alternatively, the. Chains 20 are driven by a motor which is on bridging conveyor is mounted. The bridging conveyor 12 is supported by two pairs of guide rollers 27 at each end of the conveyor inevitably moved in a direction perpendicular to its length, these guide rollers 27 having a pair of
109818/Π631109818 / Π631
sich 'quer erstreckenden Führungsstangen 30 zusammenwirken und ihre Achsen parallel zur Achse der Maschine verlaufen, und wobei die Rollenpaare 27 auf den oberen !lachen der Führungsstangen laufen und die anderen Rollenpaare 28, deren Achsen-vertikal verlaufen, an Seitenflächen der Führungsstangen laufen. Eine ' Querbewegung des überbrückenden Förderers 12 in einer Richtung senkrecht zur Maschinenachse erfolgt durch einen pneumatischen Zylinder 32, dessen Kolben 33 mit dem überbrückenden Förderer f in Verbindung steht, um den 'Förderer in Richtung auf die Ladestation 11 zu ziehen oder von dieser wegzudrücken. 'transversely extending guide rods 30 cooperate and their axes are parallel to the axis of the machine, and the pairs of rollers 27 running on the upper faces of the guide rods and the other pairs of rollers 28, whose axes are vertical run, run on the side surfaces of the guide rods. A 'transverse movement of the bridging conveyor 12 in one direction perpendicular to the machine axis is carried out by a pneumatic cylinder 32, the piston 33 of which is connected to the bridging conveyor f is in communication to pull the 'conveyor towards the loading station 11 or to push it away from it.
Beim Betrieb der Verseilmaschine können volle Haspeln 14 auf das Förderersystem 10 aufgebracht und in entsprechender Zahl gespeichert werden, und zwar entweder alle, bevor die erste der Serie von überbrückenden Förderern 12 erreicht ist, oder die entsprechende Zahl kann am Förderersystem TO gespeichert werden, und zwar unmittelbar hinter jedem überbrückenden Förderer. Wenn _.* ein Wiederbeladen der Maschine notwendig ist, wird die Maschine angehalten, um eine Welle 4 an jedem aweiten Rahmen 2 in eine vertikal herabhängende Position über ihrem Ladestößel 16 zu bringen. Jeder dieser Rahmen wird darm entajlden und separat beladen, und zwar durch Einbringen seines zugeordneten überbrückenden Förderers 12 in eine Stellung, in welcher er über dem zugeordneten Ladestößel 16 liegt. Der .Stößel■16 wird durch den Förderer 12 hindurch gehoben, um das Gewicht der leeren oder fast leeren Haspel 5 aufzunehmen, wenn die Haspel von ihrer'Welle 4 freigegebenDuring operation of the stranding machine, full reels 14 can be applied to the conveyor system 10 and stored in the appropriate number, either all before the first of the series of bridging conveyors 12 is reached, or the corresponding number can be stored on the conveyor system TO, namely immediately behind each bridging conveyor. If _. * A reloading of the machine is required, the machine is stopped to bring about a shaft 4 at each aweiten frame 2 in a vertically hanging position over its charging tappet 16. Each of these frames is then unloaded and loaded separately by bringing its associated bridging conveyor 12 into a position in which it lies above the associated loading ram 16. The ram 16 is lifted through the conveyor 12 in order to take up the weight of the empty or almost empty reel 5 when the reel is released from its shaft 4
109818/0631109818/0631
wird, und der Stößel wird gesenkt, um die leere Haspel auf den überbrückenden Förderer aufzubringen, welcher sich dann ' in den Spalt im Förderersystem 10 zurückbewegt und die leere Spule durch Vorwärtsbewegen des Förderers 12 an das Förderersystem abgibt. Gleichzeitig ist eine volle Spule 14 vom Förderersystem 10 her auf den überbrückenden Förderer 12 an die Stelle bewegt worden, die vorher von der leeren Spule 5 eingenommen wurde. Der überbrückende Förderer 12 wird nun in die Ladestation 11 hinein bewegt, wonach der Stößel 16 sich nach oben bewegt, um die volle Spule 14 auf die leere Welle 4 zu heben. Wenn die volle Spule-14 an der Welle 4 verriegelt ist, wird der Stößel gesenkt, der überbrückende Förderer 12 wird in den Spalt im Fördersystem 10 zurückbewegt, und die Welle 1 der Maschine wird um 120° gedreht, um die nächste Welle am Rahmen 2 in eine vertikal herabhängende Position zu bringen, und die Folge der Vorgänge wird für jede Welle des Rahmens wiederholt. Jeder der anderen wechselnden Rahmen wird dann in ähnlicher Weise entladen und r separat beladen. Bei dieser Anordnung sind Verriegelungen /interlocks/ zwischen dem pneumatischen Zylinder 32, welcher die Hin- und Herbewegung eines überbrückenden Förderers 12 steuert, dem Zylinder 17, der den Hebestößel 16 betätigt, und dem Motor vorgesehen, der die Maschine antMbt, um sicherzustellen, daß die Spulenrahmen .2 nicht rotieren können, während ein überbrückender Förderer "eingebracht" /"shuttled in"/ und der Stößel gehoben wird.and the ram is lowered to load the empty reel onto the bridging conveyor, which then moves' is moved back into the gap in the conveyor system 10 and delivers the empty spool to the conveyor system by moving the conveyor 12 forward. At the same time, a full spool 14 is from the conveyor system 10 has been moved on the bridging conveyor 12 to the point previously occupied by the empty spool 5 became. The bridging conveyor 12 is now moved into the loading station 11, after which the ram 16 moves upwards, to lift the full bobbin 14 onto the empty shaft 4. When the full spool-14 is locked on shaft 4, the plunger lowered, the bridging conveyor 12 is moved back into the gap in the conveyor system 10, and the shaft 1 of the machine is rotated by 120 ° to bring the next shaft on the frame 2 in a vertically depending position, and the sequence of operations is repeated for each wave of the frame. Each of the other alternating frames is then unloaded and in a similar manner r loaded separately. In this arrangement there are interlocks between the pneumatic cylinder 32, which controls the reciprocation of a bridging conveyor 12, the cylinder 17 which actuates the lift ram 16, and the motor that drives the machine to ensure that that the bobbin frames .2 cannot rotate while a bridging conveyor is "brought in" / "shuttled in" / and the Ram is lifted.
109818/0631109818/0631
Falls erwünscht, können die überbrückenden Förderer 12 und Stößel 16, welche einem Rahmen 2 um den anderen der Maschine . zugeordnet sind, miteinander verbunden sein, so daß zwei oder mehr wechselnde Rahmen der Maschine gleichzeitig entladen und beladen werden können. ■If desired, the bridging conveyors 12 and rams 16 which fit a frame 2 around the other of the machine . associated with each other, so that two or more alternating frames of the machine unload at the same time and can be loaded. ■
Anstatt leere Spulen auf das Vollspulen-Zuführungsfördersystem 10 zu entladen, kann ein w%teres Förderersystem (nicht f dargestellt) längsseits des ersten, mit Lücken in Flucht mit denjenigen im ersten Förderersystem, vorgesehen werden. Der überbrückende Förderer 12, auf welchen eine leere Spule 5 durch den Stößel 16 aufgebracht worden ist, kann mit diesem anderen Fördersystem in Flucht bzw. in eine Linie bewegt werden, und die Spule kann auf dieses abgeladen werden, der überbrückende Förderer kann dann in Flucht mit dem Vollspindel-Zufuhr-Fördersystem 10 bewegt werden, während eine volle Spule 14 ■ nach ihm hin entladen'wird, wonach es auf die Maschine zu * Rather than unloading empty bobbins onto the full bobbin infeed conveyor system 10, a further conveyor system (not shown) can be provided alongside the first, with gaps in line with those in the first conveyor system. The bridging conveyor 12, onto which an empty spool 5 has been applied by the ram 16, can be moved in alignment with this other conveyor system, and the spool can be unloaded onto this, the bridging conveyor can then be in alignment be moved with the full spindle feed conveyor system 10 while a full bobbin 14 is unloaded towards it, after which it is directed towards the machine *
befördert wird,■um es in Flucht mit dem Ladestößel zu bringen.is transported, ■ to bring it into alignment with the loading ram.
Alternativ kann, wenn genügend Raum zwischen den Spulentragenden Rahmen und ihren zugeordneten überbrückenden Förderern vorhanden ist, um den Läufer der Maschine zu drehen, während die überbrückenden Förderer, die mit verschiedenen Spulen beladen sind, sich in der "hineinbewegten" Stellung befinden, jeder überbrückende Förderer Speicherungsmöglichkeiten für (2n + 1) Spulen auf *'Q. is en, wobei "n" die Anzahl der Spulen in der Gruppe an der Station ist. "n" volle Spulen können dannAlternatively, if there is enough space between the reel supporting frames and their associated bridging conveyors to rotate the rotor of the machine while the bridging conveyors loaded with different bobbins are in the "moved in" position, each bridging conveyor can Storage options for (2n + 1) coils on * ' Q. is en, where "n" is the number of coils in the group at the station. "n" full bobbins can then
■■1 0-98 1.8/0631■■ 1 0-98 1.8 / 0631
auf das hintere ^nde des überbrückenden Förderers geladen werden, der Förderer dann "hineinbewegt11 werden, die erste leere Spule auf ihn abgeladen werden, der Förderer vorwärtsbewegt werden, bis sich die erste volle Spule über dem Ladestößel befindet, der Stößel gehoben v/erden, um jene Spule einzubringen, die Maschine um —^— gedreht werden, um die nächste leere Spule in ihre Abladeposition zu bringen, der Stößel gehoben werden, um sie auf den Förderer abzuladen, so daß sie die Stelle der ersten vollen Spule einnimmt, und so weiter, bis alle Spulen gewechselt worden sind, worauf der überbrückende Förderer herausbewegt werden kann, um seine leeren Spulen nach dein Förderersystem hin zu entladen und um zu ermöglichen, daß er mit "n" vollen Spulen neu beladen wird. Es sa. darauf hingewiesen, daß bei der beschriebenen Verseilmaschine, bei der jeder Spulenhalterahmen drei Spulen trägt, bei dieser Anordnung der überbrückenden Förderer der jedem Rahmen zugeordnet ist, Speichermöglichkeiten für sieben Spulen aufweisen würde, ψ wobei drei volle Spulen anfänglich in den drei hinteren Spulenpositionen am Förderer lokalisiert wären.on the rear ^ nde loading of the bridging conveyor, the conveyor into moves then "be 11, the first empty reel to be unloaded onto it, the conveyors are moved forward until there is the first full bobbin to the loading ram, v lifted, the plunger / ground to bring in that bobbin, turn the machine - ^ - to bring the next empty bobbin into its unloading position, lift the ram to unload it onto the conveyor so that it takes the place of the first full bobbin, and so on until all the bobbins have been changed, at which point the bridging conveyor can be moved out to unload its empty bobbins into your conveyor system and to allow it to be reloaded with "n" full bobbins that in the described stranding machine, in which each bobbin holding frame carries three bobbins, in this arrangement the bridging conveyor is assigned to each frame, storage facilities would have for seven coils, ψ with three full bobbins were initially localized in the three rear coil positions on the conveyor.
Bei einer anderen verwendbaren Anordnung, bei der nicht genügend Raum vornanden ist, um die Maschine zu drehen, während überbrückende Förderer, die mit etlichen Spulen b'eladen sind, sich in der "hineinbewegten11 Stellung befinden, erfolgt das Laden und Entladen der Spulen, während die V/ellen sich in einer herabhängenden, aber geneigten Position befinden, beispielsweise unter einem Winkel von 30 zur Senkrechten, in diesem FallIn another useful arrangement in the room is not sufficiently forward Andes, to rotate the machine, are in the "in moving 11 position during bridging conveyors b'eladen with several coils, the loading and unloading are carried out of the coils, while the waves are in a drooping but inclined position, for example at an angle of 30 to the vertical, in this case
109818/063 1109818/063 1
wird der Ladestößel auf den gleichen Winkel eingestellt, und der Förderer an der Ladestation läuft längs der Maschine, wobei seine spulentragenden flächen im rechten Winkel zur Stößelachse, seine Längsachse schneidend, verlaufen. Wie bei denanderen beschriebenen Anordnungen sind die Teilstücle des Förderers in der Fähe der Ladestationen von offener Form, um die Ladestößel durch sie hindurchführen zu können. Leere Spulen, die auf diesen Förderer abgeladen werden, können zum Wiederbewickeln wieder nach den Drahtzug-Maschinen hin befördert werden, und zwar mit Hilfe einer Verlängerung des Förderers, welcher in einer Schleife um das Ende der Maschine herum und von dort an der Rückseite der Maschine entlang läuft. „the loading ram is set to the same angle and the conveyor at the loading station runs alongside the machine, whereby its coil-carrying surfaces run at right angles to the ram axis, intersecting its longitudinal axis. Like the others The arrangements described are the parts of the conveyor in the vicinity of the charging stations of open form to the loading ram to be able to lead through them. Empty spools dumped on this conveyor are ready for rewinding be conveyed back to the wire drawing machines, and with the help of an extension of the conveyor, which in a Loop around the end of the machine and from there on the Runs along the back of the machine. "
Das Ausklinken der Spulen an ihren Wellen wird vorzugsweise automatisch bewirkt, wenn sich der Ladestößel nach oben in Richtung auf die sich in der Entladestellung befindliche Spule bewegt, und zwar durch die in der anhängigen Patentanmeldung C 44 861 IXc/47k (Anwaltsakte 68 031) beschriebene und beanspruchte Vorrichtung.The disengagement of the coils on their shafts is preferably effected automatically when the loading ram moves upwards in Direction of the bobbin in the unloading position moved, namely by the in the pending patent application C 44 861 IXc / 47k (attorney file 68 031) described and claimed Contraption.
Die Erfindung betrifft auch Abänderungen der im beiliegenden Patentanspruch 1 urnr iss enen Aus führung s form und be?jieht sie vor allem auch auf sämtliche Erf indungsinerkmale, die im einzelnen — oder in Kombination — in der gesamten Beschreibung und Zeichnung offenbart sind.The invention also relates to modifications of the embodiment specified in the attached patent claim 1 and applicable above all, it also applies to all of the invention features that are included in the individually - or in combination - throughout the description and drawings are disclosed.
109818/0631109818/0631
Claims (1)
Stößel (16), der in einem Zylinder (17) arbeitet, direkt
unter den Förderer vorragt, wobei das obere Ende des Stößels einen Tisch (18) als Auflage für den unteren Flansch einer
Spule bildet oder trägt.17. "Device according to claim 9 to 16, characterized in that at least in the area of the loading station the conveyor or, if available, the bridging conveyor is of open form, through which a single one
Plunger (16), which works in a cylinder (17), directly
protrudes under the conveyor, the upper end of the ram having a table (18) as a support for the lower flange of a
Coil forms or carries.
des Bodenflansches einer darauf befindlichen Spule, angreift.18. Apparatus according to claim 9 to 16, characterized in that a pair of rams, one on each side of the conveyor, or, if present, the bridging conveyor on diametrically opposite sides
of the bottom flange of a coil located on it, engages.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB15993/67A GB1199491A (en) | 1967-04-07 | 1967-04-07 | Improvements in or relating to Wire-Stranding Machines. |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1760119A1 true DE1760119A1 (en) | 1971-04-29 |
Family
ID=10069270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19681760119 Pending DE1760119A1 (en) | 1967-04-07 | 1968-04-06 | Equipment on wire stranding machines and procedures for their operation |
Country Status (5)
Country | Link |
---|---|
US (1) | US3468115A (en) |
BE (1) | BE713318A (en) |
DE (1) | DE1760119A1 (en) |
FR (1) | FR1560105A (en) |
GB (1) | GB1199491A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3912537A1 (en) * | 1989-04-17 | 1990-10-18 | Werner Henrich | Replacing full package in wire processing machine - by positioning package to be replaced with empty one on projecting shaft end in machine |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3721081A (en) * | 1971-10-14 | 1973-03-20 | Teijin Ltd | Apparatus for handling undrawn spun yarn in synthetic yarn producing mill |
HU179885B (en) * | 1980-07-29 | 1982-12-28 | Diosgyoeri Gepgyar | Coil feed gear for cable twisting machines with automatic change of coil |
CH648784A5 (en) * | 1981-01-22 | 1985-04-15 | Micafil Ag | DEVICE FOR INPUTING AND REMOVING STATORS IN COMBINATION WITH LOADING AND UNLOADING DEVICES IN PARALLEL SWITCHED STATOR WINDING MACHINES. |
GB2143869B (en) * | 1983-07-12 | 1986-11-12 | Cortinovis Spa | Improvements in and relating to stranding machines |
FR2588204A1 (en) * | 1985-10-08 | 1987-04-10 | Fical Fils Cables Acier Lens | ROBO OF LOADING AND UNLOADING OF METAL WIRE COILS ON A TORONNEUSE, INTENDED TO MANUFACTURE CABLES |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB586401A (en) * | 1944-12-13 | 1947-03-18 | Allin Larmuth | Improvements in and relating to wire stranding, rope and cable making machines |
FR1008023A (en) * | 1950-01-06 | 1952-05-13 | Organisation Soc Pour | Improvements to sets of supporting rollers supporting rotating cages |
DE1077114B (en) * | 1959-05-02 | 1960-03-03 | Beteiligungs & Patentverw Gmbh | Tandem high-speed stranding machine with intermediate tube |
-
1967
- 1967-04-07 GB GB15993/67A patent/GB1199491A/en not_active Expired
-
1968
- 1968-04-05 BE BE713318D patent/BE713318A/xx unknown
- 1968-04-05 US US719127A patent/US3468115A/en not_active Expired - Lifetime
- 1968-04-05 FR FR1560105D patent/FR1560105A/fr not_active Expired
- 1968-04-06 DE DE19681760119 patent/DE1760119A1/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3912537A1 (en) * | 1989-04-17 | 1990-10-18 | Werner Henrich | Replacing full package in wire processing machine - by positioning package to be replaced with empty one on projecting shaft end in machine |
Also Published As
Publication number | Publication date |
---|---|
US3468115A (en) | 1969-09-23 |
BE713318A (en) | 1968-08-16 |
FR1560105A (en) | 1969-03-14 |
GB1199491A (en) | 1970-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3538838C2 (en) | ||
DE1931043B2 (en) | Pallet unloading device | |
DE3824843A1 (en) | DEVICE FOR FEEDING COILS TO A SCHAERGATTER | |
DE1294321B (en) | Coiler system for hot-rolled wire | |
DE2060957A1 (en) | Storage system for workpieces and / or tools for several processing stations | |
DE1031252B (en) | Vertical reel | |
DE2019925A1 (en) | Device for the transport of transmission tools with coils for stators of electrical machines between different manufacturing stations | |
EP0531905A1 (en) | Apparatus for transfering bobbin tubes | |
DE2938974C2 (en) | Device for the machine stacking of grid mats with alternating turning of the same | |
DE2558964A1 (en) | DEVICE FOR CONVEYING COILS OF STEEL STRIP TO AN UNWINDING STATION | |
DE4317539A1 (en) | Device for feeding coils to a user machine | |
DE1760119A1 (en) | Equipment on wire stranding machines and procedures for their operation | |
DE3702265A1 (en) | METHOD AND DEVICE FOR REMOVING AND REPLACING YARN SLEEVES IN TEXTILE MACHINES | |
DE2231661C2 (en) | Device for storing an elongated flexible element | |
DE102008051516A1 (en) | Coding device for data carriers and method for coding data carriers | |
DE3018628A1 (en) | DEVICE FOR AUTOMATICALLY REWINDING STRINGS, ESPECIALLY WIRE | |
DE19505050C2 (en) | Transport and transfer system between at least one roving machine and a downstream storage or processing area | |
DE1153676B (en) | Method and device for the automatic binding of bundles or rings occurring in rolling mills or the like | |
DE1182192B (en) | Method and device for the continuous production of any number of wire bonds connected to one another by the wire | |
DE2917027A1 (en) | METHOD AND DEVICE FOR PROMOTING SUCCESSIVE HOT WINDINGS | |
DE3942492A1 (en) | PALLETIZING DEVICE FOR REELS | |
EP0311069B1 (en) | Transport system for roving bobbins between spinning machines | |
DE3129984C2 (en) | Loading device with automatic reel change for stranding machines in the cable industry | |
DE1940016A1 (en) | Device for collecting wire windings into bundles | |
DE2220846A1 (en) | METHOD AND DEVICE FOR DISASSEMBLING STACKS OF BRICKS |