DE1749974U DE1955B0023594 DEB0023594U DE1749974U DE 1749974 U DE1749974 U DE 1749974U DE 1955B0023594 DE1955B0023594 DE 1955B0023594 DE B0023594 U DEB0023594 U DE B0023594U DE 1749974 U DE1749974 U DE 1749974U
Authority
DE
Germany
Prior art keywords
concrete
processing
substances
allocation device
mixing components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1955B0023594
Other languages
German (de)
Inventor
Heinz Bors
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1955B0023594 priority Critical patent/DE1749974U/en
Publication of DE1749974U publication Critical patent/DE1749974U/en
Expired legal-status Critical Current

Links

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Description

Zuteilvorrichtung für körnige Stoffe, beispielsweise Mischungskomponenten für die Aufbereitung von Beton Die Neuerung bezieht sich auf eine Zuteilvorriohtung für körnige Stoffe, beispielsweise Mischungskomponenten für die Aufbereitung von Beton.Metering device for granular materials, such as mixture components for the preparation of concrete The innovation relates to a metering device for granular substances, for example mixture components for the preparation of Concrete.

Beim Mischen mehrerer Stoffe, wie es z. B. bei der Herstellung von Beton der Fall iSt besteht die Aufgabe u. a. darin: 1. Genügende Vorräte der zu mischenden Stoffe so zu lagern, daß ihre Verarbeitung möglichst geringen Aufwand erfordert ; 2. die einzelnen Stoffe in abgemessenen Mengen einer Aufnahmevorrichtung, z. B. einem Behälter, zuzuteilen, in dem die Charge zusammengestellt wird. When mixing several substances, as z. B. in the production of Concrete the case is the task i.a. therein: 1. Sufficient stocks of the to to store mixing substances so that their processing as little effort as possible requires ; 2. the individual substances in measured quantities of a receiving device, e.g. B. a container, in which the batch is assembled.

Dies gilt bei der Aufbereitung von Beton insbesondere auch für die die größte Masse darstellenden, oft unterschiedlich gekörnten Zuschlagstoffe. This applies in particular to the processing of concrete the largest mass representing, often differently grained aggregates.

Abgesehen von Großbaustellen und ortsfest eingerichteten Betonwerken, bei deren Planung der Aufwand für eine Hochbunkeranlge mit Beschickungsvorrichtung, automatischer Dosierung und Abzug noch wirtschaftlich ist, wird auf den üblichen Baustellen improvisiert, indem entweder der Aufzugsbehälter der Mischmaschine direkt zum Zusammenstellen der Chargen benutzt wird, oder hierfür ein besonderer Behälter vorgeschaltet wird, der sowohl für volumen-als auch für gewichtsmäßige Mengenmessung bekannt ist. In den meisten Fällen wird dieser heute direkt und meist mittels Handschrapper beschickt, der mit einem Sohub aber jedesmal eine so große Menge fordert daß wegen der damit verbundenen großen Ungenauigkeit von einem"Dosieren" keine Rede sein kann. An die gute und vor allem gleichmäßige Beschaffenheit des Endproduktes, z. B. des Betons, werden aber auch bei kleineren Bauvorhaben immer größere Anforderungen gestellte die nur bei gleichmäßiger Zusammensetzung der Chargen gewährleistet werden können. Zur Verbesserung der Genauigkeit des Dosierens wurden auf Baustellen bereits in improvisierter Form vor einem Aufnahmebehälter Wände errichtet mit Auslauf- öffnungen, über deren Verschlüsse eine genauere Dosierung mSg- liehwurde. Vorgeschlagen wurde auch eine standardisierte Aue' fhrng solcher nde'bei der der Aufnahmebehälter mit einem Rost abgedeckt 1st. auf dem sieh der Bediemmgsstand für di Betätigung der Dosierverschl&sse befindet* Die Beschickung d. h. die Forderung der meiet ebenerdig gelagerten Stoffe, er- folgt radial einwärts in den meisten Fällen mitteiß Nandsohrap- per, wobei die : ie A g dea : tohrappein din Xet ebenfallsimprovisiert wenden TmSten Die Nachteile dieser An Ordnungen liegen vor allem darin, daß die Wände aua einer An- zahlvon Einzelteilen jeweils aufgebaut werden mseen eine aufwendigeAbsteing gegen den FSlldru-ck erfordern trotzdem nicht ein zusätzlicher Aufwand durch Improvisationen veradLeaen werdenkonnte. Dies ist besonders dann der Fall wenn wegen ausreichender cl. hä sowohl h ; Lneichtlich clen Ge- samtvorratea wie der oberhalb der natürlichen BSachungswinkel hinter den Wänden befindlichen durch Schwerkraft selbsttätig auslaufenden Vorratsteile, die Stoffe gegen (lie-wände hoch aufgehäuft werden Bussen. In allen diesen fallen ist für die Dosierung eine zusätzliche Arbeitskraft erforderliche die nur durch eine aufwendige und für kleinere Baustellen kalkulativ nichtversbare Automatik ersetzt werden kann* Mit der Vorrichtung nach der Neuerung werden diese Nach- teile dadurch vermieden daß die Vorrichtung als turmartiger hohler Körper ausgebildet ist, dessen Wände den außerhalb die- ses Körpers befindlichen Lagerangebereich der Stoffe von einer innerhalboder untexlielb angeoreeten nen und zum Aufnehmen von Auelaufoffmmgen mit Doeiervorrich- tungen dienen. Dieser turmarbige hohle Körper-bildet eine in sich ausgesteifte) Baueinheit in oder unter deren Innenraum sich eine Aufnahmevorrichtung in Form eines Behältera befindete in dem die Charge zusammengestellt wird. In üblicher Weise sind die Voratöatoffe sektorenformig um die turmartige Vor- richtung herum im wesentlichen gelagert und werden durch eine Beschickungsvorrichtung zentrisch einwärts tmd bis zur Surm spitze aufwärts gefördert. Bei Ve=endung einer oder nobroeer Handschrapperanlagen für die Beschickung sind wesentliche Seile dieser Anlagen zB. die Sohrapperwinden oder Seilumlenkrollen, mit dem turmartigen Korper verbunden. Dabei ist die Turmspitze soausgebildete daß über mindestens eine stehend angeordnete d. h. um eine horizontale Achse drehbare und um eine vertikale Achse schwenkbare Seilrolle auf der Turmspitze der gesamte La- gerungsbereich sowohl horizontal als auch vertikal bestrichen werden kann. Dies wird besonders vorteilhaft erreicht durch eine nach oben verjüngte Form des turmartigen Körpers Bs erSLb- rigt sich hierdurch die ganze Schrapperwinde oberhalb der Turmspitze anzuordnen. Ebenfalls können bei Verwendung : vorhan- denenSchrapperanlagen etwa senkrecht unter den oberen Seil** umlenkröllen weitere solcher Rollen angeordnet werden, die die Schrapperseile aus der Senkrechten zu den seitwärts aufgestellt ten Winden in Die Betätigung der Verschlüsse der Aualauföffnungen kann wahlweise von Hand oder auch beispielsweise von der Anzeige- vorrichtung einer Waage, deren Behälter als Aufnahmevorrichtung dient,gesteuert automatisch erfolgen. Bei Handbedienung ist dieBetätigungsho'bolei vorzugsweise zentral, etwa um Bedie- nungsstand desisohrst zusammengeführt. Die Lagerung der meist unterschiedlich gekörnten Vorrats- stoffe erfolgt außerhalb des TU=mentele in r001eI0U BoXens wo- bei im Lagerungsbereich ein Sektor für die Zugabe weiterer ? 1-* schungskomponenten und den Abzug der Chargen freigehalten wird. Zum Einschieben von die Trennwände zwischen den Bolzen bilden- den Bohlen sind außen auf dem Mantel des tu=Artigen X8rpers U-Profile angebracht. Mit der Vorrichtung gemäß vorliegender Neuerung'wird bei größter Durchsatzleistung und ohne konstruktiven Aufwand für die Hochlagerung der Vorretaatoffe wie auch ohne zusätzliche Arbeitskraft eine erheblich verbesserte Genauigkeit der Dosie- ru, ag mit einem wesentlich verringerten Aufwand für Vorhaltung, Aufbau und Bedienung erreicht, der die Verwendung auch bei : Bau- vorhaben geringeren Umfanges erst rentabel macht. Die Zeichnung zeigt ein Ausfuhrungsbeispiel der Vorrich- tung gemäß der Neuerang in schematisoher Darstellung. Tig 1 ist eine Draufsicht auf einen konisch nach oben verjüngten Zuteilturm mit drei Lagerboxen. Fig. 2 ist eine schematische Darstellung teilweise im Schnitt durch die Vorrichtung mit einer eingelbsuten Schrapper"' winde, pneumatischer Betätigung der DosierverschlS-sse einem unterhal'b angeordneten Aufnahmebehälter angedeuteter ufihrung einerweiteren Komponente im Bereich des freien Sektors und einemBunkerrüttler zum Einstürzen einer teifboschung 6owie einer. Dampfleitung mit Auslaßstutzen. Die Vorrichtung nach den Figt 1 und 2 besteht aus einem oberhalb eines Aufnahmebehälters 1 angeordneten turmartigen Körper 2 der im vorliegenden Beispiel vierseitig ausgebildet und nach oben verengt ist Drei Mantelflächen des Körpers sindgeschlossen und mit Auslaufoffnungen 3 versehen deren Verschlüsse 4 mittels pneumatischer Vorrichtungen 5 Betätigt werden* Im Bereich des freien Sektors, also der vierten Beite, die nicht oder nur teilweise verkleidet ist. erfolgt die Zu..... gabe einer weiteren Komponente, z. B. eines Bindemittels ber eine Zugteil schnecke 6 sowie der Abzug der fertigen Chargen. Für die Trennwände 7 zwischen den unterschiedlich gekörnten Vorratsstoffen sind außen auf den Mantelflchen 8 -Profile 9 angebrachte in die die Trennwände 7 bildende Bohlen eingescho- ben werden. Zum Einstürzen einer SteilbSschung 10 ist in der Boxe für eine hackende einstkörnkomponente-ein. BunkerrRttler 11 dargestellt. Die Beschickung mit den ebenerdig gelagerten Stof- fen erfolgt im. Falle des Ausführungebeispiela mittels einer in denhohlen Turm eingebauten Schrapperwinde 12y von der das Schrapperseil 13 senkrecht noch oben zu einer auf der Turm- spitze angeordneten horizontal söhwenkbaren und vertikal dre- henden Umlenkrolle 14 austreibt und zu einer den ganzen La- gerungehereich horizontal und vertikal bestreichenden Schrap- perschaufel 15 umgelenkt wird. ber eine Dampfverteilungslei fang 16 werden durch materialseitig vor den Auslaufoffnungen angeordnetes perforierte 17 die Vorräte von innen heraus so vorgewärmte daß jedes Korn den Auslaß passie- ren muß und mit der vollen Brme in die Charge gelangt. Über die dargestellte Anordnung hinaus kann die Vorrich- tung gemäß der Neuerung auch mit anderer orm des turmartigen Körpers, mit anderer Art der Verschlüsse der Auslaufoffnungen und der Vorrichtung zum Einstürzen von Steilboschungen sowie mit anderer Anordnung der Beachiokungavorrichtung, des Aufnahme :" behälters und der Dampfzuleituagen ausgebildet werden* S chutsanßprüehe x 1< uteilvorrichtung. ür k9mige Stoffe beispielsweise Misehungkomponenten für die Aufbereitung-von Beton dadurch gekennzeichnet, daß sie als trmartiger hohler Körper ase- bildetist dessen Wände den außerhalb dieses rperß'befind-* lichtenagerHngsbeyeioh der Stoffe von einer innerhalb oder unterhalb angeordneten Afnahmevorriohtung trennen Tand sna. m A&i nehmen von AuslaBoffnangen mit Dosiervorrichtungen dienen. 2.Zuteilvorriohtung nach Anspruch 1 dadurch gekenneioh- netdaß der turmartige rper nach oben verjüngt ist. :Zuteilvorriehtunß ; nach Anspruch 1 oder 2$ dadurch e kennzeichnete daß mit dem tormartigen Xrper Teile mindestens einerBeschickungsvorrichtung verbunden sind. 4. Zuteilvorrichtung nach einem der Ansprüche 1'bis 3$ dadurch gekennzeichnet. daß außen auf den nden des turmar tigen Körpers U-Profile für senkrechte BohlenTrennwände an- gebrachtsind. 5 « Zuteilvorrichtung : nach einem der Ansprache"t bis 4 daclu ; rch gokennzeichnetl, daß die, : Küe die Do- siervorrichtungenzentral zusammengeführt ist Apart from large construction sites and permanently installed concrete plants, where the expense for a high bunker system with loading device, automatic dosing and discharge is still economical when planning, improvisations are made on the usual construction sites by either using the elevator container of the mixing machine directly for assembling the batches, or for this purpose a special container is installed upstream, which is known for volume measurement as well as for quantity measurement by weight. In most cases, this is fed directly and mostly by hand scraper, which, however, demands such a large amount with a sohub each time that because of the great inaccuracy associated with it, there can be no question of "dosing". The good and, above all, uniform quality of the end product, e.g. B. the concrete, but are also in smaller construction projects ever greater demands that can only be guaranteed if the batches are evenly composed. To improve the accuracy of dosing were already in improvised on construction sites form in front of a receiving tank walls erected with outflow openings, through the closures of which a more precise dosing of mSg was loaned. A standardized floodplain was also proposed fhrng such nde'bei the receiving container with a Rust covered 1st. on which you can see the control stand for you Actuation of the dosing locks is* The loading ie the demand for most of the materials stored at ground level follows radially inward in most cases by means of Nandsohrap- per, where the : ie A g dea : tohrappein din Xet alsoimprovised apply TmSten The disadvantages of this application Orders lie above all in the fact that the walls are made of a a number of individual parts must be assembled still require complex descent against the FSll pressure not an additional effort veradLeaen by improvisations could be. This is especially the case when due to sufficient cl. hä both h ; Slightly clen velvet suppliesa like that above the natural viewing angle located behind the walls by gravity automatically expiring stock parts, the fabrics against (lie-walls high buses are piled up. In all of these falls is for the Dosing an additional worker only required through a complex and calculative for smaller construction sites non-understandable automatic can be replaced* With the device according to the innovation, these parts thereby avoided that the device as tower-like hollow body is formed, the walls of which ses body storage range of substances from a arranged inside or below and for picking up Auelaufoffmmgen with doeier devices serve. This tower-colored hollow body forms an in stiffened) unit in or under its interior there was a receiving device in the form of a container in which the batch is assembled. In the usual way are the Voratöatoffe sector-shaped around the tower-like pro- direction around essentially stored and by a Loading device centrically inwards tmd up to the surm promoted upwards. At the end of a or nobroeer Hand scraper systems for feeding are essential ropes of these plants eg. the Sohrapper winches or rope pulleys, connected to the tower-like body. Here is the spire so designed that at least one standing arranged ie rotatable about a horizontal axis and about a vertical one Axis swiveling pulley on the top of the tower the entire load area covered both horizontally and vertically can be. This is achieved particularly advantageously by an upwardly tapered form of the tower-like body Bs erSLB- As a result, the whole Schrapperwinde moves above the arrange spire. Also when using : available which scraper systems approximately vertically below the upper rope** deflection rollers more such rollers are arranged that the Scraper ropes set up from the vertical to the sideways th winds in The operation of the closures of the drainage openings can either manually or, for example, from the display device of a scale, its container as a receiving device serves to be controlled automatically. With manual operation the actuation ho'bolei preferably centrally, around state of affairs desisohrst merged. The storage of the mostly differently grained storage materials takes place outside of the TU=mentele in r001eI0U BoXens wo- at in the storage area a sector for adding more ? 1-* research components and the deduction of the batches is kept free. To insert the partitions between the bolts form- the planks are outside on the mantle of the tu=type X8rpers Attached U-profiles. With the device according to the present innovation 'will be at maximum throughput and without any design effort the elevation of the Vorretaatoffe as well as without additional significantly improved dosing accuracy ru, ag with a significantly reduced effort for provision, structure and operation, which also allows use in : construction makes projects of a smaller scope profitable. The drawing shows an exemplary embodiment of the device tion according to the innovation in a schematic representation. Tig 1 is a top view of a tapered top tapered allocation tower with three storage boxes. Fig. 2 is a partial schematic representation Cut through the device with a scraper"' eingelbsuten winch, pneumatic actuation of the dosing closures unterhal'b arranged receptacle indicated guidance another component in the area of the free sector and a bunker vibrator for collapsing a deep embankment 6o like one. Steam line with outlet nozzle. The device according to FIGS. 1 and 2 consists of a tower-like arranged above a receptacle 1 Body 2 formed four-sided in the present example and narrowed upwards is Three lateral surfaces of the body are closed and provided with outlet openings 3 Closures 4 operated by pneumatic devices 5 be* In the area of the free sector, i.e. the fourth leg, which is not or only partially covered. the to..... addition of another component, e.g. B. a binder a train screw 6 and the deduction of the finished batches. For the partitions 7 between the differently grained Stock materials are outside on the lateral surfaces 8 profiles 9 attached to the planks forming the partition walls 7 be practiced To collapse a steep bank 10 is in the Box for a hacking one-grain component. BunkerrRettler 11 shown. The loading with the materials stored at ground level fen takes place in. Case of the exemplary embodiment by means of an in built-in scraper winch 12y from the das Schrapperseil 13 vertically up to a tower arranged at the top, can be swiveled horizontally and rotated vertically existing deflection roller 14 and to a whole load nearly horizontally and vertically sweeping scraping per blade 15 is deflected. via a steam distribution line catch 16 by the material in front of the outlet openings arranged perforated 17 the stocks of inside so preheated that each grain passes the outlet and gets into the batch with the full brake. In addition to the arrangement shown, the device can according to the innovation also with a different shape of the tower-like body, with a different type of closure of the outlet openings and the device for collapsing steep slopes and with a different arrangement of the Beachiokunga device, the recording :" container and the steam supply lines are designed* Protective spray x 1< dividing device. for bulky fabrics, for example Mixing components for the preparation of concrete thereby characterized in that they ase- forms whose walls are located outside of this rperß'* lichtenagerHngsbeyeioh of the substances of a within or separate receiving device arranged below Tand sna. m A&i take of AuslaBoffnangen serve with dosing devices. 2. Zuteilvorriohtung according to claim 1 thereby gekenneioh- not that the tower-like body is tapered upwards. :dispensing device ; according to claim 1 or 2$ thereby e featured that with the torrent Xrper parts at least connected to a loading device. 4. Dispensing device according to one of claims 1'to 3$ characterized. that outside on the ends of the turmar ing body U-profiles for vertical plank partitions brought. 5 « Allocation device : after one of the statements"t to 4 daclu ; rch signifies that the, : Küe the do- safety devices is brought together centrally

Claims

DE1955B0023594 1955-10-25 1955-10-25 ALLOCATION DEVICE FOR GRAINY SUBSTANCES, FOR EXAMPLE MIXING COMPONENTS FOR THE PROCESSING OF CONCRETE. Expired DE1749974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1955B0023594 DE1749974U (en) 1955-10-25 1955-10-25 ALLOCATION DEVICE FOR GRAINY SUBSTANCES, FOR EXAMPLE MIXING COMPONENTS FOR THE PROCESSING OF CONCRETE.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1955B0023594 DE1749974U (en) 1955-10-25 1955-10-25 ALLOCATION DEVICE FOR GRAINY SUBSTANCES, FOR EXAMPLE MIXING COMPONENTS FOR THE PROCESSING OF CONCRETE.

Publications (1)

Publication Number Publication Date
DE1749974U true DE1749974U (en) 1957-08-01

Family

ID=32740030

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1955B0023594 Expired DE1749974U (en) 1955-10-25 1955-10-25 ALLOCATION DEVICE FOR GRAINY SUBSTANCES, FOR EXAMPLE MIXING COMPONENTS FOR THE PROCESSING OF CONCRETE.

Country Status (1)

Country Link
DE (1) DE1749974U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1056024B (en) * 1957-11-09 1959-04-23 Fritz Breitmaier Loading device for building material mixers
DE1059819B (en) * 1957-12-04 1959-06-18 Elba Werk Maschinen Gmbh & Co Device for charging a collecting container with granular components of a concrete mix or other building materials
DE1106664B (en) * 1958-09-08 1961-05-10 Waimer Baumaschinenfabrik K G Device for allocating grainy building materials for the preparation of concrete
DE29620129U1 (en) * 1996-11-19 1997-01-16 Liebherr-Mischtechnik Gmbh, 88427 Bad Schussenried Scraper

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1056024B (en) * 1957-11-09 1959-04-23 Fritz Breitmaier Loading device for building material mixers
DE1059819B (en) * 1957-12-04 1959-06-18 Elba Werk Maschinen Gmbh & Co Device for charging a collecting container with granular components of a concrete mix or other building materials
DE1106664B (en) * 1958-09-08 1961-05-10 Waimer Baumaschinenfabrik K G Device for allocating grainy building materials for the preparation of concrete
DE29620129U1 (en) * 1996-11-19 1997-01-16 Liebherr-Mischtechnik Gmbh, 88427 Bad Schussenried Scraper

Similar Documents

Publication Publication Date Title
DE1749974U (en) ALLOCATION DEVICE FOR GRAINY SUBSTANCES, FOR EXAMPLE MIXING COMPONENTS FOR THE PROCESSING OF CONCRETE.
DE2708943C2 (en) Method for measuring the inherent moisture content of bulk materials during concrete preparation and device for carrying out the method
DE1021284B (en) Device for storing, loading and distributing granular materials, especially mixing components for the preparation of concrete
CH362542A (en) Device for measuring bulk goods
DE1817507A1 (en) Device for dosing and transporting powdered materials with compressed air
DE4413864A1 (en) Device for the metered discharge of pourable solids
DE676586C (en) Process and device for the continuous production of superphosphate
DE955758C (en) Output silo
CH442121A (en) Control device on a grinding device to maintain a predetermined specific surface area of the finished product
DE926775C (en) Method and device for allocating fine-grained goods from one room to another room with a different pressure
AT232907B (en) Device for storing, loading and distributing granular substances, in particular mixing components for the preparation of concrete
DE1173375B (en) Mobile device for dosing mixture components of concrete or the like.
DE1240375B (en) Free-fall mixer
DE1745191U (en) COLLECTION SILO WITH SCRAPER SYSTEM FOR BUILDING MATERIAL SURCHARGE OD. DGL.
AT219471B (en) Mobile metering device for concrete aggregates and concrete binders
DE2249150A1 (en) Concrete mixing process - premixing constituents other than cement with water prior to cement addn
AT254777B (en) Silo with a device for processing concrete
DE673365C (en) Device for converting a concrete mixer with a rotatable mixing trough into a machine for sieving building materials or the like.
DE1133294B (en) Device for loading a collecting container with grainy components of a concrete mix or other materials with different grains
AT224555B (en) Grain storage device
DE1459284C2 (en) Concrete preparation plant
DE7401804U (en) Dosing device for powdery material
DE1056024B (en) Loading device for building material mixers
CH385704A (en) Device for storing, charging and distributing aggregates for the production of concrete and the like
DE1263566B (en) Device for storing, loading and distributing granular materials, especially mixing components for the preparation of concrete