DE1690910U - DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS. - Google Patents

DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS.

Info

Publication number
DE1690910U
DE1690910U DE1954W0011601 DEW0011601U DE1690910U DE 1690910 U DE1690910 U DE 1690910U DE 1954W0011601 DE1954W0011601 DE 1954W0011601 DE W0011601 U DEW0011601 U DE W0011601U DE 1690910 U DE1690910 U DE 1690910U
Authority
DE
Germany
Prior art keywords
sleeve
die
boards
lever
gsbirges
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1954W0011601
Other languages
German (de)
Inventor
Heinrich Walbroehl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1954W0011601 priority Critical patent/DE1690910U/en
Publication of DE1690910U publication Critical patent/DE1690910U/en
Expired legal-status Critical Current

Links

Landscapes

  • Analysing Materials By The Use Of Radiation (AREA)

Description

A mielder:HeinrichWalbr5hl, Bonn. 2-, G ebranciijs m u. s s r ? ======= - lung--n,"--I Tiorr-luchtya-Z. V-J-.- - &-zur-'e : ? Bta I und v >ena2 Et'ue L « a'J £ stellung Yn Stollen u-id Tunel untj*"srjing iner sus . einzelnen Dielea vorzugsweise sus Pjfldieles j ? 9bi2. deten geschlossenes TuBBelhaube ? die-is"ande-Trsug vpgotriben rd uitic als auch der Fertigausba~u 2u diesem Zweck ist äs bereits akans. sogenannte besser aus doppelwandigen Blechn, dho Hçh1körper, za verwenden. Dies hat jedoch den Nachteil, dass entsprechend dem vert ... .. :' ;. ", rm hältnissässig grossen uersoimitt dar Diele ein erheblicher-l e' Bodenverlust nach dem Verzug üoer dem osamten nicht abge- bundenen fertigen Ausbauteil eintritt, wodurch dem fertigen , ß- Ausbau : 6ohon im nicht abgebundenen Zustand die äussereSohl und somit , lr. d e T eE t 4Da Js X Tf hiervon . -u. die Ti''cji c, si @''-. My'*. i. :. j ".-*"' : wartenden Gebirgssenku-ngen iazu arge. i ; die 'or' : eile ies Tunnelbaus überhaupt In Frage zu pttsll&n, { I Aus die&an Grunde i, auch bereite vstan werden ?. dünne prv ! erte StaT ; íelen Zll s tEreA i. e \ on Y ; egk311 1 ihrer geringeren Biunseifkcit ' : i- ie vrhälnis- riäz-. gis Rassig urze Baulan der einnens'i. '-' ! . tf3de ulasen ; oduroh di@ GeschlosißeMeit de T. <lJel Profilen ? durch die Vielzahl der Arbitfugen beeinträchtigt wird. i ! ec-k de 'orliegend.-j. S'eu'.,. . i-i d .. i-' -.. ?.-"' : i Dies geschieht f. er2-1 ì t mas& aK Lodenvrlu&b bei Pertiuar c-ilsii.-rt., Dies geschieht neuerngsgeass c. aurph,. d&a ir dr ? r--- trieb Dielen mit grosserer Stärke/eredt vdn und dass der Fertigausbau im Schutz vc,Dii-Len mi g'srin<'."e' ? Lick Yorgncmsn wirc.. l Gemäß einem bevorzugten Ausführunsbeispiel ist hierbei die Anordnung so getroffen, dass die die'Tunnelhaube bilden- den Dielen aus einen. Stück bestehen i.. nd im vorderen Teil eine größere Wandstärke besitzen als im rückwärtigen Teil, t z. B. dadurch, dass die Dielen im vorderen Teil doppelwandig, ! v6rzu,, vaise Yga3s nae-, h Art &mi3s k is au sY@4ts el dse D n ge tZ5u rx, Grundsätzlich ist es aber auch Eglich smäss einei weiteren -e--, derart f. sfuhrungsispiel dJLe Dielen gatTt -.-. szufuhre. derart, dass die vergleichsweise starke Voniesiele jj. it iser dun- nr-n AusbaTidiele verbunia-n die b-ti-. « l.' ziZ, g di le nachgeschleppt wird. - glatt auagebildet-anu, ei.--er fuf-.', '".. -* zu - - --- odgl. Emselssaen ist'die dureh den E&Cheel vsrk4nt8 nd- - - - - - -- - - - 'yrgesshsben werden kask nd Bierei d'="rTiestas j- ninst. I Ein- « beannders günstiger . Jtenycrtrieb5kpaj. jerbtichgemäsnej. i ! ? eitarn 6e--- denken der Neuerung dadurch dass an der uffe, Hülsa odgl. bZW5 am Handhebel eine-Rolle befestigt ist, über die der Handhebel auf die Muffe, Hülse oadglenirkt. ieriurc. Trden auch Abnutsungserseheirmngen f 9Ln LinsstmasB her- abgesetzt. zu ", y<i#t Isr Gegenstand der vorliegenden Neuerung &ei an Eand der beigefügten Zeichnung näher erläutert, in der. . ; , tL- 4 J-i Abb.- 3nen'ilv. e'e'" LsCji . % iL Fllc' dprstem, d :-.- r.. : c. d der Jeurr hs.-.'&' : 31t ? irdo Abb. 2 seist einen nescllr : te en feF f,, ee j se o haube im Vortriebsbereioilj, dji< rn ei& ? le ; o die Dielen verstärkt ausefüh ind. Atb. 3 zeigt einen ärpliehen urh it einär 3twas abgewandelten u. =füig)/o-. R d..-r'i3. Abb. 4 seigt 9inen Qu. ercljLt ur. h ßi ;'e ?'' ; : :. : 3. j3T3K. del- te t@ AusfhruRform 3er Deln . '- liar<, Abb. 6 zeigt einen Lngschritt dL-c') .-ie'-. St'-. llj :.". Simlieii- Abb. 1 wobei ein neurtg&.. ha/.'. je i'. iao Ver- zuggert 7er< ?". d,-ng fisdT ul c' Abb. 7 ist ein Querschnitt droh die wesentlichen Seile des Verzuggerätes und Abb. 8 ein vergrösserter Längsschnitt hierdurch.-. In Abb. 1 ist eine der neuerungsgeässen Dielen im Schnitt dargestellt, und zwar ist schematisch mit 1 die durchlaufende , dünne Prcfildiele bezeichnet, während 2 die im Vortriebsbereic angebrachte aebrashte Verstärkung bedeutet. t ? 21 iia Yor'Tiebs- S-2nge die dueeh c-irie N-i2. a 4'-n z . znd esr einE Vorsprang n der Diele 1,.-eiraift und iec vorswlziehm. ge3sattet, Der Tort b e e : e ; s eines Handhebels 6, der in rückwärtigem Til-5 der Vortrieba- siange 3 gelagert ist und in eine ge'&hnt oder f ? ere Weise quer profilierte Stange 7 eingreift und dabei i& 7br= triebsstang 5 nach rechte vorschibt.'rLt ? ba 13 sind die Stützbögen bezeichnete auf de'lan d llmein mit l ? e L lzd 4eC ist-ie ~I :, le- bezeichnete Tunnelhaubs-afligtv Bi 3' C ist die Be- faS ng rvrSeb de rt festigung des iex p 1 f geden angedeutete die ihrerseits drch iieel ssr nl : r 11 gegen . z3 Z 'ii-k. 3- eine zusät, z--lich ger, 1, 7he-2e -, ~A Da- e. x rars wsät k g Da- - ---" - - --- - ~. -- ------ -----.'- --- ---. - - - -.. -- - - - Stu. tsbSgcs beim andemi d ABess sn r@it JLt" ist das sogenannte Sebirge beseicJine'b L. d'BE. dar 3tle 0--f.---J ; 6,---1. da Tunnel aus sgebrqchn verden &3l aus d3, r. linhen Teil der Abbv hervorgeht erfolgt hisrs-i der Pertigausbau - -----. -- - --- ---- -- - < - - --- - - - - -- Zu diesem Zweak wird eine Eetonierscalun 173 aufgebaute 1 9 die zur Herstellung des Tusiielmäntels 14 dient. Auf diese Weise ist es mög1ich9 im Bereich de Vorriebe mit sterken mid biegungssteifen Dielen zu o : ine daas im BE ; reich des Fertigausbau ein größerer Bodenverlust eintritt. So ". - 0 lassen sich auf diese Weise die Vorteile der bisherigen Bau- weisen unter Vermeidung ihrer jeweiligen Nachteile miteinander kombinieren. Gemmes Abb. 2 t mäse x Gmäss Abb. 2 be-etehen die rflii. s"-' :. :. les. '.'-' '1 ; 0 Wio bei 22 und 23 enedet is.'"". tSt'.'.."'flra die einen Eingriff der fielen ineinaidr'. d an'\t di-3 Bit- dung einer geschlossenen Tunnelhaibj enoihen Insoweit' entspricht die Diele'dem in Abb. 1 mit bezeichnetes Teil ! 1 Im Vortriebsbereich sind diese ein tes Winkelblech 21 ; 24 zu einem kas-nträgerartige Gebilde { ; verstärkt. Dieser Verstärkungieti Lpicht d-' TiL 2 in : Abb. 1. ! a, f Z iie andere Ausführungaforia dcr 39 fit ! er die unv ? rstärke Diele 1 aus car, fei'e 26 r. 27 Hldet i ! fi- 28 b&sia. !.. das übr ei-ir'J tl. = ? "2 -'-' ii r. o : Lert O5tYeiS r rr weri, , id die Verstärl-. uu- 2 a-, a ict uit 8 wiederum ein leil ds cüj ? bse-iE ? ' Tl'L der ze-*r ieil dr-s -die » iie-i-g-, 1 1 Gemäß Abb. 4 und 5 ist-die urvertäxte iels 1 entsprechend \bb. 3 wieder aus den Teilen 256, 7-aRmngst3t während ! die Yers g aus SWstz n tcrein-rX rc^mi gen Profilen 29 besteht swischen de-en ei selne Bolzen 30 "'d i liter-bz pprossenartig aneorine ; id. Auf diess eise i ist es möglich ? die VortriebsvorrLolr'u n jder Stslla der Dielen angreifen zu lassen, ohne diae su schwächen, und evtl. auch den'Vortrieb mittels Seil-oder Drahtseilzug zu bewirken, \.,, "'", "". wobei das Seil zwischen dem Teil 25 und den Sprossen 30 ein- gelegt und um eine der Sprossen 30 herumgeführt sein kann. Die-Darstellung Die Dsrstsllag gemass Abb. 6 et-rich" ws ? entH. chen der in Jbb. . S-leihe Bsgssicen b di gle Bedeutung Aus er v ic, t 7e atz djr Ausbildung der YrtriebseinricI'. tui. di aus einer Vor- tr-, ebaBta. ge33 besteht, die innerhalb einer EKUse 3 vorge- ? oen ien snn, die ihrerseits itls BsfBgag 9 nd IC an den Siatsbgen 8 bsw. 13 befestige ist. Mit 35 i&t ein -. i .ie"&s\Abb.7undB'deutlic&srevorg tistder and-- .' hebel 36 bei 37 im Legerbock 35 ge'cgert und - "- greift Bit seiner Spitse 3S unter ine Rolle 40 die in einer nffecdr3ulse39eir43drehbarbefestig it.Mit 41 ist 1 @r an^eoltu.,-s. odr BBss 39 H. d andererseits gegn c. i3 ss :"'aidg 42. der Etzlse 54 anoe0i- snLegt die in der Hülse 54 angeordn Ls. gt I iuro ; a Ve-gemäa s7 bzw. nach rechte entsprechend der z-imgekehrzen Darstellung "in Abb. 8 ird zunächst die Hülse ? 9 ? die auf der Vortriebs- stange 33 gleiten. ksn, so verkantete dss si. sich auf der Stange 33 festklemmt und-beim weiteren Bevegen des He- bels 36 diese um einen bestimmten Betrag, und'zwar in Abb. .-., ----'-"t-.. ---'-J nach links mitnimmt, wobei die Feder 4 zusammengepreast wird. der Rückbevegmg des heb fi Oleitet nurl, i I die Hülse 39 unter Virkung der Feder 41 wieder ein Stück auf ! -'-.'-' !.- ! - I :--,', N i ; der Vortriebsstahßei d< : r Vori'. cosstargü 33. so df. gs : Lie n. r- jar. -. . u-. g für den A : iriff du Handhebeln geone' :'<.'d J'u. i 1 "riff Ceu handhebeld Vermeidung von Zahnstangen, die eine Seb. R'Lohung ds ? rcfil-s dvr Vortriebsstange bedeuten ergibt sich eine beicrs r buste Ausführung. Ausserdem kann di RLe oder Mff 35 mit Ausnehmungen 44 bzwo 45 versehen si.. jc. dm'c'1 '. i-ds. n die eigentlich klemmenden Kanten der IHs 3'3 bai derr Ver- kanten nach innen verlgty wodurch s-h''so ir tig 7ebrhaltn1ssw im Eezag auw dle-Gensw^ lçlru>b, ^ der Kanten ergeben. <IBS-L A. mielder: Heinrich Walbr5hl, Bonn. 2-, G ebranciijs m u. Ssr? ======= - lung - n, "- I Tiorr-luchtya-Z. VJ -.- - &-zur-'e:? Bta I and v> ena2 Et'ue L «a'J £ position Yn Stollen u-id Tunel untj * "srjing iner sus . individual Dielea preferably sus Pjfldieles j? 9bi2. deten closed door hood? die-is "ande-Trsug vpgotriben rd uitic as well as the prefabricated expansion u For this purpose, as is already akans. so-called better made of double-walled sheet metal, ie use a hollow body, for example. However, this has the disadvantage that according to the vert ... ..: ';. ", rm A consistently large surface area represents a considerable amount of oil e ' Loss of soil after the default bound finished expansion part occurs, whereby the finished , ß- Expansion: 6ohon in the untied state the outer sole and thus , lr. de T eE t 4Da Js X Tf of this. -u. the Ti``cji c, si @ '' -. My '*. i. :. j ".- *"': Waiting mountain subsidence iazu arge. i; the 'or': hurry ies Tunneling at all In question to pttsll & n, { I. From the & at the bottom i, also ready vstan become?. thin prv! erte StaT; íelen Zll s tEreA i. e \ on Y; egk311 1 their lower level of use: i- ie the ratio riäz-. g sharp Thoroughbred Baulan of the einnens'i. '-'! . tf3de ulasen ; oduroh di @ GeschlosißeMeit de T. <lJel Profiles? impaired by the large number of arbitrary joints will. i ! ec-k de 'orliegend.-j. S'eu '.,. . ii d .. i- '- ..? .- "': i This is done for er2-1 ì t mas & aK Lodenvrlu & b at Pertiuar c-ilsii.-rt., This happens Neuerngsgeass c. aurph ,. d & a ir dr? r --- drove boards with greater thickness / earthed from and that the prefabricated construction in protection vc, Dii-Len mi g'srin <'. "e'? Lick Yorgncmsn wirc .. l According to a preferred exemplary embodiment, this is the arrangement is made so that they form the tunnel hood the planks from one. Pieces consist i .. nd in the front part have a greater wall thickness than in the rear part, t z. B. in that the boards are double-walled in the front part,! v6rzu ,, vaise Yga3s nae-, h Art & mi3s k is au sY @ 4ts el dse D n ge tZ5u rx, Basically, however, there is also possibly one more -e--, like that f. example dJLe planks type -.-. s to supply. so, that the comparatively strong Voniesiele jj. it iser dun- no-n expansion board verbunia-n die b-ti-. «L. ' ziZ, g di le is towed. - smoothly formed-anu, ei .-- er fuf-. ', '".. - * to - - --- or the like. Emselssaen is through the E & Cheel vsrk4nt8 nd- - - - - - - - - - 'yrgesshsben werden kask nd Bierei d' = "rTiestas j- ninst. I. Somewhat cheaper . Jtenycrtrieb5kpaj. jerbtichgemäsnej. i! ? eitarn 6e --- think of the innovation by the fact that on the uffe, sleeve or the like. bZW5 a role is attached to the hand lever, over which the Hand lever on the socket, sleeve oadglenkten. ieriurc. Are wear and tear seals also made for 9Ln LinsstmasB? discontinued. to ", y <i # t Isr the subject of the present innovation & ei at Eand der accompanying drawing explained in more detail in the. . ; , tL- 4 Ji Fig .-- 3nen'ilv. e'e '"LsCji.% iL Fllc' dprstem, d: -.- r ..: c. d the Jeurr hs .-. '&': 31t? irdo Fig. 2 is a nescllr: te en feF f ,, ee j se o hood in the tunneling area, dji <rn egg &? le; O the boards are reinforced. Atb. 3 shows a troublesome thing modified u. = füig) / o-. R d ..- r'i3. Fig. 4 seigt 9inen Qu. ErcljLt ur. h ßi; 'e?''; ::. : 3. j3T3K. del- te t @ Execution form 3 deltas . '- liar <, Fig. 6 shows a long step dL-c ').-Ie'-. St'-. llj:. ". Simlieii- Fig. 1 being a neurtg & .. ha /. '. each i '. iao ver Zuggert 7er <? ". d, -ng fisdT ul c ' Fig. 7 is a cross-section threatening the essential ropes of the delay device and Fig. 8 is an enlarged longitudinal section through it. In Fig. 1, one of the renovation boards is in section shown, and that is schematically with 1 the continuous , thin profile planks, while 2 those in the propulsion area attached aebrashed reinforcement means. t? 21 iia Yor'Tiebs- S-2nge die dueeh c-irie N-i2. a 4'-nz . znd There is a ledge in board 1, - eiraift and iec pre-pull. ge3saturated, The tort bee: e; s a hand lever 6, which in the rear Til-5 of the propulsion siange 3 is stored and in a ge '& hnt or f? ere Way transversely profiled rod 7 engages and thereby i & 7br = Drive rod 5 to the right prescribes.'rLt? ba 13 are the supporting arches are marked on de'lan d llmein with l? e L lzd 4eC is-ie ~ I:, le- designated tunnel hood afligtv Bi 3 'C is the faS ng rvrSeb de rt consolidation of iex p 1 f geden indicated which in turn drch iieel ssr nl: r 11 against . z3 Z 'ii-k. 3- one additional, z - a lot ger, 1, 7he-2e -, ~ A Da- e. x rars wsät kg da- - --- "- - --- - ~. - ------ -----.'- --- ---. - - - - .. - - - - Stu. tsbSgcs at andemi d ABess sn r @ it JLt " is the so-called Sebirge beseicJine'b L. d'BE. dar 3tle 0 - f .--- J; 6, --- 1. because tunnel from sgebrqchn verden & 3l from d3, r. line Part of the Figv shows that hisrs-i will be finished - -----. - - --- ---- - - <- - --- - - - - - An Eetonierscalun 173 is set up for this purpose 1 9 which is used to produce the Tusiielmäntels 14. To this It is possible in the area of the drivetrains mid rigid planks to o: ine daas in the BE; rich the final expansion results in a greater loss of soil. So ". - 0 in this way, the advantages of the previous construction exhibit each other while avoiding their respective disadvantages combine. Gemmes Fig. 2 t mäse x According to Fig. 2, the rflii. s "- ':.:. les.'.'-' '1 ; 0 Wio at 22 and 23 enedet is. '"". tSt '.' .. "'flra the one encroachment who fell into each other. d an '\ t di-3 bit creation of a closed tunnel shaft. the floorboard corresponds to the part marked in Fig. 1! 1 In the jacking area these are a tes angle plate 21; 24 to a box-carrier-like structure { ; reinforced. This reinforcement i Lpicht d- 'TiL 2 in: Fig. 1.! a, f Z the other version aforia dcr 39 fit! he the unv? r thickness board 1 made of car, fei'e 26 r. 27 Hldet i ! fi 28 b & sia. ! .. the rest of the egg-ir'J tl. =? "2 -'- 'ii r. o: Lert O5tYeiS r rr weri,, id the amplification. uu- 2 a-, a ict uit 8 turn a leil ds cüj? bse-iE? ' Tl'L the ze- * r ieil dr-s -die »iie-ig-, 1 1 According to Fig. 4 and 5, the original iels 1 is accordingly \ bb. 3 again from parts 256, 7-aRmngst3t while! the yers g from SWstz n tcrein-rX rc ^ mi In the profile 29 there is between de-en one bolts 30 "'di liter-or sprout-like aneorine; id. In this way i Is it possible ? the jacking device in each stslla der Allow the boards to attack without weakening them, and possibly also to effect the propulsion by means of rope or wire rope hoist, \. ,, "'", "". the rope between the part 25 and the rungs 30 placed and can be guided around one of the rungs 30. The representation The Dsrstsllag according to Fig. 6 et-rich "ws? EntH. Chen the one in Jbb.. S-leihe Bsgssicen b di gle Meaning Aus er v ic, t 7e atz djr training of industrialists. tui. di from a tr-, ebaBta. ge33 exists, which is provided within an EKUse 3 ? oen ien snn, which in turn itls BsfBgag 9 nd IC at the Siatsbgen 8 bsw. 13 attach is. At 35 i & t a -. i .ie "& s \ Fig.7undB'deutlic & srevorg tistder and-- . ' lever 36 at 37 in the Legerbock 35 ge'cgert and - "- engages bit of its tip 3S under a role 40 in one nffecdr3ulse39eir43 rotatably fastened it. With 41 is 1 @r an ^ eoltu., - s. or BBss 39 H. d on the other hand against c. i3 ss: "'aidg 42. the Etzlse 54 anoe0i- sn Lays the Ls arranged in the sleeve 54. gt I. iuro; a Ve-according to s7 or to the right according to the z-inverted representation "in Fig. 8 is first the sleeve? 9? which is on the jacking slide rod 33. ksn, so dss si canted. to the rod 33 is clamped and-when moving the handle further- bels 36 this by a certain amount, and indeed in Fig. .-., ----'- "t- .. ---'- J takes with it to the left, the spring 4 pressed together will. the return movement of the heb fi Oleitet nurl, i I. open the sleeve 39 again a little under the action of the spring 41! -'-.'- '! .-! - IN i ; the propulsion steel d <: r Vori '. cosstargü 33. so df. gs: Lie n. r- jar. -. . u-. G for the A: iriff you hand levers geone ':'<.'dJ'u. i 1 "riff Ceu lever Avoiding racks that are a seb. R'Lohung ds? rcfil-s dvr drive rod mean results in a beicrs r bust execution. In addition, di RLe or Mff 35 provided with recesses 44 or 45 si .. jc. dm'c'1 '. i-ds. n the actually jamming edges of the IHs 3'3 bai derr Edges inwards, which makes s-h''so ir tig 7ebrhaltn1ssw im Eezag auw dle-Gensw ^ lçlru> b, ^ of the edges. <IBS-L

Claims (1)

S c 11 u. t z n : 3 p r iì. " h Sehu. tsan3prii-"h
l) Vorrichtung zur Herstellung 705 tjlle und 2unels unter-Verwendung'eiser u&einselBenDieter vorzugs- weise ProfildielË ; ge ds ge ha die im Wanderverzug vorgetrieben Tfird un in deren Schutz sowohl der Ausbrh ie Gsbirges als auch der F. srtigausbsu erfolgte dadurch gekennssisrnet, iass den e VortriebDielenBitgr'asrerSxkeud f"n den Frtigausbau Dielen ait geringerer Dike vorgesehen sind.
und i-m des d-sä§AssslGsiurr-r ? ? r. dass-die die TuEnelhabe bildeie lie&i sus ie Stuck bestehen und iE vorc. rsn leil eiK grEss ? ß- - stärk besitzen-ls im rücksrtigsn Teil E. E dadurch .vel&ensc&ArJLjaines..sient2*är&-augefuhnt-sind.- 3) Vorrichtung nach Anspruch dadurch gekennzeichnete dass die die Tunnelhaube bildenden Dielen geteilt aus- geführt sind derart, dass die vergleichsweise starke Tortriebsdiele mit'einer dünnen Ausbaudiele verbunden ist, die beim Verzug der Vortriebsdiele nachgeschleppt '''. wird.
JLl
)7ori-!.t ignachAnsruh 1, j. adT. geimx-ie das zum Vortrieb der die Susha b. leiden Dielen ) ja 1 e einhandbetriebenes Yerzuggerät i : nt,. £i des die Tcr- triebsstange glatt ausgebildet td Tn einer Muffe, C> Hülse o. dgl. unschl-ossen ia ; die duish <3. 3r. ndhebel versa. et und entgegen de ? V. irkung &ner ? e er us einen bestirnten Betrag vorgeschoben erdr kann und hierbei die ctriebsstange mitnim 5) Vorrichtung nach Anspruch 4. 3 dadurch ge ennzeichnet) dass an der Muffe Hülse o. dgl. bsw. am Fsndhebel ein Rolle befestigt ist, über die dsr Indhe's-. 3 auf die ffe Hülse o. dgl. einwirkt.
S c 11 u. Tzn: 3 pr iì. " H Sehu. tsan3prii- "h
l) Device for the production of 705 tjlle and 2unels using one and the same tenant preferential wise ProfildielË; ge ds ge ha the Tfird un in their protection both the Gsbirges and the Gsbirges the F. srtigausbsu took place thereby known, iass den e VortriebDielenBitgr'asrerSxkeud f "n the completion of boards with a smaller Dike is intended are.
and in des d-sä§AssslGsiurr-r? ? r. that-die the TuEnelhabeie lie & i sus ie Stuck exist and iE vorc. rsn leil eiK grEss? ß- - have strong-ls in the rear part E. E thereby .vel & ensc & ArJLjaines..sient2 * är & -augefuhnt-sind.- 3) Device according to claim characterized that the boards forming the tunnel hood are divided are guided in such a way that the comparatively strong Gate drive board connected to a thin extension board that is dragged along when the jacking board is warped '''. will.
JLl
) 7ori - !. t ignachAnsruh 1, j. adT. geimx-ie that for the advancement of the susha b. suffer floorboards ) yes 1 e one-hand operated pulling device i: nt ,. £ i of the Tcr- drive rod smoothly designed td Tn a sleeve, C> Sleeve or the like not closed ia; die duish <3. 3r. nd lever versa. et and against de? V. impact & ner? e he us one bestirnten amount advanced earth can and this take the drive rod with you 5) Device according to claim 4. 3 characterized in) that on the socket sleeve o. the like. bsw. a roller on the finder lever is attached, across the Indhe's- dsr. 3 on the ffe Sleeve o. The like. Acts.
DE1954W0011601 1954-10-23 1954-10-23 DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS. Expired DE1690910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1954W0011601 DE1690910U (en) 1954-10-23 1954-10-23 DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1954W0011601 DE1690910U (en) 1954-10-23 1954-10-23 DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS.

Publications (1)

Publication Number Publication Date
DE1690910U true DE1690910U (en) 1955-01-05

Family

ID=32185142

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1954W0011601 Expired DE1690910U (en) 1954-10-23 1954-10-23 DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS.

Country Status (1)

Country Link
DE (1) DE1690910U (en)

Similar Documents

Publication Publication Date Title
DE2329888A1 (en) MOVABLE WALL PLATE
DE102015209157B4 (en) Formwork device and battery formwork with this formwork device
DE2755227A1 (en) SENSOR FOR OPERATING FINGER LATCHES
DE2540048B1 (en) DEVICE WITH A REAR CYLINDER FOR A STRUCTURAL STRUCTURE MOVING WITH A STRUT CONVEYOR, IN PARTICULAR SHIELD REMOVAL FRAME AND WITH A DURING THE BACK, THE LYING SLEEVE ON THE LYING SLIDE PISTON
DE1690910U (en) DEVICE FOR MANUFACTURING ADAPTERS AND TUNNELS.
DE849537C (en) Longwall mining
DE1434403A1 (en) Device for the fully automatic creation of masonry
DE1941940B2 (en) Vehicle with lifting device for large-volume boxes, preferably made of concrete with recesses in the floor for telescopically adjustable legs of the lifting device
DE3244230C2 (en) Planer control device for height control of a coal plow
DE867162C (en) Scaffolding held by the building
DE4317516A1 (en) Trackless spoil-car system for material transport in a pipe profile section
DE1205036B (en) Wandering longwall with frame
DE1949674U (en) DEVICE FOR MANIPULATING ROOM-LARGE STRUCTURES, IN PARTICULAR PRE-FABRICATED GARAGES.
DE2621055C2 (en) Device for the production of room cells made of reinforced concrete, open on one side
DE8717953U1 (en) Thermally insulating component
AT346038B (en) GRAVE FORMWORK
DE3739299C1 (en) Lagging mat for roadway support
AT149326B (en) Bathing cabin.
DE524810C (en) Unloading device for conveyor wagons
DE882833C (en) Device for laying face conveyors
DE202008015772U1 (en) Device for tonpulgige and steeply falling seams
DE1237042B (en) Extension frame for mining coal in inclined and steep storage
DE9307964U1 (en) Trackless lore system for material transport in a pipe section
DE1168851B (en) Device for advancing face conveyors
DE1226062B (en) Face conveyor with attachment plate