DE1658607A1 - Process for producing a bridge, device and (bridge) for carrying out the process - Google Patents
Process for producing a bridge, device and (bridge) for carrying out the processInfo
- Publication number
- DE1658607A1 DE1658607A1 DE1967K0063685 DEK0063685A DE1658607A1 DE 1658607 A1 DE1658607 A1 DE 1658607A1 DE 1967K0063685 DE1967K0063685 DE 1967K0063685 DE K0063685 A DEK0063685 A DE K0063685A DE 1658607 A1 DE1658607 A1 DE 1658607A1
- Authority
- DE
- Germany
- Prior art keywords
- bridge
- pillar
- oct
- moved
- original
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
- E01D21/065—Incremental launching
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Description
DlPL-ING. H. FINK PATENTANWALT ■ 7300 ESSLINGEN (NECKAR) · HINDENBURGSTRASSE 44DlPL-ING. H. FINK PATENTANWALT ■ 7300 ESSLINGEN (NECKAR) · HINDENBURGSTRASSE 44
. PoHnlonwolt FINK - 7300 Ewlingw (Nxtor), Hind«nburBitre6· 44 ·. PoHnlonwolt FINK - 7300 Ewlingw (Nxtor), Hind «nburBitre6 · 44 ·
23. Okt. 1967 Be P 559523 Oct 1967 Be P 5595
Αηκ.: Dr.-Ing. Tihamer Koncz, Zürich (Schweiz), Othmarstr. 8Αηκ .: Dr.-Ing. Tihamer Koncz, Zurich (Switzerland), Othmarstr. 8th
Verfahren zum Herstellen einer Brücke, Vorrichtung und (Brücke) zur Durchführung des Verfahrens Method for producing a bridge, device and (bridge) for carrying out the method
Priorität der schweizerischen Patentanmeldung 15 502-/66 vom ?5- Okt. 1966 wird beansprucht.Priority of the Swiss patent application 15 502- / 66 of ? Oct. 5, 1966 is claimed.
Die Erfindung betrifft ein Verfahren zum Herstellen einer Brücke, welche auf festem Land gebaut und in Längsrichtung in ihre Gebrauchslage verschoben wird, sowie eine Vorrichtung und eine Brücke zur Durchführung des Verfahrens.The invention relates to a method for producing a bridge, which is built on solid land and in the longitudinal direction their position of use is shifted, as well as a device and a bridge to carry out the procedure.
Es ist bekannt, einen Überbau auf festem Land in Achse des Verkehrsweges zusammenzubauen, diesen Überbau auf Verschiebewagen zu setzen und so weit vorzuschieben, daß der auskragende Teil auf ein Schwimmgerüst abgesetzt werden kann. Der an einem Ende auf Verschiebewagen, Rollen oder Walzen und am anderen Ende auf einem Schwimmgerüst lagernde Überbau wird durch Seilwinden vom amleren Ufer aus herübergezogen. Es ist auch bekannt, beim Verschieben über Land am vorderen Ende einen Vorbauschnabel vorzusehen (Hütte III, 28. Auflage 1956, Seite 392).It is known to assemble a superstructure on solid land in the axis of the traffic route, to put this superstructure on transfer carriages and to push it forward so far that the cantilevered part can be placed on a floating structure. The superstructure, which is supported at one end on transfer carriages, rollers or rollers and at the other end on a floating structure, is pulled over from the bank by cable winches. It is also known to provide a front end when moving over land (Hut III, 28th edition 1956, page 392).
Die Erfindung hat den Bau einer Brücke auf kleiner Baustelle auf festem Land und das Einfahren der Brücke in Gebrauchslage unter weitgehender Verminderung von Pfeilerbewegungen zum Ziel. Dieses Ziel wird erfindungegemäß dadurch erreicht, daß die BrückeThe aim of the invention is to build a bridge on a small construction site on solid land and to retract the bridge in the position of use while largely reducing pillar movements. This goal is achieved according to the invention in that the bridge
009843/0803 " - 2 -009843/0803 "- 2 -
BAD ORIGINALBATH ORIGINAL
23- Okt. 1967 Be P 5595October 23, 1967 Be P 5595
in Teilen hergesteilt und abschnittsweise der Ln.nge eines Teiles entsprechend verschoben wird, wozu der Brücke auf jedem der zu ihrer augenblicklichen Abstützung dienenden Pfeiler eine Vorschubbewegung erteilt wird. Da auf festem Land nicht die Brücke in ihrer ganzen Länge sondern nur ein kurzer Teil der Brücke hergestellt wird, ist nur eine kleine Baustelle erforderlich, was insbesondere in einer gebirgigen Gegend und bei Straßen-, biegungen im Anschluß an die Brücke von Vorteil ist. Auch wird eine Schalung zum Herstellen einer Brücke nur für den jeweils herzustellenden Teil gebraucht. Wegen der der Brücke auf jed'em Pfeiler erteilten Vorschubbewegung treten keine,nennenswerten Pfeilerbewegunger] auf und es kann ohne Hilfspfeiler aus gekernter: werden. Das Verfahren kann auch bei hohen Pfeilern angewandt werden. Die Brücke wird in gleichen aufeinanderfolgenden Arbeitstakten hergestellt. made in parts and in sections the length of a part is shifted accordingly, including the bridge on each of the pillars serving for their momentary support a feed movement is granted. Since on solid land, not the entire length of the bridge but only a short part of the bridge only a small construction site is required, which is particularly important in a mountainous area and for road, bends after the bridge is advantageous. There is also a formwork for making a bridge just for each part to be produced used. Because of the bridge on every pillar given feed movement, there are no noteworthy pillar movements] on and it can be cored out without auxiliary pillars. The procedure can also be used on high pillars. The bridge is built in the same successive work cycles.
Die Steifigkeit der Brücke für den Freivorbau wird in weiterer Ausbildung dadurch erhöht, daß zum Vorschub die Brücke mit provisorischen Spanngliedern vorgespannt und nach dem Vorschub entlastet wird.The rigidity of the bridge for the cantilever is further Training increased by the fact that the bridge is pre-tensioned with provisional tendons for the advance and after the advance is relieved.
Eine Vorrichtung zur Durchführung des Verfahrens ist dadurch gekennzeichnet, daß auf dem Brückenpfeiler ein Schlitten z\xv Aufnahme der Brücke vorgesehen ist, der mittels mindestens eines VorschubgerHtes, insbesondere eines Arbeitszylinders, in Achsrichtung der Brücke zu verschieben ist, und daß mindestens ein auf dem !Teiler angebrachtes Hubgerät, insbesondere Hubzylinder, zum Heben und Senken der Brücke dient. Die Vorrichtung dient zum abschnittsweise Verschieben der Brücke. Zur Verringerung der spezifischen Belastung bei schweren Brücken ist der Schlitten auf einem großflächigen Lager zu verschieben, wobei die Gleitfläche dieses Lagers mit einer Kunststoffschicht, insbesondere aus Polytetrafluorethylen, Überzogen ist. Hierdurch ergibt sich An apparatus for carrying out the method is characterized in that on the bridge supports a carriage z \ xv receiving the bridge is provided by at least one VorschubgerHtes, particularly a working cylinder, is to be shifted in the axial direction of the bridge, and that at least one of the! Lifting device attached to the divider, in particular lifting cylinder, is used to raise and lower the bridge. The device is used to move the bridge in sections. To reduce the specific load on heavy bridges, the slide must be moved on a large-area bearing, the sliding surface of this bearing being covered with a plastic layer, in particular made of polytetrafluoroethylene . This results in
009843/0803009843/0803
23. Okt. I967 Be P 5595Oct. 23, 1967 Be P 5595
eine kleine Flächenbelastung und ein gutes Gleitverhalten.a small wing loading and a good sliding behavior.
Bn i einer Brücke zur Durchführung des erfindungsgemäßen Verfahrens mit einer erfindungsgemäßen Vorrichtung ist der zu verschiebende Teil der Brücke im Querschnitt etwa U-förmig ausgebildet und die Oberseite der Brücke ist aus vorgefertigten Platten gebildet. Die Brücke kann ohne Querfugen aus einzelnen, y.u eineri; festen Körper miteinander verbundenen und jeweils für sich hergestellten Betonteilen fugenlos zusammengesetzt werden.In a bridge for carrying out the method according to the invention with a device according to the invention, the part of the bridge to be displaced is approximately U-shaped in cross section and the top of the bridge is formed from prefabricated plates. The bridge can be made up of individual, yu eini; solid bodies connected to one another and each individually manufactured concrete parts are put together seamlessly.
V/eitere Vorteile der Erfindung ergeben sich aus den übrigen Ansprüchen in Verbindung mit der nachfolgenden Beschreibung und der Zeichnung. In dieser ist ein Ausführungsbeispiel des Gegenstandes der Erfindung schematisch dargestellt, es zeiger. Fig. 1 einen Querschnitt durch eine Brücke Fir. 2 eine im Herstellungsstadium befindliche Brücke von derFurther advantages of the invention emerge from the remaining claims in conjunction with the following description and the drawing. In this one embodiment of the object of the invention is shown schematically, it pointer. Fig. 1 shows a cross section through a bridge Fir. 2 a bridge from the
Seite resehen in anderem Maßstab l'if. 3 einen Ausschnitt aus Fig. 2 in grösserem MaßstabSee the page in a different scale l'if. 3 shows a detail from FIG. 2 on a larger scale
Die Brücke hat einen trogförmigen Teil 1 aus Beton, der sich fugenlos über die ganze Iiänge der Brücke erstreckt. Der obere Teil 2 ist eine Fahrbahndecke, welche aus vorfabrizierten Kippenplatten gebildet ist.The bridge has a trough-shaped part 1 made of concrete, which extends seamlessly over the entire length of the bridge. The upper part 2 is a road surface which is formed from prefabricated tilting plates.
Iti Verlängerung der Brückenachse wird auf festem Land ,jeweils der untere Teil 1 in Abschnitten hergestellt, welche fugenlos zusammengefügt werden. Jeweils nach der Herstellung eines Abschnittes wird der dann fertige Teil der Brücke mit Hilfe von an allen Pfeilern angebrachten Vorschubeinrichtungen 6 vorgeschoben. Danach wird der nächste Abschnitt hergestellt, mit dem bereits fertigen Brückenteil fugenlos verbunden und der Brückenteil wieder vorpopchoben. Auf diese Weise wird die Brücke abittßweiae herpoBtellt und jeweils abschnittsweise in ihreIti extension of the bridge axis is on solid land, respectively the lower part 1 made in sections which are joined together without a joint. In each case after the production of a section the then finished part of the bridge is advanced with the aid of feed devices 6 attached to all pillars. Then the next section is made, seamlessly connected to the already finished bridge part and the bridge part prepopulated again. In this way the bridge becomes white produced and each section in your
]orf> rrη«hohen. Gi) Ü 8/, j / 1Q 80 3] or f> r r η «high. Gi) Ü 8 /, j / 1 Q 80 3
BAD ORIGINAL4 -BATHROOM ORIGINAL 4 -
23. Okt. 1967 Be P 559523 Oct 1967 Be P 5595
Die auf jedem Pfeiler angebrachte Vorschubeinrichtung hat einen Schlitten 8, der auf einem Flächenlager abgestützt ist. Zwischen dem Schlitten und dem Lager befindet sich eine Gleitschicht aus Kunststoff, insbesondere aus Polytetrafluorethylen. Der Schlitten ist mit Hilfe mindestens eines Arbeitszylinders 9 in Achsrichtung der Brücke zu verschieben. Auf jeden: Pfeiler ist mindestens ein Hubzylinder 10 zum Heben und Senken der Brücke angebracht. Nach jedem Vorschubweg wird der fertiggestellte Brückenteil von dem Schlitten abgeheben, damit dieser von seinem Arbeitszylinder in seine Auscangslage zurückgeführt werden kann. Nach Rückführung des Schlittens wird der Brückenteil wieder darauf abgesetzt.The feed device attached to each pillar has a carriage 8 which is supported on a surface bearing. Between the slide and the bearing there is a sliding layer made of plastic, in particular made of polytetrafluoroethylene. The slide is to be moved in the axial direction of the bridge with the aid of at least one working cylinder 9. At least one lifting cylinder 10 is attached to each: pillar for raising and lowering the bridge. After each feed path the completed bridge part is lifted off the slide so that it moves from its working cylinder into its starting position can be traced back. After the carriage has been returned, the bridge section is set down again on it.
Arr, frei vorgebauten Ende der Brücke ist ein Vorbauschnabel 3 angebracht, dessen LHnge etwa ein Drittel der Spannweite zwischen den Pfeilern beträgt. Um die Durchbiegung des auskragenden Teiles zu verringern, ist auf der Brücke ein Abspannturm 4 aufgestellt. Bei großer Auskragung während des Vorschubes werden die Kabel des Abspannturmes angespannt und nach Erreichen des nächsten Pfeils wird die Spannung wieder< gelöst.At the front end of the bridge, at the free end of the bridge, there is a protruding nose 3, the length of which is about a third of the span between the pillars. In order to reduce the deflection of the protruding part, a guy tower 4 is set up on the bridge. In large projection during feed the cable guy tower are tense and after reaching the next arrow, the tension is released again. "
Bei einer Brücke mit etwa 50 m Spannweite und mit einer höchsten Stütze von 80 m werden die Brückenabschnitte iYi etwa 9,0 m Länge betoniert und fugenlos mit dem übrigen Brückenteil verbunden. Nach dem Betonieren wird der fertiggestellte Brückenteil jeweils um die gleiche Länge vorgeschoben. Der Vorschubweg des Schlittens beträgt eine etwa 100 cm und die Vorschubgeschnwindigkeit etwa 30 cm in der Minute. Die Vorschubeinrichtungen werden von einer Stelle aus gesteuert. Während des Verschieben der fertiggestellten BrUckenteile treten keine nennenswerten Pfeilerbewegungen auf, weshalb das Vorschubverfahren auch für lange Pfeiler verwendbar ist. Es ist nur eine Schalung fUr die Herstellung eines In the case of a bridge with a span of around 50 m and with a highest column of 80 m, the bridge sections iYi are concreted around 9.0 m in length and connected seamlessly to the rest of the bridge. After concreting, the completed bridge section is pushed forward by the same length. The advance path of the carriage is approximately 100 cm and the rate of advance approximately 30 cm per minute. The feed devices are controlled from one point. During the displacement of the completed bridge parts, there are no noteworthy pillar movements , which is why the advancement method can also be used for long piers . It is only a formwork for the production of one
009843/0803 - * 5 "009843/0803 - * 5 "
BAD ORIGINALBATH ORIGINAL
23. Okt. 1967 Be P 559523 Oct 1967 Be P 5595
:ir.':cl:er.teile notwendig. Ein Gerüst entfällt, an dessen iitelle die provisorischen Kabel und der Abspannturro trete·)-: ir. ': cl: share necessary. There is no scaffolding on which iitelle the provisional cables and the guy tower step) -
0098/. 3/0803 BAD ORIGINAL0098 /. 3/0803 BATH ORIGINAL
Claims (1)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH1550266A CH509473A (en) | 1966-10-25 | 1966-10-25 | Procedure for bridge cantilever building with feed |
Publications (3)
Publication Number | Publication Date |
---|---|
DE1658607A1 true DE1658607A1 (en) | 1970-10-22 |
DE1658607B2 DE1658607B2 (en) | 1975-05-07 |
DE1658607C3 DE1658607C3 (en) | 1979-02-22 |
Family
ID=4409598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1967K0063685 Expired DE1658607C3 (en) | 1966-10-25 | 1967-10-23 | Method and device for manufacturing a multi-span bridge superstructure made of reinforced or prestressed concrete |
Country Status (2)
Country | Link |
---|---|
CH (1) | CH509473A (en) |
DE (1) | DE1658607C3 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2638361A1 (en) * | 1976-08-26 | 1978-03-02 | Eberspaecher Gmbh | Displacer for bridge superstructure - with rear drive mechanism on bridge abutment |
FR2383269A1 (en) * | 1977-03-08 | 1978-10-06 | Mini Verkehrswesen | Bridge structure position forwarding system - comprises two moving angled pylons on support and front anchored rigging |
ES2368318A1 (en) * | 2011-06-30 | 2011-11-16 | Universidad De Cantabria | System and method for launching structures |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2939996B2 (en) * | 1979-01-23 | 1981-05-07 | Wayss & Freytag Ag, 6000 Frankfurt | Method of building a bridge from reinforced or prestressed concrete |
DE2902381C2 (en) | 1979-01-23 | 1980-10-30 | Wayss & Freytag Ag, 6000 Frankfurt | Process for building a bridge made of reinforced or prestressed concrete and auxiliary beams for carrying out the process |
-
1966
- 1966-10-25 CH CH1550266A patent/CH509473A/en not_active IP Right Cessation
-
1967
- 1967-10-23 DE DE1967K0063685 patent/DE1658607C3/en not_active Expired
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2638361A1 (en) * | 1976-08-26 | 1978-03-02 | Eberspaecher Gmbh | Displacer for bridge superstructure - with rear drive mechanism on bridge abutment |
FR2383269A1 (en) * | 1977-03-08 | 1978-10-06 | Mini Verkehrswesen | Bridge structure position forwarding system - comprises two moving angled pylons on support and front anchored rigging |
ES2368318A1 (en) * | 2011-06-30 | 2011-11-16 | Universidad De Cantabria | System and method for launching structures |
WO2013001115A1 (en) * | 2011-06-30 | 2013-01-03 | Universidad De Cantabria | System and method for launching structures |
Also Published As
Publication number | Publication date |
---|---|
CH509473A (en) | 1971-06-30 |
DE1658607C3 (en) | 1979-02-22 |
DE1658607B2 (en) | 1975-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1255695B (en) | Method and device for the construction of multi-span bridges or similar structures in sections | |
DE2756255A1 (en) | METHOD OF MANUFACTURING REINFORCED CONCRETE BRIDGES AND REINFORCED CONCRETE BRIDGES | |
DE2743273C2 (en) | Process for the production of elongated structures, in particular multi-span bridge structures made of reinforced or prestressed concrete | |
DE1658607A1 (en) | Process for producing a bridge, device and (bridge) for carrying out the process | |
EP0032959B1 (en) | Method and falsework for constructing bridges of prestressed concrete | |
DE3620587C1 (en) | Method and device for the construction of reinforced-concrete or prestressed-concrete bridge superstructures in sections | |
DE2510015C2 (en) | Device and method for the sectional production of the individual fields of the superstructure of pier bridges or similar structures | |
AT221133B (en) | Device for concreting long components | |
DE1932464A1 (en) | Method and device for the production and advancement of bridging components from prestressed concrete | |
CH437399A (en) | Process for producing structures made of steel, for example prestressed concrete, which extend mainly in a longitudinal direction | |
AT298553B (en) | Device for the section-wise production of a structure supported on pillars, in particular a multi-span bridge made of reinforced or prestressed concrete | |
DE1135511B (en) | Device for the production of long concrete structures for bridges provided with structural supports for bridges or the like. | |
DE2733628A1 (en) | PROCESS FOR MANUFACTURING A REINFORCED CONCRETE STRUCTURE WITH STRONG CURVED EXTERIORS IN THE BASE AND PLANE | |
DE1263806B (en) | Process for producing multi-span bridge structures made of reinforced or prestressed concrete and equipment for this | |
DE2618259B2 (en) | Device for the construction of a multi-span bridge made of reinforced or prestressed concrete in sections | |
DE2533734A1 (en) | Concrete bridge construction using formwork support - has frame-like supports with transverse beams and intermediary hydraulic presses | |
DE1201384B (en) | Front structure for the construction of elevated roads and bridges | |
DE2607574C2 (en) | Process for the production of arched structures | |
DE1534461C3 (en) | Device for the construction of multi-span bridges or similar structures in sections | |
DE2251475A1 (en) | PROCESS AND BASE FOR THE PRODUCTION OF A STRUCTURAL STRUCTURE, IN PARTICULAR A BRIDGE MADE OF STRENGTHENED CONCRETE | |
DE2811200A1 (en) | Sliding bearing for bridge advanced in steps - has sliding plates directly returnable to start position as bridge moves on | |
DE2216972C3 (en) | Method for transporting a formwork and device for carrying out the method | |
DE2160665B1 (en) | PROCEDURE FOR MOVING CANTILEVER FORMWORK AND DEVICE FOR CARRYING OUT THE PROCEDURE | |
DE1910197B1 (en) | Process for the production of longer structures, in particular bridge structures, in sections in front of the building and in front of the building in order to carry out the method | |
DE2207737C2 (en) | Scaffolding girders for forming reinforced concrete or prestressed concrete bridges and similar structures with a superstructure that is curved in plan |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C3 | Grant after two publication steps (3rd publication) | ||
8339 | Ceased/non-payment of the annual fee |