DE1583097A1 - Wandering longwall construction, which consists of nested four-post frames - Google Patents

Wandering longwall construction, which consists of nested four-post frames

Info

Publication number
DE1583097A1
DE1583097A1 DE19511583097 DE1583097A DE1583097A1 DE 1583097 A1 DE1583097 A1 DE 1583097A1 DE 19511583097 DE19511583097 DE 19511583097 DE 1583097 A DE1583097 A DE 1583097A DE 1583097 A1 DE1583097 A1 DE 1583097A1
Authority
DE
Germany
Prior art keywords
frames
wandering
rail
frame
nested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19511583097
Other languages
German (de)
Other versions
DE1583097B2 (en
DE1583097C3 (en
Inventor
Manfred Floeter
Dipl-Ing Egon Warns
Walter Weirich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DE19511583097 priority Critical patent/DE1583097A1/en
Publication of DE1583097A1 publication Critical patent/DE1583097A1/en
Publication of DE1583097B2 publication Critical patent/DE1583097B2/de
Application granted granted Critical
Publication of DE1583097C3 publication Critical patent/DE1583097C3/de
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0052Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor with advancing shifting devices connected therewith

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Revetment (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Specific Conveyance Elements (AREA)

Description

"Wandernder Strebausbau, der aus ineinander geschachtelten Vierstempelrahmen besteht." Bei größeren Flözmächtigkeiten und bei stärkerem Einfallen muss die Grundfläche der einzelnen Ausbauelemente größer sein, um eine genügende Standsicherheit zu erhalten. Bewährt haben sich für solche Zwecke Vierstempelrahmen oder Chocks. Das sind zwei im Abstand voneinander angeordnete Rahmen bestehend aus je zwei Stempeln, einer Sohlenschiene und einer Hangendkappe, wobei diese beiden Rahmen durch querverlaufende Schienen derart miteinander verbunden sind, daß sie als eine Einheit dem fortschreitenden Abbau entsprechend vorgerückt werden. Die große Grundfläche eines derartigen Vier$tempelrahmens hat natürlich auch den Nachteil, daß beim Rücken jeweils eine entsprechend große Fläche des Hangenden jeder Unterstützung beraubt ist."Wandering longwall construction made from nested four-post frames exists. "In the case of larger seams and greater depths, the base area must of the individual expansion elements must be larger in order to obtain sufficient stability. Four-stamp frames or chocks have proven themselves for such purposes. That's two Frames arranged at a distance from one another, each consisting of two stamps, one Sole rail and a hanging cap, these two frames through transverse Rails are connected to each other in such a way that they are progressing as a unit Dismantling will be advanced accordingly. The size Footprint of a Of course, such a four-temple frame also has the disadvantage that at the back a correspondingly large area of the hanging wall is deprived of any support.

Es ist schon vorgeschlagen worden, zur Vermeidung dieses Nachteils zwei derstige Vierstempelrahmen in Strebrichtung etwa um die halbe Breite eines Vierstempelrahmens gegeneinander versetzt ineinander zu schachteln. Das Rücken des Ausbaues soll sodann durch zwei im Abstand voneinander angeordnete Rü#kzylinder bewirkt werden, die abwechselnd den einen Rahmen vorschieben und den anderen Üachziehen. Eine Verbindung des Ausbaues mit dem Förderer oder mit einer sonstigen in Längsrichtung des Strebs verlaufende Schiene war en ist dabei nicht vorgesehen. Bei stärkerem Einfall/macht sich bei diesem Ausbau ein Abwandern desselben in Strebrichtung bemerkbar. Es ist daher ein Nachrichten praktisch jedes einzelnen Rahmens erforderlich. Dieses Nachrichten erfolgt regelmäßig von Hand unter Verwendung von Richtzylindern, die festangeordnet oder auch umsetzbar ausgebildet sein können. Nachteile Die gleichen/müssen sich auch bei einem weiteren vorgeschla- genen Ausbau ergeben, bei welchei# ein äechsstempelrahmen mit einen Vierstempelrahmen ineinander geschachtelt ist, wobei wiederum abwechselnd der Sechsstempelrahmen vorgeschoben und der Vierstempelrahmen nachgezogen wird oder umgekehrt. Auch dabei sind die Flächen, die beim Rücken des ei-'-der anderen Rahmens völlig jeder Unterstützung beraubt werden, verhältnismäßig groß, wobei zusätzlich immer noch die Gefahr eines Abwanderns beim Rücken besteht, sofern das Einfallen des Flözes entsprechend stark ist.It has already been proposed, in order to avoid this disadvantage, to nest two such four-stamp frames offset from one another in the direction of the struts by about half the width of a four-stamp frame. The back of the extension should then be effected by two back cylinders arranged at a distance from each other, which alternately push one frame forward and pull the other one behind. A connection of the expansion with the conveyor or with one other rail running in the longitudinal direction of the longwall face en is not provided for. With a stronger idea / makes itself with this expansion a drifting of the same noticeable in the direction of the strut. It is therefore necessary to send a message to practically every single frame. This message is regularly done by hand using straightening cylinders, which can be fixed or implemented. disadvantage The same / must also apply to another proposed The same expansion result, in which a six-post frame is nested with a four-post frame, with the six-post frame being pushed forward and the four-post frame being retracted alternately, or vice versa. Here, too, the areas that are completely deprived of any support when the back of the other frame is used, are relatively large, with the additional risk of migrating at the back if the collapse of the seam is correspondingly strong.

Das erw@:hnte Abwandern des Ausbaues in ßiniallrichtundist insbesondere dann nicht zulässig, wenn das Rücken des Ausbaues mittels* einer Fernsteuerung bewirkt werden soll. Gegenstand der zrfindung ist ein wandernder Strebausbau aus ineinander geschachtelten Vierstempelrahmen, bei welchem die sämtliehen genannten Nachteile vermieden werden.The above-mentioned migration of the expansion in miniallrichtundis in particular then not permitted if the removal is effected by means of * a remote control shall be. The subject of the invention is a wandering longwall construction from one another nested four-stamp frame, in which all the disadvantages mentioned be avoided.

Das Neue besteht dabei in wenigstens zwei in geringem Abstand voneinander angeordneten Vierstempelrahmen, die durch je einen Rückzylinder mit einer vor dem Kohlenstoß liegenden Schiene verbunden und unabhängig voneinander rückbar sind, wobei mit diesen beiden Vierstsmpelrahmen ein weiterer derartiger Rahmen in der heise verschachtelt ist, daß seine vorderen bzw. hinteren Stempel zwischen den encsprechenden Stempeln der beiden anderen ahmen stehen und die parallel zum Stoß verlaufende vordere s74uerschiene dieses zusätzlichen Rahmens ihrerseits en der vor dem Stoß liegenden Schiene angeschlagen ist. Es können zu einer Ausbaueinheit auch mehr als zwei Jierstempelrahmen gehören, die in Strebrichtung nebeneinander angeordnet sind und die sämtlich durch je einen Rückzylinder mit der vor dem Stoß liegenden Schiene verbunden sind, wobei je zwei dieser Vierstempelrahmen mit einem entsprechenden Rahmen verachaöhtelt sind, der zugfest an die vor dem Stoß lie-gende Schiene angeschlossen ist.The novelty consists in at least two four-stamp frames arranged at a short distance from one another, which are each connected to a rail in front of the coal face by a rear cylinder and can be moved independently of one another The front and rear stamps stand between the corresponding stamps of the other two frames and the front lower rail of this additional frame, which runs parallel to the joint, is attached to the rail in front of the joint. It can an expansion unit also includes more than two Jierstempelrahmen, which are arranged side by side in the direction of the face and which are all connected to the rail in front of the joint by a rear cylinder each, whereby two of these four-stamp frames are verachaöhtelt with a corresponding frame, which is tensile to the front the rail lying at the joint is connected.

Ggfs. können auch die mit den paarweise angeordneten Vierstempelrahmen verschachtelten Rahmen durch einen Rückzylinder an die vor dem Stoß liegende, Schiene angeschlossen sein. Ein solcher Ausbau ist noch universeller verwendbar. Er eignet sich z.8. besonders für Ausbaubetriebe mit Blasversatz, dabei, rück kann jeweils eine Reihe von Vierstempelrahmen zugelassen und das nächste Feld durch eine zweite Reihe von Vierstempelrahnen wird unterstützt worden, Wobei der Ausbau so eine geraume Zeit stehen bleiben kann, während der Förderer in kleineren Schritten dem fortschreitenden Abbau nachgerückt wird. Die Mcksylißer können überhaupt, anstatt an eine besondere vor dem Kohlenstoß liegen- einen de Schiene auch an e#uem-dort liegenden Förderer angeschlossen sein. Dabei kann es unter Umständen angebracht sein, die Pörder- rinne jeweils auf der Länge der einzelnen üierstempeligen Aus- r baueinheiten in Flözebene stark auszubilden. Die ineinander geschachtelten Vierste'pelrahsen können ihrerseits in Rückrichtung aneinander geführt sein. In der Zeichnung sind zwei Ausführuhgabeispiele der Erfindung dargestellt. Es zeigen Fig. 'i einen aus drei ineinander geschachtelten Vierstempelrahmen, bestehenden Ausbau in Grundriß, Fig. 2 den gleichen Ausbau nach dem Rücken des mitteleren Rahmens, Fig. 3 einen Ausbau, der aus fünf ineinander(geschachtelten Vierstempelrahmen bestehlt im Grundriß. Der Ausbau nach Fig. 1 und 2 dej Zeichnung besteht aus den beiden Vieratempelrahmen A und-1, die in Längsrichtung des -Strebs nebeneinander angeordneten sind. Mit diesen beiden B Rahmen A und = ist ein dritter Rahmen C verschachtelt, von Welchem das eineA-Stempelpaar sowohl an der Kohlenstoßseite als auch an der Versatzseite zwischen den entsprechenden Stempeln des Vierstempelrahaene A stehen. die beiden an.-deren Stempel des dritten Vierstempelrahaenn C stehen zwischen den Stempeln des anderen Rahmens B. Dabei sind die Rahmen A und B durch je einen Rückzylinder a.an eine Schiene b angeschlossen, die rückseitig an dem Gestell c des Förderers anliegt, der vor dim Kohlenstoß liegen mag. Der dritte mit den beiden Rahmen A und B.verschachtelte Rahmen C ist durch eine Gelenklasche d ebenfalls an die längsverlaufende Schiene b aasgelenkt.Possibly. The frames nested with the four-stamp frames arranged in pairs can also be connected to the rail in front of the joint by a rear cylinder. Such an expansion can be used even more universally. He is suitable z.8. especially for outfitting companies with blow molding, including, back can each admit a number of four-stamp frames and the next field by a second row of four-stamped teeth will been supported, whereby the expansion will stand for a long time can remain while the conveyor is moved up in smaller steps to the progressive degradation. The Mcksylisser can at all, instead of a special one lying in front of the coal face- a The rail is also connected to a conveyor located there be. It may be appropriate in some circumstances, the Pörder- channel along the length of the individual oierstempeligen r strong training of building units in seam level. The nested Vierste'pelrahsen turn to be performed together in the reverse direction. In the drawing , two exemplary embodiments of the invention are shown. In the drawings Fig. 'I interfitting of three nested Four stamp frame, the existing configuration in plan view, Fig. 2 shows the same expansion toward the back of the Mittlerer frame, Fig. 3 an extension, the nested of five into one another (four-stamp frame bestehlt in plan. The expansion according to Fig. 1 and 2 dej drawing consists of the two four-temple frames A and-1, which run in the longitudinal direction of the - Crabs are arranged side by side . With these two B. Frame A and = is a third frame C interleaved from Which the one pair of A punches on both the coal face side as well as possible on the offset side between the corresponding stamps of Vierstempelrahaene A. the other two stamps of the third four-stamp frame C are between the stamps of the other frame B. The frames A and B are each connected to a rail b by a rear cylinder a, which rests on the rear of the frame c of the conveyor, the may lie in front of the coal face. The third with the two frames A and C is B.verschachtelte frame by a hinge strap also d b aasgelenkt to the longitudinal rail.

Wie Pig: 2 der-Zeichnung erkennen lässt, wird beiz Rüchen eines solcten Ausbaues zunächst durch rückseitige Beaußschlagung der beiden Rückz,i:linder a die Schiene b und mit ihr der Förderer c in Richtung gegen den Versatz vorgeschoben. Dabei wird zugleich der mit den beiden Rahmen A und B verschachtelte mittlere Rahmen C mitgenommen, wenn zuvor seine Stempel vom Druck des Hangenden entlastet oder zumindesten gelüftet wurden. Anschließend werden dann die Stempel des Rahmens C wieder gesetzt. Darauf können zweckmäßig in zeitlicher Folge die beiden Rahmen A und'B ihrerseits gerückt werden, in-deZ die Rückzylinder a auf der xolbenstangenseite werden. In der Zeichnung ist besonders dargestellt, daß der mittlere Vierstempelrahnen C in Rückrichtung an den beiden anderen Rahmen A und B geführt ist. In Verbindung mit der großen St anzfläche aller drei Rahmen wird so ein dichtungssicheres Rücken gewährleistet. Dazu ist trotz der großen Grundfläche der einzelnen Vierstempelrahmen auch während des Rückvorganges das Hangende verhältnismäßig gleichmäßig auf der ganzen Unterstützungfläche abgesichert. As Pig: 2 reveals the drawing, pickling Rüchen is a solcten Ausbaues first by back Beaußschlagung the two Rückz, i: advanced relieving a rail b and with it the conveyor in the direction c against the offset. At the same time, the middle frame C, which is nested with the two frames A and B, is taken along if its stamps have previously been relieved of the pressure of the hanging wall or at least have been lifted. Then the stamps of the frame C are then set again. Thereupon the two frames A and B can expediently be moved in chronological order, in-deZ the rear cylinder a on the piston rod side will. In the drawing it is particularly shown that the middle four-stamp frame C is guided in the rearward direction on the two other frames A and B. In connection with the large punching area of all three frames, a tightly sealed back is guaranteed. In addition, despite the large base area of the individual four-stamp frames, the hanging wall is secured relatively evenly over the entire support surface during the return process.

Bei dem Ausbau nach Fig-. 3 der Zeichnung besteht eine Ausbeueinheit aus drei in Strebrichtung nebeneinander stehenden Vier-$t$apelrahmen A, D und B.Mit diesen drei Rahmen sind zwei weitere Rahmen C und B verschachtelt. Der Rahmen C ist verschachtelt mit den beiden zeitweilig zurückstehenden Rahmen A und D und der zweite Rahmen B ist mit den beiden Rahmen D und B verschach-' telt. Dabei sind die drei Vierstempelrahmen A, D und H durch je einen Rückzylinder a an die parallel zum Kohlenstoß verlaufende und an der Rückseite des Förderers C anliegende Schiene b angeschlossen. Die beiden anderen Rahmen C und E sind. dieses Mal auch durch entsprechende Rückzylinder a an die gleiche Schiene b angeschlossen. Auf diese Weise wird eine noch größere Freizügigkeit erreicht, als es bei der Ausführung nach Fig. 1 und 2 bereits der Fall war.In the expansion according to Fig-. 3 of the drawing, a bulging unit consists of three four-sided frames A, D and B standing side by side in the facing direction. Two further frames C and B are nested with these three frames. The frame C is interleaved with the two frames A and D, which are temporarily behind, and the second frame B is interleaved with the two frames D and B. The three four- stamp frames A, D and H are each connected by a rear cylinder a to the rail b, which runs parallel to the coal pile and rests against the rear of the conveyor C. The other two frames C and E are. this time also connected to the same rail b by means of corresponding rear cylinders a. In this way, even greater freedom of movement is achieved than was already the case with the embodiment according to FIGS. 1 and 2.

Claims (7)

Patent a n s p r ü c h e 1. Wandernder Strebausbau, der aus ineinander geschachtelten Vierstempelrahmen besteht, gekennzeichnet durch wenigstens zwei in Strebrichtung in geringem Abstand voneinander angeordnete Vierstempelrahmen (A, B), die durch je einen Rückzylinder (a) mit einer vor dem Kohlenstoß liegenden Schiene*(b) verbunden und abhängig voneinander rückbar sind, wobei mit diesen beiden Vierstempelrahmen (1,B) ein weiterer deratiger Rahmen (C) in der Weise verschacht* ist, daß seine vorderen bzw. hinteren Stempel zwischen den entsprechenden Stempeln der beiden anderen Rahmen (1,B) stehen und die parallel zum Stoß verlaufende vordere querschier ne dieses zusätilichen Rahmens (C) ihrerseits an der vor dem Stoß liegenden Schiene (b) angesch4gen ist. Patent claims 1. Wandering longwall construction, which consists of nested four-post frames, characterized by at least two four-post frames (A, B) arranged a short distance from one another in the face direction, each supported by a rear cylinder (a) with a rail in front of the coal face * (b) are connected and can be moved independently of one another, with these two four- stamp frames (1, B) being another such frame (C) nested in such a way that its front and rear stamps between the corresponding stamps of the other two frames ( 1, B) and the front cross-section of this additional frame (C) running parallel to the joint is in turn attached to the rail (b) in front of the joint. 2. Wandernder Strebausbau nach Anspruch 1, dadurch gekennzeich-@ net, daß zu einer Ausbaueinheit mehr als zwei Vierstempel- A D B) " rahme gehören, die in Strebrichtung nebeneinander angeordnet
sind, die sämtlich durch je einen Rückzylinder (A) mit der vor dem Kohlenstoß liegenden Schiene (b) verbunden, wobei je zwei dieser Vierstempelrahmen (A,D und D,B) mit einem entsprechenden Rahmen (C bzw. 0) verschachtelt sind, der _ zugfest an die vor dem Stoß liegende Schiene (b) angeschlossen ist.
2. Wandering longwall construction according to claim 1, characterized by @ net that for an expansion unit more than two four-stamp A DB) " frame , which are arranged side by side in the direction of the struts
are all connected by a rear cylinder (A) to the rail (b) in front of the coal face, two of these four- stamp frames (A, D and D, B) being nested with a corresponding frame (C or 0), which _ is firmly connected to the rail (b) in front of the joint.
3.-Wandernder Strebausbau nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß auch die mit den paarweise angeordneten Vierstempelrahmen (A,D,B) verschachtelten Rahmen (0,F) durch einen Rückzylinder (a) an die von dem Stoß liegende Schiene (b) angeschlagen sind. 3.-Wandering longwall construction according to claims 1 and 2, thereby marked that the four-stamp frames (A, D, B) arranged in pairs nested frame (0, F) by a rear cylinder (a) to the one from the joint Rail (b) are attached. 4. Wandernder Strebausbau nach Anspruch 1 bis 3, dadurch gekennzeichnet, daß: als vor dem Kohlenstoß liegende Schiene ein Fördergestell- (c) dient. 4. Wandering longwall construction according to claim 1 to 3, characterized in that: as a rail lying in front of the coal face, a conveyor frame (c) serves. 5. Wandernder Strebausbau nach Anspruch 4, dadurch gekennzeichnet, daß der Förderer (a) auf der Länge der einzelnen vierstempeligen Ausbaueinheiten in Flösebene starr ausgebildet ist. 5. Wandering longwall mining according to claim 4, characterized in that the conveyor (a) is rigid over the length of the individual four-stamp expansion units in the rafting plane. Wandernder Strebausbau nach Anspruch 1 und 2, dadurch ge- kennzeichnet, daß die in Strebrichtung verlaufende Schien& (bl an welche die verschiedenen Vierotemp elrahmen einseln angeschlossen sind, rückseitlich lose an der Förderrinne (a) an- liegt. Wandering longwall according to claim 1 and 2, characterized indicates overall that extends in the direction of longwall rail & (to which the various Vierotemp are connected einseln elrahmen bl, rückseitlich loosely to the feed channel (a) is Toggle. 7. Wandernder Strebausbau nach Anspruch 1 bis 6, dadurch gekennzeichnet, daß die ineinander geschachtelten Vierstempelrahmen in Rückrichtung aneinander geführt sind. 7. Wandering longwall construction according to claim 1 to 6, characterized in that the nested four-post frames are guided to one another in the reverse direction.
DE19511583097 1951-01-28 1951-01-28 Wandering longwall construction, which consists of nested four-post frames Granted DE1583097A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19511583097 DE1583097A1 (en) 1951-01-28 1951-01-28 Wandering longwall construction, which consists of nested four-post frames

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19511583097 DE1583097A1 (en) 1951-01-28 1951-01-28 Wandering longwall construction, which consists of nested four-post frames
DEG0051698 1967-11-21

Publications (3)

Publication Number Publication Date
DE1583097A1 true DE1583097A1 (en) 1970-04-23
DE1583097B2 DE1583097B2 (en) 1974-05-09
DE1583097C3 DE1583097C3 (en) 1974-12-05

Family

ID=25753243

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19511583097 Granted DE1583097A1 (en) 1951-01-28 1951-01-28 Wandering longwall construction, which consists of nested four-post frames

Country Status (1)

Country Link
DE (1) DE1583097A1 (en)

Also Published As

Publication number Publication date
DE1583097B2 (en) 1974-05-09
DE1583097C3 (en) 1974-12-05

Similar Documents

Publication Publication Date Title
DE1302918C2 (en) HIKING STREET STRUCTURE
DE2224438C2 (en) Shield support for struts in underground mining
DE2250296C3 (en) Knife shield propulsion device for propelling underground cavities, such as in particular tunnels, tunnels and the like
DE1583097A1 (en) Wandering longwall construction, which consists of nested four-post frames
DE916164C (en) Expansion element for longwall construction
DE2211605C3 (en) Wandering route expansion
DE1758753C3 (en) Hydraulic longwall construction
DE2401832C2 (en) Backfill wall tracked as the expansion progresses, especially for thick seams and flush backfill
DE1289805B (en) Mechanically retractable face construction unit
DE2253567C3 (en) Guide for a plane or the like.
DE1084668B (en) Wandering longwall mining
DE1932378A1 (en) Self-advancing pit support element
DE1205036B (en) Wandering longwall with frame
DE2164365C3 (en) Retractable shield extension unit
DE1458679C3 (en) Wandering expansion for underground mining
DE1458714A1 (en) Bracing device for a face conveyor
DE1030282B (en) Frame-like extension member, especially for longwall construction
DE2500624C3 (en) Shoring sign
DE1408025C (en) Planer guide device for use in steep seams
DE1029777B (en) Wandering pit construction for mining operations
DE1110575B (en) Process and under terrain device for the production of earth graves od
DE1758165A1 (en) Device for advancing a loading machine used in underground operations
DE977365C (en) Wandering longwall mining
DE1088000B (en) Wandering pit support
DE1102074B (en) Wandering longwall mining and mining processes with this

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)