DE977365C - Wandering longwall mining - Google Patents

Wandering longwall mining

Info

Publication number
DE977365C
DE977365C DEG2427A DEG0002427A DE977365C DE 977365 C DE977365 C DE 977365C DE G2427 A DEG2427 A DE G2427A DE G0002427 A DEG0002427 A DE G0002427A DE 977365 C DE977365 C DE 977365C
Authority
DE
Germany
Prior art keywords
longwall
wandering
construction according
structures
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG2427A
Other languages
German (de)
Inventor
Konrad Grebe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEG2427A priority Critical patent/DE977365C/en
Application granted granted Critical
Publication of DE977365C publication Critical patent/DE977365C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0409Aligning or guiding means for the supports or for the constitutive parts of the supports
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0052Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor with advancing shifting devices connected therewith
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0481Supports specially adapted for use in combination with the placing of filling-up materials

Description

Wandernder Strebausbau Die Erfindung betrifft ein Strebausbauverfahren, welches es ermöglicht, in einfacher Weise, auf gegebenenfalls vollmechanischem Wege, ein Wandern des Ausbaues um jeweils kurze Feldbreiten zu erzielen, das mit dem entsprechenden Rücken des Förderers und dem Vorverlegen der Blasversatzeinrichtung verbunden erfolgen kann und sich daher insbesondere zur Anwendung in Kombination mit den neuzeitlichen mechanisierten Gewinnungsverfahren eignet.Wandering longwall mining The invention relates to a longwall mining method, which makes it possible, in a simple manner, possibly in a fully mechanical way, a wandering of the expansion to achieve short field widths with the corresponding The back of the conveyor and the forward movement of the blow displacement device take place connected can and is therefore particularly suitable for use in combination with the modern mechanized extraction process.

Es ist bereits ein Ausbauverfahren bekannt, bei welchem je zwei benachbarte Ausbaue, deren jeder aus zwei Stempeln mit der durch sie getragenen Kappe und einer die Stempel miteinander verbindenden, an dem Unterstempel angebrachten Stahlschiene besteht, miteinander durch an den Stempelschlössern angeordnete Querstangen zu einem sogenannten Gespann verbunden sind, welches in der Weise verwendet wird, daß wechselweise, z. B. nach jedem Hobelschnitt, jeweils eine dieser miteinander verbundenen Gespannhälften, d. h. jedesmal nur die Hälfte der Ausbaue, vorgerückt wird. Hierbei schwingen die durch die Lenker starr miteinander zu dem Gespann verbundenen Ausbaue im Zuge des wechselweisen Vorrückens derselben umeinander.An expansion process is already known in which two adjacent Extensions, each of which consists of two stamps with the cap worn through them and one The steel rail connecting the punches to one another and attached to the lower punch exists, with one another by means of cross bars arranged on the stamp locks to one so-called team are connected, which is used in such a way that alternately, z. B. after each planing cut, one of these connected halves, d. H. each time only half of the expansion is advanced. Here they vibrate by the handlebars rigidly connected to the team expansion in the course of alternate advancement of the same around one another.

Bei anderen bereits vorgeschlagenen, jedoch nicht zum Stand der Technik gehörenden Verfahren werden die Oberkappen und/oder Unterkappen der beiden Gespannhälften beim Vorrücken aneinander geführt.Others have already been proposed, but are not part of the state of the art The upper caps and / or lower caps of the two halves of the trailer are part of the process led to each other as they advance.

Alle diese älteren Verfahren bedingen verhältnismäßig komplizierte und die Betriebssicherheit sowie die einwandfreie Wirkungsweise gefährdende Konstruktionen, insbesondere der Lenker und ihrer Verbindungen mit den Gespannhälften.All of these older procedures are relatively complex and constructions that endanger the operational safety as well as the proper functioning, especially the handlebars and their connections with the halves of the trailer.

Gemäß dem neuen Verfahren erfolgt zwar ebenfalls ein abwechselndes Vorschieben von nebeneinanderliegenden Bauen, jedoch ohne Verbindung derselben zu einem »Gespann«, und zwar in grundsätzlich anderer Weise, nämlich so, daß von drei zusammenwirkenden Ausbauen jeweils der gegenüber den äußeren zurückgesetzte mittlere Bau unter Abstützung an den beiden äußeren Bauen ohne jede starre Verbindung so weit vorgeschoben wird, daß er sich nunmehr um das gleiche Maß vor den äußeren Bauen befindet, um das er bisher zurückgesetzt war. Hierbei stellen vorübergehend oder ständig zwischen den Bauen angebrachte unstarre Verspannungselemente eine nicht einseitig, sondern von beiden Seiten her wirkende Führung dar, die am Ende des Vorschubvorganges die richtige Parallelstellung der benachbarten Baue zueinander sichert; während des Vorschubvorganges selbst kommt es dagegen auf eine Parallelführung der Baue zueinander nicht an.According to the new method, there is also an alternating one Advancing adjacent Build, but without connection the same to a "team", and in a fundamentally different way, namely so, that of three cooperating expansions in each case the one set back from the outer one middle structure with support on the two outer structures without any rigid connection is advanced so far that it is now by the same amount in front of the outer Build is around which it was previously reset. Here put temporarily or non-rigid bracing elements that are permanently attached between the structures one-sided, but from both sides acting guide, which at the end of the feed process ensures the correct parallel position of the neighboring structures to each other; while the feed process itself, however, it comes to a parallel guidance of the structures not to each other.

Im Streb folgen die Baue zweckmäßig derart aufeinander, daß die beiden zur Abstützung verwendeten Baue jeweils nicht nur das Vorrücken des zwischen ihnen befindlichen Baues unterstützen; vielmehr wird der rechte der stehenbleibenden Baue gleichzeitig auch dazu herangezogen, das Vorrücken eines rechts von ihm befindlichen Baues zu unterstützen, wobei er mit dem übernächsten wiederum stehenbleibenden Bau zusammenwirkt. In gleicher Weise wirkt der linke Bau auch mit dem übernächsten zu seiner Linken befindlichen Bau zusammen, um das Vorrücken eines weiteren Baues zu unterstützen. Während also zu Beginn des Vorganges jeder zweiteBau im Streb-zweckmäßigerweise um das Maß des Abbaufortschritts - den übrigen Bauen gegenüber zurückgesetzt ist, befinden sich diese Baue nunmehr im gleichen Maße vor den übrigen Bauen, wobei es grundsätzlich gleichgültig ist, ob die Baue gleichzeitig oder entsprechend dein Fortschritt der Gewinnungsmaschine nacheinander vorgerückt werden.In the longwall, the structures follow one another in such a way that the two not only the advance of the between them support existing building; rather, it becomes the right one of the standing structures at the same time also used for the advancement of someone to the right of him Baues to support, whereby he in turn with the next but one stopping construction cooperates. The building on the left works in the same way with the one after that building on his left to prevent another building from advancing support. So during the beginning of the process every second construction in the face-expediently by the measure of the progress of the dismantling - is set back compared to the other buildings, these buildings are now to the same extent in front of the other buildings, whereby it it is basically irrelevant whether the buildings are simultaneously or accordingly yours Progress of the mining machine can be advanced one after the other.

Beim nächsten Arbeitsgang können die vorgerückten Baue in gleicher Weise als Stützpunkte für das Vorschieben der bisher festen Baue verwendet werden.In the next work step, the advanced structures can be used in the same Way to be used as support points for the advancement of the previously solid structures.

Das erfindungsgemäße Verfahren ermöglicht eine bisher unerreichte Vollmechanisierung des Wanderns des Ausbaues unter harmonischer Anpassung desselben an den Fortschritt des Verhiebs und in weiterer Ausbildung der Erfindung die aufeinander abgestimmte vollmechanische Durchführung sämtlicher Arbeitsvorgänge der Gewinnnung, der Förderung, des Ausbaues und des Versatzes beim streichenden Strebbau.The method according to the invention enables a previously unattainable Full mechanization of the migration of the expansion with harmonious adaptation of the same to the progress of the rabble and in a further development of the invention the one another coordinated fully mechanical implementation of all mining operations, the extraction, expansion and displacement of the striking longwall mining.

Es ist bereits bekannt, zwischen einem Strebförderer und den stoßseitigen Hauptstempeln von Stempelrahmen unstarre Verspannungselemente anzuordnen, welche in einem durchgehenden Streb im Zickzack abwechselnd von der Kante des Strebförderers zu den Stempeln und zurücklaufend ein Vorrücken des Förderers durch Einziehen des Seiles ermöglichen sollen, wobei das Maß dieses Vorrückens durch weitere Distanzseilstränge zwischen dem Strebförderer und den rückwärts davon stehenden Stempeln begrenzt ist. Dieses bekannte Verfahren hat ganz offenbar mit dem Erfindungsgedanken schon hinsichtlich seiner Problemstellung keinerlei Berührungspunkte; die bei den bekannten Verfahren verwendeten Seile dienen lediglich dem Rücken des Förderers und haben mit dem Vorrücken des Ausbaues, auf das sich die Erfindung bezieht, nichts zu tun.It is already known between a face conveyor and the butt side Main stamps of stamp frames to arrange non-rigid bracing elements, which in a continuous longwall zigzag alternating from the edge of the face conveyor to the stamps and moving back an advance of the conveyor by pulling in the Rope should allow, with the extent of this advancement by further distance rope strands is limited between the face conveyor and the stamps standing behind it. This known method has quite obviously already with regard to the inventive idea his problem definition no points of contact; those in the known processes The ropes used only serve the back of the conveyor and have to move forward of the expansion to which the invention relates to do nothing.

In den Zeichnungen sind das neue Ausbauverfahren und die zu seiner Durchführung dienenden Vorrichtungen an Hand von Ausführungsbeispielen veranschaulicht.In the drawings are the new expansion method and the one for his Implementation serving devices illustrated on the basis of exemplary embodiments.

Fig. i zeigt eine Seitenansicht, in der zwei Ausbaurahmen erkennbar sind; Fig. 2 und 3 zeigen in Aufsicht - unter Fortlassung der Oberkappen und der Diagonalverspannungen - die drei jeweils miteinander zusammenwirkenden Ausbaue mit zwei verschiedenen Ausführungsformen der für das Vordrücken erforderlichen Vorrichtungen. Die Stellung des mittleren Baues und der Traverse nach dem Vordrücken ist durch gestrichelte Linien angedeutet.Fig. I shows a side view in which two mounting frames can be seen are; Fig. 2 and 3 show in plan - omitting the top caps and the Diagonal bracing - the three mutually interacting extensions with two different embodiments of the devices required for the advance. The position of the middle structure and the traverse after pushing forward is through dashed lines indicated.

Fig. 4 und 5 zeigen in verschiedenen Phasen in Aufsicht auf einen Streb das Gesamtverfahren und gleichzeitig, wie in vorteilhafter Weise mit dem Vorrücken der Baue 'auch das Vorverlegen des Förderers und der Blasrohrleitungen erfolgen kann.4 and 5 show a plan view of one in different phases Strive for the overall process and at the same time, as advantageously, with the advance The construction also includes the forwarding of the conveyor and the blowpipes can.

Wie aus den Fig. i bis 3 ersichtlich, besteht jeder der Baue aus (mindestens) zwei Stempeln, die durch Oberkappen und Unterkappen verbunden sind. Die Stempel des festen (gesetzten) Baues A' bzw. A" sind mit i und 3, die des gelösten (vorzudrückenden) Baues B mit 2 und 4, die Oberkappen beider Baue mit 5, die Unterkappen mit 5' bezeichnet. Es lassen sich sowohl starre wie - nach dem Ausführungsbeispiel - unstarre Baue verwenden. Bei letzteren bestehen die Kappen aus jedem der Stempel zugeordneten starren Abschnitten 13 und 14 (Oberkappen) - bzw. 15 und 16 (Unterkappen) -, die durch elastische Stahlbänder miteinander verbunden sind. Die starren Kappenabschnitte 13, 14, 15, 16 sind ihrerseits mit den ihnen zugeordneten Stempeln gelenkig verbunden. Zweckmäßig kragen die Oberkappenabschnitte 13 und 14 über die Stempel nach vorwärts und rückwärts über.As can be seen from Figs. I to 3, each of the structures consists of (at least) two punches that are connected by upper caps and lower caps. The stamp of the fixed (set) structure A 'or A "are with i and 3, those of the loosened (to be pushed forward) Building B with 2 and 4, the top caps of both buildings with 5, the lower caps with 5 '. Both rigid and - according to the exemplary embodiment - non-rigid structures can be used use. In the case of the latter, the caps consist of each of the stamps associated with them rigid sections 13 and 14 (upper caps) - or 15 and 16 (lower caps) -, the are connected to each other by elastic steel straps. The rigid cap sections 13, 14, 15, 16 are in turn connected in an articulated manner to the stamps assigned to them. The top cap sections 13 and 14 expediently protrude forward over the punch and backwards over.

Im Ausgangszustand sind gemäß den Ausführungsbeispielen die beiden äußeren, A' und A", der drei miteinander zusammenwirkenden Baue A', A" und B vorgerückt, und der mittlere Bau B ist diesen gegenüber um die Breite des jeweiligen Abbaufortschrittes nach rückwärts versetzt. Bei der Gesamtheit der in einem Streb aufeinanderfolgenden Baue ergibt sich daher sowohl kohlenstoßseitig wie versatzseitig ein zickzackähnlicher Verlauf der jeweils vordersten Stempelreihe.In the initial state, according to the exemplary embodiments, the two outer structures, A ' and A ", of the three interacting structures A', A" and B are advanced, and the middle structure B is offset backwards by the width of the respective mining progress. In the entirety of the structures following one another in a longwall, the result is a zigzag-like course of the foremost row of punches on both the coal joint side and the offset side.

Bevor das Vorrücken erfolgen soll, werden je zwei Führungsseile 6 oben und unten zwischen die Stempel i und 2 bzw. die Stempel 3 und 4 eingehängt, so daß der Bau B mit dem Bau A' (und ebenfalls mit dem Bau A") durch je vier solcher Seile verbunden ist. Ferner muß bei dem Ausführungsbeispiel, bei dem gemäß der vorzugsweisen Ausführungsform der Erfindung unstarre Baue benutzt werden, die Diagonalverspannung io zwischen dem Fuß des Stempels 2 und dem Kopf des Stempels q. des mittleren Baues angebracht werden, um beim Vorrücken ein Zurückbleiben der Oberkappen gegenüber den Unterkappen zu verhindern.Before the advance is to take place, two guide ropes 6 suspended above and below between stamps i and 2 or stamps 3 and 4, so that the building B with the building A '(and also with the building A ") through four such Ropes connected. Furthermore, in the embodiment in which according to the preferred Embodiment of the invention uses non-rigid structures will the Diagonal bracing io between the foot of the punch 2 and the head of the punch q. of the middle structure to prevent the To prevent top caps compared to the bottom caps.

Bei dem Ausführungsbeispiel gemäß Fig. 2 ist an dem mittleren Bau B eine Hilfsschiene 8' angebracht, die der lösbaren und schwenkbaren Befestigung einer Traverse 8 dient. Die Traverse ist andererseits in die klauenartigen Endstücke der Kolben der Druckzylinder 9, Winden od. dgl. eingehängt, die sich an den Stempeln i der äußeren Baue abstützen.In the embodiment of FIG. 2 is on the middle structure B an auxiliary rail 8 'attached to the detachable and pivotable attachment a traverse 8 is used. The traverse is on the other hand in the claw-like end pieces the piston of the pressure cylinder 9, winches od. The like. Suspended on the stamps Support the outer structures.

Bei dieser Ausführungsform sind für das Vorrücken nur zwei solcher Druckzylinder 9 od. dgl. erforderlich, wobei der Arbeitsvorgang wie folgt verläuft: Durch einen ersten Kolbenhub der Druckzylinder wird nach Druckentlastung der Stempel 2 und q. der Bau B zunächst um die Hälfte des gesamten Vorschubweges vorgedruckt. Hierauf werden die Druckkolben mit der daran hängenden Traverse wieder ausgefahren, so daß die Anbringung der Traverse an einem zweiten Befestigungspunkt der Hilfsschiene 8' erfolgen kann, worauf durch nochmalige Betätigung der Druckzylinder 9 die zweite Hälfte des Vorschubes erfolgt und anschließend die Stempel wieder gesetzt werden.In this embodiment there are only two such for advancement Printing cylinder 9 or the like required, the process proceeding as follows: A first piston stroke of the pressure cylinder becomes the stamp after the pressure has been relieved 2 and q. Building B is initially preprinted by half of the entire feed path. The pressure pistons with the traverse attached to them are then extended again, so that the attachment of the traverse to a second attachment point of the auxiliary rail 8 'can take place, whereupon by actuating the pressure cylinder 9 again, the second Half of the feed takes place and then the punches are set again.

Statt der dargestellten Art der Anbringung der Traverse 8 kann diese an den Stempeln i auch mittels Ketten od. dgl., die etwa die Länge der Zylinder 9 haben, eingehängt sein und auf den Stempel :2 ein Druckzylinder wirken, der an Stelle der Hilfsschiene 8' eventuell über mehrere Befestigungspunkte mit der Traverse 8 verbunden ist.Instead of the illustrated type of attachment of the traverse 8, this can on the stamps i also by means of chains or the like, which are approximately the length of the cylinder 9 have to be hooked and on the stamp: 2 a pressure cylinder act that on Place the auxiliary rail 8 ', possibly via several fastening points with the traverse 8 is connected.

Bei der Ausführungsform gemäß Fig. 3 werden drei Druckzylinder verwendet, d. h., je einer für jeden Bau, und die Traverse ist in die klauenartigen Endstücke der drei Kolben dieser Zylinder eingelegt. Hierbei bewirkt der dem Bau B zugeordnete Druckzylinder selbst die Abstützung am Stempel 2. Die Arbeitsweise ist sinngemäß die gleiche. Es werden zunächst die Kolben der an den beiden äußeren Bauen angeordneten Druckzylinder eingefahren und dann der Kolben des am inneren Bau befestigten Vordrückzylinders ausgefahren, so daß wie im ersten Falle jeweils der Kolbenweg nur beispielsweise (bei einem entsprechenden Abbaufortschritt) 30 cm beträgt. Die beiden Bewegungen können auch in der umgekehrten Reihenfolge oder gleichzeitig durchgeführt werden.In the embodiment according to FIG. 3, three pressure cylinders are used, that is, one for each construction, and the cross member is inserted into the claw-like end pieces of the three pistons of these cylinders. In this case, the pressure cylinder assigned to construction B itself provides support on the stamp 2. The mode of operation is analogously the same. First the pistons of the pressure cylinders arranged on the two outer structures are retracted and then the piston of the pressure cylinder attached to the inner structure is extended so that, as in the first case, the piston travel is only 30 cm, for example (with a corresponding dismantling progress). The two movements can also be performed in reverse order or at the same time.

Im Zuge des Vordrückens werden die zunächst straff gespannten, die Stempel verbindenden Seile schlaff, um, wenn das Vorrücken erfolgt ist, wieder gespannt zu werden, so daß in allen Fällen die Seile 6 sichern, daß die vorgerückten Baue am Ende des Vorrückvorganges wieder in die genaue Parallelstellung zu den stehengebliebenen Bauen gelangen.In the course of pushing forward, the initially taut, the The ropes connecting the ropes are slack, and when the advance has taken place, tensioned again to be so that in all cases the ropes 6 secure that the advanced burrows at the end of the advance process again in the exact parallel position to the stopped Build get.

Um die Druckentlastung und das Setzen der Stempel möglichst schnell und gleichmäßig durchführen zu können, werden zweckmäßig hydraulische Stempel verwendet. Es läßt sich dann durch eine geeignete Steuerung der ganze Vorgang - zentral gesteuert - in der richtigen zeitlichen Aufeinanderfolge durchführen, wobei beliebig entweder jeweils nur einer oder auch mehrere Baue gleichzeitig vorgedruckt werden können.To relieve the pressure and set the stamp as quickly as possible and to be able to perform evenly, hydraulic rams are expediently used. The whole process can then be controlled centrally through a suitable control system - Perform in the correct chronological order, with either only one or several structures can be preprinted at the same time.

Bei der üblichen Arbeitsweise des in schwebender oder fallender Richtung aufeinanderfolgenden Vorrückens der Baue findet die gesamte hierfür benötigte Apparatur jeweils nur für die Phase des Vorrückens Verwendung, um dann zweckmäßig, beispielsweise durch eine für diesen Zweck vorgesehene Hängebahn od. dgl., die von den Bauen selbst getragen wird, von einer Verwendungsstelle zur anderen transportiert zu werden.In the usual way of working in a floating or falling direction the successive advancement of the burrows finds all the equipment required for this each only for the phase of advancement use to then expedient, for example by an overhead conveyor or the like provided for this purpose, which is carried out by the buildings themselves carried to be transported from one point of use to another.

Das jeweilige Vorsetzen der zurückstehenden Baue erfolgt um das doppelte Maß des Arbeitsfortschrittes der Gewinnungsmaschine, d. h., wenn dieser Arbeitsfortschritt 30 cm beträgt, um 6o cm.The respective setting up of the receding structures takes place by twice the amount of the work progress of the mining machine, ie, if this work progress is 30 cm, by 60 cm.

Um die am oberen und unteren Ende des Strebs befindlichen Baue in gleicher Weise wie die übrigen Baue vorrücken zu können, sind gegebenenfalls in der Kopf- und Ladestrecke, wie Fig. q. und $ zeigen, Hilfsstempel i9 und 2o vorgesehen, die von Hand umgesetzt werden und an denen die Seile 6 und Zylinder 9 oder entsprechende Teile der zum Vordrucken der Baue verwendeten Apparatur in gleicher Weise wie an den Stempeln der übrigen Baue einzuhängen sind.To put the burrows at the top and bottom of the longwall To be able to advance in the same way as the other burrows are, if necessary, in the head and loading path, as in Fig. q. and $ show, auxiliary stamps i9 and 2o provided, which are implemented by hand and on which the ropes 6 and cylinder 9 or equivalent Parts of the apparatus used to preprint the buildings in the same way as on the stamps of the other structures are to be attached.

Die Seile 6, Ketten od. dgl. sind mit Ansätzen versehen, die in Schlitze, Ösen od. dgl. am oberen und unteren Ende der Stempel eingreifen oder in gleicher Weise an den Kappen angebracht werden.The ropes 6, chains or the like are provided with approaches that are in slots, Eyes od. The like. Engage at the upper and lower end of the stamp or in the same way Way to be attached to the caps.

Die an den rückwärtigen Stempeln befestigten Seile können, wie Fig. i erkennen läßt, zur Aufhängung von Maschendrahtnetzen 7 dienen, die das Ausbaufeld gegen den Versatz abschirmen.The ropes attached to the rear stamps can, as shown in Fig. i can be seen to serve for the suspension of wire mesh nets 7, which the expansion field shield against the misalignment.

Das Ausbauverfahren ergibt als besonderen Vorteil in weiterer Ausbildung die Möglichkeit, gleichzeitig mit dem Wandern des Ausbaues sowohl den Förderer wie die Rohrleitungen, insbesondere die für das Einbringen des Blasversatzes, automatisch mit vorzurücken.The expansion process results in a particular advantage in further training the possibility, at the same time with the hiking of the expansion, both the conveyor as the pipelines, in particular those for introducing the blow offset, automatically to advance with.

Die Fig. q. und 5 zeigen diese Möglichkeiten. Das Vordrucken des Förderers 17 erfolgt jeweils durch die zur Anlage an ihn kommenden vorwärtigen Unterkappen 15. Um gleichzeitig mit der Gewinnung auch den Versatz in Form von Blasversatz einbringen zu können, werden die Baue als Träger für die Blasversatzleitung benutzt, die derart mit dem Vorrücken der Baue mit vorverlegt wird. Zu diesem Zweck sind an den Oberkappen 14 der Rahmen versatzseitig Bügel ii vorgesehen (vgl. Fig. i), in welche die Blasversatzrohre 12 eingehängt werden können. Diese Bügel sind so breit, daß sich ein Spiel innerhalb derselben ergibt, das die Verschiebung der Rohre ermöglicht, die bei dem Vorrücken der Baue jeweils nur in der zweiten Phase, d. h. um den halben Weg, mitgenommen werden, während sie sich in der ersten Phase nur relativ zu den Bügeln in diesen verschieben. Die Kupplung der Rohre miteinander ist in solcher Weise nachgiebig, daß geringfügige Abwinkelungen derselben möglich werden. Um ein abschnittsweises Verlegen der Mündung der Blasversatzleitung entsprechend dem Fortschritt des Versatzes, der bei dieser Ausführungsform des Verfahrens dem der Gewinnung parallel geht, zu ermöglichen, sind in gewissen Abständen, gemäß Fig.4 und 5 an jeder zweiten Kupplungsstelle, Schiebekupplungen 18 vorgesehen, die ein Trennen und Wiederverbinden der Blasrohre an den betreffenden Stellen ermöglichen, sobald der Versatz entsprechend fortgeschritten ist, was bei der harmonischen Abstimmung zwischen Gewinnung und Versatz, die durch das neue Verfahren ermöglicht wird, in dem Zeitpunkt der Fall ist, in dem das Gewinnungsgerät bei der Berg- oder Talfahrt etwa an die betreffende Stelle des Strebs gelangt ist und damit auch an der betreffenden Stelle das Rücken des Ausbaues erfolgt.The Fig. Q. and 5 show these possibilities. The form of the sponsor 17 takes place in each case by the forward lower caps coming to bear on him 15. In order to introduce the offset in the form of blow offset at the same time as the extraction to be able to, the structures are used as a carrier for the Blasversatzleitung, which such is brought forward with the advancement of the Baue. For this purpose are on the top caps 14 of the frame on the offset side bracket ii is provided (see FIG. I), in which the blower pipes 12 can be attached. These stirrups are so wide that there is a game inside the same results, which allows the displacement of the tubes during the advance the building only in the second phase, d. H. half way, taken away while they are in the first phase only relative to the temples in these move. The coupling of the pipes to one another is flexible in such a way that that slight bends of the same are possible. To a Laying the mouth of the blow-off line in sections according to progress of the offset, which in this embodiment of the method is parallel to that of the extraction is possible, are at certain intervals, according to Fig. 4 and 5 at every second Coupling point, sliding couplings 18 are provided, which allow separation and reconnection Allow the blowpipes at the relevant points as soon as the offset is appropriate what has progressed in the harmonious coordination between extraction and Offset that is made possible by the new method at the time of the case is in which the extraction device for the ascent or descent to the relevant Place of the strut and thus also the back at the point in question the expansion takes place.

Demgemäß ist in Fig. 4 die Blasversatzleitung 12 nahe der Blasversatzmaschine durch Betätigung der Schiebekupplung 18"' getrennt. Bis hierhin reicht der in üblicher Weise zum Schutz der Strecke von Hand eingebrachte Versatz, der nach dem Streb zu annähernd senkrecht abbricht. Bei 18"' beginnt das mit Blasversatz zu beschickende Versatzfeld des Strebs, in dem der Versatz von der Grenze des Vollversatzes bis zu den das Ausbaufeld abschirmenden Maschendrahtnetzen 7 in einer Böschung abfällt, die dort durch die geraden in Richtung der Baue verlaufenden Striche angedeutet ist.Accordingly, in Fig. 4, the blow pack line 12 is close to the blow pack machine separated by actuating the sliding coupling 18 '' '. Up to this point the normal Way to protect the stretch of hand-introduced misalignment after the longwall face breaks off almost vertically. At 18 "'the one to be charged with blow-off begins Offset field of the strut in which the offset from the limit of the full offset to to the wire mesh nets 7 shielding the expansion field slopes down in an embankment, there indicated by the straight lines in the direction of the building is.

In der ersten Phase wird nunmehr der Blasversatz von 18"' aus in den anschließenden Abschnitt des Versatzfeldes eingebracht, der gemäß der Leistungsfähigkeit der Blasversatzmaschine z. B. 6 m weit bis z 8" reicht. In der gleichen Zeit ist die Gewinnungsmaschine auf ihrer Bergfahrt bzw. Talfahrt z. B. 6 m vorwärts gekommen. Nunmehr wird durch Betätigung der entsprechenden Schiebekupplungen die Blasversatzleitung um ebenfalls 6 m verlängert, nämlich um den Abschnitt von 18"' bis 18", und die Blasöffnung nach 18" verlegt. In der darauffolgenden Phase liegt die Blasöffnung bei 18', dann bei 18 usw.In the first phase, the blow offset is now from 18 "'out into the subsequent section of the offset field introduced according to the performance the blow molding machine z. B. 6 m far to z 8 ". In the same time is the extraction machine on its ascent or descent z. B. 6 m forward. Now, by actuating the corresponding sliding clutches, the blower discharge line is opened also extended by 6 m, namely by the section from 18 "'to 18", and the Blow opening moved to 18 ". The blow opening is in the following phase at 18 ', then at 18, etc.

Nach dem Umkehren des Gewinnungsgerätes vollzieht sich der gleiche Vorgang gemäß Fig. 5 in der umgekehrten Reihenfolge, indem die Blasrohrleitung durch Öffnung der Schiebekupplungen zunächst bei 18, dann bei 18' usw. fortlaufend verkürzt wird. Zum Schluß wird die Blasmaschine selbst mit dem anschließenden Rohrabschnitt gerückt, worauf wieder die erste Phase gemäß Fig. 4 beginnt.After reversing the extraction device, the same thing happens Process according to FIG. 5 in the reverse order by the blow pipe through Opening of the sliding couplings first at 18, then at 18 'etc. continuously shortened will. Finally, the blow molding machine itself with the subsequent pipe section moved, whereupon the first phase according to FIG. 4 begins again.

Wenn die Leistungsfähigkeit der Blasversatzmaschine und der Blasrohre der Gewinnungsleistung angepaßt ist, so kann der ganze Betrieb - Gewinnung, Förderung, Ausbau und Versatz - vollautomatisch durchgeführt werden.When the capacity of the blow packer and blowpipes is adapted to the extraction performance, the entire operation - extraction, extraction, Expansion and offset - can be carried out fully automatically.

Claims (2)

PATENTANSPRÜCHE: i. Wandernder Strebausbau unter Verwendung von aus je einer Oberkappe und einer Unterkappe und diese tragenden bzw. miteinander verbindenden Stempeln bestehenden Strebbauen, dadurch gekennzeichnet, daß jeweils drei untereinander parallele Baue derart zusammenwirken, daß jeweils der mittlere von ihnen mindestens während des Vorrückens an oder nahe an seinem vorderen und rückwärtigen Ende mit entsprechenden Punkten der beiden äußeren Baue durch unstarre Verspannungselemente von unter sich gleicher Länge verbunden und gegenüber den beiden äußeren Bauen zunächst um ein solches Maß zurückgesetzt ist, daß die beiderseitigen Verspannungselemente straff gespannt sind, und dieser Bau nach dem Lösen seiner Stempel so weit vorgerückt wird, bis die beiderseitigen Verspannungselemente an beiden Enden der Baue wiederum straff gespannt sind, worauf seine Stempel neu gesetzt werden. 2. Wandernder Strebausbau nach Anspruch i, dadurch gekennzeichnet, daß von sämtlichen in schwebender bzw. fallender Richtung aufeinanderfolgenden Bauen eines Strebs jeder zweite Bau gegenüber den beiden ihm benachbarten Bauen zurückgesetzt ist, so daß bei dem entsprechend dem Abbaufortschritt erfolgenden Vorrücken der zurückgesetzten Baue die stehenbleibenden Baue abwechselnd als teilweise Unterstützung zunächst des vorhergehenden und dann des folgenden Baues dienen. 3. Wandernder Strebausbau nach den Ansprüchen i und 2, dadurch gekennzeichnet, daß in der Kopfstrecke und in der Ladestrecke von Hand zu versetzende Hilfsstempel vorgesehen sind, die die Abstützfunktion der dort fehlenden Baue übernehmen. 4. Wandernder Strebausbau nach den Ansprüchen i bis 3, gekennzeichnet durch die Verwendung von fest oder lösbar mit den zusammenwirkenden Bauen verbundenen, ziehend oder schiebend wirkenden Vordrückvorrichtungen, beispielsweise hydraulischen bzw. Preßluftdruckzylindern, Winden od. dgl., die sich an den jeweils feststehenden Bauen bzw. an einem mit ihnen verbundenen Widerlager abstützen. 5. Wandernder Strebausbau nach Anspruch 4, dadurch gekennzeichnet, daß das Widerlager durch eine sich über die drei zusammenwirkenden Baue erstreckende Traverse gebildet ist, die an den Bauen und/oder an den ihnen zugeordneten Vordrückvorrichtungen lösbar befestigt ist. 6. Wandernder Strebausbau nach den Ansprüchen i bis 5, dadurch gekennzeichnet, daß sich die Vordrückvorrichtungen einerseits an (je) einem Stempel eines Baues abstützen und andererseits auf ein mit den Bauen verbundenes Widerlager wirken, oder umgekehrt. . 7. Wandernder Strebausbau nach den Ansprüchen i bis 6, dadurch gekennzeichnet, daß der vorzurückende mittlere Bau um die Hälfte des Vorschubweges durch Betätigung der ihm zugeordneten Vordrückvorrichtung (9), um die andere Hälfte des Weges durch Betätigung der den beiden äußeren Bauen zugeordneten Vordrückvorrichtungen (9) vorgeschoben wird. B. Wandernder Strebausbau nach den Ansprüchen i bis 6, dadurch gekennzeichnet, daß die Traverse (8) an dem mittleren Bau bzw. an den beiden äußeren Bauen, gegebenenfalls mittels daran angebrachter Hilfsschienen (8') od. dgl., lösbar befestigt ist und nach Vorrücken des Baues um die Hälfte des Weges gelöst wird, um an einem zurückliegenden Befestigungspunkt neu angebracht zu werden, worauf die zweite Phase des Vorrückvorganges erfolgt. 9. Wandernder Strebausbau nach den Ansprüchen i bis 8, dadurch gekennzeichnet, daß die Verspannungseleinente (Seile 6, Ketten od. dgl.) nahe dem unteren und oberen Ende der Stempel oder an de Kappen lösbar angebracht sind. io. Wandernder Strebausbau nach den Ansprüchen i bis 9 unter Verwendung von das Ausbaufeld gegen den Versatz abschirmenden iNlaschendrahtnetzeii od. dgl., dadurch gekennzeichnet, daß die Maschendrahtnetze (7) an den versatzseitig angebrachten Verspannungselementen (6) aufgehängt sind. i i. Wandernder Strebausbau nach den Ansprüchen i bis io, gekennzeichnet durch eine zwischen der kohlenstoßseitigen und der versatzseitigen Stempelreihe angeordnete Fahrbahn zum Transport der für das Vordrücken notwendigen Apparaturen (Druckzylinder, Traverse usw.). 12. Wandernder Strebausbau nach den Ansprüchen i bis ii unter Verwendung hydraulischer Stempel, gekennzeichnet durch eine gemeinsame Steuerung des Druckmittels für die jeweils zu einem Ausbau gehörenden Stempel. 13. Strebbau zur Verwendung im wandernden Strebausbau nach den Ansprüchen i bis 12, gekennzeichnet durch unstarre Oberkappen und Unterkappen, die mit den Stempeln gelenkig verbunden sind. 14. Strebbau nach Anspruch 13, gekennzeichnet durch Diagonalverspannungen (io), die während des Vorrückens den vorderen unteren Teil des zu rückenden Baues mit seinem rückwärtigen oberen Teil verbinden, um derart ein Zurückbleiben der Oberkappen zu verhindern. 15. Wandernder Strebausbau nach den Ansprüchen i bis 14, dadurch gekennzeichnet, daß beispielsweise kufenartig ausgebildete Unterkappen gleichzeitig mit dem Vorrücken des betreffenden Baues wirksam werdende Rückvorrichtungen für den Förderer bilden. 16. Wandernder Strebausbau nach den Ansprüchen i bis 15, dadurch gekennzeichnet, daß in an den versatzseitigen Stempeln der Baue angeordneten Aufhängevorrichtungen Rohrleitungen, insbesondere Blasversatzleitungen mit solchem Spiel nach Seite und Höhe geführt sind, daß die Leitungen während jedes Vorrückvorganges nur die Hälfte des Gesamtvorschubs der Baue mitmachen. 17. Wandernder Strebausbau nach Anspruch 16, gekennzeichnet durch eine die Schwenkbarkeit der Rohrabschnitte ermöglichende Kupplung der Rohrleitungen. 18. Wandernder Strebausbau nach Anspruch i bis 17, gekennzeichnet durch über die Streblänge verteilte Schiebekupplungen (18) für die Blasversatzrohre und durch eine solche Betätigung dieser Kupplungen, daß durch die Verschiebung eines davorliegenden Rohrabschnittes Blasöffnungen an den betreffenden Stellen der Streblänge freigegeben und die Blasversatzleitungen entsprechend dem Abbaufortschritt verlängert oder verkürzt werden. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 510 708; französische Patentschriften Nr. 896 346, 905 546, 956 58o; belgische Patentschriften Nr. 490 921, 492 81q.; »Glückauf«, 1941, S.589; »Bergbau-Archiv«, 1946, Bd.PATENT CLAIMS: i. Wandering longwall construction using longwall constructions each consisting of an upper cap and a lower cap and these supporting or connecting punches, characterized in that three mutually parallel constructions cooperate in such a way that the middle of them at least during the advance at or close to his front and rear end with corresponding points of the two outer structures connected by non-rigid bracing elements of the same length and is initially set back from the two outer structures by such an amount that the two-sided bracing elements are taut, and this structure after loosening its stamp is advanced so far that the two-sided bracing elements at both ends of the structure are again taut, whereupon its stamps are set again. 2. Wandering longwall construction according to claim i, characterized in that of all successive building of a longwall in the floating or falling direction every second building is set back with respect to the two adjacent buildings, so that in the progress of the setbacks taking place in accordance with the mining progress, the remaining buildings Build alternately to serve as a partial support first of the previous and then the following building. 3. Wandering longwall construction according to claims i and 2, characterized in that auxiliary rams to be displaced by hand are provided in the head section and in the loading section, which take on the supporting function of the structures missing there. 4. Wandering longwall construction according to claims i to 3, characterized by the use of fixed or detachable connected, pulling or pushing pushing devices, such as hydraulic or compressed air cylinders, winches or the like or support them on an abutment connected to them. 5. Wandering longwall construction according to claim 4, characterized in that the abutment is formed by a cross member extending over the three cooperating structures, which is releasably attached to the structures and / or to the pushing devices assigned to them. 6. Wandering longwall construction according to claims i to 5, characterized in that the pushing devices are supported on the one hand on (each) a stamp of a building and on the other hand acting on an abutment connected to the building, or vice versa. . 7. Wandering longwall construction according to claims i to 6, characterized in that the middle structure to be advanced by half of the feed path by actuation of the pusher device assigned to it (9), by the other half of the path by actuation of the pusher devices assigned to the two outer structures ( 9) is advanced. B. Wandering longwall structure according to claims i to 6, characterized in that the traverse (8) is releasably attached to the middle structure or to the two outer structures, if necessary by means of auxiliary rails (8 ') or the like attached thereto is released after the building has advanced by half of the way in order to be reattached to a previous attachment point, whereupon the second phase of the advancement process takes place. 9. Wandering longwall construction according to claims i to 8, characterized in that the bracing elements (ropes 6, chains or the like.) Are releasably attached near the lower and upper end of the stamp or on de caps. ok Migrating longwall construction according to claims i to 9 using mesh wire nets or the like shielding the extension field against the offset, characterized in that the wire mesh nets (7) are suspended from the tensioning elements (6) attached on the offset side. i i. Migrating longwall construction according to claims i to io, characterized by a roadway arranged between the coal joint-side and the offset-side row of punches for the transport of the equipment necessary for the advance (pressure cylinder, traverse, etc.). 12. Wandering longwall construction according to claims i to ii using hydraulic rams, characterized by a common control of the pressure medium for the ram belonging to an expansion. 13. Longwall for use in moving longwall mining according to claims i to 12, characterized by non-rigid upper caps and lower caps which are hingedly connected to the punches. 14. Longwall according to claim 13, characterized by diagonal braces (io) which connect the lower front part of the structure to be moved with its rear upper part during the advancement, in order to prevent the top caps from being left behind. 15. Wandering longwall mining according to claims i to 14, characterized in that, for example, skid-like lower caps form effective rear devices for the conveyor at the same time as the building in question moves forward. 16. Wandering longwall construction according to claims i to 15, characterized in that arranged on the offset-side stamps of the structures suspension devices pipelines, in particular Blasversatzlinien are guided with such play to the side and height that the lines during each advance process only half of the total advance of the Build participate. 17. Wandering longwall mining according to claim 16, characterized by a coupling of the pipelines which enables the pivotability of the pipe sections. 18. Wandering longwall structure according to claim i to 17, characterized by sliding couplings (18) distributed over the face length for the blow-off pipes and by actuating these couplings in such a way that the displacement of an upstream pipe section releases blow openings at the relevant points of the face length and the blow-off pipes accordingly extended or shortened according to the progress of dismantling. Documents considered: German Patent No. 510 708; French Patent Nos. 896 346, 9 0 5 546, 956 58o; Belgian patents Nos. 490 921, 492 81q .; "Glückauf", 1941, p.589; "Mining Archive", 1946, vol. 2, S. 95, 105, 1o7, 111, 112; »Arbeitssitzung der Bergbauausschüsse für Forschungswesen des Bergbauvereins« in Essen, 25.6. 1943, S.40. In Betracht gezogene- ältere Patente: Deutsche Patente Nr. 903 083, 919 942.2, pp. 95, 105, 1o7, 111, 112; "Working meeting of the mining committees for research of the mining association" in Essen, June 25th. 1943, p. 40. Older patents considered: German patents nos. 903 083, 919 942.
DEG2427A 1950-06-18 1950-06-18 Wandering longwall mining Expired DE977365C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG2427A DE977365C (en) 1950-06-18 1950-06-18 Wandering longwall mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG2427A DE977365C (en) 1950-06-18 1950-06-18 Wandering longwall mining

Publications (1)

Publication Number Publication Date
DE977365C true DE977365C (en) 1966-03-24

Family

ID=7116712

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG2427A Expired DE977365C (en) 1950-06-18 1950-06-18 Wandering longwall mining

Country Status (1)

Country Link
DE (1) DE977365C (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE492814A (en) *
DE510708C (en) * 1929-02-05 1930-10-22 Albert Hamel Extraction chamber with height-adjustable roof
FR896346A (en) * 1942-07-20 1945-02-19 Becorit Grubenausbau Gmbh Method and device for the exploitation and support of layers in tunnel mining processes
FR905546A (en) * 1943-03-23 1945-12-06 Erdol Ag Zechen Graf Bismarck Pushing device for formwork elements of extraction galleries
BE490921A (en) * 1948-09-01 1949-09-15 Dowty Equipment Ltd Sky support for mines
FR956580A (en) * 1943-02-11 1950-02-02
DE903083C (en) * 1943-06-10 1954-02-01 Gerhard Werner Method and device for dismantling and dismantling camps
DE919942C (en) * 1943-03-16 1954-11-08 Gerhard Werner Method and device for dismantling and dismantling camps

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE492814A (en) *
DE510708C (en) * 1929-02-05 1930-10-22 Albert Hamel Extraction chamber with height-adjustable roof
FR896346A (en) * 1942-07-20 1945-02-19 Becorit Grubenausbau Gmbh Method and device for the exploitation and support of layers in tunnel mining processes
FR956580A (en) * 1943-02-11 1950-02-02
DE919942C (en) * 1943-03-16 1954-11-08 Gerhard Werner Method and device for dismantling and dismantling camps
FR905546A (en) * 1943-03-23 1945-12-06 Erdol Ag Zechen Graf Bismarck Pushing device for formwork elements of extraction galleries
DE903083C (en) * 1943-06-10 1954-02-01 Gerhard Werner Method and device for dismantling and dismantling camps
BE490921A (en) * 1948-09-01 1949-09-15 Dowty Equipment Ltd Sky support for mines

Similar Documents

Publication Publication Date Title
DE1302918C2 (en) HIKING STREET STRUCTURE
DE2050602A1 (en) Device for the dismantling of deposits in underground mining operations
DE2732339C2 (en) Longwall mining, especially longwall mining
DE3446043C1 (en) Face-boundary support
DE977365C (en) Wandering longwall mining
DE2250296C3 (en) Knife shield propulsion device for propelling underground cavities, such as in particular tunnels, tunnels and the like
DE2758663C2 (en) Walker arrangement for a walker extension of the inclined and steep storage
DE2233751A1 (en) HIKING EXTENSION ELEMENT
DE2401832C2 (en) Backfill wall tracked as the expansion progresses, especially for thick seams and flush backfill
DE1199725B (en) Longwall construction, consisting of frame-like, height-adjustable support frames set up at a distance from one another, which can be pulled forward by means of back cylinders
DE3343311A1 (en) Arrangement for placing hydraulic self-advancing powered support units in an underground winning operation, in particular in a steep face
DE2606699A1 (en) Coalface scraper chain conveyor drive - has link pan sides forked with slot in tension direction at road end
DE2211605A1 (en) Mine support
DE1205036B (en) Wandering longwall with frame
DE3141162C2 (en) Track for a roller shearer
DE2110003C3 (en) Expansion for advance mining routes in coal mining operations
DE3024465C2 (en)
DE1952893A1 (en) Device for closing off the offset field from the face area developed by the advancing longwall construction
DE2538084C3 (en) Process for the extraction of long fronts in the chamber-pillar construction
DE2312557C3 (en) Procedure for operating longwall equipment for underground mining
DE2406751C2 (en) Hydraulic pit lining
DE1458679C3 (en) Wandering expansion for underground mining
DE2453225A1 (en) Three frame shield for steep seams - with frames advanced via interposed rails forming part of centre frame guide
DE3721735C2 (en)
DE3031113A1 (en) Opening up mine face working area - involves retaining initially guided support units to secure long face entry zone