DE1088000B - Wandering pit support - Google Patents

Wandering pit support

Info

Publication number
DE1088000B
DE1088000B DEK20968A DEK0020968A DE1088000B DE 1088000 B DE1088000 B DE 1088000B DE K20968 A DEK20968 A DE K20968A DE K0020968 A DEK0020968 A DE K0020968A DE 1088000 B DE1088000 B DE 1088000B
Authority
DE
Germany
Prior art keywords
cap
caps
expansion
structures
warping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEK20968A
Other languages
German (de)
Inventor
Dr-Ing Franz Schmid
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DEK20968A priority Critical patent/DE1088000B/en
Publication of DE1088000B publication Critical patent/DE1088000B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs
    • E21D17/01Caps for supporting mine roofs characterised by the shape of the cap, e.g. of specified cross-section
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0052Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor with advancing shifting devices connected therewith
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/006Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor provided with essential hydraulic devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/06Special mine caps or special tops of pit-props for permitting step-by-step movement

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

.-Wandernder Grubenausbau Die, Erfindung betrifft - einen wandernden Grubenausbau, der aus Ausbaueinheiten mit senkrecht zum Stoß stehenden Kapschienen und, parallel zum: Stoß verlaufenden Verzugseisen besteht. Das Neue besteht gemäß der Erfindung darin, daß die Verzugseisen eine seitlich. überkragende Länge aufweisen, die etwas geringer als der Abstand der Ausbaueinheiten voneinander ist, so daß die Verzugseisen der benachbarten Ausbaueinheiten, sich auf Teilen ihrer Länge überdecken. Um die Auflageflächen noch zu. vergrößern, sind zweckmäßig auf den Kappschienen zwischen den Verzugseisen Distanzstücke etwa, gleicher Höhe angeordnet,.die in .gleicher Weise wie. die Verzugseisen am Hangenden anliegen. Jede einzelne Ausbaueinheit. unterstützt somit eine Fläche des Hangenden, die gleich der Länge der Kappe.und dem Abstwid der -beiden benachbarten Ausbaueinheiten voneinander ist. Wird eine Ausbaueinheit vom Druck des Hangenden entlastet, so verliert dieses etwa nicht jede Unterstützung. Es bleiben ,noch die Verzugseisen der benachbarten. Ausbaueinheiten in Anlagestellung. Es wird praktisch lediglich -der, schmale Streifen, an welchem -die abgesenkte Kappschiene am Hangenden anlag; für kurze Zeit ihrer- Unterstützung beraubt. Die Zeit bis zum erneuten Setzen dieser-Ausbaueinheit ist sehr kurz, da unmittelbar nach dem Entlasten der Kappe zum Beispiel durch den Rückzylinder das Vorschieben bzw. Nachziehen der Ausbauteile erfolgt und sofort anschließend das erneute Setzen stattfindet..-Wandering mine support The invention relates to - a wandering Pit lining, consisting of expansion units with cap rails perpendicular to the joint and, parallel to the: joint running warping iron. The new exists according to the invention is that the warping iron a laterally. have protruding length, which is slightly less than the distance between the expansion units, so that the Warping bars of the neighboring expansion units overlap over parts of their length. To the support surfaces still to. are useful on the cap rails between the warping iron spacers arranged approximately the same height, .the in .equivalent Way like. the distortion bars are in contact with the hanging wall. Every single expansion unit. thus supports an area of the hanging wall that is equal to the length of the cap. and the distance between the two adjacent expansion units. Will be a Expansion unit relieved of the pressure of the hanging wall, so it does not lose every one Support. What remains are the neighboring bars. Expansion units in contact position. It will practically only - the narrow strip on which -the lowered cap rail was in contact with the hanging wall; for a short time your support deprived. The time until this extension unit is set again is very short, there immediately after relieving the cap, for example through the rear cylinder The expansion parts are pushed forward or tightened, followed immediately by the re-setting takes place.

Damit. die Zeit des Umsetzens möglichst kurz ist, kann das. Schrittmaß beim Vorrücken des einen oder anderen Ausbaus kleiner gewählt werden als der. Abstand der- auf der Kappe liegenden Verzugseisen voneinander. .Alsdann ist nur ein geringes Lüften der `Stempel notwendig,- so daß;_sich_die Verzugseisen nur geringfügig vom Hangenden abheben bzw. sogar beim Umsetzen. ati diesen entlangschleifen,< denn die vorzurückenden Verzugsschienen. brauchen .nicht unter stehenbleibenden Verzugsschienen vorbeigeführt zu werden.In order to. the time of repositioning is as short as possible, can do that be chosen smaller than that when advancing one or the other expansion. distance the warping iron lying on the cap from each other. .Then there is only a small one Ventilation of the `stamp is necessary - so that; Lift off hanging walls or even when moving them. ati drag along this, <because the advancing draft rails. do not need to be led by.

Der Ausbau kann aus drei senkrecht. zum Stoß hintereinanderstehenden-T-Bauten bestehen, von denen z. B. mittels -einer Kufe die Stempelfüße der beiden ersten Baue starr miteinander. verbunden sind, während die Kappen gelenkig gneinandergeschlossen sind und die Kappen sowie die Kufen .des zweiten und dritten Baues vorzugsweise teleskopartig verschiebbar ineinändergreifen und zwischen den beiden letzten Bauen Rückvorrichtungen zum wechselweisen Vorrücken der beiden ersten zum Nachziehen des dritten Baues, angeordnet sind. Durch die Kombination- von drei T-Bauen wird erreicht, daß mit Sicherheit das Abbaufeld und das nächste -zur Befahrung freizuhaltende Feld ständig in der erforderlichen Weise abgestützt sind. Der Fahrweg ist stets gleich 'breit.-Außerdem sind zweckmäßig die Stemel gelenkig an den Kappen und Kufen angeschlossen,- wobei die den Gelenkbolzen aufnehmenden Bohrungen derart groß gehalten sind, daß der Gebirgsdruck unmittelbar von einem Ausbauteil auf .den arideren übertragbar ist. Durch die Anordnung, derzufolge die beiden ersten Stempel durch eine starre Fußschiene miteinander verbunden sind, während- die zugehörigen Kappen gelenkig äneinändergeschlossen sind und außerdem gelenkig zwischen den Stempeln einerseits sowie den Kappen und Kufen eingeschaltet sind, .wird eine denkbar weitgehende Anpassung des Ausbaues an die wechselnde Ausgestaltung .des Flözes erreicht. Die gelenkige Verbindung zwischen den- Kufen und Kappen einerseits und den Stempeln andererseits ist so einfach und zweckmäßig, daß selbst bei den höchsten änftretenden Druckbeanspruchungen irgendwelche Beschädigungen nicht zu befürchten sind: = Als besonders zweckmäßig hat es sich herausgestellt, die Kappen und/oder Kufen an-den Stempeleinsatzstellen mit Balligen Erhöhungen zu versehen. Die Lage bzw. Neigung der Stempel an den Kappen und Kufen in den Gelenken' kann durch Vörstecker festlegbar sein. Außerdem kann in oder an dem abbaustoßseitigen Kappenende -eine Vorpfändkappe gleitbar angeordnet sein. - Als besonders zweckmäßig hat es sich herausgestellt, den dritten T-Bau mit einer Kufe zu versehen, die einen doppelt wirkenden, auf verschiedenen langen Hubeinstellbaren Druckzylinder trägt, dessen Kolbenstange an, dem- vorderen Ausbauteil angeschlossen ist: Zweckmäßig wird bei dem Ausbau gemäß der Erfindung so verfahren, daß die ersten beiden gelösten T-Baue durch den Druckzylinder am dritten Bau vorgeschoben werden, wobei sich die am Abbaustoß an-1iegende Vorpfändkappe selbsttätig einschiebt und die 'Führungskappe des' dritten Ausbaues ausgezogen wird, dann die ersten beiden Baue durch Verspannen der Stempel festgesetzt werden und nach Lösen des dritten Stempels der letzte Bau durch den-umgeschalteten, doppeltwirkenden Druckzylinder nachgeholt wird unter Einschieben der Führungskappe.The expansion can be made up of three vertically. T-buildings standing one behind the other for butting exist, of which z. B. by means of a runner the stamp feet of the first two Build rigidly together. are connected, while the caps are hinged together are and the caps and the runners .des second and third construction preferably telescope-like interlocking and between the last two buildings Reverse devices for alternately advancing the first two to pull the third building. The combination of three T-structures achieves that with certainty the mining field and the next field to be kept free for driving are constantly supported in the required manner. The route is always the same 'wide.-In addition, the stems are conveniently connected to the caps and runners in an articulated manner, wherein the bores receiving the hinge pin are kept so large that The rock pressure can be transferred directly from one extension to the other is. Due to the arrangement, which means that the first two punches are replaced by a rigid one Foot rails are connected to one another, while the associated caps are articulated are mutually closed and also articulated between the stamps on the one hand as well as the caps and runners are switched on, .will be a very extensive adjustment the expansion to the changing design of the seam achieved. The articulated one Connection between the runners and caps on the one hand and the stamps on the other is so simple and practical that even with the highest pressure loads any damage is not to be feared: = As particularly useful it has been found that the caps and / or runners at the punch insert points to provide crowned elevations. The position or inclination of the stamps on the caps and runners in the joints' can be fixed by pre-connectors. Also can A pre-pledging cap is slidably arranged in or on the end of the cap on the mine face be. - It has been found to be particularly useful to use the third T-building to provide a skid, which has a double-acting, adjustable stroke of different lengths Pressure cylinder carries, whose piston rod is connected to the front extension part is: It is expedient to proceed in the expansion according to the invention in such a way that the first both loosened T-structures are advanced through the pressure cylinder on the third structure, whereby the pre-pledging cap attached to the working face pushes in automatically and the 'guide cap of the' third expansion pulled out will, then the first two structures are fixed by tightening the stamp and after loosening of the third stamp the last construction by the-switched, double-acting pressure cylinder is made up by inserting the guide cap.

In der Zeichnung -ist ein Ausführungsbeispiel der Erfindung dargestellt. Es zeigt Abb. 1 eine Seitenansicht eines Ausbaus gemäß der Erfindung, Abb. 2 bis 4 drei Einsatzschemen mit verschieden weit angesetzten Verzugseisen, Abb. 5 ein Schema mit auf den Kappen aufgelegten versteiften Blechen.In the drawing, an embodiment of the invention is shown. It shows Fig. 1 a side view of an extension according to the invention, Fig. 2 to 4 three insert schemes with warping bars set at different distances, Fig. 5 Scheme with stiffened sheets placed on the caps.

Die Ausbaueinheiten gemäß der Erfindung bestehen aus den drei Stempeln 1, 2- und 3, den Kufen 4 und 5 und der Kappe 6 mit Vorpfändkappe 7 sowie der an die Kappe 6 angelenkten Mittelkappe 8, die in die Führungskappe 9 eingreift. Die Stempel 1 und. 2 mit der Kufe 4 und den Kappen 6, 7 und 8 bilden einen geschlossenen Rahmen, der mit dem Stempel 3 und dessen Kufe 5 und Kappe 9 zu einer Ausbaueinheit kombiniert ist. Die Stempel l und 2 sind mit Fuß-bzw. Kopfgelenken an die Kufen bzw. Kappen angeschlossen.The expansion units according to the invention consist of the three punches 1, 2 and 3, the runners 4 and 5 and the cap 6 with pre-pledging cap 7 and the center cap 8, which is hinged to the cap 6 and engages in the guide cap 9. The stamps 1 and. 2 with the runner 4 and the caps 6, 7 and 8 form a closed frame which is combined with the punch 3 and its runner 5 and cap 9 to form an expansion unit. The stamp l and 2 are with foot or. Head joints connected to the runners or caps.

Jede gelenkige Verbindung besteht aus einem Schuh, der sich auf ein gewölbtes Stück 17 der Kufen bzw. Kappen abstützt. Gegen letztere werden diese Schuhe durch seitliche Schilder 18 festgelegt, die mittels Bolzen 19 an der Kappe oder Kufe angeschlossen sind. Die Bolzen 19 haben einen kleineren. Durchmesser als die Bohrungen in den Seitenschildern 18, so daß die Kraftübertragung immer unmittelbar von der Kappe auf den. Stempel bzw. von dem Stempel auf die Kufe oder umgekehrt erfolgt und die Bolzen nicht auf Biegung bzw. Abscheren beansprucht werden. Die Stempel können durch Vorstecker20 in gewünschter Lage festgestellt werden. Ihre geneigte Stellung richtet sich nach dem Einfallen des Gebirges. Durch diesellstecker 20 wird gleichzeitig eine Schwenkbewegung der Stempel während des Vordrückens verhindert.Each articulated connection consists of a shoe which is supported on a curved piece 17 of the runners or caps. Against the latter, these shoes are fixed by side plates 18 which are connected to the cap or runner by means of bolts 19. The bolts 19 have a smaller one. Diameter than the holes in the side plates 18, so that the power transmission is always directly from the cap to the. Stamp or from the stamp to the runner or vice versa takes place and the bolts are not subjected to bending or shearing. The stamps can be fixed in the desired position by means of cotter pins20. Their inclined position depends on the collapse of the mountains. At the same time, the diesell plug 20 prevents the stamp from pivoting while it is being pushed forward.

Der Stempel 3 kann gleich oder ähnlich den Stempeln 1 und 2 ausgebildet sein. Der obere Anschluß an die Kappe 9 kann jedoch als feste Verbindung ausgeführt sein. Dieser Stempel 3 mit Kappe 9 ist durch eine besondere Führung gegen die Kappe 8 festgelegt, die sich in der Kappe 9 entsprechend verschieben kann.The stamp 3 can be designed identically or similarly to the stamps 1 and 2 . The upper connection to the cap 9 can, however, be designed as a fixed connection. This punch 3 with cap 9 is fixed by a special guide against the cap 8, which can move in the cap 9 accordingly.

Zwischen dem vorderen Rahmen und dem hinteren Teil ist eine horizontale gegenseitige Verschiebung möglich. Diese wird erzielt durch den zwischen den Füßen der Stempel 2 und 3 angeordneten Druckzylinder 10, der eine doppelseitige Wirkung hat. Außerdem ist der Druckzylinder auf einen verschieden langen Hub einstellbar. Dieser Druckzylinder 10 kann bei festgesetztem Stempel 3 den vorderen Rahmen nach dem Abbaustoß hin verschieben -und er kann - anschließend bei festgesetzten Stempeln 1 und 2 den gelösten Stempel 3 nachziehen. Diese beiden Vorgänge bedeuten zusammen einen Schritt.Horizontal mutual displacement is possible between the front frame and the rear part. This is achieved by the pressure cylinder 10, which is arranged between the feet of the stamps 2 and 3 and has a double-sided effect. In addition, the pressure cylinder can be adjusted to a stroke of different lengths. With the punch 3 fixed, this pressure cylinder 10 can move the front frame towards the excavation joint - and it can then - with the stamps 1 and 2 fixed, retighten the released punch 3. These two processes together mean one step.

Falls z. B. bei einem brüchigen Hangenden dem Verschieben des Ausbaus Hindernisse in Form von heraustretenden Kanten im Hangenden in den Weg treten, kann die Ausbaueinheit auch noch durch einen Druckzylinder unterhalb der Kappen verstärkt werden.If z. B. with a fragile hanging wall to move the expansion Obstacles in the form of protruding edges in the hanging wall can get in the way the expansion unit is also reinforced by a pressure cylinder underneath the caps will.

Über den Kappen werden Verzugseisen 11 eingesetzt, etwa senkrecht zur Kappenrichtung. Der Abstand der einzelnen Verzugseisen 11 richtet sich nach dem mehr -oder weniger schlechten bzw. guten Gebirgsverhältnissen, die auch das Schrittmaß für den Ausbau bestimmen. Zwischen den Verzugseisen 11 können Distanzstücke 21 gleicher Höhe eingesetzt werden, so daß die oberen Flächen der Distanzstücke 21 und der Verzugseisen 11 bündig liegen. Dadurch wird eine gleichmäßige Druckverteilung auf die Kappe erzielt und ein -gleichförmiges Mitgehen der Verzugseisen beim Rücken gesichert. Bei gewissen Gebirgsverhältnissen, insbesondere bei sehr gebrächem Hangenden kann es von Vorteil sein, an Stelle der einzelnen fingerartig ineinandergreifenden Verzugseisen 11 ausgesteifte Stahlbleche 22 zu verwenden. Das Schrittmaß kann dann beliebig gewählt werden, da keine Teile zweier benachbarter Rahmen ineinandergreifen.Warping irons 11 are used over the caps, approximately perpendicular to the cap direction. The distance between the individual delay iron 11 is based on the more - or less bad or good rock conditions, which also defines the increment for the expansion. Spacers 21 of the same height can be used between the draft bars 11, so that the upper surfaces of the spacers 21 and the draft bars 11 are flush. This results in an even distribution of pressure on the cap and ensures that the distortion bars move along evenly on the back. In the case of certain mountain conditions, in particular in the case of very poor hanging walls, it can be advantageous to use stiffened steel sheets 22 instead of the individual finger-like interlocking rods 11. The increment can then be chosen as desired, since no parts of two adjacent frames interlock.

Claims (7)

PATENTANSPRÜCHE: 1. Wandernder Grubenausbau, bestehend aus Ausbaueinheiten mit senkrecht zum Stoß stehenden Kappschienen und parallel zum Stoß verlaufenden Verzugseisen, dadurch gekennzeichnet, daß die Verzugseisen (11) eine seitlich überkragende Länge aufweisen, die etwas geringer als der Abstand der Ausbaueinheiten voneinander ist, so daß die Verzugseisen (11) der benachbarten Ausbaueinheiten sich auf Teilen ihrer Länge überdecken. PATENT CLAIMS: 1. Wandering pit support, consisting of support units with cut-off rails perpendicular to the joint and warping bars running parallel to the joint, characterized in that the warping bars (11) have a laterally protruding length that is slightly less than the distance between the finishing units from one another, so that the draft bars (11) of the adjacent expansion units overlap over parts of their length. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß auf den Kappen (6, 8) zwischen den Verzugseisen (11) Distanzstücke (21) etwa gleicher Höhe liegen, die in gleicher Weise wie die Verzugseisen (11) am Hangenden liegen. 2. Apparatus according to claim 1, characterized in that on the caps (6, 8) between the warping iron (11) spacers (21) are approximately the same height, which are in the same way as the warping iron (11) on the hanging wall. 3. Verfahren zum Rücken eines Grubenausbauer nach Anspruch 1, dadurch gekennzeichnet, daß das Schrittmaß beim, Vorrücken des einen oder anderen Ausbaues kleiner gewählt wird als der Abstand der auf einer Kappe liegenden Verzugseisen (11) voneinander. 3. A method for backing a mine supporter according to claim 1, characterized in that the increment when advancing one or the other Expansion is chosen smaller than the distance between the warping iron lying on a cap (11) from each other. 4. Wandernder Grubenausbau nach Anspruch 1, gekennzeichnet durch drei senkrecht zum Stoß hintereinanderstehende T-Baue, von denen z. B. mittels einer Kufe (4) die Stempelfüße der beiden ersten Baue starr miteinander verbunden sind, während die Kappen (6, 8) gelenkig aneinandergeschlossen sind und die Kappen (8, 9) sowie die Kufen (4, 5) des zweiten und dritten Baues vorzugsweise teleskopartig verschiebbar ineinandergreifen und zwischen den beiden letzten Bauen Rückvorrichtungen (10) zum wechselweisen Vor: rücken der beiden ersten und Nachziehen des dritten Baues angeordnet sind. 4. Wandering pit lining according to claim 1, characterized by three T-structures standing one behind the other perpendicular to the joint, of which z. B. by means of a runner (4), the stamp feet of the first two structures are rigidly connected to one another, while the caps (6, 8) are hinged to one another and the caps (8, 9) and the runners (4, 5) of the second and third Structures preferably interlock telescopically and between the last two structures rear devices (10) for alternately advancing the first two structures and pulling the third structure behind are arranged. 5. Ausbau nach Anspruch 4, dadurch gekennzeichnet, daß die Stempel (1, 2, 3) gelenkig an den Kappen (6, 8) und Kufen (4, 5) angeschlossen sind, wobei die den Gelenkbolzen (19) aufnehmenden Bohrungen derart groß gehalten sind, daß der Gebirgsdruck unmittelbar von einem Ausbauteil auf den anderen übertragbar ist. 5. Expansion according to claim 4, characterized in that the punches (1, 2, 3) are hinged to the caps (6, 8) and runners (4, 5) , the bores receiving the hinge pin (19) being so large are held that the rock pressure is directly transferable from one extension part to the other. 6. Ausbau nach den Ansprüchen 4 und 5, dadurch gekennzeichnet, daß die Kappen und/oder Kufen an den Stempeleinsatzstellen ballige Erhöhungen (17) aufweisen. 6. Expansion according to claims 4 and 5, thereby characterized in that the caps and / or runners are convex at the punch insert points Have elevations (17). 7. Ausbau nach den Ansprüchen 4 bis 6, dadurch gekennzeichnet, daß die Lage bzw. Neigung der Stempel (1, 2) an den Kappen und Kufen in den Gelenken durch Vorstecker (20) festzulegen ist. B. Ausbau nach den Ansprüchen 4 bis 7, dadurch gekennzeichnet, daß in oder an dem abbaustoßseitigen Kappenende eine Vorpfändekappe (7) gleitbar angeordnet ist. -9. Ausbau nach- den Ansprüchen 4 bis 8, dadurch gekennzeichnet, daß der dritte T-Bau eine Kufe (5) aufweist, die einen doppeltwirkenden, auf verschieden langen Hub einstellbaren Druckzylinder (10) trägt, dessen Kolbenstange an dem vorderen Ausbauteil angeschlossen ist. 10. Verfahren zum fortschreitenden mechanischen Ausbau, gekennzeichnet durch einen Ausbau nach den Ansprüchen 1 bis 9, dessen erste beiden gelösten T-Baue durch den Druckzylinder am dritten Bau vorgeschoben werden, wobei sich die am Abbaustoß anliegende Vorpfändkappe (7) selbsttätig einschiebt und die Führungskappe (9) des dritten Baues ausgezogen wird, dann die ersten beiden Baue durch Verspannen der Stempel (1, 2) festgesetzt werden und nach Lösen des dritten Stempels (3) der letzte Bau durch den umgeschalteten, doppeltwirkenden Druckzylinder (10) nachgeholt wird unter Einschieben der Führungskappe. In Betracht gezogene Druckschriften: Französische Patentschrift Nr. 1043 173; »Glückauf«, 1953, S. 545.7. Expansion according to claims 4 to 6, characterized in that the position or inclination of the punch (1, 2) on the caps and runners in the joints is to be determined by means of pin (20) . B. Expansion according to Claims 4 to 7, characterized in that a pre-pledging cap (7) is slidably arranged in or on the end of the cap on the working face. -9. Extension according to claims 4 to 8, characterized in that the third T-structure has a runner (5) which carries a double-acting pressure cylinder (10) which can be adjusted to different lengths of stroke and whose piston rod is connected to the front extension part. 10. A method for progressive mechanical expansion, characterized by an expansion according to claims 1 to 9, the first two loosened T-structures are advanced by the pressure cylinder on the third structure, the pre-pledging cap (7) adjacent to the mining joint pushes in automatically and the guide cap (9) of the third structure is pulled out, then the first two structures are fixed by tightening the stamps (1, 2) and after loosening the third stamp (3) the last structure is made up by the switched, double-acting pressure cylinder (10) while pushing it in the guide cap. Contemplated references: French Patent No. 1,043,173;. "Glückauf", 1953, p. 545.
DEK20968A 1954-01-30 1954-01-30 Wandering pit support Pending DE1088000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEK20968A DE1088000B (en) 1954-01-30 1954-01-30 Wandering pit support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEK20968A DE1088000B (en) 1954-01-30 1954-01-30 Wandering pit support

Publications (1)

Publication Number Publication Date
DE1088000B true DE1088000B (en) 1960-09-01

Family

ID=7216066

Family Applications (1)

Application Number Title Priority Date Filing Date
DEK20968A Pending DE1088000B (en) 1954-01-30 1954-01-30 Wandering pit support

Country Status (1)

Country Link
DE (1) DE1088000B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1179530B (en) * 1962-02-14 1964-10-15 Karl Theodor Jasper Expansion unit for migrating longwall mining

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1043173A (en) * 1951-08-22 1953-11-06 Mine props

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1043173A (en) * 1951-08-22 1953-11-06 Mine props

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1179530B (en) * 1962-02-14 1964-10-15 Karl Theodor Jasper Expansion unit for migrating longwall mining

Similar Documents

Publication Publication Date Title
DE2128023B2 (en) Migrating longwall construction with side-by-side support shields
DE1302918C2 (en) HIKING STREET STRUCTURE
DE970540C (en) Framework for progressive expansion in brown coal longwall mining
DE2914499B2 (en) Facility for upgrading a route or a tunnel
DE1089710B (en) Expansion chamber for drifting, especially in underground mining
DE1088000B (en) Wandering pit support
DE2323811A1 (en) SUPPORTING FRAME FOR WALKING FRAMES FOR DRIVE WORK
DE2211605C3 (en) Wandering route expansion
AT390819B (en) REMOVAL FOR A CALL SLOT
DE2401832C2 (en) Backfill wall tracked as the expansion progresses, especially for thick seams and flush backfill
DE3040354C2 (en) Knife shield for the extensive expansion of a route location
DE3134071A1 (en) Sliding cutter sheeting for trench driving for carrying out pipe-laying work in the ground
DE1112480B (en) Frame-like extension element for longwall construction
DE1205036B (en) Wandering longwall with frame
DE1030282B (en) Frame-like extension member, especially for longwall construction
AT294729B (en) HIKING STRUCTURAL EQUIPMENT FOR DISPLACEMENT STRUT
AT314587B (en) Device for carrying out a process for the underground production of in-situ concrete channels and tunnels of all kinds
DE1458679C3 (en) Wandering expansion for underground mining
DE2743225A1 (en) Advancing multiple section tunnel lining - has interlocking advancing sections made of lining segments supported by structural members
DE2350401A1 (en) HIKING PIT EXTENSION
DE2406044C2 (en) Shield extension frame
DE2104480C2 (en) Migrating hydraulic support to support the side of a mining stretch facing the old man
DE2164365B2 (en) RETURNABLE SHIELD UNIT
DE2406751C2 (en) Hydraulic pit lining
DE916287C (en) Wedge-shaped sledge for laying face conveyors