DE1295991B DES107559A DES0107559A DE1295991B DE 1295991 B DE1295991 B DE 1295991B DE S107559 A DES107559 A DE S107559A DE S0107559 A DES0107559 A DE S0107559A DE 1295991 B DE1295991 B DE 1295991B
Authority
DE
Germany
Prior art keywords
conveyor
belts
lifting spindles
lifting
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DES107559A
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE1295991B publication Critical patent/DE1295991B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00Pile receivers
    • B65H31/34Apparatus for squaring-up piled articles
    • B65H31/36Auxiliary devices for contacting each article with a front stop as it is piled
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H29/00Delivering or advancing articles from machines; Advancing articles to or into piles
    • B65H29/12Delivering or advancing articles from machines; Advancing articles to or into piles by means of the nip between two, or between two sets of, moving tapes or bands or rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2404/00Parts for transporting or guiding the handled material
    • B65H2404/20Belts
    • B65H2404/26Particular arrangement of belt, or belts
    • B65H2404/261Arrangement of belts, or belt(s) / roller(s) facing each other for forming a transport nip
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/17Nature of material
    • B65H2701/176Cardboard
    • B65H2701/1766Cut-out, multi-layer, e.g. folded blanks or boxes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S414/00Material or article handling
    • Y10S414/10Associated with forming or dispersing groups of intersupporting articles, e.g. stacking patterns
    • Y10S414/114Adjust to handle articles or groups of different sizes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Making Paper Articles (AREA)
  • Pile Receivers (AREA)
  • Sheets, Magazines, And Separation Thereof (AREA)
  • Delivering By Means Of Belts And Rollers (AREA)
  • Discharge By Other Means (AREA)

Description

1 21 2

Die Erfindung bezieht sich auf eine Fördervor- F i g. 4 einen Teilschnitt längs der Linie 4-4 inThe invention relates to a conveyor F i g. 4 is a partial section along line 4-4 in

richtung zur Zuführung von doppellagig gefalteten, F i g. 2.direction for feeding double-layered folded, F i g. 2.

verklebten Schlauchstücken in einen Stapelschacht, Gemäß den Zeichnungen und insbesondere gemäßglued tube pieces in a stacking shaft, according to the drawings and in particular according to

bei welcher kontinuierlich umlaufende Förderorgane F i g. 1 umfassen diejenigen Teile der Vorrichtung, sich zumindest unterseitig bis zu zwei dem Schacht 5 welche gemäß der Erfindung ausgebildet sind, insvorgeordneten Hubspindeln erstrecken. gesamt mit 11 bezeichnete Fördermittel, denen Kar-in which continuously revolving conveyor elements F i g. 1 include those parts of the device at least on the underside up to two of the shaft 5, which are designed according to the invention, into the upstream Extend lifting spindles. total of 11 designated funding, which card

Es ist bereits eine Vorrichtung dieser Bauart be- tonzuschnitte (im folgenden kurz als Zuschnitt bekannt, bei der jedoch insbesondere nachteilig ist, daß zeichnet), die schlauchstückförmig gefaltet sind, von sowohl sehr lange als auch sehr kurze Schlauch- einer hier nicht gezeigten Faltschachtelklebemaschine stücke schwer zu verarbeiten sind; beispielsweise io aus zugeführt werden, die gemäß Fig. 1 auf der würden bei der Verarbeitung verhältnismäßig langer linken Seite der Vorrichtung angeordnet ist. Die Schlauchstücke die Hubspindeln jedes Schlauch- Fördermittel 11 transportieren die doppellagig gefalstück um einen beträchtlichen Weg nach oben mit- teten Schlauchstücke (Zuschnitte) längs einer allnehmen, bevor die Förderorgane dieses Schlauch- gemein waagerechten Förderebene und geben die stück freigeben, was eine Beschädigung des Schlauch- 15 Zuschnitte an eine durch einen Hubnocken betätigte Stücks zur Folge haben kann. Die gleiche Schwie- Rolle 99 und zwei Hubspindeln 12 und 13 ab. Die rigkeit tritt auch dann auf, wenn Schlauchstücke Gewindegänge der Hubspindeln 12 und 13 erfassen verarbeitet werden, die unterschiedliche Längen die Ränder der Zuschnitte und bewegen die Zuaufweisen, schnitte derart nach oben, daß ein Stapel 14 entsteht,There is already a device of this type of concrete cuttings (hereinafter referred to as cuttings for short, in which, however, it is particularly disadvantageous that draws), which are folded in the form of tubular pieces, of both very long and very short tube of a folder gluer, not shown here pieces are difficult to process; for example io are supplied from, which is shown in FIG. 1 on the would be arranged on the left side of the device for a relatively long time during processing. the Hose pieces the lifting spindles of each hose conveyor 11 transport the double-layer folded pieces take a considerable way up the middle tube pieces (blanks) along one of the before the conveying organs of this hose common horizontal conveying level and give the release piece, which caused damage to the hose 15 blanks to a by a lifting cam May result in a piece. The same heavy roll 99 and two lifting spindles 12 and 13. the Rigkeit also occurs when pieces of tubing capture threads of the lifting spindles 12 and 13 processed, the different lengths the edges of the blanks and move the assignments, cuts upwards in such a way that a stack 14 is formed,

Der Erfindung liegt die Aufgabe zugrunde, die 20 dessen unterem Ende die Zuschnitte (Schlauch-Nachteile bekannter Fördervorrichtungen der oben stücke) zugeführt werden. Die Vorwärtsbewegung genannten Gattung zu vermeiden und insbesondere der Zuschnitte wird durch insgesamt mit 15 bezeicheine einwandfreie Förderung von Schlauchstücken nete Sperrvorrichtungen unterbrochen. Oberhalb des unterschiedlicher Größe zu gewährleisten. Stapels 14 angeordnete, insgesamt mit 16 bezeich-The invention is based on the object of the 20 whose lower end the blanks (hose disadvantages known conveyors of the above pieces) are supplied. The forward movement to avoid mentioned genus and in particular the blanks is denoted by a total of 15 Proper promotion of pieces of hose designated blocking devices interrupted. Above the different size to ensure. Stack of 14 arranged, designated a total of 16

Zur Lösung dieser Aufgabe ist gemäß der Erfin- 25 nete Abgabe- oder Entnahmemittel erfassen periodung vorgesehen, daß das oberseitige Förderorgan disch den oberen Teil des Stapels 14, um einen Stoß in zwei ineinander übergehende Längsabschnitte 17 von Zuschnitten dem oberen Ende des Stapels 14 unterteilt ist, von denen der den Hubspindeln näher zu entnehmen und den Stoß 17 in der Vorwärtsrichliegende Abschnitt aus der Förderebene entfernbar tung zu bewegen, so daß er an die Rollen eines RoI-angeordnet ist. Auf diese Weise ist es möglich, daß 30 lenförderers 18 abgegeben wird,
man das oberseitige Förderorgan derart einstellt, daß Die Fördermittel 11 umfassen im wesentlichen
To solve this problem, according to the invention, the delivery or removal means detect periodization is such that the upper part of the stack 14 is subdivided into two longitudinal sections 17 of blanks merging into one another at the upper end of the stack 14 , of which the lifting spindles can be seen in more detail and to move the thrust 17 in the forward-facing section from the conveying plane removably device so that it is arranged on the rollers of a RoI. In this way it is possible that 30 lenförderers 18 is delivered,
the upper-side conveying element is set in such a way that the conveying means 11 essentially comprise

die Schlauchstücke in ihrer Bewegung nicht behin- drei Paare von endlosen Gurten, die mit der gleidert werden, nachdem diese von den Hubspindeln chen Geschwindigkeit angetrieben werden; hierbei erfaßt worden sind. Bei der Verarbeitung relativ sind das untere Gurtaggregat mit den Gurten 19 langer Schlauchstücke wird somit das oberseitige 35 sowie die Gurte 23 und 23 a unterhalb der Zufüh-Förderorgan derart verstellt, daß die dem Schlauch- rungsbahn für die Zuschnitte angeordnet, während stück aufgeprägte zwangläufige Bewegung unter- die oberen Gurte (das oberseitige Förderorgan) 20, brachen wird, bevor das. betreffende Schlauchstück 21 und 22 oberhalb der Zuführungsbahn angeordnet durch die Hubspindeln längs einer größeren Strecke sind. Der untere Strang des einen ersten Längsnach oben bewegt wird. 40 abschnitt bildenden Gurtes 20 und der obere Strangthe pieces of tubing do not hinder their movement- three pairs of endless straps that clad with the after these are driven by the lifting spindle chen speed; here have been detected. The lower belt assembly with the belts 19 are relative during processing long pieces of hose is thus the top 35 and the belts 23 and 23 a below the feed conveyor Adjusted in such a way that the tubing path for the blanks is arranged during piece impressed inevitable movement under the upper belts (the upper conveyor element) 20, Will break before the relevant hose piece 21 and 22 is arranged above the feed path through the lifting spindles along a greater distance. The lower strand of the first longitudinal is moved above. 40 section forming belt 20 and the upper strand

Gemäß einer bevorzugten Ausgestaltung der Er- des Gurtes 19 sind stets einander zugewandt, und findung ist vorgesehen, daß bei mehreren den Hub- wenn die einen zweiten Längsabschnitt bildenden spindeln näher liegenden Förderabschnitten jeder Gurte 21 und 22 ihre (für Gurt 22) in F i g. 2 ge-Förderabschnitt unabhängig von dem anderen ent- zeigte Lage einnehmen, sind die unteren Stränge fernbar angeordnet ist. Auf diese Weise ist es mög- 45 dieser Gurte ebenfalls den oberen Strängen der lieh, Schlauchstücke mit unterschiedlicher Länge Gurte 23 und 23 α zugewandt. Die Gurte 21 und 23 einwandfrei zu fördern. arbeiten zusammen und sind auf der einen Seite derAccording to a preferred embodiment of the earth belts 19 are always facing each other, and provision is made that with several conveyor sections closer to the lifting if the spindles forming a second longitudinal section each belts 21 and 22 have their (for belt 22) in F i G. 2 ge conveyor section occupy independently of the other shown position, the lower strands are arranged remotely. In this way, it is possible 45 of these belts also facing the upper strands of the borrowed hose pieces with different lengths belts 23 and 23 α. The belts 21 and 23 to promote properly. work together and are on one side of the

Weiterhin ist gemäß einer bevorzugten Ausbildung Vorrichtung angeordnet; ebenso arbeiten die Gurte der Erfindung vorgesehen, daß der den Hubspindeln 22 und 23 a zusammen, und zwar in entsprechender näher liegende Förderorganabschnitt in Form von 50 Weise wie die Gurte 21 und 23 auf der anderen Seite mit waagerechtem Abstand angeordneten umlaufen- der Fördermittel 11.
den Bändern ausgebildet ist. Da die Einzelheiten der Ketten und Kettenräder,
Furthermore, according to a preferred embodiment, the device is arranged; Likewise, the belts of the invention work so that the lifting spindles 22 and 23a work together, namely in a corresponding closer conveying organ section in the form of 50 ways like the belts 21 and 23 on the other side with a horizontally spaced circumferential conveying means 11.
the ligaments is formed. As the details of the chains and sprockets,

Schließlich ist gemäß einer bevorzugten Ausgestal- mittels derer die Antriebseinrichtung mit den Teilen tung der Erfindung vorgesehen, daß jedes der Bän- der Vorrichtung verbunden ist, um diese Teile in der durch in einem Rahmenteil gelagerte Rollen 55 zeitlicher Abstimmung aufeinander zu betätigen, geführt ist. keinen Gegenstand der Erfindung bilden und imFinally, according to a preferred embodiment, the drive device is provided with the parts device of the invention provides that each of the belts is connected to the device to these parts in to actuate the timed coordination of rollers 55 mounted in a frame part, is led. do not form the subject of the invention and im

Ein Ausführungsbeispiel der Erfindung ergibt sich übrigen von bekannter Art sind, erübrigt sich eine aus der folgenden Beschreibung an Hand der Zeich- nähere Beschreibung dieser Anordnung,
nung. Es zeigt Die vor den Hubspindeln 12 und 13 angeordneten
An embodiment of the invention is also of a known type, a more detailed description of this arrangement from the following description with reference to the drawing is unnecessary,
tion. It shows the arranged in front of the lifting spindles 12 and 13

Fig. 1 eine erfindungsgemäße Vorrichtung in 60 Förderbandmittel26 umfassen einen oberen, alleinem Schnitt längs der Linie 1-1 in F i g. 2, gemein waagerecht verlaufenden Strang, der etwasFig. 1 shows a device according to the invention in 60 conveyor belt means 26 comprise an upper, single one Section along the line 1-1 in F i g. 2, common horizontal strand that is something

Fig. 2 einen waagerechten Schnitt längs der höher angeordnet ist als der obere Strang des Gur-Linie 2-2 in F i g. 1, tes 19. Die Förderbandmittel 26 umfassen mehrereFig. 2 is a horizontal section along which is arranged higher than the upper strand of the Gur line 2-2 in FIG. 1, tes 19. The conveyor belt means 26 comprise several

Fig. 3 einen vergrößerten Teil eines Grundrisses, schmale parallele Gurte, die gemäß Fig. 1 mit Hilfe der ein Schlauchstück in dem Zeitpunkt zeigt, in 65 von Riemenscheiben und diesen zugeordneten Ketwelchem die Vorwärtsbewegung des Schlauchstücks ten und Kettenrädern so angetrieben werden, daß sie im Bereich der Stapelvorrichtung unterbrochen wor- sich im Uhrzeigersinn bewegen. Die Vorderkanten der den ist, durch die Fördermittel 11 zugeführten Zuschnitte,Fig. 3 shows an enlarged part of a plan, narrow parallel straps, which according to FIG. 1 with the help which shows a piece of hose at the time, in 65 of pulleys and Ketwelchem associated with them the forward movement of the hose piece th and sprockets are driven so that they interrupted in the area of the stacking device, they move clockwise. The leading edges of the is the blanks fed by the conveyor 11,

3 43 4

die sich an den Hubspindeln 12 und 13 vorbei bar gelagert ist. Das Rahmenteil 46 kann aus seiner bewegen, werden zunächst durch die Gurte 26 unter- in F i g. 4 in Vollinien wiedergegebenen unteren stützt, mittels derer die Zuschnitte mit ihren Vor- Stellung in eine obere Stellung geschwenkt werden, derkanten zum unteren Ende der Sperrvorrichtung wie es in F i g. 4 mit gestrichelten Linien angedeutet 15 geführt werden. Hierbei wird die richtige Füh- 5 ist. Eine Feder 47 und Anschlagmittel 48 arbeiten rung der Zuschnitte durch eine Leiste 27 gewähr- mit dem Rahmenteil 46 zusammen, um dieses in seileistet, die kurz unterhalb des unteren Endes der ner unteren bzw. in seiner oberen Stellung zu halten. Sperrvorrichtung 15 angeordnet ist und die oberen Befindet sich das Rahmenteil 46 in seiner unterenwhich is mounted on the lifting spindles 12 and 13 over bar. The frame part 46 can from his move are first carried out by the belts 26 in FIG. 4 bottom lines reproduced in solid lines supports, by means of which the blanks are pivoted with their pre-position in an upper position, derkanten to the lower end of the locking device as shown in FIG. 4 indicated with dashed lines 15 are performed. Here the correct guiding 5 is. A spring 47 and stop means 48 work tion of the blanks by a bar 27 ensures together with the frame part 46 in order to rop it up, to keep the just below the lower end of the lower or in its upper position. Locking device 15 is arranged and the upper frame part 46 is located in its lower

Stränge der Gurte 26 abstützt. Stellung, erstreckt sich der Gurt 22 vor dem Gurt 20Strands of the belts 26 is supported. Position, the belt 22 extends in front of the belt 20

Die Hubspindeln 12 und 13 dienen dazu, die Zu- io in der in Fig. 1 mit gestrichelten Linien angedeuteschnitte in dem Stapel 14 im Bereich des hinteren ,·<· ten Weise zu einem Punkt der auf einer Linie mit Teils des Stapels zwangläufig nach oben zu bewegen. . einer Anschlagschiene 49 liegt, welche längs der Am vorderen Teil des Stapels 14 bewirkt die Vor- -« · Kartonzuführungsbahn schwingend hin- und herderkante eines neuen, dem unteren Ende des Stapels V bewegt wird, und außerdem ist die Anschlagschiene 14 zugeführten Zuschnitt, daß die darüber liegenden 15 49 so angeordnet, daß sie an den Hinterkanten von Zuschnitte nach oben gedrückt werden. Nieder- Zuschnitten angreifen kann, die mit Hilfe der Hubhalteorgane 28 und 29, die sich von Scharnieren 30 . spindeln 12 und 13 nach oben bewegt werden. Beaus nach vorn erstrecken, dienen dazu, nach unten findet sich das Rahmenteil 46 in seiner oberen Stelwirkende Kräfte auf den Stapel 14 bzw. den Stoß 17 lung, erstreckt sich der Gurt 22 nicht weiter nach aufzubringen, um zu verhindern, daß sich die ver- 20 vorn als der mittlere Gurt 20.
leimten Verbindungsstellen der rohrförmig gefalteten Da die Gurte 21 und 22 in der beschriebenen
The lifting spindles 12 and 13 serve the purpose of moving the sections in the stack 14, indicated in FIG to move. . a stop bar 49 is located, which along at the front part of the stack 14, the advantages effected - "back · carton feed path swinging and Herder edge of a new, the lower end of the stack V is moved, and in addition, the stop rail 14 is fed to cutting that the overlying 15 49 arranged so that they are pressed upwards at the rear edges of blanks. Can attack low blanks, which with the help of the lifting holding members 28 and 29, which are from hinges 30. spindles 12 and 13 are moved upwards. Beaus extend to the front, the frame part 46 is located downwards in its upper position. Forces acting on the stack 14 or the joint 17, if the belt 22 does not extend further to prevent the 20 in front than the middle strap 20.
Glued joints of the tubular folded Since the straps 21 and 22 in the described

Kartons vor dem Erhärten des Leims öffnen. Die Weise verstellt werden können, ist es möglich, die insgesamt mit 32 bezeichneten Mittel zum Ausüben gezeigte Vorrichtung zum Stapeln sowohl sehr kureiner Schubkraft, die den Entnahmemitteln 16 zu- zer als auch sehr langer Zuschnitte zu benutzen, geordnet sind, erfassen periodisch den oberen Teil 25 Wenn sich dagegen die Rahmenteile 46 gemäß des Stapels 14, um jeweils einen Stoß 17 von Zu- F i g. 4 in ihrer unteren Stellung befinden würden, schnitten in der Vorwärtsrichtung zu bewegen. während relativ lange Zuschnitte zugeführt werden,Open cardboard boxes before the glue hardens. The way can be adjusted, it is possible that Device for stacking shown as a whole with 32 designated means for exercising both very short Thrust to use the removal means 16 additional as well as very long blanks, are ordered, periodically capture the upper part 25 If, however, the frame parts 46 according to of the stack 14 in order to each time a pile 17 of supply F i g. 4 would be in their lower position, cut in the forward direction to move. while relatively long blanks are fed,

Am Ende eines Arbeitsgangs zum Herstellen einer so würden die Hubspindeln 12 und 13 jeden Zubestimmten Zahl von Faltschachteln gleicher Art ist schnitt um eine erhebliche Strecke nach oben bees dann, wenn der letzte in die Fördermittel 11 ein- 30 wegen, bevor der betreffende Zuschnitt durch die tretende Zuschnitt dem unteren Ende des Stapels 14 Gurte 21 und 22 freigegeben wird; denn bei der zugeführt worden ist, erforderlich, zusätzliche Mittel unteren Stellung der Rahmenteile 46 erstrecken sich zur Wirkung zu bringen, um das vordere Ende des die Gurte 21 und 22 bis zu einem Punkt, der den Stapels 14 am oberen Ende der Sperrvorrichtung 15 Hubspindeln 12 und 13 sehr nahe benachbart ist. über den vorderen Anschlag 32' hinwegzubewegen. 35 Wegen des relativ kleinen Abstands zwischen den Zu diesem Zweck werden Hebemittel 70 mit der Gurten 21, 22 und den Hubspindeln 12, 13 würde Hand betätigt. jede Aufwärtsbewegung des Zuschnitts durch dieAt the end of an operation to make one like this, the lifting spindles 12 and 13 would each be designated Number of folding boxes of the same type is cut up by a considerable distance then, when the last one in the conveying means 11, before the cut in question by the stepping blank the lower end of the stack 14 straps 21 and 22 is released; because with the has been supplied, additional means lower position of the frame parts 46 extend to bring about the front end of the straps 21 and 22 to a point that the Stack 14 at the upper end of the locking device 15 lifting spindles 12 and 13 is very close. move away over the front stop 32 '. 35 Because of the relatively small distance between the For this purpose, lifting means 70 with belts 21, 22 and lifting spindles 12, 13 are used Hand operated. any upward movement of the blank through the

Vorstehend wurde nur eine verhältnismäßig kurz- Hubspindeln bewirken, daß der Zuschnitt in einem gefaßte Beschreibung der in den Zeichnungen dar- solchen Ausmaß nach oben bewegt würde, daß eine gestellten Vorrichtung gegeben. Weitere Einzelhei- 40 Beschädigung des Zuschnitts eintreten würde. Bei ten bezüglich der Hauptteile der gezeigten Vorrich- der Verarbeitung relativ langer Zuschnitte müssen tung finden sich in dem eingangs erwähnten USA- daher die Rahmenteile 46 nach oben geschwenkt Patent 3 203 561, ferner in den USA-Patenten werden, damit der Abstand zwischen den Gurten 21, 3 063 577 und 2 963 177. Daher beschränkt sich die 22 und den Hubspindeln 12, 13 relativ groß wird, folgende Beschreibung im wesentlichen auf diejeni- 45 so daß der Winkel, um den jeder relativ lange Zügen Elemente, die allein oder in Verbindung mit schnitt nach oben geschwenkt wird, während er noch anderen Elementen Merkmale der vorliegenden von den Gurten 21, 22 erfaßt ist, nicht so groß wird, Erfindung bilden. daß der Zuschnitt beschädigt werden kann. WennAbove was only a relatively short lifting spindles cause the blank in one summarized description that would be moved up in the drawings to such an extent that a given device. Further details would result in 40 damage to the blank. at The processing of relatively long blanks with regard to the main parts of the device shown In the USA mentioned above, the frame parts 46 are pivoted upwards Patent 3,203,561, also in the USA patents, so that the distance between the belts 21, 3 063 577 and 2 963 177. Therefore, the 22 and the lifting spindles 12, 13 is relatively large, The following description essentially focuses on those 45 so that the angle at which each relatively long trains Items that stand alone or in conjunction with cut is pivoted up while still other elements features of the present is captured by the belts 21, 22, is not so large, Form invention. that the blank can be damaged. if

Nachstehend werden zunächst die verstellbaren ein relativ kurzer Zuschnitt verarbeitet wird und Teile der Fördermittel 11 beschrieben. Der Gurt 20, 50 wenn hierbei die Rahmenteile 46 ihre obere Stellung der sich nicht notwendigerweise längs der Mittel- einnehmen, hören die Fördermittel 11 natürlich auf, achse der Vorrichtung zu erstrecken braucht, wird eine zwangläufig wirkende Antriebskraft in der Vorim folgenden aus Gründen der Deutlichkeit als der wärtsrichtung auf den Zuschnitt aufzubringen, und mittlere Gurt bezeichnet. Es sei bemerkt, daß dieser zwar möglicherweise bevor ein solcher kurzer Zumittlere Gurt 20 an seinem vorderen Ende über ein 55 schnitt vollständig von den Hubspindeln 12, 13 Rad 41 läuft, das auf einer Welle 42 angeordnet ist, erfaßt ist, und mit Bestimmtheit, bevor sich der wobei ein erheblicher Abstand zwischen dem vor- Zuschnitt in der Nähe der Sperrenmittel 15 befindet, deren Ende des Gurtes 20 und den Hubspindeln 12 Bei relativ kurzen Zuschnitten ist es somit erforder- und 13 vorhanden ist. lieh, daß die Fördermittel 11 eine zwangläufige An-Below are first the adjustable a relatively short blank is processed and Parts of the funding 11 described. The belt 20, 50 when the frame parts 46 are in their upper position which does not necessarily take along the means, the funds 11 naturally stop, Axis of the device needs to extend, a positive driving force in the Vorim to apply the following to the blank as the downward direction for the sake of clarity, and called middle strap. It should be noted that this may have preceded such a brief intermediate Belt 20 at its front end over a 55 cut completely from the lifting spindles 12, 13 Wheel 41 is running, which is arranged on a shaft 42, is detected, and with certainty before the with a considerable distance between the pre-blank in the vicinity of the locking means 15, whose end of the belt 20 and the lifting spindles 12 For relatively short blanks, it is therefore necessary- and 13 is present. lent that the funding 11 an inevitable

Die Gurte 21 und 22 haben die gleiche Größe und 60 triebskraft aufbringen, bis der betreffende Zuschnitt Form, und sie werden durch gleichartige Bauteile einen Punkt erreicht hat, der den Hubspindeln 12, unterstützt, so daß es genügen dürfte, nur die Lage- 13 sehr nahe benachbart ist.The belts 21 and 22 have the same size and apply 60 driving force until the cut in question Shape, and they are by similar components has reached a point that the lifting spindles 12, supported, so that it should suffice, only the location 13 is very close to one another.

rung des Gurtes 22 zu beschreiben. Gemäß F i g. 4 Die beweglichen Gurte 21 und 22 sind mit un-tion of the belt 22 to describe. According to FIG. 4 The movable belts 21 and 22 are

wird der Gurt 22 längs einer Bahn geführt, die durch abhängigen Verstellmitteln versehen, damit ZuRäder oder Rollen 43, 44 und 45 bestimmt wird. Die 65 schnitte verarbeitet werden können, deren Hinter-Wellen, auf denen die Räder 44 und 45 angeordnet kanten so ausgebildet sind, daß sich eine Seite sind, erstrecken sich von einem beweglichen Rah- erheblich weiter nach hinten erstreckt als die andere menteil 46 aus, das um die Achse der Welle 42 dreh- Seite, wie es z. B. in F i g. 3 für einen Zuschnitt 51the belt 22 is guided along a path, which is provided by dependent adjusting means, so that zuWheels or roles 43, 44 and 45 is determined. The 65 cuts can be processed, their back waves, on which the wheels 44 and 45 are arranged edges are formed so that one side extend from one movable frame- extends considerably further back than the other menteil 46 from which about the axis of the shaft 42 rotating side, as it is, for. B. in Fig. 3 for a blank 51

dargestellt ist, der einen Abschnitt 51 α umfaßt, welcher sich erheblich weiter nach hinten erstreckt als der Abschnitt 51 b. Wenn die beiden Gurte 21 und 22 nur gleichzeitig verstellt werden könnten, würde die einzige Verstellung, bei der der Zuschnitt 51 nicht beschädigt werden kann, darin bestehen, die beiden Gurte 21 und 22 weiter nach oben zu bewegen. Wenn dies geschieht, wird jedoch das Aufbringen einer zwangläufigen Antriebskraft auf den Abschnitt 51 & in einem Zeitpunkt unterbrochen, der erheblich vor dem Zeitpunkt liegt, in welchem das Aufbringen einer zwangläufigen Antriebskraft auf den Abschnitt 51a unterbrochen wird; infolgedessen würde sich der Zuschnitt 51 verlagern, und die Vorrichtung könnte nicht einwandfrei arbeiten.is shown, which comprises a portion 51 α, which extends considerably further back than the portion 51 b. If the two straps 21 and 22 could only be adjusted simultaneously, the only adjustment in which the blank 51 cannot be damaged would be to move the two straps 21 and 22 further upwards. When this happens, however, the application of a positive driving force to the section 51 & is interrupted at a point in time which is well before the point in time when the application of a positive driving force to the section 51a is stopped; as a result, the blank 51 would be displaced and the device could not function properly.

Statt beide Gurte 21 und 22 nach oben zu verstellen, wird beim Beispiel gemäß F i g. 3 der Gurt 22 in seine obere Stellung gebracht, während der Gurt 21 nach unten verstellt wird. Bei dieser Einstellung der Gurte wird der Abschnitt 51 & durch den ao Gurt 21 etwa in gleichem Zeitpunkt freigegeben, in welchem der Abschnitt 51a durch den Gurt 22 freigegeben wird, so daß zwangläufig wirkende Antriebskräfte gleichmäßig auf beide Seitenteile des Zuschnitts 51 aufgebracht werden, bis der Zuschnitt einwandfrei von den Hubspindeln 12 und 13 erfaßt worden ist und die Vorwärtsbewegung des Zuschnitts 51 durch die Sperrenmittel 15 unterbrochen wird.Instead of adjusting both belts 21 and 22 upwards, in the example according to FIG. 3 the strap 22 brought into its upper position while the belt 21 is adjusted downwards. With this setting the belt is the section 51 & released by the ao belt 21 at about the same time, in which the section 51a is released by the belt 22, so that positively acting driving forces be applied evenly to both side parts of the blank 51 until the blank has been properly detected by the lifting spindles 12 and 13 and the forward movement of the The blank 51 is interrupted by the locking means 15.

Claims (4)

Patentansprüche:Patent claims: 1. Fördervorrichtung zur Zuführung von doppellagig gefalteten, verklebten Schlauchstücken in einen Stapelschacht, bei welcher kontinuierlich umlaufende Förderorgane sich zumindest unterseitig bis zu zwei dem Schacht vorgeordneten Hubspindeln erstrecken, dadurch gekennzeichnet, daß das oberseitige Förderorgan (20, 21, 22) in zwei ineinander übergehende Längsabschnitte (20; 21, 22) unterteilt ist, von denen der den Hubspindeln (13) näher liegende Abschnitt (21, 22) aus der Förderebene entfernbar angeordnet ist.1. Conveyor device for feeding double-layered, glued tube pieces in a stacking shaft in which continuously revolving conveying elements are at least on the underside extend up to two lifting spindles upstream of the shaft, characterized in that that the upper-side conveyor element (20, 21, 22) in two merging longitudinal sections (20; 21, 22) is subdivided, of which the section closer to the lifting spindles (13) (21, 22) is arranged removably from the conveying plane. 2. Fördervorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß bei mehreren den Hubspindeln (13) näher liegenden Förderabschnitten (21,22) jeder Förderabschnitt unabhängig von dem anderen entfernbar angeordnet ist.2. Conveying device according to claim 1, characterized in that when several the Lifting spindles (13) closer conveyor sections (21,22) each conveyor section independently of the other is removably arranged. 3. Fördervorrichtung nach Anspruch 1 und/ oder 2, dadurch gekennzeichnet, daß der den Hubspindeln (13) näher liegende Förderorganabschnitt in Form von mit waagerechtem Abstand angeordneten umlaufenden Bändern (21,22) ausgebildet ist.3. Conveyor device according to claim 1 and / or 2, characterized in that the lifting spindles (13) closer to the conveyor element section in the form of horizontally spaced circumferential belts (21, 22) is. 4. Fördervorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß jedes der Bänder (21,22) durch in einem Rahmenteil (46) gelagerte Rollen (43, 44, 45) geführt ist.4. Conveying device according to one of the preceding claims, characterized in that that each of the belts (21, 22) is guided by rollers (43, 44, 45) mounted in a frame part (46) is. Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings
DES107559A 1965-12-27 1966-12-22 Conveyor device for feeding hose pieces into a stacking shaft Pending DE1295991B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US516421A US3409148A (en) 1965-12-27 1965-12-27 Stacking device

Publications (1)

Publication Number Publication Date
DE1295991B true DE1295991B (en) 1969-05-22

Family

ID=24055509

Family Applications (1)

Application Number Title Priority Date Filing Date
DES107559A Pending DE1295991B (en) 1965-12-27 1966-12-22 Conveyor device for feeding hose pieces into a stacking shaft

Country Status (6)

Country Link
US (1) US3409148A (en)
JP (1) JPS496583B1 (en)
DE (1) DE1295991B (en)
FR (1) FR1506706A (en)
GB (2) GB1154392A (en)
NL (1) NL6616408A (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3601265A (en) * 1968-11-27 1971-08-24 S & S Corrugated Paper Mach Blank stacking, straightening and delivery means
US3717265A (en) * 1970-09-10 1973-02-20 Halton City State Bank Method and apparatus for cutting panels
US3706404A (en) * 1970-09-24 1972-12-19 Gerald W Gluckin Stretch fabric watchband
GB2240092B (en) * 1989-12-11 1994-02-16 Autofeeds London Ltd Sheet handling
EP0454206A3 (en) * 1990-04-23 1993-02-24 Industria Grafica Meschi S.R.L. Automatic device for aligning paper-sheets in a package
US5104283A (en) * 1990-06-07 1992-04-14 Brenton Engineering Orbital stacker
US5439344A (en) * 1994-11-04 1995-08-08 Kabushiki Kaisha Ishikawa Seisakusho, Ltd. Corrugated cardboard box counting and discharging device
US6978995B2 (en) * 2001-08-29 2005-12-27 Bowe Bell +Howell Company Apparatus and method for collecting flat and letter units

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1121917B (en) * 1959-05-12 1962-01-11 S & S Corrugated Paper Mach Device for depositing blanks

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1454924A (en) * 1920-08-28 1923-05-15 Newspaper Stuffing Machines Co Newspaper-stacking mechanism
US1819841A (en) * 1926-02-02 1931-08-18 W A Quebbeman Stacking machine
US1957318A (en) * 1933-03-28 1934-05-01 Ames Harris Neville Co Automatic feeder
US2963177A (en) * 1957-03-13 1960-12-06 S & S Corrugated Paper Mach Blank stacking, straightening and delivery device
US2931520A (en) * 1958-11-20 1960-04-05 S & S Corrugated Paper Mach Accumulating and straightening device
US3067885A (en) * 1959-02-24 1962-12-11 Conrad D Kohler Automatic panel feeder
US3063577A (en) * 1959-05-12 1962-11-13 S & S Corrugated Paper Mach Counting means
US3030867A (en) * 1960-01-11 1962-04-24 Maxwell Bros Co Machine for squaring-up carton flats or boots
US3174633A (en) * 1961-01-11 1965-03-23 Charles R Stevens Apparatus for repetitively unstacking blocks of sheet material

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1121917B (en) * 1959-05-12 1962-01-11 S & S Corrugated Paper Mach Device for depositing blanks

Also Published As

Publication number Publication date
FR1506706A (en) 1967-12-22
GB1154392A (en) 1969-06-04
NL6616408A (en) 1967-06-28
JPS496583B1 (en) 1974-02-15
DE1786420B1 (en) 1972-06-29
GB1154391A (en) 1969-06-04
US3409148A (en) 1968-11-05

Similar Documents

Publication Publication Date Title
DE2715487A1 (en) METHOD AND DEVICE FOR UNNACKING OF STACKED CARTONS
DE2125991A1 (en) Method and apparatus for transporting stacked flat objects in succession to a collection
DE3129709A1 (en) MACHINE FOR CLOSING THE UPPER LID FLAPS OF A SQUARE CARDBOARD WITH FOLDING FLAPS
DE2164279A1 (en) Automatic machine for forming cardboard boxes
DE1277140B (en) Device for stacking and transporting flat objects, especially paper towels
DE2754502A1 (en) DEVICE FOR AXIAL TRANSPORTATION OF PIECES OF WOOD THROUGH A PROCESSING STATION
DE3146788A1 (en) MEASURING DEVICE FOR AN INSERTING MACHINE
DE2242993C3 (en) Conveyor belt drive
DE1295991B (en) Conveyor device for feeding hose pieces into a stacking shaft
DE3533758C2 (en)
CH670809A5 (en)
EP1184161B1 (en) Apparatus for erecting boxes from carton blanks
DE102010031668B4 (en) Falt - plant for corrugated webs
CH694504A5 (en) A method for cutting metal sheets to metal strips and cutting device for its implementation.
DE2301172C2 (en) Folding machine
EP0030672B1 (en) Device for stacking folding boxes coming out of a folding box glueing machine
DE3417157C2 (en) Device for overturning and arranging incoming cardboard boxes in several rows on a conveyor
DE3317303A1 (en) Aligning table
EP0753386A1 (en) Apparatus for cutting folded printed products, such as newspapers, magazines, brochures or the like
DE3118308A1 (en) DEVICE FOR SEPARATING A STACK OF FOLDED OR BINDED, MULTI-LEAF PRINTED PRODUCTS
DE2241609C2 (en) Device for continuous longitudinal folding of flexible sheets
DE2534753A1 (en) CARDBOARD MAKING MACHINE
DE19535044B4 (en) Device for disassembling the bundles of sawn timber coming from a sawing machine
DE2150021A1 (en) APPLICATION DEVICE
DE4232530C2 (en) straightening table