DE1281355B - Device for the continuous removal of the material that has been dumped in a pile - Google Patents

Device for the continuous removal of the material that has been dumped in a pile

Info

Publication number
DE1281355B
DE1281355B DEM63095A DEM0063095A DE1281355B DE 1281355 B DE1281355 B DE 1281355B DE M63095 A DEM63095 A DE M63095A DE M0063095 A DEM0063095 A DE M0063095A DE 1281355 B DE1281355 B DE 1281355B
Authority
DE
Germany
Prior art keywords
recording device
heap
speed
bridge girder
embankment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEM63095A
Other languages
German (de)
Inventor
Dr-Ing Hellmuth Kuehn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BWS Technologie GmbH
Original Assignee
Maschinenfabrik Buckau R Wolf AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Buckau R Wolf AG filed Critical Maschinenfabrik Buckau R Wolf AG
Priority to DEM63095A priority Critical patent/DE1281355B/en
Priority to GB4824465A priority patent/GB1094953A/en
Publication of DE1281355B publication Critical patent/DE1281355B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/02Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads
    • B65G65/16Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads with rotary pick-up conveyors
    • B65G65/20Paddle wheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/181Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels including a conveyor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/20Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with tools that only loosen the material, i.e. mill-type wheels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Auxiliary Methods And Devices For Loading And Unloading (AREA)
  • Rollers For Roller Conveyors For Transfer (AREA)

Description

Vorrichtung zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes Die Erfindung betrifft eine Vorrichtung zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes mittels eines auf einem gegen die stirnseitige Böschung der Halde verfahrbaren Brückenträgers quer zur Böschung hin- und herfahrbaren Löse- und Aufnahmegeräte, dessen Lösegerät alle Schichten der Böschung der Höhe nach gleichzeitig erfaßt und dessen Aufnahmegerät, das sich am Böschungsfuß ansammelnde gelöste Gut aufnimmt und an einen im Brückenträger angeordneten Förderer abgibt, wobei die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes entsprechend dem auf seiner Wegstrecke in Abhängigkeit von der unterschiedlichen Böschungshöhe in unterschiedlichen Mengen anfallenden Gut so geregelt wird, daß eine stets gleich große Menge Schüttgut vom Aufnahmegerät aufgenommen wird, wobei eine im Abförderband angeordnete Förderbandwaage die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes regelt.Device for the continuous removal of what has been poured into a dump Good The invention relates to a device for the continuous removal of the Goods poured into a dump by means of a on one against the frontal Embankment of the dump movable bridge girder can be moved back and forth across the embankment Loosening and recording devices, whose loosening device all layers of the slope of the height after captured at the same time and its recording device, which accumulates at the foot of the embankment picks up dissolved material and delivers it to a conveyor arranged in the bridge girder, whereby the driving speed of the release and recording device according to the its route depending on the different embankment heights in different Amounts accumulating good is regulated so that an always the same amount of bulk material is picked up by the recording device, with a conveyor belt scale arranged in the discharge conveyor belt regulates the driving speed of the release and pick-up device.

Bei derartigen bekannten Haldenräumgeräten sollen die zu Halden angeschütteten Schüttgüter kontinuierlich entnommen werden bei einer bestimmten Vergleichmäßigung der Qualität des Schüttgutes. Dabei ist die Regelung der Fahrgeschwindigkeit des Aufnahmegerätes von dem wechselnden Böschungswinkel und der wechselnden Haldenhöhe unabhängig. In such known heap clearing devices, the heaped up to heaps should Bulk goods are continuously removed at a certain leveling the quality of the bulk material. The control of the driving speed is the Recording device of the changing angle of slope and the changing height of the pile independent.

Die Fahrgeschwindigkeit des Aufnahmegerätes kann nur einen bestimmten maximalen Wert annehmen, der in der Größenordnung zwischen 10 und 12 m/min liegt. Es kann nun vorkommen, daß die Steigerung der Fahrgeschwindigkeit des Aufnahmegerätes bis zu diesem Maximalwert nicht ausreicht, um den Fördergutstrom in konstanter Höhe aufrechtzuerhalten. The driving speed of the recording device can only be a certain one assume a maximum value of the order of magnitude between 10 and 12 m / min. It can now happen that the increase in the driving speed of the recording device up to this maximum value is not sufficient to keep the flow of conveyed material at a constant level maintain.

Damit auch bei der größtmöglichen Fahrgeschwindigkeit des Aufnahmegerätes immer eine ausreichende Menge an Schüttgut abgetragen werden kann, wird mit der Erfindung vorgeschlagen, daß bei Erreichen der maximalen Fahrgeschwindigkeit des Aufnahmegerätes und noch ungenügender Menge an Schüttgut die Förderbandwaage zusätzlich die Fahrgeschwindigkeit des Brückenträgers in Richtung zur Haldenachse hin steigert. So even at the highest possible driving speed of the recording device a sufficient amount of bulk material can always be removed with the Invention proposed that when reaching the maximum speed of the Recording device and still insufficient amount of bulk material the conveyor belt scale in addition the traveling speed of the bridge girder increases in the direction of the pile axis.

Zufolge dieser Anordnung wird auch dann, wenn die Halde einseitig aufgebaut ist, z. B., wenn auf der einen Haldenhälfte bedeutend weniger Material liegt als auf der anderen Haldenhälfte, immer ein konstanter Fördergutstrom beim Entladen der Halde aufrechterhalten. As a result of this arrangement, even if the heap is one-sided is constructed, e.g. B. if significantly less material on one half of the pile than on the other half of the heap, there is always a constant flow of conveyed goods Maintain unloading of the heap.

Damit wird das Wesen des Anmeldungsgegenstandes darin gesehen, daß neben der maximalen Geschwindigkeit des Aufnahmegerätes quer zur Halde auch eine Erhöhung der Fahrgeschwindigkeit des Brückenträgers in Richtung der Halde selbst vorgesehen wird. In beiden Fällen wird die Geschwindigkeit von der in dem Abförderband angeordneten Förderbandwaage geregelt. Dabei sind die Antriebe so geregelt, daß der Antrieb zur Regulierung der Fahrgeschwindigkeit des Brückenträgers in Richtung der Halde erst dann in Tätigkeit tritt, wenn die maximale Geschwindigkeit des Aufnahmegerätes erreicht ist. The essence of the subject of the application is thus seen in the fact that in addition to the maximum speed of the recording device across the heap also one Increasing the speed of the bridge girder in the direction of the heap itself is provided. In both cases the speed will be different from that in the discharge conveyor arranged conveyor belt scale. The drives are regulated so that the drive to regulate the travel speed of the bridge girder in the direction the stockpile only comes into operation when the maximum speed of the recording device is reached.

In der Zeichnung ist ein Ausführungsbeispiel schematisch dargestellt, und zwar zeigt A b b. 1 eine Seitenansicht, A b b. 2 eine Draufsicht der Vorrichtung. In the drawing, an embodiment is shown schematically, namely shows A b b. 1 is a side view, A b b. Figure 2 is a plan view of the device.

Längs den Seitenböschungen der Halde 1 sind Schienen 2 und 3 verlagert, auf welchen mittels der Fahrwerke 4 bis 7 ein Tragrahmen 8 für einen mit ihm verbundenen Brückenträger 9 verfahrbar ist, der ein Gitterwerk in Form eines Kastenträgers darstellt und sich parallel zur Stirnböschung der Halde erstreckt. Die Obergurte 10 des Brückenträgers 9 tragen Fahrschienen 11 und 12 für ein verfahrbares Haldenräumgerät. Das Haldenräumgerät besteht im wesentlichen aus einem Unterbau 13 mit den auf den Fahrschienen 11 und 12 verfahrbaren Fahrwerken 14, dem Kugeldrehkranz 15 sowie dem darauf schwenkbar gelagerten Oberbau6. Der Oberbau 16 ist T-förmig und weist an der Seite einen Gegengewichtsausleger mit Gegengewicht 18 und böschungsseitig je einen Vorbau 19 und 20 auf. In dem Vorbau 19 ist ein Schaufelrad 21 gelagert, das das aufgenommene Gut auf ein ansteigendes Zwischenförderband 22 abgibt. Rails 2 and 3 are shifted along the side slopes of heap 1, on which by means of the bogies 4 to 7 a support frame 8 for one connected to it Bridge girder 9 is movable, which represents a latticework in the form of a box girder and extends parallel to the front slope of the heap. The upper chords 10 of the bridge girder 9 support rails 11 and 12 for a mobile heap clearing device. The heap clearance device consists essentially of a substructure 13 with the on the rails 11 and 12 movable trolleys 14, the slewing ring 15 and the pivotable on it supported superstructure 6. The superstructure 16 is T-shaped and has a counterweight boom on the side with counterweight 18 and on the slope side a porch 19 and 20 each. In the stem 19 a paddle wheel 21 is mounted, which the picked up material on a rising Intermediate conveyor belt 22 releases.

Am Vorbau 20 ist eine sich über die Böschung er streckende rotierende Stachelwalze 23 gelagert, die durch den Motor 24 angetrieben wird. Zur Anpassung an die Haldenneigung25 ist die Stachelwalze mittels der Seilwinde 26 und des Seilzuges 27 in ihrer Neigung einstellbar. Die Seilwinde 26 wird durch den Motor 26 a angetrieben. Das von der Stachelwalze 23 gelöste und sich am Fuß der Böschung ansammelnde Gut wird von dem Schaufelrad 21 aufgenommen und von dem ansteigenden Förderband 22 auf einen längs den Fahrschienen 11, 12 angeordneten Bandförderer 28 abgegeben. Für die entgegengesetzte Fahrtrichtung des Räumgerätes wird nach einer 180°-Schwenkung des Oberbaues 16, das von dem Zwischenförderer 22 aufgenommene Gut auf den Bandförderer 29 abgegeben. Die Bandförderer 28 und 29 fördern das aufgenommene Gut quer zur Halde zu den Schütttrichtern 30, 31, unter denen sich das ortsfest angeordnete Förderband32 befindet, welches längs der Halde angeordnet ist.On the stem 20 is a rotating over the slope he is stretching Spiked roller 23, which is driven by the motor 24, is supported. To adapt on the dump slope25 is the spiked roller by means of the winch 26 and the cable 27 adjustable in their inclination. The winch 26 is through the motor 26 a driven. The loosened from the spiked roller 23 and on the foot the embankment accumulating material is picked up by the bucket wheel 21 and by the rising conveyor belt 22 on a along the rails 11, 12 arranged Belt conveyor 28 delivered. For the opposite direction of travel of the clearing device is after a 180 ° pivoting of the superstructure 16, which is from the intermediate conveyor 22 Picked up goods are delivered to the belt conveyor 29. The belt conveyor 28 and 29 promote the material picked up across the heap to the hoppers 30, 31, under which the stationary conveyor belt 32 is located, which is arranged along the heap is.

Zur Steuerung der Fahrgeschwindigkeit des Räumgerätes 21 ist das Zwischenförderband 22 als Förderbandwaage ausgebildet, die über nicht dargestellte Einrichtungen den nicht dargestellten Fahrantrieb des Haldenräumgerätes quer zur Halde steuert. Der Brückenträger 8, 9 kann stetig oder schrittweise gegen die Böschung 25 der Halde 1 verschoben werden, während das Haldenräumgerät in ständig wechselnder Geschwindigkeit parallel zur Böschung automatisch hin- und herfährt. Hat das parallel zur Böschung verfahrbare Haldenräumgerät seine maximale Fahrgeschwindigkeit erreicht und zeigt die Bandwaage 22 eine zu geringe Fördergutmenge an, dann wird über nicht dargestellte Einrichtungen der Brückenträger mit erhöhter Geschwindigkeit gegen die Böschung der Halde gefahren. Dabei kann diese Fahrgeschwindigkeit auch wieder stetig oder schrittweise erfolgen. To control the driving speed of the clearing device 21 is that Intermediate conveyor belt 22 designed as a conveyor belt scale, which is not shown Facilities the drive, not shown, of the heap clearing device transversely to Halde controls. The bridge girder 8, 9 can be steadily or gradually against the embankment 25 of the heap 1 are moved, while the heap clearing device in constantly changing Speed automatically back and forth parallel to the embankment. Has that in parallel The heap clearing device that can be moved to the embankment has reached its maximum driving speed and if the belt scale 22 shows that the amount of material to be conveyed is too low, then no illustrated facilities of the bridge girders at increased speed against drove the embankment of the heap. This driving speed can also be used again be done steadily or gradually.

Der Oberbau 16 ist außer dem Kugeldrehkranz 15 über Rollen 33 an Fahrschienen 34 abgestützt, die an den Außengurten der Tragrahmen 8 angeordnet sind. In addition to the slewing ring 15, the superstructure 16 is connected via rollers 33 Running rails 34 supported, which are arranged on the outer belts of the support frame 8.

Damit das Schaufelrad 21 des Haldenräumgerätes nicht beschädigt wird, fährt das Schaufelrad im mittleren Bereich der Halde bei normalem Betrieb nur mit einer Schnittiefe von ca. 80 O/o und entsprechender Geschwindigkeit, die in der Haldenmitte kleiner und an den Haldenrändern größer ist. Wird der Brückenträger während des Betriebes gegen die Haldenböschung verfahren, so darf das Schaufelrad nur so weit in die Halde hineingefahren werden, daß es im höchsten Falle eine Schnittiefe von ca. 90 O/o aufweist. So that the bucket wheel 21 of the heap clearing device is not damaged, the bucket wheel only moves along in the middle area of the stockpile during normal operation a depth of cut of approx. 80 O / o and the corresponding speed, which in the The center of the pile is smaller and larger at the edges of the pile. Becomes the bridge girder move against the slope of the dump during operation, the bucket wheel may can only be driven so far into the heap that in the highest case there is a cutting depth of about 90%.

Mit dieser 90 O/o-Stellung fährt das Haldenräumgerät mit unterschiedlicher Geschwindigkeit weiter bis zum Haldenrand und wieder zurück, und zwar bis zu der Stellung, an welcher das Haldenräumgerät mit dem Schaufelrad einen zusätzlichen Schritt in die Halde hineingefahren ist. Von hier fährt das Schaufelrad jetzt zur gegenüberliegenden Haldenseite mit einer Schnittiefe von ca. 100 O/o.With this 90 o / o position, the heap clearing device moves with different Speed further to the edge of the dump and back again, up to that Position at which the heap clearing device with the bucket wheel has an additional Step into the heap. From here the paddle wheel now moves to opposite pile side with a depth of cut of approx. 100%.

Bei Umkehr der Fahrtrichtung wird der Brückenträger jedoch nur mit der normalen Schrittweite, nämlich bis zu einer Schnittiefe von 80 O/o für das Schaufelrad gegen die Halde verfahren. Damit hat das Haldenräumgerät jetzt wieder die Möglichkeit, zu der veränderlichen Fahrgeschwindigkeit quer zur Halde den Brückenträger zusätzlich gegen die Halde zu verfahren. When the direction of travel is reversed, however, the bridge girder is only with the normal step size, namely up to a cutting depth of 80 O / o for the paddle wheel proceed against the heap. This means that the stockpile clearing device now has the option again the bridge girder in addition to the variable speed across the heap to proceed against the heap.

Diese Maßnahme soll verhindern, daß der Brückenträger zur Vermeidung von Überlastung des Schaufelrades zurückfahren muß, wenn er wieder an der Stelle angelangt ist, an der er den zusätzlichen Schritt gemacht hat. This measure is intended to prevent the bridge girder to avoid from overloading the paddle wheel must move back when he is back at the point is where he took the extra step.

Der Brückenträger kann aber auch so gesteuert werden, daß er zur Vermeidung von Überlastung des Schaufelrades zurückfährt. Diese Maßnahme soll jedoch möglichst vermieden werden. The bridge girder can also be controlled so that it is used for Avoid overloading the paddle wheel moves back. However, this measure is intended should be avoided if possible.

Claims (2)

Patentansprüche: 1. Vorrichtung zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes mittels eines auf einem gegen die stimseitige Böschung der Halde verfahrbaren Brückenträgers quer zur Böschung hin- und herverfahrbaren Löse- und Aufnahmegerätes, dessen Lösegerät alle Schichten der Böschung der Höhe nach gleichzeitig erfaßt unddessenAufnahmegerät, das sich amBöschungsfuß ansammelnde gelöste Gut aufnimmt und an einen im Brückenträger angeordneten Förderer abgibt, wobei die Fahrgeschwindigkeit des Löse-und Aufnahmegerätes entsprechend dem auf einer Wegstrecke in Abhängigkeit von der unterschiedlichen Böschungshöhe in unterschiedlichen Mengen anfallenden Gut so geregelt wird, daß eine stets gleich große Menge Schüttgut vom Aufnahmegerät aufgenommen wird, wobei eine im Abförderband angeordnete Förderbandwaage die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes regelt, dadurch gekennzeichnet, daß bei Erreichen der maximalen Fahrgeschwindigkeit für das Aufnahmegerät und noch ungenügender Menge an Schüttgut, die im Abförderband (22) angeordnete Förderbandwaage zusätzlich die Fahrgeschwindigkeit des Brückenträgers (8, 9) in Richtung zur Haldenstirnfläche hin steigert. Claims: 1. Device for the continuous removal of the Goods poured into a heap by means of a on one against the front side Embankment of the dump movable bridge girder can be moved back and forth across the embankment Detachment and recording device, its detachment device all layers of the slope of the height after being recorded at the same time and its recording device, which accumulates at the foot of the embankment picks up dissolved material and delivers it to a conveyor arranged in the bridge girder, the speed of the release and recording device corresponding to the a distance depending on the different embankment heights in different Amounts accumulating good is regulated so that an always the same amount of bulk material is picked up by the recording device, with a conveyor belt scale arranged in the discharge conveyor belt regulates the driving speed of the release and pick-up device, characterized in that that when reaching the maximum speed for the recording device and still Insufficient amount of bulk material, the conveyor belt scale arranged in the discharge belt (22) in addition, the travel speed of the bridge girder (8, 9) in the direction of the pile face increases towards. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Erhöhung der Fahrgeschwindigkeit des Brückenträgers gegen die Halde nach Erreichen der maximalen Fahrgeschwindigkeit des Aufnahmegerätes erfolgt. 2. Apparatus according to claim 1, characterized in that the increase the travel speed of the bridge girder against the heap after reaching the maximum Driving speed of the recording device takes place. In Betracht gezogene Druckschriften: Deutsche Auslegeschrift Nr. 1 173 843. Documents considered: German Auslegeschrift No. 1 173 843.
DEM63095A 1964-11-12 1964-11-12 Device for the continuous removal of the material that has been dumped in a pile Pending DE1281355B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DEM63095A DE1281355B (en) 1964-11-12 1964-11-12 Device for the continuous removal of the material that has been dumped in a pile
GB4824465A GB1094953A (en) 1964-11-12 1965-11-12 Improvements in or relating to methods and apparatus for removing loose material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM63095A DE1281355B (en) 1964-11-12 1964-11-12 Device for the continuous removal of the material that has been dumped in a pile

Publications (1)

Publication Number Publication Date
DE1281355B true DE1281355B (en) 1968-10-24

Family

ID=7310670

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM63095A Pending DE1281355B (en) 1964-11-12 1964-11-12 Device for the continuous removal of the material that has been dumped in a pile

Country Status (2)

Country Link
DE (1) DE1281355B (en)
GB (1) GB1094953A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014508696A (en) * 2010-10-14 2014-04-10 ヴァーレ、ソシエダージ、アノニマ Reclaimer equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1173843B (en) * 1962-08-01 1964-07-09 Buckau Wolf Maschf R Device for the continuous removal of the material that has been dumped in a pile

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1173843B (en) * 1962-08-01 1964-07-09 Buckau Wolf Maschf R Device for the continuous removal of the material that has been dumped in a pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014508696A (en) * 2010-10-14 2014-04-10 ヴァーレ、ソシエダージ、アノニマ Reclaimer equipment

Also Published As

Publication number Publication date
GB1094953A (en) 1967-12-13

Similar Documents

Publication Publication Date Title
DE4343148C2 (en) Mobile track bed processing machine
DE2122518B2 (en) Device for storing bulk material in layers parallel to the angle of slope
DE2231268A1 (en) RECOVERY DEVICE FOR ROUND, PREFERABLY CONE-SHAPED BUMPER STACKS
DE1175157B (en) Device for the continuous removal of a heaped heap by means of a heap clearing device that can be moved across the heap
DE1173843B (en) Device for the continuous removal of the material that has been dumped in a pile
DE1281355B (en) Device for the continuous removal of the material that has been dumped in a pile
EP0131589B1 (en) Crushing plant and operation method thereof
DE1281942B (en) Method and device for mixing different bulk material components
DE3519208A1 (en) Bridge device for removing dumps of loose material
DE647298C (en) Overburden conveyor system with a conveyor line formed from several movable conveyors arranged one behind the other
DE3234005C2 (en) Funnel-shaped transfer device for chargers
DE813374C (en) Storage arrangement with loading and unloading system
DE505153C (en) Overburden conveyor
DE486169C (en) Offset machine, consisting of two conveyor belts, each driven by a motor, discharging onto each other
DE2822732C2 (en)
DE550616C (en) Stripping device for the simultaneous clogging of high and low heaps in opencast mining by means of a device that can be moved on a middle platform
DE688117C (en) Device for filling rectangular basins with clay or the like.
DD154352A5 (en) BOESCHUNGSBRUECKE
DE1756048C (en) Method for the mixing discharge of bulk material stored in elongated heaps roof-shaped in layers one on top of the other
DE446111C (en) Device for clearing the masses lying between the sleepers of track systems
DE1232073B (en) System for the removal of debris
DE1929868A1 (en) Removal scratches
DE1912420A1 (en) Storage device for waste dumps
DE2519825C3 (en) Driving machine for tunneling and the like
DE570221C (en) Device for leveling the embankments of channels or the like.