DE1246227B - Press line for the production of chipboard - Google Patents

Press line for the production of chipboard

Info

Publication number
DE1246227B
DE1246227B DEG28641A DEG0028641A DE1246227B DE 1246227 B DE1246227 B DE 1246227B DE G28641 A DEG28641 A DE G28641A DE G0028641 A DEG0028641 A DE G0028641A DE 1246227 B DE1246227 B DE 1246227B
Authority
DE
Germany
Prior art keywords
press
return path
chipboard
press line
document
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEG28641A
Other languages
German (de)
Inventor
Horst Gerlach
Gerhard Schlipphak
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HORST GERLACH FA
Original Assignee
HORST GERLACH FA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HORST GERLACH FA filed Critical HORST GERLACH FA
Priority to DEG28641A priority Critical patent/DE1246227B/en
Priority to AT842760A priority patent/AT240034B/en
Priority to CH1296160A priority patent/CH402611A/en
Priority to GB4190460A priority patent/GB925799A/en
Priority to BE616007A priority patent/BE616007Q/en
Publication of DE1246227B publication Critical patent/DE1246227B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N3/00Manufacture of substantially flat articles, e.g. boards, from particles or fibres
    • B27N3/08Moulding or pressing
    • B27N3/20Moulding or pressing characterised by using platen-presses
    • B27N3/22Charging or discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N3/00Manufacture of substantially flat articles, e.g. boards, from particles or fibres
    • B27N3/08Moulding or pressing
    • B27N3/20Moulding or pressing characterised by using platen-presses

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Veneer Processing And Manufacture Of Plywood (AREA)

Description

BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY

DEUTSCHESGERMAN

PATENTAMTPATENT OFFICE

AUSLEGESCHRIFTEDITORIAL

Int. CL:Int. CL:

Nummer:
Aktenzeichen:
Anmeldetag:
Auslegetag:
Number:
File number:
Registration date:
Display day:

B29jB29j

Deutsche KL: 39 a7-5/04 German KL: 39 a7-5 /04

1246 227
G 286411 c/39 a7
19. Dezember 1959
3. August 1967
1246 227
G 286411 c / 39 a7
December 19, 1959
3rd August 1967

Die Erfindung bezieht sich auf eine Preßstraße zur Herstellung von Holzspanplatten, in der im Kreislauf wandernde Unterlagsbleche mit dem Spankuchen belegt werden, zur Speicherung in eine Pressenbeschickungsvorrichtung wandern und über diese der Presse zugeführt werden, danach über eine Pressenentleerungsvorrichtung wieder in den Förderkreislauf gelangen,' um nach Trennung von der fertiggepreßten Spanplatte und Kühlung wieder mit einem neuen Spankuchen belegt zu werden.The invention relates to a press line for the production of chipboard, in the circuit moving shims are covered with the chip cake, for storage in a press loading device migrate and are fed to the press via this, then via a press emptying device get back into the conveyor circuit, 'to after separation from the finished pressed chipboard and cooling again with a new chip cake to be occupied.

In Preßstraßen zum Vorpressen plattenförmiger Güter auf Unterlagsblechen laufen Bleche, mehr oder weniger automatisch in einem Kreislauf, wobei die einzelnen Bearbeitungsstationen durchfahren werden. So werden z. B. die Bleche mit dem Spankuchen belegt, wandern dann zur Speicherang in eine Pressenbeschickungsvorrichtung und werden nach dem Füllen der Pressenbeschiclcungsvorrichtung, das etwa zeitlich dem Fertigstellen einer Pressung entspricht, durch einen Einschubarm hi die Presse geschoben, zo aus der gleichzeitig die Unterlagsbleche mit den fertigen Spanplatten herausgezogen werden. Die Bleche in der Pressenentleerungsvorrichtung wiederum wandern, falls die Spanplatten nicht von Hand abgenommen werden, in eine danach angeordnete Trennstation, durchlaufen dann leer eine Kühlvorrichtung oder werden in Transportwagen gestellt, wo sie zur Kühlung verbleiben, um dann zum Ausgangspunkt des Kreislaufes wieder zurückzukehren. Bei automatischen Preßstraßen werden die Bleche nach dem Trennen der Preßlinge auf einer neben der Preßstraße befindlichen Förderbahn in entgegengesetzter Richtung wieder zurückgeführt, werden am Ende dieser Förderbahn durch seitliche Förderung wiederum auf die Belegebahn verbracht, um dann den Kreislauf von neuem zu beginnen.In press lines for pre-pressing plate-shaped Goods on production sheets run sheets, more or less automatically in a cycle, whereby the individual processing stations are passed through. So z. B. the sheets are covered with the chip cake, then migrate to a press feeder to the Speicherang and after filling the press loading device, which is about corresponds in time to the completion of a pressing, pushed the press by an insert arm hi, zo from which the shims with the finished chipboard are pulled out at the same time. the In turn, sheets in the press emptying device move if the chipboard is not made by hand are removed, in a separation station arranged afterwards, then pass through a cooling device empty or are placed in trolleys, where they remain for cooling, and then to the starting point return to the cycle. In automatic press lines, the sheets are after the separation of the compacts on a conveyor track located next to the press line in the opposite direction Direction returned again, are at the end of this conveyor track by lateral conveyance again placed on the conveyor belt, in order to then start the cycle all over again.

Diese bekannten Preßstraßen haben den Nachteil eines verhältnismäßig großen Raumbedarfs, der praktisch etwa die doppelte Fläche des normalen Bedarfs für die Bahn von der Belegstation bis zur Trennstation ausmacht, wobei zusätzlich noch ausreichend Platz vorzusehen ist, um zwischen den hin- und rückführenden Förderbahnen durchgehen zu können, um Reparaturen durchzuführen oder Überwachungsgänge auszuführen.These known press lines have the disadvantage of a relatively large space requirement, the practically about twice the area of the normal requirement for the train from the station to the Separating station, with sufficient space to be provided between the rear and return conveyor tracks to carry out repairs or monitoring corridors to execute.

Es ist ein Ziel der Erfindung, den erforderlichen Platzbedarf auf etwa die Hälfte zu reduzieren und gleichzeitig den Trennvorgang und die dazu erforderliche Vorrichtung wesentlich zu vereinfachen, so daß neben der Platzersparnis, die besonders bei Einbau in bereits vorhandene Gebäude wesentlich ist, auch eine erhebliche Kostensenkung bei der Erstellung Preßstraße zur Herstellung von SpanplattenIt is an object of the invention to reduce the required space to about half and Simultaneously to simplify the separation process and the necessary device significantly, so that in addition to the space saving, which is particularly important when installing in existing buildings, too a significant cost reduction in the creation of a press line for the production of chipboard

Anmelder:Applicant:

Fa. Horst Gerlach, München 2, Brienner Str. 44Horst Gerlach, Munich 2, Brienner Str. 44

Als Erfinder benannt:Named as inventor:

Horst Gerlach, München-Solln;
Gerhard Schlipphak, München
Horst Gerlach, Munich-Solln;
Gerhard Schlipphak, Munich

derartiger Preßstraßen möglich ist. Außerdem soll auch die Uberwachbarkeit der Preßstraße im Vergleich zu bisher üblichen Preßstraßen vereinfacht werden.such press lines is possible. In addition, the monitorability of the press line should also be compared to be simplified to previously common press lines.

Diese Ziele werden erreicht, wenn sich erfindungsgemäß die Kühleinrichtung unterhalb der Presse bzw. zwischen deren Rahmenständern befindet und wenn in demselben Raum unmittelbar oberhalb der Kühlehirichrung in einer dritten Wirkungsebene eine Vorrichtung zum Trennen der Spanplatten von den noch in der Entleerungsvorrichtung befindlichen heißen Unterlagsblechen angeordnet ist. Die Rückführbahn kann bei dieser Anordnung' vorteilhaft sowohl in der Ebene der Belegebahn liegen, als auch in anderen Fällen unter dieser hindurchgeführt werden, um an deren Ende durch eine Hebevorrichtung in die gleiche Ebene befördert zu werden.These goals are achieved when according to the invention the cooling device is located below the press or between its frame stands and if in the same room immediately above the cooling direction in a third level of action one Device for separating the chipboard from those still in the emptying device hot shims is arranged. In this arrangement, the return path can be both advantageous lie in the level of the occupancy path, as well as in other cases are passed under it, in order to be transported to the same level at the end by a lifting device.

Tm ersten Fall ergibt sich ein Kreislauf der Bleche im Bereich zwischen Beschickung, Presse, Entleerung, Kühlung und Rückforderung bis in den Bereich der Beschickung, während das Blech unter der Belegevorrichtung eine Hm- und Herbewegung ausführt. Im zweiten Fall ergibt sich ein durchgehender Kreislauf, in den Beschickungsvorrichtung, Presse, Entleerungsvorrichtung, Kühlstation, Rückführbahn, Hebevorrichtung und Belegestation einbezogen sind.In the first case there is a cycle of the sheets in the area between loading, press, emptying, Cooling and recovery up to the loading area, while the sheet metal is under the loading device performs a humming-and-fro movement. In the second case the result is a continuous one Circuit, in the loading device, press, emptying device, cooling station, return line, Lifting device and loading station are included.

Die Beschickungs- und Entleerungsvorrichtung sind zweckmäßig bei der neuen Preßstraße so ausgeführt, daß ihre einzelnen Etagen in abgesenktem Zustand, eng aufeinanderliegen, während sie in angehobenem Zustand im Abstand von jeweils einer Etagenhöhe der Presse hängen. Die unter diesen Vorrichtungen hindurchgeführte Rückführbahn kann dabei, um den Blechen genügend Auflage im Bereich der Vorrichtungen zu geben, am besten dreiläufig ausgeführt sein. Im Bereich von Beschickungs- und Entleerungsvorrichtung würden dabei die beiden äußeren Läufe durch auf Säulen angeordnete Walzen gebildet sein,, während der mittlere Lauf in bekannterThe loading and unloading devices are expediently designed in the new press line so that that their individual floors lie close together in the lowered position, while they are in the raised position State at a distance of one level of the press. The one among these Devices guided through the return path can provide enough support in the area around the metal sheets To give the devices, it is best to have three courses. In the area of loading and The two outer runs would be emptied by rollers arranged on columns be formed, during the middle run in well-known

709 619/543709 619/543

3 * 43 * 4

Weise aus einem angetriebenen Riemen, einer Kette bleches liegt die Rückführebene über der Belegemit Gummipuffern od. dgl. besteht. Andere den bahn. Da die Rückführbahn in diesem übergreifengleichen Zweck erfüllende Fördereinrichtungen kön- den Bereich absenkbar ausgeführt ist, gibt sie durchWay from a driven belt, a chain plate, the return plane lies above the document Rubber buffers or the like. Others take the train. Since the return path in this overlap the same Purpose-fulfilling conveyor systems can be designed to be lowerable, she says

nen ebenfalls verwendet werden. ihr Absenken das leere Unterlagsblech an die nun-can also be used. lowering the empty shim to the now

Für die Ausführung der neuen Preßstraße ist es 5 mehr höhere Belegebahn ab, die das Blech einer er-For the execution of the new press line it is 5 more higher document web from which the sheet metal of a

dem Prinzip nach gleichgültig, ob die Presse selbst neuten Belegung in Hin- und Hergang, sei es mitIn principle, it does not matter whether the press itself has a new assignment to and fro, be it with

ein- oder mehretagig ausgeführt ist. Die Etagenzahl beleimten Furnieren, Spangut od. dgl., zuführt,is carried out on one or more floors. The number of floors glued veneers, chips or the like, supplies,

der Pressenbeschickungs- und Entleerungsvorrich- Sofern sich Rückführbahn und Belegebahn in derthe press loading and emptying device, provided that the return path and receipt path are in the

rung entspricht, wie bekannt, jeweils der Etagenzahl gleichen Ebene befinden, ist auch eine andere Aus-As is known, the number of floors on the same level is the same, a different layout is also

der Presse, d. h., es erfolgt eine Speicherung von so io führungsform möglich, bei der sich die Bahnen nichtthe press, d. That is, there is a storage of so io management form possible in which the paths are not

vielen belegten Blechen, wie die Presse Etagen hat. übergreifen. Hier reicht die Rückführbahn von dermany occupied sheets, like the press has floors. overlap. Here the return path extends from the

Handelt es sich um eine Einetagenanlage, so ist es Entleerungsvorrichtung bis zur Kühlvorrichtung, möglich, das Abschieben der Spanplatte vom Unter- während danach, d. h., unter der Beschickungsvorlagsblech mit dem Entleerungsarm auszuführen, nach- richtung, die Belegebahn beginnt. Die Übergabe des dem dieser das Blech mit der fertigen Spanplatte aus 15 leeren Bleches erfolgt direkt von einer Bahn auf die der Presse herausgezogen hat. Um die Spanplatte andere, dadurch, daß beide Bahnen durch eine lösabzuschieben, wird hierbei die Etage derEntleerungs- bare Kupplung miteinander verbunden werden könvorrichtung so abgesenkt, daß der Entleerungsann nen, so daß in der Übergabephase Rückführbahn über sie hinweg wiederum auf die Presse zufahren und Belegebahn in der gleichen Richtung laufen, bis kann. Die Bewegung des Entleerungsarmes führt je- 20 das leere Unterlagsblech sich völlig auf der Belegedoch nicht ganz so weit zurück wie beim Ent- bahn befindet. Die Belegung des Bleches im Hinleerungsvorgang, sondern wird beendet, bevor die und Hergang kann beginnen, wobei vor der Rich-Ausziehorgane des Entleerungsarmes mit dem in der tungsänderung des Belegetransportes die Kupplung Presse befindlichen Blech in Berührung kommen. zwischen Rückführbahn und Belegebahn gelöst wird. Der Entleerungsarm weist in diesem Fall an seinem 25 Die Belegebahn bleibt also in entgegengesetzter Richunteren Ende ein bewegliches Verlängerungsstück rung in Bewegung, während die Rückführbahn, mit einem Rädchen auf, das bei der Bewegung des welche mittlerweile ein heißes leeres Blech in die Entleerungsarmes über die Platte hinweg durch seine Kühlvorrichtung gefahren hat, vorübergehend stehengelenkige Lagerung ausweicht und beim Zurück- bleibt.If it is a single-floor system, it is a draining device up to the cooling device, possible to push the chipboard from the bottom while afterwards, d. i.e., under the loading plate to be carried out with the emptying arm, message, the document path begins. The handover of the which this the sheet with the finished chipboard from 15 empty sheets takes place directly from a track to the pulled out of the press. To remove the chipboard from the other, by releasing both strips, the level of the emptying coupling can be connected to one another lowered so that the Entleerungsann NEN, so that in the transfer phase return path Drive over them again towards the press and run the slip web in the same direction until can. The movement of the emptying arm guides the empty base plate completely on the receipt not quite as far back as it was at the debut. The occupancy of the sheet in the emptying process, but is ended before the and the process can begin, taking in front of the rich pulling organs of the emptying arm with the coupling in the change of the line of the document transport Come into contact with the sheet metal in the press. is released between the return path and the receipt path. In this case, the emptying arm points at its 25. The document path therefore remains in the opposite direction End of a movable extension piece in motion, while the return path, with a cog that moves a hot empty tray into the Emptying arm has moved across the plate through its cooling device, temporarily standing articulated Storage evades and stays behind.

gleiten über diese hinwegrollt. In der Ausgangs- 30 Die Rückführbahn kann auch unter der Belegestellung für den Trennvorgang kehrt dieses Ver- bahn hindurchgeführt werden. Die auf ihr fortbeweglängerungsstück wieder in seine normale Lage zu- ten, die Kühlvorrichtung durchlaufenden Unterlagsrück. Es steht hierbei über dem Unterlagsblech, hat bleche wandern an deren Ende auf eine Hebevorrichjedoch von diesem einen so geringen Abstand, daß rung, welche die Bleche einzeln auf die Höhe der es bei der nunmehr beginnenden Trennbewegung des 35 Belegebahn anhebt, die sich bei dieser Ausführung Auszugarmes die Spanplatte zu erfassen und vom der neuen Preßstraße nur in einer Richtung bewegt, Unterlagsblech abzuschieben vermag. so daß die Bleche im kontinuierlichen Durchlauf be-slide over this rolled away. In the output 30 The return path can also be placed under the document this path is reversed for the separation process. The one on your locomotive extension piece back to its normal position, the back of the underlay running through the cooling device. It stands above the support plate, but has plates move onto a lifting device at the end from this such a small distance that tion, which the sheets individually to the height of the it lifts when the separating movement of the 35 document web is now beginning, which is different in this version The pull-out arm to grasp the chipboard and move it only in one direction from the new press line, Able to push off the washer. so that the sheets are

Bei Anlagen mit mehreren Etagen erfolgt die legt werden.In the case of systems with several floors, the lays are carried out.

Trennung der Spanplatte vom Unterlagsblech mittels Einige beispielsweise Ausführungsformen der ereiner gesonderten Vorrichtung, z. B. eines unterhalb 40 findungsgemäßen Preßstraße sind in den Zeichnundes Preßbereiches angeordneten Ausschubstempels, gen veranschaulicht. Es zeigt
auf dessen Höhe die zu trennende Spanplatte in der Fig. 1 das Schema einer Einetagenanlage mit Be-Entleerungsvorrichtung abgesenkt wird. Der Aus- legung im Hin-und Herlauf mit übergreifender Rückschubstempel stößt dabei auf die Stirnseite des Preß- führ- und Belegebahn,
Separation of the chipboard from the shim by means of some, for example, embodiments of the separate device, e.g. B. a below 40 inventive press line are arranged in the drawing press area push-out punch, gene illustrated. It shows
at the height of which the chipboard to be separated is lowered in FIG. The design in the back and forth run with overlapping return plunger hits the front side of the press guide and document path,

lings und gleitet beim Abschieben über das Unter- 45 Fig. 2 das Schema einer Preßstraße mit einerlings and slides when pushing over the bottom 45 Fig. 2 the scheme of a press line with a

lagsblech hinweg. Prinzipiell kann dieser Trennvor- Dreietagenpresse und lösbarer Kupplung zwischenwasher away. In principle, this separating three-day press and releasable coupling between

gang in jeder beliebigen Höhe vorgenommen werden. Rückführ- und Belegebahn,can be made at any height. Return and receipt track,

Für automatische Anlagen ist es jedoch von Vorteil, F i g. 3 eine Mehretagenanlage mit unter der Bedie Bewegungen zwischen der obersten Stellung der legebahn durchgeführter Rückführbahn.
Entleerungsvorrichtung und der Höhe der Rückführ- 5° In der in F i g. 1 schematisch dargestellten Einbahn streckenmäßig so einzustellen, daß sie die etagenanlage befindet sich ein Unterlagsblech 10 auf Etagenhöhe der Presse oder deren Vielfaches aus- der Belegebahn 1, die es in diesem Moment nach machen. Der getrennte Preßling wird entweder an rechts fördert, wobei es durch die Belegevorricheinen Ablagetisch abgegeben, ohne daß besondere rung 2 mit beleimtem Spangut 11 zur Herstellung Vorkehrungen zu Hilfe gezogen werden, oder die 55 von Spanplatten bestreut wird. Ist das Unterlagsblech Trennvorrichtung befördert ihn in das Fördermittel 10 in der rechten Endstellung der Belegebahn 1 aneiner nachfolgenden Bearbeitungsmaschine oder gekommen, so wird deren Bewegungsrichtung umzweckmäßig in Förder- oder Einzugswalzen. gekehrt und das nunmehr nach links wandernde
For automatic systems, however, it is advantageous to use FIG. 3 a multi-level system with a return path carried out under the control of movements between the uppermost position of the laying path.
Emptying device and the height of the return 5 ° In the in F i g. 1, the one-way system shown schematically in such a way that it has the floor system, there is a shim 10 at floor level of the press or a multiple of it from the document track 1, which at this point make it after. The separated compact is either promoted to the right, where it is delivered through the depositing device, a storage table without special tion 2 with glued chip material 11 to help with the production, or the 55 is sprinkled with chipboard. If the support plate separating device is conveyed to the conveyor 10 in the right end position of the document web 1 on a subsequent processing machine or has come, then its direction of movement is expedient in conveyor or intake rollers. swept and the now wandering to the left

Das von dem Preßling befreite Blech gelangt durch Unterlagsblech 10 in einem zweiten Durchgang mit Absenken der Entleerungsvorrichtung schließlich auf 60 einer weiteren Spangutlage zur vollen Ausgangshöhe die Rückführbahn und wird von dieser durch die bestreut. Die Etage 4 der Beschickungsvorrichtung 3 Kühlvorrichtung geschleust. Befindet sich die Rück- ist in vorgeschobenem Zustand dargestellt. In ihr beführbahn in der Ebene der Belegebahn, so erfolgt die findet sich ein Blech 10 mit einem zum Pressen vorÜbergabe des leeren Unterlagsbleches entweder in bereiteten Spankuchen 11. Die Presse 6 ist geöffnet, einem Bereich, zweckmäßig unter der Beschickungs- 65 In ihr liegt auf einem Unterlagsblech 10 eine fertig vorrichtung, wo die getrennt angetriebene Rückführ- ausgehärtete Spanplatte 11'. Der Auszugsarm 5' der bahn und die Belegebahn einander um Blechlänge Entleerungsvorrichtung ist in seiner Auszugsstellung übergreifen. Beim Abtransport des leeren Unterlage- dargestellt, d. h., er steht mit dem Unterlagsblech 10The sheet metal freed from the compact passes through the shim 10 in a second pass Finally, lower the emptying device to 60 another layer of chips to the full starting height the return path and is sprinkled by this through the. The floor 4 of the loading device 3 Cooling device funneled. The rear is shown in the advanced state. In her transport lane In the level of the document path, there is a sheet metal 10 with a vorÜberabe for pressing of the empty production sheet either in prepared chip cake 11. The press 6 is open, an area, expediently under the loading 65 device where the separately driven return hardened chipboard 11 '. The extension arm 5 'of the track and the document track each other by the sheet length emptying device is in its extended position overlap. When the empty document is transported away, i. i.e., it is standing with the shim 10

5 65 6

in der Presse im Eingriff, um dieses aus der Presse 6 ein aus der Trennvorrichtung 15 nach links wandernin die Etage 4' der Entleerungsvorrichtung 3' zu der Trennstempel 16 die Spanplatte von dem Unterziehen, wobei gleichzeitig der Einschubarm 5 der lagsblech nach links ab, so daß sie auf die Förder-Beschickungsvomchtung 3 das in dieser befindliche vorrichtung YIa der Formatsäge 17 gelangt, welche Unterlagsblech 10 in die Presse einschiebt. Das im 5 ihn vierseitig besäumt und dann nach links abgibt. Anschluß an diesen Vorgang in der Entleerungs- Um die nächste Spanplatte vom Unterlagsblech zu vorrichtung 3' befindliche Blech mit dem fertigen trennen, werden die Etagen der Entleerungsvorrich-Preßling wird anschließend auf Trennhöhe abge- tang 3' wiederum um eine Etagenhöhe abgesenkt, so senkt. Diese Stellung ist in F i g. 1 durch die ge- daß der vorher in seine ursprüngliche Lage verstrichelte Etage 4 α dargestellt. In dieser Stellung der io brachte Trennstempel 16 wiederum eine Spanplatte Etage vermag der dann links befindliche Auszugs- trennen kann. Zweckmäßig ist bei dieser automatiarm 5', von links nach rechts zu wandern, wobei je- sehen Funktion der Trennstempel 16 so verriegelt, doch die Bewegungsrichtung gewendet wird, bevor daß er nur eine Platte nach links schieben kann, der Arm 5' die Auszugsstellung erreicht hat, so daß wenn die Formatsäge 17 frei ist. Die leeren Unterder Auszugsarm da die Spanplatte 11' fassen und 15 lagsbleche werden durch die Entleerungsvorrichtung nach links vom Unterlagsblech abschieben kann. auf die Rückführbahn 12 abgegeben und in diein the press engaged to this from the press 6 on from the separating device 15 to the left in the floor 4 'of the emptying device 3' to the separating punch 16 the chipboard from the underpinning, while at the same time the push-in arm 5 of the liner to the left, so that it arrives at the conveyor-loading device 3 which is located in this device YIa of the sizing saw 17, which pushes the shim 10 into the press. The 5 trimmed it on four sides and then gives it to the left. Following this process in the emptying To separate the next chipboard from the backing plate to device 3 'with the finished sheet, the levels of the emptying device compact is then cut off at the cutting height 3' again lowered by one level, so lowers. This position is shown in FIG. 1 by the fact that the floor 4 α, previously dashed into its original position, is represented. In this position of the io, the separating punch 16 once again brought a chipboard level which can then separate the pull-out located on the left. It is expedient in this automatic arm 5 'to move from left to right, whereby the separating punch 16 is locked for each function, but the direction of movement is reversed before it can only push one plate to the left, the arm 5' reaches the extended position has so that when the format saw 17 is free. The empty lower extension arm as the chipboard 11 'and 15 support sheets will be able to slide off the support sheet to the left through the emptying device. released on the return path 12 and into the

In diesem Beispiel wird der Preßling während des Kühlstation 13 gebracht. Die Rückführbahn 12 undIn this example, the compact is brought during the cooling station 13. The return path 12 and

Trennvorganges durch die in der gleichen Geschwin- die Belegebahn 1 sind bei dieser AusführungsformSeparation process by the document web 1 in the same speed are in this embodiment

digkeit laufenden angetriebenen Übergabewalzen 7 getrennt ausgeführt und lediglich durch eine lösbarerunning driven transfer rollers 7 running separately and only by a detachable one

gefaßt, die ihn zur Stapelung auf den Stapel 11" 20 Kupplung 18 miteinander verbunden. Angetrieben isttaken, which connects it to one another for stacking on the stack 11 "20 coupling 18. Is driven

weitergeben. zweckmäßig die Belegebahn 1. Die Kupplung bleibtpass on. appropriately the document path 1. The clutch remains

Die Etage 4' ist mittlerweile so weit nach unten so lange zum indirekten Antrieb der Rückführbahn 12 gefahren, daß das nunmehr leere Unterlagsblech 10 angetrieben, solange sich die Belegebahn 1 in Rechtsauf die Rückführbahn 12 aufgesetzt ist, die das bewegung befindet. Bei Umkehrung ihrer Bewegungs-Unterlagsblech 10 nach rechts in die hier mit Luft 25 richtung wird die Kupplung gelöst, so daß die Rückbetriebene Kühlstation 13 einfährt, wo es eine ge- führbahn 12 mit dem in der Kühlstation befindlichen wisse Zeit verbleibt und der Frischluft ausgesetzt ist, Unterlagsblech 10 stillsteht.The floor 4 'is now so far down, so long for the indirect drive of the return path 12 driven that the now empty shim 10 driven as long as the document web 1 is in the right the return path 12 is attached, which is the movement. When reversing their movement washer 10 to the right in the direction here with air 25, the clutch is released, so that the reverse driven Cooling station 13 enters where there is a guideway 12 with the one in the cooling station A certain amount of time remains and is exposed to fresh air, the shim 10 is stationary.

die durch den Ventilator 14 eingebracht wird. Das F i g. 3 stellt eine Preßstraße für eine Achtetagenleere Unterlagsblech 10 hat also die Entleerungsvor- presse dar. Die Belegevorrichtung 2' ist aus mehreren richtung 3' im entgegengesetzten Sinn zu ihrem Ein-' 30 Blechen zusammengesetzt, unter denen sich die Befahren wieder verlassen. Die Kühlvorrichtung 13 ist legebahn 1' in dieser Ausführungsform nur in einem direkt unter der Presse 6 eingebaut. Unter der Be- Richtungssinn, nämlich nach links, bewegt. Das schickungsvorrichtang 3 übergreifen die'Rückführ- Speichern der Unterlagsbleche 10 mit Spankuchen erbahn 12 und die Belegebahn 1 einander. Dieses ist folgt in bekannter Weise, wie dies bei F i g. 2 bereits in F i g. 1 in einer Stellung veranschaulicht, in der die 35 beschrieben ist. Die Anlage wird in einer Stellung absenkbare Rückführbahn 12 in ihrer oberen Stel- gezeigt, bei der die letzte Etage der Beschickungslung gezeigt ist. Sie ist so in der Lage, ein von links vorrichtung 3 in Höhe der Belegebahn steht, um kommendes Unterlagsblech 10 über die Belegebahn nach Einfahren des letzten Unterlagsbleches in Bezu f aliren. Dann wird sie in die gestrichelt dargestellte schickstellung angehoben zu werden. Die letzte Etage Lage 12' abgesenkt. Dabei sinkt sie unter das Niveau 40 der Entleerungsvorrichtung 3' befindet sich gerade in der Belegebann 1, die somit das Unterlagsblech ab- Höhe der Trennvorrichtung 15, deren Stempel 16 fängt und einem neuen Belegevorgang durch Rechts- eine Spanplatte 11' trennt und in die Formatsäge 17 bewegung zuführt, wie dieses im Anfang beschrieben mit Hufe von Übergabewalzen 7 einbringt. Deutlichwurde. Die Rückführbahn bleibt so lange in der keitshalber sind die Etagen der Presse 6, die an sich Stellung 12' abgesenkt, bis das bestreute Unterlags- 45 in diesem Stadium noch geschlossen sind, bereits geblech 10 die Belegestation wieder verlassen hat und öffnet dargestellt. Die Rückführbahn 12" ist bei diedurch die Etage 4 der Beschickungsvorrichtung 3 in ser Preßstraße, ausgehend von der Entleerungsvor-Beschickstellung gebracht wurde. richtung 3' unter Presse, Beschickungsvorrichtungwhich is introduced by the fan 14. The F i g. 3 represents a press line for an eight-day vacancy The support plate 10 thus has the emptying pre-press. The covering device 2 'is made up of several direction 3 'in the opposite sense to their one' 30 sheets assembled, under which the driving leave again. The cooling device 13 is laying web 1 'in this embodiment only in one installed directly under the press 6. Moved under the sense of direction, namely to the left. That Schickungsvorrichtang 3 overlap die'Rückführ- storages of the shims 10 with chip cakes 12 and the document path 1 each other. This follows in a known manner, as shown in FIG. 2 already in Fig. Fig. 1 illustrates in a position in which Fig. 35 is described. The plant is in one position Lowerable return path 12 is shown in its upper position, in which the last floor of the loading is shown. She is able to a device from the left 3 in the amount of the document path is to incoming shim 10 over the document path after the last shim in Bezu has moved in fail. Then it will be lifted into the dispatch position shown in dashed lines. The last floor Lowered position 12 '. It sinks below the level 40 of the emptying device 3 'is currently in the document bann 1, which thus the base plate from the height of the separating device 15, the stamp 16 and a new covering process by right-hand a chipboard 11 'separates and into the format saw 17 feeds movement, as described at the beginning with hooves from transfer rollers 7 brings in. Became clear. The return path remains so long in the keitshalber are the floors of the press 6, which per se Position 12 'lowered until the sprinkled underlay 45 is still closed at this stage, already sheet metal 10 has left the loading station and opens. The return path 12 "is through the floor 4 of the loading device 3 in water press line, starting from the emptying pre-loading position was brought. direction 3 'under press, loading device

Die Arbeitsweise der in F i g. 2 dargestellten Drei- und Belegebahn 1' hindurchgeführt. Am Ende der etagenanlage entspricht im Prinzip der vorbeschrie- 50 Rückführbahn 12" (rechts) wird das leere Unterlagsbenen Preßstraße. Sie unterscheidet sich von dieser blech auf eine Hebevorrichtung 19 abgegeben, die durch die Trennvorrichtung 15, durch eine nach- mittels Hebeglieder 20 in die Ebene der Belegegeschaltete Formatsäge 17 und durch die Art der bahn 1' angehoben wird, wie dies gestrichelt ange-Übergabe des leeren Unterlagsbleches von der Rück- deutet ist. Rückführbahn 12" und Belegebahn V führbahn 12 an die Belegebahn 1. Auch diese Preß- 55 weisen an ihrem Ende Zahnradgetriebe 21 auf, mit straße ist in Beschickstellung veranschaulicht, d. h., denen das an der Hebevorrichtung 19 befindliche die Etagen der Beschickungs- und Entleerungsvor- Zahnrad 22 in oberer und unterer Stellung in Eingriff richtungen 3 und 3' befinden sich in angehobenem gelangt. Über das durch die Rückführ- bzw. Belege-Zustand, die Presse 6 ist geöffnet. Der Übersicht bahn somit angetriebene Zahnrad 22 wird eine Förhalber sind die in diesem Stadium in der Beschik- 60 dereinrichtung in der Hebevorrichtung 19 im gleichen kungsvorrichtung 3 und der Presse 6 befindlichen Richtungssinn in Bewegung gesetzt, um das Unter-Unterlagsbleche mit Spankuchen bzw. fertigen Span- lagsblech in die Hebevorrichtung ein- bzw. auszuplätten nicht dargestellt. Hat der Entleerungsarm 5' führen.The operation of the in F i g. 2 shown three and document web 1 'passed through. At the end of the multi-storey system, the previously described 50 return path 12 "(right) corresponds in principle to the empty underlay level press line is the plane of the documents Switched Sizing 17 is raised and by the nature of the web 1 ', as shown by dashed-transfer of the empty backing sheet from the back indicated. return path 12 "and documents web V guide track 12 to the documents web 1. these pressing 55 have at their end gear transmission 21, with street is illustrated in the loading position, that is, which the floors of the loading and emptying gear 22 located on the lifting device 19 in the upper and lower position in engagement directions 3 and 3 'are in raised got. Via the return or receipt status, the press 6 is open. The overview track thus driven gear 22 is a conveyor, the directional sense located in the loading 60 dereinrichtung in the lifting device 19 in the same kung device 3 and the press 6 at this stage are set in motion to the underlay sheets with chip cake or finished chip - Flattening or flattening the sheet metal in the lifting device is not shown. Has the emptying arm 5 'lead.

die Unterlagsbleche mit den fertigen Spanplatten aus In den Zeichnungen sind nur einige von einerthe shims with the finished chipboard in the drawings are only a few of one

der Presse 6 herausgezogen, dann wird anschließend 65 großen Reihe von Preßstraßen schematisch darge-the press 6 is pulled out, then 65 large series of press lines is then shown schematically.

die unterste Etage der Entleerungsvorrichtung 3' im stellt, wie sie nach der Erfindung eingerichtet seinthe lowest level of the emptying device 3 'in the way they are set up according to the invention

Gegensatz zu F i g. 1 in die gestrichelt dargestellte können. Preßstraßen der erfindungsgemäßen Ausfüh-In contrast to FIG. 1 in the dashed lines can. Press lines of the execution according to the invention

Lage4& abgesenkt. Hat sie diese erreicht, so schiebt rung sind raumsparend und leicht zu überwachen.Layer4 & lowered. Once this has been achieved, slides are space-saving and easy to monitor.

Sie erfordern außer einem Kommandogeber, der die Anlage einschaltet und überwacht, keinerlei Personal und gestattet eine automatische Fabrikation selbst bis zum fertigen Formatschnitt, nachdem die Plattenstapel lediglich noch durch Lagerpersonal zu entfernen sind. In den Ausführungsbeispielen sind Belegevorrichtungen 2 für die Streuung von Spangut dargestellt. An dieser Stelle können die Unterlagsbleche jedoch ebensogut mit Furnieren bzw. mit Furnieren und Spanplatten bzw. mit Furnieren und Stäbchenmittellagen belegt werden.Apart from a command transmitter that switches on and monitors the system, they do not require any personnel and allows an automatic production even up to the finished format cut after the stack of panels can only be removed by warehouse staff. In the exemplary embodiments, there are documenting devices 2 for the scattering of chips. At this point the shims but just as well with veneers or with veneers and chipboard or with veneers and core layers be occupied.

Claims (6)

Patentansprüche:Patent claims: 1. Preßstraße zur Herstellung von Holzspanplatten, in der im Kreislauf wandernde Unterlagsbleche mit dem Spankuchen belegt werden, zur Speicherung in eine Pressenbeschickungsvorrichtung wandern und über diese der Presse zugeführt werden, danach über eine Pressenentleerungsvorrichtung wieder in den Förderkreislauf gelangen, um nach Trennung von der fertiggepreßten Spanplatte und Kühlung wieder mit einem neuen Spankuchen belegt zu werden, dadurch gekennzeichnet, daß sich die Kühleinrichtung (13) unterhalb der Presse bzw, zwischen deren Rahmenständern (6) befindet und daß in demselben Raum unmittelbar oberhalb der Kühleinrichtung in einer dritten Wirkungsebene eine Vorrichtung (15) zum Trennen der Spanplatten (11') von den noch in der Entleerungsvorrichtung (3', 4') befindlichen heißen Unterlagsblechen (10) angeordnet ist (Fig. 1).1. Press line for the production of chipboard, in which the production sheet moving in a cycle are covered with the chip cake for storage in a press feeder migrate and are fed to the press via this, then via a press emptying device get back into the conveyor circuit after separation from the finished pressed chipboard and cooling again to be covered with a new chip cake, characterized in that the Cooling device (13) located below the press or between the frame stands (6) and that in the same room immediately above the cooling device in a third level of action a device (15) for separating the chipboard (11 ') from those still in the emptying device (3 ', 4') located hot shims (10) is arranged (Fig. 1). 2. Preßstraße nach Anspruch 1, dadurch gekennzeichnet, daß unterhalb der'Entleerungsvorrichtung (3', 4') als Rückführbahn ein rückläufiges, die Kühleinrichtung (13) durchlaufendes Fördermittel (12, 12") angeordnet ist (Fig. 1 bis 3).2. Press line according to claim 1, characterized in that underneath der'Entleerungsvorrichtung (3 ', 4') as a return path, a return path that runs through the cooling device (13) Conveyor means (12, 12 ") is arranged (Fig. 1 to 3). 3. Preßstraße nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Belegebahn (1) und die Rückführbahn (12) im Bereich der Beschickungsvorrichtung (3) einander übergreifend angeordnet sind, wobei vorzugsweise die Rückführbahn (12) in vertikaler Richtung verstellbar ist (Fig. 1).3. Press line according to claim 1 or 2, characterized in that the document web (1) and the return path (12) in the area of the loading device (3) overlapping one another are arranged, the return path (12) preferably being adjustable in the vertical direction is (Fig. 1). 4. Preßstraße nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Belegebahn (1) und die Rückführbahn (12) in gleicher Ebene aneinander anschließend angeordnet sind und daß die Belegebahn (1) über eine lösbare Kupplung (18) mit der Rückführbahn (12) antreibbar verbunden ist (Fig. 2).4. Press line according to claim 1 or 2, characterized in that the document web (1) and the return path (12) are arranged adjacent to one another in the same plane and that the document path (1) is drivably connected to the return path (12) via a releasable coupling (18) is (Fig. 2). 5. Preßstraße nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Belegebahn (1) und die Rückführbahn (12) in verschiedenen Ebenen angeordnet sind und daß die Rückführbahn sich unter der Belegebahn bis zu deren Anfang erstreckt und daß an diesem Ende der Rückführbahn eine die entleerten und abgekühlten Unterlagsbleche (10) von dieser abhebende und auf die Belegebahn abgebende Hebevorrichtung (19) angeordnet ist (Fig. 3).5. Press line according to claim 1 or 2, characterized in that the document web (1) and the return path (12) are arranged in different planes and that the return path extends under the slip path to the beginning and that at this end of the Return path lifts the emptied and cooled base plates (10) from the latter and a lifting device (19) dispensing with the document web is arranged (FIG. 3). 6. Preßstraße nach Anspruch 1, dadurch gekennzeichnet, daß die Vorrichtung (15) zum Trennen der Spanplatten (H') von ihren heißen Unterlagsblechen (10) aus in horizontaler Richtungwirkenden Trennkolben (16) besteht (Fig. 3).6. Press line according to claim 1, characterized in that the device (15) for Separating the chipboard (H ') from their hot support plates (10) acting in a horizontal direction Separating piston (16) consists (Fig. 3). In Betracht gezogene ältere Patente:
Deutsches Patent Nr. 1094 973.
Legacy Patents Considered:
German Patent No. 1094 973.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings 709 619/543 7.67 © Bundesdruckerei Berlin709 619/543 7.67 © Bundesdruckerei Berlin
DEG28641A 1959-12-19 1959-12-19 Press line for the production of chipboard Pending DE1246227B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DEG28641A DE1246227B (en) 1959-12-19 1959-12-19 Press line for the production of chipboard
AT842760A AT240034B (en) 1959-12-19 1960-11-12 Press line for the production of chipboard
CH1296160A CH402611A (en) 1959-12-19 1960-11-18 Press line for the production of chipboard
GB4190460A GB925799A (en) 1959-12-19 1960-12-06 Apparatus for making pressed components on support plates
BE616007A BE616007Q (en) 1959-12-19 1962-04-04 Press train for agglomerated or similar products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG28641A DE1246227B (en) 1959-12-19 1959-12-19 Press line for the production of chipboard

Publications (1)

Publication Number Publication Date
DE1246227B true DE1246227B (en) 1967-08-03

Family

ID=7123536

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG28641A Pending DE1246227B (en) 1959-12-19 1959-12-19 Press line for the production of chipboard

Country Status (4)

Country Link
AT (1) AT240034B (en)
CH (1) CH402611A (en)
DE (1) DE1246227B (en)
GB (1) GB925799A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104339819B (en) * 2013-08-04 2016-05-11 郎洪明 Fixed magnesite room plate production equipment main frame
CN112171845B (en) * 2020-09-30 2022-03-25 佛山市林智板饰有限公司 Compaction device for manufacturing and processing density board
CN112339039A (en) * 2020-10-30 2021-02-09 湖南闽新人造板有限责任公司 Automatic board feeding device for production of wood artificial boards

Also Published As

Publication number Publication date
GB925799A (en) 1963-05-08
AT240034B (en) 1965-05-10
CH402611A (en) 1965-11-15

Similar Documents

Publication Publication Date Title
DE2816167A1 (en) HANDLING SYSTEM FOR CEMENT STONES OR THE LIKE THAT REQUIRES DRYING AND FURTHER WORK CROPS
DE2612206A1 (en) LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS
EP0453806B1 (en) Installation for staking of separate individual slab-shaped work pieces or packs of such workpieces
EP2689664B1 (en) Method and installation for temporarily holding baking good carriers
DE1246227B (en) Press line for the production of chipboard
DE1916171C3 (en) Semi-automatic pallet packing device for sacks
DE2852456C2 (en) Device for on and off panels in the manufacture of laminated panels
EP0071154A1 (en) Apparatus for stacking articles or bagged goods on pallets
DE2231496C3 (en) Device for automatic loading of stationary and mobile loading areas with piece goods, in particular sacks
EP0141177B1 (en) Apparatus for compressing fibrous-cement slabs
DE2226897C3 (en) Forming and pressing line for the manufacture of chipboard
DE1268060B (en) Device for the automatic storage of a variable number of molding carriers in the ceramic industry
DE2236355C3 (en) System for loading multi-opening plate presses
EP1026109B1 (en) Process and device for the distribution of work-pieces at predetermined distances
DE1427853B2 (en) ROLLER ROLLER FOR REFRIGERATED BEDS
DE443262C (en) Device for the mass production of paper hollow bodies from pulp water
DE4121517C1 (en)
DE1683796C3 (en) Device for loading and unloading of brick moldings or the like
DE1427853C (en) Roll-up table for cooling beds
DE1249142B (en)
DE2051733A1 (en) Feeding device for material boards
DE1945416B2 (en) Facility for the conveyance of bricks
DE1953270C (en) Device for automatic Beschik ken a trolley
DE1113662B (en) Device for loading and emptying plate tunnel ovens
DE1086611B (en) Device for the automatic transfer of shaped extrudates onto supporting battens that are guided in the direction of the strand