DE121488C - - Google Patents
Info
- Publication number
- DE121488C DE121488C DENDAT121488D DE121488DA DE121488C DE 121488 C DE121488 C DE 121488C DE NDAT121488 D DENDAT121488 D DE NDAT121488D DE 121488D A DE121488D A DE 121488DA DE 121488 C DE121488 C DE 121488C
- Authority
- DE
- Germany
- Prior art keywords
- shaft
- pipe
- water
- brought down
- space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- 239000011435 rock Substances 0.000 claims description 2
- 238000009423 ventilation Methods 0.000 claims 1
- 239000002184 metal Substances 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/105—Preparation of the ground by water level modification
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/08—Sinking shafts while moving the lining downwards
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
Gegenstand der vorliegenden Erfindung ist ein Verfahren zum Entwässern des Gebirges beim Niederbringen von Senkschächten, welches sich der Hauptsache nach dadurch kennzeichnet, dafs beim Anfahren der wasserhaltigen Schicht ein mit siebartigen Durchbrechungen versehenes doppelwandiges Hülfsrohr niedergebracht wird, in dessen von den Wänden eingeschlossenem Zwischenraum die zum Entlüften des Schachtes oder zum Auspumpen des eingedrungenen Wassers notwendigen Rohrleitungen untergebracht werden.The subject of the present invention is a method for draining the rock when bringing down cesspools, which is mainly characterized by that, when approaching the water-containing layer, one provided with sieve-like openings double-walled auxiliary pipe is brought down, in its enclosed by the walls Space for venting the shaft or for pumping out the penetrated Water necessary pipelines are housed.
Ein zur Ausführung dieses Verfahrens dienendes Schachtrohr ist in beiliegender Zeichnung in den Fig. 1 bis 3 in Längsschnitt, Seitenansicht und Grundrifs dargestellt.A shaft pipe used to carry out this process is shown in the accompanying drawing 1 to 3 shown in longitudinal section, side view and Grundrifs.
Fig. 4 und 5 stellen eine abgeänderte Ausführungsform des Schachtrohres dar.Figs. 4 and 5 show a modified embodiment of the shaft pipe.
Das neue Schachtr.ohr besteht im Wesentlichen aus zwei verschiedene Durchmesser besitzenden cylindrischen Körpern α und b (Fig. ι bis 3), welche aus Blech oder anderem geeigneten Material hergestellt sind und an ihren unteren Enden siebartige, beliebig geformte Durchbrechungen g und k aufweisen. Zwischen dem inneren Rohr b und dem äufseren Rohr α bleibt ein ringförmiger Zwischenraum c, welcher an beiden Enden durch die konischen Ringe h und i (Fig. 1) geschlossen ist, während der mittlere Raum d an seinem oberen Ende offen ist und den eigentlichen Schacht bildet.The new shaft tube consists essentially of two different diameter cylindrical bodies α and b (Fig. 1 to 3), which are made of sheet metal or other suitable material and have sieve-like, arbitrarily shaped openings g and k at their lower ends. Between the inner tube b and the outer tube α remains an annular space c, which is closed at both ends by the conical rings h and i (Fig. 1), while the middle space d is open at its upper end and the actual shaft forms.
Die Ausführungsform nach Fig. 4 und 51 soll im Besonderen für gröfsere Tiefen Verwendung finden. Zu diesem Zweck wird zunächst ein Schachtrohr j von gewöhnlicher Form, dessen Durchmesser gröfser ist als der des eben beschriebenen Schachtrohrs nach den Fig. ι bis 3, in den Boden eingesenkt, und zwar so weit, bis man auf die wasserhaltige Schicht stöfst. Nunmehr wird in dieses weitere Rohr das eigentliche Schachtrohr eingeführt, dessen Construction genau dieselbe, wie die in den Fig. 1 bis 3 dargestellte ist.The embodiment according to FIGS. 4 and 5 1 is intended to be used in particular for greater depths. For this purpose, a shaft pipe j of the usual shape, the diameter of which is larger than that of the shaft pipe just described according to FIGS. 1 to 3, is sunk into the ground until the water-containing layer is encountered. Now the actual shaft pipe is inserted into this further pipe, the construction of which is exactly the same as that shown in FIGS.
Bei Benutzung eines Schachtrohres der vorliegenden Art tritt das im Schacht enthaltene Wasser sowohl von aufsen durch die Löcher g in dem äufseren Rohr <z, wie auch durch die untere Oeffhung und die Durchbrechungen k im inneren Rohr b in den Zwischenraum c ein und wird von hier durch die bereits erwähnten Rohrleitungen entfernt.When using a shaft pipe of the present type, the water contained in the shaft occurs both from the outside through the holes g in the outer pipe <z, as well as through the lower opening and the perforations k in the inner pipe b into the space c and is from here removed by the aforementioned pipelines.
Das ganze zur Aushebung des Schachtes benutzte Rohr kann später, wenn der Schacht als Brunnen benutzt werden soll, in der Erde verbleiben. In diesem Fall kann man den Zwischenraum c des Doppelrohres in bekannter Weise mit irgend einer Filtriermasse ausfüllen, und wenn man nun das Rohr durch irgend einen Boden f am unteren Ende abschliefst, so wird sich im Innern des Rohres nur klares Wasser befinden können.The entire pipe used to excavate the shaft can later remain in the ground if the shaft is to be used as a well. In this case the space c of the double pipe can be filled in a known manner with any filtering compound, and if one now closes the pipe through a bottom f at the lower end, there will only be clear water inside the pipe.
Der Boden f selbst wird zweckmäfsig derart hergestellt, dafs in Kästen aus dünnem Blech eine entsprechende Menge Cement in den Schacht hineingebracht wird, worauf die Blechkasten zertrümmert werden, so dafs der darinThe bottom f itself is expediently produced in such a way that a corresponding amount of cement is brought into the shaft in boxes made of thin sheet metal, whereupon the sheet metal boxes are smashed so that the inside
enthaltene Cement sich ausbreitet und bei der Berührung mit dem unten befindlichen Wasser nach kurzer Zeit erhärtet.contained cement spreads and on contact with the water below hardens after a short time.
Claims (1)
Publications (1)
Publication Number | Publication Date |
---|---|
DE121488C true DE121488C (en) |
Family
ID=390478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT121488D Active DE121488C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE121488C (en) |
-
0
- DE DENDAT121488D patent/DE121488C/de active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2320350C3 (en) | Device for dewatering and transporting sludge or the like. Crowds | |
DE121488C (en) | ||
WO1988004352A2 (en) | Process for making a well | |
EP1328687B1 (en) | Device and method for producing columns of particulate matter in the ground of bodies of water | |
DE19715038B4 (en) | Water-permeable filter wall and method for producing the filter wall | |
DE2522534A1 (en) | METHOD FOR MANUFACTURING AN UNDERWATER STRUCTURE, IN PARTICULAR AN ARTIFICIAL ISLAND | |
DE578650C (en) | Method and device for the production of columns of filler in natural or artificial deposits | |
DE4243303C1 (en) | Process for cleaning a well shaft | |
DE568333C (en) | Process for the production of press concrete piles | |
DE102010024607A1 (en) | Foundation pile for increasing load-carrying capacity in soil, has different layers provided with aggregate with geo-textile sacks, geo-textile trajectory and/or geo-textile fabric and between top/under-covered layers of thin aggregate | |
DE124203C (en) | ||
DE947540C (en) | Process for the production and lowering of any shaped caissons | |
DE2732281A1 (en) | Ground strata draining well with immersed pump - has vacuum two tubes connected at ground level with flexible seal | |
DE638744C (en) | Two-part, suction tube-free filter well and process for its manufacture | |
DE157094C (en) | ||
AT346777B (en) | METHOD OF MANUFACTURING A HORIZONTAL FILTER WELL | |
DE580215C (en) | Method and device for the production of columns of filler in natural or artificial deposits | |
DD138564B1 (en) | PROCESS FOR THE RESTORATION OF POLLUTED GROUNDWATER | |
DE199580C (en) | ||
DE72117C (en) | Pipe well | |
DE146801C (en) | ||
AT330095B (en) | DEVICE FOR MANUFACTURING AN IN-SITE CONCRETE POST | |
DE919706C (en) | Device for draining the overburden, especially in open-cast mining | |
DE311544C (en) | ||
DE68228C (en) | Device for driving pipe wells |