DE146801C - - Google Patents
Info
- Publication number
- DE146801C DE146801C DENDAT146801D DE146801DA DE146801C DE 146801 C DE146801 C DE 146801C DE NDAT146801 D DENDAT146801 D DE NDAT146801D DE 146801D A DE146801D A DE 146801DA DE 146801 C DE146801 C DE 146801C
- Authority
- DE
- Germany
- Prior art keywords
- lining
- lowered
- shaft
- linings
- manhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 5
- 238000013459 approach Methods 0.000 claims description 4
- 239000004576 sand Substances 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- CUZMQPZYCDIHQL-VCTVXEGHSA-L calcium;(2s)-1-[(2s)-3-[(2r)-2-(cyclohexanecarbonylamino)propanoyl]sulfanyl-2-methylpropanoyl]pyrrolidine-2-carboxylate Chemical compound [Ca+2].N([C@H](C)C(=O)SC[C@@H](C)C(=O)N1[C@@H](CCC1)C([O-])=O)C(=O)C1CCCCC1.N([C@H](C)C(=O)SC[C@@H](C)C(=O)N1[C@@H](CCC1)C([O-])=O)C(=O)C1CCCCC1 CUZMQPZYCDIHQL-VCTVXEGHSA-L 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/08—Sinking shafts while moving the lining downwards
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Sewage (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMTPATENT OFFICE
Das Abteufen von Senkschächten geschah bisher gewöhnlich in der Weise, daß zuerst ein entsprechend weiter Mauerschacht so weit gesenkt wurde, als es die Reibung zuließ. Es wurde dann entweder die Sohle mit Beton oder durch Sandeinschüttung abgedichtet, worauf ein zweiter Eisen- oder Mauerschacht in den ersten eingebaut und gesenkt wurde usw. Wurde eine Betonsohle angewendet,The sinking of cesspools has usually been done first a correspondingly wider wall shaft was lowered as far as the friction would allow. The sole was then either sealed with concrete or by pouring in sand, whereupon a second iron or wall shaft was built into the first and lowered etc. If a concrete base was used,
ίο so kam es, wenn diese nicht überall gleichmäßig entfernt wurde, nicht, selten zur Verdrückung des Senkschuhes und zum Schiefgehen des auf ihm aufgebauten Schachtes. Wurde hingegen Sandausfüllung gewählt, so erhielt der auszubauende Schacht, weil der Sand einen großen Teil des zuerst hergestellten Schachtes ausfüllte, schon oberhalb der-Sohle so viel Reibung, daß er sich nur bis zu einer verhältnismäßig geringen Tiefe senken ließ.ίο so it happened when this wasn't evenly everywhere was removed, not, seldom, to crush the sagittal shoe and to go crooked of the shaft built on it. If, on the other hand, sand filling was chosen, the shaft to be removed received, because the Sand filled a large part of the first manhole, already above the sole has so much friction that it extends only to a relatively shallow depth lowered.
Gegenstand der Erfindung ist nun ein Verfahren zum Absenken von Schächten, durch welches dieser Übelstand vermieden wird und ein schnelles Senken bei. verhältnismäßig nur geringem Pressendruck stattfindet. Auch bietet das Verfahren den Vorteil, daß der Senkschacht bis zu einer großen Tiefe die gleiche Weite behält, die er 'oben hat.The invention now relates to a method for lowering manholes which this disadvantage is avoided and a rapid lowering at. relatively only low press pressure takes place. The method also has the advantage that the Sink shaft retains the same width to a great depth as it has above.
Das Verfahren kennzeichnet sich besonders dadurch, daß die verschiedenen Schachtauskleidungen fast gleichzeitig hergestellt und daß sie anfangs sämtlich gleichzeitig gesenkt werden, bis der jeweilige äußere Schacht infolge der Reibung nicht weiter gesenkt werden kann. Es können je nach Erfordernis mehr oder weniger Schachtauskleidungen ineinander geschachtelt werden.The process is particularly characterized by the fact that the various manhole linings are produced and almost simultaneously that they are initially all lowered at the same time, until the respective outer shaft as a result the friction cannot be reduced any further. Depending on the requirements, more or less manhole linings can be intertwined be nested.
Auf der beiliegenden Zeichnung ist das neue Verfahren veranschaulicht, und zwar zeigen die Eig. 1 und 2 je einen senkrechten Schnitt durch einen Teil der Schachtwandung : in verschiedenen Tiefen.On the accompanying drawing, the new process is illustrated, namely show the prop. 1 and 2 each make a vertical section through part of the shaft wall: at different depths.
Wie ersichtlich, sind drei Schachtauskleidungen a, b und c angeordnet. Die Schachtauskleidung α ist mit dem Senkschuh versehen und über diesem so dick ausgeführt, daß es möglich ist, etwas weiter oben einen bei Schachtauskleidungen bereits bekannten Ansatz v. zu bilden, dessen Breite mindestens der Gesamtwandstärke der außerdem noch für das Verfahren benutzten Schachtauskleidungen gleicht. Die Schachtauskleidungen b und c, welche auf dem Ansätze ν der Schachtauskleidung α aufsitzen, werden so bemessen, daß kleine Spielräume zwischen a, b und c verbleiben. Die Teile jeder einzelnen Schachtwandung werden fest miteinander verbunden.As can be seen, three manhole linings a, b and c are arranged. The shaft lining α is provided with the plunger shoe and is made so thick over this that it is possible a little further above an approach v. to form, the width of which is at least equal to the total wall thickness of the shaft linings also still used for the process. The shaft linings b and c, which sit on the approaches ν of the shaft lining α , are dimensioned so that small clearances remain between a, b and c. The parts of each individual shaft wall are firmly connected to one another.
. Bei dem dann folgenden Absenken werden alle drei Schachtauskleidungen gleichzeitig niederbewegt. Die äußere c erhält nun bei ihrem Eindringen in das Gebirge eine mit der Tiefe zunehmende Reibung, die schließlich ihre weitere Bewegung verhindert. Es senkt sich alsdann die zweite Auskleidung b, die zunächst gar keinen Gebirgsdruck erfährt, mit der inneren Auskleidung α weiter, bis der Druck gegen sie ebenfalls so groß wird, daß ihr weiteres Gleiten nicht mehr stattfindet. Es geht dann schließlich die innere. During the lowering that then follows, all three manhole linings are moved down at the same time. When it penetrates the rock, the outer c receives a friction that increases with the depth, which ultimately prevents its further movement. The second lining b, which initially experiences no rock pressure at all , then sinks further with the inner lining α until the pressure against it is also so great that it no longer slides further. It then finally goes the inner one
Auskleidung α, die oben durch die Auskleidungen b und c gegen den Gebirgsdruck geschützt ist, allein weiter, bis auch sie infolge der Gebirgsreibung nicht mehr weiter getrieben werden kann. Man wird auf diese - Weise die Schachtauskleidungen, welche sich in vorteilhafter Weise selbst Führung verleihen, in erheblich größere Teufen bringen können als bei den bisher ausgeübten Verfahren. Bei dem neuen Verfahren ist es von Vorteil, daß die Schachtauskleidung α unten die größere Festigkeit besitzt, weil sie hier die größte Wandstärke hat, so daß ein Reißen und Verdrücken dieses gefährdeten Teiles nicht vorkommen kann.Lining α, which is protected against the rock pressure by the linings b and c at the top, continues on its own until it, too, can no longer be driven further due to the rock friction. In this way, the manhole linings, which advantageously lend themselves guidance, can be brought into considerably greater depths than in the previously practiced methods. With the new method it is advantageous that the shaft lining α has the greater strength at the bottom because it has the greatest wall thickness here, so that tearing and crushing of this endangered part cannot occur.
Das vorerwähnte unvorteilhafte Ausfüllen des Schachtes mit Sand oder Einbringen von Beton auf die Sohle macht das neue Verfahren vollständig entbehrlich.The aforementioned unfavorable filling of the shaft with sand or introduction of Concrete on the bottom makes the new process completely unnecessary.
Claims (1)
Publications (1)
Publication Number | Publication Date |
---|---|
DE146801C true DE146801C (en) |
Family
ID=414039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT146801D Active DE146801C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE146801C (en) |
-
0
- DE DENDAT146801D patent/DE146801C/de active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2546946A1 (en) | Buried sealing wall production - has workable plastic erosion resistant sealing mass and sealing membrane | |
DE2233732A1 (en) | PROCEDURE FOR SOLIDIZING LOOSE EARTH AND PROCESSING FASTENING PILES | |
DE2823950C2 (en) | Shaft construction, especially for the construction of deep shafts in unstable, water-bearing mountains | |
DE2544834C3 (en) | Device for sinking shafts in unstable rock | |
DE146801C (en) | ||
DE1252227B (en) | Process for the expansion of tunnels to be produced by means of shield jacking | |
DE3124622A1 (en) | DEVICE FOR CONVEYING AND STACKING A NUMBER OF CYLINDER SEGMENTS OF LARGE DIAMETER, IN PARTICULAR PITCHINE LINING SEGMENTS, CYLINDER SEGMENT, AND METHOD FOR LINING A DRILLING HOLE SHAFT | |
DE69717637T2 (en) | METHOD FOR ESTABLISHING CONSTRUCTION OR INDUSTRIAL STRUCTURES AND RELATED DEVICE | |
DE257682C (en) | ||
DE102005008679A1 (en) | Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls | |
DE3521434A1 (en) | Injection method and apparatus for soil stabilisation | |
DE578650C (en) | Method and device for the production of columns of filler in natural or artificial deposits | |
DE10258300B4 (en) | Method and device for stabilizing abandoned mine shafts | |
DE125789C (en) | ||
DE3512709A1 (en) | Method of producing and sealing a well, apparatus for carrying out the method, and well | |
DE3218995A1 (en) | Tool for making boreholes in loose compressible soils and method of making boreholes using such a tool | |
DE152676C (en) | ||
DE3307392A1 (en) | METHOD FOR CONSTRUCTION OF CONCRETE LINED UNDER CONCRETE | |
DE957745C (en) | Manhole lining made of concrete with a plastic filler | |
DE102004040191B4 (en) | Method for the production of guide elements | |
AT44549B (en) | Process for the waterproof lining of boreholes under water. | |
DE132336C (en) | ||
DE2515652C2 (en) | METHOD AND DEVICE FOR SEALING TRAENK HOLES BY CEMENTING | |
DE161548C (en) | ||
DE232267C (en) |