DE112022004307T5 - Produktionsverwaltungsverfahren, Produktionsverwaltungsvorrichtung, und Programm - Google Patents

Produktionsverwaltungsverfahren, Produktionsverwaltungsvorrichtung, und Programm Download PDF

Info

Publication number
DE112022004307T5
DE112022004307T5 DE112022004307.5T DE112022004307T DE112022004307T5 DE 112022004307 T5 DE112022004307 T5 DE 112022004307T5 DE 112022004307 T DE112022004307 T DE 112022004307T DE 112022004307 T5 DE112022004307 T5 DE 112022004307T5
Authority
DE
Germany
Prior art keywords
production
time
maintenance
impact
malfunction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE112022004307.5T
Other languages
German (de)
English (en)
Inventor
Ken Suetsugu
Hirokazu Takehara
Michiaki Mawatari
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of DE112022004307T5 publication Critical patent/DE112022004307T5/de
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/0895Maintenance systems or processes, e.g. indicating need for maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
DE112022004307.5T 2021-09-08 2022-06-21 Produktionsverwaltungsverfahren, Produktionsverwaltungsvorrichtung, und Programm Pending DE112022004307T5 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2021146484 2021-09-08
JP2021-146484 2021-09-08
PCT/JP2022/024702 WO2023037693A1 (ja) 2021-09-08 2022-06-21 生産管理方法、生産管理装置及びプログラム

Publications (1)

Publication Number Publication Date
DE112022004307T5 true DE112022004307T5 (de) 2024-07-18

Family

ID=85506282

Family Applications (1)

Application Number Title Priority Date Filing Date
DE112022004307.5T Pending DE112022004307T5 (de) 2021-09-08 2022-06-21 Produktionsverwaltungsverfahren, Produktionsverwaltungsvorrichtung, und Programm

Country Status (4)

Country Link
JP (1) JPWO2023037693A1 (https=)
CN (1) CN117730287A (https=)
DE (1) DE112022004307T5 (https=)
WO (1) WO2023037693A1 (https=)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121312269A (zh) * 2023-06-27 2026-01-09 松下知识产权经营株式会社 维护计划制定方法、维护计划制定装置、程序以及维护方法
WO2025163933A1 (ja) * 2024-01-30 2025-08-07 パナソニックIpマネジメント株式会社 部品実装システム、管理装置および情報処理方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018079778A1 (ja) 2016-10-31 2018-05-03 日本電気株式会社 生産管理装置、方法、プログラム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4384920B2 (ja) * 2004-01-15 2009-12-16 株式会社日立製作所 保守計画の評価方法及び保守計画の評価装置
JP2008112209A (ja) * 2006-10-27 2008-05-15 Omron Corp 稼働状態モニタリング装置、稼働状態モニタリング方法、およびプログラム
CN103189706B (zh) * 2010-05-31 2016-01-20 东京电力株式会社 冷凝器的性能管理方法、发电设备的管理方法、管理系统以及程序
JP7148361B2 (ja) * 2018-10-31 2022-10-05 株式会社三井ハイテック 加工装置及び加工方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018079778A1 (ja) 2016-10-31 2018-05-03 日本電気株式会社 生産管理装置、方法、プログラム

Also Published As

Publication number Publication date
JPWO2023037693A1 (https=) 2023-03-16
WO2023037693A1 (ja) 2023-03-16
CN117730287A (zh) 2024-03-19

Similar Documents

Publication Publication Date Title
DE60207588T2 (de) Zustandsschätzung und einteilung für ein herstellungssystem
EP2839727B1 (de) Zuordnung von leiterplatten auf bestückungslinien
EP2893791B1 (de) Bildung von festrüstungs-rüstfamilien zur bestückung von leiterplatten
EP2842402B1 (de) Zuordnung von leiterplatten auf bestückungslinien
DE112022004307T5 (de) Produktionsverwaltungsverfahren, Produktionsverwaltungsvorrichtung, und Programm
WO2008096006A1 (de) Verfahren und system zur ermittlung von zuverlässigkeitsparametern einer technischen anlage
DE112023001000T5 (de) Produktionsmanagementsystem, produktionsmanagementverfahren und -programm
DE112021006768T5 (de) Managementsystem, managementvorrichtung, managementverfahren und programm
EP3765962B1 (de) Verfahren zur behebung von prozessanomalien
DE102014222940A1 (de) Bestücken von Leiterplatten
EP3485455A1 (de) Verfahren und vorrichtung zum bestimmen von optimalen losgrössen
EP3381249B1 (de) Computergestütztes verfahren und vorrichtung zur zuordnung von baugruppen auf bestückungslinien
DE102006001257A1 (de) Automatisiertes Zustandabschätzungssystem für Cluster-Anlagen und Verfahren zum Betreiben des Systems
DE102020105185A1 (de) Datenkorrelation zwischen verschiedenen Maschinen einer Fertigungslinie für elektronische Bauelemente
EP4228386A1 (de) Computer-implementiertes verfahren zur bestimmung mindestens einer festrüstungs-rüstfamilie von leiterplattentypen für eine vorgegebene anzahl mehrerer gruppen von einer oder mehreren bestückungslinien
EP3786739A1 (de) Vergleich einer realen anlage mit einem digitalen zwilling durch datenverkehrsanalyse
WO2023194582A1 (de) Plasmasystem und verfahren zum betrieb eines plasmasystems
DE112021006874T5 (de) Produktionsgeschoss-Verwaltungssystem, Arbeitsgegenmaßnahmen-Bestimmungsverfahren und Arbeitsgegenmaßnahmen-Bestimmungsprogramm
EP3168698A1 (de) Verfahren und vorrichtung zum optimieren einer anlagenverfügbarkeit
DE102006025490A1 (de) Vorrichtung und Verfahren zum Verifizieren einer Modellkonstruktion und Programm dafür
EP4154692B1 (de) Verfahren und vorrichtung zum bestücken von leiterplatten mittels einer festrüstung auf mindestens zwei bestückungslinien
WO2022122686A1 (de) Fertigungslinie zur herstellung von halbleiterbauelementen
EP4309477B1 (de) Verfahren und steuereinrichtung zur bestimmung mindestens einer festrüstung für eine bestückungslinie
DE102021130517B4 (de) Verfahren für die Herstellung einer elektrischen Schalt- oder Steuerungsanlage
DE112021006886T5 (de) Produktionsflächen-Verwaltungssystem, Arbeitsanweisungsverfahren und Arbeitsanweisungsprogramm