DE10353352A1 - Method and device for harvesting mining products in underground mining - Google Patents
Method and device for harvesting mining products in underground mining Download PDFInfo
- Publication number
- DE10353352A1 DE10353352A1 DE10353352A DE10353352A DE10353352A1 DE 10353352 A1 DE10353352 A1 DE 10353352A1 DE 10353352 A DE10353352 A DE 10353352A DE 10353352 A DE10353352 A DE 10353352A DE 10353352 A1 DE10353352 A1 DE 10353352A1
- Authority
- DE
- Germany
- Prior art keywords
- ramp
- arrangement according
- loading
- loading ramp
- conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000005065 mining Methods 0.000 title claims abstract description 15
- 238000003306 harvesting Methods 0.000 title abstract description 3
- 238000000605 extraction Methods 0.000 claims abstract description 32
- 238000011084 recovery Methods 0.000 claims abstract description 13
- 230000000903 blocking effect Effects 0.000 claims description 52
- 239000003517 fume Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 3
- 239000000047 product Substances 0.000 description 22
- 239000011435 rock Substances 0.000 description 7
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 5
- 229910052802 copper Inorganic materials 0.000 description 5
- 239000010949 copper Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 239000012634 fragment Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 206010028980 Neoplasm Diseases 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 201000011510 cancer Diseases 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 238000007873 sieving Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
- E21C35/20—General features of equipment for removal of chippings, e.g. for loading on conveyor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/002—Crushing devices specifically for conveying in mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/04—Transport of mined material in gravity inclines; in staple or inclined shafts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/06—Transport of mined material at or adjacent to the working face
- E21F13/061—Chutes and braking conveyors for average and steep slopes, adapted for mining purposes
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Chutes (AREA)
- Loading Or Unloading Of Vehicles (AREA)
- Auxiliary Methods And Devices For Loading And Unloading (AREA)
Abstract
Bei dem erfindungsgemäßen Verfahren und der erfindungsgemäßen Anordnung zum Hereingewinnen von Gewinnungsprodukten in untertägigen Gewinnungsbetrieben im Bruchbau werden die in einem oberen Streb (10) hereinbrechenden Gewinnungsprodukte (20) über mindestens einen Abzugstrichter (13) o. dgl. in eine unterhalb des Strebs aufgefahrene Abzugsstrecke (14) abgezogen und in dieser mittels eines Abzugsförderers (15) abtransportiert. Nach der Erfindung sind hierbei die Abzugstrichter (13) seitlich neben dem Abzugsförderer (15) angeordnet und gehen an ihrem unteren Ende in eine zum Abzugsförderer hin geneigte Rampenfläche (17) über, wobei die durch die Abzugstrichter aus dem Streb abgezogenen Gewinnungsprodukte über die geneigte Rampenfläche zum Abzugsförderer hin rutschend transportiert werden. Die geneigte Rampenfläche wird hierbei bevorzugt von einer Laderampe (22) gebildet, die in einer seitlich von der Abzugsstrecke abzweigenden Abzugskammer (16) so angeordnet ist, daß sich ihr eines höhergelegenes Ende (19) unterhalb des Abzugstrichters befindet und ihre anderes tiefergelegenes Ende (23) einen Auslauf (21) zum Abzugsförderer hin bildet.In the method according to the invention and the arrangement according to the invention for harvesting recovery products in quarrying mining operations, the recovery products (20) entering an upper face (10) are conveyed via at least one withdrawal funnel (13) or the like into a withdrawal line ( 14) deducted and transported in this by means of a discharge conveyor (15). According to the invention in this case the discharge funnels (13) are arranged laterally next to the discharge conveyor (15) and go at its lower end in a discharge conveyor inclined towards the ramp surface (17), wherein the withdrawn through the withdrawal funnel from the longwall extraction products on the inclined ramp surface be transported to the discharge conveyor slipping. The inclined ramp surface is in this case preferably formed by a loading ramp (22) arranged in a discharge chamber (16) branching off laterally from the withdrawal section so that its higher end (19) is below the discharge hopper and its other lower end (23 ) forms an outlet (21) to the discharge conveyor out.
Description
Die Erfindung betrifft ein Verfahren zum Hereingewinnen von Gewinnungsprodukten in untertägigen Gewinnungsbetrieben im Bruchbau, bei dem in einem oberen Streb hereinbrechende Gewinnungsprodukte über mindestens einen Abzugstrichter od.dgl. im liegenden Gebirge in eine unterhalb des Strebs aufgefahrene Abzugsstrecke abgezogen und in dieser mittels eines Abzugsförderers abtransportiert werden. Die Erfindung ist ferner auf eine Anordnung zum Hereingewinnen von Gewinnungsprodukten in untertägigen Gewinnungsbetrieben im Bruchbau gerichtet, wobei das Gewinnungsprodukt nach seinem Hereinbrechen in einem Abbaustreb über mindestens einen im Liegendgebirge des Abbaustrebs angeordneten, zu einer unterhalb des Strebs aufgefahrenen Abzugsstrecke hin offenen Abzugstrichter od.dgl. abziehbar und mittels eines in der Abzugsstrecke angeordneten Abzugsförderers abtransportierbar ist. Schließlich betrifft die Erfindung auch eine Laderampe, wie sie in bevorzugter Weise bei dem erfindungsgemäßen Verfahren und der erfindungsgemäßen Anordnung zum Einsatz kommen kann.The The invention relates to a process for recovering recovery products in underground Extraction plants in the quarry, with breaking in in a top walk Extraction products over at least one discharge funnel or the like. in the lying mountains in a deducted under the strut withdrawal line deducted and in this by means of a deduction conveyor be transported away. The invention is further based on an arrangement for the capture of extraction products in underground mining operations aimed at breaking, the product being recovered after its breaking in in a quarry over at least one arranged in the recumbent mountains of the Abbaustrebs, one below the strut ascended withdrawal line towards open fume cupping or the like. removable and arranged by means of a withdrawal line discharge conveyor can be transported away. After all The invention also relates to a loading dock, as in preferred Way in the inventive method and the inventive arrangement can be used.
In
der
Das bekannte Verfahren bzw. die Anordnung sind solange anwendbar, solange das aus der Firste des Gewinnungsstrebs abbrechende Gewinnungsprodukt eine nicht zu stark variierende, vergleichsweise geringe mittlere Korngröße aufweist, die einen Abzug nach unten in die Abzugsstrecken auch durch Rollöcher oder Abzugstrichter mit vergleichsweise kleinem Querschnitt gestattet. Das bekannte Verfahren bzw. die bekannte Anordnung ist auf die Gewinnung von Produkten mit geringer Korngröße beschränkt, da ein zu großer Querschnitt der oberhalb der Abzugsförderer angeordneten Abzugstrichter oder Rollöcher dazu führen würde, daß eine zu große Materialmenge auf die Abzugsförderer gelangt, die von diesem nicht zuverlässig abtransportiert werden kann. Der Förderer kann dann schnell von dem eigentlich abzufördernden Gewinnungsprodukt verschüttet werden. Ein weiterer Nachteil des bekannten Verfahrens besteht in dem hohen Verschleiß, dem die Abzugsförderer auch bei der Gewinnung von feinkörnigem Material ausgesetzt sind, denn dieses fällt im wesentlichen ungebremst im freien Fall durch die Abzugstrichter in die Abzugsstrecke und zum großen Teil direkt auf das Förderorgan des Abzugsförderers.The known methods or the arrangement are applicable as long as long the extraction product that breaks off the roof of the extraction effort a not too strongly varying, comparatively small mean Having grain size, the a deduction down into the trigger lines also by roll holes or Discharge funnel with a comparatively small cross-section allowed. The known method or the known arrangement is based on the extraction limited by products with small grain size, as too large a cross section the above the extraction conveyor arranged discharge funnels or rolling holes would lead to a too large amount of material on the extraction conveyor arrives, which can not be reliably transported away from this. The conveyor can then quickly from the actual production product to be abzufördernden spill become. Another disadvantage of the known method consists in the high wear, the deduction conveyor also in the production of fine-grained Material are exposed, because this falls essentially unchecked in free fall through the culvert in the trigger line and for a great part directly on the conveyor the deduction conveyor.
Aufgabe der Erfindung ist es, das bekannte Verfahren und die bekannte Anordnung so zu verbessern, daß damit auch im Streb hereinbrechendes Haufwerk mit großer Korngröße gewonnen und über darunter gelegene Abzugsstrecken abtransportiert werden kann.task The invention is the known method and the known arrangement to improve so that also won in the longwall felling debris with large grain size and above located withdrawal routes can be removed.
Diese Aufgabe wird nach dem erfindungsgemäßen Verfahren dadurch gelöst, daß der mindestens eine Abzugstrichter seitlich neben dem Abzugsförderer angeordnet wird und an seinem unteren Ende in eine zum Abzugsförderer hin geneigte Rampenfläche übergeht, und daß die Gewinnungsprodukte über die geneigte Rampenfläche zum Abzugsförderer hin transportiert werden.These Task is solved by the method according to the invention characterized in that the at least a discharge funnel is arranged laterally next to the discharge conveyor and at its lower end merges into a ramp surface inclined towards the discharge conveyor, and that the Extraction products over the inclined ramp surface to the discharge conveyor be transported.
Durch die Anordnung des bzw. der Abzugstrichter seitlich neben dem Abzugsförderer und der Umlenkung des Durchlaßquerschnitts des bzw. der Trichter auf die geneigte Rampenfläche wird zum einen erreicht, daß das durch den bzw. die Abzugstrichter aus dem Streb in die Abzugsstrecke gelangende Haufwerk vor dessen Übergabe auf den Abzugsförderer erheblich abgebremst wird, also nicht länger im praktisch freien Fall auf das Förderorgan gelangt. Darüber hinaus ist es durch die seitlich versetzte Anordnung des bzw. der Abzugstrichter auch möglich, dessen bzw. deren Querschnitt erheblich größer als bei dem bislang bekannten Verfahren zu bemessen und so auch größere Bruchstükke zu gewinnen, ohne daß diese den Abzugstrichter verstopfen. Die geneigte Rampenfläche führt dabei zu einer Selbstregulierung der durch den Abzugstrichter in die Abzugsstrecke gelangenden Haufwerksmenge, denn über die schräge Rampenfläche kann nur eine begrenzte Materialmenge pro Zeiteinheit abrutschen und auf den Abzugsförderer gelangen. In diesem Zusammenhang besonders vorteilhaft ist es, wenn der zum Abzugsförderer hin weisende Auslauf der geneigten Rampenfläche mittels eines Absperrorgans blockiert wird, wenn der Füllgrad des Abzugsförderers ein vorgegebenes Maß übersteigt. Für den zuverlässigen Abtransport des gewonnenen Erzes kann es vorteilhaft sein, wenn das über die Rampenfläche zum Abzugsförderer gelangende Gewinnungsprodukt vor bzw. bei seiner Übergabe auf den Abzugsförderer zerkleinert wird, jedenfalls die Teile des hereingewonnenen Produkts, die so groß sind, daß sie nicht oder nur eingeschränkt vom Förderer transportiert werden können.By the arrangement of the or the discharge funnels laterally next to the discharge conveyor and the Deflection of the passage cross-section the hopper or on the inclined ramp surface is achieved on the one hand that this through the or the discharge funnel from the strut in the withdrawal line reaching heap before its delivery on the extraction conveyor slowed down considerably, so no longer in virtually free fall on the conveyor organ arrives. About that In addition, it is due to the laterally offset arrangement of or Discharge funnel also possible whose or their cross-section considerably larger than in the previously known Method to measure and thus also to gain larger fragments, without them clog the discharge funnel. The inclined ramp surface leads to a self-regulation of the through the hopper in the trigger line reaching Haufwerksmenge, because of the sloping ramp surface can slip only a limited amount of material per unit of time and on the extraction conveyor reach. In this context, it is particularly advantageous if to the deduction conveyor pointing outflow of the inclined ramp surface by means of a shut-off is blocked when the degree of filling the deduction conveyor exceeds a predetermined amount. For reliable removal of the recovered ore, it may be advantageous if that over the ramp surface to the discharge conveyor resulting extraction product before or at its transfer on the extraction conveyor crushed, at least the parts of the recovered product, that are so big that they are not or only limited transported by the conveyor can be.
In Anlehnung an das erfindungsgemäße Verfahren ist die Anordnung nach der Erfindung durch eine Laderampe mit einer im wesentlichen quer zur Förderrichtung des Abzugsförderers ausgerichteten, zu diesem hin geneigten Rampenfläche gekennzeichnet, deren eines, höher gelegenes Ende sich unterhalb des Abzugstrichters befindet und deren anderes, tiefer gelegenes Ende einen Auslauf zum Abzugsförderer hin bildet. Dabei kann in bevorzugter Ausführungsform der Erfindung die Neigung der Rampenfläche über ihre Länge variieren, wobei die Rampenfläche dann zweckmäßig unterhalb des Abzugstrichters eine größere Neigung aufweist als im Auslaufbereich zum Abzugsförderer. Das durch den Abzugstrichter abgezogene Erzgestein wird durch die abnehmende Neigung der Rampenfläche bei seinem Übergang über diese verlangsamt, so daß es nur noch mit geringer Geschwindigkeit auf den Abzugsförderer auftrifft.In Based on the inventive method the arrangement according to the invention by a loading dock with a essentially transversely to the conveying direction the deduction conveyor aligned, inclined towards this ramp surface, one of which, higher altitude End is below the discharge funnel and the other, lower end forms an outlet to the discharge conveyor. It can in a preferred embodiment vary the slope of the ramp surface over its length, the ramp surface then appropriate below the discharge hopper a greater inclination has as in the outlet area to the discharge conveyor. The through the funnel stripped ore is helped by the decreasing slope of the ramp surface his transition over this slows down, so it only still hits the discharge conveyor at low speed.
Besonders vorteilhaft ist es, wenn die Laderampe mit einer Blockiervorrichtung versehen ist. Diese kann im Auslaufbereich oder auch vor diesem angeordnet sein. In einer bevorzugten Ausführungsform kann die Blockiervorrichtung im wesentlichen aus mindestens einer verschwenkbaren Sperrklappe bestehen, die je nach ihrer Stellung im Auslaufbereich der Laderampe dessen Durchlaßquerschnitt für das hereingewonnene Gewinnungsprodukt vergrößert oder verringert. Da die vom Gewinnungsprodukt auf die Sperrklappe ausgeübten Kräfte beträchtlich sein können, ist es zweckmäßig, wenn der Schwenkantrieb der Sperrklappe im wesentlichen aus mindestens einem Hydraulikzylinder besteht. Die Sperrklappe kann um eine im wesentlichen horizontale Achse verschwenkbar sein und dabei vorzugsweise von einem Abschnitt der Rampenfläche in deren Auslaufbereich gebildet werden. Bei dieser Ausführungsform wird also die Neigung der Rampenfläche im Auslaufbereich variiert, und zwar bei Bedarf so weit, daß die Neigung der Rampenfläche auf Null verstellt oder sogar ei ne negativ Neigung eingestellt wird, die Laderampe also keine zum Förderer sich kontinuierlich neigende Rutschfläche mehr bildet, sondern eine im Schnitt etwa V-förmige Rinne, in der das aus dem Abzugstrichter gelangende Gestein jedenfalls zeitweise aufgefangen wird.Especially It is advantageous if the loading ramp with a blocking device is provided. This can be arranged in the outlet area or even before this be. In a preferred embodiment the blocking device may consist essentially of at least one pivotable locking flap, depending on their position in the outlet area of the loading ramp whose passage cross-section for the in-won Extraction product increased or reduced. Since the forces exerted on the damper by the recovery product are considerable can, it is useful if the pivot drive of the blocking flap substantially at least consists of a hydraulic cylinder. The blocking flap can be folded around in the be pivotable substantially horizontal axis and preferably from a section of the ramp surface be formed in the outlet area. In this embodiment So the inclination of the ramp surface varies in the outlet area, if necessary so far that the inclination the ramp surface set to zero or even a negative inclination is set, the loading ramp so no to the conveyor continuously sloping surface forms more, but one on average about V-shaped Gutter, in which the coming out of the withdrawal funnel rock in any case is temporarily intercepted.
Eine alternative, vorteilhafte Ausführungsform ergibt sich, wenn die Sperrklappe im wesentlichen von einem Segment- oder Sektorverschluß gebildet wird, der eine vorzugsweise gewölbte, die Aufgabestelle der Rampenfläche vom Auslaufbereich bei Bedarf abtrennende Stauwand aufweist, die über mindestens einen Schwenkarm um die horizontale Achse höhenverschwenkbar ist. Hier wirkt die Sperrklappe also ganz ähnlich wie bei einem Wassersperrwerk. Die vorzugsweise gewölbte Stauwand hat den besonderen Vorteil, daß damit der Segment- oder Sektorverschluß auch in seine absperrende Schließposition bewegt werden kann, wenn die Stauwand von Gestein o.dgl. beaufschlagt wird.A alternative, advantageous embodiment results when the blocking flap is substantially separated from a segmented or sector lock formed which is a preferably arched, the task of the ramp surface From the outlet area if necessary separating stowage wall which has at least a swivel arm is höhenverschwenkbar about the horizontal axis. Here Thus, the shut-off flap is very similar like a water barrier. The preferably curved stowage wall has the particular advantage of being so the segment or sector lock also in its shut-off closed position can be moved when the retaining wall of rock or the like. acted becomes.
Eine andere Ausführungsform ist gleichfalls denkbar, bei der die Sperrklappe um eine im wesentlichen vertikale Achse verschwenkbar ist und von mindestens einer, vorzugsweise zwei, oberhalb des Auslaufbereichs der Rampenfläche torartig verschwenkbaren Torklappe(n) gebildet wird. Durch Verschwenken der Torklappe(n) kann der Durchlaßquerschnitt zwischen den freien Torseiten und ggf. einer Seitenbegrenzung der Rampenfläche sehr feinfühlig eingestellt werden. Eine weitere Alternative ergibt sich, wenn die Sperrklappe von mindestens einem vom Hangenden der Abzugsstrecke oder einem Ausbaugestell sich nach unten erstreckenden, an seinem oberen Ende um eine etwa horizontale, im wesentlichen parallel zum Abzugsförderer verlaufenden Schwenkachse verschwenkbaren Schwenktor gebildet wird.A other embodiment is also conceivable, in which the blocking flap to a substantially vertical axis is pivotable and at least one, preferably two, above the outlet area of the ramp surface torartig pivoted Tork flap (s) is formed. By pivoting the gate flap (s) can the flow area between the free gate pages and possibly a side boundary of the ramp surface very sensitively adjusted become. Another alternative arises when the blocking flap from at least one of the hanging walls of the withdrawal line or one Extension frame extending downwards, at its upper end about an approximately horizontal, substantially parallel to the discharge conveyor extending pivot axis pivotable pivot is formed.
In einer weiteren, alternativen Ausbildung der Blockiervorrichtung kann diese im wesentlichen aus einem in seitlichen Führungsschienen laufenden Sektionaltor mit mehreren gelenkig miteinander verbundenen Absperrsegmenten bestehen. Ähnlich ist es vorstellbar, daß die Blockiervorrichtung im wesentlichen aus einem auf einer oberhalb der Rampenfläche angeordneten Horizontalwelle auf rollbaren Rolltor mit mehreren gelenkig miteinander verbundenen Absperrsegmenten besteht. Bei diesen beiden Ausführungsformen oder generell ist es auch möglich, daß die Blockiervorrichtung mindestens eine um eine Horizontalachse pendelnd gelagerte Pendelklappe aufweist bzw. hiervon gebildet wird. Dabei ist es besonders vorteilhaft, wenn mehrere Pendelklappen untereinander gelenkig zur Bildung eines Pendelklappenvorhangs verbunden sind, der die Blockiervorrichtung bildet.In a further alternative embodiment of the blocking device this can essentially consist of a lateral guide rails running sectional door with several hinged interconnected Absperrsegmenten exist. Similar it is conceivable that the Blocking device essentially one on one above the ramp surface arranged horizontal shaft on rollable roller shutter with several hingedly interconnected Absperrsegmenten consists. With these two embodiments or in general it is also possible that the Blocking device at least one oscillating about a horizontal axis mounted pendulum flap or is formed thereof. there It is particularly advantageous if several pendulum flaps with each other articulated to form a pendulum flap curtain, which forms the blocking device.
Die Laderampe kann im Auslaufbereich eine angetriebene Schüttelrinne aufweisen bzw. bilden, womit sie Teile des Gewinnungsproduktes, die nicht von selbst infolge der Neigung der Rampenfläche auf den Förderer gelangen, diesem zuführen kann.The Loading ramp can be a driven vibrating chute in the outlet area have or form, whereby they are parts of the extraction product, not by itself due to the inclination of the ramp surface on the promoter get to this feed can.
Um zu verhindern, daß zu große Teile des Gewinnungsprodukts auf den Förderer gelangen können, ist es von besonderem Vorteil, wenn der Laderampe eine Zerkleinerungsvorrichtung für Gewinnungsprodukte zugeordnet ist, die im wesentlichen aus einem im Auslaufbereich der Laderampe angeordneten Brecher, insbesondere Schlagwalzenbrecher oder Backenbrecher bestehen kann. Als besonders vorteilhaft hat sich aber insoweit erwiesen, wenn die Zerkleinerungsvorrichtung im wesentlichen aus einem im Auslaufbereich der Laderampe wirksamen, oberhalb der Rampenfläche angeordneten Meißel- und/oder Bohrhammer besteht, mit dem besonders große Haufwerksstücke gezielt zerkleinert werden können. Vorzugsweise ist der Meißel- und/oder Bohrhammer vom Hangenden der Abzugsstrecke bzw. einer an diesem ange ordneten Schienenbahn abhängend angeordnet und in Längsrichtung des Abzugsförderers mindestens über die Breite der Laderampe verfahrbar.In order to prevent that too large parts of the recovery product can reach the conveyor, it is particularly advantageous if the loading ramp is assigned a crushing device for recovery products, which may consist essentially of a arranged in the outlet region of the loading ramp crusher, in particular impact roll crusher or jaw crusher , However, it has proved to be particularly advantageous in this respect if the comminution device essentially consists of a chisel and / or hammer drill arranged above the ramp surface in the discharge area of the loading ramp, with which particularly large pieces of heap are purposefully crushed can. Preferably, the chisel and / or rotary hammer is suspended from the hanging walls of the triggering line or a rail track arranged thereon and can be moved in the longitudinal direction of the take-off conveyor at least over the width of the loading ramp.
Eine weiterhin bevorzugte Ausführungsform der Erfindung ergibt sich, wenn der Laderampe ein Gittersieb zugeordnet ist, das beispielsweise oberhalb der Schüttelrinne angeordnet sein kann. Mit Hilfe eines solchen, auch als Grizzly bekannten Schüttelsiebes ist es möglich, das Gewinnungsprodukt vor dessen Aufgabe auf die Fördervorrichtung zu klassieren und große Haufwerksteile zunächst zurückzuhalten, um sie vor Übergabe auf den Förderer zu zerkleinern, während kleinere Gewinnungsproduktbrocken ungehindert durch die Siebmaschen durchgehen können. Besonders vorteilhaft ist es dabei, wenn das Gittersieb mit der Schüttelrinne gekoppelt ist, wodurch der Klassiervorgang unterstützt wird und sogar bereits eine Zerkleinerung von brüchigem Haufwerk allein durch das Sieb bewirkt wird.A Still preferred embodiment of the Invention results when the loading dock assigned a grid screen is that can be arranged, for example, above the Schüttelrinne. With the help of such, also known as Grizzly shaker Is it possible, the recovery product before its task on the conveyor to classify and great Part of the heap initially restrain to her before surrender on the conveyor too crush while pass through smaller sieve product chunks unhindered through the sieve meshes can. It is particularly advantageous if the grid screen with the vibrating conveyor is coupled, whereby the classification process is supported and even already a crushing of brittle heap by alone the sieve is effected.
Als vorteilhaft hat sich erwieen, wenn das Gittersieb mindestens eine in ihrer Neigung relativ zur Laderampe veränderliche Siebfläche aufweist, wobei die Anordnung so getroffen sein kann, daß das Gittersieb zwei gelenkig miteinander verbundene Siebflächenteile aufweist, die dachartig oberhalb der Laderampe aufstellbar sind. Die in ihrer Neigung veränderliche Stellung der Siebfläche bewirkt unterschiedliche, an die verschiedenen Bedürfnisse einstellbare Siebergebnisse. Darüber hinaus kann das Gittersieb durch Aufstellen ihrer Siebfläche bzw. Siebflächenteile auch als Absperrorgan zumindest für die größeren Teile des vom Abzugstrichter herangeführten Haufwerks dienen und somit eine zusätzliche Blockiervorrichtung u.U. vollständig ersetzen bzw. überflüssig machen.When It has turned out to be advantageous if the screen is at least one Has in its inclination relative to the loading ramp variable sieve surface, wherein the arrangement can be made so that the grid screen two articulated interconnected screen surface parts has, which are roof-like erectable above the loading ramp. The variable in their inclination Position of the sieve surface causes different, to the different needs adjustable sieving results. About that In addition, the grid screen by setting up their screen surface or Siebflächenteile also as a shut-off device at least for the larger parts of the discharge hopper brought up Haufwerks serve and thus an additional blocking device u.U. Completely replace or make redundant.
Der Abzugsförderer kann unterhalb des Auslaufbereichs der Laderampe angeordnet sein, was die Materialübergabe erleichtert. Die Laderampe ist vorzugsweise am freien Ende ihres Auslaufbereichs mit einer eine Seitenwand des Abzugsförderers übergreifenden Ladeklappe versehen, so daß das gewonnene Produkt bei seiner Übergabe auf den Förderer nicht zwischen diesen und der Laderampe gelangt.Of the discharge conveyor can be arranged below the outlet area of the loading ramp, what the material transfer facilitated. The loading ramp is preferably at the free end of her Outlet area with a side wall of the extraction conveyor cross-over Provided loading flap, so that the won product at its delivery not on the conveyor between these and the loading dock passes.
Der Abzugsförderer kann ein Kettenkratzförderer oder vorzugsweise ein Vibrations-Rinnenförderer sein, wie sie im untertägigen Bergbau üblicherweise eingesetzt werden.Of the discharge conveyor can be a chain scraper or preferably a vibratory channel conveyor, as in underground mining usually be used.
Mit der Erfindung wird eine Laderampe zum Hereingewinnen von Gewinnungsprodukten in untertägigen Gewinnungsbetrieben im Bruchbau, insbesondere zum Einsatz bei dem erfindungsgemäßen Verfahren und in der Anordnung geschaffen, mit einem Laderampengestell, das an seiner Oberseite eine von einer Aufgabestelle zu einem Auslaufbereich mit abschließender Ladeklappe hin abfallend geneigte Rampenfläche aufweist, wobei im Auslaufbereich eine Blockiervorrichtung mit mindestens einem verstellbaren Sperrorgan vorgesehen ist, durch dessen Verstellung der Durchlaßquerschnitt oberhalb der Rampenfläche zur Ladeklappe hin variierbar ist. Dabei kann die Neigung der Rampenfläche vorzugsweise über ihre Länge variieren, wobei die Rampenfläche dann vorzugsweise unterhalb des Abzugstrichters eine größere Neigung aufweist als im Auslaufbereich. Als Sperrorgan kann bevorzugt eine verschwenkbare Sperrklappe zum Einsatz kommen.With The invention provides a loading dock for harvesting recovery products in underground Extraction plants in quarry construction, especially for use in the inventive method and created in the arrangement, with a loading ramp frame, the on its top one from a feeding point to a discharge area with final Has loading flap down sloping ramp surface, wherein in the outlet area a locking device with at least one adjustable locking member is provided by the adjustment of the passage cross-section above the ramp surface can be varied to the loading flap. In this case, the inclination of the ramp surface preferably via their Length vary, the ramp surface then preferably below the discharge hopper a greater inclination as in the outlet area. As a blocking member may preferably a pivotable Blocking flap are used.
Die Sperrklappe dieser Laderampe kann um eine im wesentlichen horizontale Achse verschwenkbar sein und von einem Abschnitt der Rampenfläche in deren Auslaufbereich gebildet werden. Eine ebenfalls sehr vorteilhafte Ausgestaltung ergibt sich, wenn die Sperrklappe im wesentlichen von einem Segment- oder Sek torverschluß gebildet wird, der eine vorzugsweise gewölbte, die Aufgabestelle der Rampenfläche vom Auslaufbereich bei Bedarf abtrennende Stauwand aufweist, die über mindestens einen Schwenkarm um die horizontale Achse höhenverschwenkbar ist.The Blocking flap of this loading ramp can be a substantially horizontal Axis be pivotable and by a portion of the ramp surface in the Spill area are formed. Another very advantageous one Design results when the barrier flap substantially is formed by a segment or Sek gate closure, preferably one arched, the task of the ramp surface From the outlet area if necessary separating stowage wall which has at least a swivel arm is höhenverschwenkbar about the horizontal axis.
Es ist auch möglich, wenn die Sperrklappe um eine im wesentlichen vertikale Achse verschwenkbar ist und von mindestens einer, vorzugsweise zwei, oberhalb des Auslaufbereichs der Rampenfläche torartig verschwenkbaren Torklappe(n) gebildet wird. Die Laderampe kann im Auslaufbereich eine angetriebene Schüttelrinne aufweisen bzw. bilden und es ist möglich, daß die Neigung der Rampenfläche der Laderampe mindestens im Auslaufbereich veränderbar ist.It is possible, too, when the blocking flap is pivotable about a substantially vertical axis is and of at least one, preferably two, above the outlet area the ramp surface gate-like pivotable Torklappe (s) is formed. The loading ramp can have or form a driven vibrating channel in the outlet region and it is possible that the Inclination of the ramp surface the loading ramp is changeable at least in the outlet area.
Schließlich ist es auch zweckmäßig, wenn der Laderampe ein Gittersieb zugeordnet ist. Dieses kann oberhalb der Schüttelrinne angeordnet und ist in besonders vorteilhafter Ausgestaltung der Erfindung mit der Schüttelrinne gekoppelt.Finally is it also useful if the Loading ramp is assigned a grid screen. This can be above the vibrating conveyor arranged and is in a particularly advantageous embodiment of Invention with the vibrating trough coupled.
Das Gittersieb kann mindestens eine in ihrer Neigung relativ zur Laderampe veränderliche Siebfläche aufweisen, vorzugsweise weist es zwei gelenkig miteinander verbundene Siebflächenteile auf, die dachartig oberhalb der Laderampe aufstellbar sind.The Grid screen can have at least one in their inclination relative to the loading ramp variable Screen area preferably, it has two hinged interconnected Siebflächenteile on, the roof-like above the loading ramp can be set up.
Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung und der Zeichnung, worin bevorzugte Ausführungsformen der Erfindung an Beispielen näher erläutert werden es zeigt:Further Features and advantages of the invention will become apparent from the following Description and the drawing, wherein preferred embodiments the invention of examples closer be explained it shows:
Mit
dem Abbaustreb wird das Kupfererz nur im unteren Teil seiner gesamten
Mächtigkeit
abgebaut; der weitaus größere Teil
des vorhandenen Kupfererzes, der beim Durchgang des Abbaustrebs
dessen Hangendes bildet, bricht nach dem Durchgang der Ausbaugestelle
herein und wird zu seiner Gewinnung durch im Liegenden
In
Zu
den im seitlichen Abstand von der Abzugsstrecke bzw. dem darin angeordneten
Förderer befindlichen
Abzugstrichtern sind Abzugskammern
Wie
sich aus den
Bei
der in den
Bei
der in
Bei
der vierten Ausführungsform
nach
Man
erkennt aus der Zeichnung, daß die Stauwand
Bei
der in
Eine ähnliche
Gestaltung zeigt die in
Bei
der in den
Mit
Hilfe der verschiedenen Blockiervorrichtungen ist es möglich, den
Auslauf
Um
große
Haufwerksstücke,
die durch den Abzugstrichter auf die Rampenfläche der Laderampe gelangen,
vor ihrer Übergabe
auf den Abzugsförderer
zu einer für
diesen geeigneten Größe zu zerkleinern,
ist der Laderampe der erfindungsgemäßen Anordnung eine Zerkleinerungsvorrichtung
Man
erkennt aus den Zeichnungen zum ersten und zum zweiten Ausführungsbeispiel,
daß der Abzugsförderer
Eine
sehr vorteilhafte Ausgestaltung des Auslauf- und Übergabebereichs
der Laderampe zeigen die
Die
Erfindung ist nicht auf die dargestellten und beschriebenen Ausführungsbeispiele
beschränkt,
sondern es ist eine Reihe von Änderungen und
Ergänzungen
denkbar, ohne den Rahmen der Erfindung zu verlassen. So ist es beispielsweise
in einfachster Ausgestaltung des erfindungsgemäßen Verfahrens und der erfindungsgemäßen Anordnung möglich, auf
eine Laderampe in Form eines in der Abzugskammer angeordneten Gestells
vollständig
zu verzichten und die geneigte Rampenfläche durch entsprechende Neigung
des Bodens der Abzugskammer zu erhalten, die geneigte Rampenfläche also
direkt im Gebirge aufzufahren. Diese besonders preisgünstige Variante
der Erfindung kann insbesondere dort Verwendung finden, wo es auf
ein exakt bestimmtes Winkelmaß der
Neigung und insbesondere eine Veränderung der Neigung jedenfalls
in Teilbereichen der Rampenfläche
nicht ankommt. Die Sperrklappe der Blockiervorrichtung kann auch
unmittelbar vom Hangenden
Claims (46)
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10353352A DE10353352A1 (en) | 2003-06-23 | 2003-11-14 | Method and device for harvesting mining products in underground mining |
US10/561,674 US7350874B2 (en) | 2003-06-23 | 2004-06-18 | Method and device for extracting extraction products in underground mining |
PCT/EP2004/006637 WO2005001245A2 (en) | 2003-06-23 | 2004-06-18 | Method and device for extracting extraction products in underground mining |
CA002526264A CA2526264C (en) | 2003-06-23 | 2004-06-18 | Method and arrangement for extracting extraction products in underground mining |
RU2006101677/03A RU2334111C2 (en) | 2003-06-23 | 2004-06-18 | Device for excavating product in underground breakage faces |
AU2004251183A AU2004251183B2 (en) | 2003-06-23 | 2004-06-18 | Method and device for extracting extraction products in underground mining |
EP04740079A EP1646766B1 (en) | 2003-06-23 | 2004-06-18 | Method and device for extracting extraction products in underground mining |
AP2006003494A AP2504A (en) | 2003-06-23 | 2004-06-18 | Method and device for extracting extraction products in underground mining |
CL200401543A CL2004001543A1 (en) | 2003-06-23 | 2004-06-21 | CONFIGURATION AND DISCHARGE RAMP TO RECOVER VALUABLE PRODUCTS IN UNDERGROUND PENALTIES, INCLUDES A TRANSVERSE LOAD RAMP WITH RESPECT TO THE TRANSPORTATION ADDRESS, IN WHOSE EXTREME LOWER IS PROVIDED WITH A BLOCK DEVICE IN THE |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10328287 | 2003-06-23 | ||
DE10328287.4 | 2003-06-23 | ||
DE10353352A DE10353352A1 (en) | 2003-06-23 | 2003-11-14 | Method and device for harvesting mining products in underground mining |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10353352A1 true DE10353352A1 (en) | 2005-01-13 |
Family
ID=33520863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10353352A Withdrawn DE10353352A1 (en) | 2003-06-23 | 2003-11-14 | Method and device for harvesting mining products in underground mining |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN100564806C (en) |
AP (1) | AP2504A (en) |
CL (1) | CL2004001543A1 (en) |
DE (1) | DE10353352A1 (en) |
ZA (1) | ZA200510400B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005043236B4 (en) * | 2005-09-09 | 2016-08-04 | Caterpillar Global Mining Europe Gmbh | Arrangement for mining of mining products in underground mining operations in quarry construction |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103104290B (en) * | 2013-02-05 | 2015-01-21 | 中国矿业大学 | Down-hole fully mechanized coal face wide-angle inflection point passing method |
CN105457732A (en) * | 2015-11-17 | 2016-04-06 | 安徽马钢工程技术集团有限公司 | Process for improving lean magnetite underground mining resource utilization rate |
CN109469492A (en) * | 2019-01-03 | 2019-03-15 | 淮南矿业(集团)有限责任公司 | A kind of excavator planted agent shipment system |
DE102019120582A1 (en) * | 2019-07-30 | 2021-02-04 | Kleemann Gmbh | Rock processing plant |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE402498C (en) * | 1924-09-18 | Fritz Siebert | Process for the dismantling of powerful camps in chamber construction | |
US2298599A (en) * | 1941-03-15 | 1942-10-13 | Mark A Smith | Block cave mining method and plant |
DE871359C (en) * | 1942-12-15 | 1953-03-23 | Skip Cie G M B H | Single-strand ski conveyor with a basket as a counterweight and movable ballast |
DE1086524B (en) * | 1958-07-03 | 1960-08-04 | Gewerk Eisenhuette Westfalia | Crushing device, especially for coal |
DE1248255B (en) * | 1965-10-06 | 1967-08-24 | Skip Cie G M B H | Vessel conveyor system for underground mining operations |
SE449122B (en) * | 1980-05-06 | 1987-04-06 | Vos Ni Gornorudny I | SET AND DEVICE FOR UNDERGRADUATE |
US5104239A (en) * | 1991-03-06 | 1992-04-14 | Sague John E | In situ replaceable bearing |
-
2003
- 2003-11-14 DE DE10353352A patent/DE10353352A1/en not_active Withdrawn
-
2004
- 2004-06-18 AP AP2006003494A patent/AP2504A/en active
- 2004-06-18 CN CNB2004800159489A patent/CN100564806C/en not_active Expired - Fee Related
- 2004-06-21 CL CL200401543A patent/CL2004001543A1/en unknown
-
2005
- 2005-12-22 ZA ZA200510400A patent/ZA200510400B/en unknown
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005043236B4 (en) * | 2005-09-09 | 2016-08-04 | Caterpillar Global Mining Europe Gmbh | Arrangement for mining of mining products in underground mining operations in quarry construction |
Also Published As
Publication number | Publication date |
---|---|
AP2006003494A0 (en) | 2006-02-28 |
CN1833092A (en) | 2006-09-13 |
AP2504A (en) | 2012-11-12 |
ZA200510400B (en) | 2007-04-25 |
CL2004001543A1 (en) | 2005-06-03 |
CN100564806C (en) | 2009-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2004087324A1 (en) | Comminution device | |
DE4323492A1 (en) | Mobile preparation and settling device for mining products and. the like | |
DE4343148C2 (en) | Mobile track bed processing machine | |
EP1646766B1 (en) | Method and device for extracting extraction products in underground mining | |
WO2010063464A1 (en) | Mobile crusher | |
DE10353352A1 (en) | Method and device for harvesting mining products in underground mining | |
AT388968B (en) | Mobile crushing plant | |
DE102005043236B4 (en) | Arrangement for mining of mining products in underground mining operations in quarry construction | |
WO2012092952A1 (en) | Mobile crushing unit | |
DE3630028C1 (en) | Combined device for feeding, conveying, separating and crushing stony piles | |
DE3134642C2 (en) | ||
DE19736662B4 (en) | Dredging device for underground mining | |
DE3841061A1 (en) | Mechanised support section | |
DE3501509C2 (en) | Conveyor with feeder and passage crusher for tunneling of underground operations | |
DE3720514C2 (en) | Crusher conveyor with fines pre-separation | |
DE4004428A1 (en) | Grading and pulverising device for granular materials - has inclined inlet box and relatively displaceable grading grid with inlet | |
DE8623662U1 (en) | Combined device for feeding, conveying, separating and crushing stony debris | |
EP0436068B1 (en) | Method and device for low-dust or dustless loading of enclosed spaces | |
DE3739680A1 (en) | MACHINE AND METHOD FOR CONTINUOUSLY RELEASING STONE OD. DGL. AND RECOVERY OF THE SOLVED, CRUSHED PLANT IN THE MINING, EARTH AND TUNNEL CONSTRUCTION | |
DE19621666C2 (en) | Arrangement for the downward conveyance of mineral bulk goods by gravity | |
EP0250750B1 (en) | Transferring device for mined material, particularly for open cast machines | |
DE4040141C2 (en) | ||
DE1481171C (en) | Trough-like device for the up of large, heavy goods on a conveyor belt, especially in the quarry | |
EP0136600A2 (en) | Impact mill | |
DE3023282A1 (en) | SHIELD BOCK, ESPECIALLY FOR USE IN THE DISASSEMBLY OF MIGHTY WAREHOUSES IN DISC BUILDING |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8181 | Inventor (new situation) |
Inventor name: WIRTZ, JOERG, 45527 HATTINGEN, DE Inventor name: HAHN, DETLEF, 44534 LUENEN, DE Inventor name: FISCHER, FRANK, 44534 LUENEN, DE Inventor name: T?MPNER, HANS, 08280 AUE, DE Inventor name: GEISTER BUEHLMANN, FERNANDO ARTURO, BUIN-REGION MET Inventor name: KATTH?FER, NORBERT, 44534 L?NEN, DE Inventor name: BRUEGGEMANN, REINHOLD, 44265 DORTMUND, DE Inventor name: HERRMANN, FRANK, 09125 CHEMNITZ, DE Inventor name: MARTIN, HARRY, CRANBERRY TOWNSHIP, PA., US Inventor name: DELGADO, JUAN, EAGLE PASS, TEX., US Inventor name: ENCINA MONTENEGRO, VICTOR RAUL, SANTIAGO, CL Inventor name: LETELIER PARGA, PABLO ANTONIO, SANTIAGO, CL Inventor name: CARRENO VALDES, JAIME HERNAN, REGION, CL Inventor name: HAMMEL, JOCHEN, 44795 BOCHUM, DE |
|
8127 | New person/name/address of the applicant |
Owner name: DBT GMBH, 44534 LUENEN, DE Owner name: CORPORACION NACIONAL DEL COBRE DE CHILE, SANTIAGO, |
|
8127 | New person/name/address of the applicant |
Owner name: CORPORACION NACIONAL DEL COBRE DE CHILE, SANTI, CL Owner name: BUCYRUS DBT EUROPE GMBH, 44534 LUENEN, DE |
|
8110 | Request for examination paragraph 44 | ||
8127 | New person/name/address of the applicant |
Owner name: CORPORACION NACIONAL DEL COBRE DE CHILE, SANTI, CL Owner name: BUCYRUS EUROPE GMBH, 44534 LUENEN, DE |
|
R082 | Change of representative |
Representative=s name: BUSCHHOFF-HENNICKE-ALTHAUS, DE |
|
R081 | Change of applicant/patentee |
Owner name: CATERPILLAR GLOBAL MINING EUROPE GMBH, DE Free format text: FORMER OWNERS: BUCYRUS EUROPE GMBH, 44534 LUENEN, DE; CORPORACION NACIONAL DEL COBRE DE CHILE, SANTIAGO, CL Effective date: 20120718 Owner name: CORPORACION NACIONAL DEL COBRE DE CHILE, CL Free format text: FORMER OWNERS: BUCYRUS EUROPE GMBH, 44534 LUENEN, DE; CORPORACION NACIONAL DEL COBRE DE CHILE, SANTIAGO, CL Effective date: 20120718 Owner name: CATERPILLAR GLOBAL MINING EUROPE GMBH, DE Free format text: FORMER OWNER: BUCYRUS EUROPE GMBH, CORPORACION NACIONAL DEL COBRE, , CL Effective date: 20120718 Owner name: CORPORACION NACIONAL DEL COBRE DE CHILE, CL Free format text: FORMER OWNER: BUCYRUS EUROPE GMBH, CORPORACION NACIONAL DEL COBRE, , CL Effective date: 20120718 |
|
R082 | Change of representative |
Representative=s name: KRAMER BARSKE SCHMIDTCHEN PATENTANWAELTE PARTG, DE Effective date: 20120718 Representative=s name: BUSCHHOFF-HENNICKE-ALTHAUS, DE Effective date: 20120718 |
|
R082 | Change of representative |
Representative=s name: KRAMER BARSKE SCHMIDTCHEN PATENTANWAELTE PARTG, DE |
|
R002 | Refusal decision in examination/registration proceedings | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |