DE10343378B4 - Device for processing workpieces at a number of workstations - Google Patents

Device for processing workpieces at a number of workstations Download PDF

Info

Publication number
DE10343378B4
DE10343378B4 DE2003143378 DE10343378A DE10343378B4 DE 10343378 B4 DE10343378 B4 DE 10343378B4 DE 2003143378 DE2003143378 DE 2003143378 DE 10343378 A DE10343378 A DE 10343378A DE 10343378 B4 DE10343378 B4 DE 10343378B4
Authority
DE
Germany
Prior art keywords
workpiece
workstation
workpiece carrier
transport
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE2003143378
Other languages
German (de)
Other versions
DE10343378A1 (en
Inventor
Ulrich Metzl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEITZ ENGINEERING GMBH, 77948 FRIESENHEIM, DE
Original Assignee
M & S Metzl und Seitz Industri
M & S Metzl und Seitz Industrieautomation GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by M & S Metzl und Seitz Industri, M & S Metzl und Seitz Industrieautomation GmbH filed Critical M & S Metzl und Seitz Industri
Priority to DE2003143378 priority Critical patent/DE10343378B4/en
Publication of DE10343378A1 publication Critical patent/DE10343378A1/en
Application granted granted Critical
Publication of DE10343378B4 publication Critical patent/DE10343378B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q39/00Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation
    • B23Q39/04Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation the sub-assemblies being arranged to operate simultaneously at different stations, e.g. with an annular work-table moved in steps
    • B23Q39/042Metal-working machines incorporating a plurality of sub-assemblies, each capable of performing a metal-working operation the sub-assemblies being arranged to operate simultaneously at different stations, e.g. with an annular work-table moved in steps with circular arrangement of the sub-assemblies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting

Abstract

Vorrichtung zum Bearbeiten von Werkstücken an einer Anzahl von Arbeitsstationen mit einer Anzahl von Werkstückträgern, an denen jeweils wenigstens ein Werkstück anbringbar ist, mit einer Transporteinheit, mit der die Werkstückträger von einer Arbeitsstation zur nächsten Arbeitsstation transportierbar sind, und mit einer Antriebseinheit, mit der die Transporteinheit von einer Ruheposition zu einer nächsten Ruheposition antreibbar ist, wobei die Transporteinheit mit der Antriebseinheit in einem bestimmten einen einfachen Bearbeitungszeitraum einschließenden Transporttakt entlang einer Bahn bewegbar ist, dadurch gekennzeichnet, dass die Werkstückträger (25 bis 36, 36', 36'') über eine zum Freisetzen und Verbinden über eine Ansteuereinheit ansteuerbare Manipulationseinheit (46) lösbar mit der Transporteinheit (5) verbunden sind, wobei bei wenigstens einer Mehrfacharbeitsstation (7, 8, 9, 11, 13, 14, 15, 16, 56, 57, 58, 60, 61, 63, 64, 65, 66, 67) nach Freisetzen des Werkstückträgers (25 bis 36, 36', 36'') von der Transporteinheit (5) der betreffende Werkstückträger (25 bis 36, 36', 36'') über wenigstens zwei...contraption for machining workpieces at a number of work stations with a number of workpiece carriers each of which at least one workpiece is attachable, with a Transport unit with which the workpiece carriers from a workstation to the next Workstation are transportable, and with a drive unit, with which the transport unit from a rest position to a next rest position can be driven, wherein the transport unit with the drive unit in a certain transport cycle including a simple processing period is movable along a path, characterized in that the Workpiece carrier (25 to 36, 36 ', 36 ") a manipulation unit which can be actuated for release and connection via a drive unit (46) detachable are connected to the transport unit (5), wherein at least a multiple work station (7, 8, 9, 11, 13, 14, 15, 16, 56, 57, 58, 60, 61, 63, 64, 65, 66, 67) after releasing the workpiece carrier (25 to 36, 36 ', 36' ') of the transport unit (5) of the relevant Workpiece carrier (25 to 36, 36 ', 36 ") at least two ...

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Vorrichtung zum Bearbeiten von Werkstücken an einer Anzahl von Arbeitsstationen mit einer Anzahl von Werkstückträgern, an denen jeweils wenigstens ein Werkstück anbringbar ist, mit einer Transporteinheit, mit der die Werkstückträger von einer Arbeitsstation zur nächsten Arbeitsstation transportierbar sind, und mit einer Antriebseinheit, mit der die Transporteinheit von einer Ruheposition zu einer nächsten Ruheposition antreibbar ist, wobei die Transporteinheit mit der Antriebseinheit in einem bestimmten einen einfachen Bearbeitungszeitraum einschließenden Transporttakt entlang einer Bahn bewegbar ist.The The invention relates to a device for machining workpieces a number of work stations with a number of workpiece carriers each of which at least one workpiece is attachable, with a Transport unit with which the workpiece carriers from a workstation to the next Workstation are transportable, and with a drive unit, with which the transport unit from a rest position to a next rest position can be driven, wherein the transport unit with the drive unit in a certain transport cycle including a simple processing period is movable along a path.

Eine derartige Vorrichtung ist aus der DE 100 16 897 A1 bekannt. Die vorbekannte Vorrichtung verfügt über eine Anzahl von Arbeitsstationen mit einer Anzahl von Werkstückträgern, an denen jeweils wenigstens ein Werkstück anbringbar ist. Weiterhin ist eine Transporteinheit vorhanden, mit der die Werkstückträger von einer Arbeitsstation zur nächsten Arbeitsstation transportierbar sind. Mit einer Antriebseinheit ist die Transporteeinheit von einer Ruheposition zu einer nächsten Ruheposition antreibbar, wobei die Transporteinheit mit der Antriebseinheit in einem bestimmten einen einfachen Bearbeitungszeitraum einschließenden Transporttakt entlang einer Bahn bewegbar ist. Bei dieser Vorrichtung werden in einer Aufspannung der zu bearbeitenden Werkstücke verschiedenste Bearbeitungsvorgänge durchgeführt, wobei bei jedem Arbeitstakt allen Arbeitsstationen ein anderes Werkstück zugeführt wird.Such a device is known from DE 100 16 897 A1 known. The known device has a number of workstations with a number of workpiece carriers, to each of which at least one workpiece can be attached. Furthermore, a transport unit is provided, with which the workpiece carriers can be transported from one workstation to the next workstation. With a drive unit, the transport unit can be driven from a rest position to a next rest position, wherein the transport unit with the drive unit is movable along a path in a specific transport cycle including a simple processing period. In this device, a variety of machining operations are performed in a clamping of the workpieces to be machined, with each work cycle all work stations another workpiece is supplied.

Aus der EP 0 716 902 B1 ist eine Vorrichtung bekannt, die über eine Anzahl von Werkstückträgern verfügt, an denen wenigstens ein Werkstück anbringbar ist. Die Werkstückträger sind zum Bearbeiten an einer Anzahl von Arbeitsstationen mittels einer von einer Antriebseinheit angetriebenen Transporteinheit von einer Arbeitsstation zur nächsten Arbeitsstation und mittels einer Stangenmechanik an den Arbeitsstationen anhebbar.From the EP 0 716 902 B1 a device is known which has a number of workpiece carriers to which at least one workpiece can be attached. The workpiece carriers are liftable for processing at a number of workstations by means of a transport unit driven by a drive unit from one workstation to the next workstation and by means of a rod mechanism at the workstations.

Aus der WO 00/15420 ist eine Vorrichtung für den Transport von kreisscheibenförmigen Substraten von einer Zuführstation über mehrere Zwischenstationen zu einer Endstation bekannt, bei der ein Drehtisch einer um seine Drehachse pendelnde, dem Bearbeitungszyklus angepasste Drehbewegung ausübt, wobei an jeder Arbeitsstation entsprechend einem Arbeitstakt eine Bearbeitung durchgeführt wird.Out WO 00/15420 is a device for the transport of circular disk-shaped substrates of a feeding station over several Stations known to a terminus, where a turntable one oscillating about its axis of rotation, adapted to the machining cycle Rotational movement, wherein at each workstation according to a work cycle a Processing carried out becomes.

Aus der EP 0 528 619 A2 ist ein Werkstückhandhabungssystem bekannt, das über einen Werkstücktisch verfügt, der in einer Richtung zwischen regelmäßig voneinander beabstandeten Arbeitsstationen bewegbar ist. Weiterhin ist ein zu dem Werkstücktisch koaxial angeordneter Träger für eine Bearbeitungsvorrichtung vorhanden, der in Richtung des Werkstücktisches oder entgegen dieser Richtung bewegbar ist. Dadurch lassen sich Werkstücke unterschiedlich lange an verschiedenen Arbeitsstationen bearbeiten.From the EP 0 528 619 A2 For example, there is known a workpiece handling system having a workpiece table that is movable in a direction between regularly spaced work stations. Furthermore, a support arranged coaxially with the workpiece table is provided for a machining device which is movable in the direction of the workpiece table or counter to this direction. This allows workpieces of different lengths to work on different workstations.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung der eingangs genannten Art anzugeben, die sich durch eine variable Gestaltung von Bearbeitungszeiten durch Einfach- und Mehrfachbearbeitungen bei einem bestimmten Transporttakt auszeichnet.Of the Invention is the object of a device of the initially specified type, characterized by a variable design Processing times by single and multiple machining at a certain transport cycle.

Diese Aufgabe wird bei einer Vorrichtung der eingangs genannten Art erfindungsgemäß dadurch gelöst, dass die Werkstückträger über eine zum Freisetzen und Verbinden über eine Ansteuereinheit ansteuerbare Manipulationseinheit lösbar mit der Transporteinheit verbunden sind, wobei bei wenigstens einer Mehrfacharbeitsstation nach Freisetzen des Werkstückträgers von der Transporteinheit der betreffende Werkstückträger über wenigstens zwei einfache Bearbeitungszeiträume an der betreffenden Mehrfacharbeitsstation verbleibt, und dass benachbart einer Mehrfacharbeitsstation wenigstens ein Pufferplatz eingerichtet ist, an dem das oder jedes mit dem betreffenden Werkstückträger verbundene Werkstück über wenigstens einen einfachen Bearbeitungszeitraum bearbeitungsfrei verbleibt.These The object is achieved in a device of the type mentioned in the present invention that the workpiece carrier over a to release and connect via a control unit controllable manipulation detachable with the transport unit are connected, wherein at least one Multiple workstation after release of the workpiece carrier from the transport unit of the relevant workpiece carrier over at least two simple Processing times remains at the relevant multiple workstation, and that adjacent a multiple workstation set up at least one buffer space is at which the or each connected to the respective workpiece carrier workpiece over at least a simple processing period remains unprocessed.

Dadurch, dass bei der erfindungsgemäßen Vorrichtung wenigstens ein bearbeitungsfreier Pufferplatz vorhanden und die Werkstückträger an einer dem betreffenden Pufferplatz benachbarten Mehrfacharbeitsstation von der Transporteinheit freisetzbar sowie nach wenigstens zwei einfachen Bearbeitungszeiträumen beziehungsweise im allgemeinen nach einem Mehrfachen eines einfachen Bearbeitungszeitraums wieder mit der Transporteinheit verbindbar sind, lassen sich an den Mehrfacharbeitsstationen bei einem bestimmten Transporttakt verlängerte und insbesondere auch unterschiedliche Bearbeitungszeiten einrichten. Jeder Pufferplatz dient dabei zur Aufnahme von Werkstückträgern vor oder nach einer Mehrfacharbeitsstation mit einer Bearbeitung über einen verlängerten Bearbeitungszeitraum während eines einfachen Bearbeitungszeitraumes, um die unterschiedliche Bearbeitungszeiten bei einer vorangehenden oder nachfolgenden Arbeitsstation auszugleichen und mit den übrigen Werkstückträgern im Transporttakt zu bleiben.Thereby, that in the device according to the invention at least one processing-free buffer space available and the Workpiece carrier on a relevant buffer space adjacent multiple workstation of the transport unit releasable and after at least two simple Processing periods or in general after a multiple of a simple one Processing period again connectable to the transport unit are at the multiple workstations at a particular Transport tact extended and in particular set up different processing times. Each buffer space serves to accommodate workpiece carriers or after a multiple workstation with a processing on a extended Processing period during a simple editing period to the different To compensate for processing times for a preceding or succeeding workstation and with the rest Workpiece carriers in Stay on the transport cycle.

Weitere zweckmäßige Ausgestaltungen sind Gegenstand der Unteransprüche.Further expedient embodiments are the subject of the dependent claims.

Nachfolgend werden Ausführungsbeispiele der Erfindung unter Bezug auf die Figuren der Zeichnung erläutert. Es zeigen:Hereinafter, embodiments of the invention explained with reference to the figures of the drawing. Show it:

1 in einer schematischen Darstellung in Draufsicht ein Ausführungsbeispiel einer erfindungsgemäßen Vorrichtung mit einer Gruppe von drei Mehrfacharbeitsstationen für eine Bearbeitung über drei einfache Bearbeitungszeiträume, einer Gruppe von zwei Mehrfacharbeitsstationen für eine Bearbeitung über zwei einfache Bearbeitungszeiträume und einer Anzahl von Arbeitsstationen für eine Bearbeitung über einfache Bearbeitungszeiträume, 1 1 is an exemplary embodiment of a device according to the invention with a group of three multiple workstations for processing over three simple processing periods, a group of two multiple workstations for processing over two simple processing periods, and a number of workstations for processing over simple processing periods;

2 das Ausführungsbeispiel gemäß 1 in einer im Bereich einer Antriebseinheit teilgeschnittenen Ansicht, 2 the embodiment according to 1 in a partial section in the region of a drive unit,

3 das Ausführungsbeispiel gemäß 1 und 2 in einer im Bereich von Führungsrollen teilgeschnittenen Ansicht, 3 the embodiment according to 1 and 2 in a view partially cut in the area of guide rollers,

4 das Ausführungsbeispiel gemäß 1, 2 und 3 in einer im Bereich einer Manipulationseinheit teilgeschnittenen Ansicht und 4 the embodiment according to 1 . 2 and 3 in a view partially cut in the area of a manipulation unit and

5 in einer schematischen Darstellung in Draufsicht ein weiteres Ausführungsbeispiel einer erfindungsgemäßen Vorrichtung mit drei Gruppen von jeweils zwei Mehrfacharbeitsstationen für eine Bearbeitung über zwei einfache Bearbeitungszeiträume und einer Anzahl von Arbeitsstationen für eine Bearbeitung über einfache Bearbeitungszeiträume. 5 in a schematic representation in plan view of another embodiment of a device according to the invention with three groups of two multiple workstations for processing over two simple processing periods and a number of workstations for processing over simple processing periods.

1 zeigt in einer schematischen Darstellung in Draufsicht ein Ausführungsbeispiel einer erfindungsgemäßen Vorrichtung. Die Vorrichtung gemäß 1 verfügt über eine Antriebseinheit 1, die einen Motor 2, ein mit dem Motor 2 verbundenes Getriebe 3 und ein mit dem Getriebe 3 antreibbares Antriebsritzel 4 auf weist. Weiterhin ist das Ausführungsbeispiel gemäß 1 mit einer Transporteinheit 5 ausgestattet, die als Mitnehmerteil über einen kreisförmigen Transportring 6 verfügt. Das Antriebsritzel 4 steht mit dem Transportring 6 in Eingriff, so dass der Transportring 6 mit der Antriebseinheit 1 zu einer Drehung antreibbar ist. Die an eine in 1 nicht dargestellte Ansteuereinheit angeschlossene Antriebseinheit 1 ist dazu eingerichtet, von der Ansteuereinheit gesteuert in einem bestimmten Transporttakt, der vorzugsweise einstellbar ist, den Transportring 6 um jeweils gleiche Bahnabschnitte bei diesem Ausführungsbeispiel in Uhrzeigerrichtung zu bewegen. 1 shows a schematic representation in plan view of an embodiment of a device according to the invention. The device according to 1 has a drive unit 1 that have a motor 2 , one with the engine 2 connected gearbox 3 and one with the gearbox 3 drivable drive pinion 4 having. Furthermore, the embodiment according to 1 with a transport unit 5 equipped as a driver part via a circular transport ring 6 features. The drive pinion 4 stands with the transport ring 6 engaged so that the transport ring 6 with the drive unit 1 is drivable to a rotation. The to an in 1 not shown drive unit connected drive unit 1 is arranged to controlled by the drive unit in a certain transport cycle, which is preferably adjustable, the transport ring 6 to move in each case the same track sections in this embodiment in the clockwise direction.

Bei dem Ausführungsbeispiel gemäß 1 sind zum Bearbeiten von Werkstücken eine Anzahl von Mehrfacharbeitsstationen und Einfacharbeitsstationen als Arbeitsstationen für eine Bearbeitung über einen mehrfachen beziehungsweise einen einfachen Bearbeitungszeitraum, nämlich eine erste Dreifacharbeitsstation 7, eine zweite Dreifacharbeitsstation 8 und eine dritte Dreifacharbeitsstation 9 einer Dreifachgruppe 10, eine erste Einfacharbeitsstation 11, eine Doppelgruppe 12 mit einer ersten Doppelarbeitsstation 13 sowie einer zweiten Doppelarbeitsstation 14 und schließlich eine zweite Einfacharbeitsstation 15 sowie eine dritte Einfacharbeitsstation 16 vorhanden. An den Dreifacharbeitsstationen 7, 8, 9 werden als Mehrfacharbeitsstationen über insgesamt drei einfache Bearbeitungszeiträume untereinander gleichartige Bearbeitungen durchgeführt. An den Doppelarbeitsstationen 13, 14 werden als weiterer Mehrfacharbeitsstationen über zwei einfache Bearbeitungszeiträume ebenfalls untereinander gleichartige Bearbeitungen vorgenommen. An den Einfacharbeitsstationen 11, 15, 16 schließlich werden als Arbeitsstationen über jeweils einen einzigen einfachen Bearbeitungszeitraum jeweils verschiedene Bearbeitungen ausgeführt.In the embodiment according to 1 For processing workpieces, a number of multiple workstations and single workstations are used as workstations for processing over a multiple or a simple processing period, namely a first triple workstation 7 , a second triple workstation 8th and a third triple workstation 9 a triple group 10 , a first simple workstation 11 , a double group 12 with a first double workstation 13 and a second double workstation 14 and finally a second single workstation 15 and a third single workstation 16 available. At the triple workstations 7 . 8th . 9 are performed as multiple workstations over a total of three simple processing periods with each other similar edits. At the double workstations 13 . 14 As a further multiple workstations over two simple processing periods also similar edits are made. At the simple workstations 11 . 15 . 16 Finally, different workings are carried out as workstations over a single simple processing period.

Die Arbeitsstationen 7, 8, 9, 11, 13, 14, 15, 16 sind in einem einem Bahnabschnitt oder einem Vielfachen davon entsprechenden Abstand entlang des Transportringes 6 angeordnet, wobei die Dreifacharbeitsstationen 7, 8, 9 sowie die Doppelarbeitsstationen 13, 14 in ihren Gruppen 10, 12 jeweils einen Bahnabschnitt voneinander beabstandet sind. Auch die zweite Einfacharbeitsstation 15 und die dritte Einfacharbeitsstation 16 liegen einen Bahnabschnitt voneinander entfernt.The workstations 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 are in a path section or a multiple thereof corresponding distance along the transport ring 6 arranged, with the triple workstations 7 . 8th . 9 as well as the duplicate workstations 13 . 14 in their groups 10 . 12 in each case a track section are spaced from each other. Also the second single workstation 15 and the third single workstation 16 lie one track section apart.

Bei dem Ausführungsbeispiel gemäß 1 sind zwischen der in Uhrzeigerrichtung die Dreifachgruppe 10 abschließenden dritten Dreifacharbeitsstation 9 und der ersten Einfacharbeitsstation 11 ein erster Pufferplatz 17 und ein zweiter Pufferplatz 18 eingerichtet. Zwischen der ersten Einfacharbeitsstation 11 und in Uhrzeigerrichtung zu Beginn der Doppelgruppe 12 angeordneten ersten Doppelarbeitsstation 13 sind ein dritter Pufferplatz 19 und ein vierter Pufferplatz 20 vorhanden. Zwischen dem in Uhrzeigerrichtung am Ende der Doppelgruppe 12 angeordneten zweiten Doppelarbeitsstation 14 und der zweiten Einfacharbeitsstation 15 ist ein fünfter Pufferplatz 21 vorgesehen. Schließlich sind zwischen der dritten Einfacharbeitsstation 16 und der in Uhrzeigerrichtung zu Beginn der Dreifachgruppe 10 liegenden ersten Dreifacharbeitsstation 7 ein sechster Pufferplatz 22, ein siebter Pufferplatz 23 und ein achter Pufferplatz 24 eingerichtet. Die Pufferplätze 17 bis 24 liegen ebenfalls einen Bahnabschnitt oder einem Vielfachen davon voneinander beziehungsweise von einer Arbeitsstation 7, 9, 11, 13, 14, 15, 16 entfernt.In the embodiment according to 1 are between the clockwise triple group 10 final third triple workstation 9 and the first single workstation 11 a first buffer space 17 and a second buffer space 18 set up. Between the first single workstation 11 and clockwise at the beginning of the double group 12 arranged first double workstation 13 are a third buffer space 19 and a fourth buffer space 20 available. Between the clockwise direction at the end of the double group 12 arranged second double workstation 14 and the second single workstation 15 is a fifth buffer space 21 intended. Finally, between the third single workstation 16 and in the clockwise direction at the beginning of the triple group 10 lying first triple workstation 7 a sixth buffer place 22 , a seventh buffer space 23 and an eighth buffer space 24 set up. The buffer spaces 17 to 24 also lie a track section or a multiple thereof from each other or from a workstation 7 . 9 . 11 . 13 . 14 . 15 . 16 away.

Somit sind bei dem Ausführungsbeispiel gemäß 1 an insgesamt 16 Positionen, die jeweils einen Bahnabschnitt voneinander entfernt sind, entweder Arbeitsstationen 7, 8, 9, 11, 13, 14, 15, 16 oder Pufferplätze 17 bis 24 vorhanden, die in dem Transporttakt von dem Transportring 6 anfahrbar sind.Thus, in the embodiment according to 1 in total 16 Positions that are each a track section away from each other, either workstations 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 or buffer locations 17 to 24 present in the transport cycle from the transport ring 6 are approachable.

Weiterhin verfügt das Ausführungsbeispiel gemäß 1 über eine Anzahl von Werkstückträger, nämlich über einen ersten Werkstückträger 25, einen zweiten Werkstückträger 26, einen dritten Werkstückträger 27, einen vierten Werkstückträger 28, einen fünften Werkstückträger 29, einen sechsten Werkstückträger 30, einen siebten Werkstückträger 31, einen achten Werkstückträger 32, einen neunten Werkstückträger 33, einen zehnten Werkstückträger 34, einen elften Werkstückträger 35, einen zwölften Werkstückträger 36 und einen 13. Werkstückträger 36'.Furthermore, the embodiment according to 1 via a number of workpiece carriers, namely via a first workpiece carrier 25 , a second workpiece carrier 26 , a third workpiece carrier 27 , a fourth workpiece carrier 28 , a fifth workpiece carrier 29 , a sixth workpiece carrier 30 , a seventh workpiece carrier 31 , an eighth workpiece carrier 32 , a ninth workpiece carrier 33 , a tenth workpiece carrier 34 , an eleventh workpiece carrier 35 , a twelfth workpiece carrier 36 and one 13 , Workpiece carrier 36 ' ,

In der Darstellung gemäß 1 sind der vierte Pufferplatz 20, der siebte Pufferplatz 23 und der achte Pufferplatz 24 frei von Werkstückträgern 24 bis 36, 36', während die Arbeitsstationen 7, 8, 9, 11, 13, 14, 15, 16 und die übrigen Pufferplätze 17, 18, 19, 21, 22 mit den Werkstückträgern 24 bis 36, 36' bestückt sind. Die Anordnung der Werkstückträger 24 bis 36, 36' gemäß 1 ist typisch für den Beginn einer in ihrem Ablauf weiter unten erläuterten umlaufenden Bearbeitung von in 1 nicht dargestellten Werkstücken an allen Arbeitsstationen 7, 8, 9, 11, 13, 14, 15, 16.In the illustration according to 1 are the fourth buffer space 20 , the seventh buffer space 23 and the eighth buffer space 24 free of workpiece carriers 24 to 36 . 36 ' while the workstations 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 and the remaining buffer locations 17 . 18 . 19 . 21 . 22 with the workpiece carriers 24 to 36 . 36 ' are equipped. The arrangement of the workpiece carrier 24 to 36 . 36 ' according to 1 is typical of the beginning of a continuous processing of in-process explained below 1 not shown workpieces at all workstations 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 ,

2 zeigt das Ausführungsbeispiel gemäß 1 in einer im Bereich der Transporteinheit 1 teilgeschnittenen Ansicht. Aus 2 ist ersichtlich, dass der Motor 2 und das Getriebe 3 der Transporteinheit 1 auf einer Seite einer Grundplatte 37 angebracht ist. Eine durch die Grundplatte 37 durchgreifende Welle 38 verbindet das Getriebe 3 und das auf der anderen Seite der Grundplatte 37 angeordnete Antriebsritzel 4. Aus 2 ist ersichtlich, dass das Antriebsritzel 4 und der Transportring 6 ineinandergreifende Zähne aufweisen. 2 shows the embodiment according to 1 in one in the area of the transport unit 1 partially cut view. Out 2 it can be seen that the engine 2 and the gearbox 3 the transport unit 1 on one side of a base plate 37 is appropriate. One through the base plate 37 sweeping wave 38 connects the transmission 3 on the other side of the base plate 37 arranged drive pinion 4 , Out 2 it can be seen that the drive pinion 4 and the transport ring 6 have interlocking teeth.

Weiterhin ist 2 zu entnehmen, dass der Transportring 6 mit einem Paar von einander gegenüberliegenden und seitlich abstehenden Führungsvorsprüngen 39 ausgebildet ist und an seiner von der Grundplatte 37 wegweisenden Stirnseite einen Mitnahmezapfen 40 als Vorsprung aufweist, der in der Darstellung gemäß 2 in eine Mittenausnehmung 41 als Vertiefung eingreift, die bei dem in 2 dargestellten siebten Werkstückträger 31 sowie entsprechend bei allen übrigen Werkstückträgern 25 bis 30, 32 bis 36 jeweils im Mittenbereich eingebracht ist. Die Mitnahmezapfen 40 und Mittenausnehmungen 41 bilden in besonders einfacher Weise lösbar miteinander in Eingriff bringbare Fixiermittel.Furthermore is 2 to see that the transport ring 6 with a pair of opposed and laterally projecting guide projections 39 is formed and at its from the base plate 37 pioneering front end a driving pin 40 as a projection, in the illustration according to 2 in a central recess 41 engages as a depression, which in the in 2 illustrated seventh workpiece carrier 31 as well as with all other workpiece carriers 25 to 30 . 32 to 36 each introduced in the middle region. The driving pins 40 and center recesses 41 form in a particularly simple manner releasably engageable with each other fixing.

Bei einer nicht dargestellte Abwandlung sind Fixiermittel vorhanden, die zum Herstellen einer kraftschlüssigen Verbindung zwischen den Werkstückträgern 25 bis 36 sowie der Transporteinheit 5 eingerichtet sind. Beispielsweise verfügen bei der Abwandlung die Fixiermittel über Magnete oder eine erhöhte Reibung beziehungsweise Haftung aufweisende Elemente.In a modification, not shown, fixing means are provided which are for producing a non-positive connection between the workpiece carriers 25 to 36 as well as the transport unit 5 are set up. For example, in the modification, the fixing means on magnets or increased friction or liability having elements.

Weiterhin sind, wie in 2 exemplarisch an dem siebten Werkstückträger 31 dargestellt, an den der Grundplatte 37 zuweisenden Seiten der Werkstückträger 25 bis 36 Randausnehmungen 42 ausgebildet, die beidseitig des Transportringes 6 verlaufen. Schließlich ist 2 zu entnehmen, dass die Werkstücke 43 in Bezug auf den Transportring 6 und die Werkstückträger 25 bis 36 zweckmäßigerweise im wesentlichen mittig auf den Werkstückträgern 25 bis 36 angeordnet sind.Furthermore, as in 2 exemplarily on the seventh workpiece carrier 31 shown at the base plate 37 assigning sides of the workpiece carrier 25 to 36 edge recesses 42 formed on both sides of the transport ring 6 run. Finally is 2 to see that the workpieces 43 in relation to the transport ring 6 and the workpiece carriers 25 to 36 expediently substantially centrally on the workpiece carriers 25 to 36 are arranged.

3 zeigt das Ausführungsbeispiel gemäß 1 und 2 in einer weiteren teilgeschnittenen Ansicht im Bereich des ersten Werkstückträgers 25. 3 ist zu entnehmen, dass zum Lagern des Transportringes 6 die Führungsvorsprünge 39 abschnittsweise in komplementär ausgebildete Vertiefungen von in regelmäßigen Abständen beidseitig des Transportringes 6 angeordneten Führungsrollen 44 eingreifen. Die Führungsrollen 44 sind über Verbindungsstücke 45 mit der Grundplatte 37 verbunden. 3 shows the embodiment according to 1 and 2 in a further partially sectioned view in the region of the first workpiece carrier 25 , 3 it can be seen that for storing the transport ring 6 the guide projections 39 sections in complementary trained depressions of at regular intervals on both sides of the transport ring 6 arranged guide rollers 44 intervention. The leadership roles 44 are about connectors 45 with the base plate 37 connected.

4 das Ausführungsbeispiel gemäß 1, 2 und 3 in einer weiteren teilgeschnittenen Ansicht im Bereich einer Manipulationseinheit 46 zum Freisetzen und zum Verbinden von Werkstückträgern 25 bis 36 von beziehungsweise mit dem Transportring 6 an den Arbeitsstationen 7, 8, 9, 11, 13, 14, 15, 16. Die Manipulationseinheit 46 verfügt über Führungsstangen 47, die mit einem Ende an der dem Transportring 6 gegenüberliegenden Seite der Grundplatte 37 angebracht sind. Die der Grundplatte 37 gegenüberliegenden Enden der Führungsstangen 47 stehen mit einer Befestigungsplatte 48 in Verbindung, an der ein beispielsweise pneumatisch oder hydraulisch betätigbarer Hubzylinder 49 befestigt ist. 4 the embodiment according to 1 . 2 and 3 in another partially cut view in the area of a manipulation unit 46 for releasing and connecting workpiece carriers 25 to 36 from or with the transport ring 6 at the workstations 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 , The manipulation unit 46 has guide rods 47 with one end attached to the transport ring 6 opposite side of the base plate 37 are attached. The base plate 37 opposite ends of the guide rods 47 stand with a mounting plate 48 in connection, at the example of a pneumatically or hydraulically actuated lifting cylinder 49 is attached.

Eine Zylinderstange 50 des Hubzylinders 49 steht mit ihrem von dem Hubzylinder 49 wegweisenden Ende mit einem Hubschlitten 51 in Verbindung, der mit Führungsabschnitten 52 die Führungsstangen 47 umschließt und mit Betätigungsabschnitten 53 durch die Grundplatte 37 durchgreift. An den Enden der Betätigungsabschnitte 53 sind Eingreifabschnitte 54 vorhanden, die komplementär zu den Randausnehmungen 42 der Werkstückträger 25 bis 36 ausgebildet sind.A cylinder rod 50 the lifting cylinder 49 stands with her from the lifting cylinder 49 groundbreaking end with a lifting carriage 51 in conjunction, with guide sections 52 the guide rods 47 encloses and with operating sections 53 through the base plate 37 be upheld. At the ends of the operating sections 53 are intervention sections 54 present, which is complementary to the Randausnehmungen 42 the workpiece carrier 25 to 36 are formed.

Bei Betätigen des Hubzylinders 49 bewegt sich der Hubschlitten 51 ausgehend von der in 4 dargestellten Stellung in Richtung des in 4 beispielhaft als bei der zweiten Dreifacharbeitsstation 8 der Dreifachgruppe 10 angeordnet dargestellten zweiten Werkstückträgers 26, bis die Eingreifabschnitte 54 in den Randausnehmungen 42 zu liegen kommen und der Mitnahmezapfen 40 aus der Mittenausnehmung 41 unter Freisetzen des zweiten Werkstückträgers 26 von dem Transportring 6 ausgeführt ist. Zum Verbinden des in 4 beispielhaft dargestellten zweiten Werkstückträgers 26 mit dem Transportring 6 fährt die Zylinderstange 50 in den Hubzylinder 49 zurück, bis der Mitnahmezapfen 40 innerhalb der Mittenausnehmung 41 angeordnet ist und die Eingreifabschnitte 54 freiliegen.When operating the lifting cylinder 49 the lifting carriage moves 51 starting from the in 4 position shown in the direction of 4 exemplary than the second triple work station 8th the triple group 10 arranged illustrated second workpiece carrier 26 until the intercept slice 54 in the marginal recesses 42 to come to rest and the takeaway 40 from the middle recess 41 releasing the second workpiece carrier 26 from the transport ring 6 is executed. To connect the in 4 exemplified second workpiece carrier 26 with the transport ring 6 drives the cylinder rod 50 in the lifting cylinder 49 back until the driving pin 40 within the middle recess 41 is arranged and the engaging portions 54 exposed.

Nachfolgend wird der Ablauf einer umlaufenden Bearbeitung bei dem Ausführungsbeispiel gemäß 1 bis 4 näher erläutert.Hereinafter, the sequence of a circumferential processing in the embodiment according to 1 to 4 explained in more detail.

Bei dem Ausführungsbeispiel gemäß 1 bis 4 verbleiben zu Beginn eines Bearbeitungszyklus ausgehend von der Anordnung gemäß 1 in der ersten Ruheposition des Transportringes 6 der erste Werkstückträger 25, der zweite Werkstückträger 26 und der dritte Werkstückträger 27 bei gelöster Verbindung mit dem Transportring 6 über drei einfache Bearbeitungszeiträume bei den Dreifacharbeitsstationen 7, 8, 9 der Dreifachgruppe 10, bis sie am Ende des sich aus drei einfachen Bearbeitungszeiträumen zusammensetzenden dreifachen Bearbeitungszeitraumes nach Verbindung mit dem Transportring 6 im Uhrzeigersinn bearbeitungsfrei über insgesamt drei Bahnabschnitte weitertransportiert werden.In the embodiment according to 1 to 4 remain at the beginning of a processing cycle starting from the arrangement according to 1 in the first rest position of the transport ring 6 the first workpiece carrier 25 , the second workpiece carrier 26 and the third workpiece carrier 27 when disconnected from the transport ring 6 over three simple processing periods at the triple workstations 7 . 8th . 9 the triple group 10 until, at the end of the threefold processing period composed of three simple processing periods, after connection to the transport ring 6 clockwise processing over a total of three track sections are transported.

Während der Bearbeitungszeit in der Dreifachgruppe 10 fahren der sechste Werkstückträger 30, der fünfte Werkstückträger 29 und der vierte Werkstückträger 28 jeweils während eines Transporttaktes durch die erste Einfacharbeitsstation 11 und verbleiben dort über einen einzigen einfachen Bearbeitungszeitraum in der jeweiligen Ruheposition des Transportringes 6, wobei nach dem ersten Transporttakt der zu Beginn des Bearbeitungszyklus leere vierte Pufferplatz 20 von dem aus dem dritten Pufferplatz auffahrenden siebten Werkstückträger 31 besetzt wird und der sechste Werkstückträger 30 aus der ersten Einfacharbeitsstation 11 auf den dritten Pufferplatz 19 vorrückt.During the processing time in the triple group 10 drive the sixth workpiece carrier 30 , the fifth workpiece carrier 29 and the fourth workpiece carrier 28 each during a transport cycle through the first single workstation 11 and remain there over a single simple processing period in the respective rest position of the transport ring 6 , wherein after the first transport cycle, the fourth buffer space empty at the beginning of the processing cycle 20 from the seventh workpiece carrier rising from the third buffer space 31 is occupied and the sixth workpiece carrier 30 from the first single workstation 11 on the third buffer place 19 advances.

Der zu Beginn des Bearbeitungszyklus in der ersten Doppelarbeitsstation 13 der Doppelgruppe 12 befindliche achte Werkstückträger 32 und der ebenfalls zu Beginn des Bearbeitungszyklus in der zweiten Doppelarbeitsstation 14 der Doppelgruppe 12 befindliche neunte Werkstückträger 33 verbleiben bei gelöster Verbindung mit dem Transportring 6 über einen sich aus zwei einfachen Bearbeitungszeiträumen zusammensetzenden zweifachen Bearbeitungszeitraum in den Doppelarbeitsstationen 13, 14. Nach Abschluss der Bearbeitung an den Doppelarbeitsstationen 13, 14 werden der achte Werkstückträger 32 und der neunte Werkstückträger 33 wieder mit dem Transportring 6 verbunden und verfahren über zwei Bahnabschnitte an die Position der zweiten Einfacharbeitsstation 15 beziehungsweise den fünften Pufferplatz 21, wobei die Positionen an den Doppelarbeitsstationen 13, 14 nunmehr von dem siebten Werkstückträger 31 und sechsten Werkstückträger 30 eingenommen werden, die aus den beiden der Doppelgruppe 12 vorangehenden Pufferstationen 19, 20 ebenfalls um zwei Bahnabschnitte in die nächste Ruheposition des Transportringes 6 nachrücken.The at the beginning of the processing cycle in the first double workstation 13 the double group 12 located eighth workpiece carrier 32 and also at the beginning of the processing cycle in the second double workstation 14 the double group 12 located ninth workpiece carrier 33 remain with dissolved connection with the transport ring 6 over a two-time processing period composed of two simple processing periods in the duplicate work stations 13 . 14 , After completing the processing at the duplicate workstations 13 . 14 become the eighth workpiece carrier 32 and the ninth workpiece carrier 33 again with the transport ring 6 connected and moved over two track sections to the position of the second single workstation 15 or the fifth buffer space 21 , where the positions at the double workstations 13 . 14 now from the seventh workpiece carrier 31 and sixth workpiece carrier 30 taken from the two of the double group 12 preceding buffer stations 19 . 20 also about two track sections in the next rest position of the transport ring 6 move up.

Zu Beginn des Bearbeitungszyklus ist der fünfte Pufferplatz 21 mit dem zehnten Werkstückträger 34 besetzt, während der elfte Werkstückträger 35 an der zweiten Einfacharbeitsstation 15 und der zwölfte Werkstückträger 36 an der dritten Einfacharbeitsstation 16 angeordnet sind. Der 13. Werkstückträger 36' befindet sich an dem sechsten Pufferplatz 22. Nach einem einfachen Bearbeitungszeitraum rücken zu Beginn des nächsten Transporttaktes der zehnte Werkstückträger 34 in die zweite Einfacharbeitsstation 15, der elfte Werkstückträger 35 in die dritte Einfacharbeitsstation 16 und der zwölfte Werkstückträger 36 auf den sechsten Pufferplatz 22 vor. Der 13. Werkstückträger 36' ist dann auf dem siebten Pufferplatz 23. Nach entsprechenden Vorrücken um jeweils einen weiteren Bahnabschnitt in eine weitere Ruheposition des Transportringes 6 befinden sich schließlich der elfte Werkstückträger 35, der zwölfte Werkstückträger 36 und der 13. Werkstückträger 36' an den Positionen des sechsten Pufferplatz 22, des siebten Pufferplatz 23 beziehungsweise des achten Pufferplatzes 24, aus denen sie bei dem nächsten Transporttakt gemeinsam über drei Bahnabschnitte in die Dreifacharbeitsstationen 7, 8, 9 der Dreifachgruppe 10 überführt werden.At the beginning of the processing cycle is the fifth buffer space 21 with the tenth workpiece carrier 34 occupied during the eleventh workpiece carrier 35 at the second single work station 15 and the twelfth workpiece carrier 36 at the third single workstation 16 are arranged. Of the 13 , Workpiece carrier 36 ' is located at the sixth buffer place 22 , After a simple processing period move to the beginning of the next transport cycle of the tenth workpiece carrier 34 into the second single workstation 15 , the eleventh workpiece carrier 35 into the third single workstation 16 and the twelfth workpiece carrier 36 on the sixth buffer place 22 in front. Of the 13 , Workpiece carrier 36 ' is then on the seventh buffer place 23 , After corresponding advances by a respective further track section in a further rest position of the transport ring 6 Finally there are the eleventh workpiece carrier 35 , the twelfth workpiece carrier 36 and the 13 , Workpiece carrier 36 ' at the positions of the sixth buffer space 22 , the seventh buffer place 23 or the eighth buffer space 24 , from which they together on the next transport cycle over three track sections in the triple work stations 7 . 8th . 9 the triple group 10 be transferred.

Die Bearbeitung wird fortgesetzt, bis jeder Werkstückträger 25 bis 36, 36' an den Ruhepositionen des Transportringes 6 über entsprechende einfache oder mehrfache Bearbeitungszeiträume bei jeder Arbeitsstation 7, 8, 9, 11, 13, 14, 15, 16 verweilt hat. Danach werden die für diesen Bearbeitungszyklus fertig bearbeiteten Werkstücke 43 von den Werkstückträgern 25 bis 36, 36' entnommen oder einer weiteren Bearbeitung zugeführt.Processing continues until each workpiece carrier 25 to 36 . 36 ' at the rest positions of the transport ring 6 via corresponding single or multiple processing periods at each workstation 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 has lingered. Thereafter, the finished for this processing cycle workpieces 43 from the workpiece carriers 25 to 36 . 36 ' removed or supplied for further processing.

Die erfindungsgemäße Vorrichtung gemäß dem Ausführungsbeispiel von 1 zeichnet sich durch die Einrichtung von Pufferplätzen 19, 20, 21, 22, 23, 24 in Umlaufrichtung des Transportringes 6 sowohl vor als auch nach der Dreifachgruppe 10 beziehungsweise der Doppelgruppe 12 aus.The inventive device according to the embodiment of 1 characterized by the establishment of buffer spaces 19 . 20 . 21 . 22 . 23 . 24 in the direction of rotation of the transport ring 6 both before and after the triple group 10 or the double group 12 out.

5 zeigt ein weiteres Ausführungsbeispiel einer erfindungsgemäßen Vorrichtung, das ähnlich dem anhand 1 bis 4 erläuterten Ausführungsbeispiel und insbesondere mit insgesamt 13 Werkstückträgern 25 bis 36, 36' aufgebaut ist sowie über einen 14. Werkstückträger 36'' verfügt, wobei sich entsprechende Elemente in 1 bis 4 und in 5 mit gleichen Bezugszeichen versehen und im Detail nicht erneut näher erläutert sind. 5 shows a further embodiment of a device according to the invention, similar to the reference 1 to 4 explained embodiment and in particular with total 13 Workpiece carriers 25 to 36 . 36 ' is constructed as well as over one 14 , Workpiece carrier 36 '' has, with corresponding elements in 1 to 4 and in 5 provided with the same reference numerals and are not explained in detail again.

Das Ausführungsbeispiel gemäß 5 verfügt über eine erste Doppelgruppe 55 mit einer ersten Doppelarbeitsstation 56 und einer zweiten Doppelarbeitsstation 57 als Mehrfacharbeitsstationen zum Durchführen einer ersten gleichartigen Bearbeitung über zwei einfache Bearbeitungszeiträume. Weiterhin sind eine erste Einfacharbeitsstation 58 als Arbeitsstation für eine Bearbeitung über jeweils einen einfachen Bearbeitungszeitraum, eine zweite Doppelgruppe 59 mit einer dritten Doppelarbeitsstation 60 sowie einer vierten Doppelarbeitsstation 61 als Mehrfacharbeitsstationen zum Durchführen einer zweiten gleichartigen Bearbeitung über zwei einfache Bearbeitungszeiträume, eine unmittelbar auf die zweite Doppelgruppe 59 folgende dritte Doppelgruppe 62 mit einer fünften Doppelarbeitsstation 63 und einer sechsten Doppelarbeitsstation 64 als Mehrfacharbeitsstationen zum Durchführen einer dritten gleichartigen Bearbeitung über zwei einfache Bearbeitungszeiträume sowie eine Abfolge von einer zweiten Einfacharbeitsstation 65, einer dritten Einfacharbeitsstation 66 und einer vierten Einfacharbeitsstation 67 als Arbeitsstationen für eine Bearbeitung über jeweils einen einfachen Bearbeitungszeitraum eingerichtet.The embodiment according to 5 has a first double group 55 with a first double workstation 56 and a second double workstation 57 as multiple workstations for performing a first similar processing over two simple processing periods. Furthermore, a first single workstation 58 as a workstation for processing over one simple processing period each, a second double group 59 with a third double workstation 60 and a fourth double workstation 61 as multiple workstations for performing a second similar processing over two simple processing periods, one directly on the second double group 59 following third double group 62 with a fifth double workstation 63 and a sixth double workstation 64 as multiple workstations for performing a third similar processing over two simple processing periods and a sequence of a second single workstation 65 , a third single workstation 66 and a fourth single workstation 67 set up as workstations for one-time editing.

Zwischen der zweiten Doppelarbeitsstation 57 der ersten Doppelgruppe 55 und der ersten Einfacharbeitsstation 58 ist ein erster Pufferplatz 68 vorhanden, während sich zwischen der ersten Einfacharbeitsstation 58 und der ersten Doppelarbeitsstation 60 der zweiten Doppelgruppe 59 ein zweiter Pufferplatz 69 und ein dritter Pufferplatz 70 befindet. Weiterhin sind zwischen der zweiten Doppelarbeitsstation 64 der dritten Doppelgruppe 62 und der zweiten Einfacharbeitsstation 65 ein vierter Pufferplatz 71 und zwischen der vierten Einfacharbeitsstation 67 und der ersten Doppelarbeitsstation 56 der ersten Doppelgruppe 55 ein fünfter Pufferplatz 72 sowie ein sechster Pufferplatz 73 eingerichtet.Between the second double workstation 57 the first double group 55 and the first single workstation 58 is a first buffer space 68 present while in between the first single workstation 58 and the first double workstation 60 the second double group 59 a second buffer space 69 and a third buffer space 70 located. Furthermore, between the second double work station 64 the third double group 62 and the second single workstation 65 a fourth buffer space 71 and between the fourth single workstation 67 and the first double workstation 56 the first double group 55 a fifth buffer space 72 as well as a sixth buffer place 73 set up.

Die Bearbeitungsabfolge bei dem Ausführungsbeispiel gemäß 5 erfolgt zu Beginn des Arbeitszyklus in der Anordnung der Werkstückträger 25 bis 36, 36', 36'' gemäß 5. Dabei verbleiben entsprechend der Bearbeitungsabfolge bei dem Ausführungsbeispiel gemäß 1 in Doppelarbeitsstationen 56, 57, 60, 61, 63, 64 angeordnete Werkstückträger 25 bis 36 von dem Transportring 6 freigesetzt über zwei einfache Bearbeitungszeiträume in den jeweiligen Doppelstationen 55, 59, 62, während in dieser Zeit in den Einfacharbeitsstationen 58, 65, 66, 67 beziehungsweise an Pufferplätzen 68, 69, 70, 71, 72, 73 positionierte Werkstückträger 25 bis 36, 36', 36'' nach einem einfachen Bearbeitungszeitraum um einen einzigen Bahnabschnitt zur nächsten Ruheposition des Transportringes 6 vor rücken, bis die Bearbeitungszeit in den Doppelarbeitsstationen 56, 57, 60, 61, 63, 64 beendet ist.The processing sequence in the embodiment according to 5 takes place at the beginning of the work cycle in the arrangement of the workpiece carrier 25 to 36 . 36 ' . 36 '' according to 5 , In this case, according to the processing sequence remain in the embodiment according to 1 in duplicate workstations 56 . 57 . 60 . 61 . 63 . 64 arranged workpiece carrier 25 to 36 from the transport ring 6 Released over two simple processing periods in the respective double stations 55 . 59 . 62 while at this time in the basic workstations 58 . 65 . 66 . 67 or at buffer locations 68 . 69 . 70 . 71 . 72 . 73 positioned workpiece carrier 25 to 36 . 36 ' . 36 '' After a simple processing period to a single track section to the next rest position of the transport ring 6 move forward until the processing time in the duplicate workstations 56 . 57 . 60 . 61 . 63 . 64 finished.

Anschließend rücken alle Werkstückträger 25 bis 36, 36', 36'' um einen Bahnabschnitt zur nächsten Ruheposition des Transportringes 6 vor, wobei die dann in Einfacharbeitsstationen 58, 65, 66, 67 angeordneten Werkstückträger 26, 33, 34 mit der Manipulationseinheit 46 von dem Transportring 6 freigesetzt werden. Dann rücken die übrigen Werkstückträger 25, 27 bis 32, 35, 36, 36', 36'' um einen weiteren Bahnabschnitt bis zur der nächsten Ruheposition des Transportringes 6 vor.Subsequently, all workpiece carriers move 25 to 36 . 36 ' . 36 '' around a path section to the next rest position of the transport ring 6 before, which then in single workstations 58 . 65 . 66 . 67 arranged workpiece carrier 26 . 33 . 34 with the manipulation unit 46 from the transport ring 6 be released. Then the other workpiece carriers move 25 . 27 to 32 . 35 . 36 . 36 ' . 36 '' to another track section to the next rest position of the transport ring 6 in front.

Im weiteren Verlauf der Bearbeitung erfolgt entsprechend immer dann ein Freisetzen von Werkstückträgern 25 bis 36, 36', 36'' an einer Arbeitsstation 56, 57, 58, 60, 61, 63, 64, 65, 66, 67, wenn bei einem Vorrücken um mehr als einen Bahnabschnitt die Bearbeitung an der betreffenden Arbeitsstationen 56, 57, 58, 60, 61, 63, 64, 65, 66, 67 noch nicht durchgeführt worden ist.As the process progresses, a release of workpiece carriers always takes place accordingly 25 to 36 . 36 ' . 36 '' at a workstation 56 . 57 . 58 . 60 . 61 . 63 . 64 . 65 . 66 . 67 if, when advancing by more than one track section, the machining at the respective workstations 56 . 57 . 58 . 60 . 61 . 63 . 64 . 65 . 66 . 67 has not been done yet.

Das Ausführungsbeispiel gemäß 2 zeichnet sich durch eine Pufferplätze sparende effiziente, unmittelbar hintereinander gelegene Anordnung von zwei Doppelgruppen, nämlich der zweiten Doppelgruppe 59 und der dritten Doppelgruppe 62 aus.The embodiment according to 2 is characterized by an efficient buffering, immediately one behind the other arrangement of two double groups, namely the second double group 59 and the third double group 62 out.

Claims (10)

Vorrichtung zum Bearbeiten von Werkstücken an einer Anzahl von Arbeitsstationen mit einer Anzahl von Werkstückträgern, an denen jeweils wenigstens ein Werkstück anbringbar ist, mit einer Transporteinheit, mit der die Werkstückträger von einer Arbeitsstation zur nächsten Arbeitsstation transportierbar sind, und mit einer Antriebseinheit, mit der die Transporteinheit von einer Ruheposition zu einer nächsten Ruheposition antreibbar ist, wobei die Transporteinheit mit der Antriebseinheit in einem bestimmten einen einfachen Bearbeitungszeitraum einschließenden Transporttakt entlang einer Bahn bewegbar ist, dadurch gekennzeichnet, dass die Werkstückträger (25 bis 36, 36', 36'') über eine zum Freisetzen und Verbinden über eine Ansteuereinheit ansteuerbare Manipulationseinheit (46) lösbar mit der Transporteinheit (5) verbunden sind, wobei bei wenigstens einer Mehrfacharbeitsstation (7, 8, 9, 11, 13, 14, 15, 16, 56, 57, 58, 60, 61, 63, 64, 65, 66, 67) nach Freisetzen des Werkstückträgers (25 bis 36, 36', 36'') von der Transporteinheit (5) der betreffende Werkstückträger (25 bis 36, 36', 36'') über wenigstens zwei einfache Bearbeitungszeiträume an der betreffenden Mehrfacharbeitsstation (7, 8, 9, 11, 13, 14, 15, 16, 56, 57, 58, 60, 61, 63, 64, 65, 66, 67) verbleibt, und dass benachbart einer Mehrfacharbeitsstation (7, 8, 9, 11, 13, 14, 15, 16, 56, 57, 58, 60, 61, 63, 64, 65, 66, 67) wenigstens ein Pufferplatz (17, 18, 19, 21, 22, 23, 24, 68 bis 73) eingerichtet ist, an dem das oder jedes mit dem betreffenden Werkstückträger (25 bis 36, 36', 36'') verbundene Werkstück (43) über wenigstens einen einfachen Bearbeitungszeitraum bearbeitungsfrei verbleibt.Device for processing workpieces at a number of workstations with a number of workpiece carriers, to each of which at least one workpiece can be attached, with a transport unit, with which the workpiece carriers can be transported from one workstation to the next workstation, and with a drive unit, with which the Transport unit can be driven from a rest position to a next rest position, wherein the transport unit with the drive unit in a certain a simple processing period enclosing transport cycle along a path is movable, characterized in that the workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) via a triggering unit for releasing and connecting via a drive unit controllable manipulation unit ( 46 ) detachable with the transport unit ( 5 ), wherein at least one multiple workstation ( 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 . 56 . 57 . 58 . 60 . 61 . 63 . 64 . 65 . 66 . 67 ) after release of the workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) of the transport unit ( 5 ) the relevant workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) for at least two simple processing periods at the relevant multiple workstation ( 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 . 56 . 57 . 58 . 60 . 61 . 63 . 64 . 65 . 66 . 67 ) and that adjacent to a multiple workstation ( 7 . 8th . 9 . 11 . 13 . 14 . 15 . 16 . 56 . 57 . 58 . 60 . 61 . 63 . 64 . 65 . 66 . 67 ) at least one buffer space ( 17 . 18 . 19 . 21 . 22 . 23 . 24 . 68 to 73 ) is set up on which the or each with the relevant workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) connected workpiece ( 43 ) remains free of machining over at least one simple processing period. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Transporteinheit (5) ein in sich geschlossenes Mitnehmerteil (6) aufweist.Apparatus according to claim 1, characterized in that the transport unit ( 5 ) a self-contained driver part ( 6 ) having. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, dass das Mitnehmerteil ein kreisförmiger Transportring (6) ist.Apparatus according to claim 2, characterized in that the driver part, a circular transport ring ( 6 ). Vorrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die Antriebseinheit (1) an eine Ansteuereinheit angeschlossen ist, mit der der Transporttakt einstellbar ist.Device according to one of claims 1 to 3, characterized in that the drive unit ( 1 ) is connected to a drive unit with which the transport cycle is adjustable. Vorrichtung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass an den Werkstückträgern (25 bis 36, 36', 36'') sowie der Transporteinheit (5) miteinander lösbar in Eingriff bringbare Fixiermittel (40, 41) ausgebildet sind und dass die Manipulationseinheit (46) einen Hubzylinder (49) aufweist, mit dem die Werkstückträger (25 bis 36, 36', 36'') von der Transporteinheit (5) abhebbar sind.Device according to one of claims 1 to 4, characterized in that on the workpiece carriers ( 25 to 36 . 36 ' . 36 '' ) and the transport unit ( 5 ) releasably engageable fixatives ( 40 . 41 ) and that the manipulation unit ( 46 ) a lifting cylinder ( 49 ), with which the workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) of the transport unit ( 5 ) can be lifted. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass die Fixiermittel Vorsprünge (40) und Vertiefungen (41) aufweisen.Apparatus according to claim 5, characterized in that the fixing means projections ( 40 ) and depressions ( 41 ) exhibit. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass die Fixiermittel zum Herstellen einer kraftschlüssigen Verbindung eingerichtet sind.Device according to claim 5, characterized in that that the fixing means for producing a non-positive connection are set up. Vorrichtung nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass wenigstens eine Doppelgruppe (12, 55, 59, 62) mit zwei Doppelarbeitsstationen (13, 14, 56, 57, 60, 61, 63, 64) vorhanden ist, an denen die Werk stückträger (25 bis 36, 36', 36'') über zwei einfache Bearbeitungszeiträume verbleiben.Device according to one of claims 1 to 7, characterized in that at least one double group ( 12 . 55 . 59 . 62 ) with two double workstations ( 13 . 14 . 56 . 57 . 60 . 61 . 63 . 64 ) on which the work piece carriers ( 25 to 36 . 36 ' . 36 '' ) remain for two simple processing periods. Vorrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass wenigstens eine Dreifachgruppe (10) mit drei Dreifacharbeitsstationen (7, 8, 9) vorhanden ist, an denen die Werkstückträger (25 bis 36, 36', 36'') über drei einfache Bearbeitungszeiträume verbleiben.Device according to one of claims 1 to 8, characterized in that at least one triple group ( 10 ) with three triple workstations ( 7 . 8th . 9 ) is present at which the workpiece carrier ( 25 to 36 . 36 ' . 36 '' ) remain for three simple processing periods. Vorrichtung nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass wenigstens eine Vierfachgruppe mit vier Vierfacharbeitsstationen vorhanden ist, an denen die Werkstückträger (25 bis 36) über vier einfache Bearbeitungszeiträume verbleiben.Device according to one of claims 1 to 9, characterized in that there is at least one quadruple group with four quadruple work stations on which the workpiece carriers ( 25 to 36 ) remain for four simple processing periods.
DE2003143378 2003-09-17 2003-09-17 Device for processing workpieces at a number of workstations Expired - Fee Related DE10343378B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2003143378 DE10343378B4 (en) 2003-09-17 2003-09-17 Device for processing workpieces at a number of workstations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003143378 DE10343378B4 (en) 2003-09-17 2003-09-17 Device for processing workpieces at a number of workstations

Publications (2)

Publication Number Publication Date
DE10343378A1 DE10343378A1 (en) 2005-05-12
DE10343378B4 true DE10343378B4 (en) 2005-11-24

Family

ID=34428095

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003143378 Expired - Fee Related DE10343378B4 (en) 2003-09-17 2003-09-17 Device for processing workpieces at a number of workstations

Country Status (1)

Country Link
DE (1) DE10343378B4 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102023001136A1 (en) 2023-03-23 2024-04-25 Mercedes-Benz Group AG Device and method for producing cable harnesses

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20061905A1 (en) * 2006-10-04 2008-04-05 Cosberg Spa MACHINING AND ASSEMBLY MACHINE FOR SMALL DETAILS
DE102016008948A1 (en) * 2016-07-26 2018-02-01 Fresenius Medical Care Deutschland Gmbh Rotary feedthrough for a transport device and transport device with a rotary feedthrough and method for transporting objects from workstation to workstation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0528619A2 (en) * 1991-08-17 1993-02-24 Autotech Robotics Limited Workpiece handling system
WO2000015420A1 (en) * 1998-09-10 2000-03-23 Leybold Systems Gmbh Device for transporting circular disk-shaped substrates from a feeding station to an end station via several intermediate stations
DE10016897A1 (en) * 2000-04-05 2001-10-18 Supfina Grieshaber Gmbh & Co Device for multiple processing of workpieces in chucks has at least two processing stations for successive or simultaneous processing of workpieces clamped in chucks throughout

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0528619A2 (en) * 1991-08-17 1993-02-24 Autotech Robotics Limited Workpiece handling system
WO2000015420A1 (en) * 1998-09-10 2000-03-23 Leybold Systems Gmbh Device for transporting circular disk-shaped substrates from a feeding station to an end station via several intermediate stations
DE10016897A1 (en) * 2000-04-05 2001-10-18 Supfina Grieshaber Gmbh & Co Device for multiple processing of workpieces in chucks has at least two processing stations for successive or simultaneous processing of workpieces clamped in chucks throughout

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102023001136A1 (en) 2023-03-23 2024-04-25 Mercedes-Benz Group AG Device and method for producing cable harnesses

Also Published As

Publication number Publication date
DE10343378A1 (en) 2005-05-12

Similar Documents

Publication Publication Date Title
DE4323935C1 (en) Machine for the fine machining of tooth flanks of gear-shaped workpieces with an internally toothed tool
DE4408449A1 (en) Transport system
EP1979128B1 (en) Apparatus for handling parts of any kind, in particular for the linear loading and unloading of machines
DE3722180C2 (en) Transfer machine
EP0705655A1 (en) Work machine with relative movable rotating devices
DE102006020922A1 (en) Device for processing components of a motor vehicle body
DE3244019C2 (en) Industrial robots
DE102013103904B4 (en) Brush manufacturing device
DE102015111468A1 (en) Processing machine with new workpiece loading device
DE10343378B4 (en) Device for processing workpieces at a number of workstations
DE102007009329A1 (en) Machining line, has processing units provided between receiving and unloading stations, and loading units displaceably located on transport path, where each loading unit transports workpieces and is independently moved on transport path
EP1927429A1 (en) Machine tool with tool magazine
DE3914008C2 (en)
DE3001396A1 (en) Machine tool with indexing tool head - has transfer unit between head and endless conveyor for tool carriers in tool magazine carriage
DE2239856A1 (en) THREAD TURNING MACHINE
DE102008005956B4 (en) Machining center with workpiece changer and setup station
DE3048738A1 (en) Multistation circular saw tooth machining unit - has swivel arms of indexing latches mechanically adjustable for different saw blade dia.
DE2810382A1 (en) Automatic welding device for assembling silencer - includes horizontal transporter and revolving welding fixture
AT403690B (en) Apparatus for cutting a glass plate and for removing a coating from the glass plate
EP1882550B1 (en) Device for processing the finish of workpieces
DE1453268A1 (en) Finger joint milling machine
WO2006136128A2 (en) Adapter system and quick-change device comprising an adapter system
DE2025435A1 (en) Machine for printing, painting, finishing, labeling etc. of tubes, sleeves or tubular workpieces in a continuous flow
DE409065C (en) Shaping machine, planing machine or related machine tool with a reciprocating ram
DE10257634A1 (en) Transporter device for e.g. transfer station for component processing moves parts into working area, out of area after finishing, and to next working station

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8364 No opposition during term of opposition
8327 Change in the person/name/address of the patent owner

Owner name: SEITZ ENGINEERING GMBH, 77948 FRIESENHEIM, DE

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20140401